Water Park- How to Open Water Park Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Machinery, Raw Materials, Feasibility Study, Investment Opportunities, Cost and Revenue, Plant Economics, Working Capital Requirement, Plant Layout, Process Flow Sheet, Cost of Project, Projected Balance Sheets, Profitability Ratios, Break Even Analysis

August 2, 2018 | Author: Ajay Gupta | Category: Amusement Park, Expense, Working Capital, Accrual, Profit (Accounting)
Share Embed Donate


Short Description

A water park is an amusement park that features water play areas, such as swimming pools, water slides, splash pads, spr...

Description

Introduction A water park or waterpark is an amusement park that features water play areas, such as swimming pools, water slides, splash pads, spray grounds (water playgrounds), lazy rivers, or other recreational bathing, swimming, and barefooting environments. Water parks in more current states of development may also be equipped with some type of artificial surfing or body boarding environment such as a wave pool or Flow Rider.

In ancient India, there was large use of water in the  Tapovana, and different Ashrams in the forests. Elephanta

caves

in

the

Maharashtra

can

be

considered as Water Park. Now the water park is the good idea of amusement. It is very good assets created by human being to enjoy the natural scenery artificially, if situated near by forest or hilly area.

Amusement

water

parks

generally feature a few water rides, such as the log flume, bumper boats, and rowing boats. Such rides are usually gentler

and

shorter

than

roller coasters and many are suit suitab able le for for all ages ages.. Wate Waterr ride rides s are are espe especi cial ally ly popu popula larr on hot days.

Amusement water parks generally generally feature a few water rides, such as the log flume, bumper boats, and rowi rowing ng boa boats. ts. Such Such ride rides s are are usua usuall lly y gent gentle lerr and shorter than roller coasters coasters and many are suitable for all ages. Water rides are especially popular on hot days.

Market Outlook Amusement parks are an integral part of the global leisure and entertainment industry. The industry can be broadly categorised into amusement parks, theme parks and water parks. The sector can also be broadly segmented on the basis of the catchment area that they cater to, along with the type and scale of  activities they offer.

Global amusement parks can also be classified on the basis of the conc conce epts and theme emes around which hich a park/ offering is designed such as thrill & adventure, spo sports & edu edutainme nment, amon mongst a few. Every year industry industry is seeing 15-20 percent percent growth in the sector

– 

be it expansion of existing parks or the setting up of  new ones.

 The Industry has been growing at a compounded annual growth growth rate (CAGR) (CAGR) of more than 17.5 percent with annual revenue of approx. INR 17 billion and estimated to grow to at least INR 40 billion by 2020. Sixty-six percent of the population in India is below 35 years, with the median age of 27 years driving consumption.

Younger

consumers

have

high

spendi nding power and and are open to experiment ent with newer places and forms of entertainment.

 The water park industry has shown continued growth in 2014 with increased numbers of indoor and outdoor water parks being developed throughout the United States and Canada. Our projections for 2015 show a number of new openi enings ngs will occur cur thro hroug ugh hout North America, which will boost the supply of water parks and increase revenues for this growing industry.

 The Indian amusement parks industry is expected to clock 20% CAGR over the next few years to touch Rs 6,000 crore.  The Indian amusement park segment is valued at $400 million (about Rs 2,500 crore), compared to the $25 billion global industry.

Amusement Parks to Attract Rs. 17,000 Cr Investment in Next Few Years. Project

Location

Promoter/JV

Estimated Investment (Rs crore)

Sea World

Sindhudurg, Maharashtra

Proposed by GoM to be undertaken on PPP basis, parties yet to be decided

500-510

Theme Park MGM Lavasa, Hollywood Theme Park

Nagpur, Maharashtra Lavasa, Maharashtra

Landmark Entertainment MGM – Lavasa (work still to begin)

1 5 00 450

Spaceworld theme park

Lavasa, Maharashtra

400

Wonderla Wonderla Appu Ghar

Hyderabad, Andhra Pradesh Chennai, Tamil Nadu Gurgaon, Haryana

Space Investment Co. – Lavasa (work still to begin) Wonderla Holidays Wonderla Holidays International Amusements

30 0 40 0

Surat theme park

Surat, Gujarat

Atlanta (work still to begin)

9500-10,000

Krishna Lila theme park

Bengaluru, Karnataka

ISKCON

35 0

Jaipur Mega-tourism city

Jaipur, Rajasthan

International Amusements

25 00

Naya Raipur amusement park Naya Ra Raipur, Ch Chattisgarh

Adventure Island and MetroWalk

Rohini, Delhi

Proposed by NR NRDA on on PP PPP basis; parties yet to be decided 50: 50 JV of International Amusement and Unitech

25 0

23

1000-1100

 The global amusement-park industry is estimated at $25bn, expected to touch $32bn by FY17, a 9% CAGR.

