Videocon d2h Setup and Reflector Installation Guidelines

April 12, 2017 | Author: IndianMascot | Category: N/A
Share Embed Donate


Short Description

Download Videocon d2h Setup and Reflector Installation Guidelines...

Description

www.dthforum.com

Reflector Installation Guideline for Engineers

1

Videocon d2h Broadcasting Parameters

ST - 2 Satellite

www.dthforum.com Our Satellite Satellite Position Sr. No. 1 2 3 4 5 6 7 8 9 10

Transponder Frequency (Mhz) 11483 11483 11546 11546 11609 11609 11672 11672 11164 11164

: SingTel - 2 (ST-2) : 88 Degree East Longitude TP No. 6A 6B 7A 7B 8A 8B 9A 9B 10A 10B

Polarisation Vertical Low Horizontal Low Vertical Low Horizontal Low Vertical Low Horizontal Low Vertical Low Horizontal Low Vertical Low Horizontal Low

2

Reflector Installation Steps                  

Site Selection Choose Better Mounting Option Align Foot Mount at 90 Degree www.dthforum.com Preparation before drilling Drill Holes & Fix Coach Screws Fix Foot Mount on the Wall Assemble MAST with Foot Mount Align MAST at 90 Degree with respect to Ground Fix Struts with MAST aligning 180 Degree with respect to Ground Fix bolts with MAST Bracket Assemble MAST bracket with Antenna Bracket Assemble Antenna bracket & MAST Bracket with Reflector Insert Weather seal & Assemble LNBF with LNBF Clamp Assemble LNBF Clamp & LNBF with LNBF Arm Assemble LNBF Arm with Antenna Bracket Adjust SKEW ( approx. ) as per Look Angle chart Assemble Reflector Assembly with Mount Assembly Align Elevation & Azimuth angle as per Look Angle chart of respective city

3

Step -1 : Site Selection  Survey different locations (like Balcony , Roof etc.) of the building for Reflector Installation with customer consent  Align colored part of magnetic needle to the NORTH direction Colour Part of Needle

N

45

315

E

W 135

225 141

S www.dthforum.com  Identify Line Of Sight (LOS) direction based on Azimuth Angle of your city (refer below link to know -

http://www.satsig.net/maps/satellite-dish-pointing-india.htm  Ensure Compass is held Straight & Still during locating Azimuth Angle  No Metallic ( Finger Ring) / Magnetic object should be near compass while locating Azimuth Angle

4

How to Calculate Azimuth, Elevation & Skew Angle  Type link http://www.satsig.net/maps/satellite-dish-pointing-india.htm in web address bar, below Screen appear Select Satellite as 88 E ST 1 & Type City name, then Click on Go to know Azimuth, Elevation & skew angle

Azimuth, Elevation & Skew angle of Location for Reflector Installation

www.dthforum.com

Select Satellite from here

Type Name of Installation location here

Click Here to Calculate

5

Step :1 - Site Selection (Continued.. )  Select location for Reflector Installation with clear view of Satellite (Line Of Sight) by using Magnetic compass

 There should not be any partial / future obstruction in LOS like- Tree branches, Shed, Growing Tree, Under Construction Building etc. Obstruction in LOS

Clear LOS

Satellite

Satellite

www.dthforum.com

Subscriber

Subscriber

6

Step :1 - Site Selection ( Continued.. ) Also consider below mentioned points during Site Selection :

 Reflector Installation Location :  Should be minimum 5 Meters away from Bare Electrical Lines (Overhead / Side)  Should be easily accessible for Maintenance / Service  Should not be accessible by Children / Pet Animals  Should be such that Rain / Water Drainage from Roof does not fall directly on the Reflector  Should not be in the Passage

 Should not be in Damp Area  Always Prefer wall Mount option for Reflector Assembly  Never Install Reflector Assembly on Water Tank or wall of the Water Tank

7

Step :1 - Site Selection ( Continued.. ) Also consider below mentioned points during Site Selection (continued….)  Minimum 15 cm Distance should be maintained between corner edge of the wall & hole to be drilled

