Topics

Introduction ICSS Concept & Features ICSS Key Components Conclusion

Copyright © Yokogawa Electric Corporation

-2-

ICSS System Architecture CCR

Instrument Room

Vnet /IP Network

Vnet/IP Network

DCS

Safety

DCS

Safety

SAR2-SS1 Vnet/IP Network

Vnet/IP Network

DCS

DCS

Safety

RDS

RDS Vnet/IP Network

Vnet /IP Network DCS

Safety

Vnet /IP Network Safety

DCS

Well heads Copyright © Yokogawa Electric Corporation

Well heads -3-

Vnet /IP Network DCS

Safety

Safety

CENTUM VP System Configuration – Major components Client PC

Operator Station (HIS) Asset management station

PRM

Enclosed Display Style Console HIS

Dual Redundant Vnet/IP Real-time Control Network

Open Display Style Console Desktop type HIS HIS

FCS

3rd party wireless gateway

Ethernet TSE server an/or ENG

ProSafe-RS SENG

Safety Instrumented System Controller

ExaQuantum ExaOPC (PIMS) (OPC server)

Sub system gateway

ESD / F&G Field Network ProSafe-RS SCS

Unified Gateway Station (UGS) RTU/PLC

Copyright © Yokogawa Electric Corporation

• Single Window Operation • Integrated • Scalable • Reliable • Open -4-

Yokogawa and the Digital Oil Field Single Window Operation

True integration of safety system with DCS – Common architecture simplifies engineering – Common HMI improves operational efficiency

Alarm integration Operational integration

ProSafe-RS Integrated Safety System safeguards your plant and operations Copyright © Yokogawa Electric Corporation

-5-

Proven Experience

Network Fault Tolerant

Cyber Certification

Reliable

Lost data was recovered

Digitally Enabled

Programming Languages

Intelligent Controller

Commns. Independent

In all Process Plants & pipelines

Application Portfolio

DNA 99.99999%

Copyright © Yokogawa Electric Corporation

-6-

Unified Gateway Station

New Approach

Central Processing Facility Simplified architecture for all subsystems - Unified interface engineering - Facilitate easier change management - Various Interface available • MODBUS TCP, MODBUS RTU • EtherNet/IP • OPC DA and OPC AE - STARDOM controller without OPC server - ADL is available between FCS and UGS - Redundant configuration

Controller

OPC Server

3rd Party PLC

Modbus

3rd Party PLC

Copyright © YMA

UNIFIED GATEWAY (UGS)

EtherNet/IP

OPC Server

3rd Party PLC

-7-

AB PLC

STARDOM

Yokogawa and the Digital Oil Field Scalable System CENTUM VP is available from small to large scale DCS System Sizing Total number of stations (FCS + HIS) per domain Maximum number of domains Total tag capacity per system

Min. Configuration

Max. Domain Configuration

Max. No. of Tags Max. No. of Stations

: 64 stations (Total 1024 /system) : 31 domains : 1,000,000 tags

Max. System Configuration

: 100,000 per HIS : 64

Max. No. of Domains: 31 Copyright © Yokogawa Electric Corporation

-8-

Pair & Spare CPU Architecture Both CPU modules are processing independently, so CENTUM achieves real bumpless switchover (For Redundancy purpose) A pair of CPU chips is on each CPU module

Vnet/IP

Power card

Vnet/IP I/F

CPU 1

CPU 1

CPU 2

CPU 2

Comparator

Main memory with ECC

Comparator

CPU module

Vnet/IP I/F

– Each CPU is processing independently

PIO I/F

PIO I/F

PIO I/F

PIO I/F

IO bus I/F

IO bus I/F

Coupler

Coupler

Copyright © Yokogawa Electric Corporation

CPU module Main memory with ECC

Power card

Result checking – Processed results of CPUs are every time compared each other – If the results are not congruous, control switches to the stand-by module (To avoid the effect of transient error)

I/O bus -9-

Versatile Redundant Options - VMR

Redundancy for Enhanced Availability with no SIL Degradation.