There

are

over

800

amusement

parks

worldwide with annual attendance of over 700m visitors. The US alone has 50% of the parks and annual visitors. Europe has ~330 amusement parks with annual visits of 165m. Parks in the US and Euro Eu rope pe are are near near matu maturi rity ty leve levels ls,, wher wherea eas s Asia Asia has has seen rapid growth in visitors in the last seven years.

Few Indian Major Players are as under •

Accoland, Guwahati



Amaazia, Surat



Anandi Water Park, Lucknow, Uttar Pradesh



Appu Ghar



Aqua Marina Water Parks and Resorts, Kolkata



Aqua Village, Pinjore



Aquamagica, Adlabs Imagica, Khopoli



Aquatica, Kolkata



Bellilious Park, Kolkata



Black Thunder, Mettupalayam, Tamil Nadu



Dash n Splash, Chennai, Tamil Nadu



Dolphin the Water World, Agra (U.P.)



Dream World, Thrissur, Kerala



Fantasy Park, Palakkad, Kerala



Fantasy World, Kolkata



Fun N Food Village, Gurgaon, New Delhi



Fun N Food Park, NAGPUR,



Funcity, Panchkula



Funtasia Water Park, Patna



Juckies, Kannur, Kerala



Jungle Water Park, Kanpur, Uttar Pradesh



Blue World, Mandhana, Kanpur



Sports Village, Bithoor, Kanpur



Ekta Water Park, Kanpur



Hungama World, Patna



swapna srushti water park, Gandhinagar Gujarat



Water Island (Fantasy Motels) Motels),, Kanpur Lucknow Hwy, Unnao



Kishkinta, Chennai



Manasa Water Park, Mangalore



Merry Kingdom, Kannur, Kerala



Nature Park, Kolkata



Nicco Park, Kolkata



Pink City Water Park, Jaipur



Rose Valley Amusement Parks, Kolkata



Sentosa, Pune



Savin Kingdom, Siliguri, West Bengal



Somanipuram Adventure Park, Indore



Splashdown Waterpark Goa, Anjuna, Goa



Splash-The Water Park Delhi, Alipur, Delhi



Splash-The Splash-T he Fun World Ahmedab Ahmedabad, ad, Ahmedab Ahmedabad, ad, Gujarat



Spla Sp lash sh-T -The he Sunci Suncity ty Gwali Gwalior or,, Gwali Gwalior or,, Ma Madh dhya ya Pradesh



Splash Water World, Rohtak, Haryana



Tikuji-Ni-Wadi, Thane, Maharashtra



Vanraj water park, Junagadh, Gujarat



Vismaya, Kannur, Kerala



Water Kingdom, Gorai, Mumbai



Wet N' Joy Water Park, Lonavala



Wonderla, Kochi, Kerala, and Bangalore



Worlds of Wonder Water Park, Noida



Shanku's Water Park & Resort, Mehsana Gujarat

Cost Estimation: Capacity

:

1000 visitors / Day

Plant & Machinery

:

84 Lakh

 Total Capital Investment :

362 Lakh

Rate of Return

:

41%

Break Even Point

:

38%

Major Queries/Questions Answered in the Report?

1. What is Wate Water r Park indust industry ry ? 2. How has has the Water Park Park industry performed so far and how will it perform in the coming years ? 3. What is the Project Feasibility of Water Park Park ? 4. What are the requ requireme irements nts of Work Working ing Capit Capital al for setting up Water Park ?

5.

What is What is the the str struct ucture ure of the Wat Water er Par Park k Busi Busines ness s and who are the key key/ma /major jor pla player yers s?

6. What is the total project cost for setting up Water Park ? 7. What are the operating costs for setting up a  Water Park ? 8.

What are the machinery and equipment requireme requ irements nts for setting setting up up Water Park ?

9. W Wh ho are the Supp pplliers and Manufacturers of  Plan Pl antt & Ma Mach chin iner ery y for for se sett ttin ing g up up Wat Water er Pa Park rk ? 10. What What are the req requir uireme ements nts of ra raw w mate materia riall for setting up Water Park? 11. Who are the Suppliers and Manufacturers of Raw  mate ma ter ria ials ls fo for r se settti ting ng up Wa Wate ter r Pa Park ? 12.. Wha 12 Whatt is th the e Pla Plant nt La Layo yout ut fo for r se sett ttin ing g up up a  Water Park Business?