Minimum 15 cm

 Thickness of the Wall should be more than1.5 times of Rawl Plug Length

www.dthforum.com

 In case hole to be drilled is above shoulder height always use Ladder  Reflector should never be Installed directly on the “Roof”  In case of Floor Mounting Reflector Should be installed on the Flat concrete base of below mentioned Specification 60 cm

Flat Surface 15 cm 60 cm

8

Step :1 - Site Selection ( Continued.. ) Also consider below mentioned points during Site Selection (continued….)  Check for conceal electric cables with Line Detector

 Check for Water Pipe Line, Gas Pipe line & other cables with Customer consent

Always check for Water line, Gas line or any other cables before drilling in the wall Green LED will glow if Line detector detects Current flow

 Minimum 7 cm distance should be maintained between Electric Cable & Hole to be drilled  Ensure that Water Line, Gas Pipe, Other Cables / Customer Property is not damage while drilling

9

Step :1 - Site Selection ( Continued.. ) Also consider below mentioned points during Site Selection (continued….)  Cable Length should be minimum from Reflector to Satellite Box in order to avoid Signal & Voltage Drop.

www.dthforum.com Reflector

Digital Set Top Box

Cable Length should be minimum

 Cable Should be routed with minimum number of drill holes  Location selected for Satellite Box should have proper air circulation  Select two most suitable locations for Reflector Installation  Take Customer permission for Reflector Installation at best suitable location

10

Step : 2 - Choose Better Mounting Option  Always prefer Wall Mount as a Mounting option

To be Avoided

To be Preferred

Wall Mount

www.dthforum.com

Floor Mount 11

Step -3 : Align Foot Mount at 90 Degree  Align Foot Mount at 90 degree with respect to ground by using Spirit

 After Alignment of Foot Mount, Mark 1 hole for drilling

level meter Bubble in Center

Mark Hole for Drilling Foot Mount

Spirit Level Meter

 Foot Mount should be installed on Flat (Plane) surface

12

Step -4 : Preparation before Drilling  Take Customer permission before drilling

Guide Rod

Self Lockable Chuck

Forward /Reversing

 Clean Drill machine & Drill bits  Set Drilling mode according to Wall ( Concrete / Brick )  Check Drill bit size according to Rawl Plug diameter  Adjust guide rod according to Rawl Plug length (Guide Rod Setting = Rawl Plug Length + 2mm)

( Depth of Hole

Drilling Mode Selection Switch

Speed Variation Switch

= Rawl Plug Length + 2mm)

 Drill Machine should be in “OFF” mode while selecting the mode, inserting Drill bit or adjusting Guide Rod.

Speed Control Switch

 Always wear Safety goggle while drilling & blowing dust from hole

13

Step -5 : Drill Holes & Fix Coach Screws  Hold the drill machine with both hands while drilling  Put forward the left leg ( for a Right handed Person ) with the right index finger on Speed Control Switch, Hold the handle with Left Hand – vice versa for Left Handed person  Hold the Drill Machine Horizontally & Drill hole perpendicular to the Wall  Slowly increase the speed by using the speed control switch

Safety Precautions :  Don’t let drill stop while the bit is still inside the hole (If the drill is stuck in the hole, reverse the direction of rotation & slowly pull out the drill bit)  Don’t change the rotation direction with the switch while the drill machine is ON  Don’t lean on Drill Machine while drilling  Use Drill Machine with Safety Precautions to avoid injury

14

Step -5 : Drill Holes & Fix Coach Screws (Cont..)  Drill the first hole

 Blow the dust from the drilled hole

 Push Rawl Plug inside the wall by using Hammer

Dust Blower

Hammer

 Do not breathe while blowing dust.

