No 000-2019/VHCVCG

INFORME DE SUPERVISIÓN DE OBRA PROYECTO 

HABILITACIÓN URBANA “VIVE HOGAR CASTILLA”  CASTILLA”  CASTILLA – PIURA - PIURA  1

AGOSTO - 2019

 

VALORIUM CONSULT GROUP S.A.C.

INMOBILIARIA MALYVET S.A.C.

CAJA HUANCAYO S.A. 2

 

ÍNDICE

1. 2.

INTRODUCCIÓN: ............ ......................... ........................... ........................... .......................... .......................... .......................... .................... ....... 4 CARACTERISTICAS DEL PROYECTO ............. .......................... ........................... ........................... ........................ ........... 4

4.

DATOS GENERALES: ............. .......................... .......................... .......................... .......................... .......................... ......................... ............ 5

4.1.

INFORMACION GENERAL DEL PROYECTO: ............ .......................... .......................... ........................ ............ 5

5.

SITUACIÓN MUNICIPAL ............ ......................... .......................... ........................... .......................... ......................... ....................... .......... 7

6.

ESTRUCTURA DE PRESUPUESTO DE OBRA: ............ .......................... .......................... ...................... .......... 10

7.

VALORIZACION N° 00 DEL PRESUPUESTO GENERAL: .......................... ............. .................... ....... 15

8. INICIALES POR VENTAS: ........................................................................................ 25 9. MONTOS DE LIBERACIÓN: ..................................................................................... 26 10. MONTO RECIBIDO POR EL PROMOTOR PARA OBRA: ........................... ............. ......................... ........... 26 11. CUADRO DEL FLUJO DE FONDOS TRANSFERIDOS: ......................... ............ .......................... ................ ... 26 12. CONCLUSIONES: ............ ......................... .......................... ........................... ........................... .......................... .......................... .................... ....... 28  ANEXO 1: REPORTE FOTOGRAFICO: FOTOGRAFICO:.......................... ............ ........................... .......................... ......................... .................... ........ 31  ANEXO 2: VALORIZACION DE OBRA: .......................... ............ ........................... .......................... ......................... .................... ........ 34  ANEXO 3: VALORIZACIÓN DE GASTOS GASTOS INDIRECTOS:......................... ............ ......................... .................... ........ 87

3

 

“HABILITACIÓN URBANA VIVE HOGAR CASTILLA”  CASTILLA”   1. INTRODUCCIÓN: El presente informe corresponde a la supervisión de obra del proyecto “Habilitación Urbana Vive Hogar Castilla” Castilla” para la valorización del avance de construcción ejecutado al 31 de Agosto del 2019, ubicado en Parcela C y D, Distrito de Castilla, Provincia y Departamento de Piura, el cual está ubicado dentro del Predio Matriz (Predio Rústico RC19036, ubicado en el Sector Medio Piura, Distrito de Castilla, Provincia y Departamento de Piura. La presente valorización hace referencia a las Etapas I, II, III, IV, I V, V, VI, VII y VIII de la Habilitación Urbana “Vive Hogar Castilla”.  Castilla”. 

2. CARACTERISTICAS CARACTERISTICAS DEL PROYECTO El Proyecto “Vive Hogar Castilla” cuenta Castilla” cuenta con una Habilitación Urbana que abarcará 4008 lotes para viviendas unifamiliares en sus 8 Etapas. A continuación, se presenta el resumen de la cantidad de Viviendas por Etapas: I Etapa: 481 viviendas unifamiliares. II Etapa: 454 viviendas unifamiliare unifamiliares. s. III Etapa: 550 viviendas unifamiliares. IV Etapa: 516 viviendas unifamiliares. V Etapa: 520 viviendas unifamiliare unifamiliares. s. VI Etapa: 557 viviendas unifamiliares VII Etapa: 458 viviendas unifamiliares VIII Etapa: 472 viviendas unifamiliares  TOTAL: 4,008 viviendas unifamiliares.

VIVIENDA TIPO I: El módulo típico de vivienda tiene un área techada de 25.00 m 2, sobre un área de terreno en su mayoría de aprox. 62.50 m 2, la cual consta de sala-comedor, cocina, patio - lavandería, 02 dormitorios, 1 baño común y jardín. Cabe mencionar que todas las viviendas hasta la Etapa IV se construirán con Módulos de 24.875 y 25.00 m2.  Asimismo, a partir de la V Etapa hasta la octava se construirán viviendas de 25.00 y 33.00 m2, lo cual dependerá de la licencia de Edificación, ya que a la fecha f echa el Promotor solo tiene Licencias de Edificación para la I y II Etapa. 4

 

4. DATOS GENERALES: 4.1. INFORMACION GENERAL DEL PROYECTO: N° de Viviendas: 4008

FICHA TECNICA DEL PROYECTO: “HABILITACIÓN URBANA VIVE HOGAR CASTILLA” CASTILLA”  NOMBRE DEL PROYECTO HABILITACIÓN URBANA “VIVE HOGAR CASTILLA”  CASTILLA”   EL PROYECTO

VIVIENDAS UNIFAMILIARES

UBICACIÓN PROYECTO

DEL DISTRITO DE CASTILLA, PROVINCIA DE PIURA, DEPARTAMENTO DE PIURA.  ÁREA DE TERRENO PARCELA PARCELA C: 379,466.88 m2. (Etapa I hasta VI) ÁREA DEL TERRENO  ÁREA DE TERRENO PARCELA PARCELA D.: 105,713.17 m2. (Etapa VII hasta VIII) 2

N° DE VIVIENDAS INICIALMENTE N° DE VIVIENDAS FINALES N° DE TIENDAS / OFICINAS N° DE ESTACIONAMIENTOS AREA TECHADA A CONSTRUIR (8 ETAPAS) ÁRE TECHADA CON LICENCIAS PLAZO DE EJECUCIÓN PARA CONSTRUCCIÓN

 ÁREA DE TERRENO PARA PARA LAS 8 ETAPAS: 485,180.05 m . 4008 UNIDADES INMOBILIARIAS 4008 UNIDADES INMOBILIARIAS 0 UNIDADES 4,127 ESTACIONAMIENTOS NO VENDIBLES. 110,773.25 m2  23,324.25 m2 (ETAPA I Y II)

LA 60 MESES

PRESUPUESTO TOTAL (INC. GG + UTILIDAD + S/.168’392 S/.168’392,289.99 ,289.99 I.G.V.)

CIENTO SESENTA Y OCHO MILLONES TRESCIENTOS NOVENTA Y DOS MIL DOSCIENTOS OCHENTA Y NUEVE CON 99/100 SOLES).

PROMOTOR

INMOBILIARIA MALYVET S.A.C.

CONSTRUCTOR

CONSORCIO: CESAR WIESE Y CIA S.R.L. CONTRATISTAS GENERALES Y ABB CONSTRUCCIONES S.A.C.   Tabla 1: Ficha Técnica del Proyecto

 Asimismo, se presenta presenta el resumen técnico de la obra: obra: 5

 

RESUMEN TÉCNICO  TÉCNICO 

Nombre del Proyecto Habilitación Urbana “Vive Hogar Castilla”  Castilla”  Fecha de valorización 31/08/2 31/08/2019 019 Valorización  AGOSTO correspondiente correspondien te al mes: Ubicación Parcela C y D, Distrito de Castilla, Provincia y Ubicación Departamento de Piura.

No de niveles No Unidades Inmobiliarias Promotor Constructor Residente

Situación Municipal

Plazo de construcción Porcentaje de avance de obra Acumulada del Presupuesto General

01 Piso. 4008 viviendas unifamiliares. Inmobiliaria Malyvet S.A.C CONSORCIO: CESAR WIESE Y CIA S.R.L. CONTRATISTAS GENERALES Y ABB CONSTRUCCIONES S.A.C.  

Ing. Francisco Javier Varillas Trelles. Licencia de Habilitación Urbana: Resolución Gerencial Nº 0112018-GDUR-MDC de fecha 17 de Diciembre del 2,018 (Planeamiento (Planeamien to Integral del Proyecto por las 09 Etapas). Licencias de Habilitación Urbana: Resolución Gerencial N°12,13,14,15,16-2018-GDUR-MDC, correspondiente a las Etapas I, II, III, IV y V. Licencia de Edificación: Cuenta con Licencia de Edificación para las 02 primeras Etapas. I Etapa: Resolución de Licencia de Edificación Nº 402-2018SGCYCU-GDUR-MDC = 481 lotes para viviendas =11,998.75 m 2  II Etapa: Resolución de Licenci Licencia a de Edificación Nº 373-2019SGCYCU-GDUR-MDC = 454 lotes para viviendas = 11,325.50 m2  Póliza Car (Viviendas): No 230188605 del 01/09/2019 al 30/06/2020 Póliza Car (Habilitación Urbana): No 230188606 del 01/09/2019 al 30/06/2020. 60 Meses Inicio de obra: Julio 2019 (Según información de Inmobiliaria Malyvet S.A.C) Finalización de obra: Mayo 2,024 0.49%  Tabla 2: Resumen Técnico  6

 

5. SITUACIÓN MUNICIPAL

El cliente remitió Resolución Gerencial Nº 011-2018-GDUR-MDC de fecha 17 de Diciembre del 2,018, que hace referencia al proyecto de Integral para las 09 Etapas del Proyecto. Asimismo, cabe mencionar que el presente informe de Supervisión hace referencia a las 08 primeras primer as Etapas de la Habilitación Urbana “Vive Hogar Castilla”. Castilla”.    Además, cuenta con las las siguientes licencias de H Habilitación abilitación Urbana:

I Etapa: Resolución Gerencial Nº 012-2018-GDUR-MDC de fecha 17 de Diciembre del 2,018.

II Etapa: Resolución Gerencial Nº 013-2018-GDUR-MDC de fecha 17 de Diciembre del 2,018.

III Etapa: Resolución Gerencial Nº 014-2018-GDUR-MDC de fecha 17 de Diciembre del 2,018.

IV Etapa: Resolución Gerencial Nº 015-2018-GDUR-MDC de fecha 17 de Diciembre del 2,018.

V Etapa: Resolución Gerencial Nº 016-2018-GDUR-MDC de fecha 17 de Diciembre del 2,018.

VI, VII y VIII Etapa: No cuenta con licencia de Habilitación Urbana.  Además, el proyecto no cuenta con Resolución emitida por ENOSA, pero si cuenta con Certificado de Factibilidad Eléctrica R-336-2018/Enosa, de fecha 20 de Junio del 2018. Por otro lado, el promotor cuenta con certificados de Factibilidad de Agua y Desagüe emitidos por EPS GRAU S.A., así también t ambién cuenta con proyecto aprobado de redes de  Agua y Alcantarillado según según RESOLUC RESOLUCIÓN IÓN DE G GERENCIA ERENCIA GENER GENERAL AL N°0164-2019EPS GRAU S.A. -100, de fecha 20 de Mayo del 2019. Cabe recalcar que el promotor aún no ha realizado la perforación del pozo tubular por ello no tiene la certeza de la cantidad y calidad del agua y referente al proyecto de desagüe no se cuenta con un proyecto específico de la PTAR.  Asimismo, se muestra el cuadro general de áreas de las 08 primeras Etapas del proyecto: 7

 

 

USOS   USOS SPC

N° ETAPA MANZANAS

ÁREA ÁREA N° N° LOTES ÁREA ÚTIL LOTES APORTE ÁREA LOTES ÁREA VENDIBLES Mz. m2 VENDIBLES RECREATIVO APORTE TOTALES OTROS EDUCACIÓN SALUD m2 m2 EDUCACIÓN FINES m2 m2

1

15

485

481

38,448.66

31,796.13

5,986.26

2

15

457

454

36,318.87

29,971.37

6,347.50

3

16

554

550

43,185.19

36,467.29

6,498.75

4

16

519

516

40,554.42

34,206.92

6,347.50

5

16

524

520

45,060.52

34,493.00

5,578.96

4,988.56

6

16

562

557

49,110.22

37,357.17

6,372.21

5,255.49

7

14

460

458

31,942.99

30,257.45

1,685.54

8

13

475

472

35,111.12

31,572.74

1,630.24

4036

4008

319,731.99 266,122.07

40,446.96

TOTAL

EQUIPAMIENTO EQUIPAMIEN TO URBANO

OTROS USOS

ÁREA RESERVADA

ÁREA VERDE

666.27

219.15

125.35

1,908.14

10,244.05

2,793.56

0.00

0.00

125.35

ÁREA DE VÍAS

TOTAL

22,223.01

60,671.67

19,561.52

55,880.39

22,921.17

66,106.36

20,546.75

61,101.17

20,826.56

65,887.08

20,709.99

69,820.21

18,860.04

50,803.03

19,799.02

54,910.14

165,448.06 485,180.05

 

Tabla 3: Cuadro General de áreas de las 08 Etapas

8

 

 

 Además, el cliente remitió Resolución de Licencia de Edificación No 402-2018-

SGCYGU-GDUR-MDC de fecha 21 de diciembre del 2,018, la cual indica un área techada total de 11,998.75 m2 y se encuentra referida a las viviendas unifamiliares de la I Etapa con un total de 481 viviendas viviendas con vigencia vigencia de 36 meses. Está referido en los siguientes Lotes: Manzana “ A1”  A1” del lote 01 al lote 62 62,, Manzana “ A2”  A2” del lote 01 al lote 42, 42, Manzana “ A3”  A3” del lote 01 al lote 62, Manzana “ A4”  A4” del lote 01 al 40, Manzana “A5” del lote 01 al lote 09 y del lote 11 al lote 20, Manzana “A6” del lote 01 al lote 32, Manzana “A7” del lote 01 al lote 32, Manzana “B1” del lote 01 al lote 28, Manzana “B2” del lote 01 al lote 62, Manzana “B3” del lote 01 al 26, Manzana “B4” del lote 01 al 04 y del lote 07 al 11, Manzana “B5” del lote 01 al 32, Manzana “C4” del lote 15 al 28 y Manzana “D3” del lote 22 al 42.

 Asimismo, el cliente remitió Resolución de Licencia de Edificación No 403-2018-

SGCYGU-GDUR-MDC de fecha 20 de Diciembre del 2018, la cual indica un área techada total de 11,325.50 m2 y se encuentra referida a las viviendas unifamiliares de la II Etapa con un total de 454 viviendas con vigencia de 36 meses. Esta referido a los siguientes Lotes: Manzana “C1” del lote 01 al lote 62, Manzana “C2” del lote 01 al 26, Manzana Manzana  “C3” del lote 01 al 62, Manzana “C4” del lote 01 al 14, Manzana Manzana “C5” del lote 01 al 19, Manzana Manzana “C6” del lote 01 al 32, Manzana “D1” del lote 01 al 62, Manzana “D2” del lote 01 al 40, Manzana “D3” del lote 01 al 21, Manzana “D4” del lote 01 al 19, Manzana “D5” del llote ote 01 al 32, Manzana “D6” del lote 01 al 32, Manzana “N3” del lote 14 al 26, Manzana “M4” del lote 21 al 40.  40.  

9

 

6. ESTRUCTURA DE PRESUPUESTO DE OBRA: 6.1. ESTRUCTURA DEL PRESUPUESTO GENERAL

Con relación a los Costos, se adjunta la Estructura de Costos presentado por el Promotor para el Presupuesto General. ETAPA

MONTO (S/.)

I ETAPA II ETAPA

27,529,637.40 16,943,976.82

III ETAPA

21,791,158.85

IV ETAPA

20,084,958.69

V ETAPA

23,077,893.81

VI ETAPA

21,991,145.04

VII ETAPA

18,058,762.46

VIII ETAPA

18,914,756.92

PRESUPUESTO TOTAL (S/.)

168,392,289.99

Tabla 4: Estructura de Presupuesto General por Etapas

6.2.

 

PRESUPUESTOS POR ETAPAS

6.2.1. ETAPA I: ESPECIALIDAD OBRAS DE CABECERA Y OTROS PISTA DE ACCESO Y PLATAFORMAS CAMPAMENTO POZO DE ABASTECIMIENTO SISTEMA DE BOMBEO Y CLORACIÓN PTAR LÍNEA PRIMARIA DE ELECTRICIDAD

PRESUPUESTO (S/.) 6,922,840.00 200,000.00 300,000.00 1,200,000.00 330,000.00 2,500,000.00 650,000.00

COMPRA ENCOFRADO COMPRA DE DE AUTOHORMIGONERA / PLANTA + DUMPER COMPRA DE TELEHANDLER (ROTATORIO) HABILITACIÓN URBANA MOVIMIENTO DE TIERRAS IISS REDES DE AGUA, ALCANTARILLADO Y DRENAJE PLUVIAL PISTAS, VEREDAS Y PARQUES. REDES ELÉCTRICAS URBANISMO

653,251.00 561,796.00 527,793.00 5,437,667.29 732,694.95 1,281,248.69 2,443,462.92 730,260.73 250,000.00

10

 

EDIFICACIÓN MOVIMIENTO DE TIERRAS ESTRUCTURAS  ARQUITECTURA INSTALACIONES ELECTRICAS INSTALACIONES SANITARIAS COSTO DIRECTO GASTOS GENERALES (8.42% ) UTILIDAD (3.17% ) SUB TOTAL I.G.V. 18% PRESUPUESTO DE I ETAPA (S/.)

8,546,160.94 384,754.59 3,895,368.76 2,674,811.66 730,422.55 860,803.37 20,906,668.23 1,760,662.73 662,870.23 23,330,201.19 4,199,436.21 27,529,637.40

 

Tabla 5: Presupuesto desagregado de la Etapa I

6.2.2. ETAPA II: ESPECIALIDAD HABILITACIÓN URBANA MOVIMIENTO DE TIERRAS IISS REDES DE AGUA, ALCANTARILLADO Y DRENAJE PLUVIAL

PRESUPUESTO (S/.) 4,798,026.68 684,431.33 992,626.82

PISTAS, VEREDAS Y PARQUES. REDES ELÉCTRICAS URBANISMO EDIFICACIÓN MOVIMIENTO DE TIERRAS ESTRUCTURAS  ARQUITECTURA INSTALACIONES ELECTRICAS INSTALACIONES SANITARIAS COSTO DIRECTO GASTOS GENERALES (8.45%) UTILIDAD (3.17%) SUB TOTAL I.G.V. 18% PRESUPUESTO DE II ETAPA (S/.)

2,181,699.57 689,268.96 250,000.00 8,066,438.81 363,157.14 3,676,709.81 2,524,666.31 689,421.70 812,483.85 12,864,465.49 1,086,954.02 407,882.88 14,359,302.39 2,584,674.43 16,943,976.82

 

Tabla 6: Presupuesto desagregado de la Etapa II

6.2.3. ETAPA III:

ESPECIALIDAD OBRAS DE CABECERA Y OTROS PTAR

HABILITACIÓN URBANA MOVIMIENTO DE TIERRAS

PRESUPUESTO (S/.) 500,000.00 500,000.00 6,362,285.58 798,531.97

11

 

IISS REDES DE AGUA, ALCANTARILLADO Y DRENAJE PLUVIAL PISTAS, VEREDAS Y PARQUES. REDES ELÉCTRICAS URBANISMO EDIFICACIÓN MOVIMIENTO DE TIERRAS ESTRUCTURAS  ARQUITECTURA INSTALACIONES ELECTRICAS INSTALACIONES SANITARIAS COSTO DIRECTO GASTOS GENERALES UTILIDAD (3.17%)(7.85%) SUB TOTAL I.G.V. 18% PRESUPUESTO DE LA III ETAPA (S/.)

1,485,496.47 2,993,239.67 835,017.47 250,000.00 9,772,117.50 439,948.08 4,454,163.86 3,058,516.45 835,202.50 984,286.60 16,634,403.07 1,305,267.60 527,413.10 18,467,083.77 3,324,075.08 21,791,158.85

 

Tabla 7: Presupuesto desagregado de la Etapa III

6.2.4. ETAPA IV:

ESPECIALIDAD OBRAS DE CABECERA Y OTROS PTAR COMPRA DE ENCOFRADO 2 HABILITACIÓN URBANA MOVIMIENTO DE TIERRAS IISS REDES DE AGUA, ALCANTARILLADO Y DRENAJE PLUVIAL PISTAS, VEREDAS Y PARQUES. REDES ELÉCTRICAS URBANISMO EDIFICACIÓN MOVIMIENTO DE TIERRAS ESTRUCTURAS  ARQUITECTURA INSTALACIONES ELECTRICAS INSTALACIONES SANITARIAS COSTO DIRECTO GASTOS GENERALES (7.31%) UTILIDAD (3.00%) SUB TOTAL I.G.V. 18% PRESUPUESTO DE LA IV ETAPA (S/.)

PRESUPUESTO (S/.) 826,625.00 500,000.00 326,625.00 5,435,465.45 678,839.07 1,154,073.97 2,569,154.20 783,398.20 250,000.00 9,168,022.96 412,751.29 4,178,815.55 2,869,444.53 783,571.80 923,439.79 15,430,113.41 1,128,017.53 463,020.49 17,021,151.43 3,063,807.26 20,084,958.69

 

Tabla 8: Presupuesto desagregado de la Etapa IV 

12

 

6.2.5. ETAPA V: ESPECIALIDAD OBRAS DE CABECERA Y OTROS PTAR SISTEMA DE ALMACENAMIENTO HABILITACIÓN URBANA MOVIMIENTO DE TIERRAS IISS REDES DE AGUA, ALCANTARILLADO Y DRENAJE PLUVIAL PISTAS, VEREDAS Y PARQUES. REDES ELÉCTRICAS URBANISMO EDIFICACIÓN MOVIMIENTO DE TIERRAS ESTRUCTURAS  ARQUITECTURA INSTALACIONES ELECTRICAS INSTALACIONES SANITARIAS COSTO DIRECTO GASTOS GENERALES (8.11%) UTILIDAD (3.23%)

PRESUPUESTO (S/.) 2,000,000.00 500,000.00 1,500,000.00 5,171,261.83 619,304.48 1,126,508.18 2,385,978.11 789,471.06 250,000.00 10,393,979.52 467,944.78 4,737,610.65 3,253,149.32 888,351.75 1,046,923.02 17,565,241.35 1,425,013.32 567,282.46

SUB TOTAL I.G.V. 18% PRESUPUESTO DE LA V ETAPA (S/.)

19,557,537.13 3,520,356.68 23,077,893.81

Tabla 9: Presupuesto Desagregado de la Etapa V

6.2.6. ETAPA VI ESPECIALIDAD HABILITACIÓN URBANA MOVIMIENTO DE TIERRAS IISS REDES DE AGUA, ALCANTARILLADO Y DRENAJE PLUVIAL PISTAS, VEREDAS Y PARQUES. REDES ELÉCTRICAS URBANISMO EDIFICACIÓN MOVIMIENTO DE TIERRAS ESTRUCTURAS  ARQUITECTURA INSTALACIONES ELECTRICAS INSTALACIONES SANITARIAS COSTO DIRECTO GASTOS GENERALES (8.62%) UTILIDAD (3.17%) SUB TOTAL I.G.V. 18% PRESUPUESTO DE LA ETAPA VI (S/.)

PRESUPUESTO (S/.) 5,537,215.80 765,056.11 1,145,725.23 2,530,789.50 845,644.96 250,000.00 11,133,551.14 501,240.85 5,074,709.87 3,484,623.41 951,561.39 1,121,415.62 16,670,766.94 1,437,230.58 528,566.07 18,636,563.59 3,354,581.45 21,991,145.04

Tabla 10: Presupuesto Desagregado de la Etapa VI

13

 

6.2.7. ETAPA VII ESPECIALIDAD HABILITACIÓN URBANA MOVIMIENTO DE TIERRAS IISS REDES DE AGUA, ALCANTARILLADO Y DRENAJE PLUVIAL PISTAS, VEREDAS Y PARQUES. REDES ELÉCTRICAS URBANISMO EDIFICACIÓN MOVIMIENTO DE TIERRAS ESTRUCTURAS  ARQUITECTURA INSTALACIONES ELECTRICAS INSTALACIONES SANITARIAS COSTO DIRECTO GASTOS GENERALES (10.58% ) UTILIDAD (3.29% ) SUB TOTAL I.G.V. 18% PRESUPUESTO DE LA ETAPA VII (S/.)

PRESUPUESTO (S/.) 4,285,910.03 451,638.25 975,172.39 1,913,757.57 695,341.82 250,000.00 9,154,697.35 412,151.36 4,172,741.69 2,865,273.82 782,432.89 922,097.58 13,440,607.37 1,421,425.53 442,003.08 15,304,035.98 2,754,726.48 18,058,762.46

Tabla 11: Presupuesto Desagregado de la Etapa VII

6.2.8. ETAPA VIII

ESPECIALIDAD HABILITACIÓN URBANA MOVIMIENTO DE TIERRAS IISS REDES DE AGUA, ALCANTARILLADO Y DRENAJE PLUVIAL PISTAS, VEREDAS Y PARQUES. REDES ELÉCTRICAS URBANISMO EDIFICACIÓN MOVIMIENTO DE TIERRAS ESTRUCTURAS  ARQUITECTURA INSTALACIONES ELECTRICAS INSTALACIONES SANITARIAS COSTO DIRECTO GASTOS GENERALES (12.12%) UTILIDAD (3.29%) SUB TOTAL I.G.V. 18% PRESUPUESTO DE LA ETAPA VIII (S/.)

PRESUPUESTO (S/.) 4,468,673.64 564,857.61 963,877.24 1,973,341.98 716,596.81 250,000.00 9,434,535.26 424,749.87 4,300,292.75 2,952,858.61 806,350.05 950,283.97 13,903,208.90 1,685,428.69 440,817.43 16,029,455.02 2,885,301.90 18,914,756.92

Tabla 12: Presupuesto Desagregado de la Etapa VIII

14

 

7.

VALORIZ VALORIZACION ACION N° 00 DEL PRESUPUESTO GENERAL:

El monto valorizado del presupuesto general de obra en el mes de Agosto es de S/.

828,464.20 (Ochocientos veinte y ocho mil cuatrocientos sesenta y cuatro con 20/100 Soles)  incluido los impuestos de Ley, que representa el 0.49% del presupuesto general de obra (8 Etapas). El monto valorizado acumulado al 31 de Agosto del 2019 es de S/. 828,464.20

(Ochocientos veinte y ocho mil cuatrocientos sesenta y cuatro con 20/100 Soles) incluido los impuestos de Ley, que representa el 0.49% del presupuesto general de obra (8 Etapas). El saldo por valorizar al 31 de Agosto del 2019 es de S/. 167’ 167’563,825.79 (Ciento

sesenta y siete millones quinientos sesenta y tres mil ochocientos veinte y

cinco con 79/100 Soles) incluido los impuestos de Ley, que representa el 99.51% del presupuesto general de obra (8 Etapas).  A continuación, se presentará un resumen de la valorización de obra a la fecha del 31 de agosto del 2019:

15

 

 

RESUMEN GENERAL DE CADA ETAPA

I ETAPA

% PORCENTAJE ACUMULADO VAL. ACTUAL ACUMULADO SALDO POR DE ANTERIOR (S/.) (S/.) y (%) (S/.) y (%) VALORIZAR (S/.) y (%) PARTICIPACIÓN 27,529,637.40 16.35% 0.00 770,995.95 2.80% 770,995.95 2.80% 26,758,641.46 97.20%

II ETAPA

16,943,976.82

10.06%

0.00

28,811.88 0.17%

28,811.88 0.17% 16,915,164.93

99.83%

III ETAPA

21,791,158.85

12.94%

0.00

28,656.37 0.13%

28,656.37 0.13% 21,762,502.48

99.87%

IV ETAPA

20,084,958.69

11.93%

0.00

0.00 0.00%

0.00 0.00% 20,084,958.69 100.00%

V ETAPA

23,077,893.81

13.70%

0.00

0.00 0.00%

0.00 0.00% 23,077,893.81 100.00%

VI ETAPA

21,991,145.04

13.06%

0.00

0.00 0.00%

0.00 0.00% 21,991,145.04 100.00%

VII ETAPA

18,058,762.46

10.72%

0.00

0.00 0.00%

0.00 0.00% 18,058,762.46 100.00%

VIII ETAPA VALORI VALO RIZA ZACI CI N TOTAL ACTUAL (S/.)

18,914,756.92

11.23%

0.00

0.00 0.00%

0.00 0.00% 18,914,756.92 100.00%

ETAPA

PRESUPUESTO INCL. IGV (S/.)

168,392,289.99

0.00

100.00%

0.00%

828,464.20

828,464.20

167,563,825.79

0.49%

0.49%

99.51%

Tabla 13: Resumen General de obra

16

 

7.1. RESUMEN DE VALORIZACIÓN VALORIZACIÓN DE LA “I ETAPA”  ETAPA”    El monto valorizado acumulado al 31 de Agosto del 2019 es de S/. 770,995.95 (Setecientos setenta mil novecientos noventa y cinco con 95/100



Soles) incluido los impuestos de Ley, que representa el 2.80% del presupuesto de la “I Etapa”.  Etapa”.    El saldo por valorizar al 31 de Agosto del 2019 es de S/. 26’758,641.46 (Veintiseis millones setecientos cincuenta y ocho mil seiscientos



cuarenta y uno con 46/100 Soles)  Soles)  incluido los impuestos de Ley, que representa el 97.20% del presupuesto de la “I Etapa”. Etapa”. RESUMEN DE VALORIZACIÓN DE ETAPA I ESPECIALIDAD OBRAS DE CABECERA Y OTROS PISTA DE ACCESO Y PLATAFORMAS CAMPAMENTO POZO DE ABASTECIMIENTO SISTEMA DE BOMBEO Y CLORACIÓN PTAR LÍNEA PRIMARIA DE ELECTRICIDAD COMPRA DE AUTOHORMIGONERA ENCOFRADO COMPRA DE / PLANTA + DUMPER COMPRA DE TELEHANDLER (ROTATORIO) HABILITACIÓN HABILIT ACIÓN URBAN URBANA A MOVIMIENTO DE TIERRAS IISS REDES DE AGUA, ALCANTARILLADO Y DRENAJE PLUVIAL PISTAS, VEREDAS Y PARQUES. REDES ELÉCTRICAS URBANISMO EDIFICACIÓN EDIFICACIÓ N MOVIMIENTO DE TIERRAS ESTRUCTURAS ARQUITECTURA INSTALACIONES ELECTRICAS INSTALACIONES SANITARIAS

COSTO DIRECTO GASTOS GENERALES (8.42%) UTILIDAD (3.17%) SUB TOTAL I.G.V. 18% VALORIZACIÓN VALORIZACIÓN TOTAL ACTUAL (S/.)

6,922,840.00 200,000.00 300,000.00 1,200,000.00 330,000.00 2,500,000.00 650,000.00

% POR ESPECIALIDAD 100.00% 2.89% 4.33% 17.33% 4.77% 36.11% 9.39%

ACUMULADO ANTERIOR (S/.) 0.00 0.00 0.00 0.00 0.00 0.00 0.00

653,251.00 561,796.00

9.44% 8.12%

527,793.00 5,437,667.29 732,694.95

7.62% 100.00% 13.47%

PRESUPUESTO (S/.)

VAL. ACTUAL (S/.) y (%)

ACUMULADO (S/.) y (%)

SALDO POR VALORIZAR (S/.) y (%) 6,359,202.15 91.86% 0.00 0.00% 165,000.00 55.00% 1,200,000.00 100.00% 330,000.00 100.00% 2,500,000.00 100.00% 650,000.00 100.00%

563,637.85 200,000.00 135,000.00 0.00 0.00 0.00 0.00

8.14% 100.00% 45.00% 0.00% 0.00% 0.00% 0.00%

563,637.85 200,000.00 135,000.00 0.00 0.00 0.00 0.00

8.14% 100.00% 45.00% 0.00% 0.00% 0.00% 0.00%

0.00 0.00

228,637.85 0.00

35.00% 0.00%

228,637.85 0.00

35.00% 0.00%

424,613.15 561,796.00

65.00% 100.00%

0.00 0.00 0.00

0.00 21,875.00 21,875.00

0.00% 0.40% 2.99%

0.00 21,875.00 21,875.00

0.00% 0.40% 2.99%

527,793.00 5,415,792.29 710,819.95

100.00% 99.60% 97.01%

1,281,248.69

23.56%

0.00

0.00

0.00%

0.00

0.00%

1,281,248.69

100.00%

2,443,462.92 730,260.73 250,000.00 8,546,160.94 384,754.59 3,895,368.76 2,674,811.66 730,422.55 860,803.37

44.94% 13.43% 4.60% 100.00% 4.50% 45.58% 31.30% 8.55% 10.07%

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

2,443,462.92 730,260.73 250,000.00 8,546,160.94 384,754.59 3,895,368.76 2,674,811.66 730,422.55 860,803.37

100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%

20,906,668.23 1,760,662.73 662,870.23 23,330,201.19 4,199,436.21 27,529,637.40 100.00%

0.00 0.00 0.00 0.00 0.00 0.00 0.00%

585,512.85 49,309.18 18,564.37 653,386.40 117,609.55 770,995.95 2.80%

Tabla 14: Resumen de Valorización de la I Etapa

 

585,512.85 49,309.18 18,564.37 653,386.40 117,609.55 770,995.95 2.80%

20,321,155.38 1,711,353.55 644,305.86 22,676,814.79 4,081,826.66 26,758,641.46 97.20%

17

 

7.2 7.2.. RESUMEN DE VALORIZACIÓN VALORIZACIÓN DE LA “II “II ETAPA” ETAPA”    El monto valorizado acumulado al 31 de Agosto del 2019 es de S/. 28,811.88 (Veintiocho mil ochocientos once con 88/100 Soles) incluido los



impuestos de Ley, que representa el 0.17% del presupuesto de la “I “III Etapa”. Etapa”.   16’915,164.93 (Dieciseis millones Novecientos quince mil ciento sesenta y cuatro con   El saldo por valorizar valorizar al 31 de Agosto del 2019 es de S/. 16’



93/100 Soles) incluido Soles) incluido los impuestos de Ley, que representa el 99.83% 99.83 % del presupuesto de la “II “II Etapa”. Etapa”.   RESUMEN DE VALORIZACIÓN DE ETAPA II ESPECIALIDAD HABILITACIÓN HABILIT ACIÓN URBAN URBANA A

PRESUPUESTO (S/.)

% POR ESPECIALIDAD

ACUMULADO ANTERIOR (S/.)