SIL3

Input

CPU

Output

Circuit, MPU

MPU, memory

Circuit, MPU

Circuit, MPU

MPU, memory

Circuit, MPU

Circuit, MPU

MPU, memory

Circuit, MPU

Circuit, MPU

MPU, memory

Circuit, MPU

Copyright © Yokogawa Electric Corporation

- 10 -

Oil & Gas References User

Loc

Scope

Hard I/Os

Value

KHURAIS CPF

KSA

ICSS-PCS

30,000

20M+

ADCO ASAB

UAE

ICSS

20,000

12M+

HAWIYAH GAS PLANT

KSA

ICSS BROWNFIELD EPIC

35,000

30M+

PS2, PS3

QATAR

ICSS BROWNFIELD EPIC

5,000

17M+

PDO KAUTHER

OMAN

ICSS

7,000

5M+

ALGERIA

ICSS SCADA

28,000

10M+

ADMA OPCO SARB/ULFFD/A NSFFD

UAE

ICSS MAC

65,000

50M+

ZADCO UZ750K

UAE

ICSS MAC

45,000

30M+

EL MERK

Copyright © Yokogawa Electric Corporation

- 11 -

Real time Control network (Vnet/IP)

Copyright © Yokogawa Electric Corporation

- 12 -

Evolution of CENTUM - 39 years of Heritage 2011

2008 CENTUM VP

2001 2005 CENTUM CS 3000

1998 1993

10 MBPS Dual Redundant Token Pass V net

HF-Bus 1MBPS Dual Redundant Token Pass

1983

1988

CENTUM V

CENTUM-XL

COPS2 COPSV

CENTUM CS

CENTUM CS 3000

ICS

HIS Vnet/IP

1Gbps Dual Redundant

1Gbps Dual Redundant

FCS ABC

ENGS

PFCS LFCSKFCS

EOPS

CFCS EFCD

F-Bus 250 KBPS Dual Redundant Token Pass

FFCS

Vnet/IP

FCS

1975 CFCS2 CFCD2 CFFS

AVR

HIS

CENTUM COPS

HIS HIS

PICS

EWS

UGS

R3

CFCS CFCD Copyright © Yokogawa Electric Corporation

- 13 -

FFCS

350MHz, 128MB New ESB modules 14 Nodes, 50 KM

Control Network (Vnet/IP)

Open

Client PC

Reliable

Realtime

Operator Station (HIS) Asset management station

PRM

Enclosed Display Style Console HIS

Dual Redundant Vnet/IP Real-time Control Network

Open Display Style Console Desktop type HIS HIS

FCS

3rd party wireless gateway

Ethernet TSE server an/or ENG

ProSafe-RS SENG

Safety Instrumented System Controller

ExaQuantum ExaOPC (PIMS) (OPC server)

Sub system gateway

ESD / F&G Field Network ProSafe-RS SCS

Unified Gateway Station (UGS) Subsystems

Copyright © Yokogawa Electric Corporation

-Vnet/IP: Real-time Control Network -Ethernet: Information Network -Exaopc: OPC Server -Exaquantum : Plant information management system - 14 -

ICSS System Architecture – Domain Structure

Multiple-domain configuration for Vnet /IP ENG HIS SENG IP Vnet/IP

Domain 1

HIS

HIS

L3 switch

HIS/ENG

HIS

HIS/ENG

Vnet/IP

Domain 2

Vnet/IP

Domain 4

Domain 3 Copyright © Yokogawa Electric Corporation

Vnet/IP

- 15 -

HIS

Field Control Station (FCS)

Copyright © Yokogawa Electric Corporation

- 16 -

Field Control Station (FCS) Client PC

Operator Station (HIS) Asset management station

PRM

Enclosed Display Style Console HIS

Dual Redundant Vnet/IP Real-time Control Network

Open Display Style Console Desktop type HIS HIS

FCS

3rd party wireless gateway

Ethernet TSE server an/or ENG

ProSafe-RS SENG

Safety Instrumented System Controller

ExaQuantum ExaOPC (PIMS) (OPC server)

Sub system gateway

ESD / F&G Field Network ProSafe-RS SCS

Unified Gateway Station (UGS) Subsystems

Copyright © Yokogawa Electric Corporation

-Vnet/IP: Real-time Control Network -Ethernet: Information Network -Exaopc: OPC Server -Exaquantum : Plant information management system - 17 -

Yokogawa DCS Solutions –System Architecture L2 Router

Bus 1 Open

Bus 2 Vnet/IP Data Highway – 1 Gbps

Reliable

Field Control Unit (FCU)

Realtime

Remote I/O Bus – 50 km max

Redundant Controllers & Vnet/IP Communications

Local FIO Node (FIO)

