GHAZIABAD PRECISION PRODUCTS PVT LTD

FR-ENG-009

Process failure Mode and Effects Analysis ( Process FMEA)

PLANNING & PREPARATION ( STEP 1) Company NamePlant LocationCustomer Name- ASHOK LEYLAND Model Year/ Platform- 2013 Part Name :- Rocker Arm ( Int & E xh ) CONTINOUS IMPROVEMENT

History / change Authorization ( As applicable )

SubjectPFMEA Start Date- 01.01.21 PFMEA Revision Date- 25.01.21 Cross- Functional Team- ONT/MKG/RSM/SA/KM/US/AR/PK/SM/KS/BDM

STRUCTURE ANALYSIS (STEP2)

1. Proc Proces ess s IIte tem m

Rocker Arm Sub assembly

2. Proc Proces ess s Ste Step p

10 / Incoming Inspection of Raw Material

3.Process Work Element

FUNCTION ANALYSIS (STEP 3)

1. Function of the process Item

PFMEA ID No- PFMEA/2001-2002/01 Process Responsibility- Line Incharge Confidentiality level- 04

FAILURE ANALYSIS (STEP 4)

2. Function of the 1. Failure Effects 3.Function of the process step & (FE) to the next process work element & product heigher level process charecteristics charecteristics element

   E    F    f   o    )    S    (   y    t    i   r   e   v   e    S

2. Failure Mode (FM) of the Process Step

3. Failure Cause  (FC) of the Work Element

Sub Supplier

Suppleir should be approved as per DS-PUR001

7

Supplier Not  Approved

Chemical composition

As per material standard.

7

Not meeting the specification

7

Not meeting the specification

Dimensional Parameters

Metallurgy

Standard packaging

To provide acceptable i.e. Conformity to the specs i.e. To transfer motion Dimensinal, from input to output Metallurgical, Physical and visual appereance material for further operation

 As per standard

As per standard

 As per standard to prevent any dust, damage or

Material can be produce rejection or not meeting the specifications e.g :Dimensionaly,Hardn ess & Microstructure

7

Wrong material passed on the shop floor for further processing.

Not meeting the specification

6

Not meeting the specification

8

Not meeting the specification

colateral damage.

Visual apperance

Free from dust, dirt, rust, pitting, black spots, dents and any other 

 

GHAZIABAD PRECISION PRODUCTS PVT LTD

RISK ANALYSIS (STEP 5)

Current Prevention Control (PC) of FC

   f   o    )    O    (   e   c   n   C   e   F   r   r   u   c   c    O

  n   C   o   F    i    t   f   c   o   e   )      M    t   e   C    F    D   D    t   (    l   r   n  o  o   e   r    t   r   r   n   u  o    C   C

   f   o    )

   D    (    M   n   F   o   /    i    t   C   c   F   e    t   e    D

FR-ENG-009

OPTIMIZATION (STEP 6)    P    A    A    E    M    F    P

  s   c    i    l    t   s   r    i   a   i   e   c   e   t   p  c    S  e   r   a    h    C

  e   l    d  a   o  o   n    C    i   r   t   e  p    t   o    l    i    (    F

  n   o    i    t   c    A   e   v    i    t   n   e   v   e   r    P

  n   o    i    t   c    A   n   o    i    t   c   e    t   e    D

  e   e  m    l    b    i   a   s   n   N   s   o   '   p  n   o   s  s   e  r    R  e    P

  p   e   m    t   o  a    d    C    t   e   g   r   a    T

  s   u    t   a    t    S

  e    h   c    t    i   n   w  e    d    i   n   e  v   e    k   a  o    t    t   n  r   e   o    i    t    t   n   c   i    A  o   p

  n   o    i    t   e    l

  n   o    i    t   e    l   p   m   o    C

   E    F    f   o    )    S    (   y    t    i   r   e   v   e    S

   )    O    (   e   c   n   e   r   r   u   c   c    O

  e    t   a    D

   )    D    (   n   o    i    t   c   e    t   e    D

  s   c    i    l    t   s    i   a   i   r   c   e   e   t   p  c   e    S  r   a    h   c

   A    A    E    M    F    P

  e   )    d   l   o  n   a    C   o   r   i   e   t    t    l   p   o    i    (    F

  s    k   r   a   m   e    R

   P

4

Material can not be procured as purchase order will not be generated without Vendor code

4

M

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

Chemical composition verified for every heat.

5

Incoming Inspection, IIIrd party verification, procurement from approved mills.

6

M

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

Receipt inspection

5

5

M

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

5

M

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

6

M

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

6

M

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

Non-approved supplier can't supply as there is no vendor code provided to them

Inspection with Variable & attribute gauges (As per inspection format)

Metallurgical Inspection of every lot

5

Packaging standard defined and mentioned on Purchase Order 

7

Receipt inspection

7

Inspection with variable instruments (As per inspection format)

verify the packaging standard material

Checked visually

 

GHAZIABAD PRECISION PRODUCTS PVT LTD

FR-ENG-009

Process failure Mode and Effects Analysis ( Process FMEA)

PLANNING & PREPARATION ( STEP 1) Company NamePlant LocationCustomer Name- ASHOK LEYLAND Model Year/ Platform- 2013 Part Name :- Rocker Arm ( Int & Exh ) CONTINOUS IMPROVEMENT

History / change Authorization ( As applicable )

SubjectPFMEA Start Date- 01.01.21 PFMEA Revision Date- 25.01.21 Cross- Functional Team- ONT/MKG/RSM/SA/KM/US/AR/PK/SM/KS/BDM

STRUCTURE ANALYSIS (STEP2)

1. Pr Proc oces ess s Ite Item m

2. Pr Proc oces ess sS Ste tep p

3. 3.Pr Proc oces ess s Work Work E Ele leme ment nt

(Cope & Drag) Dimensional Parameters

Rocker Arm Sub assembly

20 / Pattern & Tooling Inspection

Standard packaging

Visual apperance

FUNCTION ANALYSIS (STEP 3)

1. Function of the process Item

2. Function of the process step & product charecteristics

3.Function of the process work element & process charecteristics

PFMEA ID No- PFMEA/2001-2002/01 PFMEA/2001-2002/01 Process Responsibility- Line Incharge Confidentiality level- 04

FAILURE ANALYSIS (STEP 4)

1. Failure Effects (FE) to the next heigher level element

 As per standard

To provide acceptable i.e. Conformity to the  As per standard to prevent specs i.e. To transfer motion any dust, damage or colateral Dimensinal, from input to output damage. Physical and visual appereance material for further operation Free from dust, dirt, rust, pitting, black spots, dents and any other 

   E    F    f   o    )    S    (   y    t    i   r   e   v   e    S

2. Failure Mode 3. Failure Cause (FC)  (FM)  of the Process Step

Not meeting the specification

7

Material can be produce rejection or not meeting the specifications e.g :Dimensionaly,Hardn ess & Microstructure

6

8

of the Work Element

Wrong material passed on the shop floor for further processing.

Not meeting the specification

Not meeting the specification

 

GHAZIABAD PRECISION PRODUCTS PVT LTD

RISK ANALYSIS (STEP 5)    f   o    )    O    (

Current Prevention Control (PC) of FC

  c   e   n   C   e   F   r   r   u   c   c    O

  n   C   o   F    i    t   f   c  o   e   )      t   e   C    D   M    F    D    t   (    l   r   n  o  o   r   e   r   t   r   n   u  o    C    C

FR-ENG-009

OPTIMIZATION (STEP 6)

   f   o    )    D    (    M   n   F   o   /    i    t   C   c   F   e    t   e    D

   P    A    A    E    M    F    P

  s   c    i    l    t   s   a   i    i   c   t   e   r   e   c   p  e    S  r   a    h    C

  e   l    d  a    C   o   i   o   n   r   t   e  p    t   o    l    i   (    F

  n   o    i    t   c    A   e   v    i    t   n   e   v   e   r    P

  n   o    i    t   c    A   n   o    i    t   c   e    t   e    D

  e   e  m    l    b    i   a   n   s   N   s   o   '   p  n   s  o   s   e  r    R  e    P

  n   o    i    t   e    l   p    t   e   m   o  a    d    C    t   e   g   r   a    T

  s   u    t   a    t    S

  e    h   c    t    i   n   w  e    d    i   n   e    k   e  v   a  o    t    t   n  r   e   o    i   t    t   n   c   i    A  o   p

  e    t   a    D   n   o    i    t   e    l   p   m   o    C

   E    F    f   o    )    S    (   y    t    i   r   e   v   e    S

   )    O    (   e

   )    D    (

  n   c   e   r   r   u   c   c    O

  o   n    i    t   c   e    t   e    D

  s   c    i    l   t   s   a   i   r    i   c   t   e   e  c   p  e    S  r   a    h   c

   P    A    A    E    M    F    P

  e   )    d   l   a    C   o  n   o    i   r   t   e  p    t    l   o    i    (    F

  s    k   a   r   m   e    R

Receipt inspection

5

Inspection with Variable & attribute gauges (As per inspection format)