13. What is the total size of land required for setting up  Water Park ? 14. What will be the income and expenditures of   Water Amusement Park? 15.. What 15 What ar are e th the e Pr Proj ojec ecte ted d Ba Bala lanc nce e Sh Shee eets ts of Wa Wate ter r Park ? 16. What are the requirement of utilities overhe ove rheads ads for set settin ting g up Wat Water er Par Park k?

and

17. What is the Built up Area Requirement Requirement and cost for setting setti ng up Wate Water r Park Busine Business? ss?

18. What are the Personnel (Manpower) Requirements for setting up Water Amusement Park Business? 19.. What is the Mark 19 Marke et Stu Study dy and and As Asse sess ssm men entt fo for r settin set ting g up Water Water Park Park? ? 20.. Wh 20 What at is th the e ti time me re requ quire ired d to to br brea eakk-ev even en of Wa Wate ter r Park ? 21. What is the Break-Even Analysis of Water  Amusement Park ? 22.. What 22 What are the Pro Projec jectt fina financi ncials als of Wat Water er Par Park k?

23.. Wh 23 What at ar are e the the Pr Prof ofit itab abil ilit ity y Ra Rati tios os of Wa Wate ter r Pa Park rk ? 24.. What 24 What is th the e Se Sens nsit itiv ivit ity y An Anal alys ysis is-P -Pri rice ce/V /Vol olum ume e of   Water Park? 25.. 25

26.. 26

What ar What are e th the e Pr Proj ojec ecte ted d Pa Payy-Ba Back ck Pe Peri riod od an and d IRR of of Wate Water r Amuseme Amusement nt Park? Park? What is th What the e Pr Proc oces ess s Fl Flow ow Shee Sheett Di Diag agra ram m Wa Wate ter r Park project?

27.. Wha 27 Whatt are the Mar Market ket Opp Opport ortuni unitie ties s for set settin ting g up Water Park?

Table of Contents of the Project Report

1. PRO PROJEC JECT T LOC LOCATI ATION ON 1.1. 1. 1. 1.1.1. 1.1. 1. 1.1.2. 1.1 .2. 1.1. 1. 1.3. 3. 1.1.4. 1.1 .4. 1.1.5. 1.1. 1. 1.6. 6.

DISTRI DIST RIC CT PRO PROF FIL ILE E & GEOT GEOTEC ECHN HNIC ICA AL SI SITE CHARACTERIZATION Gene Genera rall Locati Location on & Geog Geograp raphic hical al Area Area Topo Topogr grap aphy hy Admini Administr strati ative ve set up Map Indus In dustr try y at a Gla Glanc nce e

2. INTRODUCTION 3. USES AND APPL APPLICAT ICATIONS IONS

4. PROPE PROPERTIE RTIES S & CHAR CHARACTER ACTERISTIC ISTICS S 5. CONST CONSTRUCT RUCTION ION OF WATE WATER R PARK 5.1. 5.2. 5.3.

REQUIREMENT OF MATERIAL: MACHINERY RE REQUIRED: CONSTRUCTION:

6. MAR MARKET KET SUR SURVEY VEY 7. FINANCIAL FINANCIALS S & COMPA COMPARISO RISON N OF MAJOR INDIAN PLAYERS/COMPANI PLAYERS/COMPANIES ES

7.1. 7. 1. 7.2. 7.3. 7.4. 7.5. 7. 5. 7.6. 7.6.1. 7.6 .1. 7.6. 7. 6.2. 2. 7.6. 7. 6.3. 3. 7.6. 7. 6.4. 4. 7.6.5. 7.6 .5. 7.6.6.. 7.6.6

ABOU BOUT FINA FINAN NCI CIA AL STAT TATEME EMENTS NTS OF CM CMIIE DATABASE PROFITS & APPROPRIATIONS TOTAL LI LIABILITIES TOTAL ASSETS NET NE T CA CASH FLOW FLOW FRO FROM OP OPER ERA ATING TING ACTI CTIVI VITI TIES ES SECTION – I Name Nam e of Company Company with with Con Contac tactt Details Details Name Na me of Dire Direct ctor or(S (S)) Plan Plantt Cap Capac acit ity y Loca Lo cati tion on of of Plan Plantt Capita Cap itall Expendi Expenditur ture e Project Projects s Name of of Raw Materia Material(S) l(S) Consume Consumed d With With Quantity Quantity & Cost

7.7. SECTION – II 7.7. 7. 7.1. 1. Asset ssets s 7.7. 7. 7.2. 2. Ca Cash sh Flow Flow 7.7. 7. 7.3. 3. Cost ost as as % Ge of Sales ales 7.7. 7. 7.4. 4. Fore Forex x Trans Transact actio ion n 7.7.5. 7.7 .5. Growth Growth in in Assets Assets & Liab Liabili ilitie ties s 7.7.6. 7.7 .6. Growth Growth in in Income Income & Expen Expendit diture ure 7.7.7. 7.7 .7. Income Income & Expendi Expenditur ture e 7.7. 7. 7.8. 8. Liab Liabililit itie ies s 7.7. 7. 7.9. 9. Liqu Liquid idit ity y Ratio Ratios s 7.7.10.Profitability Ratio 7.7.11.Profits 7.7.12.Return Ratios 7.7.13.Structure of Assets & Liabilities (%) 7.7.14.Working Capital & Turnover Ratios