Maximum FIO Nodes / FCU 14 (includes the FCU node) Maximum FIO Nodes / FCU 14 (includes the FCU node) Maximum Local FIO Nodes 10 Maximum Local FIO Nodes 10 Maximum Remote FIO Nodes 13/FCURemote - 8/remote line Maximum FIObus Nodes 13/FCU - 8/remote bus line

Redundant Node Interface Units

Local I/O Bus – 128 Mbps Remote I/O Bus – 128 Mbps

Local FIO Node (FIO)

Redundant Power Supplies

Copyright © Yokogawa Electric Corporation

- 18 -

FCS (Field Control Station) High availability process controller – Seven 9’s (99.9999959) hardware availability – Pair & Spare technology for higher control loop availability Large capacity Controller – One controller handles 1,760 analog signals and 4,096 digital signals – Various field digital protocols can be handled • Foundation Fieldbus, ISA100, PROFIBUS, EtherNet/IP, HART, etc – Up to 13 extra I/O racks – Up to 50km distance remote I/O rack Various types of control functions available – Regulatory Control blocks, Sequence Control Blocks, Arithmetic blocks, etc – 7,000 functions work on a controller Self-Independent controller – All the control application runs in the highly reliable controller hardware

Copyright © Yokogawa Electric Corporation

- 19 -

Key-Technologies for Highly Available FCS Extremely low failure rate design of each hardware Self-diagnosis function.

– Each portion is checked just before working. – If some abnormalities are detected, the module set its status flag as FALSE

Dual hardware configuration.

– Each of dual hardware components is checking the status flags of the partner hardware through backplane bus

Real-time abnormality detecting Seamless switching.

– Immediately switching from the active module to the stand-by module without affecting the input / output for process.

Hot swapping

– Abnormal modules can be removed and spare modules can be inserted instead without stopping any other input/output or any other hardware.

Copyright © Yokogawa Electric Corporation

- 20 -

Pair & Spare CPU Architecture Both CPU modules are processing independently, so CENTUM achieves real bumpless switchover (For Redundancy purpose) A pair of CPU chips is on each CPU module

Vnet/IP

Power card

Vnet/IP I/F

CPU 1

CPU 1

CPU 2

CPU 2

Comparator

Main memory with ECC

Comparator

CPU module

Vnet/IP I/F

– Each CPU is processing independently

PIO I/F

PIO I/F

PIO I/F

PIO I/F

IO bus I/F

IO bus I/F

Coupler

Coupler

Copyright © Yokogawa Electric Corporation

CPU module Main memory with ECC

Power card

Result checking – Processed results of CPUs are every time compared each other – If the results are not congruous, control switches to the stand-by module (To avoid the effect of transient error)

I/O bus - 21 -

Field Digital Communication Protocols ALE111 Ethernet Communications Module •EtherNet/IP (CIP) •Modbus TCP •PLC-5/SLC500 Ethernet Communication

ALP111 PROFIBUS-DP Module

CIP

• Redundant Configuration is available.

Control Logix

PROFIBUS-DP Linking Device

ALF111 Foundation Fieldbus Module • • • •

DeviceNet

World’s First Dual-Redundant Fieldbus Ports 4 Ports per ALF111 31 Devices per Port 1,500 Fieldbus faceplate blocks per FCS

Modbus/TCP

Foundation Fieldbus

PLC-5

HART I/O

Copyright © Yokogawa Electric Corporation

- 22 -

4-20mA

SLC500

ProSafe-RS

Copyright © Yokogawa Electric Corporation

- 23 -

Field Control Station (FCS) Client PC

Operator Station (HIS) Asset management station

PRM

Enclosed Display Style Console HIS

Dual Redundant Vnet/IP Real-time Control Network

Open Display Style Console Desktop type HIS HIS

FCS

3rd party wireless gateway

Ethernet TSE server an/or ENG

ProSafe-RS SENG

Safety Instrumented System Controller

ExaQuantum ExaOPC (PIMS) (OPC server)

Sub system gateway

ESD / F&G Field Network ProSafe-RS SCS

Unified Gateway Station (UGS) Subsystems

Copyright © Yokogawa Electric Corporation

-Vnet/IP: Real-time Control Network -Ethernet: Information Network -Exaopc: OPC Server -Exaquantum : Plant information management system - 24 -

Topics

ProSafe-RS Positioning Certification Key Components Safety Architectures & Redundancy Diagnostics Advanced Features Conclusion.