 Ensure the Drill Machine is Switched “OFF” immediately after drilling of holes  Always use Coach Screw & Rawl Plug recommended by Company

15

Step -5 : Drill Holes & Fix Coach Screws (Cont..) T-Spanner

Fix coach screw with Washer by using T-Spanner

Coach Screw

Mark second Hole after assuring Foot mount at 90 Degree with Spirit Level Meter

Drill Second hole

Washer

16

Step -5 : Fix Foot Mount on the Wall

Tighten Anchor bolt by checking Foot Mount 90o with respect to ground

 Dust should be blown from drilled holes before inserting Rawl Plug  Always use Proper Size Spanner in order to avoid damage to Coach Screw

17

Step 6: Assemble MAST with Foot Mount B

A

C

Nut & Bolt

www.dthforum.com

18

Step 7: Align MAST at 90 Degree with respect to Ground

Align MAST at 90 Degree in front by using Spirit Level Meter

Mast at 90 Degree in X - Axis

Align MAST at 90 Degree in

side by using Spirit Level Meter

Mast at 90 Degree in Y - Axis

19

Step 8: Assemble Struts with MAST Bubble in Center

Connect this side with Mast (More flat surface)

www.dthforum.com

Assemble Struts with Mast

Align both Struts at 180o with respect to Ground & mark Holes

 Drill Holes at marked position, fix Coach Screws & tighten both Struts by using T Spanner  Re-check 180o by keeping Spirit Level Meter with respect to Ground Bubble in Center

 Check Strength of the Mast & Foot Mount by gentle Shaking  Re - Check MAST for 90 Degree from both axis to get Peak signals

20

Step 9: Assemble MAST bracket with LNBF arm Arrow mark shows upward direction

Antenna Bracket

LNBF Arm

21

Step 10: Fix bolts with MAST Bracket Square groove arrangement for locking Bolt head

www.dthforum.com

Nut should be fixed from this side

 Keep the bolts slightly loose for Final Azimuth alignment

22

Step 11: Assemble MAST bracket with Antenna Bracket Mast Bracket

Insert the Bolt Head from inside in Square groove

Antenna Bracket Insert Mast Bracket inside Antenna Bracket as shown above

Top View

Back View

www.dthforum.com

Side View

23

Step12 : Insert Weather Seal & Assemble LNBF with LNBF Clamp

Insert Weather Seal

LNBF Clamp with Screws

LNBF + LNBF Clamp

www.dthforum.com

 Keep the bolts slightly loose for Final SKEW alignment

24

Step 13: Assemble LNBF Clamp & LNBF with LNBF Arm

LNBF Arm

25

Step 14 : Assemble Antenna bracket assembly with Reflector

Always tighten Bolts diagonally

Nuts & Bolts

Note : Reflector surface should not get deformed or damaged while handling Reflector

26

Step 15: Align Elevation & Azimuth angle as per Look Angle of respective city Elevation

Azimuth

scale for Elevation Angle marking

Magnetic Compass

The vertical movement of Reflector to Track the Satellite is called Elevation adjustment

The Horizontal movement of Reflector to track the Satellite is called Azimuth adjustment

27

Step 16: Adjust SKEW (approx.) as per Look Angle Chart Adjust approximate SKEW as per division marking available on LNBF

5 Degree

Clock wise rotation for negative Polarization angle

For example : If SKEW angel is “- 37.2 degree” 1 Division = 5 Degree Division marking for LNBF rotation = 37.2 / 5 = 7.4 Align “0” mark of LNBF clamp with approx. 7.4 division (Clockwise) on LNBF. Rotate LNBF Clock wise from LNBF connector for negative (-) Polarisation angle. Rotate LNBF Anti Clock wise from LNBF connector for Positive (+) Polarisation angle.

28

Step 17 : Sat Finder Tracking Procedure  Slightly Rotate sensitivity knob anti-clock wise. The Indicator needle will move lower ( Left ) side  Again align Reflector till indicator needle reaches to maximum signal level ( Right ) side.

 Repeat this process till you get maximum signals. Track the Reflector to a maximum signal level & sensitivity knob to anti-clock direction as much as possible.