VAL. ACTUAL (S/.) y (%)

ACUMULADO (S/.) y (%)

SALDO POR VALORIZAR (S/.) y (%)

4,798,026.68

100.00%

0.00

21,875.00

0.46%

21,875.00

0.46%

4,776,151.68

99.54%

MOVIMIENTO DE TIERRAS

684,431.33

14.26%

0.00

21,875.00

3.20%

21,875.00

3.20%

662,556.33

96.80%

IISS REDES DE AGUA, ALCANTARILLADO Y DRENAJE PLUVIAL

992,626.82

20.69%

0.00

0.00

0.00%

0.00

0.00%

992,626.82

100.00%

PISTAS, VEREDAS Y PARQUES. REDES ELÉCTRICAS URBANISMO

2,181,699.57

45.47%

0.00

0.00

0.00%

0.00

0.00%

2,181,699.57

100.00%

689,268.96

14.37%

0.00

0.00

0.00%

0.00

0.00%

689,268.96

100.00%

250,000.00

5.21%

0.00

0.00

0.00%

0.00

0.00%

250,000.00

100.00%

EDIFICACIÓN

8,066,438.81

100.00%

0.00

0.00

0.00%

0.00

0.00%

8,066,438.81

100.00%

MOVIMIENTO DE TIERRAS

363,157.14

4.50%

0.00

0.00

0.00%

0.00

0.00%

363,157.14

100.00%

ESTRUCTURAS

3,676,709.81

45.58%

0.00

0.00

0.00%

0.00

0.00%

3,676,709.81

100.00%

ARQUITECTURA

2,524,666.31

31.30%

0.00

0.00

0.00%

0.00

0.00%

2,524,666.31

100.00%

INSTALACIONES ELECTRICAS

689,421.70

8.55%

0.00

0.00

0.00%

0.00

0.00%

689,421.70

100.00%

INSTALACIONES SANITARIAS

812,483.85

10.07%

0.00

0.00

0.00%

0.00

0.00%

812,483.85

100.00%

COSTO DIRECTO

12,864,465.49

0.00

21,875.00

21,875.00

12,842,590.49

GASTOS GENERALES (8.45% )

1,086,954.02

0.00

1,848.28

1,848.28

1,085,105.74

UTILIDAD (3.17% )

407,882.88

0.00

693.57

693.57

407,189.31

SUB TOTAL

14,359,302.39

0.00

24,416.85

24,416.85

14,334,885.53

I.G.V. 18%

2,584,674.43

0.00

4,395.03

4,395.03

2,580,279.40

VALORIZACIÓN TOTAL ACTUAL (S/.) VALORIZACIÓN

16,943,976.82

0.00

28,811.88

28,811.88

16,915,164.93

100.00%

0.00%

0.17%

0.17%

99.83%

Tabla 15: Resumen de valorización de II Etapa

18

 

 

7.3. RESUMEN DE VALORIZACIÓN DE LA “III “I II ETAPA” ETAPA”    El monto valorizado acumulado al 31 de Agosto del 2019 es de S/. 28,656.37 (Veintiocho mil seiscientos cincuenta y seis con 37/100 Soles)



incluido los impuestos de Ley, que representa el 0.13% 0.13% del presupuesto de la “III “I II Etapa”. Etapa”.   21’762,502.48 (Veintiún millones setecientos sesenta y dos mil quinientos dos con   El saldo por valorizar valorizar al 31 de Agosto del 2019 es de S/. 21’



48/100 Soles) incluido Soles) incluido los impuestos de Ley, que representa el 99.87% 99.87 % del presupuesto de la “III “III Etapa”. Etapa”.  

RESUMEN DE VALORIZACIÓN DE ETAPA III ESPECIALIDAD

PRESUPUESTO (S/.)

OBRAS DE CABECERA Y OTROS PTAR HABILITACIÓN HABILITA CIÓN URBANA MOVIMIENTO DE TIERRAS IISS REDES DE AGUA, ALCANTARILLADO Y DRENAJE PLUVIAL PISTAS, VEREDAS Y PARQUES. REDES ELÉCTRICAS URBANISMO

EDIFICACIÓN EDIFICACIÓ N MOVIMIENTO DE TIERRAS

% POR ESPECIALIDAD

500,000.00

ACUMULADO ANTERIOR (S/.)

100.00%

ACUMULADO (S/.) y (%)

VAL. ACTUAL (S/.) y (%)

0.00

0.00

0.00%

0.00

0.00%

SALDO POR VALORIZAR (S/.) y (%) 500,000.00

100.00% 100.00%

500,000.00

100.00%

0.00

0.00

0.00%

0.00

0.00%

500,000.00

6,362,285.58

100.00%

0.00

21,875.00

0.34%

21,875.00

0.34%

6,340,410.58

99.66%

798,531.97

12.55%

0.00

21,875.00

2.74%

21,875.00

2.74%

776,656.97

97.26%

1,485,496.47

23.35%

0.00

0.00

0.00%

0.00

0.00%

1,485,496.47

100.00%

2,993,239.67

47.05%

0.00

0.00

0.00%

0.00

0.00%

2,993,239.67

100.00%

835,017.47

13.12%

0.00

0.00

0.00%

0.00

0.00%

835,017.47

100.00%

250,000.00

3.93%

0.00

0.00

0.00%

0.00

0.00%

250,000.00

9,772,117.50

100.00%

0.00

0.00

0.00%

0.00

0.00%

9,772,117.50

100.00% 100.00%

439,948.08

4.50%

0.00

0.00

0.00%

0.00

0.00%

439,948.08

100.00%

ESTRUCTURAS

4,454,163.86

45.58%

0.00

0.00

0.00%

0.00

0.00%

4,454,163.86

100.00%

ARQUITECTURA

3,058,516.45

31.30%

0.00

0.00

0.00%

0.00

0.00%

3,058,516.45

100.00%

INSTALACIONES ELECTRICAS

835,202.50

8.55%

0.00

0.00

0.00%

0.00

0.00%

835,202.50

100.00%

INSTALACIONES SANITARIAS

984,286.60

10.07%

0.00

0.00

0.00%

0.00

0.00%

984,286.60

100.00%

COSTO DIRECTO

16,634,403.07

0.00

21,875.00

21,875.00

16,612,528.07

GASTOS GENERALES (7.85%)

1,305,267.60

0.00

1,716.49

1,716.49

1,303,551.11

527,413.10

0.00

693.57

693.57

526,719.53

SUB TOTAL

18,467,083.77

0.00

24,285.06

24,285.06

18,442,798.72

I.G.V. 18% VALORIZACIÓN TOTAL ACTUAL (S/.)

3,324,075.08

0.00

4,371.31

4,371.31

3,319,703.77

21,791,158.85

0.00

28,656.37

28,656.37

21,762,502.48

100.00%

0.00%

0.13%

0.13%

99.87%

UTILIDAD (3.17%)

Tabla 16: Resumen de Valorización de la III Etapa

 

19

 

7.4. RESUMEN DE VALORIZACIÓN DE LA “IV “I V ETAPA” ETAPA”    El monto valorizado acumulado al 31 de Agosto del 2019 es de S/. 0.00 (Cero con 00/100 Soles) incluido los impuestos de Ley, que representa el



0.00% 0.00 % del presupuesto de la “IV “IV Etapa”. Etapa”.   20’084,958.69 (Veinte millones ochenta y cuatro mil novecientos cincuenta y ocho con   El saldo saldo por valorizar al 31 de Agosto Agosto del 2019 e ess de S/. 20’



69/100 Soles) incluido Soles) incluido los impuestos de Ley, que representa el 100.00% 100.00 % del presupuesto de la “IV “IV Etapa”. Etapa”.  

RESUMEN DE VALORIZACIÓN DE ETAPA IV 826,625.00

100.00%

ACUMULADO ANTERIOR (S/.) 0.00

0.00

0.00%

ACUMULADO (S/.) y (%) 0.00 0.00%

826,625.00

100.00%

PTAR

500,000.00

60.49%

0.00

0.00

0.00%

0.00

0.00%

500,000.00

100.00%

COMPRA DE ENCOFRADO 2

326,625.00

39.51%

0.00

0.00

0.00%

0.00

0.00%

326,625.00

100.00%

5,435,465.45

100.00%

0.00

0.00

0.00%

0.00

0.00%

5,435,465.45

100.00%

678,839.07

12.49%

0.00

0.00

0.00%

0.00

0.00%

678,839.07

100.00%

1,154,073.97

21.23%

0.00

0.00

0.00%

0.00

0.00%

1,154,073.97

100.00%

ESPECIALIDAD OBRAS DE CABECERA Y OTROS

HABILITACIÓN HABILITA CIÓN URBANA MOVIMIENTO DE TIERRAS IISS REDES DE AGUA, ALCANTARILLADO Y DRENAJE PLUVIAL PISTAS, VEREDAS Y PARQUES.

PRESUPUESTO (S/.)

% POR ESPECIALIDAD

VAL. ACTUAL (S/.) y (%)

SALDO POR VALORIZAR (S/.) y (%)

2,569,154.20

47.27%

0.00

0.00

0.00%

0.00

0.00%

2,569,154.20

100.00%

REDES ELÉCTRICAS

783,398.20

14.41%

0.00

0.00

0.00%

0.00

0.00%

783,398.20

100.00%

URBANISMO

250,000.00

4.60%

0.00

0.00

0.00%

0.00

0.00%

250,000.00

100.00%

9,168,022.96

100.00%

0.00

0.00

0.00%

0.00

0.00%

9,168,022.96

100.00%

EDIFICACIÓN EDIFICACIÓ N MOVIMIENTO DE TIERRAS

412,751.29

4.50%

0.00

0.00

0.00%

0.00

0.00%

412,751.29

100.00%

ESTRUCTURAS

4,178,815.55

45.58%

0.00

0.00

0.00%

0.00

0.00%

4,178,815.55

100.00%

ARQUITECTURA

2,869,444.53

31.30%

0.00

0.00

0.00%

0.00

0.00%

2,869,444.53

100.00%

INSTALACIONES ELECTRICAS

783,571.80

8.55%

0.00

0.00

0.00%

0.00

0.00%

783,571.80

100.00%

INSTALACIONES SANITARIAS

923,439.79

10.07%

0.00

0.00

0.00%

0.00

0.00%

923,439.79

100.00%

COSTO DIRECTO

15,430,113.41

0.00

0.00

0.00

15,430,113. 15,430,113.41 41

GASTOS GENERALES (7.31%)

1,128,017.53

0.00

0.00

0.00

1,128,017.53

463,020.49

0.00

0.00

0.00

463,020.49

17,021,151.43

0.00

0.00

0.00

17,021,151.43

UTILIDAD (3.00%) SUB TOTAL I.G.V. 18%

3,063,807.26

0.00

0.00

0.00

3,063,807.26

VALORIZACIÓN TOTAL ACTUAL (S/.) VALORIZACIÓN

20,084,958.69

0.00

0.00

0.00

20,084,958.69

0.00%

100.00%

0.00%

100.00%

0.00%

Tabla 17: Resumen de Valorización de la IV Etapa

20

 

 

7.5. RESUMEN DE VALORIZACIÓN DE LA “V “V ETAPA” ETAPA”    El monto valorizado acumulado al 31 de Agosto del 2019 es de S/. 0.00 (Cero con 00/100 Soles) incluido los impuestos de Ley, que representa el



0.00% 0.00 % del presupuesto de la “V “V Etapa”. Etapa”.   23’077,893.81 (Veinte y tres millones setenta y siete mil ochocientos noventa y tres   El saldo por valorizar valorizar al 31 de Agosto del 2019 es de S/. 23’



con 81/100 Soles) incluido Soles) incluido los impuestos de Ley, que representa el 100.00% 100.00% del presupuesto de la “V “V Etapa”. Etapa”.  

RESUMEN DE VALORIZACIÓN DE ETAPA V 2,000,000.00

100.00%

ACUMULADO ANTERIOR (S/.) 0.00

500,000.00

25.00%

0.00

0.00

0.00%

0.00

0.00%

500,000.00

100.00%

SISTEMA DE ALMACENAMIENTO

1,500,000.00

75.00%

0.00

0.00

0.00%

0.00

0.00%

1,500,000.00

100.00%

HABILITACIÓN HABILITA CIÓN URBANA

5,171,261.83

100.00%

0.00

0.00

0.00%

0.00

0.00%

5,171,261.83

100.00%

MOVIMIENTO DE TIERRAS IISS REDES DE AGUA, ALCANTARILLADO Y DRENAJE PLUVIAL PISTAS, VEREDAS Y PARQUES.

619,304.48 1,126,508.18

11.98% 21.78%

0.00 0.00

0.00 0.00

0.00% 0.00%

0.00 0.00

0.00% 0.00%

619,304.48 1,126,508.18

100.00% 100.00%

ESPECIALIDAD OBRAS DE CABECERA Y OTROS PTAR

REDES ELÉCTRICAS URBANISMO

EDIFICACIÓN MOVIMIENTO DE TIERRAS

PRESUPUESTO (S/.)

% POR ESPECIALIDAD

VAL. ACTUAL (S/.) y (%) 0.00 0.00%

ACUMULADO (S/.) y (%) 0.00 0.00%

SALDO POR VALORIZAR (S/.) y (%) 2,000,000.00

100.00%

2,385,978.11

46.14%

0.00

0.00

0.00%

0.00

0.00%

2,385,978.11

100.00%

789,471.06

15.27%

0.00

0.00

0.00%

0.00

0.00%

789,471.06

100.00%

250,000.00

4.83%

0.00

0.00

0.00%

0.00

0.00%

250,000.00

100.00%

10,393,979.52

100.00%

0.00

0.00

0.00%

0.00

0.00%

10,393,979.52

100.00%

467,944.78

4.50%

0.00

0.00

0.00%

0.00

0.00%

467,944.78

100.00%

ESTRUCTURAS

4,737,610.65

45.58%

0.00

0.00

0.00%

0.00

0.00%

4,737,610.65

100.00%

ARQUITECTURA

100.00%

3,253,149.32

31.30%

0.00

0.00

0.00%

0.00

0.00%

3,253,149.32

INSTALACIONES ELECTRICAS

888,351.75

8.55%

0.00

0.00

0.00%

0.00

0.00%

888,351.75

100.00%

INSTALACIONES SANITARIAS

1,046,923.02

10.07%

0.00

0.00

0.00%

0.00

0.00%

1,046,923.02

100.00%

COSTO DIRECTO

17,565,241.35

0.00

0.00

0.00

17,565,241.35

GASTOS GENERALES (8.11%)

1,425,013.32

0.00

0.00

0.00

1,425,013.32

567,282.46

0.00

0.00

0.00

567,282.46

19,557,537.13

0.00

0.00

0.00

19,557,537.13

UTILIDAD (3.23%) SUB TOTAL I.G.V. 18%

3,520,356.68

0.00

0.00

0.00

3,520,356.68

VALORIZACIÓN ACIÓN TOTAL ACTUAL (S/.) VALORIZ

23,077,893.81

0.00

0.00

0.00

23,077,893.81

0.00%

100.00%

0.00%

100.00%

0.00%

Tabla 18: Resumen de Valorización de la V Etapa

 

21

 

7.6. RESUMEN DE VALORIZACIÓN DE LA “VI “VI ETAPA” ETAPA”    El monto valorizado acumulado al 31 de Agosto del 2019 es de S/. 0.00 (Cero con 00/100 Soles) incluido los impuestos de Ley, que representa el



0.00% 0.00 % del presupuesto de la “VI “VI Etapa”. Etapa”.   21’991,145.04 (Veintiun millones novecientos noventa y un mil ciento cuarenta y cinco   El saldo saldo por valorizar al 31 de Agosto Agosto del 2019 e ess de S/. 21’



con 04/100 Soles) incluido Soles) incluido los impuestos de Ley, que representa el 100.00% 100.00% del presupuesto de la “VI “VI Etapa”. Etapa”.  

RESUMEN DE VALORIZACIÓN DE ETAPA VI ESPECIALIDAD HABILITACIÓN HABILITA CIÓN URBANA MOVIMIENTO DE TIERRAS IISS REDES DE AGUA, ALCANTARILLADO Y DRENAJE PLUVIAL PISTAS, VEREDAS Y PARQUES. REDES ELÉCTRICAS URBANISMO

EDIFICACIÓN EDIFICACIÓ N MOVIMIENTO DE TIERRAS

5,537,215.80

100.00%

ACUMULADO ANTERIOR (S/.) 0.00

5,537,215.80

100.00%

765,056.11

13.82%

0.00

0.00

0.00%

0.00

0.00%

765,056.11

100.00%

1,145,725.23

20.69%

0.00

0.00

0.00%

0.00

0.00%

1,145,725.23

100.00%

PRESUPUESTO (S/.)

% POR ESPECIALIDAD

VAL. ACTUAL (S/.) y (%) 0.00 0.00%

ACUMULADO (S/.) y (%) 0.00 0.00%

SALDO POR VALORIZAR (S/.) y (%)

2,530,789.50

45.71%

0.00

0.00

0.00%

0.00

0.00%

2,530,789.50

100.00%

845,644.96

15.27%

0.00

0.00

0.00%

0.00

0.00%

845,644.96

100.00%

250,000.00

4.51%

0.00

0.00

0.00%

0.00

0.00%

250,000.00

100.00%

11,133,551.14

100.00%

0.00

0.00

0.00%

0.00

0.00%

11,133,551.14

100.00%

501,240.85

4.50%

0.00

0.00

0.00%

0.00

0.00%

501,240.85

100.00%

ESTRUCTURAS

5,074,709.87

45.58%

0.00

0.00

0.00%

0.00

0.00%

5,074,709.87

100.00%

ARQUITECTURA

3,484,623.41

31.30%

0.00

0.00

0.00%

0.00

0.00%

3,484,623.41

100.00%

INSTALACIONES ELECTRICAS

951,561.39

8.55%

0.00

0.00

0.00%

0.00

0.00%

951,561.39

100.00%

INSTALACIONES SANITARIAS

1,121,415.62

10.07%

0.00

0.00

0.00%

0.00

0.00%

1,121,415.62

100.00%

COSTO DIRECTO GASTOS GENERALES (8.62%) UTILIDAD (3.17%) SUB TOTAL

16,670,766.94 1,437,230.58

0.00 0.00

0.00 0.00

0.00 0.00

16,670,766.94 1,437,230.58

528,566.07

0.00

0.00

0.00

528,566.07

18,636,563.59

0.00

0.00

0.00

18,636,563.59

I.G.V. 18%

3,354,581.45

0.00

0.00

0.00

3,354,581.45

VALORIZACIÓN TOTAL ACTUAL (S/.) VALORIZACIÓN

21,991,145.04

0.00

0.00

0.00

21,991,145.04

0.00%

0.00%

100.00%

0.00%

100.00%

Tabla 19: Resumen de Valorización de la VI Etapa

22

 

 

7.7. RESUMEN DE VALORIZACIÓN DE LA “VII “VII ETAPA” ETAPA”    El monto valorizado acumulado al 31 de Agosto del 2019 es de S/. 0.00 (Cero con 00/100 Soles) incluido los impuestos de Ley, que representa el



0.00% 0.00 % del presupuesto de la “VII “VII Etapa”. Etapa”.   18’058,762.46 (Dieciocho millones cincuenta y ocho mil setecientos sesenta y dos con   El saldo saldo por valorizar a all 31 de A Agosto gosto del 2019 e ess de S/. 18’



46/100 Soles) incluido Soles) incluido los impuestos de Ley, que representa el 100.00% 100.00 % del presupuesto de la “VII “VII Etapa”. Etapa”.  

RESUMEN DE VALORIZACIÓN DE ETAPA VII 4,285,910.03

100.00%

ACUMULADO ANTERIOR (S/.) 0.00

0.00

0.00%

ACUMULADO (S/.) y (%) 0.00 0.00%

4,285,910.03

100.00%

MOVIMIENTO DE TIERRAS

451,638.25

10.54%

0.00

0.00

0.00%

0.00

0.00%

451,638.25

100.00%

IISS REDES DE AGUA, ALCANTARILLADO Y DRENAJE PLUVIAL

975,172.39

22.75%

0.00

0.00

0.00%

0.00

0.00%

975,172.39

100.00%

1,913,757.57 695,341.82

44.65% 16.22%

0.00 0.00

0.00 0.00

0.00% 0.00%

0.00 0.00

0.00% 0.00%

1,913,757.57 695,341.82

100.00% 100.00%

ESPECIALIDAD HABILITACIÓN HABILIT ACIÓN URBAN URBANA A

PISTAS, VEREDAS Y PARQUES. REDES ELÉCTRICAS URBANISMO

EDIFICACIÓN MOVIMIENTO DE TIERRAS

PRESUPUESTO (S/.)

% POR ESPECIALIDAD

VAL. ACTUAL (S/.) y (%)

SALDO POR VALORIZAR (S/.) y (%)

250,000.00

5.83%

0.00

0.00

0.00%

0.00

0.00%

250,000.00

100.00%

9,154,697.35

100.00%

0.00

0.00

0.00%

0.00

0.00%

9,154,697.35

100.00%

412,151.36

4.50%

0.00

0.00

0.00%

0.00

0.00%

412,151.36

100.00%

ESTRUCTURAS

4,172,741.69

45.58%

0.00

0.00

0.00%

0.00

0.00%

4,172,741.69

100.00%

ARQUITECTURA

2,865,273.82

31.30%

0.00

0.00

0.00%

0.00

0.00%

2,865,273.82

100.00%

INSTALACIONES ELECTRICAS

782,432.89

8.55%

0.00

0.00

0.00%

0.00

0.00%

782,432.89

100.00%

INSTALACIONES SANITARIAS

922,097.58

10.07%

0.00

0.00

0.00%

0.00

0.00%

922,097.58

100.00%

COSTO DIRECTO

13,440,607.37

0.00

0.00

0.00

13,440,607.37

GASTOS GENERALES (10.58%)

1,421,425.53

0.00

0.00

0.00

1,421,425.53

442,003.08

0.00

0.00

0.00

442,003.08

15,304,035.98

0.00

0.00

0.00

15,304,035.98

UTILIDAD (3.29%) SUB TOTAL I.G.V. 18%

2,754,726.48

0.00

0.00

0.00

2,754,726.48

VALORIZACIÓN TOTAL ACTUAL (S/.) VALORIZACIÓN

18,058,762.46

0.00

0.00

0.00

18,058,762.46

100.00%

0.00%

0.00%

100.00%

0.00%

Tabla 20: Resumen de Valorización de la VII Etapa

 

23

 

7.8. RESUMEN DE VALORIZACIÓN DE LA “VIII “VIII ETAPA” ETAPA”    El monto valorizado acumulado al 31 de Agosto del 2019 es de S/. 0.00 (Cero con 00/100 Soles) incluido los impuestos de Ley, que representa el



0.00% 0.00 % del presupuesto de la “VIII “VIII Etapa”. Etapa”.   18’914,756.92 (Dieciocho millones novecientos catorce mil setecientos cincuenta y   El saldo por valorizar al 31 de Agosto del 2019 es de S/. 18’



seis con 92/100 Soles) incluido Soles) incluido los impuestos de Ley, que representa el 100.00% 100.00% del presupuesto de la “VIII “ VIII Etapa”. Etapa”.  

RESUMEN DE VALORIZACIÓN DE ETAPA VIII ESPECIALIDAD HABILITACIÓN HABILIT ACIÓN URBAN URBANA A MOVIMIENTO DE TIERRAS IISS REDES DE AGUA, ALCANTARILLADO Y DRENAJE PLUVIAL PISTAS, VEREDAS Y PARQUES. REDES ELÉCTRICAS URBANISMO

EDIFICACIÓN EDIFICACIÓ N MOVIMIENTO DE TIERRAS

4,468,673.64

% POR ESPECIALIDAD 100.00%

ACUMULADO ANTERIOR (S/.) 0.00

0.00

0.00%

ACUMULADO (S/.) y (%) 0.00 0.00%

4,468,673.64

100.00%

564,857.61

12.64%

0.00

0.00

0.00%

0.00

0.00%

564,857.61

100.00%

963,877.24

21.57%

0.00

0.00

0.00%

0.00

0.00%

963,877.24

100.00%

PRESUPUESTO (S/.)

VAL. ACTUAL (S/.) y (%)

SALDO POR VALORIZAR (S/.) y (%)

1,973,341.98

44.16%

0.00

0.00

0.00%

0.00

0.00%

1,973,341.98

100.00%

716,596.81

16.04%

0.00

0.00

0.00%

0.00

0.00%

716,596.81

100.00%

250,000.00

5.59%

0.00

0.00

0.00%

0.00

0.00%

250,000.00

100.00%

9,434,535.26

100.00%

0.00

0.00

0.00%

0.00

0.00%

9,434,535.26

100.00%

424,749.87

4.50%

0.00

0.00

0.00%

0.00

0.00%

424,749.87

100.00%

ESTRUCTURAS

4,300,292.75

45.58%

0.00

0.00

0.00%

0.00

0.00%

4,300,292.75

100.00%

ARQUITECTURA

2,952,858.61

31.30%

0.00

0.00

0.00%

0.00

0.00%

2,952,858.61

100.00%

INSTALACIONES ELECTRICAS

806,350.05

8.55%

0.00

0.00

0.00%

0.00

0.00%

806,350.05

100.00%

INSTALACIONES SANITARIAS

950,283.97

10.07%

0.00

0.00

0.00%

0.00

0.00%

950,283.97

100.00%

COSTO DIRECTO

13,903,208.90

0.00

0.00

0.00

13,903,208.90

GASTOS GENERALES (12.12%)

1,685,428.69

0.00

0.00

0.00

1,685,428.69

440,817.43

0.00

0.00

0.00

440,817.43

16,029,455.02

0.00

0.00

0.00

16,029,455.02

UTILIDAD (3.29%) SUB TOTAL I.G.V. 18% VALORIZACIÓN TOTAL ACTUAL (S/.)

2,885,301.90

0.00

0.00

0.00

2,885,301.90

18,914,756.92

0.00

0.00

0.00

18,914,756.92

100.00%

0.00%

0.00%

100.00%

0.00%

Tabla 21: Resumen de Valorización de la VIII Etapa

24

 

 

 

8. INICIALES POR VENTAS:

 A continuación, se muestra la cobranza de iniciales según las vventas entas realizadas realizadas en cada Etapa al 31 de Agosto del 2019. 8.1 De las Ventas de la I Etapa:  COBRANZAS "I ETAPA" Detalle de Venta

Iniciales Cobradas

Ventas Contado + BFH

995,299.85

Ventas Directo + BFH

2’307,179.00

Ventas con Hipotecario + BFH

1,305.00

Unidades por Vender

0.00

TOTAL RECIBIDO

3’303,783.85

Tabla 22: Cuotas iniciales cobradas de preventas de la I Etapa

8.2. De las Ventas de la II Etapa: COBRANZAS "II ETAPA" Detalle de Venta

Iniciales Cobradas

Ventas Contado + BFH

476,000.00

Ventas Directo + BFH

3’398,845.63

Ventas con Hipotecario + BFH

45,371.20

Unidades por Vender

0.00

TOTAL RECIBIDO

3’921,216.83

Tabla 23: Cuadro de iniciales cobradas de preventas de la II Etapa

8.3. De las Ventas de la III Etapa:

COBRANZAS "III ETAPA" Detalle de Venta

Iniciales Cobradas

Ventas Contado + BFH

71,280.00

Ventas Directo + BFH

1’094,554.72 1’094,554 .72

Ventas con Hipotecario + BFH

1,615.00

Unidades por Vender

0.00

TOTAL RECIBIDO

1’167,449.72   1’167,449.72

Tabla 24: Cuadro de iniciales cobradas de preventas de la III Etapa

25

 

8.4. Cobranzas Totales al 31 de Agosto del 2019: COBRANZAS DE INICIALES TOTALES Descripción

Iniciales Cobradas

I ETAPA

3’303,783.85   3’303,783.85

II ETAPA

3’921,216.83   3’921,216.83

III ETAPA

1’167,449.72   1’167,449.72

TOTAL RECIBIDO

8’392,450.40   8’392,450.40

Tabla 25: Cuadro de cobranzas totales al 31 de Agosto del 2019

El promotor recibió un monto de S/. 8’392,450.40 por iniciales referente a las preventas de las viviendas de la I, II y III Etapa. Nota: Información brindada por Inmobiliaria Malyvet S.A.C.

9. MONTOS DE LIBERACIÓN: Traslado a libre Monto disposición Primer traslado S/1,600,000.00 Segundo S/500,000.00 traslado TOTAL S2,100,000.

Fecha

Motivo

Comentario

Para obra.

Back to Back

Para obra

Back to Back

Tabla 26: Montos liberados para obra

Nota: Información brindada por Inmobiliaria Malyvet S.A.C.

10. MONTO RECIBIDO POR EL PROMOTOR PARA OBRA: FINALIDAD Iniciales de Preventas

Monto S/. 8’392,450.40  8’392,450.40 

Montos liberados

S/. 2,100,000.00

TOTAL

10’492,450.40   10’492,450.40

Tabla 27: Monto Recibido Total para Obra

11. CUADRO DEL FLUJO DE FONDOS TRANSFERIDOS: Para realizar el cuadre del flujo de fondos transferidos se usará la siguiente fórmula: Monto transferido + Aporte (1)

=

Valorización (2)

Manifiesto de

+

 

Tabla 28: Cuadro del Flujo de Fondos Transferidos 26

gasto

 

Para el cálculo del monto transferido + aporte se tiene lo siguiente: Monto transferido + Aporte

Aporte (Val. Agos.)

=

Monto transferido

+

S/19´555,369.90Tabla 29:Cuadro = del Flujo S/9,062,919.50 + de Fondos Transferidos

S/10’492,450.40 S/10’492,450.40  

Por lo que el monto transferido + aporte = S/. 10´492,450.40 + S/. 9´062,919.50 = S/. S/19´555,369.90 El monto del aporte se ha considerado el precio real pagado por Malyvet del terreno. La valorización + Manifiesto de gasto se tiene lo siguiente: Valorización + Manifiesto de gasto

=

Valorización

+

Manifiesto de Gastos (Gastos Indirectos)

S/ 19,190,505 19,190,505.98 .98

=

S/828,464.20

+

S/18’ S/18’362,041.78 362,041.78

 

Tabla 30:Cuadro del Flujo de Fondos Transferidos

La valorización está referida a la valorización de obra acumulada que asciende a S/ 828,464.20.  Además, el manifiesto de gasto está referido a los Gastos Indirectos del proyecto (incluye terreno) lo cual se observa en el siguiente cuadro: RESUMEN GENERAL DE CADA ETAPA DISGREGADO 

ETAPA

PRESUPUESTO % DE (S/.) PARTICIPACIÓN

ACUMULADO ANTERIOR (S/.)

VAL. ACTUAL (S/.) y (%)

ACUMULADO (S/.) y (%)

SALDO POR VALORIZAR (%) (S/.) y

I ETAPA

10,962,617.38

24.86%

0.00

9,701,601.54 88.50% 9,701,601.54 88.50% 1,261,015.84 11.50%

II ETAPA

4,853,704.22

11.01%

0.00

3,462,398.37 71.34% 3,462,398.37 71.34% 1,391,305.85 28.66%

III ETAPA

5,629,274.08

12.77%

0.00

1,957,788.42 34.78% 1,957,788.42 34.78% 3,671,485.66 65.22%

IV ETAPA

5,504,476.34

12.48%

0.00

668,695.59 12.15%

668,695.59 12.15% 4,835,780.75 87.85%

V ETAPA

4,927,150.66

11.17%

0.00

719,200.08 14.60%

719,200.08 14.60% 4,207,950.58 85.40%

VI ETAPA

4,735,256.69

10.74%

0.00

736,797.25 15.56%

736,797.25 15.56% 3,998,459.44 84.44%

VII ETAPA

3,658,686.85

8.30%

0.00

536,104.21 14.65%

536,104.21 14.65% 3,122,582.64 85.35%

VIII ETAPA VALORI VALO RIZA ZACI CI N TOTAL ACTUAL (S/.)

3,823,682.14

8.67%

0.00

579,456.32 15.15%

579,456.32 15.15% 3,244,225.82 84.85%

44,094,848.36 100.00%

0.00

18,362,041.78

18,362,041.78

25,732,806.58

0.00%

41.64%

41.64%

58.36%

 

Tabla 31: Resumen de Valorización de Gastos Indirectos

27

 

 Al 31 de Agosto del 2019 se ha valorizado los gastos indirectos (incluye terreno) por un monto que asciende a S/ 18’362,041.78 18’362,041.78 (Dieciocho millones trescientos sesenta y

dos mil cuarenta y uno con 78//100 soles) que representa el 41.64% del presupuesto total de los gastos Indirectos.  Además, la valorización completa completa de gastos indirectos se verá verá reflejada en el Anexo 3. Por consiguiente, se tiene lo siguiente:

Monto transferido + Aporte

=

Valorización + Manifiesto de gasto

S/19´555,369.90 

>

S/ 19´190,505 19´190,505.98 .98 

Tabla 32: Monto Transferido + aporte >Valorización +gastos indirectos 

Como se aprecia en el cuadro la valorización +manifiesto de gasto NO supera al monto transferido (S/10’492,450.40 (S/10’492,450.40)) + Aporte (S/9,062,919.50). Por lo que el monto de S/19´555,369.90 corresponde a lo siguiente: Concepto

Monto

% Incidencia

Valorización Agosto 2019 Valorización Gastos Indirectos del Proyecto al 31 de  Agosto 2019

S/828,464.20

4.32% 

S/18’362,041.78 S/18’ 362,041.78

95.68% 

S/ 19´190,505 19´190,505.98 .98 

100.00%

TOTAL

Tabla 33: Gastos para ejecución de obra 

Inmobiliaria Malyvet S.A.C. mantiene un saldo de S/ 364,863.92 para que continúe la obra durante el mes de Setiembre del 2019.

12. CONCLUSIONES:

-

El proy proyecto ecto cuenta cuenta con Licencia de Habilitación Urbana: Resolución Gerencial Nº 011-2018-GDUR-MDC de fecha 17 de Diciembre del 2,018 (Planeamiento Integral del Proyecto por las 09 Etapas).

28

 

-

El proyecto ccuenta uenta con Licencias de Habilitación Urbana Urbana:: Resolucione Resolucioness Gerenciales N°012,013,014,015,016-2018-GDUR-MDC, de fechas 17 de Diciembre del 2018, para la I, II, III, II I, IV y V Etapa.

-

El proyecto no cue cuenta nta con licencia de Habilitación Habilitación Urbana para la VI, VII y VIII Etapa.

-

El proyecto tiene Factibilidad Eléctrica R-336-2018/Enosa, de fecha 20 de Junio del 2018, pero no cuenta con Resolución emitida por la entidad ENOSA, para el sistema de Electrificación.

-

El proy proyecto ecto cuen cuenta ta co con n proy proyecto ecto apro aprobado bado de Ag Agua ua y Alcantarillado por parte parte de EPS GRAU S.A: según RESOLUCIÓN DE GERENCIA GENERAL N°01642019- EPS GRAU S.A.-100, de fecha 20 de Mayo del 2019.

-

La Habilitación Urbana “Vive Hogar Castilla” no cuenta con proyecto específico de la Planta de Tratamiento de Aguas Residuales (diseño, sistema de evacuación de aguas residuales, etc.)

-

Aún no se ha realizado la perforación perforación del p pozo ozo tubular para el aba abastecimiento stecimiento del agua al proyecto.

-

El proyecto cuenta con Licencia de Edificación No 402-2018-SGCYGU-GD 402-2018-SGCYGU-GDURUR-

MDC de fecha 21 de diciembre del 2,018, para 481 viviendas de la I Etapa. -

El proyecto cuenta con Licencia de Edificación No 403-2018-SGCYGU-GDUR-

MDC de fecha 20 de diciembre del 2018 , para 454 viviendas de la II Etapa. -

El presupuesto general de obra para las 8 Etapas asciende a S/168’392,289.99. S/168’392,289.99.  