Copyright © Yokogawa Electric Corporation

- 25 -

Safety Product Positioning

No SIL

SIL 1

SIL 2

SIL 3

SIL 4

Control

Asset Protection

PSD F&G

ESD PSD F&G

HIPPS sub sea nuclear

Copyright © Yokogawa Electric Corporation

- 26 -

TÜV Certification

First certified for SIL3 applications by TÜV Rheinland on 10th March, 2005.

Visit TÜV homepage

http://www.tuvasi.com/ Copyright © Yokogawa Electric Corporation

- 27 -

Certified Applications

ESD, PSD, BMS and F&G included. Copyright © Yokogawa Electric Corporation

- 28 -

Logic Solver Components SCS (Safety Control Station) comprises – –

one SCU (Safety Control Unit) SNUs (Safety Node Units)

110 I/O modules can be mounted – –

More than 1500 I/O points per SCS Redundant 800 points /100mS scan

Safety communication can be established between different SCS via V net, V net/IP –

Safety communication data is protected by CRC, Seq.No, time stamp, SRC/DST add.

Transferring the safety I/O data between CPU module and I/O modules via ESB/SB Bus (Safety I/O Bus) Communication data between CPU and I/O is also protected.

Copyright © Yokogawa Electric Corporation

- 29 -

Versatile Modular Redundancy Multiple redundant configuration are available

Fully Redundant

– – –

Fully single Fully redundant Partially redundant

– – –

Power supply module V net interface unit I/O Bus (SB-Bus) interface module are always in redundant.

Redundant switch over is controlled by each redundant pair, not controlled by processor module. (partial switch over)

Partially Redundant

Copyright © Yokogawa Electric Corporation

Fully Single

- 30 -

Remote IO

Distance up to 50km – only for Vnet/IP SCS

V-net/IP

CPU node (SSC50□)

0-5Km

5-50Km

Master

SNT401

SNT411

Slave

SNT501

SNT511

ESBbus

IO node (SNB10D)

Optical fiber max 50km x 4 (2 pairs) Max 50km, 9xSNB10D IO node (SNB10D) ESBbus

IO node (SNB10D)

Copyright © Yokogawa Electric Corporation

- 31 -

Highly Scalable Architecture

Distribution on Vnet 64 stations in a domain – 100 thousand tags

V net/IP

1000 I/O per CPU rack plus I/O racks

Total 14 racks

50 I/O per CPU rack . Copyright © Yokogawa Electric Corporation

- 32 -

Single SIL3

SIL3 with single Input-CPU-Output modules – Internal redundancy inside module using proven “Pair & Spare” concept from Centum DCS Single CPU module

Single Input module Single Output module Input

Circuit, MPU

CPU

Circuit, MPU

Copyright © Yokogawa Electric Corporation

MPU, memory

MPU, memory

- 33 -

Output

Circuit, MPU

Circuit, MPU

Increased Availability With No SIL Degradation

High availability via redundant CPU & I/O module – Proven redundant technology from Centum DCS – Redundant options are selectable part by part! Redundant CPU module

Redundant Input module Input

Circuit, MPU

Redundant Output module CPU

MPU, memory

Circuit, MPU

Input

Circuit, MPU

MPU, memory

CPU

Circuit, MPU Copyright © Yokogawa Electric Corporation

MPU, memory

MPU, memory

- 34 -

Output

Circuit, MPU

Circuit, MPU

Output

Circuit, MPU

Circuit, MPU

Versatile Redundant Options

Redundancy for Enhanced Availability with no SIL Degradation.

SIL3

Input

CPU

Output

Circuit, MPU

MPU, memory

Circuit, MPU

Circuit, MPU

MPU, memory

Circuit, MPU

Circuit, MPU

MPU, memory

Circuit, MPU

Circuit, MPU

MPU, memory

Circuit, MPU

Copyright © Yokogawa Electric Corporation

- 35 -

Integrated Control & Safety

DCS and SIS share the Vnet DCS and SIS are integrated physically, segregated logically. Vnet/IP Domain A

Safety ENG

Vnet/IP Domain C ENG

HIS/ENG

HIS

SENG

L3 Switch

L3 Switch Repeater

FCS

Safety Controller

Optical Repeater

Safety Controller

FCS

FCS

FCS L3 Switch

Optical Repeater

Vnet/IP Domain B SENG

Safety Controller

FCS

Copyright © Yokogawa Electric Corporation

Safety Safety Controller Controller - 36 -

Safety Controller

Communication on Vnet/IP Centum VP HIS

Vnet/IP Safety Comm.