8. PRESE PRESENT NT WATER PARK 9. LAY LAYOUT OUT OF PLA PLANN NNING ING 10. WATER PARKS EQUIPMENT/MACHINERY SUPPLIERS 11. SUPPLIERS OF RAW MATERIAL 11.1 11 .1.. SU SUPP PPLI LIER ERS S OF OF RAW RAW MATE MATERI RIAL AL

12. PHOTOGRAPHS OF WATER PARK

Project Financials •

Project at a Glance

Annexure

• Assumptions for Profitability workings ………………………..1 • Plant Economics……………… Economics……………………………………… …………………………………..2 …………..2 • Production Schedule……………… Schedule………………………………………… ………………………………3 ……3 • Land & Building……………………………………………….…… 4 Factory Land & Building Site Development Expenses

• Plant & Machinery……………………………………………..……..5 Indigenous Machineries Other Machineries (Miscellaneous, Laboratory etc.)

• Other Fixed Assets………………………………………..........…....... 6 Furniture & Fixtures Pre-operative and Preliminary Expenses Technical Knowhow Provision of Contingencies • Working Capital Requirement Per Month ……………………….…7 Raw Material Packing Material Lab & ETP Chemical Cost Consumable Store

• Overheads Required Per Month and Per Annum………….…….…8 Utilities & Overheads (Power, Water and Fuel Expenses etc.) Royalty and Other Charges Selling and Distribution Expenses • Salary and Wages …………………………………………....……..9 • Turnover Per Annum ……………………………………….....… 10 • Share Capital…………………… Capital………………………………………… ……………………………….....11 ………….....11

Equity Capital Preference Share Capital





      

Anne An nexu xurre 1 :: Co Cost st of Pr Proj ojec ectt and and Me Mean anss of Fi Fina nanc ncee Annexur Anne xuree 2 :: Pr Profit ofitab abili ility ty and Net Cas Cash h Acc Accrua ruals ls

Revenue/Income/Realisation Expenses/Co Expen ses/Cost st of Prod Products/ ucts/Service Services/Item s/Itemss Gross Profit Financial Charges Tota otall Cost Cost of Sal Sales es Net Profit After Taxes Net Cash Accruals

Annexure 3 :: Assessment of Working Capital requirements •

    



Current Assets Gross Working Capital Current Liabilities Net Working Capital Working Note for for Calculation of Work-in process Annexuree 4 :: Source Annexur Sourcess and Dispos Disposition ition of Funds

www.entrepreneurindia.co



   •

  

Annexure 5 ::

Projected Balance Sheets

ROI (Av (Average of Fix Fixed ed Assets) RONW (Av (Average of Share Capital) ROI (Av (Average of Total Assets) Annexure 6

::

Profitability Profitabi lity Ratios

D.S.C.R Earnings Per Per Share (EPS) Debt Equity Ratio



Annexure Annex ure 7

::

Break-Even Analysis



Variable Cost & Expens Expenses es



Semi-Variable/Semi-Fixed Semi-V ariable/Semi-Fixed Expenses Expe nses



Profit Volume Ratio (PVR)



Fixed Expenses / Cost



B.E.P



Annexure 8 to 11 :: Sensitivity Analysis-Price/V Analysis-Price/Volume olume



Resultan Resu ltantt N.P.B.T N.P.B.T



Resultant D.S.C.R



Resultant PV Ratio



Resultant DER



Resultant ROI



Resultant BEP



Annexure Annexu re 12 :: Sharehol Shareholding ding Pattern Pattern and Stake Stake Status



Equity Capital



Preference Share Capital



Annexure 13 :: Quantitative Quantitative Details-Output/Sales/Stocks



Determined Capacity P.A P.A of Products/Services



Achievab Achiev able le Efficiency/Yield % of Products/Services/Items



Net Usable Usable Load/Capacity of Products/Services/Items



Expected Sales/ Rev Revenue/ Income of Products/ Services/ Items



Annexure 14

::

Product wise Domestic Sales

Realisation •

Annexure 15

::

Total Raw Material Cost



Annexure 16

::

Raw Material Cost per unit



Annexure 17

::

Total Lab & ETP Chemical Cost



Annexure 18

::

Consumables, Store etc.