5

M

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

Packaging standard defined and mentioned on Purchase Order 

7

verify the packaging standard material

6

M

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

Receipt inspection

7

Checked visually

6

M

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

 

GHAZIABAD PRECISION PRODUCTS PVT LTD

FR-ENG-009

Process failure Mode and Effects Analysis ( Process FMEA)

PLANNING & PREPARATION ( STEP 1) Company NamePlant LocationCustomer Name- ASHOK LEYLAND Model Year/ Platform- 2013 Part Name :- Rocker Arm ( Int & Exh ) CONTINOUS IMPROVEMENT

SubjectPFMEA Start Date- 01.01.21 PFMEA Revision Date- 25.01.21 Cross- Functional Team- ONT/MKG/RSM/SA/KM/US/AR/PK/SM/KS/BDM

STRUCTURE ANALYSIS (STEP2)

PFMEA ID No- PFMEA/2001-2002/01 Process Responsibility- Line Incharge Confidentiality level- 04

FUNCTION ANALYSIS (STEP 3)

FAILURE ANALYSIS (STEP 4)    E    F    f

History / change Authorization ( As applicable )

1. Pr Proc oces ess s Item Item

2. Pr Proc oces ess s Step Step 3.Pr 3.Proc oces ess s Work Work El Elem emen entt

1. Function of the process Item

2. Function of the process step & product charecteristics

3.Function of the process work element & process charecteristics

1. Failure Effects (FE) to the next heigher level element

   )   o    S    (   y    t    i   r   e   v   e    S

2. Failure Mode (FM)  of 3. Failure Cause (FC) of the Process Step the Work Element

Depression at core due to Cavity cleaning not done on depletion of carbon at regular basis resulting corebox carbon depletion

Extra metal at casting surface

7

Dent at casting surface

8

Tool mark on corebox pattern

Cleaning done through steel rod,brush etc

7

Temperature variation showing in M/C

M/C heating controller failure

Knowledge of M/C Operation & process parameters

Skilled operator 

To produce core as per specification

Core Shooter M/C

Extra metal & Sand inclusion at component

Rocker Arm Sub assembly

30 / Core Making

 Air Pressure

M/C Parameters

Core Box(Cope & Drag)

Silicon Spray

To transfer motion from input to output

Shooting of sand in cavity through pressure to obtain cores

To proviide a constant presure to M/C for s hooting

Sand inclusion at casting surface

Blow holes at casting To obtain hardness within spec & good surface finish of cores Extra metal & Sand inclusion at component

7

Low air shooting pressure in  Air pressure not maintained M/C resulting low strength constantly cores

Low heating temperature Heating Temperature not fixed at M/C

7 High heating temperature

Lower thickness of To obtain profile & thickness casting at hollow of cores within spec surface

8

Higher thickness of core

pattern cavity worn out

 Applying at pattern surface Sand inclusion at for Proper ejection of cores casting surface from M/C

7

Sand erosion from core surface during ejection

Not properly applying spray on periodicaly basis

 

GHAZIABAD PRECISION PRODUCTS PVT LTD

RISK ANALYSIS (STEP 5)

Current Prevention Control (PC) of FC

   f   o    )    O    (   e   c   C   n   F   e   r   r   u   c   c    O

  n   C   o   F    i    t   f   c   o    t   e   )      C   M   e    F    D   D    t   (    l   r   n  o  o   e   r   r   t   r   n   u  o    C   C

   f   o    )    D    (   M   n   F   o   /    i    C    t   c   F   e    t   e    D

FR-ENG-009

OPTIMIZATION (STEP 6)    P    A    A    E    M    F    P

  s   c    i    t   s    l   a   i   r    i   e   c   t   e  c   p  e    S  r   a    h    C

  e   l   n    d   o  a   o    C    i   r   t   e  p    t   o    l    i    (    F

  n   o    i    t   c    A   e   v    i    t   n   e   v   e   r    P

  n   o    i    t   c    A   n   o    i    t   c   e    t   e    D

  e   e   m    l    b  a    i   s   N   n   '   s   o  n   p   s   o   e   s   r    R  e    P

  n   o    i    t   e    l

  p  e   m    t   o  a    C   d    t   e   g   r   a    T

  s   u    t   a    t    S

  e    h  c    t    i   n   w  e    d   v   n   e   i    k   e   a   o    t    t   n  r   e   o   t    i    t   n   c   i    A  o   p

  e    t   a    D   n   o    i    t   e    l   p   m   o    C

   E    F    f   o    )    S    (   y    t    i   r   e   v   e    S

   )    O    (   c   e   n   e   r   r   u   c   c    O

   )    D    (   n   o    i    t   c   e    t   e    D

  s   c    i    t   s    l   a   i    i   r   c   t   e   e   p  c   e    S  r   a    h   c

   P    A    A    E    M    F    P

  e   )    l    d   o  n   a    C  o   r   i   e   t   p    t    l   o    i    (    F

  s    k   r   a   m   e    R

Displayed Work instruction machine for reference WI-PRD-034

5

Monitoring in every 4 hrs & record in core making record DOC NO- FR-PRD-036

6

M

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

Displayed work instruction in machine for cleaning of corebox pattern through copper rod only

5

Verification of pattern condition after returning & record maintain through pattern history card in ERP

4

M

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

6

M

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

Preventive maintenance done as per yearly plan & autonomous maintenance on daily basis

5

Preventive maintenance Plan Vs actual( FR-MNT-010) &  Autonomus maintenace checksheet (FR-MNT-004)

FRL installed in line to provide constant pressure to M/C

3

Monitoring in every 4 hrs & record in Set-up Approval Report ( Doc No :- FR-PRD-036)

6

M

Heating Temp fixed according to process validation & control through PLC

4

Monitoring in every 4 hrs & record in Set-up Approval Report ( Doc No :- FR-PRD-036)

6

M

Shelf Life of pattern is fixed to 250000 shots & Pattern verification is done on every 50000 shots

4

 Applying of silicon spray in pattern after every 4 shots to eject core smoothly

5

Monitoring through Pattern History Card in ERP

6

M

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

6

M

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

(Doc No: FR-TLG-003)

Monitoring in every 4 hrs & record in Set-up Approval Report ( Doc No :- FR-PRD-036)

 

GHAZIABAD PRECISION PRODUCTS PVT LTD

FR-ENG-009

Process failure Mode and Effects Analysis ( Process FMEA)

PLANNING & PREPARATION ( STEP 1) Company NamePlant LocationCustomer Name- ASHOK LEYLAND Model Year/ Platform- 2013 Part Name :- Rocker Arm ( Int & Exh ) CONTINOUS IMPROVEMENT

History / change Authorization ( As applicable )

SubjectPFMEA Start Date- 01.01.21 PFMEA Revision Date- 25.01.21 Cross- Functional Team- ONT/MKG/RSM/SA/KM/US/AR/PK/SM/KS/BDM

STRUCTURE ANALYSIS (STEP2)

1. Pr Proc oces ess s IIte tem m

2. Pr Proc oces ess s Ste Step p

3. 3.Pr Proc oces ess sW Wor ork kE Ele leme ment nt

PFMEA ID No- PFMEA/2001-2002/01 PFMEA/2001-2002/01 Process Responsibility- Line Incharge Confidentiality level- 04

FUNCTION ANALYSIS (STEP 3)

1. Function of the process Item

2. Function of the process step & product charecteristics

3.Function of the process work element & process charecteristics

FAILURE ANALYSIS (STEP 4)

1. Failure Effects (FE) to the next higher level element

   E    F    f   o    )    S    (   y    t    i   r   e   v   e    S

Mold Making M/C

To produce Cope & Drag mold as per specified parameters

Pattern Plate Temp

To achieve a desired temp for pattern in which resin coated sand will start bonding & make a solid mold

Depression at casting surface

8

Cavity cleaning not done on regular basis resulting carbon depletion

Cavity cleaning not done on regular basis resulting carbon depletion

Dent at casting surface

8

Tool mark on pattern surface

Cleaning done through steel rod,brush etc

Extra metal & Sand inclusion at casting

7

Temperature variation showing in M/C

M/C heating controller failure

Extra metal & Sand inclusion at casting

7

High pattern plate temperature Temp thermocouple failure

Blow holes at

7

casting

40 / Mold Making

Investment time

3. Failure Cause  (FC) of the Work Element

Knowledge of M/C Operation & process parameters

Skilled operator 

Rocker Arm Sub assembly

2. Failure Mode (FM) of the Process Step

Shooting of sand To transfer motion in cavity through from input to gravity to obtain output cope & drag molds