29

Step 17 : Sat Finder Tracking Procedure (Contd…)  After getting maximum signal, tighten Azimuth & Elevation bolts  Signal should not decreased during & after tightening

Tightening Azimuth bolts

Tightening Elevation bolts

30

Step 17 : Sat Finder Tracking Procedure (Contd…)  Then fine tune the Skew till indicator needle reaches to maximum Signal level  Rotate sensitivity knob anti-clock wise till some extent  Again adjust Skew till indicator needle reaches to maximum Signal level

 Repeat this process till you get maximum signals. Adjust the Skew to a maximum signal level & sensitivity knob to anti-clock direction as much as possible

31

Step 17 : Sat Finder Tracking Procedure (Contd…)  After getting maximum signal, tighten LNBF clamp screws

 After Peak Tracking Switch OFF the Satellite Box & Remove the Sat Finder Connections

www.dthforum.com

32

Step 18 : Check Signal Quality & Strength in Satellite Management Screen for all TP  

Check Signal Quality & Strength bars for Green Colour in all 10 Transponders Ensure must be Green in all Transponder 11483 (V)

11546 (V)

11609 (H)

11609 (V)

11672 (H)

11672 (V)

33

Step 19 : Mark Azimuth, Elevation & Skew Angles 

After tightening all Nut, Bolt & screws mark the Azimuth, Elevation & Skew Adjustment with Permanent marker

Azimuth



Elevation

Skew

Always write Customer Flat Number or ID with Permanent Maker on Back Side of

Reflector 

Also inform the same to customer.

34

Cable Preparation and Conectorisation

35

Cable Preparation & Connectorisation  Cable Parts & Connectors  Cable Preparation & Connectorisation Tools  Cable Preparation Process  Do’s & Don’t of Cable Preparation  Cable Preparation Process Continued…  Connectorisation Process

36

Cable Parts & Connectors “Connectorisation” is the process of connecting Connector with Cable.

Center conductor

Dielectric

Bonded Aluminum Foil Shield RG 6 Connector (PPC)

Aluminum Braided Shield

Jacket

RG 6 Connector (Gilbert)

RG 6 Cable

37

Cable Preparation & Connectorisation - Tools

Cable Cutter

RG 6 Cable Preparation Tool

RG 6 Compression Tool

38

Cable Preparation Process Step 1 :– Cut the Cable straight ( Perpendicular to the Cable ) by using Cable Cutter

 Cable should never be Cut angled, Crushed

Angled

Crushed

39

Cable Preparation Process Step 2 :– After Cutting the Cable, give Circular shape to dielectric using fingers

 Do not use Cable Stripper, Pliers or other tools for giving round shape  Usage of Cable Stripper / Plier for giving round shape may damage the Cable Parts

Never use Cable Stripper

Never use Plier

40

Cable Preparation Process Step 3 :– Insert cable in Preparation Tool

 Cable should always Flush with the stopper

 Cable inserted too short, Not touching Stopper

41

Cable Preparation Process Step 4 :– Hold Cable near Preparation Tool.

42

Cable Preparation Process Step 5 :– Rotate tool 3 times in clockwise direction and 3 times in Anti Clockwise direction

3 times Clock-wise rotation

3 times Anti Clock-wise rotation

43

Cable Preparation Process Step 6 :– Hold Cable and Pull out Preparation Tool

 After Preparation, Length of the various Parts of Cable should be as mentioned below 1/4”

1/4” 5/16”

44

Do’s & Don’t of Cable Preparation Topic

Do’s

Don’t

 Dielectric Length

 Always dielectric length should be 1 / 4 inch 1/4”

 Dielectric should Never be too long or too short.

Dielectric too long

Dielectric too short  Length of Center Conductor

 Always Center Conductor’s length should be 5 / 16 inch  There should not be any Scratch on Center Conductor

5/16”

 Center Conductor should Never be too long or too short. Center Conductor too long Center Conductor too short

45

Do’s & Don’t of Cable Preparation Topic  Aluminum Braid’s Length

Do’s  Aluminum Braid’s Length should be 1 / 4 inch

Don’t  Aluminum Braid’s Length should never be too long or too short.

Braid’s too long 1/4” Braid’s too short  Use Preparation Tool

 Always use company approved Preparation tool

 Never use knife, Cutter, blade or other than company approved tools for cable preparation

46

Cable Preparation Process (Continued…) Step 7 :– Fold back Aluminum Braided Shield 180o on the jacket Precautions :  Braid wire should not damage.  At least 95% braid should be there.  Fold all braid wires on Jacket.  No braid should be on foil / Center Conductor.