Vnet comm.

Safety Controller (SCS)

S. Data

Centum VP FCS

S. Data N. Data

Safety Layer

N. Data

Safety Layer

7 2 1

7 2 1

Copyright © Yokogawa Electric Corporation

- 37 -

N. Data

7 2 1

Advanced Features Plant Resource Manager

from PST package

SIL3 AIO with HART

AIO with FF/HART

PST

Control Valves

Safety Valves

Diagnostic information of field equipments by FF/HART

Copyright © Yokogawa Electric Corporation

- 38 -

Integration with other systems

Copyright © Yokogawa Electric Corporation

- 39 -

Field Control Station (FCS) Client PC

Operator Station (HIS) Asset management station

PRM

Enclosed Display Style Console HIS

Dual Redundant Vnet/IP Real-time Control Network

Open Display Style Console Desktop type HIS HIS

FCS

3rd party wireless gateway

Ethernet TSE server an/or ENG

ProSafe-RS SENG

Safety Instrumented System Controller

ExaQuantum ExaOPC (PIMS) (OPC server)

Sub system gateway

ESD / F&G Field Network ProSafe-RS SCS

Unified Gateway Station (UGS) Subsystems

Copyright © Yokogawa Electric Corporation

- 40 -

Challenges for multiple sub-systems integration Central Processing Facility

- Complex architecture depending on subsystem - Complex engineering - Cumbersome change management

Traditional Approach

OPC Client

Controller

Modbus RTU

3rd Party PLC

Modbus TCP

3rd Party PLC

Copyright © Yokogawa Electric Corporation

OPC Server

3rd Party PLC

- 41 -

OPC Client

OPC Client

OPC Server

AB PLC

OPC Server

STARDOM

Unified Gateway Station

New Approach

Central Processing Facility Simplified architecture for all subsystems - Unified interface engineering - Facilitate easier change management - Various Interface available • MODBUS TCP, MODBUS RTU • EtherNet/IP • OPC DA and OPC AE - STARDOM controller without OPC server - ADL is available between FCS and UGS - Redundant configuration

Controller

OPC Server

3rd Party PLC

Modbus

UNIFIED GATEWAY (UGS)

EtherNet/IP

3rd Party PLC

Copyright © Yokogawa Electric Corporation

3rd Party PLC

- 42 -

OPC Server

AB PLC

STARDOM

Field Digital Communication Protocols ALE111 Ethernet Communications Module •EtherNet/IP (CIP) •Modbus TCP •PLC-5/SLC500 Ethernet Communication

ALP111 PROFIBUS-DP Module

CIP

• Redundant Configuration is available.

Control Logix

PROFIBUS-DP Linking Device

DeviceNet

Modbus/TCP

Copyright © Yokogawa Electric Corporation

PLC-5

- 43 -

SLC500

Operation and Monitoring

Copyright © Yokogawa Electric Corporation

- 46 -

CENTUM VP System Configuration – major components Client PC

Operator Station (HIS) Asset management station

PRM

Enclosed Display Style Console HIS

Dual Redundant Vnet/IP Real-time Control Network

Open Display Style Console Desktop type HIS HIS

FCS

3rd party wireless gateway

Ethernet TSE server an/or ENG

ProSafe-RS SENG

Safety Instrumented System Controller

ExaQuantum ExaOPC (PIMS) (OPC server)

Sub system gateway

ESD / F&G Field Network ProSafe-RS SCS

Unified Gateway Station (UGS) Subsystems

Copyright © Yokogawa Electric Corporation

-Vnet/IP: Real-time Control Network -Ethernet: Information Network -Exaopc: OPC Server -Exaquantum : Plant information management system - 47 -

Features of HIS (Operation Station) Large Capacity ( No License )

– Max. No. of Tags: 1,000,000 per system – Max. Graphic Displays: 4,000 per HIS – Real-time trend Points: 3,328 per HIS

Operation environment

– Single, dual, Quad LCD. – Desktop, Solid Style Console, and Open Style Console – Latest Microsoft Windows OS platform

Performance and function for achieving real-time plant operation – – – – – –

1 second graphic call up 1 second screen refresh Real-time trend time based at Controller 1 msec SOE at IO level Frame display Window History function