Low pattern plate temperature

Crack defect at casting

7

Low investment time

Blow holes at casting

7

High investment time

Improper setting of investment i nvestment time in PLC

To achieve a desired thickness of mold wrt time

Curing time

To cure the mold perfectly & release the excess resin from mold

Blow holes at casting

7

Low curing time

Improper setting of curing time in PLC

 Air Pressure

To proviide a constant presure to M/C for shooting

Sand inclusion at casting surface

7

Low air shooting pressure in M/C resulting low strength cores

 Air pressure not maintained maintained constantly

M/C Parameters

Cope & Drag Pattern

Silicon Spray

Blow holes at To obtain hardness within casting spec & good surface finish of Extra metal & Sand cores inclusion at component

7

Lower thickness of To obtain profile & thickness casting at hollow of mold within spec surface

8

Higher thickness of mold

pattern cavity worn out

 Applying at pattern surface Sand inclusion at for Proper ejection of cores casting surface from M/C

7

Sand erosion from core surface during ejection

Not properly applying spray on periodicaly basis

Low heating temperature Heating Temperature not fixed at M/C High heating temperature

 

GHAZIABAD PRECISION PRODUCTS PVT LTD

RISK ANALYSIS (STEP 5)    C    F    f   o    )

Current Prevention Control (PC) of FC

   O    (   e   c   n   e   r   r   u   c   c    O

  r   o   n   o   C    i    F    t   c   f    t   e   o     e   )    C    M    D    t   D    (   F   n   l   e  o   r   r   r    t   u  n    C  o    C

FR-ENG-009

OPTIMIZATION (STEP 6)    f   o    )

   D    M    (   n   F   o   /    i    t   C   c   F   e    t   e    D

   P    A    A    E    M    F    P

  s   c    i    t

   l   s   r    i   a   i   e   c   t   e  c   p  e    S  r   a    h    C

   l   a   n   o    i    t   p   o    (   e    d   o    C   r   e    t    l    i    F

  n   o    i    t   c    A   e   v    i    t   n   e   v   e   r    P

  n   o    i    t   c    A   n   o    i    t   c   e    t   e    D

  e   e   m    l    b  a    i   s   N   n   '   s   o  n   p  o   s   s   e   r    R  e    P

  n   o    i    t   e    l   p  e   m    t   o  a    d    C    t   e   g   r   a    T

  s   u    t   a    t    S

  e    h  c    t    i   n   w  e    d    i   n   e  v    k  e   a  o    t    t   n  r   e   o   t    i    t   n   c   i    A  o   p

  e    t   a    D   n   o    i    t   e    l   p   m   o    C

   E    F    f   o    )    S    (   y    t    i   r   e   v   e    S

   )    O    (   c   e   n   e   r   r   u   c   c    O

   )    D    (   n   o    i    t   c   e    t   e    D

  s   c    i    l    t    i   a   i   s   r   c   t   e   e  c   p  e    S  r   a    h   c

   P

   )    l   a   n   o    i    t

   A    A    E    M    F    P

  o   p    (   e    d   o    C   r   e    t    l    i    F

  s    k   r   a   m   e    R

Displayed Work instruction machine for reference WIPRD-005

5

Monitoring in every 4 hrs & record in Mold making record DOC NO- FR-PRD-0036

6

M

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

Displayed work instruction in machine for cleaning of pattern through copper rod only

5

Verification of pattern condition after returning & record maintain through pattern history card in ERP

4

M

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

Preventive maintenance done as per yearly plan & autonomous maintenance on daily basis

5

Preventive maintenance Plan Vs actual( FR-MNT-010) &  Autonomus maintenace checksheet (FR-MNT-004)

6

M

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

4

M

P

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

4

M

P

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

4

M

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

4

M

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

4

M

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

6

M

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

6

M

P -

-

-

-

-

-

-

-

-

-

-

-

-

-

1.PLC controlled programming & Visual inspection of every mold according to color chart displayed in line 2.Setup approval before

4

continous production

4

Monitoring of pattern plate temp once in 4hrs through IR pyrometer 

4 Monitoring of investment time in every 4 hrs through PLC & record in setup approval sheet

Process validation done & fixed the spec & monitor through PLC 4

Process validation done & fixed the spec & monitor through PLC

4

FRL installed in line to provide constant pressure to M/C

4

Monitoring of curing time in every 4 hrs through PLC & record in setup approval sheet Monitoring in every 4 hrs & record in Set-up Approval Report ( Doc No :FR-PRD-036)

Heating Temp fixed according to process validation & control through PLC

4

4

Shelf Life of pattern is fixed to 250000 shots 7 pattern verification is done on every 50000 shots

4

Displayed work instruction in machine for application of silicon spray in pattern

4

Monitoring in every 4 hrs & record in Set-up Approval Report ( Doc No :FR-PRD-036)

Monitoring through Pattern History Card in ERP (Doc No: FR-TLG-003)

Monitoring in every 4 hrs & record in Set-up Approval Report ( Doc No :FR-PRD-036)

6

M

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

6

M

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

 

GHAZIABAD PRECISION PRODUCTS PVT LTD

FR-ENG-009

Process failure Mode and Effects Analysis ( Process FMEA)

PLANNING & PREPARATION ( STEP 1) Company NamePlant LocationCustomer Name- ASHOK LEYLAND Model Year/ Platform- 2013 Part Name :- Rocker Arm ( Int & Exh ) CONTINOUS IMPROVEMENT

History / change Authorization ( As applicable )

SubjectPFMEA Start Date- 01.01.21 PFMEA Revision Date- 25.01.21 Cross- Functional Team- ONT/MKG/RSM/SA/KM/US/AR/PK/SM/KS/BDM

STRUCTURE ANALYSIS (STEP2)

1. Pr Proc oces ess s IIte tem m

2. Proc Proces ess sS Ste tep p

3.Pr 3.Proc oces ess sW Wor ork kE Ele leme ment nt

FUNCTION ANALYSIS (STEP 3)

1. Function of the process Item

2. Function of the process step & product charecteristics

3.Function of the process work element & process charecteristics

PFMEA ID No- PFMEA/2001-2002/01 Process Responsibility- Line Incharge Confidentiality level- 04

FAILURE ANALYSIS (STEP 4)

1. Failure Effects (FE) to the next heigher level element

   E    F    f   o    )    S    (   y    t    i   r   e   v   e    S

High Hardness at casting

8

Wrong charging of raw material in furnace low hardness at casting

inclusion,blow w To melt the metal in required Slag inclusion,blo specification holes in casting

Induction Furnace

High & low hardness

assembly

To achieve the chemistry of part as from input to output per specification To transfer motion

60 / Melting Spectrometer 

M/C Parameters

High Si % at bath

Knowledge of M/C Operation & process parameters

Skilled operator 

Rocker Arm Sub

2. Failure Mode (FM) of 3. Failure Cause (FC) of the Process Step the Work Element

8

7

High C% at bath

Hydrogen, nitrogen pickup Lining nature of furnace not in furnace during melting fixed

8

To give the chemical result

Chemical composition

Internal calibration for

within specific range

showing out of specification

spectrometer not done

Mic icrr o ost strr u uct ctu ur a all defect fect

8

High/low Hardness at casting

8

High Si & C% at bath

C% & Si% parameters not fixed

To provide C & Si% in order High/low Hardness to match with spectrometer  at casting

6

High Si & C% at CE meter

Failure of machine showing   wrong result

To achieve the chemical composition as per specification in order to achieve hardness & tensile strength of component

CE meter

 

GHAZIABAD PRECISION PRODUCTS PVT LTD

Process Parameters

To achieve the desired High/low Hardness microstructure & hardness of at casting component

FR-ENG-009

8

High tapping temp

Tapping temp not measured by operator while tapping

 

GHAZIABAD PRECISION PRODUCTS PVT LTD

FR-ENG-009

RISK ANALYSIS (STEP 5)

Current Prevention Control (PC) of FC

   C    F    f   o    )    O    (   e   c   n   e   r   r   u   c   c    O

  r   n  o   o   C    i    t   F   c   f    t   e  o   e   )      C   M    D    F    t   D   n   (    l   e   o   r   r   r   t   u  n    C  o    C

5

5

4

Monitoring of every lining through furnace lining life record DOC No- FR-PRD-016

3

3

4

chemistry pouring & willlab notapproval done

 Alternate verification of chemistry through spectrometer for assurance & Preventive maintenance done as per yearly plan

   P    A    A    E    M    F    P

  n   o    i    t   c    A   e   v    i    t   n   e   v   e   r    P

  n   o    i    t

  e   e   m    l

   A   c   n   o    i    t   c   e    t   e    D

  a    i    b   s   N   n   '   s   o  n   p  o   s   s   e   r    R  e    P

  s   u    t   a    t    S

  e    h    t   c    i   n   w  e    d   v   n   i   e    k   e   a   o    t    t   n  r   o  e    i    t   t   n   c   i    A  o   p

  e    t   a    D   n   o    i    t   e    l   p   m   o    C

   E    F    f

   )    O    (

   )   o    S    (   y    t    i   r   e   v   e    S

  e   c   n   e   r   r   u   c   c    O

   )    D    (   n   o    i    t   c   e    t   e    D

  s   c    i    t    l   a   i   s    i   r   c   t   e   e  c   p    S  e   r   a    h   c

