VMS SingleRAN Demo Site (PartI - Indoor Installation Guide)

March 19, 2023 | Author: Anonymous | Category: N/A
Share Embed Donate


Short Description

Download VMS SingleRAN Demo Site (PartI - Indoor Installation Guide)...

Description

VMS SingleRAN project

DEMO NEW SITE

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

Page 0

Indoor equipment installation

3G WBBP

2G GTMU

3G WMPT

2G MFRU

DCDU 2G

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

DCDU RRU 3G

Page 1

Part I: Indoor equipment installation

Site overview: TP48300 power system & BTS3900 HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

Page 2

1. Installation tools Yêu cầu ầ các đội độ lắp ắ đặt đặ chuẩn ẩ bịị dụng ụ cụ ụ lắp ắ đặt đầy đầ đủ trước ướ khi đến đế sites.

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

Page 3

2. Unpacking cases and check items 1. 2. 3. 4.

Up

HUAWEI TECHNOLOGIES CO., LTD.

Check whether the number of products in the packing cases is the same as is mentioned in the packing list. Check whether the packing cases are intact. Check whether the cases have the same number and types of items as are mentioned in the packing list. Sign the Packing List along with the customer and sub-con. sub

Note: 1. Do not touch the unpainted metal surface of the equipment or its components with sweat-soaked sweat or dirty gloves 2. When unloading the equipment, check whether the quantity of the packing cases on the site agrees with the Packing List, and whether the place of delivery agrees with the installation place. 3. It's better to move the cabinet by hand

Huawei Confidential

Page 4

3. Installation Preparations 1. 2.

Lists the technical documents for reference during the installation.Follow Engineering Design and Construction Drawings Preparing Tools and Instruments (Kiểm tra list các tài liệu ệ kỹỹ thuật ậ để tham khảo ảo trong quá trình lắp đặt. theo thiết kế kỹ thuật và bản vẽ. Chuẩn ẩ bịị các dụng ụ cụ ụ lắp ắ đặt đặ và sắp ắ xếp ế một ột cách hợ hợp lý)

1) Permission 2) TSSR hardcopy 3) Quality Standard checklist 4) Camera 5) Installation Tools

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

Page 5

4.1 Install BTS in equipment room 1. 2. 3.

2

4.

3

4

HUAWEI TECHNOLOGIES CO., LTD.

According to the layout and make sure the location., if have any change, should be contact and got the confirmation from HW ) Mark the points of the holes. Drilling holes at the marked points and then installing the expansion bolts and fix the BTS base. Install the Insulating spacer.

Chú ý: Lắp ắ đặt vị trí BTS theo bản ả vẽẽ TSSR, nếu ế có bất ấ cứ ứ sự ự thay đổi nên liên hệệ và có được đổ đượ xác nhận ậ từ ừ HW. Nhớ ớ lắp ắ đặt đặ 2 tấm ấm cách điện đ ệ trước ướ khi cố ố định đị chân đế BTS.

Insulating Spacer

Huawei Confidential

Page 6

4.2 Install BTS in equipment room

1

Plastic expansion bolts

1. 2. 3. 4. 5.

2

4

HUAWEI TECHNOLOGIES CO., LTD.

Installing the expansion bolts The base should be fixed well. Use lever bar to check of base leveling. Test the insulation value (should be >= 5MΩ) Move the cabinet to the base and make it to the suitable position.

Note: If room floor so weak, it’s not suitable for fixing the base by expansion bolts that provided from Huawei. Please use M14 plastic expansion bolts to fix it.

3

5

(Nếu sàn phòng thiết bị bên dưới chủ yếu là cát, ko có bê tông. Không nên sử dụng nở sắt Huawei đã cấp để cố định chân đế. Bạn nên sử dụng nở nhựa M14 kết hợp với các long đen của nở sắt để cố định chân đế một cách chắc chắn Các đội nên luôn chuẩn bị ít nhất 4 nở nhựa M14 trong túi đồ)

Huawei Confidential

Page 7

4.3 Install BTS in equipment room

1. 2.

Don’t forget installing the two clamp bolts in the front of the cabinet. Use Torque wrench to fix.

(Không quên sử ử dụng ụng 2 bulong hãm để cố ố định đị chân đế sau khi hoàn thành lắp lắ đặt. đặ

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

Page 8

5.1 Install DCDU for 3G.

Two screw nuts

1. 2.

Before install DCDU we should remove the mounting ears from the two sides of DCDU so that 3G DCDC in the same line with 2G DCDU. 3G DCDU should be installed lower 2G DCDU with two screw nuts.