Annexure 19

::

Packing Material Cost



Annexure 20

::

Packing Material Cost Per Unit



Annexure 21

::

Employees Employ ees Expenses



Annexure 22

::

Fuel Expenses



Annexure 23

::

Power/Electricity Po wer/Electricity Expenses



Annexure 24

::

Royalty Roy alty & Other Charges



Annexure 25

::

Repairs & Maintenance

Expenses •

Annexure 26

::

Other Manufacturing Expenses



Annexure 27

::

Administration Expenses



Annexure 28

::

Selling Expenses

Annexure 29 :: Deprecia Depreciation tion Charges (Total) •

Annexure 30 :: Deprecia Depreciation tion Charges (P & M) •

 – 

as per Books

 – 

as per Books

Annexure 31 :: Depr Annexure Deprecia eciation tion Char Charges ges - as per IT Act WDV WD V (Total) ( Total) •

Annexure 32 :: Depr Annexure Deprecia eciation tion Char Charges ges - as per IT Act WDV (P & M) •



Annexure 33 :: Interest and Repa Repayment yment - Ter Term m Loans



Annexure 34 :: Tax on Profits



Anne An nexu xurre 35 :: Pr Proj ojec ecte ted d Payy-Ba Back ck Per erio iod d an and d IR IRR R

Reasons for buying our report: •  This

report helps you to identify a profitable project for investing

or diversifying into by throwing light to crucial areas like industry size, market potential of the product and reasons for investing in the product This •   This

repo re port rt pr prov ovid ides es vi vita tall in info form rmat atio ion n on th the e pr prod oduc uctt li like ke   it’s

characteristics and segmentation •  This

report helps you market and place the product correctly by

identifying the target customer group of the product

•   This

report helps you understand the viability of the project by

disc di sclo losi sing ng de deta tail ils s li like ke ma mach chin iner ery y re requ quir ired ed,, pr proj ojec ectt co cost sts s an and d snapshot of other project financials •

  The The rep epor ortt

pro rov vid ides es a

gli limp mpse se of gov ove ern rnm men entt

reg re gula lati tion ons s

applicable on the industry •   The

report provides forecasts of key parameters which helps to

anti an tici cipa pate te th the e in indu dust stry ry pe perf rfor orma manc nce e an and d ma make ke so soun und d bu busi sine ness ss decisions

Our Approach: •  Our

research reports broadly cover Indian markets, present analysis,

outlook and forecast for a period of five years. The •   The

mark ma rket et fo fore reca cast sts s ar are e de deve velo lope ped d on th the e ba basi sis s of se seco cond ndar ary y

rese re sear arch ch an and d

are ar e

cros cr osss-va vali lida date ted d

thro th roug ugh h

inte in tera ract ctio ions ns wi with th th the e

industry players •

  We We

use

reli lia able

sources

of

information

and

databases.

And

information from such sources is processed by us and included in the report

Scope of the Report The report titled   “Market  Survey cum Detailed Techno Economic Feasibility Report on  Water Park” provides an insight into the  Water

Park   ma market in In Ind dia with focus on uses and applications, Manu Ma nufa fact ctur urin ing g Pr Proc oces ess, s, Pr Proc oces ess s Fl Flow ow Sh Shee eets ts,, Pl Plan antt La Layo yout ut an and d

Water Park Park   project. The report assesses the Project Financials of   Water market sizing and growth of the Indian  Water Park  Industry. While expanding a current business or while venturing into new business, entrepreneurs are often faced with the dilemma of zeroing in on a suitable product/line. And before diversifying/venturing into any product, they wish to study the following aspects of the identified product:

• Good

Present/Future Demand

• Export-Import • Raw

Market Potential

Material & Manpower Availability

• Project

Costs and Payback Period

We

NPCS,

at

con onsu sult lta anc ncy y

through

and ma mark rke et

our

reliable

rese re sea arc rch h

exp xpe ertise

fiel fi eld d,

in

the

project

have ha ve dem emy yst stif ifie ied d

the th e

situation by putting forward the emerging business opportunity in

Water Park Park   secto the   Water sectorr in Ind India ia alo along ng wi with th its bus busine iness ss pro prospe spects cts.. Waterr Park Park   pro Thro Th roug ugh h th this is re repo port rt we ha have ve id iden entif tifie ied d   Wate proje jec ct as a lucrative investment avenue.