-

El presup presupuesto uesto de de G Gastos astos Indirectos Indirectos (incluye (incluye terreno) para las 8 etapas del proyecto asciende a S/ 44’ 44 ’094,848.36.

-

El monto valorizado d de e obra acumulado al 31 de Ag Agosto osto del 2019 es de S/.

828,464.20 (Ochocientos veinte y ocho mil cuatrocientos sesenta y cuatro con 20/100 Soles) incluido los impuestos de Ley, que representa el 0.49% del presupuesto general de obra (8 Etapas). -

El Saldo de o obra bra por valorizar valorizar al 31 de Agosto Agosto del 20 2019 19 es de S/.

167’’563,825.79 (Ciento sesenta y siete millones quinientos sesenta y tres 167 mil ochocientos veinte y cinco con 79/100 Soles)  incluido los impuestos de Ley, que representa el 99.51% del presupuesto general de obra (8 Etapas). 29

 

-

Referente a los gast gastos os indirectos (incluye terreno), el m monto onto valorizado valorizado acumulado al 31 de Agosto del 2019 es de S/. 18’ 18’362,041.78 362,041.78 (Dieciocho

millones trescientos sesenta y dos mil cuarenta y uno con 78/100 Soles) incluido los impuestos de Ley, que representa el 41.64% del presupuesto de los gastos indirectos. -

El saldo por valoriz valorizar ar de los gastos indirectos indirectos al 31 de Agosto del 2019 es de

S/. 25’ 25’732,806.58 732,806.58 (Veinte y cinco millones setecientos treinta y dos mil ochocientos seis con 58/100 Soles) incluido los impuestos de Ley, que representa el 58.36% del presupuesto de los gastos indirectos. -

Inmobiliaria Malyvet S.A.C. mantiene un saldo de 36 364,863.92 4,863.92 para que continúe la obra durante el mes m es de Setiembre del 2019.

30

 

ANEXO 1: REPORTE FOTOGRAFICO:

31

 

Imagen 1:Vista de Caseta de Ventas del Proyecto

Imagen 2: Vista Actual del Terreno

32

 

Imagen 3: Movimiento de Tierras del Proyecto

Imagen 4: Vivienda Piloto

33

 

ANEXO 2: VALORIZACION DE OBRA:

34

 

 

ITEM

PARTIDA

1 1.1 1.1.1 1.1.2 1.2 1.2.1 1.2.2 1.2.3 1.2.4 1.2.4.1 1.2.4.2 1.2.4.3 1.2.4.4 1.2.5 1.2.6 1.2.6.1

PROYECTO: VIVE HOGAR CASTILLA| OBRAS PRELIMINARES PISTA DE ACCESO Y PLATAFORMAS CAMPAMENTO INFRAESTRUCTU RA Y DESARROLLO POZO DE ABASTECIMIENTO SISTEMA DE BOMBEO Y CLORACIÓN SISTEMA DE ALMACENAMIENTO PTAR PTAR E1-E2 PTAR E3-E4 PTAR E4-E5 PTAR E5-E6 L NEA PRIMARIA DE ELECTRICIDAD COMPRA DE ENCOFRADO + EQUIPOS Compra de Encofrado Compra de Autohormigonera / Planta + Dumper Compra de Telehandler (Rotatorio) Compra de Encofrado 2 CONSTRUCCIÓN ETAPA 1 HABILITACI ÓN URBANA MOVIMIENTO DE TIERRAS LIMPIEZA Y DESBROCE CORTE RELLENO ELIMINACIÓN DE MATERIAL PLATAFORMADO DE CASAS AGUA POTABLE Y ALCANTARILL ADO AGUA POTABLE RED DE DISTRIBUCIÓN TRABAJOS PRELIMINARES RIEGO DE LA ZONA DE TRABAJO PARA MITIGAR LA CONTAMINACION POR POLVO TRAZ O Y REPLANTEO INICIAL DE LA LINEA TRAZO Y REPLANTEO DURANTE LA INSTALACION DE TUBERIAS MOVIMIENTO DE TIERRAS EXC. S/INTERF. TERRENO SUELTO P/TUB. DN=110-160mm Hasta H=1.20m. EXC. S/INTERF. TERRENO SUELTO P/TUB. DN=200-250mm Hasta H=1.20m. REFINES Y NIVELACION FONDO DE ZANJA P/TUB DN 110-160MM EN TERRENO NORMAL REFINES Y NIVELACION FONDO DE ZANJA P/TUB DN 200-250MM EN TERRENO NORMAL CAMA DE ARENA MANUAL E=0.1M ZANJA P/TUB DN 110-160; MATERIAL PROPIO ZARANDEADO CAMA DE ARENA MANUAL E=0.1M ZANJA P/TUB DN 200-250; MATERIAL PROPIO ZARANDEADO RELL. D/ZANJ. D/MAT. PROPIO COMP. C/EQ P/TUB 110-160mm,H=1.20m RELL. D/ZANJ. D/MAT. PROPIO COMP. C/EQ P/TUB 200-250mm,H=1.20m ELIMINACION MATERIAL EXCEDENTE C/EQUIPO HASTA 1KM INSTALACION DE TUBERIAS DE AGUA POTABLE (INC.SUMINISTRO) SUMI. E INST. TUBERIA PVC UF, PN7. 5, P/AGUA POTABLE DN 110 mm. NTP 16422 SUMI. E INST. TUBERIA PVC UF, PN7. 5, P/AGUA POTABLE DN 160 mm. NTP 16423 SUMI. E INST. TUBERIA PVC UF, PN10, P/AGUA POTABLE DN 200 mm. NTP 16424 PRUEBA HIDRAULICA Y DESINFECCION DE TUBERIA ZANJA TAPADA PRUEBA HIDRAULICA Y DESINFECCION DE TUBERIA DN 100mm PRUEBA HIDRAULICA Y DESINFECCION DE TUBERIA DN 160mm PRUEBA HIDRAULICA Y

1.2.6.2 1.2.6.3 1.2.6.4 1.3 1.3.1 1.3.1.1 1.3.1.1.1 1.3.1.1.1. 1 1.3.1.1.1. 2 1.3.1.1.1. 3 1.3.1.1.1. 4 1.3.1.1.1. 6 1.3.1.1.2 1.3.1.1.2. 2 1.3.1.1.2. 2.1 1.3.1.1.2. 2.1.1 1.3.1.1.2.2.1.1.1 1.3.1.1.2. 2.1.1.2 1.3.1.1.2.2.1.1.3 1.3.1.1.2. 2.1.2 1.3.1.1.2.2.1.2.1 1.3.1.1.2.2.1.2.2 1.3.1.1.2.2.1.2.3 1.3.1.1.2.2.1.2.4 1.3.1.1.2.2.1.2.5 1.3.1.1.2.2.1.2.6 1.3.1.1.2.2.1.2.7 1.3.1.1.2.2.1.2.8 1.3.1.1.2.2.1.2.9 1.3.1.1.2.2.1.3 1.3.1.1.2.2.1.3.1 1.3.1.1.2.2.1.3.2 1.3.1.1.2.2.1.3.3 1.3.1.1.2.2.1.4 1.3.1.1.2.2.1.4.1 1.3.1.1.2.2.1.4.2 1.3.1.1.2.2.1.4.3

UND

VALORIZACION DE OBRA N° 0 CORRESPONDIENTE AL PERIODO JULIO 2019 @ 31 AGOSTO 2019  2019  CONTRATO AVANCE ANTERIOR AVANCE ACTUAL METRADO C.U. S/ PARCIAL S/ METRADO S/ % METRADO S/ 127,415,474.75

%

AVANCE ACUMULADO METRADO S/ %

SALDO POR EJECUTAR METRADO S/

%

glb glb

1.00 1.00

200,000 300,000

200,000 300,000

-

-

0% 0%

1.00 0.45

200,000.00 135,000.00

100.0% 45.0%

1.00 0.45

200,000.00 135,000.00

100.0% 45.0%

0.55

165,000.00

0.0% 55.0%

glb glb glb

1.00 1.00 1.00

1,200,000 330,000 1,500,000

1,200,000 330,000 1,500,000

-

-

0% 0% 0%

-

-

0.0% 0.0% 0. 0%

-

-

0.0% 0.0% 0.0%

1.00 1. 00 1.00

1,200,000.00 330,000.00 1,500,000.00

100.0% 100.0% 100.0%

glb glb glb glb glb

1.00 1.00 1.00 1.00 1.00

2,500,000 500,000 500,000 500,000 650,000

2,500,000 500,000 500,000 500,000 650,000

-

-

0% 0% 0% 0% 0%

-

-

0.0% 0.0% 0.0% 0.0% 0.0%

-

-

0.0% 0.0% 0.0% 0.0% 0.0%

1.00 1.00 1.00 1.00 1.00

2,500,000.00 500,000.00 500,000.00 500,000.00 650,000.00

100.0% 100.0% 100.0% 100.0% 100.0%

glb

1.00

653,251

653,251

-

-

0%

0.35

228,637.85

35.0%

0.35

228,637.85

35.0%

0.65

424,613.15

65.0%

glb

1.00

561,796

561,796

-

-

0%

-

-

0.0%

-

-

0.0%

1.00

561,796.00

100.0%

glb glb

1.00 1.00

527,793 326,625

527,793 326,625

-

-

0% 0%

-

-

0.0% 0.0%

-

-

0.0% 0.0%

1.00 1.00

527,793.00 326,625.00

100.0% 100.0%

m2 m3 m3 m2 m2

62,500.00 26,192.25 26,669.63 62,500.00 11,687.50

0.35 3.69 6.09 0.08 38.22

21,875 96,649 162,418 5, 000 446,753

-

-

0% 0% 0% 0% 0%

62,500.00 -

21,875.00 -

100.0% 0.0% 0.0% 0.0% 0.0%

62,500.00 -

21,875.00 -

100.0% 0.0% 0.0% 0.0% 0. 0%

26,192.25 26,669.63 62,500.00 11,687.50

96,649.40 162,418.02 5,000.00 446,752.54

0.0% 100.0% 100.0% 100.0% 100.0%

ml

2,585.5

2.84

7, 343

-

-

0%

-

-

0.0%

-

-

0.0%

2,585.47

7,342.73

100.0%

ml

2,585.5

1.18

3,051

-

-

0%

-

-

0.0%

-

-

0.0%

2,585.47

3,050.85

100.0%

ml

2,585.5

1.86

4, 809

-

-

0%

-

-

0.0%

-

-

0.0%

2,585.47

4,808.97

100.0%

ml

2,556.5

11.26

28,786

-

-

0%

-

-

0.0 %

-

-

0.0%

2,556.45

28,785.63

100.0%

ml

29.0

12.66

367

-

-

0%

-

-

0.0%

-

-

0.0%

29.02

367.39

100.0%

ml

2,556.5

1.33

3, 400

-

-

0%

-

-

0.0%

-

-

0.0%

2,556.45

3,400.08

100.0%

ml

29.0

1.60

46

-

-

0%

-

-

0.0%

-

-

0.0%

29.02

46.43

100.0%

ml

2,556.5

3.71

9, 484

-

-

0%

-

-

0.0%

-

-

0.0%

2,556.45

9,484.43

100.0%

ml

29.0

4.16

121

-

-

0%

-

-

0.0%

-

-

0.0%

29.02

120.72

100.0%

ml

2,556.5

14.69

37,554

-

-

0%

-

-

0.0 %

-

-

0.0%

2,556.45

37,554.25

100.0%

ml

29.0

16.71

485

-

-

0%

-

-

0.0%

-

-

0.0%

29.02

484.92

100.0%

m3

1,116.9

8.31

9, 282

-

-

0%

-

-

0.0%

-

-

0.0%

1,116.92

9,281.61

100.0%

ml

2,164.2

19.59

42,396

-

-

0%

-

-

0.0 %

-

-

0.0%

2,164.16

42,395.89

100.0%

ml

392.3

36.61

14,362

-

-

0%

-

-

0.0%

-

-

0.0%

392.29

14,361.74

100.0%

ml

29.0

55.21

1,602

-

-

0%

-

-

0.0%

-

-

0.0%

29.02

1,602.19

100.0%

ml

2,164.2

1.49

3, 225

-

-

0%

-

-

0.0%

-

-

0.0%

2,164.16

3,224.60

100.0%

ml

392.3

1.88

738

-

-

0%

-

-

0.0%

-

-

0.0%

392.29

737.51

100.0%

ml

29.0

2.31

67

-

-

0%

-

-

0.0%

-

-

0.0%

29.02

67.04

100.0%

DESINFECCION DE TUBERIA DN 200mm

35

 

1.3.1.1.2.2.1.5 1.3.1.1.2.2.1.5.1 1.3.1.1.2.2.1.5.2 1.3.1.1.2.2.1.5.3 1.3.1.1.2.2.1.5.4 1.3.1.1.2.2.1.5.5 1.3.1.1.2.2.1.5.6 1.3.1.1.2.2.1.5.7 1.3.1.1.2.2.1.5.8 1.3.1.1.2.2.1.5.9 1.3.1.1.2.2.1.5.10 1.3.1.1.2.2.1.5.11 1.3.1.1.2.2.1.5.12 1.3.1.1.2.2.1.5.13 1.3.1.1.2. 2.1.6 1.3.1.1.2.2.1.6.1 1.3.1.1.2.2.1.6.2 1.3.1.1.2.2.1.7 1.3.1.1.2.2.1.7.1 1.3.1.1.2.2.1.7.2 1.3.1.1.2.2.1.7.3 1.3.1.1.2.2.1.7.4 1.3.1.1.2.2.1.7.5 1.3.1.1.2.2.1.7.6 1.3.1.1.2.2.1.7.7 1.3.1.1.2.2.1.7.8 1.3.1.1.2.2.1.7.9 1.3.1.1.2. 2.2 1.3.1.1.2.2.2.1 1.3.1.1.2.2.2.1.1 1.3.1.1.2.2.2.1.2 1.3.1.1.2.2.2.1.3 1.3.1.1.2.2.2.1.4 1.3.1.1.2.2.2.1.5 1.3.1.1.2.2.2.1.6 1.3.1.1.2.2.2.1.7 1.3.1.1.2.2.2.1.8 1.3.1.1.2.2.2.1.9 1.3.1.1.2.2.2.1.10 1.3.1.1.2.2.2.1.11

INSTALACION DE ACCESORIOS PVC AGUA POTABLE (INC. SUMINISTRO) SUMI. E INST. TEE PVC 110 x 110mm; PN=10 SUMI. E INST. TEE PVC 160 x 160mm; PN=10 SUMI. E INST. TEE PVC 200 x 200mm; PN=10 SUMI. E INST. CODO DE PVC DN 90º x 110mm SUMI. E INST. CODO DE PVC DN 45º x 110mm SUMI. E INST. CODO DE PVC DN 45º x 160mm SUMI. E INST. CODO DE PVC DN 22.5º x 110mm SUMI. E INST. CODO DE PVC DN 22.5º x 160mm SUMI. E INST. REDUCCIONES PVC DN 160mm a 110mm SUMI. E INST. REDUCCIONES PVC DN 200mm a 160mm SUMI. E INST. DE TAPON PVC UF DN 110mm SUMI. E INST. DE TAPON PVC UF DN 160mm SUMI. E INST. DE TAPON PVC UF DN 200mm ANCLAJES Y/O APOYOS CONCRETO F'C=175KG/CM2 PARA ANCLAJE DE ACCESORIOS EMPALME A TUBERIA EXISTENTE VALVULAS Y ACCESORIOS DE HIERRO DUCTIL SUMI. E INST. VALVULA DE COMPUERTA HD 110mm SUMI. E INST. VALVULA DE COMPUERTA HD 160mm SUMI. E INST. VALVULA DE COMPUERTA HD 200mm SUMI. E INST. VALVULA DE PURGA DN 100mm INCLUYE ACCESORIOS, EXCA. CONCRETO 210, TUB. 110mm SUMI. E INST. VALVULA DE PURGA DN 160mm INCLUYE ACCESORIOS, EXCA. CONCRETO 210, TUB. 160mm SUMI. E INST. VALVULA DE AIRE BB DN 25mm INC. ACCESO. CAJA, P/TUB. DN 110mm. SUMI. E INST. VALVULA DE AIRE BB DN 25mm INC. ACCESO. CAJA, P/TUB. DN 160mm. SUMI. E INST. DE GRIFO CONTRA INCENDIOS FºFº, 02 SALIDAS CAJA DE VALVULA COMPUERTA CONEXIONES DOMICILIARIA S CONEXIÓN DOMICILIARIA DE AGUA POTABLE RIEGO DE LA ZONA DE TRABAJO PARA MITIGAR LA CONTAMINACION POR POLVO TRAZO Y REPLANTEOS CONEXIÓN DOMICILIARIA GUA EXCAVACION DE ZANJA T.NORMAL (0.4x1.20m); CONEX. AGUA REFINE Y NIVELACION DE ZANJA CONEXIÓN AGUA CAMA DE ARENA DE P/TUB. 1/2, C/MATERIAL PROPIO ZARANDEADO; CONEXIÓN DOMIL. RELLENO Y COMP. DE ZANJA CONEXIÓN ELIMINACION MATERIAL EXCEDENTE C/EQUIPO HASTA 1KM CONEXIÓN DOMICILIARIA AGUA TUB. PVC 1/2; LPROM=6m. CONEXIÓN DOMICILIARIA AGUA TUB. PVC 3/4; LPROM=6m. SUM. E INST. DE MICROMEDIDORES CONEXIÓN DOMIC.AGUA,INCL. INSTALACION Y ACCESORIOS PRUEBA HIDRAULICA Y DESINFECCION DE TUBERIA PVC Ø 1/2

und

25.0

92.76

2,319

-

-

0%

-

-

0.0%

-

-

0.0%

25.00

2,319.00

100.0%

und

5.0

220.98

1,105

-

-

0%

-

-

0.0%

-

-

0.0%

5.00

1,104.90

100.0%

und

2.0

787.52

1,575

-

-

0%

-

-

0.0%

-

-

0.0%

2.00

1,575.04

100.0%

und

1.0

88.86

89

-

-

0%

-

-

0.0%

-

-

0.0%

1.00

88.86

100.0%

und

1.0

146.84

147

-

-

0%

-

-

0.0%

-

-

0.0%

1.00

146.84

100.0%

und

1.0

88.19

88

-

-

0%

-

-

0.0%

-

-

0.0%

1.00

88.19

100.0%

und

24.0

86.19

2,069

-

-

0%

-

-

0.0%

-

-

0.0%

24.00

2,068.56

100.0%

und

5.0

140.17

701

-

-

0%

-

-

0.0%

-

-

0.0%

5.00

700.85

100.0%

und

6.0

125.65

754

-

-

0%

-

-

0.0%

-

-

0.0%

6.00

753.90

100.0%

und

3.0

168.93

507

-

-

0%

-

-

0.0%

-

-

0.0%

3.00

506.79

100.0%

und

5.0

68.36

342

-

-

0%

-

-

0.0%

-

-

0.0%

5.00

341.80

100.0%

und

2.0

128.63

257

-

-

0%

-

-

0.0%

-

-

0.0%

2.00

257.26

100.0%

und

1.0

165.82

166

-

-

0%

-

-

0.0%

-

-

0.0%

1.00

165.82

100.0%

und

88.0

68.42

6,021

-

-

0%

-

-

0.0%

-

-

0.0%

88.00

6,020.96

100.0%

und

und

2.0

358.98

718

-

-

0%

-

-

0.0%

-

-

0.0%

2.00

717.96

100.0%

und

1.0

623.10

623

-

-

0%

-

-

0.0%

-

-

0.0%

1.00

623.10

100.0%

und

1.0

882.43

882

-

-

0%

-

-

0.0%

-

-

0.0%

1.00

882.43

100.0%

1.0

4,536.59

4,537

-

-

0%

-

-

0.0%

-

-

0.0%

1.00

4,536.59

100.0%

und

2.0

1,155.65

2,311

-

-

0%

-

-

0.0%

-

-

0.0%

2.00

2,311.30

100.0%

und

4.0

180.59

722

-

-

0%

-

-

0.0%

-

-

0.0%

4.00

722.36

100.0%

und und und und

ml

2,892.0

2.84

8, 213

-

-

0%

-

-

0.0%

-

-

0.0%

2,892.00

8,213.28

100.0%

ml

2,892.0

1.20

3, 470

-

-

0%

-

-

0.0%

-

-

0.0%

2,892.00

3,470.40

100.0% 100.0%

ml

2,892.0

22.35

64,636

-

-

0%

-

-

0.0 %

-

-

0.0%

2,892.00

64,636.20

ml

2,892.0

0.65

1, 880

-

-

0%

-

-

0.0%

-

-

0.0%

2,892.00

1,879.80

100.0%

ml

2,892.0

2.16

6, 247

-

-

0%

-

-

0.0%

-

-

0.0%

2,892.00

6,246.72

100.0%

ml

2,892.0

13.56

39,216

-

-

0%

-

-

0.0 %

-

-

0.0%

2,892.00

39,215.52

100.0%

m3

1,249.3

8.31

10,382

-

-

0%

-

-

0.0 %

-

-

0.0%

1,249.34

10,382.02

100.0%

und

482.0

218.22

105,182

-

-

0%

-

-

0.0%

-

-

0.0%

482.00

105,182.04

100.0%

ml

482.0

154.60

74,517

-

-

0%

-

-

0.0%

-

-

0.0%

482.00

74,517.20

100.0%

ml

2,892.0

1.14

3, 297

-

-

0%

-

-

0.0%

-

-

0.0%

2,892.00

3,296.88

100.0%

und

36

 

1.3.1.1.2.2.3 1.3.1.1.2.2.3.1 1.3.1.1.2.2.3.1.1 1.3.1.1.2.2.3.1.2 1.3.1.1.2. 2.4 1.3.1.1.2. 2.4.1 1.3.1.1.2.2.4.1.1 1.3.1.1.2.2.4.1.2 1.3.1.1.2.2.4.1.3 1.3.1.1.2. 2.4.2 1.3.1.1.2.2.4.2.1 1.3.1.1.2.2.4.2.2 1.3.1.1.2.2.4.2.3 1.3.1.1.2.2.4.2.4 1.3.1.1.2.2.4.2.5 1.3.1.1.2.2.4.3 1.3.1.1.2.2.4.3.1 1.3.1.1.2.2.4.4 1.3.1.1.2.2.4.4.1 1.3.1.1.2.2.4.5 1.3.1.1.2.2.4.5.1 1.3.1.1.2.2.4.5.2 1.3.1.1.2.2.4.5.3 1.3.1.1.2. 2.4.6 1.3.1.1.2.2.4.6.1 1.3.1.1.2.2.4.7 1.3.1.1.2.2.4.7.1 1.3.1.1.2.2.4.7.2 1.3.1.1.2.3 1.3.1.1.2.3.1 1.3.1.1.2. 3.1.1 1.3.1.1.2.3.1.1.1 1.3.1.1.2.3.1.1.2 1.3.1.1.2.3.1.1.3 1.3.1.1.2. 3.1.2 1.3.1.1.2. 3.1.2.1 1.3.1.1.2.3.1.2.1.1 1.3.1.1.2.3.1.2.1.2 1.3.1.1.2.3.1.2.2 1.3.1.1.2.3.1.2.2.1 1.3.1.1.2.3.1.2.2.2 1.3.1.1.2.3.1.2.3 1.3.1.1.2.3.1.2.3.1

PRUEBAS DE CONTROL DE CALIDAD PRUEBAS DE CONTROL DE CALIDAD PRUEBA COMPACTACION SUELOS (PROCTOR MODIFICADO) PRUEBA COMPACTACION SUELOS (DENSIDAD DE CAMPO) LÍNEA DE IMPULSIÓN TRABAJOS PRELIMINARES RIEGO DE LA ZONA DE TRABAJO PARA MITIGAR LA CONTAMINACION POR POLVO TRAZO Y REPLANTEO INICIAL DE LA LINEA TRAZO Y REPLANTEO DURANTE LA INSTALACION DE TUBERIAS MOVIMIENTO DE TIERRAS EXC. S/INTERF. TERRENO SUELTO P/TUB. DN=200-250mm Hasta H=1.50m. REFINES Y NIVELACION FONDO DE ZANJA P/TUB DN 200-250MM EN TERRENO NORMAL CAMA DE ARENA MANUAL E=0.1M ZANJA P/TUB DN 200-250; MATERIAL PROPIO ZARANDEADO RELL. D/ZANJ. D/MAT. PROPIO COMP. C/EQ P/TUB 200-250mm,H=1.50m ELIMINACION MATERIAL EXCEDENTE C/EQUIPO HASTA 1KM INSTALACION DE TUBERIAS DE AGUA POTABLE (INC.SUMINISTRO) SUM. E INST. TUB PVC UF PN16 P/AGUA H=1.5m DN 200MM ISO 1452 PRUEBA HIDRAULICA Y DESINFECCION DE TUBERIA, ZANJA TAPADA PRUEBA HIDRAULICA Y DESINFECCION DE TUBERIA DN 200MM INSTALACION DE ACCESORIOS PVC AGUA POTABLE (INC. SUMINISTRO) SUMI. E INST. CODO PVC DN 45º x 200mm SUMI. E INST. CODO PVC DN 22.5º x 200mm SUMI. E INST. DE TAPON PVC DN 200MM ANCLAJES Y/O APOYOS CONCRETO F'C=175KG/CM2 PARA ANCLAJE DE ACCESORIOS PRUEBAS DE CONTROL DE CALIDAD PRUEBA COMPACTACION SUELOS (PROCTOR MODIFICADO) PRUEBA COMPACTACION SUELOS (DENSIDAD DE CAMPO) ALCANTARILLADO RED DE COLECTORES SECUNDARIOS TRABAJOS PRELIMINARES RIEGO DE LA ZONA DE TRABAJO PARA MITIGAR LA CONTAMINACION POR POLVO TRAZO Y REPLANTEOS INICIALES DEL PROYECTO TRAZO Y REPLANTEO DURANTE EL PROCESO CONSTRUCTIVO DE LA OBRA MOVIMIENTO DE TIERRAS EXCAVACIONES DE ZANJAS EXCAVACION DE ZANJA C/MAQ. T. NORMAL HASTA 1.50MPP EXCAVACION DE ZANJA C/MAQ. T. NORMAL HASTA 2.00MPP REFINE, NIVELACION Y CONFORMACION DE ZANJAS REFINE, NIVELACION Y CONFORMACION DE FONDO DE ZANJA HASTA HPROM=3.00m CAMA DE ARENA DE APOYO DE TUBERIA PVC DN (200-250) E=0.10M; A=0.60m; C/MATERIAL PROPIO ZARANDEADO RELLENO Y COMPACTACION DE ZANJAS RELLENO COMP. ZANJA T. NORMAL HASTA 1.50MPP

ml

1.0

70.00

70

-

-

0%

-

-

0.0%

-

-

0.0%

1.00

70.00

100.0%

ml

23.0

60.00

1,380

-

-

0%

-

-

0.0%

-

-

0.0%

23.00

1,380.00

100.0%

ml

265.7

2.84

755

-

-

0%

-

-

0.0%

-

-

0.0%

265.71

754.62

100.0%

ml

265.7

1.18

314

-

-

0%

-

-

0.0%

-

-

0.0%

265.71

313.54

100.0% 100.0%

ml

265.7

1.86

494

-

-

0%

-

-

0.0%

-

-

0.0%

265.71

494.22

ml

265.7

13.51

3,590

-

-

0%

-

-

0.0%

-

-

0.0%

265.71

3,589.74

100.0%

ml

265.7

1.60

425

-

-

0%

-

-

0.0%

-

-

0.0%

265.71

425.14

100.0%

ml

265.7

4.16

1,105

-

-

0%

-

-

0.0%

-

-

0.0%

265.71

1,105.35

100.0%

ml

265.7

19.37

5,147

-

-

0%

-

-

0.0%

-

-

0.0%

265.71

5,146.80

100.0%

m3

133.9

8.31

1,113

-

-

0%

-

-

0.0%

-

-

0.0%

133.92

1,112.88

100.0%

ml

265.7

55.50

14,747

-

-

0%

-

-

0.0%

-

-

0.0%

265.71

14,746.91

100.0%

ml

265.7

2.31

614

-

-

0%

-

-

0.0%

-

-

0.0%

265.71

613.79

100.0%

und

4.0

212.19

849

-

-

0%

-

-

0.0%

-

-

0.0%

4.00

848.76

100.0%

und

2.0

207.19

414

-

-

0%

-

-

0.0%

-

-

0.0%

2.00

414.38

100.0%

und

2.0

53.64

107

-

-

0%

-

-

0.0%

-

-

0.0%

2.00

107.28

100.0%

und

6.0

142.96

858

-

-

0%

-

-

0.0%

-

-

0.0%

6.00

857.76

100.0%

ml

1.0

70.00

70

-

-

0%

-

-

0.0%

-

-

0.0%

1.00

70.00

100.0%

ml

3.0

60.00

180

-

-

0%

-

-

0.0%

-

-

0.0%

3.00

180.00

100.0%

m

2,289.2

2.84

6,50 1

-

-

0%

-

-

0.0%

-

-

0.0%

2,289.23

6,501.41

100.0%

m

2,289.2

1.24

2,83 9

-

-

0%

-

-

0.0%

-

-

0.0%

2,289.23

2,838.65

100.0%

m

2,289.2

1.72

3,93 7

-

-

0%

-

-

0.0%

-

-

0.0%

2,289.23

3,937.48

100.0%

m

2,072.8

14.88

30,843

-

-

0%

-

-

0.0 %

-

-

0.0%

2,072.76

30,842.67

100.0%

m

216.5

17.01

3,682

-

-

0%

-

-

0.0%

-

-

0.0%

216.47

3,682.15

100.0%

m

2,289.2

2.17

4,96 8

-

-

0%

-

-

0.0%

-

-

0.0%

2,289.23

4,967.63

100.0%

m

2,289.2

3.89

8,90 5

-

-

0%

-

-

0.0%

-

-

0.0%

2,289.23

8,905.10

100.0%

m

2,072.8

15.46

32,045

-

-

0%

-

-

0.0 %

-

-

0.0%

2,072.76

32,044.87

100.0%

37

 

1.3.1.1.2.3.1.2.3.2 1.3.1.1.2.3.1.2.3.3 1.3.1.1.2. 3.1.2.4 1.3.1.1.2.3.1.2.4.1 1.3.1.1.2.3.1.3 1.3.1.1.2.3.1.3.1 1.3.1.1.2.3.1.3.2 1.3.1.1.2.3.1.4 1.3.1.1.2.3.1.4.1 1.3.1.1.2.3.1.4.2 1.3.1.1.2.3.1.4.3 1.3.1.1.2.3.1.4.4 1.3.1.1.2. 3.2 1.3.1.1.2.3.2.1 1.3.1.1.2.3.2.1.1 1.3.1.1.2.3.2.1.2 1.3.1.1.2.3.2.1.3 1.3.1.1.2.3.2.1.4 1.3.1.1.2.3.2.1.5 1.3.1.1.2.3.2.1.6 1.3.1.1.2.3.2.1.7 1.3.1.1.2.3.2.1.8 1.3.1.1.2.3.2.1.9 1.3.1.1.2.3.2.1.10 1.3.1.1.2.3.2.1.11 1.3.1.1.2.3.3 1.3.1.1.2.3.3.1 1.3.1.1.2.3.3.1.1 1.3.1.1.2.3.3.1.2 1.3.1.1.2.3.3.1.3 1.3.1.1.2.3.4 1.3.1.1.2.3.4.1 1.3.1.1.2. 3.4.1.1 1.3.1.1.2.3.5 1.3.1.1.2. 3.5.1 1.3.1.1.2.3.5.1.1 1.3.1.1.2.3.5.1.2 1.3.1.1.2.3.5.1.3 1.3.1.1.2. 3.5.2 1.3.1.1.2. 3.5.2.1 1.3.1.1.2.3.5.2.1.1 1.3.1.1.2.3.5.2.1.2 1.3.1.1.2.3.5.2.1.3 1.3.1.1.2.3.5.2.1.4