(Chúng ta sẽẽ phải ả lắp ắ đặt đặ 1 DCDU cho 3G bên dưới ưới cùng củ của tủ ủ BTS. Trước ướ khi lắp ắ DCDU cho 3G nên dịch ị chuyển ể 2 bên tai vào trong để đảm đả bảo ả bềề mặ mặt ngoài của ủ 2 khối ố DCDU là cân bằng. ằ Vịị trí lắp ắ đặt đặ bên dưới ướ DCDU cho 2G một ộ khoảng ả 2 đai đ ốc, không được đượ lắp ắ 2 DCDU sát nhau)

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

Page 9

5.1.2 Install DCDU for 3G.



Install grounding cable for DCDU. Ensure that connection is tighten.

(Kết ế nối ố tiếp ế đất đấ cho DCDU, chỉỉ cần ầ một ộ đoạn đ ạ dây khoảng ảng chừng chừ 30cm nối ố đất đấ ngay bên cạnh thành BTS.

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

Page 10

5.1.3. DC Power cable connection of RRUs installation guide We We need to make one lug for PGND connection of DC power cable, then connect it to PGND slot position of 3G DCDU. Không được đượ cắt ắ lớp ớ chống ố nhiễu ễ dây nguồn ồn RRU khi kế kết nối ố vào DCDU 3G. Lớp ớ chống ố nhiễu ễ xoắn ắ lại ạ thành 1 dây, bóp cốt ố và nối ối vào chân PGND. Nhắ Nhắc tất ấ cảả các đội độ vấn ấ đề này, nếu đã cắt lớp chống nhiễu, chỉ kết nối cặp -48VDC 48VDC và 0VDC thì sẽ rất ấ khó để sửa ử lại. ạ

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

Page 11

5.1.4. Optical module connection of RRUs installation guide We need to put the 5 optical module at the WBBP card under, and 3 optical module at RRU (port_W), ), and the CPRI cable will connect from the port_W at RRU to CPRI0,1,2 at WBBP card.  S ử dụng 3 module quang cho kết nối ổng quang tai RRU (cổng ( W), 3 module quang cho cổng quang (CPRI0,1,2) tại card WBBP. Ngoài ra chú ý còn có hai modul quang kèm theo sẽ được lắp vào các cổng quang tiếp theo dành cho nâng cấp sau này.

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

Page 12

5.2.1 Install BTS3900 power and grounding cable. 

PGND cable connection

(Nối đất cho tủ BTS3900)



HUAWEI TECHNOLOGIES CO., LTD.

Make power cable of cabinet and ground earthling terminal of PGND, according to the actual path going of protection ground cable, install protection ground cable(Yellow-green cable(Yellow cable )The protection ground cables is tided with the power cord and upward from the left . (Làm đầu cốt cho dây đất đấ và dây nguồn ồ DC theo đúng đ yêu cầu ầ kỹỹ thuật. ậ Dây tiếp ế đất cho BTS màu vàng xanh M16 nối vào điểm đất bên tay trái phía trên cùng BTS, kết kế nối ố vào bảng ả đất đấ indoor. Huawei Confidential

Page 13

5.2.2 Install BTS3900 power and grounding cable. 

Power cable connection for 2G & 3G



Pay more attention to arranged difference of DCDU terminals in BTS cabinet.

Note: Độ Đội lắp ắ đặt đặ cần ầ chú ý khi kết ế nối ối dây nguồn vào các cầu cầ đấu đấ trong DCDU2G&3G. Có

sự ự khác biệt ệ trên dưới ướ giữa ữ cực ực RTN(+) và NEG(-). NEG( Đối với DCDU2G cực NEG(-) bên phía trên, cực ự RTN(+) ở dưới. ướ Còn DCDU cấp ấ nguồn ồn cho các RRU 3G thì ngượ ngược lại. ạ Nếu ế các bạn ạ không cẩn ẩ thận ậ sẽẽ có thểể bịị nhầm ầ cực ự dây nguồn. ồn.

2G DCDU HUAWEI TECHNOLOGIES CO., LTD.

3G DCDU Huawei Confidential

Page 14

5.2.3 Install BTS3900 power and grounding cable. 

Power cable connection for 2G & 3G (Kết nối nguồn cho DCDU 2G và DCDU 3G) 

-48VDC of 2G is connected to C100A function fuse



-48VDC of 3G is connected to C80A function fuse



0V DC of 2G & 3G are connected to battery positive pole in the power cabinet.

Note:   

HUAWEI TECHNOLOGIES CO., LTD.

Dây nguồn M16 màu xanh -48V của DCDU cho 2G kết nối vào cầu chì 100A trong tủ nguồn. Dây nguồn M16 màu xanh -48V của DCDU cho 3G kết nối vào cầu chì 80A trong tủ nguồn. Hai dây M16 màu đen 0V kết nối vào bảng cực + chung bên trong tủ nguồn.