   P    A    A    E    M    F    P

   )    l   a   n   o    i    t   p   o    (   e    d   o    C   r   e    t    l    i    F

   k   s   r   a   m   e    R

6

M

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

6

M

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

6

M

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

6

M

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

6

M

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

6

M

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

6

M

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

Monitoring on daily basis through internal CRM before start of production & record on softcopy

Daily calibration of spectrometer done as per internal CRM & weekly calibration through CRM

Displayed SOP at M/C for reference & without final bath

   (    D   M   n   F   o   /    i    t   C   c   F   e    t   e    D

  s   c    i    t    l   a    i   s    i   r   e   c   t   e  c   p  e    S  r   a    h    C

  n   o    i    t   e    l   p  e   m    t   o  a    C   d    t   e   g   r   a    T

Effectiveness of operator checked on every 3 months & Skill matrix for melting operation FR-HR-002

On job training providing to operator regarding machine operations & effectiveness is measured in every 3 months

 Acidic nature of lining is fixed in furnace for increasing lining life & forming oxidation layer to form oxides which can remove it in the form of slag

   f   o    )

OPTIMIZATION (STEP 6)    l   a   n   o    i    t   p   o    (   e    d   o    C   r   e    t    l    i    F

Monitoring on every heat basis through online display of spectrometer

4

Monitoring of every heat through spectrometer & record on softcopy & Preventive maintenance Plan Vs actual( FR-MNT-010)

 

GHAZIABAD PRECISION PRODUCTS PVT LTD

Displayed SOP at M/C for reference & alternate verification of pouring temp doneavoid at pouring stage to rejection

5

Monitoring on every heat basis through immersion pyrometer & record in melting recordNO- FR-PRD-005 DOC

6

M

P

-

-

-

-

-

FR-ENG-009

-

-

-

-

-

-

-

-

-

-

 

GHAZIABAD PRECISION PRODUCTS PVT LTD

FR-ENG-009

Process failure Mode and Effects Analysis ( Process FMEA)

PLANNING & PREPARATION ( STEP 1) Company NamePlant LocationCustomer Name- ASHOK LEYLAND Model Year/ Platform- 2013 Part Name :- Rocker Arm ( Int & Exh ) CONTINOUS IMPROVEMENT

SubjectPFMEA Start Date- 01.01.21 PFMEA Revision Date- 25.01.21 Cross- Functional Team- ONT/MKG/RSM/SA/KM/US/AR/PK/SM/KS/BDM

STRUCTURE ANALYSIS (STEP2)

PFMEA ID No- PFMEA/2001-2002/01 Process Responsibility- Line Incharge Confidentiality level- 04

FUNCTION ANALYSIS (STEP 3)

FAILURE ANALYSIS (STEP 4)    E    F    f

History / change Authorization ( As applicable )

1. Proc Proces ess s Ite Item m

2. Pr Proc oces ess sS Ste tep p

3. 3.Pr Proc oces ess sW Wor ork k Ele Eleme ment nt

1. Function of the process Item

2. Function of the process step & product charecteristics

70 / tapping

1. Failure Effects (FE) to the next heigher level element

   )   o    S    (   y    t    i   r   e   v   e    S

2. Failure Mode (FM)  of the Process Step

3. Failure Cause (FC) of the Work Element

8

Low & high amount of inoculation while tapiing

Inoculation amount of qty nt fixed

8

Low & high metal tapped in laddle

Reference for tapping at laddle not fixed

Knowledge of M/C Operation Low & High & process parameters Hardness at casting

Skilled operator 

Rocker Arm Sub assembly

3.Function of the process work element & process charecteristics

To achieve the desired microstructure &

To tap the metal in laddle in specific angle

Low & High Hardness at casting

7

Homogeneity / mixing of inoculation not done properly

Ram sliding not working

Laddle

To maintain the molten metal temp within tolerated time range

Cold at castings

8

Temp drop of molten metal

Tap to pouring stage time not fixed

Process Parameters

To achieve the desired microstructure & hardness of component

8

High tapping temp

Induction Furnace

To transfer motion from input to output

hardness of component

High/low Hardness at casting

Tapping temp not measured by operator while tapping

 

GHAZIABAD PRECISION PRODUCTS PVT LTD

RISK ANALYSIS (STEP 5)

Current Prevention Control (PC) of FC

On job training providing to operator regarding machine operations & effectiveness is

   C    F    f   o    )    O    (   e   c   n   e   r   r   u   c   c    O

Preventive maintenance done as per yearly plan &

   D    (   M   n   /    F   o    i    t   C   c   F   e    t   e    D

   P    A    A    E    M    F    P

  s   c    i    t   s    l   a   i   r    i   e   c   t   e   c   p  e    S  r   a    h    C

  n   o    i    t   c    A   e   v    i    t   n   e   v   e   r    P

  n   o    i    t

  e   e   m    l

   A   c   n   o    i    t   c   e    t   e    D

   b    i   a   s   N   n   '   s   o  n   p  o   s   s   e   r    R  e    P

  s   u    t   a    t    S

  e    h  c    t    i   n   w  e    d   v   n   i   e    k   e   a   o    t    t   n  r   e   o   t    i    t   n   c   i    A  o   p

  e    t   a    D   n   o    i    t   e    l   p   m   o    C

   E    F    f   o    )    S    (   y    t    i   r   e   v   e    S

   )    O    (   e   c   n   e   r   r   u   c   c    O

   )    D    (   n   o    i    t   c   e    t   e    D

  s   c    i    t    l   a   i   s    i   r   c   t   e   e  c   p    S  e   r   a    h   c

   P    A    A    E    M    F    P

   )    l   a   n   o    i    t   o   p    (   e    d   o    C   r   e    t    l    i    F

   k   s   r   a

  m   e    R

6

M

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

5

Monitoring on once per shift basis & record in laddle lining register DOC NO - FR-PRD018

6

M

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

5

Preventive maintenance Plan Vs actual ( FR-MNT-010) &  Autonomus maintenace checksheet (FR-MNT-004)

6

M

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

5

Monitoring of every heat through pouring time display meter & record in pouring sheet DOC NO- FR-PRD-006

6

M

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

6

M

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

Monitoring on every heat

Displayed SOP at M/C for reference & alternate verification of pouring temp done at pouring stage to avoid rejection

   f   o    )

  n   o    i    t   e    l   p  e   m    t   o  a    d    C    t   e   g   r   a    T

Effectiveness of operator checked on every 3 months & Skill matrix for melting operation FR-HR-002

autonomous maintenance on daily basis

Displayed SOP as per process validation & fixed pouring time range to avoid cold defect

OPTIMIZATION (STEP 6)    l   a   n   o    i    t   p   o    (   e    d   o    C   r   e    t    l    i    F

5

measured in every 3 months Marking on laddle done for reference while tapping of metal

  r   n  o   o   C    i    t   F   c   f   o      t   e   e   )    C    M    D    t   D    (   F   n   l   e   o   r   r   r   t   u  n    C  o    C

FR-ENG-009

5

basis through immersion pyrometer & record in melting record DOC NO- FR-PRD-005

 

GHAZIABAD PRECISION PRODUCTS PVT LTD

FR-ENG-009

Process failure Mode and Effects Analysis ( Process FMEA)

PLANNING & PREPARATION ( STEP 1) Company NamePlant LocationCustomer Name- ASHOK LEYLAND Model Year/ Platform- 2013 Part Name :- Rocker Arm ( Int & Exh ) CONTINOUS IMPROVEMENT

SubjectPFMEA Start Date- 01.01.21 PFMEA Revision Date- 25.01.21 Cross- Functional Team- ONT/MKG/RSM/SA/KM/US/AR/PK/SM/KS/BDM

STRUCTURE ANALYSIS (STEP2)

FUNCTION ANALYSIS (STEP 3)

PFMEA ID No- PFMEA/2001-2002/01 Process Responsibility- Line Incharge Confidentiality level- 04

FAILURE ANALYSIS (STEP 4)    E    F    f

History / change Authorization ( As applicable )

1. Proc Proces ess s IIte tem m

2. Pr Proc oces ess sS Ste tep p

3.Pr 3.Proc oces ess s Wor Work k Ele Eleme ment nt

1. Function of the process Item

2. Function of the process step & product charecteristics

assembly

To transfer motion 80 / Pouring

Mono Rail

Laddle

Process Parameters

   )   o    S    (   y    t    i   r   e   v   e    S

Cold at castings

8

2. Failure Mode (FM) of the Process Step

from input to output

3. Failure Cause (FC) of the Work Element

Slow pouring

Knowledge of Pouring method & time

Skilled operator 

Rocker Arm Sub

3.Function of the process work element & process charecteristics

1. Failure Effects (FE) to the next heigher level element

Less knowledge about pouring to operator 

Flash at castings

8

Fast pouring

To run the rail system in a specific time in order to achieve constant speed

Cold at castings

7

Slow pouring

Pneumatic cylinder failure

To maintain the molten metal temp within tolerated time range

Cold at castings

8

Temp drop of molten metal

Tap to pouring stage time not fixed

8

More pouring time

Effect of inoculation start fading at the end of pouring

To achieve the desired microstructure hardness of & component

To achieve the desired microstructure & hardness of Microstructural defect component

