WORK BELOW LOWEST FLOOR FINISH (WBLFF)

WBLFF/ SUBSTRUCTURE - COMPONENTS 1. Column bases/Pad Footings/Strip Footing/Pile Caps 2. Column Stumps 3. Ground Beam 4. Bed/Slab

Excavation (m3) Filling (m3) Disposal (m3) Hardcore (m2/m3)

Excavation (m3) Disposal (m3) Filling (m3)

Blinding (m3) Damp-proof membrane (m2) Bed/Slab

Concrete (m3) Formwork (m/m2)

Pad/Strip footing/ Pile caps

Reinforcement (kg)

Excavation (m3)

WBLFF/ Substructure

Concrete (m3) Formwork (m/m2) Reinforcement (kg)

Filling (m3) Disposal (m3)

Ground Beam

Column Stumps

Concrete (m3)

Blinding (m3) Concrete (m3) Formwork (m/m2)

Formwork (m/m2) Reinforcement (kg)

CONCRETE WORK 

F.1  –  GENERALLY 





F.3  –  CONCRETE CATEGORIES

Plain in-situ concrete/ Reinforced in-situ concrete

2. Foundation in trenches

Grade concrete

5. Ground Beam

F.2.1  –  THICKNESS CATEGORIES 



Not exceeding 100mm

3. Isolated foundation bases

7. Pile caps 8. Beds

100mm – 150mm

9. Suspended slabs

150mm – 300mm

15. Isolated columns

exceeding 300mm

16. Steps/staircase

CONCRETE WORKS 

Example:

Plain In-Situ Concrete Grade 7 as specified; blinding screed; laid on earth or hardcore Under pile caps/pad footings/ground beam/grd. Floor slab

Reinforced In-Situ Concrete Grade …… as specified In foundation in trenches In isolated foundation bases to columns (In No………) In ground beams

REINFORCEMENT 



F.8.4 - CLASSIFICATION 

In foundation (bases, ground beam & pile cap)



In ground slabs (beds)



In isolated column (stump)

F.8.5 - CATEGORIES 

Straight and bend bars



Curved bars



Link, stirrups, binders and the like

Straight and bend bars (4 Y12) Link, stirrups, binders and the like (28 R8 - 250) Width  –  Conc. Covers (40mm) + Hooks (24 x diameter of bar)

REINFORCEMENT 

Example:

Reinforcement bars; hot rolled plain round mild steel Reinforcement bars; hot rolled deformed high tensile steel In foundation in trenches In isolated foundations In ground beams In pile caps In pad footings

FORMWORKS 

F.10.1  –  CATEGORIES F.11.1 - Formwork to edges & faces of: 



Foundations and beds (footings, pile caps bases, ground beams)

HEIGHT CATEGORIES (for height n.e. 1.00m) 

Not exceeding 250mm high 250mm – 500mm high 500mm – 1.00m high

FORMWORKS 

Example:

Class F1 formwork as specified to foundation and beds To edges & faces of pile caps To edges & faces of pad footings To edges & faces of strip footings To edges of beds To edges of slabs To ground beams To sides of column stumps

HARDCORE 

D.23 – Classification of materials - Material arising from excavation

FILLING

- Material arising from excavation to be selected and treated

Hardcore of clean hard broken stones to be obtained off site at contractor own source

- Material to be obtained off site at contractor own source 

D.26 – Filling to make up levels >250mm shall be given in m3 250mm shall be given in m3 stating

To make up levels not exceeding 250mm thick; average 250mm thick To make up levels over 250mm thick  To make up l evels over 250mm thick; depositing in layers; ...mm maximum thickness

DAMP PROOF MEMBRANE 

K.1 – Classification of Work  a. Damp proofing & tanking b. Flooring & underlay c. Paving d. Roofing



K.2 – Measurement 1. Description shall include: - Kind & quality of material - Thickness & no. of coats & layers - Nature of base - Surface treatment 2. No deduction shall be made for voids