Real-time Alarm Management View Copyright © Yokogawa Electric Corporation

- 48 -

HIS Screen Overview System Message Banner – Buttons to call-up the alarm & event dialogs quickly – Latest 3 alarm messages are always displayed in real-time

Navigation – Graphics & trend views are arranged in a hierarchy display – Alarm status are shown as the icon color

Favorite – Frequently used views can be registered by operators’ drag & drop

Operation History – Last 20 call-up operations are listed – Double-click the listed operation to call up the same view again

Graphics, trend graphs and other views are displayed

Copyright © Yokogawa Electric Corporation

- 49 -

Alarm Handling Real-time Alarm View (CAMS) – Both process alarm and system alarm are covered – Alarms from the ProSafe-RS safety system and from the PRM Plant Asset Management system are also covered – A single operation is required to call up the related dialogs – The functions to reduce the operators’ overload to avoid overlook of important alarms are available • Filtering, Eclipsing, Suppression, Shelving – Alarm engineering is available in the standard engineering function

Alarm Set-point Management

– The set-points are managed in a master database • Master database is initiated in the alarm design phase • Master database can be downloaded to the HIS, FCS • The function to show the deviations clearly between the master and the current alarm set-points is available on the HIS • Import function to reflect the current set-points to the master database is available for process improvement purpose

Copyright © Yokogawa Electric Corporation

- 50 -

Real-time Alarm View (CAMS) The latest three alarms are always shown

Click blinking icons to open the CAMS View

Shelving Pane – Non-urgent alarms can be shelved in temporary – Operators can concentrate to the alarms which requires urgent actions

Filter Pane – Based on the priority, consequence, tag, etc – Only the related alarm message for the operator can be shown to reduce the workload. Copyright © Yokogawa Electric Corporation

- 51 -

Alarm list is shown here

Trend Graph Display Example Trend line Assignment

Index

– Drag & Drop to assign the data points from any trend blocks on a trend view

– Up to three indexes can be displayed – Data values on the trend graphs can be checked

Faceplate Display

Legend Area – Assigned data points and the current data are shown – Check/Uncheck to show/hide trend line Copyright © Yokogawa Electric Corporation

- 52 -

– Click the Legend Area, then the Faceplate is shown next to the trend graph view

Engineering Function

Copyright © Yokogawa Electric Corporation

- 53 -

Quick & High-quality Engineering Minimized shutdown time or reconstruction – The longer time links the larger financial disadvantage

CENTUM VP provides the following configuration environment – – – – –

Total Project management. Reuse of configuration data Multiple Engineers can work simultaneously. On-line maintenance. DCS Tag equalization for Historian

Copyright © Yokogawa Electric Corporation

- 54 -

Advanced Debugging for Project Database Virtual test – – – –

Normal operation is available.

Check simple entry mistakes. Try new control logic. Check graphic work Operator training

HIS

Memory in PC FCS FCS FCS FCS Simulator

Target test – Check actual FCS CPU performance – Check the actual relationship among each station.

DCS and ESD Integrated simulation OTS platform readily available Minimum check at Start up ! Copyright © Yokogawa Electric Corporation

- 55 -

oo oo oo ooo

Virtual input is Virtual input is created from the created from the output from FCS output from FCS simulator.

For HIS, this pretends FCS

FCS memory

Field devices devices Field

Auto Auto wiring wiring

For FCS For FCS, this simulator, this pretends the pretends the actual plant. actual plant.

Start plant) Targetup test Virtual test! (Actual Actual plant

Safety Integration Integrated Monitoring

DCS and SIS are ’truly integrated’ – SIS and DCS data are within the same window – SIS data can be used in the FCS – Integrated SIS & DCS Sequence of Event (SOE) data CENTUM VP

Time shared on the same network

FCS

Vnet/IP

SIS data can be used in FCS ProSafe-RS SCS

SCS and FCS Faceplates

-

Faceplate Trend Graphic System status Alarm SOE

System status

SCS

SCS

FCS

SOE Viewer FCS and SCS information integrated

CENTUM VP FCS

Copyright © Yokogawa Electric Corporation

- 56 -

Yokogawa’s PRM (Asset Management)

Copyright © Yokogawa Electric Corporation

- 57 -

Field Devices – Data flow to PRM

Copyright © Yokogawa Electric Corporation

- 58 -

Color Status for Field Devices in Maintenance Alarm

Status icon display in Navigator windows Plant View

Network View

Icon

Detail

(Green)