 

GHAZIABAD PRECISION PRODUCTS PVT LTD

FR-ENG-009

RISK ANALYSIS (STEP 5)

Current Prevention Control (PC) of FC

   C    F    f   o    )    (    O   e   c   n   e   r   r   u   c   c    O

  r   n  o   o   C    i    t   F   c   f   o      t   e   )   e    C    M    D    F    t   D   n   (    l   e   o   r   r   r   t   u  n    C  o    C

5

   f   o    )    D    (   M   n   F   o   /    i    C    t   c   F   e    t   e    D

OPTIMIZATION (STEP 6)    P    A    A    E    M    F    P

  s   c    i    t    l   a   i   s   r    i   e   c   t   e  c   p  e    S  r   a    h    C

   l   a   n   o    i    t   p   o    (   e    d   o    C   r   e    t    l    i    F

  n   o    i    t   c    A   e   v    i    t   n   e   v   e   r    P

  n   o    i    t   c    A   n   o    i    t   c   e    t   e    D

  e   e  m    l   a    i    b   s   N   n   '   s   o  n   p  o   s  s   e  r    R  e    P

  n   o    i    t   e    l

  p  e   m    t   o  a    d    C    t   e   g   r   a    T

  s   u    t   a    t    S

  e    h   c    t   n    i   w  e    d   n   v   e   i    k  e   a  o    t    t   n  r   o  e    i    t   t   n   c   i    A  o   p

  e    t   a    D   n   o    i    t   e    l   p   m   o    C

   E    F    f   o    )    S    (   y    t    i   r   e   v   e    S

   )    O    (   e   c   n   e   r   r   u   c   c    O

   )    D    (   n   o    i    t   c   e    t   e    D

  s   c    i    t    l   a   i   s    i   r   c   t   e   e   p  c    S  e   r   a    h   c

   P    A    A    E    M    F    P

   )    l   a   n   o    i    t   p   o    (   e    d   o    C   r   e    t    l    i    F

   k   s   r   a   m   e    R

6

M

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

6

M

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

Effectiveness of operator checked on every 3 months & Skill matrix for melting operation FR-HR-002

Displayed SOP for pouring time / mold for specific part & On job training providing to operator regarding machine operations & effectiveness is measured in every 3 months 5

Preventive maintenance done as per yearly plan & autonomous maintenance on daily basis

5

Preventive maintenance Plan Vs actual ( FR-MNT-010) &  Autonomus maintenace maintenace checksheet (FR-MNT-004)

6

M

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

Displayed SOP as per process validation & fixed pouring time range to avoid cold defect

3

Monitoring of every heat through pouring time display meter & record in pouring sheet DOC NO- FR-PRD-006

6

M

P

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

Pouring time fixed for every part through process validation & fixed in pouring timer

4

Monitoring on every heat basis through pouring timer & record in pouring record DOC NO- FR-PRD-006

6

M

P

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

 

GHAZIABAD PRECISION PRODUCTS PVT LTD

FR-ENG-009

Process failure Mode and Effects Analysis ( Process FMEA)

PLANNING & PREPARATION ( STEP 1) Company NamePlant LocationCustomer Name- ASHOK LEYLAND Model Year/ Platform- 2013 Part Name :- Rocker Arm ( Int & Exh ) CONTINOUS IMPROVEMENT

SubjectPFMEA Start Date- 01.01.21 PFMEA Revision Date- 25.01.21 Cross- Functional Team- ONT/MKG/RSM/SA/KM/US/AR/PK/SM/KS/BDM

STRUCTURE ANALYSIS (STEP2)

FUNCTION ANALYSIS (STEP 3)

PFMEA ID No- PFMEA/2001-2002/01 PFMEA/2001-2002/01 Process Responsibility- Line Incharge Confidentiality level- 04

FAILURE ANALYSIS (STEP 4)    E    F    f

History / change Authorization ( As applicable )

1. Proc Proces ess s Ite Item m

2. Proc Proces ess sS Ste tep p

3.Pr 3.Proc oces ess s Wor Work k Ele Eleme ment nt

1. Function of the process Item

2. Function of the process step & product charecteristics

3.Function of the process work element & process charecteristics

1. Failure Effects (FE) to the next heigher level element

   )   o    S    (   y    t    i   r   e   v   e    S

High/Low hardness

8

Less knowledge about knockout to operator 

Microstructural defect

90 / Knockout

Knockout Timer

Process Parameters

To transfer motion from input to output

3. Failure Cause (FC) of the Work Element

Fast/Late knockout

Knowledge of knockout method & time

Skilled operator 

Rocker Arm Sub assembly

2. Failure Mode (FM) of the Process Step

8

Fast/Late knockout

8

Timer not showing correct time

Timer failure

More Hardness

8

Less Knockout time

Variation in knoukout time as it is not fixed

Low Hardness

8

More knockout time

Increase in knockout time shows decrease in hardness of component

To achieve the desired microstructure & hardness of component

To achieve a desired time for High/Low hardness knockout of component

To achieve the desired microstructure & hardness of component

 

GHAZIABAD PRECISION PRODUCTS PVT LTD

FR-ENG-009

RISK ANALYSIS (STEP 5)

Current Prevention Control (PC) of FC

   C    F    f   o    )    O    (   e   c   n   e   r   r   u   c   c    O

  r   n  o   o   C    i    t   F   c   f   o      t   e   )   e    C    M    D    F    D    t   (   n   l   e   o   r   r   r   t   u  n    C  o    C

5 Displayed SOP forpart knockout time for specific & On  job training providing to operator regarding machine operations & effectiveness is measured in every 3 months

   f   o    )    D    (   M   n   F   o   /    i    C    t   c   F   e    t   e    D

OPTIMIZATION (STEP 6)    P    A    A    E    M    F    P

  s   c    i    t    l   a   i   r   s    i   e   c   t   e  c   p   r    S  e   a    h    C

   l   a   n   o    i    t   p   o    (   e    d   o    C   r   e    t    l    i    F

  n   o    i    t   c    A   e   v    i    t   n   e   v   e   r    P

  n   o    i    t   c    A   n   o    i    t   c   e    t   e    D

  e   e  m    l    b  a    i   s   N   n   '   s   o  n   p  o   s  s   e  r    R  e    P

  p  e   m    t   o  a    d    C    t   e   g   r   a    T

  s   u    t   a    t    S

  e    h  c    t    i   n   w  e    d   n   e   i   v    k  e   a  o    t    t   n  r   e   o   t    i    t   n   c   i    A  o   p

  n   o    i    t   e    l

  e    t   a    D   n   o    i    t   e    l   p   m   o    C

   E    F    f   o    )    S    (   y    t    i   r   e   v   e    S

   )    O    (   e   c   n   e   r   r   u   c   c    O

   )    D    (   n   o    i    t   c   e    t   e    D

  s   c    i    t   s    l   a   i    i   r   c   t   e   e  c   p    S  e   r   a    h   c

   P    A    A    E    M    F    P

   )    l   a   n   o    i    t   p   o    (   e    d   o    C   r   e    t    l    i    F

  s    k   r   a   m   e    R

6

M

P

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

6

M

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

6

M

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

6

M

P

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

6

M

P

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

Effectiveness of operator checked on every 3 months & Skill matrix for melting operation FR-HR-002 5

Monitoring on every heat  Alternate verification of timing through stop watch on per heat basis & Calibration done as per yearly plan

5

basis & record basison pouring DOC NO- FR-PRD-006 Calibration Plan Vs actual ( FR-CAL-002)

5 Knockout time fixed for every

Monitoring on every heat

part through process validation & fixed in knockout timer

basis through knockout timer & record in pouring record DOC NO- FR-PRD-006 4

 

GHAZIABAD PRECISION PRODUCTS PVT LTD

FR-ENG-009

Process failure Mode and Effects Analysis ( Process FMEA)

PLANNING & PREPARATION ( STEP 1) Company NamePlant LocationCustomer Name- ASHOK LEYLAND Model Year/ Platform- 2013 Part Name :- Rocker Arm ( Int & Exh ) CONTINOUS IMPROVEMENT

History / change Authorization ( As applicable )

SubjectPFMEA Start Date- 01.01.21 PFMEA Revision Date- 25.01.21 Cross- Functional Team- ONT/MKG/RSM/SA/KM/US/AR/PK/SM/KS/BDM

STRUCTURE ANALYSIS (STEP2)

1. Proc Proces ess s Ite Item m

2. Proc Proces ess s Ste Step p

3.Pr 3.Proc oces ess sW Wor ork kE Ele leme ment nt

FUNCTION ANALYSIS (STEP 3)

