Penyelesaian sumur meliputi pemasangan casing dan rangkaian pipa produksi, serta mengupayakan agar cairan dapat mengalir ke permukaan, dimana dipasang kepala sumur lengkap dengan Christmas tree. Christmas tree merupakan sekumpulan valve, alat ukur tekanan, penyangga tubing, dll.
What is a wellhead ? – The wellhead is • the surface foundation on which the well is built up during the drilling operations and • the base for the Xmas tree for production operations.
3
Wellheads - Drilling During drilling process : The well is controlled by a BOP and choke manifold As the well is drilled :Each annulus is sealed off by the wellhead 4
Wellheads - Completed well After the tubing is installed :
The BOP's are removed
Xmas Tree
The Christmas tree is installed to control the flow from the well
Wellhead
5
Wellhead systems must be designed to : 1
Withstand tensile loads of suspended tubulars
2
Provide a pressure sealing capability ISOLATE the well from the external
Life of Well •Drilling •Production •Workover •Suspension •Abandonment
6
environment ISOLATE between casings and downhole formations MAINTAIN PRESSURE during well control operations, well testing or shut in periods.
What does a wellhead do ? 1
HANG-OFF WEIGHT
2
CONTAINS PRESSURE
3
MONITOR THE WELL SAFETY PROVIDE A BASE FOR THE XMAS TREE
4 7
Surface Wellheads
Conventional spooled system BOP Stack
Tubing Head Spool Casing Head Spool
Casing Head Housing
9
What are the main components ? Xmas Tree
Tubing Head Spool
Casing Head Spool
Casing Head Housing 10
Surface Wellhead schematic • Medium cost spool system
11
Casing Head Housing First element of the wellhead
12
Casing Head Housing Functions – It is normally connected to the surface casing – Supports the next string of casing – Provides connection to the BOP and together with it can: • Seal the wellbore (from the atmosphere) • Control access to the wellbore : – for pressure control – or fluid returns during drilling operations.
13
Casing Head Housing DescriptionTop connection flanged (standard) Ring groove
Landing area for Casing Hanger
Side outlets threaded or studded
Test port Slip-on weld or threaded bottom connection 14
Starter Head • Threaded onto surface casing • Can provide a landing plate to sit on the conductor • Internal profile for next casing string
15
CHH - Base Plate The casing head may be used in conjunction with a base plate for more effective weight distribution.
Cellar
Conductor pipe 18
Surface casing
What happens after installing the Casing Head Housing ? – – – –
Nipple up and test BOPs Install wear bushing. The next hole section is drilled. The intermediate casing is run in the hole and is cemented. – P/U BOPs – A rough cut is performed to allow retrieving remaining casing and removing BOPs
19
Casing hung on Casing Hanger Housing
20
Casing Hangers - Functions • Suspends intermediate or production casing string • Centres the casing string in the head (or spool) • Seals off the casing annulus. ( It is the primary seal )
21
Starter Head summary
22
Casing Hangers
23
Casing Hangers
24
Casing Hangers
25
Casing Hangers
26
Casing Head Spools Second element of the wellhead
Normally not threaded as pressures higher Eg >3000psi.
27
Next Section is Installed Casing Spool
28
Casing Head Spools Functions – Seals off (packs off) surface casing string – Provides support (landing bowl) for next casing string – Provides support for well control equipment (BOP Stack) • Sealing the wellbore (from the atmosphere) • Controlling access to the wellbore : – for pressure control – or fluid returns during drilling operations.
29
Casing Head Spools Description Top connection flanged (standard)
Landing area for Casing Hanger
Bottom connection compatible with the top connection on the previous casing head or spool 30
Ring groove Side outlets threaded or studded / flanged (threaded not common)
Test port
Pack Off or Secondary Seal. Designed to fit around OD of current casing
What Seals Pressure Between Flanges ? Achieved using API ring gaskets
32
What happens after installing the Casing Spool Housing ? – – – –
Nipple up and test BOPs Install wear bushing. The next hole section is drilled. The intermediate/Production casing is run in the hole and is cemented. – P/U BOPs – A rough cut is performed to allow retrieving remaining casing and removing BOPs. – Casing Hanger is installed
33
Casing Hangers
Landing area
Intermediate or Production Casing
34
Casing Pack-offs • Fits inside the lower flange of the casing spool
35
Casing Pack-offs • Fits inside the lower flange of the casing spool
36
Casing Pack-offs • Fits inside the lower flange of the casing spool
37
Casing Spools summary
38
Tubing Head Spools Third element of the wellhead
39
Tubing Head Spools Functions • Seals off (packs off) production casing string • Provides support and lockdown for tubing hanger • Provides support for the BOP Stack
40
Tubing Head Spools Description TUBING HANGER
LOCK DOWN BOLT
TOP BOWL FOR TUBING HANGER VALVE REMOVAL PLUG THREADS
TEST PORT Pack off designed to fit around OD of production casing 41
Tubing Hangers Tubing Hanger Tubing Head Spool
Tubing Bonnet
Tubing Hanger
Production casing Tubing
42
Tubing Head Spool
Tubing Hangers Functions • Suspends the tubing • Seals off the annulus • Provides a seat for a back pressure valve (BPV) that can be temporally installed allowing the BOP stack or Xmas tree to be removed
43
Dual Tubing Head • Locator pins to orient the dual hanger
46
Tubing Hanger
47
Tubing Heads summary
48
Tubing Bonnet • Seats over the tubing hanger neck • Xmas tree on top of this
49
Tubing Bonnet
50
Tubing Bonnet
51
Dual Tubing Bonnet • Dual completion • Two tubing strings – Long string – Short string