3. Covering > 300mm wide shall be in m2 < 300mm wide shall be in m (stating the width in stages of 150mm) Classification – a. Flat coverings n.e. 10° (horizontal) b. Sloping covering over 10° but n.e. 45° (horizontal) c. Sloping covering over 45° (horizontal & vertical) 4. Isolated areas n.e. 1.00m2 shall be enumerated

DAMP PROOF MEMBRANE Example: WBLFF Damp Proofing And Tanking Coverings; 1 layer of Polythene sheet as specified, 1000 gauge or 0.25mm thick; laid on hardcore Over 300mm wide; flat; not exceeding 10° from horizontal; subsequently covered Over 300mm wide; sloping 10 - 45 degrees from horizontal; subsequently covered Over 300mm wide; vertical or sloping over 45 degrees from horizontal; subsequently covered Not exceeding 150mm wide; flat; not exceeding 10° from horizontal; subsequently covered Not exceeding 150mm wide; sloping 10 - 45 degrees from horizontal; subsequently covered Not exceeding 150mm wide; vertical or sloping over 45 degrees from horizontal; subsequently covered

DAMP PROOF MEMBRANE

DAMP PROOF COURSE 

G.28 – Generally 1. Description shall include: - Kind & quality of material - Gauge, Thickness or substances - Number of layers - Composition & mix of bedding material 2. No deduction shall be made for voids n.e. 0.50m2



Example:

BRICKWORK Damp Proof Course Bituminous damp proof course as specified; 150mm laps; bedding in cement mortar (1:1); no allowance in measurement for laps

> 225mm wide shall be in m2

On horizontal surfaces

< 225mm wide shall be in m (stating the width)

On raking surfaces

No allowance in measurement shall be made for laps

On vertical surfaces

Horizontal, raking, vertical & curved work shall be

On curved surfaces

DAMP PROOF COURSE

BRICKWORK  

G.1.1 – Classification for heading a. Foundations b. Load bearing superstructure c. Non-load bearing superstructure



G.3 – Generally 1. Description shall include: a. Kind, quality & size of bricks b. Type of bond c. Composition & mix of mortar  3. Separate classes given stating the thickness a. Walls

Example:

BRICKWORK Foundation 225mm thick Clay brick as specified; in cement and sand (1:3) mortar in English bond Walls/Retaining walls/Lift walls

TUTORIAL 2 WORK BELOW LOWEST FLOOR FINISH

TUTORIAL 2  –  WBLFF WORKS With reference to the following drawings and SMM2, take off the element WBLFF. 1.

Take off WBLFF works for Link House 20' X 70‘ Jenis A4 & A5

2.

Prepare the Bill of Quantity for the work 

Remarks: 

Excavate top soil for re-use in temporary spoil heaps 50m from site



All disposal of excavated material shall be removed from site at contractor own source



Filling of excavation arising – material arising from excavation

TAKING OFF LIST  –  TUTORIAL 2 

Excavation top soil



Removal of excavated top soil



Excavation in pit to receive pile cap



Removal of excavated material



Excavation in rock for pit excavation



Excavation in trench to receive ground beam



Removal of excavated material



Excavation in rock for trench excavation

TUTORIAL 3 WORK BELOW LOWEST FLOOR FINISH



With reference to the following drawings and SMM2, take off the element WBLFF.



This is an individual assignment.



Notes: •

Excavate topsoil 150mm deep to be used on site



Hardcore shall be cleaned broken stones or bricks



Concrete to strip foundation shall be of Grade 20



All bricks shall be well burnt ordinary clay bricks



Damp proof membrane shall be 1000 gauge polythene

9000mm

    m     m      0      0      0      2      1

A

A 8000mm

    m     m      0      5      7      1

    m     m      0      0      3

50mm thk Grade 7 Lean Concrete

750mm