1. Function of the process Item

2. Function of the process step & product charecteristics

3.Function of the process work element & process charecteristics

PFMEA ID No- PFMEA/2001-2002/01 Process Responsibility- Line Incharge Confidentiality level- 04

FAILURE ANALYSIS (STEP 4)

1. Failure Effects (FE) to the next heigher level element

   E    F    f    )   o    S    (   y    t    i   r   e   v   e    S

2. Failure Mode (FM) of the Process Step

9

More less ferrite/Pearlite judge the defect visualy in moreorcarbide at component& Not microstructure analysis

Knowledge of M/C operations Fit & function failure & checking Microstructure & at customer end hardness of component

Skilled operator 

9

Rocker Arm Sub assembly

100 / Inspection( Metall urgical)

Fitment issue in engine assembly at customer end

More or less hardness at component

Not correctly measure the reading of hardness

Chemistry showing wrong result

Improper flow rate of argon gas

Chemical composition showing out of specification

Internal calibration for spectrometer not done

To check the microstructure & hardness of component 9

High & low hardness

Spectrometer 

3. Failure Cause (FC) of the Work Element

8

To give the chemical result within specific range Microstruct ur ural de defect

8

 

GHAZIABAD PRECISION PRODUCTS PVT LTD

FR-ENG-009

RISK ANALYSIS (STEP 5)

Current Prevention Control (PC) of FC

   C    F    f   o

  r   n  o   o   C    i    t   F

   )    O    (   e   c   n   e   r   r   u   c   c    O

  o   e   c   f    t   e   )      C    M    D    D    F    t   (   n   l   e   o   r   r   r   t   u  n    C  o    C

Trained metallurgist are only responsible for miscrostructural inspection & their effectiveness is carried through MSA in every 3 months  Also Grain morphology morphology charts are displayed in lab for reference

On job training providing to operator regarding machine operations & effectiveness is measured in every 3 months through MSA

4

4

Flow rate of argon gas fixed & displayed WI in M/C for reference

4

Effectiveness of operator checked on every 3 months & Skill matrix for Lab FR-HR-002

Effectiveness of operator checked on every 3 months & Skill matrix for Lab FR-HR-002

Monitoring on daily basis through pressure gauge & record in autonomous checksheet

4

   f   o    )    D    (    M   n   F   o   /    i    C    t   c   F   e    t   e    D

OPTIMIZATION (STEP 6)

   A    P    A    E    M    F    P

  s   c    i    t   s    l    i   a    i   r   c  e   e   t   c   p  e    S  r   a    h

   C

   l   a   n   o    i    t   p   o    (   e    d   o    C   r   e    t    l    i    F

  n   o    i    t   c    A   e   v    i    t   n   e   v   e   r    P

  n   o    i    t   c    A   n   o    i    t   c   e    t   e    D

  e   e  m    l   a    b    i   N   s   n   '   s   o  n   p  o   s  s   e  r    R  e    P

  n   o    i    t   e    l   p   e   m    t   o  a    d    C    t   e   g   r   a    T

  s   u    t   a    t    S

  e    h    t   c    i   n   w  e    i   n   d   e  v    k  e   a  o    t    t   n  r   o  e    i    t   t   n   c   i    A  o   p

  e    t   a    D   n   o    i    t   e    l   p   m   o    C

   E    F    f   o    )    S    (   y    t    i   r   e   v   e    S

   )    O    (   e   c   n   e   r   r   u   c   c    O

   )    D    (   n   o    i    t   c   e    t   e    D

  s   c    i    l    t   s   a   i    i   r   c  e   e   t   p  c   e    S  r   a    h   c

   P    A    A    E    M    F    P

   )    l   a   n   o    i    t   p   o    (   e    d   o    C   r   e    t    l    i    F

  s    k   r   a   m   e    R

6

M

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

6

M

K

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

6

M

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

6

M

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

6

M

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

Monitoring on daily basis through internal CRM before

Daily calibration of spectrometer done as per

start of production & record on softcopy

internal CRM & weekly calibration through CRM 4

 

GHAZIABAD PRECISION PRODUCTS PVT LTD

FR-ENG-009

Process failure Mode and Effects Analysis ( Process FMEA)

PLANNING & PREPARATION ( STEP 1) Company NamePlant LocationCustomer Name- ASHOK LEYLAND Model Year/ Platform- 2013 Part Name :- Rocker Arm ( Int & Exh ) CONTINOUS IMPROVEMENT

SubjectPFMEA Start Date- 01.01.21 PFMEA Revision Date- 25.01.21 Cross- Functional Team- ONT/MKG/RSM/SA/KM/US/AR/PK/SM/KS/BDM

STRUCTURE ANALYSIS (STEP2)

FUNCTION ANALYSIS (STEP 3)

PFMEA ID No- PFMEA/2001-2002/01 PFMEA/2001-2002/01 Process Responsibility- Line Incharge Confidentiality level- 04

FAILURE ANALYSIS (STEP 4)    E    F    f

History / change Authorization ( As applicable )

1. Pr Proc oces ess s Ite Item m

2. Pr Proc oces ess s Ste Step p

3.Pr 3.Proc oces ess s Wor Work k Ele Eleme ment nt

1. Function of the process Item

2. Function of the process step & product charecteristics

To remove the To transfer motion parting line, flashes & fins from from input to output component

110 / Fettling

Bench Grinder 

1. Failure Effects (FE) to the next heigher level element

Knowledge of M/C operations Under dimension of & process parameters component

Skilled operator

Rocker Arm Sub assembly

3.Function of the process work element & process charecteristics

   )   o    S    (   y    t    i   r   e   v   e    S

2. Failure Mode (FM) of the Process Step

3. Failure Cause  (FC) of the Work Element

Less knowledge & awareness

7

Over grinding

to operator regarding grinding operations

suface finish not Ok in casting

7

rough surface of grinding wheel

Dressing not done by operator 

Crack on chill face of casting

7

Vibr Vibrat atio ion n on on gri grind ndin ing g whe wheel el

Whee Wheell ali align gnme ment nt not not don done e

To grind the part as per specification

 

GHAZIABAD PRECISION PRODUCTS PVT LTD

FR-ENG-009

RISK ANALYSIS (STEP 5)

Current Prevention Control (PC) of FC

Displayed WI on shop floor for grinding operatorto&operator On job training providing regarding machine operations & effectiveness is measured in every 3 months

Displayed WI for dressing procedure in M/C for

5

5

Effectiveness of operator checked on every 3 months & Skill matrix for Lab FR-HR-002

Monitoring on daily basis & record in Machine

   f   o    )    (    D   M   n   F   o   /    i    t   C   c   F   e    t   e    D

OPTIMIZATION (STEP 6)    P    A    A    E    M    F    P

  s   c    i    t    l    i   s   a    i   r   e   c   t   e  c   p  e    S  r   a    h

   C

   l   a   n   o    i    t   o   p    (   e    d   o    C   r   e    t    l    i    F

  n   o    i    t    A   c   e   v    i    t   n   e   v   e   r    P

  n   o    i    t   c    A   n   o    i    t   c   e    t   e    D

  e   e   m    l    i    b    N   s   a   n   '   s   o  n   p  o   s   s   e   r    R  e    P

  n   o    i    t   e    l   p   e   m    t   o  a    C   d    t   e   g   r   a    T

  s   u    t   a    t    S

  e    h    t   c    i   n   w  e   n   d    i   v   e    k   e   a   o    t    t   n  r   o  e    i    t   t   n   c   i    A  o   p

  e    t   a    D   n   o    i    t   e    l   p   m   o    C

   E    F    f    )   o    S    (   y    t    i   r   e   v   e    S

   )    O    (   e   c   n   e   r   r   u   c   c    O

   )    D    (   n   o    i    t   c   e    t   e    D

  s   c    i   s    l    i   a   t    i   r   c   t   e   e  c   p  e    S  r   a    h   c

   P    A    A    E    M    F    P

   )    l   a   n   o    i    t   p   o    (   e    d   o    C   r   e    t    l    i    F

  s    k   r   a   m   e    R

6

M

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

6

M

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

6

M

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

checksheet

reference

Displayed WI for wheel aligning procedure in M/C for reference

  r   o   n   o   C    i    t   F   c   o   e   f    t   e   )      C   M    D    F    t   D    (   n   l   e   o   r   r   r   t   u  n    C  o    C

   C    F    f   o    )    O    (   e   c   n   e   r   r   u   c   c    O

5

Monitoring on daily basis & record in Machine checksheet

 

GHAZIABAD PRECISION PRODUCTS PVT LTD

FR-ENG-009

Process failure Mode and Effects Analysis ( Process FMEA)

PLANNING & PREPARATION ( STEP 1) Company NamePlant LocationCustomer Name- ASHOK LEYLAND Model Year/ Platform- 2013 Part Name :- Rocker Arm ( Int & Exh ) CONTINOUS IMPROVEMENT

History / change Authorization ( As applicable )