Tags Indian Amusement Park Industry, Amusement Park Industry in India, Water Park Project Report, Build Water Park, Project of Water Park in India, Project Report on Water Park, Water Park Investment Opportunities India, Waterpark Projects, Build Profitable Waterpark, Water Park Equipment, Profitable Water Construction, Design and Construction of Water Parks, Profitable Kids Water Park, Setting Up Profitable Water Park, Family Entertainment and Amusement Parks, Entertainment Industry, Amusement Park Cum Water Park, Theme Park in India, Water Park Investment Oppor pportu tuni niti ties es,, Wate Waterr Park Park Indu Indust stry ry,, Busi Busine ness ss Oppo Opport rtun unit itie ies s in Wate Waterr Park Park,, Amusement and Water Park, Adventure Park in India, Amusement Park Industry, Entertainment Park, Water Parks in India, Best Water Parks in India, Water Park Equipment, Theme Parks in India, How to Start Theme Park In India, How to Open Water Park, Amusement Park Business Plan, Start Up Business Plan for Water Park, Water Park Business Plan, Water Park Project, Starting Water Parks Business, How to Start Your Own Water Park, Guide to Starting Water Parks, How to Start Small Water Park, Theme and Amusement Parks in India, Most Famous Amusement Parks in India, Opportunity in Water Parks Industry in India, Steps to Build Water Park, Starting Amusement & Theme Park, Free Amusement Park Business Plan, Beginners Guide to Starting Amusement Park,

Fun Center Business Plan, Business Plan of Entertainment Park, Water Park for Prof Profit it,, Fam Family ily Enter nterta tain inm ment ent Busi Busine ness ss Id Idea eas, s, Leis Leisur ure e indu indust stry ry,, Prof Profit itab able le Amusement Business, How to Design Water Park, Water Park for Beginners, Water Park Park Proj Project ect Id Ideas eas,, Proj Project ects s on Smal Smalll Scale Scale Indus Industri tries, es, Smal Smalll Scal Scale e Indus Industri tries es Projects Ideas, Water Park Based Small Scale Projects, Project Profile on Small Scale Industries, New Project Profile on Water Park Industries, Project Report on Water Park Manufacturing Industry, Detailed Project Report on Water Park, Pre-Investment Feasibility Feasibility Study on Water Park, Techno-Economic Techno-Economic Feasibility Study on Water Park, Feasibility Report on Water Park, Free Project Profile on Amusement Parks, Project Prof Profil ile e on Them Theme e Park Park,, Down Downlo load ad Free Free Proj Projec ectt Prof Profil ile e on Amus Amusem emen entt Park Parks, s, Industr Industrial ial Project Project Report, Report, Project Project Consulta Consultant, nt, Project Project Consul Consultanc tancy, y, NPCS, NPCS, Niir, Niir, Process Process Technolo Technology gy Books, Books, Busines Business s Consult Consultancy ancy,, Busines Business s Consul Consultant tant,, Projec Projectt Ident Id entif ific icat atio ion n and and Select Selectio ion, n, Prepa Prepara rati tion on of Proj Project ect Profi Profiles les,, Star Startu tup, p, Busi Busines ness s Guidan Guidance, ce, Busines Business s Gu Guida idance nce to Client Clients, s, Startu Startup p Project Project for Amuseme Amusement nt Parks, Parks, Startup Project, Startup Ideas, Project for Startups, Startup Project Plan, Business Start-Up, Business Plan for Startup Business, Great Opportunity for Startup, Small Start-Up Business Project, Project Report for Bank Loan, Project Report for Bank Finance, Project Report Format for Bank Loan in Excel, Excel Format of Project Report and CMA Data, Project Report Bank Loan Excel, Detailed Project Plan Reports

Niir Project Consultancy Services (NPCS) can provide Detailed Project Report on

Water Park- How to Open Water Park Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Machinery, Raw Materials, Feasibility Study, Investment Opportunities, Cost and Revenue, Plant Economics, Working Capital Requirement, Plant Layout, Proc Pr oces ess s Flo Flow w Sh Shee eet, t, Co Cost st of Pr Proj ojec ect, t, Pr Proj ojec ecte ted d Ba Bala lanc nce e Sh Shee eets ts,, Pr Prof ofit itab abil ilit ity y Ratios, Break Even Analysis

See more

https://goo.gl/CFxLXJ https://goo.gl/ZdFrZf

Visit us at  www.entrepreneurindia.co

Take a look at Niir Project Consultancy Services on #Street View https://goo.gl/VstWkd

 Locate us on Google Maps https://goo.gl/maps/BKkUtq9gevT2

www.entrepreneurindia.co

OUR CLIENTS Our ine Our nex xha hau ust stib ible le Cli lie ent li list st in inc clu lud des pu publ bliicc-s sec ecto torr companies, Corporate Houses, Government undertaking, indi in divi vidu dual al en entr trep epre rene neur urs, s, NR NRI, I, Fo Fore reig ign n in inve vest stors ors,, no nonnprofit organizations and educational institutions from all part rts s of the World. The list is just a glimpse of our esteemed & satisfied Clients.

