Introduction: Detailed design of 'walking' / 'raked' columns. Calculations include: 1. Assesment of 'strut and tie' forces based on column geometry and gravity loading. 2. Concrete compressive strut check and reinforcement as required. 3. Tie forces local to walking column within the slab above and below. Reinforcment requirements. 4. Vertical shear check. S concrete. 5. Horizontal shear check at slab interface. 6. Assessment of secondary moments to columns above and below walking column. 7. Reinforcement Summary. Diagram:
Geometry Column Reference
Walk Width mm
E146
300
Head Level Lvl (ref) Lvl (m) 2
18.45
Base Level Lvl (ref) Lvl (m) 1
13.95
Walk (m) 2.95
Angle, Deg. 57
1
Fcu_Walk N/mm2 55
Project
10/11/2011 Job no.
Date
GJ
By
Date
Sheet no.
5.1
Details
Part
Design
Section
24140333
Checked Rev
Status
New South Glasgow Hospital
Rev
1
Tel
44 (0)141 429 3555
Fax
44 (0)141 429 3666
ZE - Walking Column E146
1 - Loading:
Please refer to gravity load takedown information in section 1.2. A hand load takedown and a Ram C load takedown has been carried out with the most conservative results adopted. SLS Load Combination = 1.0 DL + 1.0 LL ULS Load Combination = 1.4 DL + 1.6 LL Loading Hand LTD
Loading RAMC LTD
Vertical Loading
Dead
Imposed
Dead
Imposed
SLS
ULS
kN
kN
kN
kN
kN
3208
1335
3215
1138
4550
Lateral Load to Diaphragm (kN) - Tie Force - F Dead
Imposed
Total SLS
DL/TAN 1, kN LL/TAN 1, kN 2108
875
Load in Raked Column - F
Strut
kN
Dead DL/SIN 1, kN
Imposed DL/SIN 1, kN
ULS kN
6637
3844
1596
7936
tie
Total ULS
kN
kN
2983
4351
2 - Compression Strut Capacity: The 'virtual' compression strut width will be calculated based on reasonable geometry over which stress can be assumed to distribute. In order to allow distribution of stress from wall to column below a downstand is to be included.
Column Width (mm) Above
Below
b1
b2
600
400
Downstand (mm) dd Calculated b2.tan
1
610
2
Selected
deg.
user
tan-1(dd/b2)
850
65
Strut Width bs
3
deg. 180- 1 58
Concrete Cap(kN) Fc
(mm) 2
b2/cos 2.sin
3
801
Asreq
As
(mm2)
(mm2)
Prov
0.4fcu wall.bs.Walk Width
(Fstrut-Fc)/0.87fy
user
5944
4579
4910 10-H25
3 - Tension 'Tie' Capacity Column depth (mm)
Asreq
As
Above
Below
(mm2)
(mm2)
h1
h2
Ftie/0.87fy
user
600
900
10002
Prov
11260
Beam Above Dims (mm)
Beam Below Dims (mm)
Width
Depth
Width
Depth
600
850
900
850
14-H32
Distribution of the lateral forces imparted to the slab diaphrgm are to be considered in the slab analysis. An additional mat of reinforcement local to the walking column is envisaged. The slab designer should be advised of the applied loads or a hand calculation/mark up provided showing additional rebar requirements.
Project
Date By Checked Rev
Date
Part
4 - Vertical Shear Check
New South Glasgow Hospital 10/11/2011 Job no. GJ
Section
24140333
Details
ZE - Walking Column E146
Status Design Sheet no.
5.1
Rev
1
Tel
44 (0)141 429 3555
Fax
44 (0)141 429 3666
Project
Date By Checked Rev
Part
Date
New South Glasgow Hospital 10/11/2011 Job no. GJ
Section
24140333
Details
ZE - Walking Column E146
Status Design Sheet no.
5.1
Rev
1
Tel
44 (0)141 429 3555
Fax
44 (0)141 429 3666
Project
Date By Checked Rev
Part
Date
New South Glasgow Hospital 10/11/2011 Job no. GJ
Section
24140333
Details
ZE - Walking Column E146
Status Design Sheet no.
5.1
Rev
1
Tel
44 (0)141 429 3555
Fax
44 (0)141 429 3666
Project
Date By Checked Rev
Date
Part
5 - Horizontal Shear Check
New South Glasgow Hospital 10/11/2011 Job no. GJ
Section
24140333
Details
ZE - Walking Column E146
Status Design Sheet no.
5.1
Rev
1
Tel
44 (0)141 429 3555
Fax
44 (0)141 429 3666
Project
Date By Checked Rev
Part
Date
New South Glasgow Hospital 10/11/2011 Job no. GJ
Section
24140333
Details
ZE - Walking Column E146
Status Design Sheet no.
5.1
Rev
1
Tel
44 (0)141 429 3555
Fax
44 (0)141 429 3666
Project
Date By Checked Rev
Part
Date
New South Glasgow Hospital 10/11/2011 Job no. GJ
Section
24140333
Details
ZE - Walking Column E146
Status Design Sheet no.
5.1
Rev
1
Tel
44 (0)141 429 3555
Fax
44 (0)141 429 3666
Project
New South Glasgow Hospital 10/11/2011 Job no.
Date
GJ
By
Date
Details
Part
Design Sheet no.
5.1
24140333
Checked Rev
Section
Status
Rev
1
Tel
44 (0)141 429 3555
Fax
44 (0)141 429 3666
ZE - Walking Column E146
6 - Secondary Moments to Columns
The columns at levels above and below are fixed by a continuous monolithic connection to the walking column. To assess secondary moments arising in the columns above and below the walk a 2d s-frame model has been adopted in accordance with TRM 261. The main factor influencing the rotation of the walking column, and therefore moments to columns is the elongation of the slab strut and tie. The walking column itself is a very stiff element and as such deformation of the panel itself contributes to a lesser extent. The virtual strut within the wall panel has been modelled as a beam element based on the dimensions determined in section 2. This is deemed to be conservative as an increased rotation is expected at the joints in comparison to if the full rigidity of the wall panel were modelled. The section dimensions of the slab struts and ties and the representative lengths back to the supports have been assesed on a column by column basis. Assuptions are conservative in this regard as it is difficult to approximate the true behaviour of the floor plate in a 2d model. Typically a half bay width of 3750mm has been considered of length equal to 'distance to closest point of support' i.e. core walls or Full Slab Diaphragm. These moments are to be considered in addition to Ram Concept Slab Moments
S-Frame Member Properties
Element Description Col L01 Col L02 Col L03 Col L04 Col L05 Col L06 Col L07 Col L08 Virtual Strut Slab Strut/Tie
Thank you for interesting in our services. We are a non-profit group that run this website to share documents. We need your help to maintenance this website.