SubjectPFMEA Start Date- 01.01.21 PFMEA Revision Date- 25.01.21 Cross- Functional Team- ONT/MKG/RSM/SA/KM/US/AR/PK/SM/KS/BDM

STRUCTURE ANALYSIS (STEP2)

1. Proc Proces ess s It Item em

2. Proc Proces ess s Step Step 3.Pr 3.Proc oces ess s Work Work Elem Elemen entt

FUNCTION ANALYSIS (STEP 3)

1. Function of the process Item

2. Function of the process step & product charecteristics

3.Function of the process work element & process charecteristics

PFMEA ID No- PFMEA/2001-2002/01 PFMEA/2001-2002/01 Process Responsibility- Line Incharge Confidentiality level- 04

FAILURE ANALYSIS (STEP 4)

1. Failure Effects (FE) to the next heigher level element

   E    F    f   o    )    S    (   y    t    i   r   e   v   e    S

2. Failure Mode (FM) of 3. Failure Cause (FC) of the Process Step the Work Element

Counting of components not done

Skilled operator 

Rocker Arm Sub assembly

To shot the To transfer motion component in from input to order to achieve output good surface appearance

120 / Shot Blasting

Knowledge of M/C Operation & process parameters

Poor visual appearance(extrametal & Poor Surface finish on component at final inspection area Poor visual appearance(extra metal & Poor Surface finish on component at final inspection area

6

Uncleaned & surface finish not ok

Shots level not checked

To shot blast the Shot Blasting Machine

component in order to achieve good surface appearance

Impellar work not properly

 

GHAZIABAD PRECISION PRODUCTS PVT LTD

FR-ENG-009

RISK ANALYSIS (STEP 5)    C    F    f   o    )    O    (

Current Prevention (PC) of FC Control

1.100% counting of component & 2.Part wise loading qty defined in process sheet

  e   c   n   e   r   r   u   c   c    O

Current Detection Control (DC) of FC or FM

OPTIMIZATION (STEP 6)    f   o    )    D    (    M   n   o   /    F    i    C    t   c   F   e    t   e    D

   P    A    A    E    M    F    P

  s   c    i    t    l    i   s   a  r    i   e   c   e   t   p  c   e    S  r   a    h    C

   l   a   n   o    i    t   p   o    (   e    d   o    C   r   e    t    l    i    F

  n   o    i    t   c    A   e    i   v    t   n   e   v   e   r    P

  n   o    i    t   c    A

  e   e   m    l   a    b    i    N   s

  n   o    i    t   c   e    t   e    D

  o   n   '   s   p  n   o   s   s   e   r    R  e    P

  n   o    i    t   e    l   p   m  e   a   o   t    d    C    t   e   g   r   a    T

  s   u    t   a    t    S

  e    h  c    t    i   n   w  e    d   n   i   e   v   e    k   a   t   o    t   n  r   e   o   t    i    t   n   c   i    A  o   p

  e    t   a    D   n   o    i    t   e    l   p   m   o    C

   E    F    f   o    )    S    (   y    t    i   r   e   v   e    S

   )    O    (   e   c   n   e   r   r   u   c   c    O

   )    D    (   n   o    i    t   c   e    t   e    D

  s   c    i    l    t   s   a   i    i   r   c   e   e   c   p   t    S  e   r   a    h   c

   P    A    A    E    M    F    P

   )    l   a   n   o    i    t   p   o    (

  s    k   r

  e    d   o    C   r   e    t    l    i    F

  a   m   e    R

5

Monitoring in every loading basis & record in shot blasting record Doc no- FR-PRD-018

6

M

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

4

Monitoring in every hour basis & record in shot blasting record Doc no- FR-PRD-018

6

M

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

5

Monitoring in every hour basis & record in shot blasting record Doc no- FR-PRD-003

6

M

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

6

M

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

for reference Doc no- FRPRD-038

1.Timer is been installed in M/C for time measurement 2.Shot blasting blasting WI for reference Doc no- FR-PRD038 3.On job training providing to operator regarding machine operations & effectiveness is measured in every 3 months

1.Amperage meter with marking is installed in M/C 2.Shot blasting blasting WI for reference Doc no- FR-PRD038 3.On job training providing to operator regarding machine operations & effectiveness is measured in every 3 months

Preventive maintenance done as per yearly plan & autonomous maintenance on daily basis

Preventive maintenance Plan 5

Vs actual( FR-MNT-010) &  Autonomus maintenace checksheet (FR-MNT-004) (FR-MNT-004)

 

GHAZIABAD PRECISION PRODUCTS PVT LTD

FR-ENG-009

Process failure Mode and Effects Analysis ( Process FMEA)

PLANNING & PREPARATION ( STEP 1) Company NamePlant LocationCustomer Name- ASHOK LEYLAND Model Year/ Platform- 2013 Part Name :- Rocker Arm ( Int & Exh ) CONTINOUS IMPROVEMENT

History / change Authorization ( As applicable )

SubjectPFMEA Start Date- 01.01.21 PFMEA Revision Date- 25.01.21 Cross- Functional Team- ONT/MKG/RSM/SA/KM/US/AR/PK/SM/KS/BDM

STRUCTURE ANALYSIS (STEP2)

1. Proc Proces ess s It Item em

2. Proc Proces ess s Step Step 3. 3.Pr Proc oces ess s Work Work Elem Elemen entt

FUNCTION ANALYSIS (STEP 3)

1. Function of the process Item

2. Function of the process step & product charecteristics

3.Function of the process work element & process charecteristics

Knowledge of M/C Operation & process parameters

Skilled operator

Rocker Arm Sub assembly

Fitment issue in engine assembly at customer end

130 / Visual Inspection Lighting conditon

Gauges

PFMEA ID No- PFMEA/2001-2002/0 PFMEA/2001-2002/01 1 Process Responsibility- Line Incharge Confidentiality level- 04

To check the visual defects in component To provide good lighting condion for observing defects

FAILURE ANALYSIS (STEP 4)

1. Failure Effects (FE) to the next heigher level element

Defective Component dispatched to customer & get break during engine running

   E    F    f   o    )    S    (   y    t    i   r   e   v   e    S

2. Failure Mode (FM) of 3. Failure Cause (FC) of the Process Step the Work Element

9

Surface defects missed during visual inspection

1.Less Knowledge & awareness to operator  2. Lack of visual defect display

9

Low lux level

Lux level not defined at inspection area

9

Dimension out of specification

Gauge worn out

Defective Component dispatched to customer & get break during engine running

Fit & function To identify the OK parts & failure at customer reject the defect pieces end

 

GHAZIABAD PRECISION PRODUCTS PVT LTD

FR-ENG-009

RISK ANALYSIS (STEP 5)    C    F    f   o    )    O    (

Current Prevention (PC) of FC Control

  e   c   n   e   r   r   u   c   c    O

Limit sample board are displayed in line for reference & On job training providing to operator regarding machine operations & effectiveness is measured in every 3 months

4

Lux level specified at visual inspection area(min 750 lux)

4

Calibration of Gauges done according to schedule

4

OPTIMIZATION (STEP 6)    f   o    )    D    (   M

Current Detection Control (DC) of FC or FM

Limit sample acceptance criteria  Doc No : FR-ENG-011 & Effectiveness of operator checked on every 3 months which reflects on Skill matrix of Final inspection FR-HR-004

Monitoring on per shift basis & record in lux level register 

Monitoring through Master list for calibration of gauges Doc No : FR--CAL-002

  o   n   C    /    F    i    t   c   F   e    t   e    D

   P    A    E    A    M    F    P

  s   c    i    t    l   s   a   i   r    i   e   e   c   t   p  c   r    S  e   a    h    C

   l   a   n   o    i    t   p   o    (   e    d   o    C   r   e    t    l    i    F

  n   o    i    t   c    A   e    i   v    t   n   e   v   e   r    P

  n   o    i    t   c    A

  e   e   m    l   a    b    i    N   s

  n   o    i    t   c   e    t   e    D

  o   n   '   s   p  n   s   o   e   s   r    R  e    P

  n   o    i    t   e    l   p   m  e   o   t   a    d    C    t   e   g   r   a    T

  s   u    t   a    t    S

  e    h  c    t    i   n   w  e    d   n   i   e   v   e    k   a   t   o    t   n  r   e   o   t    i    t   n   c   i    A  o   p

  e    t   a    D   n   o    i    t   e    l   p   m   o    C

   E    F    f   o    )    S    (   y    t    i   r   e   v   e    S

   )    O    (   e   c

   )    D    (   n

  s   c    i    l    t   s   a   i    i   r

  e   n   r   r   u   c   c    O

   i    t   o   c   e    t   e    D

  e   e   c   t   p  c   e    S  r   a    h   c

   P    A    A    E    M    F    P

   )    l   a   n   o    i    t   p   o    (

  e    d   o    C   r   e    t    l    i    F

  s    k   r   a   m   e    R

6

M

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

6

M

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

6

M

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

 

GHAZIABAD PRECISION PRODUCTS PVT LTD

FR-ENG-009

Process failure Mode and Effects Analysis ( Process FMEA)