RELLENO COMP. ZANJA T. NORMAL HASTA 2.00MPP ELIMINACION MATERIAL EXCEDENTE C/EQUIPO EN TERRENO ANEXO ENTIBADO DE ZANJAS ENTIBADO DE PROTECCION DE ZANJAS H>2.00m SUMINISTRO E INSTALACION TUBOS COLECTOR/EMISOR SUMIN. E INSTAL. TUBO PVC UF, SN-4, DN 200MM, ISO 4435 PRUEBA HIDRAULICA TUBO PVC DN 200MM CONSTRUCCION DE BUZONES Y EMPALMES BUZON TIPO I, C/MARCO Y TAPA DE CONCRETO Di=1.20m x h=1.20MPP BUZON TIPO I, C/MARCO Y TAPA DE CONCRETO Di=1.20m x h=1.50MPP BUZON TIPO I, C/MARCO Y TAPA DE CONCRETO Di=1.20m x h=2.00MPP EMPALME A BUZON DE TUB. PVC CON DADO DE CONCRETO SIMPLE CONEXIONES DOMICILIARIA S CONEXION DOMICILIARIA DESAGUE RIEGO DE LA ZONA DE TRABAJO PARA MITIGAR LA CONTAMINACION POR POLVO TRAZOS Y REPLANTEOS DURANTE EL PROCESO CONSTRUCTIVO DE LA OBRA EXCAVACION DE ZANJA T.NORMAL (0.4x1.20m); CONEX. AGUA REFINE Y NIVELACION DE ZANJA CONEXIÓN AGUA CAMA DE ARENA DE P/TUB. 1/2, CMATERIAL PROPIO ZARANDEADO; CONEXIÓN DOMIL. RELLENO Y COMP. DE ZANJA CONEXIÓN ELIMINACION MATERIAL EXCEDENTE C/EQUIPO EN TERRENO ANEXO SUMIN. E INSTALACION DE TUBO PVC, SN-4, DN 160 MM, ISO 4435 SUMIN. E INSTALACION CAJA DE REGISTRO DE DESAGUE Y MEDIA CAÑA EMPALME A COLECTOR PVC DN 200MM PRUEBA HIDRAULICA CONEX. DOMICILIARIA DESAGUE PRUEBAS DE CONTROL DE CALIDAD PRUEBAS DE CONTROL DE CALIDAD PRUEBA COMPACTACION SUELOS (PROMOTOR MODIFICADO) PRUEBA COMPACTACION SUELOS (DENSIDAD DE CAMPO) PRUEBA DE CALIDAD DE CONCRETO VARIOS VARIOS LIMPIEZA FINAL DE OBRA COLECTOR PRINCIPAL DE DESAGÜES TRABAJOS PRELIMINARES RIEGO DE LA ZONA DE TRABAJO PARA MITIGAR LA CONTAMINACION POR POLVO TRAZO Y REPLANTEOS INICIALES DEL PROYECTO TRAZO Y REPLANTEO DURANTE EL PROCESO CONSTRUCTIVO DE LA OBRA MOVIMIENTO DE TIERRAS EXCAVACIONES DE ZANJAS EXCAVACION DE ZANJA C/MAQ. T. NORMAL HASTA 1.50MPP EXCAVACION DE ZANJA C/MAQ. T. NORMAL HASTA 2.00MPP EXCAVACION DE ZANJA C/MAQ. T. NORMAL HASTA 2.50MPP EXCAVACION DE ZANJA C/MAQ. T. NORMAL HASTA 3.00MPP

m

216.5

20.51

4,440

-

-

0%

-

-

0.0%

-

-

0.0%

216.47

4,439.80

100.0%

m3

989.0

8.31

8,218

-

-

0%

-

-

0.0%

-

-

0.0%

988.95

8,218.17

100.0%

m

216.5

39.01

8,444

-

-

0%

-

-

0.0%

-

-

0.0%

216.47

8,444.49

100.0%

ml

2,289.2

30.46

69,730

-

-

0%

-

-

0.0 %

-

-

0.0%

2,289.23

69,729.95

100.0%

ml

2,289.2

1.80

4, 121

-

-

0%

-

-

0.0%

-

-

0.0%

2,289.23

4,120.61

100.0%

und

34.0

1,909.31

64,917

-

-

0%

-

-

0.0%

-

-

0.0%

34.00

64,916.54

100.0%

und

4.0

2,485.81

9,943

-

-

0%

-

-

0.0%

-

-

0.0%

4.00

9,943.24

100.0%

und

4.0

2,765.76

11,063

-

-

0%

-

-

0.0%

-

-

0.0%

4.00

11,063.04

100.0%

und

110.0

159.24

17,516

-

-

0%

-

-

0.0%

-

-

0.0%

110.00

17,516.40

100.0%

ml

2,289.2

2.84

6, 501

-

-

0%

-

-

0.0%

-

-

0.0%

2,289.23

6,501.41

100.0%

ml

2,892.0

1.31

3, 789

-

-

0%

-

-

0.0%

-

-

0.0%

2,892.00

3,788.52

100.0%

ml

2,892.0

22.35

64,636

-

-

0%

-

-

0.0 %

-

-

0.0%

2,892.00

64,636.20

100.0%

ml

2,892.0

1.31

3, 789

-

-

0%

-

-

0.0%

-

-

0.0%

2,892.00

3,788.52

100.0%

ml

2,892.0

2.81

8, 127

-

-

0%

-

-

0.0%

-

-

0.0%

2,892.00

8,126.52

100.0%

ml

2,892.0

13.56

39,216

-

-

0%

-

-

0.0 %

-

-

0.0%

2,892.00

39,215.52

100.0%

m3

1,249.3

8.31

10,382

-

-

0%

-

-

0.0 %

-

-

0.0%

1,249.34

10,382.02

100.0%

m

2,892.0

20.60

59,575

-

-

0%

-

-

0.0 %

-

-

0.0%

2,892.00

59,575.20

100.0%

und

482.0

130.56

62,930

-

-

0%

-

-

0.0%

-

-

0.0%

482.00

62,929.92

100.0%

und

482.0

95.42

45,992

-

-

0%

-

-

0.0%

-

-

0.0%

482.00

45,992.44

100.0%

und

2,892.0

1.80

5,206

-

-

0%

-

-

0.0%

-

-

0.0%

2,892.00

5,205.60

100.0%

und

1.0

70.00

70

-

-

0%

-

-

0.0%

-

-

0.0%

1.00

70.00

100.0%

und

23.0

60.00

1,380

-

-

0%

-

-

0.0%

-

-

0.0%

23.00

1,380.00

100.0%

und

1.0

2,000.00

2,000

-

-

0%

-

-

0.0%

-

-

0.0%

1.00

2,000.00

100.0%

m

2,289.2

1.31

2,999

-

-

0%

-

-

0.0%

-

-

0. 0%

2,289.23

2,998.89

100.0%

m

876.2

2.84

2,488

-

-

0%

-

-

0.0%

-

-

0.0%

876.18

2,488.35

100.0%

m

876.2

1.24

1,086

-

-

0%

-

-

0.0%

-

-

0.0%

876.18

1,086.46

100.0%

m

876.2

1.72

1,507

-

-

0%

-

-

0.0%

-

-

0.0%

876.18

1,507.03

100.0%

m

836.2

14.88

12,442

-

-

0%

-

-

0.0%

-

-

0.0%

836.18

12,442.36

100.0%

m

25.0

17.01

425

-

-

0%

-

-

0.0%

-

-

0.0%

25.00

425.25

100.0%

m

15.0

29.77

447

-

-

0%

-

-

0.0%

-

-

0.0%

15.00

446.55

100.0%

m

38

 

1.3.1.1.2.3.5.2.1.5 1.3.1.1.2.3.5.2.1.6 1.3.1.1.2.3.5.2.1.7 1.3.1.1.2.3.5.2.2 1.3.1.1.2.3.5.2.2.1 1.3.1.1.2.3.5.2.2.2 1.3.1.1.2.3.5.2.2.3 1.3.1.1.2.3.5.2.2.4 1.3.1.1.2.3.5.2.2.5 1.3.1.1.2.3.5.2.3 1.3.1.1.2.3.5.2.3.1 1.3.1.1.2.3.5.2.3.2 1.3.1.1.2.3.5.2.3.3 1.3.1.1.2.3.5.2.3.4 1.3.1.1.2.3.5.2.3.5 1.3.1.1.2.3.5.2.3.6 1.3.1.1.2.3.5.2.3.7 1.3.1.1.2.3.5.2.3.8 1.3.1.1.2. 3.5.2.4 1.3.1.1.2.3.5.2.4.1 1.3.1.1.2.3.5.2.4.2 1.3.1.1.2.3.5.2.4.3 1.3.1.1.2.3.5.2.4.4 1.3.1.1.2.3.5.2.4.5 1.3.1.1.2.3.5.2.4.6 1.3.1.1.2.3.5.3 1.3.1.1.2.3.5.3.1 1.3.1.1.2.3.5.3.2 1.3.1.1.2.3.5.3.3 1.3.1.1.2.3.5.3.4 1.3.1.1.2.3.5.3.5 1.3.1.1.2.3.5.3.6 1.3.1.1.2.3.5.3.7 1.3.1.1.2.3.5.3.8 1.3.1.1.2.3.5.4 1.3.1.1.2.3.5.4.1 1.3.1.1.2.3.5.4.2 1.3.1.1.2.3.5.4.3 1.3.1.1.2.3.5.4.4 1.3.1.1.2.3.5.4.5

EXCAVACION DE ZANJA C/MAQ. T. NORMAL HASTA 3.50MPP EXCAVACION DE ZANJA C/MAQ. T. NORMAL HASTA 4.00MPP EXCAVACION DE ZANJA C/MAQ. T. NORMAL HASTA 4.50MPP REFINE, NIVELACION Y CONFORMACION DE ZANJAS REFINE, NIVELACION Y CONFORMACION DE FONDO DE ZANJA HASTA HPROM=3.00m REFINE, NIVELACION Y CONFORMACION DE FONDO DE ZANJA HASTA HPROM=4.00m REFINE, NIVELACION Y CONFORMACION DE FONDO DE ZANJA HASTA HPROM=4.50m CAMA DE ARENA DE APOYO DE TUBERIA PVC DN (200-250) E=0.10M; A=0.60m; C/MATERIAL PROPIO ZARANDEADO CAMA DE ARENA DE APOYO DE TUBERIA PVC DN (315-450) E=0.10M; A=0.80m; C/MATERIAL PROPIO ZARANDEADO RELLENO Y COMPACTACION DE ZANJAS RELLENO COMP. ZANJA T. NORMAL HASTA 1.50MPP RELLENO COMP. ZANJA T. NORMAL HASTA 2.00MPP RELLENO COMP. ZANJA T. NORMAL HASTA 2.50MPP RELLENO COMP. ZANJA T. NORMAL HASTA 3.00MPP RELLENO COMP. ZANJA T. NORMAL HASTA 3.50MPP RELLENO COMP. ZANJA T. NORMAL COMP. HASTAZANJA 4.00MPP RELLENO T. NORMAL HASTA 4.50MPP ELIMINACION MATERIAL EXCEDENTE C/EQUIPO EN TERRENO ANEXO ENTIBADO DE ZANJAS ENTIBADO DE PROTECCION DE ZANJAS H>2.00m ENTIBADO DE PROTECCION DE ZANJAS H>2.50m ENTIBADO DE PROTECCION DE ZANJAS H>3.00m ENTIBADO DE PROTECCION DE ZANJAS H>3.50m ENTIBADO DE PROTECCION DE ZANJAS H>4.00m ENTIBADO DE PROTECCION DE ZANJAS H>4.50m SUMINISTRO E INSTALACION TUBOS COLECTOR/EMISOR SUMIN. E INSTAL. TUBO PVC UF, SN-4, DN 200MM, ISO 4435 SUMIN. E INSTAL. TUBO PVC UF, SN-4, DN 250MM, ISO 4436 SUMIN. E INSTAL. TUBO PVC UF, SN-4, DN 315MM, ISO 4437 SUMIN. E INSTAL. TUBO PVC UF, SN-4, DN 355MM, ISO 4438 PRUEBA HIDRAULICA TUBO PVC DN 200MM PRUEBA HIDRAULICA TUBO PVC DN 250MM PRUEBA HIDRAULICA TUBO PVC DN 315MM PRUEBA HIDRAULICA TUBO PVC DN 355MM CONSTRUCCION DE BUZONES Y EMPALMES BUZON TIPO I, C/MARCO Y TAPA DE CONCRETO Di=1.20m x h=1.20MPP BUZON TIPO I, C/MARCO Y TAPA DE CONCRETO Di=1.20m x h=1.50MPP BUZON TIPO I, C/MARCO Y TAPA DE CONCRETO Di=1.20m x h=2.00MPP BUZON TIPO I, C/MARCO Y TAPA DE CONCRETO Di=1.20m x h=2.50MPP BUZON TIPO I, C/MARCO Y TAPA DE CONCRETO Di=1.20m x h=3.00MPP

m m m

m

876.2

2.17

1,901

-

-

0%

-

-

0.0%

-

-

0.0%

876.18

1,901.31

100.0%

m

524.3

3.89

2,039

-

-

0%

-

-

0.0%

-

-

0.0%

524.29

2,039.49

100.0%

m

351.9

4.84

1,703

-

-

0%

-

-

0.0%

-

-

0.0%

351.89

1,703.15

100.0%

m

836.2

15.46

12,927

-

-

0%

-

-

0.0%

-

-

0.0%

836.18

12,927.34

100.0%

m

25.0

20.51

513

-

-

0%

-

-

0.0%

-

-

0.0%

25.00

512.75

100.0%

15.0

42.82

642

-

-

0%

-

-

0.0%

-

-

0.0%

15.00

642.30

100.0%

m m

m m m m m m3

378.5

8.31

3,145

-

-

0%

-

-

0.0%

-

-

0.0%

378.51

3,145.42

100.0%

m

40.0

39.01

1,560

-

-

0%

-

-

0.0%

-

-

0.0%

40.00

1,560.40

100.0%

524.3

30.46

15,970

-

-

0%

-

-

0.0%

-

-

0.0%

524.29

15,969.87

100.0%

100.0%

m m m m m

ml ml ml

270.0

73.43

19,827

-

-

0%

-

-

0.0%

-

-

0.0%

270.01

19,826.83

ml

81.9

104.53

8,559

-

-

0%

-

-

0.0%

-

-

0.0%

81.88

8,558.92

100.0%

ml

524.3

1.80

944

-

-

0%

-

-

0.0%

-

-

0.0%

524.29

943.72

100.0%

ml ml

270.0

2.48

670

-

-

0%

-

-

0.0%

-

-

0.0%

270.01

669.62

100.0%

ml

81.9

2.76

226

-

-

0%

-

-

0.0%

-

-

0.0%

81.88

225.99

100.0%

und

13.0

1,909.31

24,821

-

-

0%

-

-

0.0%

-

-

0.0%

13.00

24,821.03

100.0%

und

2.0

2,485.81

4,972

-

-

0%

-

-

0.0%

-

-

0.0%

2.00

4,971.62

100.0%

1.0

2,765.76

2,766

-

-

0%

-

-

0.0%

-

-

0.0%

1.00

2,765.76

100.0%

0.0%

-

-

0.0%

38.00

6,051.12

100.0%

und und und

39

 

1.3.1.1.2.3.5.4.6 1.3.1.1.2.3.5.4.7 1.3.1.1.2.3.5.4.8 1.3.1.1.2.3.5.4.9 1.3.1.1.2.3.5.5 1.3.1.1.2.3.5.5.1 1.3.1.1.2.3.5.5.2 1.3.1.1.2.3.5.5.3 1.3.1.1.3 1.3.1.1.3. 2 1.3.1.1.3. 2.1 1.3.1.1.3.2.1.1 1.3.1.1.3.2.1.2 1.3.1.1.3. 2.2 1.3.1.1.3.2.2.1 1.3.1.1.3.2.2.2 1.3.1.1.3.2.2.3 1.3.1.1.3.2.2.4 1.3.1.1.3.2.2.5 1.3.1.1.3.2.3 1.3.1.1.3.2.3.1 1.3.1.1.3. 2.3.2 1.3.1.1.3. 2.3.3 1.3.1.1.3.2.3.4 1.3.1.1.3. 2.3.5 1.3.1.1.3.2.3.6 1.3.1.1.3.3 1.3.1.1.3. 3.1 1.3.1.1.3.3.1.1 1.3.1.1.3. 3.2 1.3.1.1.3.3.2.1 1.3.1.1.3.3.2.2 1.3.1.1.3.3.2.3 1.3.1.1.3. 3.3 1.3.1.1.3.3.3.1 1.3.1.1.3.3.3.2 1.3.1.1.3.3.3.3 1.3.1.1.3.3.3.4 1.3.1.1.3.3.3.5 1.3.1.1.3.4 1.3.1.1.3. 4.1 1.3.1.1.3.4.1.1 1.3.1.1.3.4.1.2 1.3.1.1.3.4.1.3 1.3.1.1.3.4.2 1.3.1.1.3.4.2.1

BUZON TIPO II DE CONCRETO ARMADO, C/MARCO Y TAPA, Di=1.50m x H=3.50MPP BUZON TIPO II DE CONCRETO ARMADO, C/MARCO Y TAPA, Di=1.50m x H=4.00MPP BUZON TIPO II DE CONCRETO ARMADO, C/MARCO Y TAPA, Di=1.50m x H=4.50MPP EMPALME A BUZON DE TUB. PVC CON DADO DE CONCRETO SIMPLE PRUEBAS DE CONTROL DE CALIDAD PRUEBA COMPACTACION SUELOS (PROMOTOR MODIFICADO) PRUEBA COMPACTACION SUELOS (DENSIDAD DE CAMPO) PRUEBA DE CALIDAD DE CONCRETO PISTAS Y VEREDAS PISTAS Y ESTACIONAMIENTO OBRAS PROVISIONALES TRAZO, NIVELES Y REPLANTEO INICIAL DE OBRA TRAZO REPLANTEO Y CONTRO TOPOGRAFICO DE EJES Y NIVELES DE PISTAS DURANTE LA EJECUCION DE LA OBRA MOVIMIENTO DE TIERRAS CORTE HASTA NIVEL DE SUBRASANTE EXTRACCION Y APILAMIENTO DE MATERIAL DE PRESTAMO CARGUIO Y TRANSPORTE DE MATERIAL PROPIO RELLENO Y COMPACTACION CON MATERIAL PROPIO ELIMINACION DE MATERIAL PROPIO EXCEDENTE EN TERRENO ANEXO PAVIMENTOS CONFORMACION Y COMPACTACION DE SUBRASANTE PARA PISTAS SUB-BASE DE 20 CMS BASE DE 15 CMS BARRIDO Y LIMPIEZA P/CARPETA ASFALTICA IMPRIMACION ASFALTICA CARPETA ASFALTICA EN CALIENTE DE 2" VEREDAS OBRAS PROVISIONALES TRAZO, REPLANTEO Y CONTROL TOPOGRAFICO DE EJES Y NIVELES DE VEREDAS MOVIMIENTO DE TIERRAS PERFILADO, NIVELACION Y COMPACTACION DE SUBRASANTE VEREDAS COLOCACION DE AFIRMADO/BASE GRANULAR PARA VEREDAS EXCAVACION MANUAL PARA SARDINELES DE VEREDAS VEREDAS Y SARDINELES ENCOFRADO Y DESENCOFRADO DE VEREDAS CONCRETO PARA SARDINELES DE VEREDAS h=35 cm F'C=175 kg/cm2 CONCRETO PARA VEREDAS DE H=10CM F'C=175 KG/CM2 JUNTA DE DILATACION ASFALTICA PARA VEREDAS; e=1/2 CURADO QUIMICO PARA VEREDAS PAVIMENTO RGIDO: PASAJE PEATONAL MOVIMIENTO DE TIERRAS PERFILADO, NIVELACION Y COMPACTACION DE SUBRASANTE COLOCACION DE AFIRMADO/BASE GRANULAR EXCAVACION MANUAL PARA SADINELES SUMERGIDOS CONCRETO EN PASAJES PEATONALES CONCRETO PARA SARDINEL SUMERGID; H=0.25cm; F'C=210 kg/cm2

und und und und

38.0

159.24

6,051

-

-

0%

-

-

und

1.0

und

8.0

70.00

70

-

-

0%

-

-

0.0%

-

-

0.0%

1.00

70.00

100.0%

60.00

480

-

-

0%

-

-

0.0%

-

-

0.0%

8.00

480.00

glb

1.0

100.0%

2,042.35

2,042

-

-

0%

-

-

0.0%

-

-

0.0%

1.00

2,042.35

100.0%

m2

15,457.0

0.73

11,284

-

-

0%

-

-

0.0%

-

-

0.0%

15,456.98

11,283.60

100.0%

m2

15,457.0

1.81

27,977

-

-

0%

-

-

0.0%

-

-

0.0%

15,456.98

27,977.13

100.0%

m3

18,119.8

8.01

145,139

-

-

0%

-

-

0.0%

-

-

0 .0%

18,119.76

145,139.28

100.0%

m3

5,555.5

4.56

25,333

-

-

0%

-

-

0.0 %

-

-

0.0%

5,555.48

25,332.99

100.0%

m3

5,555.5

4.25

23,611

-

-

0%

-

-

0.0 %

-

-

0.0%

5,555.48

23,610.79

100.0%

m3

5,555.5

19.36

107,554

-

-

0%

-

-

0.0%

-

-

0. 0%

5,555.48

107,554.09

100.0%

m3

15,077.1

6.36

95,891

-

-

0%

-

-

0.0%

-

-

0.0%

15,077.14

95,890.58

100.0%

m2

15,457.0

2.03

31,378

-

-

0%

-

-

0.0%

-

-

0.0%

15,456.98

31,377.67

100.0%

m2 m2

15,457.0 15,457.0

16.85 18.65

260,450 288,273

-

-

0% 0%

-

-

0.0% 0. 0%

-

-

0.0% 0.0%

15,456.98 15,456.98

260,450.11 288,272.68

100.0% 100.0%

m2

15,457.0

0.45

6,956

-

-

0%

-

-

0.0%

-

-

0.0%

15,456.98

6,955.64

100.0%

m2

15,457.0

4.29

66,310

-

-

0%

-

-

0.0%

-

-

0.0%

15,456.98

66,310.44

100.0%

m2

15,457.0

35.71

551,969

-

-

0%

-

-

0.0%

-

-

0.0%

15,456.98

551,968.76

100.0%

m2

5,336.8

2.15

11,474

-

-

0%

-

-

0.0 %

-

-

0.0%

5,336.78

11,474.08

100.0%

m2

5,336.8

6.83

36,450

-

-

0%

-

-

0.0 %

-

-

0.0%

5,336.78

36,450.21

100.0%

m2

5,336.8

14.80

78,984

-

-

0%

-

-

0.0 %

-

-

0.0%

5,336.78

78,984.34

100.0%

m

3,947.2

4.03

15,907

-

-

0%

-

-

0.0%

-

-

0.0%

3,947.21

15,907.26

100.0% 100.0%

m2

756.1

41.58

31,438

-

-

0%

-

-

0.0%

-

-

0.0%

756.09

31,438.14

m

3,866.2

17.70

68,431

-

-

0%

-

-

0.0 %

-

-

0.0%

3,866.16

68,431.03

100.0%

m2

5,336.8

48.20

257,233

-

-

0%

-

-

0.0%

-

-

0. 0%

5,336.78

257,232.80

100.0%

ml

1,205.4

4.87

5, 870

-

-

0%

-

-

0.0%

-

-

0.0%

1,205.40

5,870.30

100.0%

m2

5,336.8

1.67

8, 912

-

-

0%

-

-

0.0%

-

-

0.0%

5,336.78

8,912.42

100.0%

m2

1,649.5

6.83

11,266

-

-

0%

-

-

0.0 %

-

-

0.0%

1,649.49

11,266.02

100.0%

m2

1,649.5

19.35

31,918

-

-

0%

-

-

0.0 %

-

-

0.0%

1,649.49

31,917.63

100.0%

m

1,029.0

4.03

4,14 7

-

-

0%

-

-

0.0%

-

-

0.0%

1,028.96

4,146.71

100.0%

m

1,029.0

19.96

20,538

-

-

0%

-

-

0.0 %

-

-

0.0%

1,028.96

20,538.04

100.0%

40

 

1.3.1.1.3.4.2.2 1.3.1.1.3.4.2.3 1.3.1.1.3.4.2.4 1.3.1.1.3. 5 1.3.1.1.3. 5.1 1.3.1.1.3.5.1.1 1.3.1.1.3.5.1.2 1.3.1.1.3.5.1.3 1.3.1.1.3. 5.2 1.3.1.1.3.5.2.1 1.3.1.1.3.5.2.2 1.3.1.1.3.5.2.3 1.3.1.1.3.5.2.4 1.3.1.1.3. 5.2.5 1.3.1.1.3.6 1.3.1.1.3.6.1 1.3.1.1.3.6.1.1 1.3.1.1.3.6.1.2 1.3.1.1.3.6.1.3 1.3.1.1.3.6.1.4 1.3.1.1.3.6.1.5 1.3.1.1.3. 7 1.3.1.1.3. 7.1 1.3.1.1.3. 7.1.1 1.3.1.1.3. 8 1.3.1.1.3. 8.1 1.3.1.1.3.8.1.1 1.3.1.1.3.8.1.2 1.3.1.1.3.8.1.3 1.3.1.1.4 1.3.1.1.4. 1 1.3.1.1.4. 2 1.3.1.2 1.3.1.2.1 1.3.1.2.1.1 1.3.1.2.1.2 1.3.1.2.1.3 1.3.1.2.1.4 1.3.1.2.1. 5 1.3.1.2.2 1.3.1.2.2.1 1.3.1.2.2.1.1 1.3.1.2.2.1.2 1.3.1.2.2.1.3 1.3.1.2.2.1.4 1.3.1.2.2.2 1.3.1.2.2.2.1 1.3.1.2.2.2.2 1.3.1.2.2.2.3 1.3.1.2.2. 3 1.3.1.2.2.3.1 1.3.1.2.2.3.2 1.3.1.2.2.3.3 1.3.1.2.2.3.4

PAVIMENTO RIGIDO DE CONCRETO EN PASAJE PEATONAL; H=12.5cm; F'C=210 KG/CM2 JUNTA DE DILATACION ASFALTICA EN PAVIMIENTO RIGIDO; e=1/2 CURADO QUIMICO PARA PAVIMENTO RIGIDO RAMPAS PEATONALES MOVIMIENTO DE TIERRAS PERFILADO, NIVELACION Y COMPACTACION DE SUBRASANTE COLOCACION DE AFIRMADO/BASE GRANULAR EXCAVACION MANUAL PARA SARDINELES SUMERGIDOS CONCRETO EN RAMPAS ENCOFRADO Y DESENCOFRADO DE RAMPAS CONCRETO PARA SARDINELES DE RAMPAS h=20cm F'C=175kg/cm2 CONCRETO PARA RAMPAS DE H=10CM F'C=175 KG/CM2 CURADO QUIMICO PARA RAMPAS BRUÑADO DE RAMPAS SEÑALIZACIÓN SEÑALIZACION PINTADO EN BLANCO DE LETRAS, CRUCES PEATONALES Y SIMBOLOS EN PAVIMENTO PINTADO DE AMARILLO EN PSJE. PEATONAL PINTADO DE AMARILLO EN SARDINELES, MARTILLOS, RAMPAS Y ESTACIONAMIENTO PINTADO DE BLANCO DE LINEAS DISCONTINUAS Y CONTINUAS EN PAVIMENTO SEÑALIZACION VERTICAL (PREVENTIVA Y REGLAMENTARIA) LIMPIEZA DE OBRA LIMPIEZA DE OBRA LIMPIEZA FINAL DE OBRA PRUEBAS DE CALIDAD PRUEBAS DE CALIDAD PRUEBAS DE CALIDAD DE SUBRASANTE PRUEBAS DE CALIDAD DE LA SUB BASE Y BASE PRUEBAS DE CALIDAD DEL CONCRETO RED ELÉCTRICA RED PRIMARIA RED SECUNDARIA VIVIENDAS MOV. TIERRAS CASA Corte de Terreno con maquinaria h=0.35 (0.15 Platea + 0.20 Afirmado) Inc. Eliminación Excavación de Zanjas cimentación manual (Uñas de Platea) Inc Eliminación Relleno con material de préstamo (Afirmado e= 0.20m) Proctor 95% Nivelación y compactación de Terreno Acarreo de Material excedente ESTRUCTURAS PLATEA Concreto premezclado fc=175kg/cm2 Encofrado y desencofrado Acero de refuerzo de fy =4200kg/cm2 Acabado de Losa Platea MUROS Concreto premezclado fc=175kg/cm2 Encofrado y desencofrado Acero de refuerzo de fy =4200kg/cm2 LOSA TECHO Concreto premezclado fc=175kg/cm2 Encofrado y desencofrado Acero de refuerzo de fy =4200kg/cm2 Junta de dilatación tecnopor 1

m2

1,649.5

61.18

100,916

-

-

0%

-

-

0.0%

-

-

0. 0%

1,649.49

100,915.80

100.0%

m

378.0

4.87

1,841

-

-

0%

-

-

0.0%

-

-

0.0%

378.00

1,840.86

100.0%

m2

1,649.5

1.67

2, 755

-

-

0%

-

-

0.0%

-

-

0.0%

1,649.49

2,754.65

100.0%

m2

199.3

6.83

1,361

-

-

0%

-

-

0.0%

-

-

0.0%

199.26

1,360.95

100.0%

m2

199.3

14.80

2,949

-

-

0%

-

-

0.0%

-

-

0.0%

199.26

2,949.05

100.0%

m

142.6

4.03

575

-

-

0%

-

-

0.0%

-

-

0.0%

142.56

574.52

100.0% 100.0%

m2

44.7

46.43

2,074

-

-

0%

-

-

0.0%

-

-

0.0%

44.68

2,074.45

m

142.6

15.99

2,280

-

-

0%

-

-

0.0%

-

-

0.0%

142.56

2,279.53

100.0%

m2

199.3

48.20

9,604

-

-

0%

-

-

0.0%

-

-

0.0%

199.26

9,604.33

100.0%

m2

199.3

1.67

333

-

-

0%

-

-

0.0%

-

-

0.0%

199.26

332.76

100.0%

m2

199.3

13.73

2,736

-

-

0%

-

-

0.0%

-

-

0.0%

199.26

2,735.84

100.0%

100.0%

m2

844.2

23.01

19,425

-

-

0%

-

-

0.0%

-

-

0.0%

844.21

19,425.27

m2

258.3

21.08

5,445

-

-

0%

-

-

0.0%

-

-

0.0%

258.30

5,444.96

100.0%

m

1,232.6

9.52

11,734

-

-

0%

-

-

0.0%

-

-

0.0%

1,232.55

11,733.88

100.0%

m und

1,022.9 11.0

7.99 580.95

8,17 3 6,390

-

-

0% 0%

-

-

0.0% 0.0%

-

-

0.0% 0.0%

1,022.88 11.00

8,172.81 6,390.45

100.0% 100.0%

Ha

6.7

3,024.00

20,170

-

-

0%

-

-

0. 0%

-

-

0.0%

6.67

20,1 70.08

100.0%

glb

1.0

2,680.00

2,680

-

-

0%

-

-

0.0%

-

-

0.0%

1.00

2,680.00

100.0%

glb

1.0

15,480.00

15,480

-

-

0%

-

-

0.0%

-

-

0.0%

1.00

15,4 80.00

100.0%

-

-

0.0%

-

-

0.0%

1.00

1,850.00

100.0%

-

0.0% 0.0%

-

-

0.0% 0.0%

1.00 1.00

162,013.47 568,247.26

100.0% 100.0%

glb

1.0

1,850.00

1,850

-

-

0%

glb glb

1.0 1.0

162,013.47 568,247.26

162,013 568,247

-

-

0% 0%

m3

5,483.4

17.94

98,372

-

-

0%

-

-

0.0 %

-

-

0.0%

5,483.40

98,372.20

100.0%

m3

355.9

46.80

16,658

-

-

0%

-

-

0.0%

-

-

0.0%

355.94

16,657.99

100.0%

m3

2,347.3

86.88

203,932

-

-

0%

-

-

0.0%

-

-

0. 0%

2,347.28

203,931.69

100.0%

m2 m3

12,977.4 5,839.3

2.64 5.40

34,260 31, 532

-

-

0% 0%

-

-

0.0% 0.0%

-

-

0.0% 0.0%

12,977.38 5,839.34

34,260.28 31,532.44

100.0% 100.0%

m3

2,189.5

311.32

681,633

-

-

0%

-

-

0.0%

-

-

0 .0%

2,189.49

681,632.68

100.0%

m2

4,821.7

14.95

72,071

-

-

0%

-

-

0.0%

-

-

0.0%

4,821.70

72,070.93

100.0%

kg

122,625.4

4.10

503,255

-

-

0%

-

-

0.0%

-

-

0.0%

##########

503,254.70

100.0%

m2

12,025.0

6.77

81,428

-

-

0%

-

-

0.0%

-

-

0.0%

12,025.00

81,428.49

100.0%

2,636.3

m3

333.63

879,532

0.0%

-

-

0 .0%

m2

52,725.2

9.55

503,656

-

-

0%

-

-

0.0%

-

-

0.0%

52,725.16

503,655.75

100.0%

kg

106,990.2

4.10

439,088

-

-

-

-

0%

0%

-

-

-

-

0.0%

-

-

0.0%

##########

2,636.26

439,087.93

879,531.57

100.0%

100.0%

m3

1,202.5

333.63

401,189

-

-

0%

-

-

0.0%

-

-

0 .0%

1,202.50

401,188.63

100.0%

m2

12,025.0

10.24

123,131

-

-

0%

-

-

0.0%

-

-

0.0%

12,025.00

123,130.84

100.0%

kg

48,993.0

4.10

201,067

-

-

0%

-

-

0.0%

-

-

0 .0%

48,992.96

201,067.09

100.0%

m2

1,794.1

5.19

9,320

-

-

0%

-

-

0.0%

-

-

0.0%

1,794.13

9,320.15

100.0%

0% 0% 0% 0% 0% 0% 0% 0% 0%

-

-

0. 0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0 % 0.0%

-

-

0.0% 0.0% 0.0% 0. 0% 0.0% 0.0% 0.0% 0.0% 0.0%

2,405.00 481.00 3,367.00 2,405.00 481.00 481.00 3,848.00 3,367.00 481.00

137,566.00 27,513.20 192,592.40 137,566.00 13,227.50 13,227.50 35,978.80 38,888.85 74,074.00

100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%

41

 

1.3.1.2.3 1.3.1.2.3. 1 1.3.1.2.3.2 1.3.1.2.3. 3 1.3.1.2.3. 4 1.3.1.2.3.5 1.3.1.2.3.6 1.3.1.2.3.7 1.3.1.2.3. 8 1.3.1.2.3.9 1.3.1.2.3.10 1.3.1.2.3. 11 1.3.1.2.3.12 1.3.1.2.4 1.3.1.2.4. 1 1.3.1.2.4. 2 1.3.1.2.4. 3 1.3.1.2.4.4 1.3.1.2.4. 5 1.3.1.2.4. 6 1.3.1.2.4. 7 1.3.1.2.4.8 1.3.1.2.4.9 1.3.1.2.4.10 1.3.1.2.4. 11 1.3.1.2.4. 12 1.3.1.2.4. 13 1.3.1.2.4.14 1.3.1.2.4.15 1.3.1.2.5 1.3.1.2.5.1 1.3.1.2.5.1.1 1.3.1.2.5.1.2 1.3.1.2.5.2 1.3.1.2.5.2.1 1.3.1.2.5. 2.2 1.3.1.2.5. 2.3 1.3.1.2.5. 3 1.3.1.2.5.3.1 1.3.1.2.5.3.2 1.3.1.2.5.3.3 1.3.1.2.5. 3.4 1.3.1.2.5. 4 1.3.1.2.5.4.1 1.3.1.2.5.4.2 1.3.1.2.5.4.3 1.3.1.2.5.4.4 1.3.1.2.5.4.5 1.3.1.2.5.5 1.3.1.2.5.5.1 1.3.1.2.5.5.2 1.3.1.2.5.5.3 1.3.1.2.5.5.4 1.3.1.2.5.6 1.3.1.2.5.6.1 1.3.1.2.5.6.2 1.3.1.2.5.6.3 1.3.1.2.5.6.4 1.3.1.2.5.6.5 1.3.1.2.5.6.6 1.3.1.2.5.6.7 1.3.1.2.5.6.8 1.3.1.2.5.6.9 1.3.1.2.5.6.10