Click here to take a look

https://goo.gl/G3ICjV

Free Instant Online Project Identification & Selection Search Facility  Selection process starts with the generation of a product idea. In order to select the most promising project, the entrepreneur needs to generate a few ideas about the possible projects. Here’s   we offer a best and easiest way for every entrepreneur to

searching

criteria

of

www.entrepreneurindia.co www.entre preneurindia.co Identification and Selection ”

projects that

is

on “Instant

our Online

website Project

NPCS Team has simplified the process for you by providing a "Free "Free Instant Online Project Identification & Selection"" se Selection sear arch ch fa faci cili lity ty to id iden enti tify fy pr proj ojec ects ts ba base sed d on multiple searc rch h parameters re rellated to project costs namely: Plant & Machinery Cost, Total Capital Investment, Cost of the project, Rate of Return% (ROR) and Break Even Point % (BEP). You can sort the projects on the basis of mentioned pointers and identify a suitable project matching your investment requisites.

Click here to go http://www.entrepreneurindia.co/project-identification http: //www.entrepreneurindia.co/project-identification

Contact us Niir Project Consultancy Services 106--E, Kamla Nagar, Opp. Spark Mall, 106 New DelhiDelhi-110007, India. Email:   [email protected] , [email protected] , [email protected] Tel: +91+91-11 11--23843955, 23845654, 23845886, 8800733955 Mobile: +91+91-9811043595 Website : www.entrepreneurindia.co www.entrepreneurindia.co ,  , www.niir.org Take a look at NIIR PROJECT CONSULTANCY SERVICES on #StreetView

https://goo.gl/VstWkd

An ISO An  ISO 9001:2008 Company 9001:2008 Company

Who are we?

o

One of the leading reliable names in industrial world for providing  thee mo th most st co comp mpre rehe hens nsiv ivee te tech chni nica call co cons nsul ulti ting ng se serv rvic ices es

o

We adopt a systematic approach to provide the strong fundamental   support needed for the effective delivery of services to our  Clients’    Clients’  in India & abroad 

We at NPCS want to grow with you by providing solutions  scale to suit your new operations and help you reduce risk  and give a high return on application investments. We have  successfully achieved top-notch quality standards with a high level of customer appreciation resulting in long lasting   relation and large amount of referral work through technological breakthrough and innovative concep eptts. A large number of our Indian, Overseas and NRI Clients have appreciated our expertise for excellence which speaks volumes about our commitment and dedication to every client cli ent's 's suc succes cess. s.

We bring deep, functional expertise, but are known for  our holistic perspective: we capture value across boundaries and between the silos of any organization. We have proven a multiplier effect from optimizing the  sum of the parts, not just the individual pieces.

We

actively encourage a culture of innovation, which  facilitates the development of new technologies and  ensures a high quality product.

What do we offer? o

 Project Identification

o

 Detailed Project Reports/Pre-feasibility Reports Reports

o

 Market Research Reports Reports

o

 Business Plan

o

Technology Books and Directory

o

 Industry Trend 

o

 Databases on CD-ROM 

o

 Laboratory Testing Testing Services

o o

Turnkey Project Consultancy/Solutions  Entrepreneur India (An Industrial Industrial Monthly Journal) Journal)

How are we different ? o

We have two decades long experience in project consultancy and market research field 

o

We empower our customers with the prerequisite know-how to take  sound business decisions decisions

o

We help catalyze business growth by providing distinctive and  profound market market analysis

o

We serve a wide array of customers , from individual entrepreneurs to Corporations and Foreign Investors

o

We use authentic & reliable sources to ensure business precision

Our Approach Requirement collection Thorough analysis of the project Economic feasibility study of the Project Market potential survey/research

Report Compilation

Who do we serve? o

 Public-sector Companies

o

Corporates

o

Government Undertakings

o o

 Individual Entrepreneurs Entrepreneurs   NRI’s

o

 Foreign Investors

o

 Non- profit  profit Organizations, NBFC’s

o

 Educational Institutions

o

 Embassies & Consulates

o o

Consultancies  Industry / trade associations associations

Sectors We Cover o

 Ayurvedic And Herbal Medicines, Medicines, Herbal Cosmetics

o

 Alcoholic And Non Alcoholic Beverages, Beverages, Drinks

o

 Adhesives, Industrial Adhesive, Adhesive, Sealants, Glues, Gum & Resin

o

 Activated Carbon & Activated Charcoal  Charcoal 

o

 Aluminium And Aluminium Extrusion Profiles & Sections,

o

 Bio-fertilizers And Biotechnology

o

 Breakfast Snacks And Cereal Cereal Food 

o

 Bicycle Tyres & Tubes, Bicycle Parts, Bicycle Assembling 

Sectors We Cover

Cont …

o

 Bamboo And Cane Based Based Projects

o

 Building Materials And Construction Projects

o

 Biodegradable & Bioplastic Bioplastic Based Projects

o

Chemicals (Organic And Inorganic)