 Unfold the Braids  Turn the braids perpendicular to the cable length

 Fold back the Aluminum braids 180 degree on the jacket

47

Cable Preparation Process (Continued…) Step 8 :– Clean the Center Conductor with Soft dry Cloth

 Aluminum Braid / Foil should never touch center conductor.

48

Connectorisation Process Step 9 :– Insert Cable into RG-6 connector (Gently push the connector)  Insert cable into connector

 Dielectric should flush with Post of the connector

 Dielectric should never be below or above the Connector Post

Dielectric below the Connector Post

Dielectric above the Connector Post

49

Connectorisation Process Step 10 :– Insert RG-6 Connector in to the Compression Tool & compress.

 Connector inserted for compression

 Compressing the Connector

 Connector fully Compressed

50

Connectorisation Process Step 11 :– Take out fully Compressed Connector from compression Tool.

Di Electric flush with Post Aluminum Braid / Foil not touching center conductor.

Straight Center Conductor

Connector Fully Compressed

51

Cable Routing

52

Cable Routing Guidelines  Cable Routing Guidelines  Weather Seal Application  C Bend near LNBF  Service Loop near Mast

 Application of Cable Tie  S Bend Application  C Bend on edge of the wall  C Bend while laying cable at 900  U Loop & Sealant Application  Through Hole for Cable Laying  P Clip Application

 Cable Routing Precautions ( Do’s & Don’t ) 53

Cable Routing Guidelines Weather Seal Application  Ensure / Check for Weather Seal, It should be fixed at LNBF port before connecting the connector to LNBF

 Connect the Cable to LNBF  Tighten Connector by Hand

 Finally Tighten the connector with open ended spanner

Benefits :  Weather Seal prevents Water Ingress / Seepage inside the cable  Weather Seal prevents Cable Damage, Satellite Box Failure & Connector Corrosion due to Water Ingress/ Seepage

54

Cable Routing Guidelines C Bend near LNBF  C Bend should be always made near LNBF

C Bend Tie Wrap

Benefits : By Application of C Bend the “Bend Radius” is maintained, thereby :  Prevents Cable Damage near Connector at LNBF end  Less Signal Losses ( as the Sharp Bend is avoided )

55

Cable Routing Guidelines Service Loop near Mast  Service loop ( Only One Round ) should be tied with Mast

Service Loop

( 8~ 9 inch Diameter )

Benefits : -

( 0.20 ~ 0.22 Meter Diameter )

 Service Loop can be used for future service Applications like Re - Connectorisation etc.

56

Cable Routing Guidelines Application of Cable Tie  Loose / Hanging Cable should be properly tied with Cable Tie / P Clip

Tail of the Cable Tie should be trimmed properly with maximum tail length of 5mm (after cutting)  Always use Company Approved Cable Tie

Benefits :  Prevents Cable damage due to rubbing with wall edges / metallic parts  Improves Aesthetic Look of the Installation

Precautions :  Avoid over tightening of Tie warp as it may damage Cable Jacket which may results in Water Ingress / Seepage  Width of Cable Tie should be more than 5mm

57

Cable Routing Guidelines S Bend on edge of the wall  S - Bend should be always made, while routing the Cable vertically from one side of wall to other side of the wall

S Bend ( Outer Edge of Wall )

Always use Two P Clips ( Opposite Direction ) while putting any bend / Loop

Benefits : By Application of S - Bend the “Bend Radius” is maintained, thereby :  Less Signal Losses ( as the Sharp Bend is avoided )  Prevents Cable Damage due to friction with Wall (Outer Edge Case )

58

Cable Routing Guidelines C Bend on edge of the wall ( Inner & Outer )  C-Bend should be always made while routing the Cable at Inner & Outer Edge of the Wall  Cable should be laid through PVC Conduit or use Double sided Tape in case of Outer Edge

C Bend ( Inner Edge of Wall )

C Bend ( Outer Edge of Wall )

PVC Bend ( Outer Edge of Wall )

Benefits : By Application of C Bend / PVC Bend the “Bend Radius” is maintained, thereby : -