Healthy by Device Patrol

(Red)

Maintenance alarming by Device patrol

(Yellow)

Maintenance Warning By Device patrol

New

(Gray)

Communication failure

(White)

Status not yet confirmed Alarm Off

(Background Gray) Un-confirmed alarm

Copyright © Yokogawa Electric Corporation

- 59 -

NAMUR Recommendation NE107 (FF-912)

There are four alarm categories defined as per the NE107 specification, Failed (Failure), Off-Specification (Out of Specification), Maintenance (Maintenance Required), and Check function (Check Function).

Copyright © Yokogawa Electric Corporation

- 60 -

System 1 Event Messages

View System 1 event messages as PRM maintenance alarms in PRM

Copyright © Yokogawa Electric Corporation

- 61 -

Integration with GE Energy’s System 1 Call Detail panel of System1

PRM navigator panel displays status of System1.

Machinery condition monitoring

PRM monitors asset conditions

Copyright © Yokogawa Electric Corporation

- 62 -

Plant Asset Data Integration Device information can be called-up

Device status

Help

Device diagnostic information

Result of device Diagnosis Copyright © Yokogawa Electric Corporation

- 63 -

Multi Valve Vendor PST Scheduler Multi-vendor ESD Valves Grouped per Process area  Time scale from minutes to a year 

Calendar based Scheduling

Results & Coming Schedule

Copyright © Yokogawa Electric Corporation

- 64 -

PST Notification

Maintenance Alarm Message in PRM Operation Guidance Message in CENTUM HIS

Copyright © Yokogawa Electric Corporation

- 65 -

Yokogawa FF Solutions

Copyright © Yokogawa Electric Corporation

- 66 -

Foundation Fieldbus on CENTUM VP Integrated DCS with Fieldbus

Ethernet HIS

•Operation •Engineering

PRM

HIS-ENG

V net

FCS

•Control •FF Block

•Device Monitoring •Maintenance Management •Advanced Diagnosis •Link Master (LAS) •Redundancy •4 ports supported

ALF111 (master) ALF111 (slave) Power Supply

IO Module for FF_H1

4-20 mA

H1 Fieldbus Fieldbus Equipment

Conventional Equipment

Copyright © Yokogawa Electric Corporation

- 67 -

Signal Flow (Analog FF loop)

12 Devices

12 Devices Copyright © Yokogawa Electric Corporation

- 68 -

Evolution by Fieldbus : Operations and Maintenance Maintenance Cost reduction: Realize of Predictive maintenance Fieldbus System 4~20mA Digital communication (PRM) Plant Operation

Remote maintenance: -Parameter change -Device alarm event -Device detail display -Advanced diagnosis

Analog PV PV

Diagnosis status Device Alarm

MV

AI

etc

PID

AI

AO Maintenance work in site: -Parameter change -Periodical patrol -Confirmation on site

Intelligent Device Diagnosis etc

Copyright © Yokogawa Electric Corporation

- 69 -

Salient Features of Centum VP (DCS) Features

Benefits to Users

Simple and Common Architecture

Ease in Operation, Monitoring and Maintenance

Globally Distributed Database

No Server required. No loss of Data on HMI failure

Unique Pair and Spare architecture.

Bumpless transfer without process upset.

V-Net/IP, 1 Gbps Network. World’s Fastest

Smooth Operator interaction with process

Open Architecture and Interoperability

Easier integration with third party system, field devices

Tag License per Operator station (100,0001,000,000 Tags)

No tag limitation. No cost during project expansion

Test Function : Simulator

Faster Installation and Commissioning

Easy Software Upgrade and Various Migration Tools Easy upgradation, expansion with less time and cost

Final Benefit : Total Cost of Ownership (TCO) is the lowest in Industry Copyright © Yokogawa Electric Corporation

- 70 -

Salient Features of ProSafe RS Features

Benefits to Users

Versatile Modular Redundancy - VMR

Minimal Failures - Fault Tolerant - High Availability

Each modules from Input to Processor to Output are equipped with Dual CPUs and Dual Circuits

No Time Restriction in degraded mode as SIL 3 Certified with Single Modules.

No Emergency operator and spare inventory required to keep continuous operation.

