Welltrain Subsea Vertical Kill Sheet - API Field Units - Revised July 2010

July 31, 2022 | Author: Anonymous | Category: N/A
Share Embed Donate


Short Description

Download Welltrain Subsea Vertical Kill Sheet - API Field Units - Revised July 2010...

Description

 

WELL CONTROL PRE-KICK SHEET (SUBSEA ONLY)

Page 1 of 4

Name:…………………………………. Name:…………… ……………………. Date:………… Date:…………………………. ………………. Level:……………………. Level:………… …………. (All depths measured from RKB)

Measured Depth:……………… Depth:……………………7060……… ……7060……………….ft. ……….ft.

True Vert Vertical ical Depth:……7060

ft.

Measured Depth to Casing Shoe:………………… Shoe:………………….ft. .ft.

Casing Shoe TVD:………………… TVD:……………………ft. …ft.

Water Depth:………………… Depth:……………………………………… ……………………....ft. ....ft.

Air Gap:………………… Gap:……………………………… …………… .ft.

CAPACITIES AND VOLUMES DRILL STRING DATA

O.D.

I.D.

W t.

CAPACITY

(in)

(in)

(lb/ft)

(bbl/ft)

x

LENGTH = (ft)

V VO OLUME (bbls)

DRILL PIPE HWDP DRILL COLLARS Total Drillstring

Total Length

CHECK THAT TOTAL LENGTH = MEASURED DEPTH (ft)

 ANNULUS DATA

CAPACITY

x

(bbl/ft)

LENGTH =

(bbls)

VOLUME

(ft)

(bbls)

CHOKE LINE Bit to Shoe Volume

DP/HWDP IN CASING DP/HWDP IN OPEN HOLE COLLARS IN OPEN HOLE

(bbls) Total Length

Total Annulus

Note: Total Length Length may not equal Mea easured sured Depth if choke line is longer than the riser. (ft)

(bbls)

TOTAL TOT AL SYSTEM VOLUME TOTAL DRILLSTRING (SURFACE TO BIT)

(bbls)

RISER DATA

TOTAL SYSTEM SYSTEM VOLUME

TOTAL ANNULUS (BIT TO SURFACE)

+

(bbls)

CAPACITY x (DP/RISER) (bbl/ft)

LENGTH = (ft)

=

(bbls)

VOLUME (bbls)

DP/RISER ANNULUS VOLUME TR-TP-PER-021_Rev0 K3 Reviewed By: L Kenyon

Subsea Kill Sheet API Field Units – K3 Wel Welltr ltrain ain Logo Logo 20 June 2016

 Approved By: L Nally

Page 1 of 4

 

WELL CONTROL PRE-KICK SHEET (SUBSEA ONLY)

KILL LINE

CHOKE LINE

FLEX JOINT

Page 2 of 4

Read and rec recor ord d SL SLOW OW CIR CIRCULAT CULATING ING RA RATES TES Pump No.

Current Mud Weight

Pump Output

(ppg)

(bbls/stk) UPPER  ANNULAR

CHOKE LINE

S.C.R

RISER

CHOKE LINE FRICTION

….. spm CONNECTOR

(psi)

….. spm

LOWER  ANNULAR

=

(psi)

(psi)

(psi)

-

(psi)

=

(psi)

(psi)

-

(psi)

=

(psi)

….. spm SHEAR RAMS

-

Drill String Data Data Drill String Volume (bbls)

UPPER PIPE RAMS

Pump Output (bbls/stk)

÷ Surface to Bit Strokes

Surface to Bit Strokes

= Slow Circulating Rate (spm)

Surface to Bit Time

MIDDLE PIPE RAMS

÷

=

(min)

Open Hole Data LOWER PIPE RAMS

Bit to Shoe Volume (bbls)

Pump Output (bbls/stk)

÷

CONNECTOR

Bit to Shoe Strokes

Bit to Shoe Strokes

= Slow Circulating Rate (spm)

÷

Bit to Shoe Time

=

(min)

 Ann ul us Data Bit to Surface Volume (bbls) CASING SHOE

(ft)

÷

MD

Bit to Surface Strokes

Pump Output (bbls/stk)

=

TVD (ft)

Slow Circulating Rate (spm)

Bit to Surface Strokes

÷

Bit to Surf ace Time

=

(min)

Riser Data DP/Riser Volume (bbls)

Pump Output (bbls/stk)

÷

BIT

TR-TP-PER-021_Rev0 K3 Reviewed By: L Kenyon

(ft)

MD

(ft)

TVD

BOP to Surface Strokes

BOP to Surf ace Strokes

= BOP to Surf ace Time

Slow Circulating Rate (spm)

÷

=

(min)

Subsea Kill Sheet API Field Units - Welltrain Logo 20 June 2016

 Approved By:

Page 2 of 4

 

WELL CONTROL KICK SHEET (SUBSEA ONLY)

Page 3 of 4

Name: ………………… ………………………………................ ……………................