Huawei Confidential

Page 15

6. Install Power System.

Internal structure of the TP48300/A

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

Page 16

6. Install Power System. Specifications of the Mini Telecom Power Operating Temperature

-20℃ to +50℃

Input Voltage

90 V AC to 290 V AC, default: 220 V AC

AC input lightning protection

Class C

AC input

One 63A 3-phase-MCB

Output voltage

44 V DC to 58 V DC, rated value: 53.5 V

DC output lightning protection

10 kA/15 kA lightning protection board

Battery fuse

Two 160 A fuses

Branch of the BLVD load

Two 80 A fuses, One 100A Fuse

Branch of the LLVD load

Two 16 A MCBs, one 32 A MCBs, one 63A MCBs

Full configuration

180 A or 300 A

Dimensions

HUAWEI TECHNOLOGIES CO., LTD.

420 mm (width) x 360 mm (depth) x 700 mm (height)

Huawei Confidential

Page 17

6.1 Install Power System. (Rack installation) 1. 2. 3. 4. 5.

According to the layout and make sure the location., if have any change, should be contact and got the confirmation from HW ) Install Install rack of storage batteries Install the rack-mounting ears to the cabinet. Move the cabinet to the installation position on the rack of storage batteries. Align the expansion bolt holes on the base in the front of the cabinet with the installation holes for the bolt holes on the rack of storage batteries. Fix the bolts into the holes and 4 fasten the bolts.

1. 2. 3. 4. 5.

HUAWEI TECHNOLOGIES CO., LTD.

Dựa vào bản thiết kế site survey, xác định rõ vị trí hệ thống tủ nguồn. Lắp đặt tai đỡ hai bên cho tủ nguồn. Di chuyển tủ nguồn tới vị trí lắp đặt trên rack. Đánh dấu vị trí sẽ khoan lỗ để cố định rack. Sử dụng nở sắt hoặc nở nhựa (M14) cố định tại 4 góc.

Huawei Confidential

Page 18

6.2 Install Power System. (Battery installation)  Install battery follow the order from bottom to top, and the battery must

arrange in line and must linked toghether in each group. (Lp đt accqui)

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

6.3 Install Power System. (Power & Grounding cables) 1. 2.

Remove the PGND, Power cables from the original equipment rack, cut off the connector. Assemble an OT terminal at one end of the shielding layer, and then lead the cable through the heat-shrinkable shrinkable tube at the place where the shielding layers are exposed. 3. When copper lugs are made at two ends of power cord and grounding wire, they must be welded or pressed firmly (Sử ử dụng ụ kìm bóp cốt ố khi làm các đầu đầ cốt ố của ủ dây nguồn, ồn, dây tiế tiếp địa. đị Chú ý sử ử dụng ụ các ống ố co nhiệt ệ Huawei cấp trong khi làm các đầu cốt)

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

Page 20

6.4 Install Power System. (Power & Grounding cables) Note: Grounding of Power cabinet: Use 16mm2 PGND yellow-green yellow cable. ! Các đội cần chú ý dự án này sẽ dùng dây M16 làm tiế địa tiếp đị cho tủ ủ nguồn. ồ Nếu ế bạn ạ cắt ắ nhầm ầ dây M35 dùng cho outdoor để làm tiếp ế địa đị cho tủ ủ nguồn ồ sẽ ẽ bịị thiế dây bên ngoài. thiếu

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

Page 21

6.5 Install Power System. 



In this project we will use 3 groups of battery. Therefore, we will connect 2 battery groups under together, then connect to CB 1 (first CB from the left side). The battery group above connect separate to CB 2. Notice: Must connect correct CB as the instruction. Trong dự ự án này chúng ta sẽẽ sử ử dụng ụ 3 tổ ổ acquy cho thiế thiết bị, ị vì thếế chúng ta sẽẽ đấu nối hai tổ acquy bên dưới tới cầu đấu, sau đó sẽ từ cầu đấu tới ớ CB 1 trong tủ ủ nguồn nguồ (CB đầu tiên tính từ trái sang). Riêng tổ acquy trên cùng sẽ đấu riêng tới CB2. Chú ý đấu chính xác CB như nh yêu cầu.