o

Confectionery, Bakery/Baking And Other Food 

o

Cereal Processing 

o

Coconut And Coconut Based Products

o

Cold Storage For Fruits & Vegetables

o

Coal & Coal Byproduct 

Sectors We Cover o

Cont …

Copper & Copper Based Projects

o

 Dairy/Milk Processing 

o

 Disinfectants, Pesticides, Pesticides, Insecticides, Mosquito Mosquito Repellents,

o

 Electrical, Electronic And Computer based Projects Projects

o

 Essential Oils, Oils Oils & Fats And Allied  Allied 

o

 Engineering Goods

o

 Fibre Glass & Float Glass

o

 Fast Moving Consumer Consumer Goods

o

 Food, Bakery, Agro Processing  Processing 

www.entrepreneurindia.co

Sectors We Cover

Cont …

o

 Fruits & Vegetables Vegetables Processing 

o

 Ferro Alloys Based Projects

o

 Fertilizers & Biofertilizers

o

Ginger & Ginger Based Projects

o

 Herbs And Medicinal Medicinal Cultivation And Jatropha Jatropha (Biofuel)

o

 Hotel & Hospitability Projects

o

 Hospital Based Projects Projects

o

 Herbal Based Projects

o

 Inks, Stationery And Export Industries

www.entrepreneurindia.co

Sectors We Cover o

Cont …

 Infrastructure Projects

o

 Jute & Jute Based Products Products

o

 Leather And Leather Based Projects Projects

o

 Leisure & Entertainment Based Projects

o

 Livestock Farming Of Birds & Animals

o

 Minerals And Minerals

o

 Maize Processing(Wet Milling) & Maize Based Projects

o

 Medical Plastics, Disposables Disposables Plastic Syringe, Blood Blood Bags

o

Organic Organ ic Farming, Farming, Neem Produ Products cts Etc. Etc.

www.entrepreneurindia.co

Sectors We Cover o

Cont …

 Paints, Pigments, Varnish & Lacquer  Lacquer 

o

 Paper And Paper Board, Paper Paper Recycling Projects

o

 Printing Inks

o

 Packaging Based Projects

o

 Perfumes, Cosmetics And Flavours

o

 Power Generation Based Projects & Renewable Energy Based

 Projects o

 Pharmaceuticals And Drugs

o

 Plantations, Farming And Cultivations Cultivations

o

 Plastic Film, Plastic Waste And Plastic Compounds

o

 Plastic, PVC, PET, HDPE, LDPE Etc.

www.entrepreneurindia.co

Sectors We Cover

Cont …

o

 Potato And Potato Based Projects

o

 Printing And Packaging  Packaging 

o

 Real Estate, Leisure And Hospitality

o

 Rubber And Rubber Rubber Products

o

Soaps And Detergents

o

Stationary Products

o

Spices And Snacks Food 

o

Steel & Steel Products

o

Textile Auxiliary And Chemicals

www.entrepreneurindia.co

Sectors We Cover

Cont …

o

Township & Residential Complex

o

Textiles And Readymade Garments

o

Waste Management & Recycling 

o

Wood & Wood Products

o

Water Industry(Packaged Drinking Water & Mineral

Water) o

Wire & Cable

www.entrepreneurindia.co

Contact us Niir Project Consultancy Services 106--E, Kamla Nagar, Opp. Spark Mall, 106 New DelhiDelhi-110007, India. Email:   [email protected] , [email protected] , [email protected] Tel: +91+91-11 11--23843955, 23845654, 23845886, 8800733955 Mobile: +91+91-9811043595 Website : www.entrepreneurindia.co www.entrepreneurindia.co ,  , www.niir.org Take a look at NIIR PROJECT CONSULTANCY SERVICES on #StreetView

https://goo.gl/VstWkd

Follow us https://www.linkedin.com/c linkedin.com/company/niir ompany/niir--project project-https://www. consultancy consultan cy--services https://www.facebook.com/NIIR.ORG

https://www.youtube.com/us .youtube.com/user/NIIRproject er/NIIRproject https://www https://plus.google.com/+EntrepreneurIndiaNewDelhi EntrepreneurIndiaNewDelhi https://plus.google.com/+

https://twitter.com/npcs_in



https://www.pinterest.com/ https://www .pinterest.com/npcsindia/ npcsindia/

For more information, visit us at: www.niir.org

www.entrepreneurindia.co www .entrepreneurindia.co

View more...

Comments

Copyright ©2017 KUPDF Inc.
SUPPORT KUPDF