On-Line addition of IO modules / IO Node On-Line Scan time change

Easy future add-ons / expansions : Lower overhead cost as no shutdown needed No manual intervention and shutdown. Large IOs can be added

Analogue cards are HART compatible

No HART Mux/panels required. Less Hardware. Less Foot Print. Less Power Consumption. Comprehensive Integrated AMS on single DCS PRM

Corrosive Coating up to ‘G3’ Level is a standard feature.

High physical strength : Long Life of Components and System

Temperature withstand up to 70Deg

Suitable for Outdoor application : Low Cost

Copyright © Yokogawa Electric Corporation

- 71 -

Salient Features of ProSafe RS Features

Benefits to Users

DO Module with 2 Amp is available for High Current

No relay needed so less intermediate components and (e.g. Horns and Beacons). Line Monitoring achievable.

Line Monitoring for IO Modules

Easy Diagnostics and Maintenance - Short and Open Circuit detection

1 ms Real time SOE In-Built Standard Feature

Accurate post incident analysis. Pin point the root cause.

ONE Network, ONE Window

No additional gateway required. No Engineering. Less Hardware, Less failures, Less Foot Print and above all very efficient due to single window

CPU Memory Flash Memory High capacity Memory 32 MB. Battery Backed RAM Copyright © Yokogawa Electric Corporation

Smooth handling of large database. Instantaneous start and protect logics in case of Power Failure. Safety Ensured.

- 72 -

BENEFITS OF INTEGRATED DCS SYSTEMS Yokogawa Solution

Non Yokogawa Solution

Attributor

Vnet I/P

MODBUS/OPC or loosely connected

Integration Level 

Integrated Same as existing DCS network 

Separated Via OPC server

SOE Resolution 

1msec  Real Time 

OPC A&E based

Alarm Detection 

1 Sec 

3 to 5 Sec 

SOE Screen (Operator Station) 

Integrated in DCS Alarm display 

Separate 

Time Synchronization 

1 msec 

Based on SNTP server resolution.

Complex to achieve as DCS ‐ Same as DCS. No configuration required.  Color discrimination for DCS and SIS is available.  Extensive configuration required. No  direct faceplate block available in  FCS. Control Network is loaded. 

Faceplate 

Tag Mapping 

Fully integrated – instantaneous 

OPC Mapping  

Diagnostics 

Through integrated System display page 

Depend upon ability of the DCS  system (via graphics page) 

Data Transfer

Deterministic 

Non‐Deterministic

Trend Limitation

No limitations. Trends at one‐second intervals can be  displayed.

Trends at one‐second intervals  cannot be displayed.

Copyright © Yokogawa Electric Corporation

- 73 -

BENEFITS OF INTEGRATED DCS SYSTEMS Yokogawa Solution

Non Yokogawa Solution

Attributor

ProSafe RS

MODBUS/OPC or loosely connected

Shared Maintenance Procedure 

Lower Maintenance Overhead 

Dual maintenance Overhead 

Redundancy

Secured, Fully, Reliable

Switch Over time

Instantaneous (less than 1ms)

Loosely redundant, engineering  solution 10‐15sec

Redundancy Software

Not required. Seamlessly integrated.

Required.

Reboot of Gateway during data  changes.

Not Applicable

Reboot of OPC server is necessary  for changes. 

Engineering

Easy, seamless

Complex.

FCS cannot access to Gateway

Not Applicable, seamless.

Not Possible.

Asset Management 

Integrated (through HART Pass Through, using DCS &  Separate (Via HART multiplexers &  ESD Communication infrastructure)  Separate Network required) 

Attributor

ProSafe RS

OPC Interface

Shared Maintenance Procedure 

Lower Maintenance Overhead 

Dual maintenance Overhead 

Copyright © Yokogawa Electric Corporation

- 74 -

Conclusion - ProSafe-RS

ProSafe-RS provides Best In Class Combination of Safety, DCS Integration and Asset Management Flexible architectures without SIL compromise Advanced diagnostics for maximum process availability High environmental robustness for remote mounting.

Copyright © Yokogawa Electric Corporation

- 75 -

Conclusion - Centum VP

Stable System Architecture Solutions-Oriented Approach Strong Production Management & Optimization Solutions Broad Product, Application & Service Offering Open Communication Infrastructure Comprehensive Lifecycle Support

Copyright © Yokogawa Electric Corporation

- 76 -

View more...

Comments

Copyright ©2017 KUPDF Inc.
SUPPORT KUPDF