CB2 CB1

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

6.6 Install Power System. 

Connect of the storage battery to the Battery positive-pole positive in the power cabinet (M35 black power cable)

Sử ử dụng ụ dây nguồn ồ màu đen đ M35 kết ế nối ố từ ừ bản ả cực ự dươ ương trên rack lên bảng ả đồng đồ 0V chung bên trong tủ ủ nguồn. ồ

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

6.7 Install Power System. 

Loose the bolt on top of battery negative-pole pole access fuse base, connect -48V input cable to the bolt, and use torque wrench to tighten the bolt. Function fuse is 160A. (M35 blue power cable)

(Dùng dây nguồn ồ màu xanh M35 kết ế nối ố từ ừ bản ả cực ực âm củ của ACCU lên điểm đ ể kết ế nối ố cầu ầ chì tổ ổ ACCU1. Chú ý cầu ầ chỉ tổng phải là 160A)

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

6.8 Install Power System. 

Rectifier and monitor module installation (Lắp đặt rectifier và module giám sát)

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

6.9 Install Power System. 

Battery temperature sensor installation

(Lắp đặt bộ cảm biến giám sát nhiệt độ acqui)

Battery sensor will be connected between VBTEM1 slot in Power cabinet and + pole of battery terminal.

ắm VBTEM1 (Kết nối cảm biến nhiệt cho acqui từ cực + vào khe cắm bên trong tủ nguồn)

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

6.10 Install Power System. 

Alarm connection (Đấu nối cảnh báo tủ nguồn) Chú ý quan trọng: Mỗi ỗ trạm ạ new site sẽẽ được đượ cấp ấp 1 sợi cáp mạ mạng 20m màu xám. Chia sợi ợ cáp làm 2, một ộ sử ử dụng ụ

sợi ợ cáp mạng ạ này để đấu đấ nối ố cảnh ả báo tủ ủ nguồn, ồ một ột cho cảnh cả báo ngoài đấu đấ vào DDF. Một ộ đầu đầ cắm ắ vào chân EXT-ALM1/UEIU đầu đầ còn lại ạ tách thành 4 cặp ặ cảnh ảnh báo kế kết nối ố vào ALM1, ALM2, ALM3, ALM6 trong tủ nguồn.

EXT-ALM1

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

6.11 Install Power System. 

Battery terminal connection (Kết nối các cực ACCU)

Note: The force moment of tightening the bolt should be tighten properly ~ 10Nm. 1. 2. 3. 4. 5.

Siết ế chặt ặ các cầu ầ đấu đấ battery, tuyệt ệ đối đố không được vặ vặn quá tay, quá mạnh ạ dẫn ẫ đến đế hỏng ỏ đầu đầ kết ế nối. ố Kết ế nối ố từng ừ cực ự một ộ và siết ế chặt ặt ngay sau khi hoàn thành

Sau mỗi ỗ một ộ kết ế nối ố giữa ữ hai cực ự sử ử dụng ụ các đầu chụ chụp đậy đậ kín các cực ự battery lại. ạ Dán nhãn mác cấp sẵn từ 01-> 04 dán cho mỗi ỗi battery tương tươ ứng. ứ Chú ý lắp ống thoát axit cho các tổ acquy.

c

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

6.12 Install Power System. 

Check after installation (Kết nối các cực ACCU) The main items needed to be checked after installation.

No

Item

1

The polarities are in right connection, the voltage of the battery group between positive and negative output terminal are higher than 48V. Should be checked output voltage in the Power cabinet. (Kiểm ể tra cẩn ẩ thận ậ các cực ự battery kết ế nối ối chính xác. Đo Đ đ điện ệ áp đầ đầu ra giữa ữ hai bản ả cực ự cao hơn ơ 48V. Kiểm ể tra luôn điện đ ệ áp ra giữa ữ điểm nối nố cầu ầ chì và bảng ả đồng đồ chung 0V trong tủ nguồn)

2

Should be checked carefully the voltage of each battery is between 2.1 and 2.2V (Nên kiểm tra cẩn thận điện áp mỗi battery khoảng khoả 12v)

3

All of the bolts, nuts and crews are fastened tightly as technical requirement. (Tất ấ cảả các kết ế nối ố đảm đả bảo ả đã đ được đượ siết ế chặt ặt theo yêu cầ cầu kỹỹ thuật) ậ

4

All of the parameter of the battery group, such as the equalization charge and float charge currents, have been set correctly. (Cài đặ đặt lại ạ thông số ố tủ ủ nguồn ồ như ư dung lượng ượng battery chính xác)

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

6.13.1 Install Power System. 

AC power connection Dây màu xanh dùng cho kết nối vào bảng trung tính

Kết nối dây đen đ trực ự tiếp ếp vào AC MCB

Đấu nối vào hệ thống nguồn của khách hàng. Cần xác định chính xác CB cho BTS. (ghi rõ nhãn AC-BTS)x HUAWEI TECHNOLOGIES CO., LTD.

Đấu loop giả 3 phase tại CB trong tủ nguồn Huawei Confidential

6.13.2 Install Power System. 

Check before power switch on:We We will check the follow items: Equipment hardware fasten or not; The input/output switch is switch on or switch off; The cable connected is right or not; The equipment and environment closed equipment is cleaning up.