INSTALACIONES ELÉCTRICAS Salida p/centro de luz Salida p/braquetes Tomacorrie nte bipolar Interrupt or de 01 golpe Salida p/timbre Salida p/pulsador de timbre Alimentador de TD a Caja Medidor Tubo PVC SAP 25mm Tablero Electrico de Distribucion Tubo PVC SAP 25mm acometida para futura conexión pozo de tierra. Prueba electrica Conexión a banco de medidores INSTALACION ES SANITARIAS Excavacion y relleno de zanja Tuberia PVC SAL 4 Tuberia PVC SAL 2 Caja registro 12x24 Salida de desague 2 Salida de desague 4 Salida de ventilacio n 2 Sumidero de bronce 2 Registro de bronce 4 Sombrero de ventilacion 2 Salida de agua fria 1/2 Tuberia PVC C10 Agua Fria 1/2 Tuberia PVC C10 Agua Fria 3/4 Valvula compuerta 1/2 Valvula compuerta 3/4 ACABADOS LAVANDERA Concreto premezclado fc=175kg/cm2 Encofrado BAÑO Concreto simple 1:6 en sardinel ducha 0.10x0.20 Piso Cerámico 30x30 Ducha Zócalo cerámico 30x30 Ducha CARPINTERÍA DE MADERA P1 - Puerta Principal de HDF contraplacada - 0.90x2.60 - Sin Pintura P2 - Puerta Dormitorio y Lavandería de HDF contraplacada - 0.80x2.60 - Sin Pintura P3 - Puerta Baño de HDF contraplacada - 0.70x2.6 - Sin Pintura Instalació n de Puertas CARPINTERÍA DE ALUMINIO V1 - Ventana de Aluminio Sala 0.85x1.4 V2 - Ventana de Aluminio Dormitorios - 1.0x1.4 V3 - Ventana de Aluminio Baño 0.30x0.50 V4 - Ventana de Aluminio Patio 0.95x1.4 Instalación Ventanas CERRAJERÍA Cerradura Fixer Puerta Principal llave exterior/boton interior acero inoxidable Cerradura Fixer Baño Ranura ext./botoninterior Cerradura Fixer Puerta Jardin llave exterior/botoninterior acero inoxidable Cerradura Fixer Dormitorio Ranura ext./botoninterior APARATOS Y ACCESORIOS SANITARIOS Inodoro Rapid Jet Blanco Lavatorio Fontana de Baño Lavadero de Cocina Luxor 1 Poza sin Escurridero 50cm Lavarropa de Granito Jorss 1 Poza 80cm Griferia p/ducha Trebol ECO Griferia p/lavatorio de baño Trebol ECO Griferia p/lavadero cocina a Pared Trebol ECO Llave para Lavadero de Ropa Hubolt 1/2 Instalacion de Inodoro Instalacion de Lavatorio y Lavarropa

pto pto pto pto pto pto ml ml und

2,405.0 481.0 3,367.0 2,405.0 481.0 481.0 3,848.0 3,367.0 481.0

57.20 57.20 57.20 57.20 27.50 27.50 9.35 11.55 154.00

137,566 27,513 192,592 137,566 13,228 13,228 35,979 38,889 74,074

-

-

ml

2,886.0

11.55

33,333

-

-

0%

-

-

0.0 %

-

-

0.0%

2,886.00

33,333.30

100.0%

glb glb

481.0 481.0

27.50 27.50

13,228 13,228

-

-

0% 0%

-

-

0.0% 0.0%

-

-

0.0% 0.0%

481.00 481.00

13,227.50 13,227.50

100.0% 100.0%

ml ml ml und pto pto pto und und und pto ml ml und und

3,367.0 2,405.0 962.0 481.0 1,443.0 481.0 1,924.0 962.0 481.0 1,924.0 2,405.0 1,443.0 2,212.6 481.0 962.0

19.80 26.95 16.83 275.00 61.60 85.80 44.00 23.10 35.20 8.25 61.60 15.95 18.37 64.35 70.95

66,667 64,815 16,190 132,275 88,889 41,270 84,656 22,222 16,931 15,873 148,148 23,016 40,645 30,952 68,254

-

-

0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

-

-

0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0 % 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%

-

-

0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%

3,367.00 2,405.00 962.00 481.00 1,443.00 481.00 1,924.00 962.00 481.00 1,924.00 2,405.00 1,443.00 2,212.60 481.00 962.00

66,666.60 64,814.75 16,190.46 132,275.00 88,888.80 41,269.80 84,656.00 22,222.20 16,931.20 15,873.00 148,148.00 23,015.85 40,645.46 30,952.35 68,253.90

100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%

m3

80.1

288.26

23,100

-

-

0%

-

-

0.0%

-

-

0.0%

80.13

23,099.60

100.0%

m2

128.9

13.84

1,784

-

-

0%

-

-

0.0%

-

-

0.0%

128.91

1,784.09

100.0%

und

481.0

21.06

10,130

-

-

0%

-

-

0.0%

-

-

0.0%

481.00

10,129.86

100.0%

m2 m2

346.3 2,635.9

44.98 44.98

15,578 118,566

-

-

0% 0%

-

-

0.0% 0.0%

-

-

0. 0% 0.0%

346.32 2,635.88

15,578.04 118,566.19

100.0% 100.0%

und

481.0

165.96

79,827

-

-

0%

-

-

0.0%

-

-

0.0%

481.00

79,826.76

100.0%

und

1,443.0

140.52

202,770

-

-

0%

-

-

0.0%

-

-

0 .0%

1,443.00

202,770.36

100.0%

und

481.0

129.85

62,458

-

-

0%

-

-

0.0%

-

-

0.0%

481.00

62,457.85

100.0%

und

2,405.0

53.94

129,726

-

-

0%

-

-

0.0%

-

-

0.0%

2,405.00

129,725.70

100.0%

und

481.0

186.66

89,783

-

-

0%

-

-

0.0%

-

-

0.0%

481.00

89,783.08

100.0%

und

962.0

239.12

230,033

-

-

0%

-

-

0.0%

-

-

0.0%

962.00

230,033.44

100.0%

und

481.0

67.84

32,630

-

-

0%

-

-

0.0%

-

-

0.0%

481.00

32,630.27

100.0%

und

481.0

229.45

110,368

-

-

0%

-

-

0.0%

-

-

0.0%

481.00

110,367.57

100.0%

und

2,405.0

69.04

166,034

-

-

0%

-

-

0.0%

-

-

0.0%

2,405.00

166,033.50

100.0%

und

481.0

17.91

8,614

-

-

0%

-

-

0.0%

-

-

0.0%

481.00

8,613.75

100.0%

und

481.0

17.91

8,614

-

-

0%

-

-

0.0%

-

-

0.0%

481.00

8,613.75

100.0%

und

481.0

17.91

8,614

-

-

0%

-

-

0.0%

-

-

0.0%

481.00

8,613.75

100.0%

und

962.0

17.91

17,227

-

-

0%

-

-

0.0%

-

-

0.0%

962.00

17,227.50

100.0%

100.0% 100.0%

und und

481.0 481.0

187.38 70.63

90,127 33,971

-

-

0% 0%

-

-

0.0% 0.0%

-

-

0.0% 0.0%

481.00 481.00

90,127.38 33,970.63

und

481.0

60.63

29,161

-

-

0%

-

-

0.0%

-

-

0.0%

481.00

29,160.63

100.0%

und

481.0

104.75

50,385

-

-

0%

-

-

0.0%

-

-

0.0%

481.00

50,384.75

100.0%

und

481.0

68.50

32,949

-

-

0%

-

-

0.0%

-

-

0.0%

481.00

32,948.50

100.0%

und

481.0

50.75

24,411

-

-

0%

-

-

0.0%

-

-

0.0%

481.00

24,410.75

100.0%

und

481.0

58.50

28,139

-

-

0%

-

-

0.0%

-

-

0.0%

481.00

28,138.50

100.0%

und

481.0

29.38

14,129

-

-

0%

-

-

0.0%

-

-

0.0%

481.00

14,129.38

100.0%

und und

481.0 962.0

31.25 31.25

15,031 30,063

-

-

0% 0%

-

-

0.0% 0.0%

-

-

0.0% 0.0%

481.00 962.00

15,031.25 30,062.50

100.0% 100.0%

42

 

1.3.1.2.5.6.11 1.3.1.2.5.6.12 1.3.1.2.5.7 1.3.1.2.5.7.1 1.3.1.2.6 1.3.1.2.6.1 1.3.1.2.6.1.1 1.3.1.2.6. 1.2 1.3.1.2.6.2 1.3.1.2.6. 2.1 1.3.1.3 1.3.2 1.3.2.1 1.3.2.1.1 1.3.2.1.1. 1 1.3.2.1.1. 2 1.3.2.1.1. 3 1.3.2.1.1. 4 1.3.2.1.1. 6 1.3.2.1.2 1.3.2.1.2. 2 1.3.2.1.2. 2.1 1.3.2.1.2. 2.1.1 1.3.2.1.2.2.1.1.1 1.3.2.1.2.2.1.1.2 1.3.2.1.2.2.1.1.3 1.3.2.1.2. 2.1.2 1.3.2.1.2.2.1.2.1 1.3.2.1.2.2.1.2.2 1.3.2.1.2.2.1.2.3 1.3.2.1.2.2.1.2.4 1.3.2.1.2.2.1.2.5 1.3.2.1.2.2.1.2.6 1.3.2.1.2.2.1.2.7 1.3.2.1.2.2.1.2.8 1.3.2.1.2.2.1.2.9 1.3.2.1.2.2.1.3 1.3.2.1.2.2.1.3.1 1.3.2.1.2.2.1.3.2 1.3.2.1.2.2.1.3.3 1.3.2.1.2.2.1.4 1.3.2.1.2.2.1.4.1 1.3.2.1.2.2.1.4.2 1.3.2.1.2.2.1.4.3 1.3.2.1.2.2.1.5 1.3.2.1.2.2.1.5.1 1.3.2.1.2.2.1.5.2 1.3.2.1.2.2.1.5.3 1.3.2.1.2.2.1.5.4 1.3.2.1.2.2.1.5.5

Instalacion de Lavadero Cocina Instalacion Llave y Pico de Ducha COBERTURA Cobertura Techo de Fibraforte incluida parrilla de madera PINTURA INTERIOR Limpeza e imprimado de Muro Limpeza e imprimado de Techo EXTERIOR Pintura Latex en Muros Exteriores URBANISMO ETAPA 2 HABILITACI ÓN URBANA MOVIMIENTO DE TIERRAS LIMPIEZA Y DESBROCE CORTE RELLENO ELIMINACIÓN DE MATERIAL PLATAFORMADO DE CASAS AGUA POTABLE Y ALCANTARILL ADO AGUA POTABLE RED DE DISTRIBUCIÓN TRABAJOS PRELIMINARES RIEGO DE LA ZONA DE TRABAJO PARA MITIGAR LA CONTAMINACION POR POLVO TRAZO Y REPLANTEO INICIAL DE LA LINEA TRAZO Y REPLANTEO DURANTE LA INSTALACION DE TUBERIAS MOVIMIENTO DE TIERRAS EXC. S/INTERF. TERRENO SUELTO P/TUB. DN=110-160mm Hasta H=1.20m. EXC. S/INTERF. TERRENO SUELTO P/TUB. DN=200-250mm Hasta H=1.20m. REFINES Y NIVELACION FONDO DE ZANJA P/TUB DN 110-160MM EN TERRENO NORMAL REFINES Y NIVELACION FONDO DE ZANJA P/TUB DN 200-250MM EN TERRENO NORMAL CAMA DE ARENA MANUAL E=0.1M ZANJA P/TUB DN 110-160; MATERIAL PROPIO ZARANDEADO CAMA DE ARENA MANUAL E=0.1M ZANJA P/TUB DN 200-250; MATERIAL PROPIO ZARANDEADO RELL. D/ZANJ. D/MAT. PROPIO COMP. C/EQ P/TUB 110-160mm,H=1.20m RELL. D/ZANJ. D/MAT. PROPIO COMP. C/EQ P/TUB 200-250mm,H=1.20m ELIMINACION MATERIAL EXCEDENTE C/EQUIPO HASTA 1KM INSTALACION DE TUBERIAS DE AGUA POTABLE (INC.SUMINISTRO) SUMI. E INST. TUBERIA PVC UF, PN7. 5, P/AGUA POTABLE DN 110 mm. NTP 16422 SUMI. E INST. TUBERIA PVC UF, PN7. 5, P/AGUA POTABLE DN 160 mm. NTP 16423 SUMI. E INST. TUBERIA PVC UF, PN10, P/AGUA POTABLE DN 200 mm. NTP 16424 PRUEBA HIDRAULICA Y DESINFECCION DE TUBERIA ZANJA TAPADA PRUEBA HIDRAULICA Y DESINFECCION DE TUBERIA DN 100mm PRUEBA HIDRAULICA Y DESINFECCION DE TUBERIA DN 160mm PRUEBA HIDRAULICA Y DESINFECCION DE TUBERIA DN 200mm INSTALACION DE ACCESORIOS PVC AGUA POTABLE (INC. SUMINISTRO) SUMI. E INST. TEE PVC 110 x 110mm; PN=10 SUMI. E INST. TEE PVC 160 x 160mm; PN=10 SUMI. E INST. TEE PVC 200 x 200mm; PN=10 SUMI. E INST. CODO DE PVC DN 90º x 110mm SUMI. E INST. CODO DE PVC DN 45º x 110mm

und und

481.0 481.0

31.25 31.25

15,031 15,031

-

-

0% 0%

-

-

0.0% 0.0%

-

-

0.0% 0.0%

481.00 481.00

15,031.25 15,031.25

100.0% 100.0%

m2

12,145.3

25.41

308,611

-

-

0%

-

-

0.0%

-

-

0.0%

12,145.25

308,610.80

100.0%

m2 m2

47,195.7 11,010.1

9.91 9.91

467,804 109,132

-

-

0% 0%

-

-

0.0% 0.0%

-

-

0.0% 0.0%

47,195.72 11,010.09

467,803.98 109,132.01

100.0% 100.0%

m2 glb

7,816.3 1.0

12.15 250,000.00

94,983 250,000

-

-

0% 0%

-

-

0.0% 0.0%

-

-

0.0% 0.0%

7,816.25 1.00

94,983.07 250,000.00

100.0% 100.0%

m2 m3 m3 m2 m2

62,500.0 26,192.3 26,669.6 62,500.0 11,350.0

0.35 3.69 6.09 0.08 35.11

21,875.00 96,649.40 162,418.02 5,000.00 398,488.91

-

-

0% 0% 0% 0% 0%

62,500.00 -

21,875.00 -

100.0% 0.0% 0.0% 0.0% 0.0%

62,500.00 -

21,875.00 -

100.0% 0.0% 0.0% 0.0% 0 .0%

26,192.25 26,669.63 62,500.00 11,350.00

96,649.40 162,418.02 5,000.00 398,488.91

0.0% 100.0% 100.0% 100.0% 100.0%

ml

2,168.2

2.84

6,157.69

-

-

0%

-

-

0.0 %

-

-

0.0%

2,168.20

6,157.69

100.0%

ml

2,168.2

1.18

2,558.48

-

-

0%

-

-

0.0 %

-

-

0.0%

2,168.20

2,558.48

100.0%

ml

2,168.2

1.86

4,032.85

-

-

0%

-

-

0.0 %

-

-

0.0%

2,168.20

4,032.85

100.0%

ml

2,168.2

11.26

24,413.93

-

-

0%

-

-

0.0%

-

-

0. 0%

2,168.20

24,413.93

100.0%

2,883.71

-

-

0%

-

-

0.0 %

-

-

0.0%

2,168.20

2,883.71

100.0%

8,044.02

-

-

0%

-

-

0.0 %

-

-

0.0%

2,168.20

8,044.02

100.0%

31,850.86

-

-

0%

-

-

0.0%

-

-

0. 0%

2,168.20

31,850.86

100.0%

-

0%

-

-

0.0%

-

-

0.0%

936.66

7,783.64

100.0%

ml ml

12.66 2,168.2

ml ml

2,168.2

3.71

2,168.2

14.69

ml ml

1.33 1.60

4.16

ml

16.71

m3

936.7

8.31

7,783.64

-

ml

1,970.6

19.59

38,603.07

-

-

0%

-

-

0.0%

-

-

0. 0%

1,970.55

38,603.07

100.0%

ml

197.7

36.61

7,235.97

-

-

0%

-

-

0.0%

-

-

0.0%

197.65

7,235.97

100.0%

ml

55.21

ml

1,970.6

1.49

2,936.12

-

-

0%

-

-

0.0 %

-

-

0.0%

1,970.55

2,936.12

100.0%

ml

197.7

1.88

371.58

-

-

0%

-

-

0.0%

-

-

0.0%

197.65

3 71.58

100.0%

ml

2.31

und

22.0

92.76

2,040.72

-

-

0%

-

-

0.0%

-

-

0.0%

22.00

2,040.72

100.0%

und

4.0

220.98

883.92

-

-

0%

-

-

0.0%

-

-

0.0%

4.00

883.92

100.0%

und

787.52

und

88.86

und

146.84

43

 

1.3.2.1.2.2.1.5.6 1.3.2.1.2.2.1.5.7 1.3.2.1.2.2.1.5.8 1.3.2.1.2.2.1.5.9 1.3.2.1.2.2.1.5.10 1.3.2.1.2.2.1.5.11 1.3.2.1.2.2.1.5.12 1.3.2.1.2.2.1.5.13 1.3.2.1.2. 2.1.6 1.3.2.1.2.2.1.6.1 1.3.2.1.2.2.1.6.2 1.3.2.1.2.2.1.7 1.3.2.1.2.2.1.7.1 1.3.2.1.2.2.1.7.2 1.3.2.1.2.2.1.7.3 1.3.2.1.2.2.1.7.4 1.3.2.1.2.2.1.7.5 1.3.2.1.2.2.1.7.6 1.3.2.1.2.2.1.7.7 1.3.2.1.2.2.1.7.8 1.3.2.1.2.2.1.7.9 1.3.2.1.2. 2.2 1.3.2.1.2.2.2.1 1.3.2.1.2.2.2.1.1 1.3.2.1.2.2.2.1.2 1.3.2.1.2.2.2.1.3 1.3.2.1.2.2.2.1.4 1.3.2.1.2.2.2.1.5 1.3.2.1.2.2.2.1.6 1.3.2.1.2.2.2.1.7 1.3.2.1.2.2.2.1.8 1.3.2.1.2.2.2.1.9 1.3.2.1.2.2.2.1.10 1.3.2.1.2.2.2.1.11 1.3.2.1.2.2.3 1.3.2.1.2.2.3.1 1.3.2.1.2.2.3.1.1 1.3.2.1.2.2.3.1.2 1.3.2.1.2.3 1.3.2.1.2.3.1 1.3.2.1.2. 3.1.1

SUMI. E INST. CODO DE PVC DN 45º x 160mm SUMI. E INST. CODO DE PVC DN 22.5º x 110mm SUMI. E INST. CODO DE PVC DN 22.5º x 160mm SUMI. E INST. REDUCCIONES PVC DN 160mm a 110mm SUMI. E INST. REDUCCIONES PVC DN 200mm a 160mm SUMI. E INST. DE TAPON PVC UF DN 110mm SUMI. E INST. DE TAPON PVC UF DN 160mm SUMI. E INST. DE TAPON PVC UF DN 200mm ANCLAJES Y/O APOYOS CONCRETO F'C=175KG/CM2 PARA ANCLAJE DE ACCESORIOS EMPALME A TUBERIA EXISTENTE VALVULAS Y ACCESORIOS DE HIERRO DUCTIL SUMI. E INST. VALVULA DE COMPUERTA HD 110mm SUMI. E INST. VALVULA DE COMPUERTA HD 160mm SUMI. E INST. VALVULA DE COMPUERTA HD 200mm SUMI. E INST. VALVULA DE PURGA DN 100mm INCLUYE ACCESORIOS, EXCA. CONCRETO 210, TUB. 110mm SUMI. E INST. VALVULA DE PURGA DN 160mm INCLUYE ACCESORIOS, EXCA. CONCRETO 210, TUB. 160mm SUMI. E INST. VALVULA DE AIRE BB DN 25mm INC. ACCESO. CAJA, P/TUB. DN 110mm. SUMI. E INST. VALVULA DE AIRE BB DN 25mm INC. ACCESO. CAJA, P/TUB. DN 160mm. SUMI. E INST. DE GRIFO CONTRA INCENDIOS FºFº, 02 SALIDAS CAJA DE VALVULA COMPUERTA CONEXIONES DOMICILIARIA S CONEXIÓN DOMICILIARIA DE AGUA POTABLE RIEGO DE LA ZONA DE TRABAJO PARA MITIGAR LA CONTAMINACION POR POLVO TRAZO Y REPLANTEOS CONEXIÓN DOMICILIARIA GUA EXCAVACION DE ZANJA T.NORMAL (0.4x1.20m); CONEX. AGUA REFINE Y NIVELACION DE ZANJA CONEXIÓN AGUA CAMA DE ARENA DE P/TUB. 1/2, C/MATERIAL PROPIO ZARANDEADO; CONEXIÓN DOMIL. RELLENO Y COMP.CONEXIÓN DE ZANJA ELIMINACION MATERIAL EXCEDENTE C/EQUIPO HASTA 1KM CONEXIÓN DOMICILIARIA AGUA TUB. PVC 1/2; LPROM=6m. CONEXIÓN DOMICILIARIA AGUA TUB. PVC 3/4; LPROM=6m. SUM. E INST. DE MICROMEDIDORES CONEXIÓN DOMIC.AGUA,INCL. INSTALACION Y ACCESORIOS PRUEBA HIDRAULICA Y DESINFECCION DE TUBERIA PVC Ø 1/2 PRUEBAS DE CONTROL DE CALIDAD PRUEBAS DE CONTROL DE CALIDAD PRUEBA COMPACTACION SUELOS (PROCTOR MODIFICADO) PRUEBA COMPACTACION SUELOS (DENSIDAD DE CAMPO) ALCANTARILLADO RED DE COLECTORES SECUNDARIOS TRABAJOS PRELIMINARES

und

88.19

und

20.0

86.19

1,723.80

-

-

0%

-

-

0.0%

-

-

0.0%

20.00

1,723.80

100.0%

und

4.0

140.17

560.68

-

-

0%

-

-

0.0%

-

-

0.0%

4.00

560.68

100.0%

und

4.0

125.65

502.60

-

-

0%

-

-

0.0%

-

-

0.0%

4.00

502.60

100.0%

und

168.93

und

5.0

68.36

341.80

-

-

0%

-

-

0.0%

-

-

0.0%

5.00

341.80

100.0%

und

1.0

128.63

128.63

-

-

0%

-

-

0.0%

-

-

0.0%

1.00

128.63

100.0%

und

165.82

und

76.0

68.42

5,199.92

-

-

0%

-

-

0.0%

-

-

0.0%

76.00

5,199.92

100.0%

und

6.0

167.16

1,002.96

-

-

0%

-

-

0.0%

-

-

0.0%

6.00

1,002.96

100.0%

und

7.0

358.98

2,512.86

-

-

0%

-

-

0.0%

-

-

0.0%

7.00

2,512.86

100.0%

und

1.0

623.10

623.10

-

-

0%

-

-

0.0%

-

-

0.0%

1.00

623.10

100.0%

1,561.21

-

-

0%

-

-

0.0%

-

-

0.0%

1.00

1,561.21

100.0%

und und

882.43 1.0

1,561.21

und und

4,536.59

und und

1.0

1,155.65

1,155.65

-

-

0%

-

-

0.0%

-

-

0.0%

1.00

1,155.65

100.0%

und

8.0

180.59

1,444.72

-

-

0%

-

-

0.0%

-

-

0.0%

8.00

1,444.72

100.0%

ml

2,724.0

2.84

7,736.16

-

-

0%

-

-

0.0 %

-

-

0.0%

2,724.00

7,736.16

100.0%

ml

2,724.0

1.20

3,268.80

-

-

0%

-

-

0.0 %

-

-

0.0%

2,724.00

3,268.80

100.0%

ml

2,724.0

22.35

60,881.40

-

-

0%

-

-

0.0%

-

-

0. 0%

2,724.00

60,881.40

100.0%

ml

2,724.0

0.65

1,770.60

-

-

0%

-

-

0.0 %

-

-

0.0%

2,724.00

1,770.60

100.0%

ml

2,724.0

2.16

5,883.84

-

-

0%

-

-

0.0 %

-

-

0.0%

2,724.00

5,883.84

100.0% 100.0%

ml

2,724.0

13.56

36,937.44

-

-

0%

-

-

0.0%

-

-

0. 0%

2,724.00

36,937.44

m3

1,176.8

8.31

9,778.96

-

-

0%

-

-

0.0 %

-

-

0.0%

1,176.77

9,778.96

100.0%

und

454.0

218.22

99,071.88

-

-

0%

-

-

0.0%

-

-

0.0%

454.00

99,071.88

100.0%

ml

454.0

154.60

70,188.40

-

-

0%

-

-

0. 0%

-

-

0.0%

454.00

70,188.40

100.0%

ml

2,724.0

1.14

3,105.36

-

-

0%

-

-

0.0 %

-

-

0.0%

2,724.00

3,105.36

100.0%

ml

1.0

70.00

70.00

-

-

0%

-

-

0.0%

-

-

0.0%

1.00

70.00

100.0%

ml

21.0

60.00

1,260.00

-

-

0%

-

-

0.0%

-

-

0.0%

21.00

1,260. 00

100.0%

und

44

 

1.3.2.1.2.3.1.1.1 1.3.2.1.2.3.1.1.2 1.3.2.1.2.3.1.1.3 1.3.2.1.2. 3.1.2 1.3.2.1.2. 3.1.2.1 1.3.2.1.2.3.1.2.1.1 1.3.2.1.2.3.1.2.1.2 1.3.2.1.2.3.1.2.2 1.3.2.1.2.3.1.2.2.1 1.3.2.1.2.3.1.2.2.2 1.3.2.1.2.3.1.2.3 1.3.2.1.2.3.1.2.3.1 1.3.2.1.2.3.1.2.3.2 1.3.2.1.2.3.1.2.3.3 1.3.2.1.2. 3.1.2.4 1.3.2.1.2.3.1.2.4.1 1.3.2.1.2.3.1.3 1.3.2.1.2.3.1.3.1 1.3.2.1.2.3.1.3.2 1.3.2.1.2.3.1.4 1.3.2.1.2.3.1.4.1 1.3.2.1.2.3.1.4.2 1.3.2.1.2.3.1.4.3 1.3.2.1.2.3.1.4.4 1.3.2.1.2. 3.2 1.3.2.1.2.3.2.1 1.3.2.1.2.3.2.1.1 1.3.2.1.2.3.2.1.2 1.3.2.1.2.3.2.1.3 1.3.2.1.2.3.2.1.4 1.3.2.1.2.3.2.1.5 1.3.2.1.2.3.2.1.6 1.3.2.1.2.3.2.1.7 1.3.2.1.2.3.2.1.8 1.3.2.1.2.3.2.1.9 1.3.2.1.2.3.2.1.10 1.3.2.1.2.3.2.1.11 1.3.2.1.2.3.3 1.3.2.1.2.3.3.1 1.3.2.1.2.3.3.1.1 1.3.2.1.2.3.3.1.2

RIEGO DE LA ZONA DE TRABAJO PARA MITIGAR LA CONTAMINACION POR POLVO TRAZO Y REPLANTEOS INICIALES DEL PROYECTO TRAZO Y REPLANTEO DURANTE EL PROCESO CONSTRUCTIVO DE LA OBRA MOVIMIENTO DE TIERRAS EXCAVACIONES DE ZANJAS EXCAVACION DE ZANJA C/MAQ. T. NORMAL HASTA 1.50MPP EXCAVACION DE ZANJA C/MAQ. T. NORMAL HASTA 2.00MPP REFINE, NIVELACION Y CONFORMACION DE ZANJAS REFINE, NIVELACION Y CONFORMACION DE FONDO DE ZANJA HASTA HPROM=3.00m CAMA DE ARENA DE APOYO DE TUBERIA PVC DN (200-250) E=0.10M; A=0.60m; C/MATERIAL PROPIO ZARANDEADO RELLENO Y COMPACTACION DE ZANJAS RELLENO COMP. ZANJA T. NORMAL HASTA 1.50MPP RELLENO COMP. ZANJA T. NORMAL HASTA 2.00MPP ELIMINACION MATERIAL EXCEDENTE C/EQUIPO EN TERRENO ANEXO ENTIBADO DE ZANJAS ENTIBADO DE PROTECCION DE ZANJAS H>2.00m SUMINISTRO E INSTALACION TUBOS COLECTOR/EMISOR SUMIN. E INSTAL. TUBO PVC UF, SN-4, DN 200MM, ISO 4435 PRUEBA HIDRAULICA TUBO PVC DN 200MM CONSTRUCCION DE BUZONES Y EMPALMES BUZON TIPO I, C/MARCO Y TAPA DE CONCRETO Di=1.20m x h=1.20MPP BUZON TIPO I, C/MARCO Y TAPA DE CONCRETO Di=1.20m x h=1.50MPP BUZON TIPO I, C/MARCO Y TAPA DE CONCRETO Di=1.20m x h=2.00MPP EMPALME A BUZON DE TUB. PVC CON DADO DE CONCRETO SIMPLE CONEXIONES DOMICILIARIA S CONEXION DOMICILIARIA DESAGUE RIEGO DE LA ZONA DE TRABAJO PARA MITIGAR LA CONTAMINACION POR POLVO TRAZOS Y REPLANTEOS DURANTE EL PROCESO CONSTRUCTIVO DE LA OBRA EXCAVACION DE ZANJA T.NORMAL (0.4x1.20m); CONEX. AGUA REFINE Y NIVELACION DE ZANJA CONEXIÓN AGUA CAMA DE ARENA DE P/TUB. 1/2, CMATERIAL PROPIO ZARANDEADO; CONEXIÓN DOMIL. RELLENO Y COMP. DE ZANJA CONEXIÓN ELIMINACION MATERIAL EXCEDENTE C/EQUIPO EN TERRENO ANEXO SUMIN. E INSTALACION DE TUBO PVC, SN-4, DN 160 MM, ISO 4435 SUMIN. E INSTALACION CAJA DE REGISTRO DE DESAGUE Y MEDIA CAÑA EMPALME A COLECTOR PVC DN 200MM PRUEBA HIDRAULICA CONEX. DOMICILIARIA DESAGUE PRUEBAS DE CONTROL DE CALIDAD PRUEBAS DE CONTROL DE CALIDAD PRUEBA COMPACTACION SUELOS (PROMOTOR MODIFICADO) PRUEBA COMPACTACION SUELOS (DENSIDAD DE CAMPO)

m

1,835.9

2.84

5,214.07

-

-

0%

-

-

0.0 %

-

-

0.0%

1,835.94

5,214.07

100.0%

m

1,835.9

1.24

2,276.57

-

-

0%

-

-

0.0 %

-

-

0.0%

1,835.94

2,276.57

100.0%

m

1,835.9

1.72

3,157.82

-

-

0%

-

-

0.0 %

-

-

0.0%

1,835.94

3,157.82

100.0%

m

1,668.8

14.88

24,831.45

-

-

0%

-

-

0.0%

-

-

0. 0%

1,668.78

24,831.45

100.0%

m

167.2

17.01

2,843.39

-

-

0%

-

-

0.0%

-

-

0.0%

167.16

2,843.39

100.0%

m

1,835.9

2.17

3,983.99

-

-

0%

-

-

0.0 %

-

-

0.0%

1,835.94

3,983.99

100.0%

m

1,835.9

3.89

7,141.81

-

-

0%

-

-

0.0 %

-

-

0.0%

1,835.94

7,141.81

100.0%

m

1,668.8

15.46

25,799.34

-

-

0%

-

-

0.0%

-

-

0. 0%

1,668.78

25,799.34

100.0%

m

167.2

20.51

3,428.45

-

-

0%

-

-

0.0%

-

-

0.0%

167.16

3,428.45

100.0%

m3

793.1

8.31

6,590.91

-

-

0%

-

-

0.0%

-

-

0.0%

793.13

6,590.91

100.0%

m

167.2

39.01

6,520.91

-

-

0%

-

-

0.0%

-

-

0.0%

167.16

6,520.91

100.0%

ml ml

1,835.9 1,835.9

30.46 1.8

55,922.73 3,304.69

-

-

0% 0%

-

-

0.0% 0.0%

-

-

0. 0% 0.0%

1,835.94 1,835.94

55,922.73 3,304.69

100.0% 100.0%

und

19.0

1909.31

36,276.89

-

-

0%

-

-

0.0%

-

-

0.0%

19.00

36,276.89

100.0%

und

12.0

2485.81

29,829.72

-

-

0%

-

-

0.0%

-

-

0.0%

12.00

29,829.72

100.0%

und

2.0

2765.76

5,531.52

-

-

0%

-

-

0.0%

-

-

0.0%

2.00

5,531.52

100.0%

und

89.0

159.24

14,172.36

-

-

0%

-

-

0.0%

-

-

0.0%

89.00

14,172.36

100.0%

ml

2,724.0

2.84

7,736.16

-

-

0%

-

-

0.0 %

-

-

0.0%

2,724.00

7,736.16

100.0%

ml

2,724.0

1.31

3,568.44

-

-

0%

-

-

0.0 %

-

-

0.0%

2,724.00

3,568.44

100.0%

ml

2,724.0

22.35

60,881.40

-

-

0%

-

-

0.0%

-

-

0. 0%

2,724.00

60,881.40

100.0%

ml

2,724.0

1.31

3,568.44

-

-

0%

-

-

0.0 %

-

-

0.0%

2,724.00

3,568.44

100.0%

ml

2,724.0

2.81

7,654.44

-

-

0%

-

-

0.0 %

-

-

0.0%

2,724.00

7,654.44

100.0% 100.0%

ml

2,724.0

13.56

36,937.44

-

-

0%

-

-

0.0%

-

-

0. 0%

2,724.00

36,937.44

m3

1,176.8

8.31

9,778.96

-

-

0%

-

-

0.0 %

-

-

0.0%

1,176.77

9,778.96

100.0%

m

2,724.0

20.6

56,114.40

-

-

0%

-

-

0. 0%

-

-

0.0%

2,724.00

56,114.40

100.0%

und

454.0

130.56

59,274.24

-

-

0%

-

-

0.0%

-

-

0.0%

454.00

59,274.24

100.0%

und

454.0

95.42

43,320.68

-

-

0%

-

-

0.0%

-

-

0.0%

454.00

43,320.68

100.0%

und

2,724.0

1.8

4,903.20

-

-

0%

-

-

0.0%

-

-

0.0%

2,724.00

4,903.20

100.0%

und

1.0

70

70.00

-

-

0%

-

-

0.0%

-

-

0.0%

1.00

70.00

100.0%

und

18.0

60

1,080.00

-

-

0%

-

-

0.0%

-

-

0.0%

18.00

1,080.00

100.0%

45

 

1.3.2.1.2.3.3.1.3 1.3.2.1.2.3.4 1.3.2.1.2.3.4.1 1.3.2.1.2. 3.4.1.1 1.3.2.1.3 1.3.2.1.3. 2 1.3.2.1.3. 2.1 1.3.2.1.3.2.1.1 1.3.2.1.3.2.1.2 1.3.2.1.3. 2.2 1.3.2.1.3.2.2.1 1.3.2.1.3.2.2.2 1.3.2.1.3.2.2.3 1.3.2.1.3.2.2.4 1.3.2.1.3.2.2.5 1.3.2.1.3.2.3 1.3.2.1.3.2.3.1 1.3.2.1.3. 2.3.2 1.3.2.1.3. 2.3.3 1.3.2.1.3.2.3.4 1.3.2.1.3. 2.3.5 1.3.2.1.3.2.3.6 1.3.2.1.3.3 1.3.2.1.3. 3.1 1.3.2.1.3.3.1.1 1.3.2.1.3. 3.2 1.3.2.1.3.3.2.1 1.3.2.1.3.3.2.2 1.3.2.1.3.3.2.3 1.3.2.1.3. 3.3 1.3.2.1.3.3.3.1 1.3.2.1.3.3.3.2 1.3.2.1.3.3.3.3 1.3.2.1.3.3.3.4 1.3.2.1.3.3.3.5 1.3.2.1.3.4 1.3.2.1.3. 4.1 1.3.2.1.3.4.1.1 1.3.2.1.3.4.1.2 1.3.2.1.3.4.1.3 1.3.2.1.3.4.2 1.3.2.1.3.4.2.1 1.3.2.1.3.4.2.2 1.3.2.1.3.4.2.3 1.3.2.1.3.4.2.4 1.3.2.1.3. 5 1.3.2.1.3. 5.1 1.3.2.1.3.5.1.1 1.3.2.1.3.5.1.2