 Less Signal Losses ( as the Sharp Bend is avoided )  Prevents Cable Damage due to friction with Wall (Outer Edge Case )

59

Cable Routing Guidelines C Bend while laying the cable  C - Bend should be always made while routing the Cable on the wall from vertical to horizontal or vice versa

More than 90o C Bend

Benefits : By Application of C - Bend the “Bend Radius” is maintained, thereby :  Less Signal Losses ( as the Sharp Bend is avoided )

60

Cable Routing Guidelines U Loop ( Drip Loop ) before cable entry in house Sealant Application  U – Loop should be always made before cable entry in the house  Sealant should be applied from both sides of the hole with no air Gap  Use appropriate bit for Wooden or steel Frame Sealant Application Without any air gap C Bend ( more than 90 degree ) Height Minimum 20cm

U Loop

Benefits : -

Diameter Minimum 12cm

By Application of U – Loop & Sealant the below mentioned can be prevented  Water Ingress / Seepage inside the house  Satellite Box Failure due to water Ingress / Seepage

61

Cable Routing Guidelines Through Hole for Cable laying  It is recommended to drill through hole for Cable entry from Inside to Outside

30 o Angle

Outside

Inside House Wall

 Through Hole for Cable entry should have a slope towards outside the House

 While drilling through Hole drill machine should not be in hammer Mode  There should not be any damage on the inside / outside surface of the wall

62

Cable Routing Guidelines P Clip Application  Always use company approved/recommended proper Diameter P-Clips

 Nail of the P Clip should be downwards, in case of Horizontal laying of Cable Nail should be downwards

 Cabling should be Straight  P-Clip should not be equi – distance

Precautions :  Cable should not deform / damage while P-clipping with hammer  P Clip should neither be loose nor over tightened

63

Cable Routing Precautions ( Do’s & Don’t ) Topic  Kinking / Bending of the Cable

Do’s  Take care while pulling cable to prevent cable from Kink / cut.

Don’t  Never use Kinked / Bend Cable.

Benefit :-

Disadvantage :-

 Protect Cable from damage.

 Chances of missing few channels

64

Cable Routing Precautions ( Do’s & Don’t ) Topic  Cable Routing on horizontal surface

Do’s

Don’t

 Always lay the cable on vertical side of the Parapet wall.

 Never lay cable on top of the Parapet wall / horizontal surface.

Benefit : Less chances of Cable Damage.  Minimize chances of water seepage while water logging (if Cable is damage)

Disadvantage : Higher Chances of Cable Damage.  Higher chances of water Ingress / Seepage (if Cable is damage)

65

Cable Routing Precautions ( Do’s & Don’t ) Topic  Cable Routing near Electrical Cable

Do’s

Don’t

 Always 7cm ( minimum ) distance should be maintained between Electrical Lines & Signal Cable.  Always route Cable 5 meters (minimum) away from overhead / side Bare Electrical line.

 Never route cable with Electrical Lines.  Never route Cable near overhead/ side bare Electrical.

Electrical Lines Minimum 7 cm. Signal Cable

Benefit : Less chances of Signal Interference.

Disadvantage : Picture Freezing may occur due to Interference.

66

Cable Routing Precautions ( Do’s & Don’t ) Topic

Do’s

Don’t

 Cable Routing near Satellite Box

 Always neatly keep one round ( 8~ 9 inch /0.2 ~ 0.22 Meter Diameter ) of Service Loop near Satellite Box.  Tighten the Connector finally with spanner at Satellite Box IF input port.

 Never leave loose cable near Satellite Box.  Never leave loose connector at Satellite Box end.

Benefit : Less chances of cable damage.  Avoid loose connectivity.

Disadvantage : Chances of Cable Damage.  Chances of Picture Freezing / No Signal

67

Demonstration of Videocon d2h Services Once Installation completed, Check for :  Good Signal in all Transponder (Green Bar for Signal Strength & Signal Quality)  Cable is properly connected in Product & product properly connected with Power Socket (no loose connection)  Channel & Services opted by Customer activated Once Installation/ Activation completed, Please Call all family members present at home for Demonstration

68

View more...