Equipment power on: Switch on the AC breaker on turn, using millimeter test the power input and output is normal or not. Measure the output voltage of battery, function fuse (within the range of -38.4 V DC to -57 V DC).



Battery selection must be reconfigured (Batt String: 2, Cap1: 300, Cap2: 150).

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

6.13.3 Install Power System. 

Checking, power on and parameter configuration for power system. (Very important) (Kiểm ể tra bật ậ nguồn ồ và cài đặt đặ thông số ố cho tủ ủ nguồ nguồn)

Chú ý quan trọng: Ngay sau khi bật ậ nguồn ồ phải ải cài đặ đặt ngay thông số của dụng lượng acqui cho tủ nguồn

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

6.13.4 Install Power System. 

Checking, power on and parameter configuration for power system. (Very important) (Kiểm ể tra bật ậ nguồn ồ và cài đặt đặ thông số ố cho tủ ủ nguồ nguồn)

Chú ý quan trọng: Ngay sau khi bật ậ nguồn ồ phải ải cài đặt đặ ngay thông số ố của ủ dụng ụ lượng ượ acqui cho tủ ủ nguồn. ồ Cài đặt các thông số như ư sau: Batt String = 2, Cap. 1 = 300Ah, Cap. 2 = 150Ah + Cap1 ứng với CB1 (ngoài cùng bên trái)

+ Cap2 ứng với CB2 (bên cạnh CB1).

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

6.14 Install Power System. 

Keep carefully the Fastening pin of insulated handle.

Note: Keep carefully the Fastening pin of insulated handle when you open the package. (Không được đượ làm mất ấ cái chốt ố sử ử dụng ụng khi thao tác đ đóng mở ở các cầu ầ chỉỉ trong tủ ủ nguồn. ồ Nếu ế bạn ạ làm mất ấ nó sẽẽ rất ấ khó để có thểể thực ự hiện ện thao tác này sau khi công việ việc lắp ắ đặt đặ hoàn tất) ấ

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

7.1 Signal cable connection 

Alarm cable connection. (Đấu nối các dây cảnh báo) 

EXT-ALM0/UEIU is connected to left side of the DDF (For collecting of External Alarm:: Door, Fire, Water, Smoke sensors…). Please loop-back back all external alarm cables after connecting.  EXT-ALM1/UEIU is connected to power cabinet. It’s power alarms.  DCDU SPD alarm is not necessary.

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

7.2 Signal cable connection 

E1 cable connection. (Đấu nối cáp dây luồng E1 cho 2G)  

E1 cable will be connected to right side in the DDF. Connect E1 in order of RX TX in the same line.

Dây E1 sẽẽ kết ế nối ố đủ 4 cặp ặ dây luồng ồng vào phím krone bên phả phải trong DDF. Kết ế nối ố E1 theo thứ ứ tự ự thu phát liền ền nhau trên cùng một mộ phím krone. Phiến 1 Màu

RX1

TX1 Trắng- ghi

Phiến 2

Trẵng-xanh dương RX3

Màu

Trắng- xanh lục

Đỏ - cam

TX3

HUAWEI TECHNOLOGIES CO., LTD.

RX2 Trắng- cam RX4 Trắng-Nâu Nâu

TX2 Đỏ- xanh dương TX4 Đỏ- Xanh lục

Huawei Confidential

7.3 Signal cable connection 

FE cable connection. (Đấu nối cáp dây luồng FE cho 3G) 

Connect FE cable from FEO slot in WMPT broad. FE cable will fixed tidy on the horizontal cable ladder. Kết ế nối ố dây truyền ề dẫn ẫ FE cho 3G, đi đ cùng với ới các dây E1, cảnh cả báo trên mặt ặ tủ ủ và thang cáp đứng. đứ Quấn ấ gọn ọ gàng, thít đề đều lại ạ trên thang cáp ngang chờ ờ truyền ề dẫn ẫ của ủa khách hàng.

FE0 cable for 3G

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

7.4.1 Signal cable connection (Option 1) 

Share transmission between 2G & 3G. (FE1 port) (Đấu nối share truyền dẫn giữa 2G và 3G) 

Note: Các module quang, fiber ko dùng đến, đội lắp đặt cần giữ lại cẩn thận, mang về, sau đó bàn giao cho PM để tránh thất lạc.