Read and record SIDPP, SICP and PIT GAIN

S.I.D.P.P.

PIT GAIN

S.I.C.P.

............... psi

............... psi ............... bbls

Day: Da y: .. .... .... .... .... .... .... .... .... .... .... ....

Da Date te:: .. .... .... .... .... .... .... .... .... .... .... ....

Tim ime: e: .... ...... .... .... .... .... .... .... .... .... ....

Max. Mud Mud Wt. Casing T.V.D. from RKB

Surface Leak Off Test

Leak Off Test Mud Weight

÷

÷

(psi)

(ft)

0.052

Maximum Mud Weight

=

+

OR

(ppg)

(ppg)

Formation Breakdown Gradient

Maximum Mud Weight

÷

0.052

=

(psi/ft)

M.A.A.S.P. Maximum Mud Weight

Casing T.V.D. from RKB

Drilling Dril ling Mud Weight Weight

-

X 0.052

(ppg)

(ppg) Maximum Allowable  Ann ul us Sur Surface face Pr ess essur ure e

X

=

(ppg)

(ft)

(psi)

M.A.C.P. Casing Yield

Casing Burst

Maximum Allowable Casing Casing Pressure

Safety Factor 

X

0.8 (psi)

Kill Mud Wt. S.I.D.P.P.

T.V.D. from RKB

Drilling Mud Weight

÷

÷ 0.052

(psi)

Kill Mud We Weight ight

=

+

(ft)

(ppg)

(ppg)

NEW M.A.A.S.P. Maximum Mud Weight

Casing T.V.D. from RKB

Kill Mud Weigh Weightt

(ppg) TR-TP-PER-021_Rev0 K3 Reviewed By: L Kenyon

X 0.052 (ppg)

New Maximum Maximum All owable  Ann ul us Sur Surface face Pr ess essur ure e

X

= (ft)

(psi)

Subsea Kill Sheet API Field Units - Welltrain Logo 20 June 2016

 Approved By:

Page 3 of 4

 

WELL CONTROL KICK SHEET (SUBSEA ONLY) Pressure Step Down Chart 1) Calculate I.C.P. 2) Calculate F.C. P. 3) Calculate Step-down. 4) In the left column record strokes in 100 stroke intervals, ΔP x 100 until final circulating pressure is reached 5) Record I.C.P. in top right column, and deduct the pressure step down Δ down ΔP P until F.C.P. is reached (psi/100 stks) 6) Calculate adjusted choke line friction (using Kill Mud).

Page 4 of 4

Strokes Minimum to Bit D.P psi

0

Includ in g Safety

ICP =

7) Calculate complete circulation, in strokes and time

I.C.P. SCR Riser 

Initial Circulating Pressure

SIDPP

+ F.C.P.

=

(psi)

(psi)

Kill Mud

SCR Riser 

(psi)

=

÷

X (psi)

(ppg)

(ppg)

ΔP ICP

Final Circulating Pressure

Drilling Mud

(psi)

Surface to

FCP

Pressure Step-down

Bit strokes

-

=

÷ (psi)

(psi)

(stks)

(psi/stk)

I.D.C.P. SICP

Initial Dynamic Dynamic Ca Casing sing Pressure

Choke Line Friction

-

=

(psi)

(psi)

(psi)

 Adju  Ad ju st ed Cho Choke ke L i ne Fr i ct i on Choke Line Friction

(psi)

Kill Mud

X

(ppg)

 Adju  Ad ju st ed Chok Ch ok e Li ne Fr ic ti on

Drilling Mud

÷

=

(ppg)

(psi)

Complete Circul Circul ation Da Data ta

+

= Total Time to Kill Well

Bit to Surface Time

Surface to Bit Time (min)

Total Strokes to Kill We Well ll

Bit to Surface strokes

Surface to Bit Strokes

+

(min)

=

(min)

Riser Data Riser Strokes

Pump Output

DP/Riser Volume (bbl)

÷

= Time to Displace Riser 

Slow Circulating Rate

Riser strokes

÷ TR-TP-PER-021_Rev0 K3 Reviewed By: L Kenyon

(bbl/stk)

(spm)

=

(min) Subsea Kill Sheet API Field Units - Welltrain Logo 20 June 2016

View more...

Comments

Copyright ©2017 KUPDF Inc.
SUPPORT KUPDF