PRUEBA DE CALIDAD DE CONCRETO VARIOS VARIOS LIMPIEZA FINAL DE OBRA PISTAS Y VEREDAS PISTAS Y ESTACIONAMIENTO OBRAS PROVISIONALES TRAZO, NIVELES Y REPLANTEO INICIAL DE OBRA TRAZO REPLANTEO Y CONTRO TOPOGRAFICO DELA EJES Y NIVELES DURANTE EJECUCION DEDE LAPISTAS OBRA MOVIMIENTO DE TIERRAS CORTE HASTA NIVEL DE SUBRASANTE EXTRACCION Y APILAMIENTO DE MATERIAL DE PRESTAMO CARGUIO Y TRANSPORTE DE MATERIAL PROPIO RELLENO Y COMPACTACION CON MATERIAL PROPIO ELIMINACION DE MATERIAL PROPIO EXCEDENTE EN TERRENO ANEXO PAVIMENTOS CONFORMACION Y COMPACTACION DE SUBRASANTE PARA PISTAS SUB-BASE DE 20 CMS BASE DE 15 CMS BARRIDO Y LIMPIEZA P/CARPETA ASFALTICA IMPRIMACION ASFALTICA CARPETA ASFALTICA EN CALIENTE DE 2" VEREDAS OBRAS PROVISIONALES TRAZO, REPLANTEO Y CONTROL TOPOGRAFICO DE EJES Y NIVELES DE VEREDAS MOVIMIENTO DE TIERRAS PERFILADO, NIVELACION Y COMPACTACION DE SUBRASANTE VEREDAS COLOCACION DE AFIRMADO/BASE GRANULAR PARA VEREDAS EXCAVACION MANUAL PARA SARDINELES DE VEREDAS VEREDAS Y SARDINELES ENCOFRADO Y DESENCOFRADO DE VEREDAS CONCRETO PARA SARDINELES DE VEREDAS h=35 cm F'C=175 kg/cm2 CONCRETO PARA VEREDAS DE H=10CM F'C=175 KG/CM2 JUNTA DE DILATACION ASFALTICA PARA VEREDAS; e=1/2 CURADO QUIMICO PARA VEREDAS PAVIMENTO RÍGIDO: PASAJE PEATONAL MOVIMIENTO DE TIERRAS PERFILADO, NIVELACION Y COMPACTACION DE SUBRASANTE COLOCACION DE AFIRMADO/BASE GRANULAR EXCAVACION MANUAL PARA SADINELES SUMERGIDOS CONCRETO EN PASAJES PEATONALES CONCRETO PARA SARDINEL SUMERGID; H=0.25cm; F'C=210 kg/cm2 PAVIMENTO RIGIDO DE CONCRETO EN PASAJE PEATONAL; H=12.5cm; F'C=210 KG/CM2 JUNTA DE DILATACION ASFALTICA EN PAVIMIENTO RIGIDO; e=1/2 CURADO QUIMICO PARA PAVIMENTO RIGIDO RAMPAS PEATONALES MOVIMIENTO DE TIERRAS PERFILADO, NIVELACION Y COMPACTACION DE SUBRASANTE COLOCACION DE AFIRMADO/BASE GRANULAR

und

1.0

2000

2,000.00

-

-

0%

-

-

0.0%

-

-

0.0%

1.00

2,000.00

100.0%

m

1,835.9

1.31

2,405.08

-

-

0%

-

-

0.0%

-

-

0 .0%

1,835.94

2,405.08

100.0%

m2

13,445.2

0.73

9,815.02

-

-

0%

-

-

0.0%

-

-

0. 0%

13,445.23

9,815.02

100.0%

m2

13,445.2

1.81

24,335.87

-

-

0%

-

-

0.0%

-

-

0 .0%

13,445.23

24,335.87

100.0%

m3

10,022.6

8.01

80,280.87

-

-

0%

-

-

0.0%

-

-

0 .0%

10,022.58

80,280.87

100.0%

m3

10,461.3

4.56

47,703.44

-

-

0%

-

-

0.0%

-

-

0 .0%

10,461.28

47,703.44

100.0%

m3

10,461.3

4.25

44,460.44

-

-

0%

-

-

0.0%

-

-

0 .0%

10,461.28

44,460.44

100.0%

m3

10,461.3

19.36

202,530.38

-

-

0%

-

-

0.0%

-

-

0.0%

10,461.28

202,530.38

100.0%

m3

6.36

m2

13,445.2

2.03

27,293.82

-

-

0%

-

-

0.0%

-

-

0 .0%

13,445.23

27,293.82

100.0%

m2 m2

13,445.2 13,445.2

16.85 18.65

226,552.13 250,753.54

-

-

0% 0%

-

-

0.0% 0.0%

-

-

0.0% 0 .0%

13,445.23 13,445.23

226,552.13 250,753.54

100.0% 100.0%

m2

13,445.2

0.45

6,050.35

-

-

0%

-

-

0.0%

-

-

0. 0%

13,445.23

6,050.35

100.0%

m2

13,445.2

4.29

57,680.04

-

-

0%

-

-

0.0%

-

-

0.0%

13,445.23

57,680.04

100.0%

m2

13,445.2

35.71

480,129.16

-

-

0%

-

-

0.0%

-

-

0.0%

13,445.23

480,129.16

100.0%

m2

4,683.8

2.15

10,070.23

-

-

0%

-

-

0.0%

-

-

0. 0%

4,683.83

10,070.23

100.0%

m2

4,683.8

6.83

31,990.56

-

-

0%

-

-

0.0%

-

-

0. 0%

4,683.83

31,990.56

100.0%

m2

4,683.8

14.8

69,320.68

-

-

0%

-

-

0.0%

-

-

0. 0%

4,683.83

69,320.68

100.0%

m

3,174.5

4.03

12,793.15

-

-

0%

-

-

0. 0%

-

-

0.0%

3,174.48

12,793.15

100.0%

m2

689.9

41.58

28,686.37

-

-

0%

-

-

0.0 %

-

-

0.0%

689.91

28,686.37

100.0%

m

3,174.5

17.7

56,188.30

-

-

0%

-

-

0. 0%

-

-

0.0%

3,174.48

56,188.30

100.0%

m2

4,683.8

48.2

225,760.61

-

-

0%

-

-

0.0%

-

-

0 .0%

4,683.83

225,760.61

100.0%

ml

1,059.0

4.87

5,157.33

-

-

0%

-

-

0.0 %

-

-

0.0%

1,059.00

5,157.33

100.0%

m2

4,683.8

1.67

7,822.00

-

-

0%

-

-

0.0 %

-

-

0.0%

4,683.83

7,822.00

100.0%

m2

1,655.9

6.83

11,309.46

-

-

0%

-

-

0.0%

-

-

0. 0%

1,655.85

11,309.46

100.0%

m2

1,655.9

19.35

32,040.70

-

-

0%

-

-

0.0%

-

-

0 .0%

1,655.85

32,040.70

100.0%

m

1,034.6

4.03

4,169.48

-

-

0%

-

-

0.0 %

-

-

0.0%

1,034.61

4,169.48

100.0%

m

1,034.6

19.96

20,650.82

-

-

0%

-

-

0.0%

-

-

0. 0%

1,034.61

20,650.82

100.0%

m2

1,655.9

61.18

101,304.90

-

-

0%

-

-

0.0%

-

-

0.0%

1,655.85

101,304.90

100.0%

m

378.0

4.87

1,840.86

-

-

0%

-

-

0.0%

-

-

0.0%

378.00

1,840.86

100.0%

m2

1,655.9

1.67

2,765.27

-

-

0%

-

-

0.0 %

-

-

0.0%

1,655.85

2,765.27

100.0%

m2

180.3

6.83

1,231.45

-

-

0%

-

-

0.0%

-

-

0.0%

180.30

1,231.45

100.0%

m2

180.3

14.8

2,668.44

-

-

0%

-

-

0.0%

-

-

0.0%

180.30

2,668.44

100.0%

46

 

1.3.2.1.3.5.1.3 1.3.2.1.3. 5.2 1.3.2.1.3.5.2.1 1.3.2.1.3.5.2.2 1.3.2.1.3.5.2.3 1.3.2.1.3.5.2.4 1.3.2.1.3. 5.2.5 1.3.2.1.3.6 1.3.2.1.3.6.1 1.3.2.1.3.6.1.1 1.3.2.1.3.6.1.2 1.3.2.1.3.6.1.3 1.3.2.1.3.6.1.4 1.3.2.1.3.6.1.5 1.3.2.1.3. 7 1.3.2.1.3. 7.1 1.3.2.1.3. 7.1.1 1.3.2.1.3. 8 1.3.2.1.3. 8.1 1.3.2.1.3.8.1.1 1.3.2.1.3.8.1.2 1.3.2.1.3.8.1.3 1.3.2.1.4 1.3.2.1.4. 1 1.3.2.1.4. 2 1.3.2.2 1.3.2.2.1 1.3.2.2.1.1 1.3.2.2.1.2 1.3.2.2.1.3 1.3.2.2.1.4 1.3.2.2.1. 5 1.3.2.2.2 1.3.2.2.2.1 1.3.2.2.2.1.1 1.3.2.2.2. 1.2 1.3.2.2.2.1.3 1.3.2.2.2. 1.4 1.3.2.2.2.2 1.3.2.2.2.2.1 1.3.2.2.2.2.2 1.3.2.2.2.2.3 1.3.2.2.2. 3 1.3.2.2.2.3.1 1.3.2.2.2.3.2 1.3.2.2.2.3.3 1.3.2.2.2.3.4 1.3.2.2.3 1.3.2.2.3. 1 1.3.2.2.3.2 1.3.2.2.3. 3 1.3.2.2.3.4 1.3.2.2.3.5 1.3.2.2.3.6 1.3.2.2.3. 7 1.3.2.2.3. 8 1.3.2.2.3.9 1.3.2.2.3.10

EXCAVACION MANUAL PARA SARDINELES SUMERGIDOS CONCRETO EN RAMPAS ENCOFRADO Y DESENCOFRADO DE RAMPAS CONCRETO PARA SARDINELES DE RAMPAS h=20cm F'C=175kg/cm2 CONCRETO PARA RAMPAS DE H=10CM F'C=175 KG/CM2 CURADO QUIMICO PARA RAMPAS BRUÑADO DE RAMPAS SEÑALIZACIÓN SEÑALIZACION PINTADO EN BLANCO DE LETRAS, CRUCES PEATONALES Y SIMBOLOS EN PAVIMENTO PINTADO DE AMARILLO EN PSJE. PEATONAL PINTADO DE AMARILLO EN SARDINELES, MARTILLOS, RAMPAS Y ESTACIONAMIENTO PINTADO DE BLANCO DE LINEAS DISCONTINUAS Y CONTINUAS EN PAVIMENTO SEÑALIZACION VERTICAL (PREVENTIVA Y REGLAMENTARIA) LIMPIEZA DE OBRA LIMPIEZA DE OBRA LIMPIEZA FINAL DE OBRA PRUEBAS DE CALIDAD PRUEBAS DE CALIDAD PRUEBAS DE CALIDAD DE SUBRASANTE PRUEBAS DE CALIDAD DE LA SUB BASE Y BASE PRUEBAS DE CALIDAD DEL CONCRETO RED ELÉCTRICA RED PRIMARIA RED SECUNDARIA VIVIENDAS MOV. TIERRAS CASA Corte de Terreno con maquinaria h=0.35 (0.15 Platea + 0.20 Afirmado) Inc. Eliminación Excavación de Zanjas cimentación manual (Uñas de Platea) Inc Eliminación Relleno con material de préstamo (Afirmado e= 0.20m) Proctor 95% Nivelación y compactación de Terreno Acarreo de Material excedente ESTRUCTURAS PLATEA Concreto premezclado fc=175kg/cm2 Encofrado y desencofrad o Acero de refuerzo de fy =4200kg/cm2 Acabado de Losa Platea MUROS Concreto premezclado fc=175kg/cm2 Encofrado y desencofrado Acero de refuerzo de fy =4200kg/cm2 LOSA TECHO Concreto premezclado fc=175kg/cm2 Encofrado y desencofrado Acero de refuerzo de fy =4200kg/cm2 Junta de dilatación tecnopor 1 INSTALACIONES ELÉCTRICAS Salida p/centro de luz Salida p/braquetes Tomacorrie nte bipolar Interruptor de 01 golpe Salida p/timbre Salida p/pulsador de timbre Alimentad or de TD a Caja Medidor Tubo PVC SAP 25mm Tablero Electrico de Distribucion Tubo PVC SAP 25mm acometida para futura conexión pozo de tierra.

m

125.1

4.03

504.03

-

-

0%

-

-

0.0%

-

-

0.0%

125.07

5 04.03

100.0% 100.0%

m2

39.8

46.43

1,848.17

-

-

0%

-

-

0.0%

-

-

0.0%

39.81

1,8 48.17

m

125.1

15.99

1,999.87

-

-

0%

-

-

0.0%

-

-

0.0%

125.07

1,999.87

100.0%

m2

180.3

48.2

8,690.46

-

-

0%

-

-

0.0%

-

-

0.0%

180.30

8,690.46

100.0%

m2

180.3

1.67

301.10

-

-

0%

-

-

0.0%

-

-

0.0%

180.30

3 01.10

100.0%

m2

180.3

13.73

2,475.52

-

-

0%

-

-

0.0%

-

-

0.0%

180.30

2,475.52

100.0%

m2

742.6

23.01

17,086.54

-

-

0%

-

-

0.0 %

-

-

0.0%

742.57

17,086.54

100.0%

m2

258.3

21.08

5,444.96

-

-

0%

-

-

0.0%

-

-

0.0%

258.30

5,444.96

100.0%

m

1,114.5

9.52

10,609.66

-

-

0%

-

-

0. 0%

-

-

0.0%

1,114.46

10,609.66

100.0%

m

982.7

7.99

7,852.09

-

-

0%

-

-

0.0%

-

-

0.0%

982.74

7,852.09

100.0%

und

8.0

580.95

4,647.60

-

-

0%

-

-

0.0%

-

-

0.0%

8.00

4,647.60

100.0%

Ha

5.6

3024

16,873.92

-

-

0%

-

-

0.0 %

-

-

0.0%

5.58

16,873.92

100.0%

glb

1.0

2680

2,680.00

-

-

0%

-

-

0.0%

-

-

0.0%

1.00

2,680.00

100.0%

glb

1.0

15480

15,480.00

-

-

0%

-

-

0.0%

-

-

0.0%

1.00

15,4 80.00

100.0%

glb

1.0

1850

1,850.00

-

-

0%

-

-

0.0%

-

-

0.0%

1.00

1,850.00

100.0%

glb glb

1.0 1.0

152,919.16 536,349.80

152,919.16 536,349.80

-

-

0% 0%

-

-

0.0% 0.0%

-

-

0.0% 0.0%

1.00 1.00

152,919.16 536,349.80

100.0% 100.0%

m3

5,175.6

17.94

92,850.26

-

-

0%

-

-

0.0%

-

-

0 .0%

5,175.60

92,850.26

100.0%

m3

336.0

46.80

15,722.93

-

-

0%

-

-

0.0 %

-

-

0.0%

335.96

15,722.93

100.0%

m3

2,215.5

86.88

192,484.38

-

-

0%

-

-

0.0%

-

-

0.0%

2,215.52

192,484.38

100.0%

m2 m3

12,248.9 5,511.6

2.64 5.40

32,337.15 29,762.42

-

-

0% 0%

-

-

0.0% 0.0%

-

-

0.0% 0.0%

12,248.92 5,511.56

32,337.15 29,762.42

100.0% 100.0%

m3

2,066.6

311.32

643,370.55

-

-

0%

-

-

0.0%

-

-

0.0%

2,066.58

643,370.55

100.0%

m2

4,551.0

14.95

68,025.37

-

-

0%

-

-

0.0%

-

-

0.0%

4,551.04

68,025.37

100.0%

kg

115,742.1

4.10

475,005.47

-

-

0%

-

-

0.0%

-

-

0.0%

##########

475,005.47

100.0%

m2

11,350.0

6.77

76,857.66

-

-

0%

-

-

0.0%

-

-

0.0%

11,350.00

76,857.66

100.0%

-

-

0%

-

-

0.0%

-

-

0.0%

2,488.28

830,160.77

100.0%

-

0%

-

-

0.0%

-

-

0.0%

49,765.53

475,384.02

100.0% 100.0%

m3

2,488.3

333.63

830,160.77

m2

49,765.5

9.55

475,384.02

-

kg

100,984.5

4.10

414,440.58

-

-

0%

-

-

0.0%

-

-

0.0%

##########

414,440.58

m3

1,135.0

333.63

378,668.69

-

-

0%

-

-

0.0%

-

-

0.0%

1,135.00

378,668.69

100.0%

m2

11,350.0

10.24

116,219.13

-

-

0%

-

-

0.0%

-

-

0.0%

11,350.00

116,219.13

100.0% 100.0%

kg

46,242.8

4.10

189,780.58

-

-

0%

-

-

0.0%

-

-

0.0%

46,242.83

189,780.58

m2

1,693.4

5.19

8,796.98

-

-

0%

-

-

0.0%

-

-

0.0%

1,693.42

8,796.98

100.0%

pto pto pto pto pto pto ml ml und

2,270.0 454.0 3,178.0 2,270.0 454.0 454.0 3,632.0 3,178.0 454.0

57.20 57.20 57.20 57.20 27.50 27.50 9.35 11.55 154.00

129,844.00 25,968.80 181,781.60 129,844.00 12,485.00 12,485.00 33,959.2 0 36,705.90 69,916.00

-

-

0% 0% 0% 0% 0% 0% 0% 0% 0%

-

-

0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0. 0% 0.0%

-

-

0 .0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%

2,270.00 454.00 3,178.00 2,270.00 454.00 454.00 3,632.00 3,178.00 454.00

129,844.00 25,968.80 181,781.60 129,844.00 12,485.00 12,485.00 33,959. 20 36,705.90 69,916.00

100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%

ml

2,724.0

11.55

31,462.20

-

-

0%

-

-

0.0%

-

-

0. 0%

2,724.00

31,462.20

100.0%

47

 

1.3.2.2.3. 11 1.3.2.2.3.12 1.3.2.2.4 1.3.2.2.4. 1 1.3.2.2.4. 2 1.3.2.2.4. 3 1.3.2.2.4.4 1.3.2.2.4. 5 1.3.2.2.4. 6 1.3.2.2.4. 7 1.3.2.2.4.8 1.3.2.2.4.9 1.3.2.2.4.10 1.3.2.2.4. 11 1.3.2.2.4. 12 1.3.2.2.4. 13 1.3.2.2.4.14 1.3.2.2.4.15 1.3.2.2.5 1.3.2.2.5.1 1.3.2.2.5.1.1 1.3.2.2.5.1.2 1.3.2.2.5.2 1.3.2.2.5.2.1 1.3.2.2.5. 2.2 1.3.2.2.5. 2.3 1.3.2.2.5.3 1.3.2.2.5.3.1 1.3.2.2.5.3.2 1.3.2.2.5.3.3 1.3.2.2.5.3.4 1.3.2.2.5.4 1.3.2.2.5.4.1 1.3.2.2.5.4.2 1.3.2.2.5.4.3 1.3.2.2.5.4.4 1.3.2.2.5.4.5 1.3.2.2.5.5 1.3.2.2.5.5.1 1.3.2.2.5.5.2 1.3.2.2.5.5.3 1.3.2.2.5.5.4 1.3.2.2.5.6 1.3.2.2.5.6.1 1.3.2.2.5.6.2 1.3.2.2.5.6.3 1.3.2.2.5.6.4 1.3.2.2.5.6.5 1.3.2.2.5.6.6 1.3.2.2.5.6.7 1.3.2.2.5.6.8 1.3.2.2.5.6.9 1.3.2.2.5.6.10 1.3.2.2.5.6.11 1.3.2.2.5.6.12 1.3.2.2.5.7 1.3.2.2.5.7.1 1.3.2.2.6 1.3.2.2.6.1 1.3.2.2.6.1.1 1.3.2.2.6.1.2 1.3.2.2.6.2 1.3.2.2.6. 2.1 1.3.2.3

Prueba electrica Conexión a banco de medidores INSTALACION ES SANITARIAS Excavacion y relleno de zanja Tuberia PVC SAL 4 Tuberia PVC SAL 2 Caja registro 12x24 Salida de desague 2 Salida de desague 4 Salida de ventilacio n 2 Sumidero de bronce 2 Registro de bronce 4 Sombrero de ventilacion 2 Salida de agua fria 1/2 Tuberia PVC C10 Agua Fria 1/2 Tuberia PVC C10 Agua Fria 3/4 Valvula compuerta 1/2 Valvula compuerta 3/4 ACABADOS LAVANDERÍA Concreto premezclado fc=175kg/cm2 Encofrado BAÑO Concreto simple 1:6 en sardinel ducha 0.10x0.20 Piso Cerámico 30x30 Ducha Zócalo cerámico 30x30 Ducha CARPINTERA DE MADERA P1 - Puerta Principal de HDF contraplacada - 0.90x2.60 - Sin Pintura P2 - Puerta Dormitorio y Lavandería de HDF contraplacada - 0.80x2.60 - Sin Pintura P3 - Puerta Baño de HDF contraplacada - 0.70x2.6 - Sin Pintura Instalación de Puertas CARPINTERA DE ALUMINIO V1 - Ventana de Aluminio Sala 0.85x1.4 V2 - Ventana de Aluminio Dormitorios - 1.0x1.4 V3 - Ventana de Aluminio Baño 0.30x0.50 V4 - Ventana de Aluminio Patio 0.95x1.4 Instalación Ventanas CERRAJERA Cerradura Fixer Puerta Principal llave exterior/boton interior acero inoxidable Cerradura Fixer Baño Ranura ext./botoninterior Cerradura Fixer Puerta Jardin llave exterior/botoninterior acero inoxidable Cerradura Fixer Dormitorio Ranura ext./botoninterior APARATOS Y ACCESORIOS SANITARIOS Inodoro Rapid Jet Blanco Lavatorio Fontana de Baño Lavadero de Cocina Luxor 1 Poza sin Escurridero 50cm Lavarropa de Granito Jorss 1 Poza 80cm Griferia p/ducha Trebol ECO Griferia p/lavatorio de baño Trebol ECO Griferia p/lavadero cocina a Pared Trebol ECO Llave para Lavadero de Ropa Hubolt 1/2 Instalacion de Inodoro Instalacion de Lavatorio y Lavarropa Instalacion de Lavadero Cocina Instalacion Llave y Pico de Ducha COBERTURA Cobertura Techo de Fibraforte incluida parrilla de madera PINTURA INTERIOR Limpeza e imprimado de Muro Limpeza e imprimado de Techo EXTERIOR Pintura Latex en Muros Exteriores URBANISMO

glb glb

454.0 454.0

27.50 27.50

12,485.00 12,485.00

-

-

0% 0%

-

-

0.0% 0.0%

-

-

0.0% 0.0%

454.00 454.00

12,485.00 12,485.00

100.0% 100.0%

ml ml ml und pto pto pto und und und pto ml ml und und

3,178.0 2,270.0 908.0 454.0 1,362.0 454.0 1,816.0 908.0 454.0 1,816.0 2,270.0 1,362.0 2,088.4 454.0 908.0

19.80 26.95 16.83 275.00 61.60 85.80 44.00 23.10 35.20 8.25 61.60 15.95 18.37 64.35 70.95

62,924.40 61,176.50 15,281.64 124,850.00 83,899.20 38,953.20 79,904.00 20,974.80 15,980.80 14,982.00 139,832.00 21,723.90 38,363.91 29,214.90 64,422.60

-

-

0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

-

-

0.0% 0.0 % 0.0% 0.0% 0. 0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%

-

-

0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0. 0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%

3,178.00 2,270.00 908.00 454.00 1,362.00 454.00 1,816.00 908.00 454.00 1,816.00 2,270.00 1,362.00 2,088.40 454.00 908.00

62,924.40 61,176.50 15,281.64 124,850.00 83,899.20 38,953.20 79,904.00 20,974.80 15,980.80 14,982.00 139,832.00 21,723.9 0 38,363.9 1 29,214.90 64,422.60

100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%

m3

75.6

288.26

21,802.95

-

-

0%

-

-

0.0%

-

-

0.0%

75.64

21,802.95

100.0%

m2

121.7

13.84

1,683.94

-

-

0%

-

-

0.0%

-

-

0.0%

121.67

1,683.94

100.0%

und

454.0

21.06

9,561.24

-

-

0%

-

-

0.0%

-

-

0.0%

454.00

9,561.24

100.0%

m2 m2

326.9 2,487.9

44.98 44.98

14,703.60 111,910.71

-

-

0% 0%

-

-

0.0% 0.0%

-

-

0.0% 0.0%

326.88 2,487.92

14,703.60 111,910.71

100.0% 100.0%

und

454.0

165.96

75,345.84

-

-

0%

-

-

0.0%

-

-

0.0%

454.00

75,345.84

100.0%

und

1,362.0

140.52

191,388.24

-

-

0%

-

-

0.0%

-

-

0.0%

1,362.00

191,388.24

100.0%

und

454.0

129.85

58,951.90

-

-

0%

-

-

0.0%

-

-

0.0%

454.00

58,951.90

100.0%

und

2,270.0

53.94

122,443.80

-

-

0%

-

-

0.0%

-

-

0.0%

2,270.00

122,443.80

100.0%

und

454.0

186.66

84,743.28

-

-

0%

-

-

0.0%

-

-

0.0%

454.00

84,743.28

100.0%

und

908.0

239.12

217,120.96

-

-

0%

-

-

0.0%

-

-

0.0%

908.00

217,120.96

100.0%

und

454.0

67.84

30,798.63

-

-

0%

-

-

0.0%

-

-

0.0%

454.00

30,798.63

100.0%

und

454.0

229.45

104,172.30

-

-

0%

-

-

0.0%

-

-

0.0%

454.00

104,172.30

100.0%

und

2,270.0

69.04

156,713.54

-

-

0%

-

-

0.0%

-

-

0.0%

2,270.00

156,713.54

100.0%

und

454.0

17.91

8,130.23

-

-

0%

-

-

0.0%

-

-

0.0%

454.00

8,130.23

100.0%

und

454.0

17.91

8,130.23

-

-

0%

-

-

0.0%

-

-

0.0%

454.00

8,130.23

100.0%

und

454.0

17.91

8,130.23

-

-

0%

-

-

0.0%

-

-

0.0%

454.00

8,130.23

100.0%

und

908.0

17.91

16,260.46

-

-

0%

-

-

0.0%

-

-

0.0%

908.00

16,260.46

100.0%

und und

454.0 454.0

187.38 70.63

85,068.25 32,063.75

-

-

0% 0%

-

-

0.0% 0.0%

-

-

0.0% 0.0%

454.00 454.00

85,068.25 32,063.75

100.0% 100.0%

und

454.0

60.63

27,523.75

-

-

0%

-

-

0.0%

-

-

0.0%

454.00

27,523.75

100.0%

und

454.0

104.75

47,556.50

-

-

0%

-

-

0.0%

-

-

0.0%

454.00

47,556.50

100.0%

und

454.0

68.50

31,099.00

-

-

0%

-

-

0.0%

-

-

0.0%

454.00

31,099.00

100.0%

und

454.0

50.75

23,040.50

-

-

0%

-

-

0.0%

-

-

0.0%

454.00

23,040.50

100.0%

und

454.0

58.50

26,559.00

-

-

0%

-

-

0.0%

-

-

0.0%

454.00

26,559.00

100.0%

und

454.0

29.38

13,336.25

-

-

0%

-

-

0.0%

-

-

0.0%

454.00

13,336.25

100.0%

und und und und

454.0 908.0 454.0 454.0

31.25 31.25 31.25 31.25

14,187.50 28,375.00 14,187.50 14,187.50

-

-

0% 0% 0% 0%

-

-

0.0% 0.0% 0.0% 0.0%

-

-

0.0% 0.0% 0.0% 0.0%

454.00 908.00 454.00 454.00

14,187.50 28,375.00 14,187.50 14,187.50

100.0% 100.0% 100.0% 100.0%

m2

11,463.5

25.41

291,287.54

-

-

0%

-

-

0.0%

-

-

0.0%

11,463.50

291,287.54

100.0%

m2 m2

44,546.5 10,392.1

9.91 9.91

441,544.71 103,006.10

-

-

0% 0%

-

-

0.0% 0.0%

-

-

0.0% 0.0%

44,546.48 10,392.06

441,544.71 103,006.10

100.0% 100.0%

m2 glb

7,377.5 1.0

12.15 250,000.00

89,651.38 250,000.00

-

-

0% 0%

-

-

0.0% 0.0%

-

-

0.0% 0.0%

7,377.50 1.00

89,651.38 250,000.00

100.0% 100.0%

48

48

 

1.3.3 1.3.3.1 1.3.3.1.1 1.3.3.1.1. 1 1.3.3.1.1. 2 1.3.3.1.1. 3 1.3.3.1.1. 4 1.3.3.1.1. 6 1.3.3.1.2 1.3.3.1.2. 2 1.3.3.1.2. 2.1 1.3.3.1.2. 2.1.1 1.3.3.1.2.2.1.1.1 1.3.3.1.2.2.1.1.2 1.3.3.1.2.2.1.1.3 1.3.3.1.2. 2.1.2 1.3.3.1.2.2.1.2.1 1.3.3.1.2.2.1.2.2 1.3.3.1.2.2.1.2.3 1.3.3.1.2.2.1.2.4 1.3.3.1.2.2.1.2.5 1.3.3.1.2.2.1.2.6 1.3.3.1.2.2.1.2.7 1.3.3.1.2.2.1.2.8 1.3.3.1.2.2.1.2.9 1.3.3.1.2.2.1.3 1.3.3.1.2.2.1.3.1 1.3.3.1.2.2.1.3.2 1.3.3.1.2.2.1.3.3 1.3.3.1.2.2.1.4 1.3.3.1.2.2.1.4.1 1.3.3.1.2.2.1.4.2 1.3.3.1.2.2.1.4.3 1.3.3.1.2.2.1.5 1.3.3.1.2.2.1.5.1 1.3.3.1.2.2.1.5.2 1.3.3.1.2.2.1.5.3 1.3.3.1.2.2.1.5.4 1.3.3.1.2.2.1.5.5 1.3.3.1.2.2.1.5.6 1.3.3.1.2.2.1.5.7 1.3.3.1.2.2.1.5.8 1.3.3.1.2.2.1.5.9 1.3.3.1.2.2.1.5.10 1.3.3.1.2.2.1.5.11

ETAPA 3 HABILITACI ÓN URBANA MOVIMIENTO DE TIERRAS LIMPIEZA Y DESBROCE CORTE RELLENO ELIMINACIÓN DE MATERIAL PLATAFORMADO DE CASAS AGUA POTABLE Y ALCANTARILL ADO AGUA POTABLE RED DE DISTRIBUCIÓN TRABAJOS PRELIMINARES RIEGO DE LA ZONA DE TRABAJO PARA MITIGAR LA CONTAMINACION POR POLVO TRAZO Y REPLANTEO INICIAL DE LA LINEA TRAZO Y REPLANTEO DURANTE LA INSTALACION DE TUBERIAS MOVIMIENTO DE TIERRAS EXC. S/INTERF. TERRENO SUELTO P/TUB. DN=110-160mm Hasta H=1.20m. EXC. S/INTERF. TERRENO SUELTO P/TUB. DN=200-250mm Hasta H=1.20m. REFINES Y NIVELACION FONDO DE ZANJA P/TUB DN 110-160MM EN TERRENO NORMAL REFINES Y NIVELACION FONDO DE ZANJA P/TUB DN 200-250MM EN TERRENO NORMAL CAMA DE ARENA MANUAL E=0.1M ZANJA P/TUB DN 110-160; MATERIAL PROPIO ZARANDEADO CAMA DE ARENA MANUAL E=0.1M ZANJA P/TUB DN 200-250; MATERIAL PROPIOD/MAT. ZARANDEADO RELL. D/ZANJ. PROPIO COMP. C/EQ P/TUB 110-160mm,H=1.20m RELL. D/ZANJ. D/MAT. PROPIO COMP. C/EQ P/TUB 200-250mm,H=1.20m ELIMINACION MATERIAL EXCEDENTE C/EQUIPO HASTA 1KM INSTALACION DE TUBERIAS DE AGUA POTABLE (INC.SUMINISTRO) SUMI. E INST. TUBERIA PVC UF, PN7. 5, P/AGUA POTABLE DN 110 mm. NTP 16422 SUMI. E INST. TUBERIA PVC UF, PN7. 5, P/AGUA POTABLE DN 160 mm. NTP 16423 SUMI. E INST. TUBERIA PVC UF, PN10, P/AGUA POTABLE DN 200 mm. NTP 16424 PRUEBA HIDRAULICA Y DESINFECCION DE TUBERIA ZANJA TAPADA PRUEBA HIDRAULICA Y DESINFECCION DE TUBERIA DN 100mm PRUEBA HIDRAULICA Y DESINFECCION DE TUBERIA DN 160mm PRUEBA HIDRAULICA Y DESINFECCION DE TUBERIA DN 200mm INSTALACION DE ACCESORIOS PVC AGUA POTABLE (INC. SUMINISTRO) SUMI. E INST. TEE PVC 110 x 110mm; PN=10 SUMI. E INST. TEE PVC 160 x 160mm; PN=10 SUMI. E INST. TEE PVC 200 x 200mm; PN=10 SUMI. E INST. CODO DE PVC DN 90º x 110mm SUMI. E INST. CODO DE PVC DN 45º x 110mm SUMI. E INST. CODO DE PVC DN 45º x 160mm SUMI. E INST. CODO DE PVC DN 22.5º x 110mm SUMI. E INST. CODO DE PVC DN 22.5º x 160mm SUMI. E INST. REDUCCIONES PVC DN 160mm a 110mm SUMI. E INST. REDUCCIONES PVC DN 200mm a 160mm SUMI. E INST. DE TAPON PVC UF DN 110mm

m2 m3 m3 m2 m2

62,500.0 26,192.3 26,669.6 62,500.0 13,750.0

0.35 3.69 6.09 0.08 37.28

21,875.00 96,649.40 162,418.02 5,000.00 512,589.55

-

-

0% 0% 0% 0% 0%

62,500.00 -

21,875.00 -

100.0% 0.0% 0.0% 0.0% 0.0%

62,500.00 -

21,875.00 -

100.0% 0.0% 0.0% 0.0% 0 .0%

26,192.25 26,669.63 62,500.00 13,750.00

96,649.40 162,418.02 5,000.00 512,589.55

0.0% 100.0% 100.0% 100.0% 100.0%

ml

2,810.6

2.84

7,982.08

-

-

0%

-

-

0.0 %

-

-

0.0%

2,810.59

7,982.08

100.0%

ml

2,810.6

1.18

3,316.50

-

-

0%

-

-

0.0 %

-

-

0.0%

2,810.59

3,316.50

100.0%

ml

2,810.6

1.86

5,227.70

-

-

0%

-

-

0.0 %

-

-

0.0%

2,810.59

5,227.70

100.0%

ml

2,810.6

11.26

31,647.24

-

-

0%

-

-

0.0%

-

-

0. 0%

2,810.59

31,647.24

100.0%

2,810.6

1.33

3,738.08

-

-

0%

-

-

0.0 %

-

-

0.0%

2,810.59

3,738.08

100.0%

2,810.6

3.71

10,427.29

-

-

0%

-

-

0.0%

-

-

0. 0%

2,810.59

10,427.29

100.0%

2,810.6

14.69

41,287.57

-

-

0%

-

-

0.0%

-

-

0. 0%

2,810.59

41,287.57

100.0%

m3

1,214.2

8.31

10,089.75

-

-

0%

-

-

0.0%

-

-

0. 0%

1,214.17

10,089.75

100.0%

ml

2,536.7

19.59

49,693.95

-

-

0%

-

-

0.0%

-

-

0. 0%

2,536.70

49,693.95

100.0%

ml

273.9

36.61

10,027.11

-

-

0%

-

-

0.0 %

-

-

0.0%

273.89

10,027.11

100.0%

ml ml ml ml ml ml ml

ml

ml

2,536.7

1.49

3,779.68

-

-

0%

-

-

0.0 %

-

-

0.0%

2,536.70

3,779.68

100.0%

ml

273.9

1.88

514.91

-

-

0%

-

-

0.0%

-

-

0.0%

273.89

5 14.91

100.0%

ml

und

29.0

92.76

2,690.04

-

-

0%

-

-

0.0%

-

-

0.0%

29.00

2,690.04

100.0%

und

4.0

220.98

883.92

-

-

0%

-

-

0.0%

-

-

0.0%

4.00

883.92

100.0%

1.0

123.88

123.88

-

-

0%

-

-

0.0%

-

-

0.0%

1.00

123.88

100.0%

und und und und und

29.0

86.19

2,499.51

-

-

0%

-

-

0.0%

-

-

0.0%

29.00

2,499.51

100.0%

und

4.0

140.17

560.68

-

-

0%

-

-

0.0%

-

-

0.0%

4.00

560.68

100.0%

und

5.0

125.65

628.25

-

-

0%

-

-

0.0%

-

-

0.0%

5.00

628.25

100.0%

7.0

68.36

478.52

-

-

0%

-

-

0.0%

-

-

0.0%

7.00

478.52

100.0%

0%

-

-

0.0%

-

-

0.0%

82.00

5,610.44

100.0%

und und

49

 