If Customer transmission is provided directly by FE (Electrical transmission) we will insert two optical modules to FE1/GTMUb board and FE1/WMPT board. Use fiber cable to link between two ports. FE0/WMPT port will be used for 3G transmission connecting. (Nếu ế truyền ề dẫn ẫ khách hàng cung cấp ấ đầu đầ vào bằng ằng truyền truyề dẫn ẫ điện, đ ệ chúng ta sẽẽ kết ế nối ố 2 module quang vào 2 cổng ổ FE1 trên card GTMUb và WMPT. Sử ử dụng ụ cặp ặp dây quang kết kế nối ố link 2 cổng ổ này. Chú ý quấn ấ gọn ọ gàng và cố ố định lại đị ạ trên bềề mặt ặ BBU bằng ằ băng ă keo dán. Đầu ra FEO/WMPT sẽ là truyền ề dẫn ẫ dùng cho 3G.

Share FE1 transmission: Tất ấ cảả các vật ậ tư ư này sẽẽ không lắ lắp ở site tại ạ thời ờ điểm đ ể swap. Các đội độ sẽẽ giữ ữ cẩn ẩ Thận ậ bàn giao cho PM, sau đó đ sẽẽ dùng cho chuyển ển đổi đổ từ ừ E1 sang FE sau này. HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

7.4.2 Signal cable connection (Option 2) 

Share transmission between 2G & 3G. (FE0 port) (Đấu nối share truyền dẫn giữa 2G và 3G)  

Note: Các module quang, fiber ko dùng đến, đội lắp đặt cần giữ lại cẩn thận, mang về, sau đó bàn giao cho PM để tránh thất lạc.

If Customer transmission is provided directly by FE1 (Optical transmission), we will insert optical modules (SM-ESFP) to FE1/WMPT board. Use network cable to link between FE0/GTMUb board and FE0/WMPT board to share transmission between 2G and 3G. ( Nếu ế truyền ề dẫn ẫn khách hàng kéo vào site là truyề truyền dẫn ẫ quang. Chúng ta sẽẽ gắn ắ module quang loại ạ Single Mode vào cổng ổ FE1 của ủ 3G. Truyền ề dẫn ẫ của ủa khách hàng sẽ kết ế nối ố trực ự tiếp ế vào module này, truyền ề dẫn ẫ cho 3G là truyền ề dẫn ẫ quang. Sử ử dụng ụ một ộ dây cáp mạng ạng kế kết nối ố 2 cổng ổ FEO của ủ 2G và 3G để share truyền ề dẫn. ẫ Bởi ở vì khoảng ả cách 2 port là rất ấ gần ầ nên đoạn đ ạn dây thừa thừ cần ầ quấn ấ gọn ọ gàng và buộc ộ lại ạ bằng ằ dây thít đặt đặ trên BBU.

Share FE0 transmission

Share FE0 transmission: Tất ấ cảả các vật ậ tư ư này sẽẽ không lắ lắp ở site tại ạ thời ờ điểm đ ể swap. Các đội độ sẽẽ giữ ữ cẩn ẩ Thận ậ bàn giao cho PM, sau đó đ sẽẽ dùng cho chuyển ển đổi đổ từ ừ E1 sang FE sau này. HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

7.4.3 Signal cable connection (Option 3) 

Share transmission between 2G & 3G. (GE transminssion) (Đấu nối share truyền dẫn giữa 2G và 3G)

 

Note: Các module quang, fiber ko dùng đến, đội lắp đặt cần giữ lại cẩn thận, mang về, sau đó bàn giao cho PM để tránh thất lạc.

If Customer transmission is provided directly by GE (Optical transmission), we will insert optical modules (SM-ESFP) to optical port at UTRP board Use network cable to link between FE0/GTMUb GTMUb board and FE0/WMPT board to share transmission between 2G and 3G. truyề dẫn quang GE. Chúng ta sẽ gắn module quang loại Single ( Nếu truyền dẫn khách hàng kéo vào site là truyền Mode vào cổng FE1 của 3G. Truyền dẫn của khách hàng sẽ kết nối trực tiếp vào module này, truyền dẫn cho 3G là truyền dẫn quang. Sử dụng một dây cáp mạng mạ kết nối 2 cổng FEO của 2G và 3G để share truyền dẫn. Bởi vì khoảng cách 2 port là rất gần nên đoạn dây thừa cần quấn gọn gàng và buộc lại bằng dây thít đặt trên BBU.

Share FE0 transmission

Share FE0 transmission: Tất cả các vật tư này sẽ không lắp ở site tại thời điểm swap. Các đội sẽ giữ cẩn Thận bàn giao cho PM, sau đó sẽ dùng cho chuyển đổi từ E1 sang FE sau này. HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

8.1 Routing of cable in equipment room 

Routing of cable on the surface of BTS and vertical cable ladder.

Fiber cables

Power cable of RRUs

DC power cables

Routing of Signal cables (FE, E1, Alar

Jumper cables

PGND cable

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

8.2 Routing of cable in equipment room 

Routing of signal and power cable.