PLANNING & PREPARATION ( STEP 1) Company NamePlant LocationCustomer Name- ASHOK LEYLAND Model Year/ Platform- 2013 Part Name :- Rocker Arm ( Int & Exh ) CONTINOUS IMPROVEMENT

History / change Authorization ( As applicable )

SubjectPFMEA Start Date- 01.01.21 PFMEA Revision Date- 25.01.21 Cross- Functional Team- ONT/MKG/RSM/SA/KM/US/AR/PK/SM/KS/BDM

STRUCTURE ANALYSIS (STEP2)

1. Pro Proce cess ss Ite Item m

2. Pro Proce cess ss S Ste tep p

3. 3.Pr Proc oces ess s Work Work Elem Elemen entt

FUNCTION ANALYSIS (STEP 3)

1. Function of the process Item

2. Function of the process step & product charecteristics

3.Function of the process work element & process charecteristics

Knowledge of M/C Skilled operator

Rocker Arm Sub assembly

PFMEA ID No- PFMEA/2001-2002/01 Process Responsibility- Line Incharge Confidentiality level- 04

FAILURE ANALYSIS (STEP 4)

1. Failure Effects (FE) to the next heigher level element

   E    F    f   o    )    (    S   y    t    i   r   e   v   e    S

Fit & function

2. Failure Mode (FM)  3. Failure Cause (FC) of of the Process Step the Work Element

failure at customer end

9

Dimension out of specification

Less knowledge of GD&T to operator 

Fit & function To check the component failure at customer specific dimension end

9

Dimension out of specification

Uncalibrated measuring instrument used

Operation & process parameters

To check the Fitment issue in dimension of engine assembly component as per at customer end customer Dwg

140 / Final Inspection

Measuring Instruments

 

GHAZIABAD PRECISION PRODUCTS PVT LTD

RISK ANALYSIS (STEP 5)    C    F    f   o    )    O    (

Current Prevention Control (PC) of FC

  e   c   n   e   r   r   u   c   c    O

OPTIMIZATION (STEP 6)    f   o    )    D    (   M

Current Detection Control (DC) of FC or FM

FR-ENG-009

   F   o   n   /    i    C    t   c   F   e    t   e    D

   P    A    E    A    M    F    P

  s   c    i    l    t   s   a   i    i   r   c   e   t   e   p  c   e    S  r   a    h    C

   l   a   n   o    i    t   p   o    (

  e    d   o    C   r   e    t    l    i    F

  n   o    i    t   c    A

  n   o    i    t   c    A

  e   e  m    l   a    b    i    N   s

  e   v    i    t   n   e   v   e   r    P

  n   o    i    t   c   e    t   e    D

  n   s   o   '   p  n   o   s  s   e  r    R  e    P

  n   o    i    t   e    l   p   e    t   a   o   m    C   d    t   e   g   r   a    T

  s   u    t   a    t    S

  e    h   c    t    i   n   w  e    d   n   i   e   v

  e    t   a    D   n

   k   a   e   o    t    t   n  r   o  e    i    t   t   n   c   i    A  o   p

   i    t   o   e    l   p   m   o    C

   E    F    f   o    )    S    (   y    t    i   r   e   v   e    S

   )    O    (   e   c

   )    D    (   n

  n   e   r   r   u   c   c    O

   i    t   o   c   e    t   e    D

  s   c    i    l    t   s   a   i    i   r

  c   e   t   e   p  c   e    S  r   a    h   c

   P    A    A    E    M    F    P

   )    l   a   n   o    i    t   p   o    (

  e    d   o    C   r   e    t    l    i    F

  s    k   r   a   m   e    R

Monitoring of Trained personnel through Standard room

Qualified & trained personel are responsible for dimension inspection & effectiveness is measured in every 3 months

4

Calibration of equipment done as per schedule

4

capabilities matrix & Effectiveness monitored in every 3 months Doc No: DS-STD-001

Monitoring through Master list for calibration of gauges Doc No : FR--CAL-002

6

M

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

6

M

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

 

GHAZIABAD PRECISION PRODUCTS PVT LTD

FR-ENG-009

Process failure Mode and Effects Analysis ( Process FMEA)

PLANNING & PREPARATION ( STEP 1) Company NamePlant LocationCustomer Name- ASHOK LEYLAND Model Year/ Platform- 2013 Part Name :- Rocker Arm ( Int & Exh ) CONTINOUS IMPROVEMENT

History / change Authorization ( As applicable )

SubjectPFMEA Start Date- 01.01.21 PFMEA Revision Date- 25.01.21 Cross- Functional Team- ONT/MKG/RSM/SA/KM/US/AR/PK/SM/KS/BDM

STRUCTURE ANALYSIS (STEP2)

1. Pr Proc oces ess s Item Item

2. Pr Proc oces ess s St Step ep 3.Pr 3.Proc oces ess s Work Work El Elem emen entt

150 / Oiling

160 / Packing

FUNCTION ANALYSIS (STEP 3)

1. Function of the process Item

Skilled Operator

To transfer motion from input to output

170 / FG Storage

Storage

2. Function of the process step & product charecteristics

3.Function of the process work element & process charecteristics

Rust prevention of

To dip the component in

final component

RP as per work instruction

Packing of component as per To pack the component as

Skilled Operator

Rocker Arm Sub assembly

PFMEA ID No- PFMEA/2001-2002 PFMEA/2001-2002/01 /01 Process Responsibility- Line Incharge Confidentiality level- 04

FAILURE ANALYSIS (STEP 4)

1. Failure Effects (FE) to the next heigher level element

Rusted component dispatch to customer 

 Customer

   E    F    f   o    )    S    (   y    t    i   r   e   v   e    S

8

7

2. Failure Mode (FM) of 3. Failure Cause (FC) of the Process Step the Work Element

Oiling not done on

Less Knowledge &

component

awareness to operator 

Improper Counting

standard/ agreement

per packing standard

dissatisfaction

Storage of component as per standard/

To store the com component ponent as per packing standard

 Customer dissatisfaction

8

Rust in casting

Customer dissatisfaction

7

Proper documents not attached along with supply

Less Knowledge & awareness to operator 

Components kept in floor 

agreement

180 / Dispatch

Skilled Operator

Dispatch of To dispatch the component component as per as per invoice invoice

Less Knowledge & awareness to operator 

 

GHAZIABAD PRECISION PRODUCTS PVT LTD

RISK ANALYSIS (STEP 5)    C    F    f   o    )    O    (

Current Prevention (PC) of FC Control

  c   e   n   e   r   r   u   c   c    O

100% dipping application on component & On job training providing to operator regarding machine operations

5

Dock audit as per schedule & On job training providing to operator regarding machine operations

Components are stored in pallet/bins to prevent from moisture/ rust & displayed

5

5

WI at area for reference DOC NO- WI-PRD-046

Invoice control

Current Detection Control (DC) of FC or FM

Effectiveness monitored in every 3 months which reflects through Skill matrix of Oiling operation FR-HR-004 Work instruction for oiling operation Doc No :- FR- ENG-023

Effectiveness monitored in every 3 months which reflects through Skill matrix of Packing operation FR-HR-004 Work instruction for Packing operation Doc No :- FR- ENG-023

Monitoring through Dock audit conduct once in every week

FR-ENG-009

OPTIMIZATION (STEP 6)    f   o    )    D    (    M   n    /    F   o   C    i    t   c   F   e    t   e    D

   P    A    E    A    M    F    P

  s   c    i    l   t   s   a   i   r    i   e   c   t   e   p  c   e    S  r   a    h    C

   l   a   n   o    i    t   p   o    (

  e    d   o    C   r   e    t    l    i    F

  n   o    i    t   c    A   e    i   v    t   n   e   v   e   r    P

  n   o    i    t   c    A   n   o    i    t   c   e    t   e    D

  n   o   e    i   e  m    t    l   e   a    l    b    i    N   p   s   m  e   s   n   o   '   o   t   a    C   d   p  n   s  o    t   e  s   e   r   g    R  e   r    P   a    T

  s   u    t   a    t    S

  e    h  c    t    i   n   w  e    d   n   i   e  v   e    k   a   t   o    t   n  r   e   o   t    i    t   n    i   c    A  o   p

  e    t   a    D   n   o    i    t   e    l   p   m   o    C

   E    F    f   o    )    S    (   y    t    i   r   e   v   e    S

   )    O    (   e   c   e   n   r   r   u   c   c    O

   )    D    (   n   o    i    t   c   e    t   e    D

  s   c    i    l   t   s   a   i    i   r   e   c   t   e   p  c    S  e   r   a    h   c

   P    A    A    E    M    F    P

   )    l   a   n   o    i    t   p   o    (

  s    k   r

  e    d   o    C   r   e    t    l    i    F

  a   m   e    R

6

M

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

6

M

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

6

M

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

6

M

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

DOC NO - FR-IQA-014

5

Monitoring in every dispatch by store incharge