1.3.3.1.2.2.1.5.12 1.3.3.1.2.2.1.5.13 1.3.3.1.2. 2.1.6 1.3.3.1.2.2.1.6.1 1.3.3.1.2.2.1.6.2 1.3.3.1.2.2.1.7 1.3.3.1.2.2.1.7.1 1.3.3.1.2.2.1.7.2 1.3.3.1.2.2.1.7.3 1.3.3.1.2.2.1.7.4 1.3.3.1.2.2.1.7.5 1.3.3.1.2.2.1.7.6 1.3.3.1.2.2.1.7.7 1.3.3.1.2.2.1.7.8 1.3.3.1.2.2.1.7.9 1.3.3.1.2. 2.2 1.3.3.1.2.2.2.1 1.3.3.1.2.2.2.1.1 1.3.3.1.2.2.2.1.2 1.3.3.1.2.2.2.1.3 1.3.3.1.2.2.2.1.4 1.3.3.1.2.2.2.1.5 1.3.3.1.2.2.2.1.6 1.3.3.1.2.2.2.1.7 1.3.3.1.2.2.2.1.8 1.3.3.1.2.2.2.1.9 1.3.3.1.2.2.2.1.10 1.3.3.1.2.2.2.1.11 1.3.3.1.2.2.3 1.3.3.1.2.2.3.1 1.3.3.1.2.2.3.1.1 1.3.3.1.2.2.3.1.2 1.3.3.1.2.3 1.3.3.1.2.3.1 1.3.3.1.2. 3.1.1 1.3.3.1.2.3.1.1.1 1.3.3.1.2.3.1.1.2 1.3.3.1.2.3.1.1.3 1.3.3.1.2. 3.1.2 1.3.3.1.2. 3.1.2.1 1.3.3.1.2.3.1.2.1.1

SUMI. E INST. DE TAPON PVC UF DN 160mm SUMI. E INST. DE TAPON PVC UF DN 200mm ANCLAJES Y/O APOYOS CONCRETO F'C=175KG/CM2 PARA ANCLAJE DE ACCESORIOS EMPALME A TUBERIA EXISTENTE VALVULAS Y ACCESORIOS DE HIERRO DUCTIL SUMI. E INST. VALVULA DE COMPUERTA HD 110mm SUMI. E INST. VALVULA DE COMPUERTA HD 160mm SUMI. E INST. VALVULA DE COMPUERTA HD 200mm SUMI. E INST. VALVULA DE PURGA DN 100mm INCLUYE ACCESORIOS, EXCA. CONCRETO 210, TUB. 110mm SUMI. E INST. VALVULA DE PURGA DN 160mm INCLUYE ACCESORIOS, EXCA. CONCRETO 210, TUB. 160mm SUMI. E INST. VALVULA DE AIRE BB DN 25mm INC. ACCESO. CAJA, P/TUB. DN 110mm. SUMI. E INST. VALVULA DE AIRE BB DN 25mm INC. ACCESO. CAJA, P/TUB. DN 160mm. SUMI. E INST. DE GRIFO CONTRA INCENDIOS FºFº, 02 SALIDAS CAJA DE VALVULA COMPUERTA CONEXIONES DOMICILIARIA S CONEXIÓN DOMICILIARIA DE AGUA POTABLE RIEGO DE LA ZONA DE TRABAJO PARA MITIGAR LA CONTAMINACION POR POLVO TRAZO Y REPLANTEOS CONEXIÓN DOMICILIARIA GUA EXCAVACION DE ZANJA T.NORMAL (0.4x1.20m); CONEX. AGUA REFINE Y NIVELACION DE ZANJA CONEXIÓN AGUA CAMA DE ARENA DE P/TUB. 1/2, C/MATERIAL PROPIO ZARANDEADO; CONEXIÓN DOMIL. RELLENO Y COMP. DE ZANJA CONEXIÓN ELIMINACION MATERIAL EXCEDENTE C/EQUIPO HASTA 1KM CONEXIÓN DOMICILIARIA AGUA TUB. PVC 1/2; LPROM=6m. CONEXIÓN DOMICILIARIA AGUA TUB. PVC 3/4; LPROM=6m. SUM. E INST. DE MICROMEDIDORES CONEXIÓN DOMIC.AGUA,INCL. INSTALACION Y ACCESORIOS PRUEBA HIDRAULICA Y DESINFECCION DE TUBERIA PVC Ø 1/2 PRUEBAS DE CONTROL DE CALIDAD PRUEBAS DE CONTROL DE CALIDAD PRUEBA COMPACTACION SUELOS (PROCTOR MODIFICADO) PRUEBA COMPACTACION SUELOS (DENSIDAD DE CAMPO) ALCANTARILLADO RED DE COLECTORES SECUNDARIOS TRABAJOS PRELIMINARES RIEGO DE LA ZONA DE TRABAJO PARA MITIGAR LA CONTAMINACION POR POLVO TRAZO Y REPLANTEOS INICIALES DEL PROYECTO TRAZO Y REPLANTEO DURANTE EL PROCESO CONSTRUCTIVO DE LA OBRA MOVIMIENTO DE TIERRAS EXCAVACIONES DE ZANJAS EXCAVACION DE ZANJA C/MAQ. T. NORMAL HASTA 1.50MPP

und und und

82.0

68.42

5,610.44

-

-

und

1.0

358.98

358.98

-

-

0%

-

-

0.0%

-

-

0.0%

1.00

358.98

100.0%

und

1.0

623.1

623.10

-

-

0%

-

-

0.0%

-

-

0.0%

1.00

623.10

100.0%

und

1.0

1155.65

1,155.65

-

-

0%

-

-

0.0%

-

-

0.0%

1.00

1,155.65

100.0%

und

2.0

180.59

361.18

-

-

0%

-

-

0.0%

-

-

0.0%

2.00

361.18

100.0%

und

und und und und und

ml

3,306.0

2.84

9,389.04

-

-

0%

-

-

0.0 %

-

-

0.0%

3,306.00

9,389.04

100.0%

ml

3,306.0

1.2

3,967.20

-

-

0%

-

-

0.0%

-

-

0.0%

3,306.00

3,967.20

100.0%

ml

3,306.0

22.35

73,889.10

-

-

0%

-

-

0.0%

-

-

0. 0%

3,306.00

73,889.10

100.0%

ml

3,306.0

0.65

2,148.90

-

-

0%

-

-

0.0 %

-

-

0.0%

3,306.00

2,148.90

100.0%

ml

3,306.0

2.16

7,140.96

-

-

0%

-

-

0.0 %

-

-

0.0%

3,306.00

7,140.96

100.0%

ml

3,306.0

13.56

44,829.36

-

-

0%

-

-

0.0%

-

-

0. 0%

3,306.00

44,829.36

100.0%

m3

1,428.2

8.31

11,868.26

-

-

0%

-

-

0.0%

-

-

0. 0%

1,428.19

11,868.26

100.0%

und

551.0

218.22

120,239.22

-

-

0%

-

-

0.0%

-

-

0.0%

551.00

120,239.22

100.0%

ml

551.0

154.6

85,184.60

-

-

0%

-

-

0.0 %

-

-

0.0%

551.00

85,184.60

100.0%

ml

3,306.0

1.14

3,768.84

-

-

0%

-

-

0.0 %

-

-

0.0%

3,306.00

3,768.84

100.0%

und

ml

1.0

70

70.00

-

-

0%

-

-

0.0%

-

-

0.0%

1.00

70.00

100.0%

ml

30.0

60

1,800.00

-

-

0%

-

-

0.0%

-

-

0.0%

30.00

1,800.00

100.0%

m

2,553.2

2.84

7,251.20

-

-

0%

-

-

0.0 %

-

-

0.0%

2,553.24

7,251.20

100.0%

m

2,553.2

1.24

3,166.02

-

-

0%

-

-

0.0 %

-

-

0.0%

2,553.24

3,166.02

100.0%

m

2,553.2

1.72

4,391.57

-

-

0%

-

-

0.0 %

-

-

0.0%

2,553.24

4,391.57

100.0%

m

1,707.9

14.88

25,413.28

-

-

0%

-

-

0.0%

-

-

0. 0%

1,707.88

25,413.28

100.0%

50

 

1.3.3.1.2.3.1.2.1.2 1.3.3.1.2.3.1.2.2 1.3.3.1.2.3.1.2.2.1 1.3.3.1.2.3.1.2.2.2 1.3.3.1.2.3.1.2.3 1.3.3.1.2.3.1.2.3.1 1.3.3.1.2.3.1.2.3.2 1.3.3.1.2.3.1.2.3.3 1.3.3.1.2. 3.1.2.4 1.3.3.1.2.3.1.2.4.1 1.3.3.1.2.3.1.3 1.3.3.1.2.3.1.3.1 1.3.3.1.2.3.1.3.2 1.3.3.1.2.3.1.4 1.3.3.1.2.3.1.4.1 1.3.3.1.2.3.1.4.2 1.3.3.1.2.3.1.4.3 1.3.3.1.2.3.1.4.4 1.3.3.1.2. 3.2 1.3.3.1.2.3.2.1 1.3.3.1.2.3.2.1.1 1.3.3.1.2.3.2.1.2 1.3.3.1.2.3.2.1.3 1.3.3.1.2.3.2.1.4 1.3.3.1.2.3.2.1.5 1.3.3.1.2.3.2.1.6 1.3.3.1.2.3.2.1.7 1.3.3.1.2.3.2.1.8 1.3.3.1.2.3.2.1.9 1.3.3.1.2.3.2.1.10 1.3.3.1.2.3.2.1.11 1.3.3.1.2.3.3 1.3.3.1.2.3.3.1 1.3.3.1.2.3.3.1.1 1.3.3.1.2.3.3.1.2 1.3.3.1.2.3.3.1.3 1.3.3.1.2.3.4 1.3.3.1.2.3.4.1 1.3.3.1.2. 3.4.1.1 1.3.3.1.2.3.5 1.3.3.1.2. 3.5.1 1.3.3.1.2.3.5.1.1 1.3.3.1.2.3.5.1.2

EXCAVACION DE ZANJA C/MAQ. T. NORMAL HASTA 2.00MPP REFINE, NIVELACION Y CONFORMACION DE ZANJAS REFINE, NIVELACION Y CONFORMACION DE FONDO DE ZANJA HASTA HPROM=3.00m CAMA DE ARENA DE APOYO DE TUBERIA PVC DN (200-250) E=0.10M; A=0.60m; C/MATERIAL PROPIO ZARANDEADO RELLENO Y COMPACTACION DE ZANJAS RELLENO COMP. ZANJA T. NORMAL HASTA 1.50MPP RELLENO COMP. ZANJA T. NORMAL HASTA 2.00MPP ELIMINACION MATERIAL EXCEDENTE C/EQUIPO EN TERRENO ANEXO ENTIBADO DE ZANJAS ENTIBADO DE PROTECCION DE ZANJAS H>2.00m SUMINISTRO E INSTALACION TUBOS COLECTOR/EMISOR SUMIN. E INSTAL. TUBO PVC UF, SN-4, DN 200MM, ISO 4435 PRUEBA HIDRAULICA TUBO PVC DN 200MM CONSTRUCCION DE BUZONES Y EMPALMES BUZON TIPO I, C/MARCO Y TAPA DE CONCRETO Di=1.20m x h=1.20MPP BUZON TIPO I, C/MARCO Y TAPA DE CONCRETO Di=1.20m x h=1.50MPP BUZON TIPO I, C/MARCO Y TAPA DE CONCRETO Di=1.20m x h=2.00MPP EMPALME A BUZON DE TUB. PVC CON DADO DE CONCRETO SIMPLE CONEXIONES DOMICILIARIA S CONEXION DOMICILIARIA DESAGUE RIEGO DE LA ZONA DE TRABAJO PARA MITIGAR LA CONTAMINACION POR POLVO TRAZOS Y REPLANTEOS DURANTE EL PROCESO CONSTRUCTIVO DE LA OBRA EXCAVACION DE ZANJA T.NORMAL (0.4x1.20m); CONEX. AGUA REFINE Y NIVELACION DE ZANJA CONEXIÓN AGUA CAMA DE ARENA DE P/TUB. 1/2, CMATERIAL PROPIO ZARANDEADO; CONEXIÓN DOMIL. RELLENO Y COMP. DE ZANJA CONEXIÓN ELIMINACION MATERIAL EXCEDENTE C/EQUIPO EN TERRENO ANEXO SUMIN. E INSTALACION DE TUBO PVC, SN-4, DN 160 MM, ISO 4435 SUMIN. E INSTALACION CAJA DE REGISTRO DE DESAGUE Y MEDIA CAÑA EMPALME A COLECTOR PVC DN 200MM PRUEBA HIDRAULICA CONEX. DOMICILIARIA DESAGUE PRUEBAS DE CONTROL DE CALIDAD PRUEBAS DE CONTROL DE CALIDAD PRUEBA COMPACTACION SUELOS (PROMOTOR MODIFICADO) PRUEBA COMPACTACION SUELOS (DENSIDAD DE CAMPO) PRUEBA DE CALIDAD DE CONCRETO VARIOS VARIOS LIMPIEZA FINAL DE OBRA COLECTOR PRINCIPAL DE DESAGÜES TRABAJOS PRELIMINARES RIEGO DE LA ZONA DE TRABAJO PARA MITIGAR LA CONTAMINACION POR POLVO TRAZO DEL Y REPLANTEOS INICIALES PROYECTO

m

845.4

17.01

14,380.59

-

-

0%

-

-

0.0 %

-

-

0.0%

845.42

14,380.59

100.0%

m

2,553.2

2.17

5,540.53

-

-

0%

-

-

0.0 %

-

-

0.0%

2,553.24

5,540.53

100.0%

m

2,553.2

3.89

9,932.10

-

-

0%

-

-

0.0 %

-

-

0.0%

2,553.24

9,932.10

100.0%

m

1,707.8

15.46

26,402.90

-

-

0%

-

-

0.0%

-

-

0. 0%

1,707.82

26,402.90

100.0%

m

845.4

20.51

17,339.56

-

-

0%

-

-

0.0 %

-

-

0.0%

845.42

17,339.56

100.0%

m3

1,103.0

8.31

9,165.93

-

-

0%

-

-

0.0 %

-

-

0.0%

1,103.00

9,165.93

100.0%

m

845.4

39.01

32,979.83

-

-

0%

-

-

0.0 %

-

-

0.0%

845.42

32,979.83

100.0%

ml

2,553.2

30.46

77,771.69

-

-

0%

-

-

0.0%

-

-

0. 0%

2,553.24

77,771.69

100.0%

ml

2,553.2

1.8

4,595.83

-

-

0%

-

-

0.0%

-

-

0.0%

2,553.24

4,595.83

100.0%

und

26.0

1,909.31

49,642.06

-

-

0%

-

-

0.0%

-

-

0.0%

26.00

49,642.06

100.0%

und

16.0

2,485.81

39,772.96

-

-

0%

-

-

0.0%

-

-

0.0%

16.00

39,772.96

100.0%

und

5.0

2,765.76

13,828.80

-

-

0%

-

-

0.0%

-

-

0.0%

5.00

13,828.80

100.0%

und

122.0

159.24

19,427.28

-

-

0%

-

-

0.0%

-

-

0.0%

122.00

19,427.28

100.0%

ml

3,306.0

2.84

9,389.04

-

-

0%

-

-

0.0 %

-

-

0.0%

3,306.00

9,389.04

100.0%

ml

3,306.0

1.31

4,330.86

-

-

0%

-

-

0.0 %

-

-

0.0%

3,306.00

4,330.86

100.0%

ml

3,306.0

22.35

73,889.10

-

-

0%

-

-

0.0%

-

-

0. 0%

3,306.00

73,889.10

100.0%

ml

3,306.0

1.31

4,330.86

-

-

0%

-

-

0.0 %

-

-

0.0%

3,306.00

4,330.86

100.0%

ml

3,306.0

2.81

9,289.86

-

-

0%

-

-

0.0 %

-

-

0.0%

3,306.00

9,289.86

100.0%

ml

3,306.0

13.56

44,829.36

-

-

0%

-

-

0.0%

-

-

0. 0%

3,306.00

44,829.36

100.0%

m3

1,428.2

8.31

11,868.26

-

-

0%

-

-

0.0%

-

-

0. 0%

1,428.19

11,868.26

100.0%

m

3,306.0

20.6

68,103.60

-

-

0%

-

-

0. 0%

-

-

0.0%

3,306.00

68,103.60

100.0%

und

551.0

130.56

71,938.56

-

-

0%

-

-

0.0%

-

-

0.0%

551.00

71,938.56

100.0%

und

551.0

95.42

52,576.42

-

-

0%

-

-

0.0%

-

-

0.0%

551.00

52,576.42

100.0%

und

3,306.0

1.8

5,950.80

-

-

0%

-

-

0.0%

-

-

0.0%

3,306.00

5,950.80

100.0%

100.0%

und

1.0

70

70.00

-

-

0%

-

-

0.0%

-

-

0.0%

1.00

70.00

und

25.0

60

1,500.00

-

-

0%

-

-

0.0%

-

-

0.0%

25.00

1,500.00

100.0%

und

1.0

2,000.00

2,000.00

-

-

0%

-

-

0.0%

-

-

0.0%

1.00

2,000.00

100.0%

m

2,553.2

1.31

3,344.74

-

-

0%

-

-

0.0%

-

-

0 .0%

2,553.24

3,344.74

100.0%

m

951.8

2.84

2,702.97

-

-

0%

-

-

0.0%

-

-

0.0%

951.75

2,702.97

100.0%

m

951.8

1.24

1,180.17

-

-

0%

-

-

0.0%

-

-

0.0%

951.75

1,180.17

100.0%

0%

-

-

0.0%

-

-

0.0%

951.75

1,637.01

100.0%

51

 

1.3.3.1.2.3.5.1.3 1.3.3.1.2. 3.5.2 1.3.3.1.2. 3.5.2.1 1.3.3.1.2.3.5.2.1.1 1.3.3.1.2.3.5.2.1.2 1.3.3.1.2.3.5.2.1.3 1.3.3.1.2.3.5.2.1.4 1.3.3.1.2.3.5.2.1.5 1.3.3.1.2.3.5.2.1.6 1.3.3.1.2.3.5.2.1.7 1.3.3.1.2.3.5.2.2 1.3.3.1.2.3.5.2.2.1 1.3.3.1.2.3.5.2.2.2 1.3.3.1.2.3.5.2.2.3 1.3.3.1.2.3.5.2.2.4 1.3.3.1.2.3.5.2.2.5 1.3.3.1.2.3.5.2.3 1.3.3.1.2.3.5.2.3.1 1.3.3.1.2.3.5.2.3.2 1.3.3.1.2.3.5.2.3.3 1.3.3.1.2.3.5.2.3.4 1.3.3.1.2.3.5.2.3.5 1.3.3.1.2.3.5.2.3.6 1.3.3.1.2.3.5.2.3.7 1.3.3.1.2.3.5.2.3.8 1.3.3.1.2. 3.5.2.4 1.3.3.1.2.3.5.2.4.1 1.3.3.1.2.3.5.2.4.2 1.3.3.1.2.3.5.2.4.3 1.3.3.1.2.3.5.2.4.4 1.3.3.1.2.3.5.2.4.5 1.3.3.1.2.3.5.2.4.6 1.3.3.1.2.3.5.3 1.3.3.1.2.3.5.3.1 1.3.3.1.2.3.5.3.2 1.3.3.1.2.3.5.3.3 1.3.3.1.2.3.5.3.4 1.3.3.1.2.3.5.3.5 1.3.3.1.2.3.5.3.6 1.3.3.1.2.3.5.3.7 1.3.3.1.2.3.5.3.8

TRAZO Y REPLANTEO DURANTE EL PROCESO CONSTRUCTIVO DE LA OBRA MOVIMIENTO DE TIERRAS EXCAVACIONES DE ZANJAS EXCAVACION DE ZANJA C/MAQ. T. NORMAL HASTA 1.50MPP EXCAVACION DE ZANJA C/MAQ. T. NORMAL HASTA 2.00MPP EXCAVACION DE ZANJA C/MAQ. T. NORMAL HASTA 2.50MPP EXCAVACION DE3.00MPP ZANJA C/MAQ. T. NORMAL HASTA EXCAVACION DE ZANJA C/MAQ. T. NORMAL HASTA 3.50MPP EXCAVACION DE ZANJA C/MAQ. T. NORMAL HASTA 4.00MPP EXCAVACION DE ZANJA C/MAQ. T. NORMAL HASTA 4.50MPP REFINE, NIVELACION Y CONFORMACION DE ZANJAS REFINE, NIVELACION Y CONFORMACION DE FONDO DE ZANJA HASTA HPROM=3.00m REFINE, NIVELACION Y CONFORMACION DE FONDO DE ZANJA HASTA HPROM=4.00m REFINE, NIVELACION Y CONFORMACION DE FONDO DE ZANJA HASTA HPROM=4.50m CAMA DE ARENA DE APOYO DE TUBERIA PVC DN (200-250) E=0.10M; A=0.60m; C/MATERIAL PROPIO ZARANDEADO CAMA DE ARENA DE APOYO DE TUBERIA PVC DN (315-450) E=0.10M; A=0.80m; C/MATERIAL PROPIO ZARANDEADO RELLENO Y COMPACTACION DE ZANJAS RELLENO COMP. ZANJA T. NORMAL HASTA 1.50MPP RELLENO COMP. ZANJA T. NORMAL HASTA 2.00MPP RELLENO COMP. ZANJA T. NORMAL HASTA 2.50MPP RELLENO COMP. ZANJA T. NORMAL HASTA 3.00MPP RELLENO COMP. ZANJA T. NORMAL HASTA 3.50MPP RELLENO COMP. ZANJA T. NORMAL HASTA 4.00MPP RELLENO COMP. ZANJA T. NORMAL HASTA 4.50MPP ELIMINACION MATERIAL EXCEDENTE C/EQUIPO EN TERRENO ANEXO ENTIBADO DE ZANJAS ENTIBADO DE PROTECCION DE ZANJAS H>2.00m ENTIBADO DE PROTECCION DE ZANJAS H>2.50m ENTIBADO DE PROTECCION DE ZANJAS H>3.00m ENTIBADO DE PROTECCION DE ZANJAS H>3.50m ENTIBADO DE PROTECCION DE ZANJAS H>4.00m ENTIBADO DE PROTECCION DE ZANJAS H>4.50m SUMINISTRO E INSTALACION TUBOS COLECTOR/EMISOR SUMIN. E INSTAL. TUBO PVC UF, SN-4, DN 200MM, ISO 4435 SUMIN. E INSTAL. TUBO PVC UF, SN-4, DN 250MM, ISO 4436 SUMIN. E INSTAL. TUBO PVC UF, SN-4, DN 315MM, ISO 4437 SUMIN. E INSTAL. TUBO PVC UF, SN-4, DN 355MM, ISO 4438 PRUEBA HIDRAULICA TUBO PVC DN 200MM PRUEBA HIDRAULICA TUBO PVC DN 250MM PRUEBA HIDRAULICA TUBO PVC DN 315MM PRUEBA HIDRAULICA TUBO PVC DN 355MM

m

951.8

1.72

1,637.01

m m

-

-

555.4

14.88

8,263.61

-

-

0%

-

-

0.0%

-

-

0.0%

555.35

8,263.61

100.0%

44.7

17.01

761.03

-

-

0%

-

-

0.0%

-

-

0.0%

44.74

761.03

100.0%

m

79.1

19.84

1,569.34

-

-

0%

-

-

0.0%

-

-

0.0%

79.10

1,569. 34

100.0%

m

80.2

29.77

2,388.45

-

-

0%

-

-

0.0%

-

-

0.0%

80.23

2,388. 45

100.0%

m

35.8

39.7

1,422.05

-

-

0%

-

-

0.0%

-

-

0.0%

35.82

1,422.0 5

100.0%

m

98.1

69.03

6,768.39

-

-

0%

-

-

0.0%

-

-

0.0%

98.05

6,768. 39

100.0%

m

58.5

103.54

6,052.95

-

-

0%

-

-

0.0%

-

-

0.0%

58.46

6,0 52.95

100.0%

m

759.4

2.17

1,647.94

-

-

0%

-

-

0.0%

-

-

0.0%

759.42

1,647.94

100.0%

m

133.9

2.61

349.40

-

-

0%

-

-

0.0%

-

-

0.0%

133.87

3 49.40

100.0%

m

58.5

3.25

190.00

-

-

0%

-

-

0.0%

-

-

0.0%

58.46

190.00

100.0%

m

794.6

3.89

3,090.96

-

-

0%

-

-

0.0%

-

-

0.0%

794.59

3,090.96

100.0%

m

157.2

4.84

760.65

-

-

0%

-

-

0.0%

-

-

0.0%

157.16

7 60.65

100.0%

m

555.4

15.46

8,585.71

-

-

0%

-

-

0.0%

-

-

0.0%

555.35

8,585.71

100.0%

m

44.7

20.51

917.62

-

-

0%

-

-

0.0%

-

-

0.0%

44.74

917.62

100.0%

m

79.1

30.25

2,392.78

-

-

0%

-

-

0.0%

-

-

0.0%

79.10

2,392. 78

100.0%

m

80.2

42.82

3,435.45

-

-

0%

-

-

0.0%

-

-

0.0%

80.23

3,435. 45

100.0%

m

35.8

59.94

2,147.05

-

-

0%

-

-

0.0%

-

-

0.0%

35.82

2,147. 05

100.0%

m

98.1

42.82

4,198.50

-

-

0%

-

-

0.0%

-

-

0.0%

98.05

4,198. 50

100.0%

m

58.5

42.82

2,503.26

-

-

0%

-

-

0.0%

-

-

0.0%

58.46

2,503. 26

100.0%

m3

411.2

5.41

2,224.38

-

-

0%

-

-

0.0%

-

-

0.0%

411.16

2,224.38

100.0%

m

44.7

39.01

1,745.31

-

-

0%

-

-

0.0%

-

-

0.0%

44.74

1,745. 31

100.0%

m

79.1

39.7

3,140.27

-

-

0%

-

-

0.0%

-

-

0.0%

79.10

3,140.2 7

100.0%

m m

80.2 35.8

57.16 66.72

4,585.95 2,389.91

-

-

0% 0%

-

-

0.0% 0.0%

-

-

0.0% 0.0%

80.23 35.82

4,585. 95 2,389. 91

100.0% 100.0%

m

98.1

83.58

8,195.02

-

-

0%

-

-

0.0%

-

-

0.0%

98.05

8,195. 02

100.0%

m

58.5

105.71

6,179.81

-

-

0%

-

-

0.0%

-

-

0.0%

58.46

6,1 79.81

100.0%

ml

346.2

30.46

10,545.25

-

-

0%

-

-

0.0 %

-

-

0.0%

346.20

10,545.25

100.0%

ml

448.4

48.98

21,962.14

-

-

0%

-

-

0.0 %

-

-

0.0%

448.39

21,962.14

100.0%

ml

157.2

73.43

11,540.26

-

-

0%

-

-

0.0 %

-

-

0.0%

157.16

11,540.26

100.0%

ml ml

346.2

1.8

623.16

-

-

0%

-

-

0.0%

-

-

0.0%

346.20

623.16

100.0%

ml

448.4

2.11

946.10

-

-

0%

-

-

0.0%

-

-

0.0%

448.39

9 46.10

100.0%

ml

157.2

2.48

389.76

-

-

0%

-

-

0.0%

-

-

0.0%

157.16

3 89.76

100.0%

ml

52

 

1.3.3.1.2.3.5.4 1.3.3.1.2.3.5.4.1 1.3.3.1.2.3.5.4.2 1.3.3.1.2.3.5.4.3 1.3.3.1.2.3.5.4.4 1.3.3.1.2.3.5.4.5 1.3.3.1.2.3.5.4.6 1.3.3.1.2.3.5.4.7 1.3.3.1.2.3.5.4.8 1.3.3.1.2.3.5.4.9 1.3.3.1.2.3.5.5 1.3.3.1.2.3.5.5.1 1.3.3.1.2.3.5.5.2 1.3.3.1.2.3.5.5.3 1.3.3.1.3 1.3.3.1.3. 2 1.3.3.1.3. 2.1 1.3.3.1.3.2.1.1 1.3.3.1.3.2.1.2 1.3.3.1.3. 2.2 1.3.3.1.3.2.2.1 1.3.3.1.3.2.2.2 1.3.3.1.3.2.2.3 1.3.3.1.3.2.2.4 1.3.3.1.3.2.2.5 1.3.3.1.3.2.3 1.3.3.1.3.2.3.1 1.3.3.1.3. 2.3.2 1.3.3.1.3. 2.3.3 1.3.3.1.3.2.3.4 1.3.3.1.3. 2.3.5 1.3.3.1.3.2.3.6 1.3.3.1.3.3 1.3.3.1.3. 3.1 1.3.3.1.3.3.1.1 1.3.3.1.3. 3.2 1.3.3.1.3.3.2.1 1.3.3.1.3.3.2.2 1.3.3.1.3.3.2.3 1.3.3.1.3. 3.3 1.3.3.1.3.3.3.1 1.3.3.1.3.3.3.2 1.3.3.1.3.3.3.3 1.3.3.1.3.3.3.4 1.3.3.1.3.3.3.5