Đi tất ấ cả ả các dây E1, FE, cảnh ả báo gọn ọn gàng bên tay phải phả tủ ủ BTS, tại ạ một ộ điểm đ ể cố ố định đị chỉỉ - Đ sử ử dụng ụ dây thít 1 lần, ầ khoảng ảng cách các dây thít đều đề nhau. - Dây nguồn ồ cho RRU cũng ũ đi đ cùng phía với ới dây tín hiệu, hiệ nên tách biệt ệ chúng tốt ố nhất ấ có thểể để đảm đả bảo ả khoảng ả cách giữa ữa dây tín hiệu và dây nguồ nguồn cách nhau ít nhất ấ là 3cm.

Power cable of RRU Signal cables

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

8.3 Routing of cable in equipment room 

Routing of Fiber and DC power cable.

đ gọn ọ gàng sát ngoài cùng của ủa thang cáp đứng, đứ cố ố định đị trên mặt ặ BTS. Chú ý - Dây quang đi chỗ ỗ điểm đ ể uốn ố dây quang trên mặt ặ BTS, ko đượ được cố ố định đị ép sát xuống ố mặt ặ BTS như ư làm cho dây E1, dây nguồn ồ vì rất ấ dễễ làm gập ập dây quang. - Cặp ặ dây nguồn ồ DC cho 3G đi đ bên dưới ướ cặp ặp DC cho 2G như trong hình vẽ. ẽ

Shouldn’t fix fiber cable in here 2G DC power cable Fiber cables

3G DC power cable

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

8.4 Routing of cable in equipment room 

Routing of jumper cables. Please run the jumper cable as the picture

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

8.5 Routing of cable in equipment room 

Routing of jumper cables.

Thêm vòng băng dính màu trắng cho jumper băng tần 1800.

Main Sector (A): Two Rings (Dây main 2 vòng màu)

ANT-RXB

Div Sector (B): One Ring (Dây Div 1 vòng màu)

ANT-TX/RXA

All indoor connectors should hould be covered by hear-shrink hear tube HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

8.6 Routing of cable in equipment room 

Routing of cable on cable tray. - DC battery, AC, PGND, DC BTS and Alarm cables should be run separately on top of the power cabinet and vertical cable ladder. - Make the holes in Cover plate is best.

(Định Đị sẵn ẵ các lỗ ỗ sẽẽ đi đ dây trên tủ ủ nguồn, ồ cắt ắt các lỗ vừa ừ đủ để luồn ồ các dây tương ươ ứng. ứ Tất ấ cảả các dây nên tách biệt, ệ cách đều đề nhau trên tủ ủ nguồn ồn cũ cũng như ư trên thang cáp đứng.) đứ

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

8.7 Routing of cable in equipment room 

Routing of Feeder, PGND, Power cables on vertical cable ladder. - No any cross on cable tray. - Redundant fiber cable should be pull up tidily and put on the indoor cable tray.

(Chú ý: Phần ầ thừa ừ của ủ cáp quang CPRI được cuộ cuộn gọn ọ thành 3 cuộn ộ có đường đườ kính lớn ớ hơn ơ 15cm và để trên cầu thang cáp ngang trong nhà.)

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

8.8 Routing of cable in equipment room 

Routing of cable in DDF. - Use cable ladder to fix E1, Alarm, PGND cable - Redundant E1, Alarm cable should be fixed tidily in DDF.

- Remember paste all labels for E1, Alarm, PGND, E1 cover in DDF - Insulating tape added in the peeling of the cable (Sử ử dụng ụ thang cáp thay cho máng đỡ nếu ế cần ầ thiết, ết, quấ quấn dự ự phòng 4~5 vòng dây E1, alarm trong DDF gọn ọ gàng như ư hình bên dưới, ướ dán nhãn mác, sử ử dụ dụng băng ă keo quấn ấ lại ạ các phần ầ dây bóc tách vỏ) ỏ

Cable ladder bar

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

8.9 Routing of cable in equipment room 

Routing of AC cable. - Because Huawei hasn’t provided the electrical trough, so we used cable ladder bar to replace. AC cable can fix inside on the wall. Note: Cable ladder bar should be fixed by iron expansion bolts on the wall.

(sử ử dụng ụ các thanh thang cáp cố ố định đị trên tường ường bằ bằng các nở ở sắt ắ một ộ cách chắc ắ chắn. ắ Đi Đ dây AC trong máng cáp, cố ố định đị gọn ọ gàng bằng ằng dây thít trắ trắng)

Cable ladder bar Cable ladder bar

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

9.1 Cable ladder installation Check key item: Checking supporting bar are firmly installed PGND cable for cable tray

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

Page 50

9. 2 Cable ladder installation Check key item: - Checking lay-out of cable tray. If lay-out out is not suitable, please stop the work then confirm ASAP. We will make solution is better. - Checking supporting bar are firmly installed - Leveling of the cable tray - PGND cable for cable tray (Kiểm ể tra vịị trí lắp ắ đặ đặt thang cáp, nếu ế ví trí lắp ắp là không phù hợp, hợ lấy ấ xác nhận ậ đồng đồ thời ờ đưa đư ra giải ả pháp tối ố ưu. ư Tất ấ cả ả các thanh chống ố cần ầ đủ bulong và lắ lắp đặt đặ chắc ắ chắn. ắ Kiểm ể tra độ cân bằng ằ của ủ thang cáp, gắn ắ tiếp ế địa đị cho tất ấ cả ả các điểm đ ể nối ối thang cáp và kế kết nối ố vào bảng ả đồng) đồ

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

Page 51

10.1 Label requirement The The label should follow Huawei template if the customer no special requirement. The The labels of power cable and ground cable are filled in and stuck correctly and reliably. They must be in a tidy position and the same direction. They must be stuck on a position about 2cm away from their connectors. They can be made in a uniform way according to customer requirements, including the label for power distribution switch. We We will use three types of label: cable tie label, L-shaped L label, plastic label Note: Có 3 loại nhãn chính sẽ sử dụng: Nhãn nhựa ựa cứng, cứ nhãn gấp, ấ nhãn thít 1. Tất ấ cảả các dây tín hiệu ệ (E1, FE, cảnh ảnh báo ngoài, cảnh báo nguồn, nguồ cảnh ả báo battery sensor…yêu cầu ầ dán nhãn tại 2 đầu, cách conector khoảng 2cm. 2. Tất ấ cảả các dây nguồn ồ dán nhãn tại ạ 2 đầu, đầ riêng đối với vớ nhãn cho dây DC 0V dán bên trên nắp ắ đậ đậy tủ ủ nguồn ồ 3. Dán đủ và ghi rõ nhãn cho dây đất đấ bảng ả đồng indoor. 4. Dán nhãn rõ ràng, cùng một ộ chiều, ề tránh sự ự lộn ộn xộn chồ chồng chéo giữa ữ các nhãn mác đã đ dán.

Plastic label HUAWEI TECHNOLOGIES CO., LTD.

L-Shaped Shaped label Huawei Confidential

Cable tie label Page 52

10.2 Label requirement Paste the label for CPRI cables

3G WPPB broad: CPRI 0, CPRI 1, CPRI 2

HUAWEI TECHNOLOGIES CO., LTD.

2G GTMU broad: CPRI 0, CPRI 2, CPRI 4 cho băng tần 900; CPRI 1, CPRI3, CPRI5 cho băng tần 1800.

Huawei Confidential

Page 53

10.3 Label requirement Paste the label for Alarm cables

In UEIU broad: ALM 0, ALM 1

HUAWEI TECHNOLOGIES CO., LTD.

In Power cabinet, DDF: ALM0, ALM 1

Huawei Confidential

Page 54

10.4 Label requirement Paste Paste the label for Power cable of RRU and PGND cable at Indoor grounding bar.

Note: Sử dụng nhãn nhựa màu cứng dán nhãn cho các dây nguồn của RRU trong BTS,

HUAWEI TECHNOLOGIES CO., LTD.

Note: Sử dụng nhãn thít, ghi rõ lần lượt cho các nhãn: PGND DDF, PGND BTS, PGND Power cabinet.

Huawei Confidential

Page 55

10.5.1 Label requirement Paste the label for DC power cables.

Note: Nhãn 0V DC dán bên trên nắp đậy tủ nguồn

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

Page 56

10.5.2 Label requirement Paste the label for DC power cables.

Note: - Nhãn 0V DC dán bên trên nắp đậy tủ nguồn -Nhãn -48VDC trong tủ nguồn, phía trên CB -Nhãn cho cặp dây nguồn DC 2G, 3G bên trong tủ BTS.

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

Page 57

10.6 Label requirement Paste the label for Ac power cables.

Note: Dán nhãn kết ế nối ố AC trong tủ ủ BTS và hộp ộp phân phối phố nguồn ồ của ủ khách hàng.

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

Page 58

11. Clean equipment room Check key item: after after completion of the installation and leave the site, need to clean equipment room. All sparing materials packed in a box and put neatly in a corner of the sites. (Sau khi hoàn thành lắp ắ đặt đặ và rời ờ khỏi ỏ site, cần ầ dọn ọn dẹ dẹp sạch ạ sẽẽ phòng thiết ế bị. ị Các vật ậ tư ư thừa ừ đóng đ lại ạ trong một ộ hộp ộ và đặt đặ gọn ọ gàng tại ạ một ột góc)

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

Page 59