CONSTRUCCION DE BUZONES Y EMPALMES BUZON TIPO I, C/MARCO Y TAPA DE CONCRETO Di=1.20m x h=1.20MPP BUZON TIPO I, C/MARCO Y TAPA DE CONCRETO Di=1.20m x h=1.50MPP BUZON TIPO I, C/MARCO Y TAPA DE CONCRETO Di=1.20m x h=2.00MPP BUZON TIPO I, C/MARCO Y TAPA DE CONCRETO Di=1.20m x h=2.50MPP BUZON TIPO I, C/MARCO Y TAPA DE CONCRETO Di=1.20m x h=3.00MPP BUZON TIPO II DE CONCRETO ARMADO, C/MARCO Y TAPA, Di=1.50m x H=3.50MPP BUZON TIPO II DE CONCRETO ARMADO, C/MARCO Y TAPA, Di=1.50m x H=4.00MPP BUZON TIPO II DE CONCRETO ARMADO, C/MARCO Y TAPA, Di=1.50m x H=4.50MPP EMPALME A BUZON DE TUB. PVC CON DADO DE CONCRETO SIMPLE PRUEBAS DE CONTROL DE CALIDAD PRUEBA COMPACTACION SUELOS (PROMOTOR MODIFICADO) PRUEBA COMPACTACION SUELOS (DENSIDAD DE CAMPO) PRUEBA DE CALIDAD DE CONCRETO PISTAS Y VEREDAS PISTAS Y ESTACIONAMIENTO OBRAS PROVISIONALES TRAZO, NIVELES Y REPLANTEO INICIAL DE OBRA TRAZO REPLANTEO Y CONTRO TOPOGRAFICO DE EJES Y NIVELES DE PISTAS DURANTE LA EJECUCION DE LA OBRA MOVIMIENTO DE TIERRAS CORTE HASTA NIVEL DE SUBRASANTE EXTRACCION Y APILAMIENTO DE MATERIAL DE PRESTAMO CARGUIO Y TRANSPORTE DE MATERIAL PROPIO RELLENO Y COMPACTACION CON MATERIAL PROPIO ELIMINACION DE MATERIAL PROPIO EXCEDENTE EN TERRENO ANEXO PAVIMENTOS CONFORMACION Y COMPACTACION DE SUBRASANTE PARA PISTAS SUB-BASE DE 20 CMS BASE DE 15 CMS BARRIDO Y LIMPIEZA P/CARPETA ASFALTICA IMPRIMACION ASFALTICA CARPETA ASFALTICA EN CALIENTE DE 2" VEREDAS OBRAS PROVISIONALES TRAZO, REPLANTEO Y CONTROL TOPOGRAFICO DE EJES Y NIVELES DE VEREDAS MOVIMIENTO DE TIERRAS PERFILADO, NIVELACION Y COMPACTACION DE SUBRASANTE VEREDAS COLOCACION DE AFIRMADO/BASE GRANULAR PARA VEREDAS EXCAVACION MANUAL PARA SARDINELES DE VEREDAS VEREDAS Y SARDINELES ENCOFRADO Y DESENCOFRADO DE VEREDAS CONCRETO PARA SARDINELES DE VEREDAS h=35 cm F'C=175 kg/cm2 CONCRETO PARA VEREDAS DE H=10CM F'C=175 KG/CM2 JUNTA DE DILATACION ASFALTICA PARA VEREDAS; e=1/2 CURADO QUIMICO PARA VEREDAS

und und

9.0

2,485.81

22,372.29

-

-

0%

-

-

0.0%

-

-

0.0%

9.00

22,372.29

und

2.0

2,765.76

5,531.52

-

-

0%

-

-

0.0%

-

-

0.0%

2.00

5,531.52

100.0% 100.0%

und

2.0

3,416.55

6,833.10

-

-

0%

-

-

0.0%

-

-

0.0%

2.00

6,833.10

100.0%

und

1.0

3,545.76

3,545.76

-

-

0%

-

-

0.0%

-

-

0.0%

1.00

3,545.76

100.0%

und

2.0

4,151.22

8,302.44

-

-

0%

-

-

0.0%

-

-

0.0%

2.00

8,302.44

100.0%

und

1.0

4,906.23

4,906.23

-

-

0%

-

-

0.0%

-

-

0.0%

1.00

4,906.23

100.0%

und

1.0

5,745.11

5,745.11

-

-

0%

-

-

0.0%

-

-

0.0%

1.00

5,745.11

100.0%

und

43.0

159.24

6,847.32

-

-

0%

-

-

0.0%

-

-

0.0%

43.00

6,847.32

100.0%

100.0%

und

1.0

70

70.00

-

-

0%

-

-

0.0%

-

-

0.0%

1.00

70.00

und

10.0

60

600.00

-

-

0%

-

-

0.0%

-

-

0.0%

10.00

600.00

100.0%

glb

1.0

895

895.00

-

-

0%

-

-

0.0%

-

-

0.0%

1.00

895.00

100.0%

m2

17,729.3

0.73

12,942.39

-

-

0%

-

-

0.0%

-

-

0 .0%

17,729.30

12,942.39

100.0%

m2

17,729.3

1.81

32,090.03

-

-

0%

-

-

0.0%

-

-

0 .0%

17,729.30

32,090.03

100.0%

m3

15,001.4

8.01

120,161.29

-

-

0%

-

-

0.0%

-

-

0.0%

15,001.41

120,161.29

100.0%

m3

18,791.6

4.56

85,689.56

-

-

0%

-

-

0.0%

-

-

0 .0%

18,791.57

85,689.56

100.0%

m3

18,791.6

4.25

79,864.17

-

-

0%

-

-

0.0%

-

-

0 .0%

18,791.57

79,864.17

100.0%

m3

18,791.6

19.36

363,804.80

-

-

0%

-

-

0.0%

-

-

0.0%

18,791.57

363,804.80

100.0%

m3

6.36

m2

17,729.3

2.03

35,990.48

-

-

0%

-

-

0.0%

-

-

0 .0%

17,729.30

35,990.48

100.0%

m2 m2

17,729.3 17,729.3

16.85 18.65

298,738.71 330,651.45

-

-

0% 0%

-

-

0.0% 0.0%

-

-

0.0% 0 .0%

17,729.30 17,729.30

298,738.71 330,651.45

100.0% 100.0%

m2

17,729.3

0.45

7,978.19

-

-

0%

-

-

0.0%

-

-

0. 0%

17,729.30

7,978.19

100.0%

m2

17,729.3

4.29

76,058.70

-

-

0%

-

-

0.0%

-

-

0.0%

17,729.30

76,058.70

100.0%

m2

17,729.3

35.71

633,113.30

-

-

0%

-

-

0.0%

-

-

0.0%

17,729.30

633,113.30

100.0%

m2

6,031.9

2.15

12,968.50

-

-

0%

-

-

0.0%

-

-

0. 0%

6,031.86

12,968.50

100.0%

m2

6,031.9

6.83

41,197.60

-

-

0%

-

-

0.0%

-

-

0. 0%

6,031.86

41,197.60

100.0%

m2

6,031.9

14.8

89,271.53

-

-

0%

-

-

0.0%

-

-

0. 0%

6,031.86

89,271.53

100.0%

m

4,348.2

4.03

17,523.13

-

-

0%

-

-

0. 0%

-

-

0.0%

4,348.17

17,523.13

100.0%

m2

802.9

41.58

33,385.58

-

-

0%

-

-

0.0 %

-

-

0.0%

802.92

33,385.58

100.0% 100.0%

m

4,348.2

17.7

76,962.61

-

-

0%

-

-

0. 0%

-

-

0.0%

4,348.17

76,962.61

m2

6,031.9

48.2

290,735.65

-

-

0%

-

-

0.0%

-

-

0 .0%

6,031.86

290,735.65

100.0%

ml

1,257.0

4.87

6,121.59

-

-

0%

-

-

0.0 %

-

-

0.0%

1,257.00

6,121.59

100.0%

m2

6,031.9

1.67

10,073.21

-

-

0%

-

-

0.0%

-

-

0. 0%

6,031.86

10,073.21

100.0%

53

 

1.3.3.1.3.4 1.3.3.1.3. 4.1 1.3.3.1.3.4.1.1 1.3.3.1.3.4.1.2 1.3.3.1.3.4.1.3 1.3.3.1.3.4.2 1.3.3.1.3.4.2.1 1.3.3.1.3.4.2.2 1.3.3.1.3.4.2.3 1.3.3.1.3.4.2.4 1.3.3.1.3. 5 1.3.3.1.3. 5.1 1.3.3.1.3.5.1.1 1.3.3.1.3.5.1.2 1.3.3.1.3.5.1.3 1.3.3.1.3. 5.2 1.3.3.1.3.5.2.1 1.3.3.1.3.5.2.2 1.3.3.1.3.5.2.3 1.3.3.1.3.5.2.4 1.3.3.1.3. 5.2.5 1.3.3.1.3.6 1.3.3.1.3.6.1 1.3.3.1.3.6.1.1 1.3.3.1.3.6.1.2 1.3.3.1.3.6.1.3 1.3.3.1.3.6.1.4 1.3.3.1.3.6.1.5 1.3.3.1.3. 7 1.3.3.1.3. 7.1 1.3.3.1.3. 7.1.1 1.3.3.1.3. 8 1.3.3.1.3. 8.1 1.3.3.1.3.8.1.1 1.3.3.1.3.8.1.2 1.3.3.1.3.8.1.3 1.3.3.1.3. 9 1.3.3.1.3. 9.1 1.3.3.1.3.9.1.1 1.3.3.1.3.9.1.2 1.3.3.1.3.9.1.3 1.3.3.1.3.9.1.4 1.3.3.1.3.9.1.5 1.3.3.1.4 1.3.3.1.4. 1 1.3.3.1.4. 2 1.3.3.2 1.3.3.2.1 1.3.3.2.1.1 1.3.3.2.1.2

PAVIMENTO RGIDO: PASAJE PEATONAL MOVIMIENTO DE TIERRAS PERFILADO, NIVELACION Y COMPACTACION DE SUBRASANTE COLOCACION DE AFIRMADO/BASE GRANULAR EXCAVACION MANUAL PARA SADINELES SUMERGIDOS CONCRETO EN PASAJES PEATONALES CONCRETO SARDINEL SUMERGID; H=0.25cm;PARA F'C=210 kg/cm2 PAVIMENTO RIGIDO DE CONCRETO EN PASAJE PEATONAL; H=12.5cm; F'C=210 KG/CM2 JUNTA DE DILATACION ASFALTICA EN PAVIMIENTO RIGIDO; e=1/2 CURADO QUIMICO PARA PAVIMENTO RIGIDO RAMPAS PEATONALES MOVIMIENTO DE TIERRAS PERFILADO, NIVELACION Y COMPACTACION DE SUBRASANTE COLOCACION DE AFIRMADO/BASE GRANULAR EXCAVACION MANUAL PARA SARDINELES SUMERGIDOS CONCRETO EN RAMPAS ENCOFRADO Y DESENCOFRADO DE RAMPAS CONCRETO PARA SARDINELES DE RAMPAS h=20cm F'C=175kg/cm2 CONCRETO PARA RAMPAS DE H=10CM F'C=175 KG/CM2 CURADO QUIMICO PARA RAMPAS BRUÑADO DE RAMPAS SEÑALIZACIÓN SEÑALIZACION PINTADO EN BLANCO DE LETRAS, CRUCES PEATONALES Y SIMBOLOS EN PAVIMENTO PINTADO DE AMARILLO EN PSJE. PEATONAL PINTADO DE AMARILLO EN SARDINELES, MARTILLOS, RAMPAS Y ESTACIONAMIENTO PINTADO DE BLANCO DE LINEAS DISCONTINUAS Y CONTINUAS EN PAVIMENTO SEÑALIZACION VERTICAL (PREVENTIVA Y REGLAMENTARIA) LIMPIEZA DE OBRA LIMPIEZA DE OBRA LIMPIEZA FINAL DE OBRA PRUEBAS DE CALIDAD PRUEBAS DE CALIDAD PRUEBAS DE CALIDAD DE SUBRASANTE PRUEBAS DE CALIDAD LA SUB BASE YDE BASE PRUEBAS DE CALIDAD DEL CONCRETO SARDINEL CENTRAL SARDINEL CENTRAL EXCAVACION MANUAL PARA SARDINEL CENTRAL ENCOFRADO Y DESENCOFRADO DE SARDINEL CENTRAL CONCRETO PARA SARDINELES CENTRALES DE CALLE F'C=210 kg/cm2 JUNTA DE DILATACION ASFALTICA PARA SARDINEL CENTRAL; e=1/2 CURADO QUIMICO DE SARDINEL CENTRAL RED ELÉCTRICA RED PRIMARIA RED SECUNDARIA VIVIENDAS MOV. TIERRAS CASA Corte de Terreno con maquinaria h=0.35 (0.15 Platea + 0.20 Afirmado) Inc. Eliminación Excavación de Zanjas cimentación manual (Uñas de Platea) Inc Eliminación

m2

1,655.9

6.83

11,309.46

-

-

0%

-

-

0.0%

-

-

0. 0%

1,655.85

11,309.46

100.0%

m2

1,655.9

19.35

32,040.70

-

-

0%

-

-

0.0%

-

-

0 .0%

1,655.85

32,040.70

100.0%

m

1,025.4

4.03

4,132.48

-

-

0%

-

-

0.0 %

-

-

0.0%

1,025.43

4,132.48

100.0%

m

1,025.4

19.96

20,467.58

-

-

0%

-

-

0.0%

-

-

0. 0%

1,025.43

20,467.58

100.0%

m2

1,655.9

61.18

101,304.90

-

-

0%

-

-

0.0%

-

-

0.0%

1,655.85

101,304.90

100.0%

m

378.0

4.87

1,840.86

-

-

0%

-

-

0.0%

-

-

0.0%

378.00

1,840.86

100.0%

m2

1,655.9

1.67

2,765.27

-

-

0%

-

-

0.0 %

-

-

0.0%

1,655.85

2,765.27

100.0%

m2

222.4

6.83

1,518.92

-

-

0%

-

-

0.0%

-

-

0.0%

222.39

1,518.92

100.0%

m2

222.4

14.8

3,291.37

-

-

0%

-

-

0.0%

-

-

0.0%

222.39

3,291.37

100.0%

m

168.8

4.03

680.43

-

-

0%

-

-

0.0%

-

-

0.0%

168.84

6 80.43

100.0%

m2

50.9

46.43

2,364.03

-

-

0%

-

-

0.0%

-

-

0.0%

50.92

2,3 64.03

100.0%

m

168.8

15.99

2,699.75

-

-

0%

-

-

0.0%

-

-

0.0%

168.84

2,699.75

100.0%

m2

222.4

48.2

10,719.20

-

-

0%

-

-

0.0%

-

-

0.0%

222.39

10,719.20

100.0%

m2

222.4

1.67

371.39

-

-

0%

-

-

0.0%

-

-

0.0%

222.39

3 71.39

100.0%

m2

222.4

13.73

3,053.41

-

-

0%

-

-

0.0%

-

-

0.0%

222.39

3,053.41

100.0%

m2

1,046.4

23.01

24,077.43

-

-

0%

-

-

0.0%

-

-

0 .0%

1,046.39

24,077.43

100.0%

m2

258.3

21.08

5,444.96

-

-

0%

-

-

0.0%

-

-

0.0%

258.30

5,444.96

100.0%

m

1,512.7

9.52

14,401.09

-

-

0%

-

-

0. 0%

-

-

0.0%

1,512.72

14,401.09

100.0%

m

1,301.3

7.99

10,396.99

-

-

0%

-

-

0. 0%

-

-

0.0%

1,301.25

10,396.99

100.0%

und

11.0

580.95

6,390.45

-

-

0%

-

-

0.0%

-

-

0.0%

11.00

6,390.45

100.0%

Ha

7.0

3024

21,016.80

-

-

0%

-

-

0.0 %

-

-

0.0%

6.95

21,016.80

100.0%

glb

1.0

2680

2,680.00

-

-

0%

-

-

0.0%

-

-

0.0%

1.00

2,680.00

100.0%

glb

1.0

15480

15,480.00

-

-

0%

-

-

0.0%

-

-

0.0%

1.00

15,4 80.00

100.0%

glb

1.0

1850

1,850.00

-

-

0%

-

-

0.0%

-

-

0.0%

1.00

1,850.00

100.0%

m

330.2

3.02

997.11

-

-

0%

-

-

0.0%

-

-

0.0%

330.17

9 97.11

100.0%

m2

660.3

41.58

27,456.94

-

-

0%

-

-

0.0 %

-

-

0.0%

660.34

27,456.94

100.0%

m

330.2

25.77

8,508.48

-

-

0%

-

-

0.0%

-

-

0.0%

330.17

8,508.48

100.0%

m

49.5

4.87

241.19

-

-

0%

-

-

0.0%

-

-

0.0%

49.53

241.19

100.0%

m

330.2

1.26

416.01

-

-

0%

-

-

0.0%

-

-

0.0%

330.17

4 16.01

100.0%

glb glb

1.0 1.0

185,254.49 649,762.97

185,254.49 649,762.97

-

-

0% 0%

-

-

0.0% 0.0%

-

-

0.0% 0.0%

1.00 1.00

185,254.49 649,762.97

100.0% 100.0%

m3

6,270.0

17.94

112,483.80

-

-

0%

-

-

0.0%

-

-

0.0%

6,270.00

112,483.80

100.0%

m3

407.0

46.80

19,047.60

-

-

0%

-

-

0.0 %

-

-

0.0%

407.00

19,047.60

100.0%

54

 

1.3.3.2.1.3 1.3.3.2.1.4 1.3.3.2.1. 5 1.3.3.2.2 1.3.3.2.2.1 1.3.3.2.2.1.1 1.3.3.2.2. 1.2 1.3.3.2.2.1.3 1.3.3.2.2. 1.4 1.3.3.2.2.2 1.3.3.2.2.2.1 1.3.3.2.2.2.2 1.3.3.2.2.2.3 1.3.3.2.2. 3 1.3.3.2.2.3.1 1.3.3.2.2.3.2 1.3.3.2.2.3.3 1.3.3.2.2.3.4 1.3.3.2.3 1.3.3.2.3. 1 1.3.3.2.3.2 1.3.3.2.3. 3 1.3.3.2.3.4 1.3.3.2.3.5 1.3.3.2.3.6 1.3.3.2.3. 7 1.3.3.2.3. 8 1.3.3.2.3.9 1.3.3.2.3.10 1.3.3.2.3. 11 1.3.3.2.3.12 1.3.3.2.4 1.3.3.2.4. 1 1.3.3.2.4. 2 1.3.3.2.4. 3 1.3.3.2.4.4 1.3.3.2.4. 5 1.3.3.2.4. 6 1.3.3.2.4. 7 1.3.3.2.4.8 1.3.3.2.4.9 1.3.3.2.4.10 1.3.3.2.4. 11 1.3.3.2.4. 12 1.3.3.2.4. 13 1.3.3.2.4.14 1.3.3.2.4. 15 1.3.3.2.5 1.3.3.2.5.1 1.3.3.2.5.1.1 1.3.3.2.5.1.2 1.3.3.2.5.2 1.3.3.2.5.2.1 1.3.3.2.5. 2.2 1.3.3.2.5. 2.3 1.3.3.2.5.3 1.3.3.2.5.3.1 1.3.3.2.5.3.2 1.3.3.2.5.3.3 1.3.3.2.5.3.4 1.3.3.2.5.4 1.3.3.2.5.4.1 1.3.3.2.5.4.2 1.3.3.2.5.4.3 1.3.3.2.5.4.4 1.3.3.2.5.4.5

Relleno con material de préstamo (Afirmado e= 0.20m) Proctor 95% Nivelación y compactación de Terreno Acarreo de Material excedente ESTRUCTURAS PLATEA Concreto premezclado fc=175kg/cm2 Encofrado y desencofrad o Acero de refuerzo de fy =4200kg/cm2 Acabado de Losa Platea MUROS Concreto premezclado fc=175kg/cm2 Encofrado y desencofrado Acero de refuerzo de fy =4200kg/cm2 LOSA TECHO Concreto premezclado fc=175kg/cm2 Encofrado y desencofrado Acero de refuerzo de fy =4200kg/cm2 Junta de dilatación tecnopor 1 INSTALACIONES ELÉCTRICAS Salida p/centro de luz Salida p/braquetes Tomacorrie nte bipolar Interruptor de 01 golpe Salida p/timbre Salida p/pulsador de timbre Alimentad or de TD a Caja Medidor Tubo PVC SAP 25mm Electrico Distribucion TuboTablero PVC SAP 25mm de acometida para futura conexión pozo de tierra. Prueba electrica Conexión a banco de medidores INSTALACION ES SANITARIAS Excavacion y relleno de zanja Tuberia PVC SAL 4 Tuberia PVC SAL 2 Caja registro 12x24 Salida de desague 2 Salida de desague 4 Salida de ventilacio n 2 Sumidero de bronce 2 Registro de bronce 4 Sombrero de ventilacion 2 Salida de agua fria 1/2 Tuberia PVC C10 Agua Fria 1/2 Tuberia PVC C10 Agua Fria 3/4 Valvula compuerta 1/2 Valvula compuerta 3/4 ACABADOS LAVANDERA Concreto premezclado fc=175kg/cm2 Encofrado BAÑO Concreto simple 1:6 en sardinel ducha 0.10x0.20 Piso Cerámico 30x30 Ducha Zócalo cerámico 30x30 Ducha CARPINTERA DE MADERA P1 - Puerta Principal de HDF contraplacada - 0.90x2.60 - Sin Pintura P2 - Puerta Dormitorio y Lavandería de HDF contraplacada - 0.80x2.60 - Sin Pintura P3 - Puerta Baño de HDF contraplacada - 0.70x2.6 - Sin Pintura Instalación de Puertas CARPINTERA DE ALUMINIO V1 - Ventana de Aluminio Sala 0.85x1.4 V2 - Ventana de Aluminio Dormitorios - 1.0x1.4 V3 - Ventana de Aluminio Baño 0.30x0.50 V4 - Ventana de Aluminio Patio 0.95x1.4 Instalación Ventanas

m3

2,684.0

86.88

233,185.92

-

-

0%

-

-

0.0%

-

-

0.0%

2,684.00

233,185.92

100.0%

m2 m3

14,839.0 6,677.0

2.64 5.40

39,174.96 36,055.80

-

-

0% 0%

-

-

0.0% 0.0%

-

-

0.0% 0.0%

14,839.00 6,677.00

39,174.96 36,055.80

100.0% 100.0%

m3

2,503.6

311.32

779,413.66

-

-

0%

-

-

0.0%

-

-

0.0%

2,503.57

779,413.66

100.0%

m2

5,513.4

14.95

82,409.59

-

-

0%

-

-

0.0%

-

-

0.0%

5,513.38

82,409.59

100.0%

kg

140,216.2

4.10

575,447.16

-

-

0%

-

-

0.0%

-

-

0.0%

##########

575,447.16

100.0%

m2

13,750.0

6.77

93,109.50

-

-

0%

-

-

0.0%

-

-

0.0%

13,750.00

93,109.50

100.0% 100.0%

m3

3,014.4

333.63

1,005,701. 38

-

-

0%

-

-

0.0%

-

-

0.0%

3,014.43

1,005,701.38

m2

60,288.6

9.55

575,905.75

-

-

0%

-

-

0.0%

-

-

0.0%

60,288.64

575,905.75

100.0%

kg

122,338.1

4.10

502,075.60

-

-

0%

-

-

0.0%

-

-

0.0%

##########

502,075.60

100.0%

m3

1,375.0

333.63

458,739.60

-

-

0%

-

-

0.0%

-

-

0.0%

1,375.00

458,739.60

100.0%

m2

13,750.0

10.24

140,794.10

-

-

0%

-

-

0.0%

-

-

0.0%

13,750.00

140,794.10

100.0% 100.0%

kg

56,021.1

4.10

229,910.40

-

-

0%

-

-

0.0%

-

-

0.0%

56,021.05

229,910.40

m2

2,051.5

5.19

10,657.13

-

-

0%

-

-

0.0%

-

-

0.0%

2,051.50

10,657.13

100.0%

pto pto pto pto pto pto ml ml

2,750.0 550.0 3,850.0 2,750.0 550.0 550.0 4,400.0 3,850.0

57.20 57.20 57.20 57.20 27.50 27.50 9.35 11.55

157,300.00 31,460.00 220,220.00 157,300.00 15,125.00 15,125.00 41,140.0 0 44,467.50

-

-

0% 0% 0% 0% 0% 0% 0% 0%

-

-

0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0. 0%

-

-

0 .0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%

2,750.00 550.00 3,850.00 2,750.00 550.00 550.00 4,400.00 3,850.00

157,300.00 31,460.00 220,220.00 157,300.00 15,125.00 15,125.00 41,140. 00 44,467.50

100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%

und ml

550.0 3,300.0

154.00 11.55

84,700.00 38,115.00

-

-

0% 0%

-

-

0.0% 0.0%

-

-

0.0% 0. 0%

550.00 3,300.00

84,700.00 38,115.00

100.0% 100.0%

glb glb

550.0 550.0

27.50 27.50

15,125.00 15,125.00

-

-

0% 0%

-

-

0.0% 0.0%

-

-

0.0% 0.0%

550.00 550.00

15,125.00 15,125.00

100.0% 100.0%

ml ml ml und pto pto pto und und und pto ml ml und und

3,850.0 2,750.0 1,100.0 550.0 1,650.0 550.0 2,200.0 1,100.0 550.0 2,200.0 2,750.0 1,650.0 2,530.0 550.0 1,100.0

19.80 26.95 16.83 275.00 61.60 85.80 44.00 23.10 35.20 8.25 61.60 15.95 18.37 64.35 70.95

76,230.00 74,112.50 18,513.00 151,250.00 101,640.00 47,190.00 96,800.00 25,410.00 19,360.00 18,150.00 169,400.00 26,317.50 46,476.10 35,392.50 78,045.00

-

-

0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

-

-

0.0% 0.0 % 0.0 % 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%

-

-

0.0% 0.0% 0.0% 0.0% 0. 0% 0.0% 0. 0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%

3,850.00 2,750.00 1,100.00 550.00 1,650.00 550.00 2,200.00 1,100.00 550.00 2,200.00 2,750.00 1,650.00 2,530.00 550.00 1,100.00

76,230.00 74,112.50 18,513.00 151,250.00 101,640.00 47,190.00 96,800.00 25,410.00 19,360.00 18,150.00 169,400.00 26,317.5 0 46,476.1 0 35,392.50 78,045.00

100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%

m3

91.6

288.26

26,413.27

-

-

0%

-

-

0.0%

-

-

0.0%

91.63

26,413.27

100.0%

m2

147.4

13.84

2,040.02

-

-

0%

-

-

0.0%

-

-

0.0%

147.40

2,040.02

100.0%

und

550.0

21.06

11,583.00

-

-

0%

-

-

0.0%

-

-

0.0%

550.00

11,583.00

100.0%

m2 m2

396.0 3,014.0

44.98 44.98

17,812.73 135,574.65

-

-

0% 0%

-

-

0.0% 0.0%

-

-

0.0% 0.0%

396.00 3,014.00

17,812.73 135,574.65

100.0% 100.0%

und

550.0

165.96

91,278.00

-

-

0%

-

-

0.0%

-

-

0.0%

550.00

91,278.00

100.0%

und

1,650.0

140.52

231,858.00

-

-

0%

-

-

0.0%

-

-

0.0%

1,650.00

231,858.00

100.0%

und

550.0

129.85

71,417.50

-

-

0%

-

-

0.0%

-

-

0.0%

550.00

71,417.50

100.0%

und

2,750.0

53.94

148,335.00

-

-

0%

-

-

0.0%

-

-

0.0%

2,750.00

148,335.00

100.0%

und

550.0

186.66

102,662.56

-

-

0%

-

-

0.0%

-

-

0.0%

550.00

102,662.56

100.0%

und

1,100.0

239.12

263,032.00

-

-

0%

-

-

0.0%

-

-

0.0%

1,100.00

263,032.00

100.0%

und

550.0

67.84

37,311.12

-

-

0%

-

-

0.0%

-

-

0.0%

550.00

37,311.12

100.0%

und

550.0

229.45

126,199.92

-

-

0%

-

-

0.0%

-

-

0.0%

550.00

126,199.92

100.0%

und

2,750.0

69.04

189,851.20

-

-

0%

-

-

0.0%

-

-

0.0%

2,750.00

189,851.20

100.0%

55

 

1.3.3.2.5.5 1.3.3.2.5.5.1 1.3.3.2.5.5.2 1.3.3.2.5.5.3 1.3.3.2.5.5.4 1.3.3.2.5.6 1.3.3.2.5.6.1 1.3.3.2.5.6.2 1.3.3.2.5.6.3 1.3.3.2.5.6.4 1.3.3.2.5.6.5 1.3.3.2.5.6.6 1.3.3.2.5.6.7 1.3.3.2.5.6.8 1.3.3.2.5.6.9 1.3.3.2.5.6.10 1.3.3.2.5.6.11 1.3.3.2.5.6.12 1.3.3.2.5.7 1.3.3.2.5.7.1 1.3.3.2.6 1.3.3.2.6.1 1.3.3.2.6.1.1 1.3.3.2.6.1.2 1.3.3.2.6.2 1.3.3.2.6. 2.1 1.3.3.3 1.3.4 1.3.4.1 1.3.4.1.1 1.3.4.1.1. 1 1.3.4.1.1. 2 1.3.4.1.1. 3 1.3.4.1.1. 4 1.3.4.1.1. 6 1.3.4.1.2 1.3.4.1.2. 2 1.3.4.1.2. 2.1 1.3.4.1.2. 2.1.1 1.3.4.1.2.2.1.1.1 1.3.4.1.2.2.1.1.2 1.3.4.1.2.2.1.1.3 1.3.4.1.2. 2.1.2 1.3.4.1.2.2.1.2.1 1.3.4.1.2.2.1.2.2 1.3.4.1.2.2.1.2.3 1.3.4.1.2.2.1.2.4 1.3.4.1.2.2.1.2.5 1.3.4.1.2.2.1.2.6 1.3.4.1.2.2.1.2.7 1.3.4.1.2.2.1.2.8 1.3.4.1.2.2.1.2.9 1.3.4.1.2.2.1.3 1.3.4.1.2.2.1.3.1

CERRAJERA Cerradura Fixer Puerta Principal llave exterior/boton interior acero inoxidable Cerradura Fixer Baño Ranura ext./botoninterior Cerradura Fixer Puerta Jardin llave exterior/botoninterior acero inoxidable Cerradura Fixer Dormitorio Ranura ext./botoninterior APARATOS Y ACCESORIOS SANITARIOS

und

550.0

17.91

9,849.40

-

-

0%

-

-

0.0%

-

-

0.0%

550.00

9,849.40

100.0%

und

550.0

17.91

9,849.40

-

-

0%

-

-

0.0%

-

-

0.0%

550.00

9,849.40

100.0%

und

550.0

17.91

9,849.40

-

-

0%

-

-

0.0%

-

-

0.0%

550.00

9,849.40

100.0%

und

1,100.0

17.91

19,698.80

-

-

0%

-

-

0.0%

-

-

0 .0%

1,100.00

19,698.80

100.0%

Inodoro Rapid Jet Blanco Lavatorio Fontana de Baño Lavadero de Cocina Luxor 1 Poza sin Escurridero 50cm Lavarropa de Granito Jorss 1 Poza 80cm Griferia p/ducha Trebol ECO Griferia p/lavatorio de baño Trebol ECO Griferia p/lavadero cocina a Pared Trebol ECO Llave para Lavadero de Ropa Hubolt 1/2 Instalacion de Inodoro Instalacion de Lavatorio y Lavarropa Instalacion de Lavadero Cocina Instalacion Llave y Pico de Ducha COBERTURA Cobertura Techo de Fibraforte incluida parrilla de madera PINTURA INTERIOR Limpeza e imprimado de Muro Limpeza e imprimado de Techo EXTERIOR Pintura Latex en Muros Exteriores URBANISMO ETAPA 4 HABILITACI ÓN URBANA MOVIMIENTO DE TIERRAS LIMPIEZA Y DESBROCE CORTE RELLENO ELIMINACIÓN DE MATERIAL PLATAFORMADO DE CASAS AGUA POTABLE Y ALCANTARILL ADO AGUA POTABLE RED DE DISTRIBUCIÓN TRABAJOS PRELIMINARES RIEGO DE LA ZONA DE TRABAJO PARA MITIGAR LA CONTAMINACION POR POLVO TRAZO Y REPLANTEO INICIAL DE LA LINEA TRAZO Y REPLANTEO DURANTE LA INSTALACION DE TUBERIAS MOVIMIENTO DE TIERRAS

und und

550.0 550.0

187.38 70.63

103,056.25 38,843.75

-

-

0% 0%

-

-

0.0% 0.0%

-

-

0.0% 0.0%

550.00 550.00

103,056.25 38,843.75

100.0% 100.0%

und

550.0

60.63

33,343.75

-

-

0%

-

-

0.0%

-

-

0.0%

550.00

33,343.75

100.0%

und

550.0

104.75

57,612.50

-

-

0%

-

-

0.0%

-

-

0.0%

550.00

57,612.50

100.0%

und

550.0

68.50

37,675.00

-

-

0%

-

-

0.0%

-

-

0.0%

550.00

37,675.00

100.0%

und

550.0

50.75

27,912.50

-

-

0%

-

-

0.0%

-

-

0.0%

550.00

27,912.50

100.0%

und

550.0

58.50

32,175.00

-

-

0%

-

-

0.0%

-

-

0.0%

550.00

32,175.00

100.0%

EXC. S/INTERF. SUELTO P/TUB. DN=110-160mm HastaTERRENO H=1.20m. EXC. S/INTERF. TERRENO SUELTO P/TUB. DN=200-250mm Hasta H=1.20m. REFINES Y NIVELACION FONDO DE ZANJA P/TUB DN 110-160MM EN TERRENO NORMAL REFINES Y NIVELACION FONDO DE ZANJA P/TUB DN 200-250MM EN TERRENO NORMAL CAMA DE ARENA MANUAL E=0.1M ZANJA P/TUB DN 110-160; MATERIAL PROPIO ZARANDEADO CAMA DE ARENA MANUAL E=0.1M ZANJA P/TUB DN 200-250; MATERIAL PROPIO ZARANDEADO RELL. D/ZANJ. D/MAT. PROPIO COMP. C/EQ P/TUB 110-160mm,H=1.20m RELL. D/ZANJ. D/MAT. PROPIO COMP. C/EQ P/TUB 200-250mm,H=1.20m ELIMINACION MATERIAL EXCEDENTE C/EQUIPO HASTA 1KM INSTALACION DE TUBERIAS DE AGUA POTABLE (INC.SUMINISTRO) SUMI. E INST. TUBERIA PVC UF, PN7. 5, P/AGUA POTABLE DN 110 mm. NTP 16422

und

550.0

29.38

16,156.25

-

-

0%

-

-

0.0%

-

-

0.0%

550.00

16,156.25

100.0%

und und und und

550.0 1,100.0 550.0 550.0

31.25 31.25 31.25 31.25

17,187.50 34,375.00 17,187.50 17,187.50

-

-

0% 0% 0% 0%

-

-

0.0% 0.0% 0.0% 0.0%

-

-

0.0% 0.0% 0.0% 0.0%

550.00 1,100.00 550.00 550.00

17,187.50 34,375.00 17,187.50 17,187.50

100.0% 100.0% 100.0% 100.0%

m2

13,887.5

25.41

352,881.38

-

-

0%

-

-

0.0%

-

-

0.0%

13,887.50

352,881.38

100.0%

m2 m2

53,966.0 12,589.5

9.91 9.91

534,910.99 124,787.12

-

-

0% 0%

-

-

0.0% 0.0%

-

-

0.0% 0.0%

53,966.00 12,589.50

534,910.99 124,787.12

100.0% 100.0%

m2 glb

8,937.5 1.0

12.15 250,000.00

108,608.50 250,000.00

-

-

0% 0%

-

-

0.0% 0.0%

-

-

0.0% 0.0%

8,937.50 1.00

108,608.50 250,000.00

100.0% 100.0%

m2 m3 m3 m2 m2

62,500.0 26,192.3 26,669.6 62,500.0 12,900.0

0.35 3.69 6.09 0.08 30.46

21,875.00 96,649.40 162,418.02 5,000.00 392,896.66

-

-

0% 0% 0% 0% 0%

-

-

0.0% 0.0% 0.0% 0.0% 0.0%

-

-

0.0% 0.0% 0.0% 0.0% 0 .0%

62,500.00 26,192.25 26,669.63 62,500.00 12,900.00

21,875.00 96,649.40 162,418.02 5,000.00 392,896.66

100.0% 100.0% 100.0% 100.0% 100.0%

ml

2,390.5

2.84

6,788.93

-

-

0%

-

-

0.0 %

-

-

0.0%

2,390.47

6,788.93

100.0%

ml

2,390.5

1.18

2,820.75

-

-

0%

-

-

0.0 %

-

-

0.0%

2,390.47

2,820.75

100.0%

ml

2,390.5

1.86

4,446.27

-

-

0%

-

-

0.0 %

-

-

0.0%

2,390.47

4,446.27

100.0%

ml

2,390.5

11.26

26,916.69

-

-

0%

-

-

0.0%

-

-

0. 0%

2,390.47

26,916.69

100.0%

2,390.5

1.33

3,179.33

-

-

0%

-

-

0.0 %

-

-

0.0%

2,390.47

3,179.33

100.0%

2,390.5

3.71

8,868.64

-

-

0%

-

-

0.0 %

-

-

0.0%

2,390.47

8,868.64

100.0%

2,390.5

14.69

35,116.00

-

-

0%

-

-

0.0%

-

-

0. 0%

2,390.47

35,116.00

100.0%

m3

1,032.7

8.31

8,581.57

-

-

0%

-

-

0.0 %

-

-

0.0%

1,032.68

8,581.57

100.0%

ml

2,390.5

19.59

46,829.31

-

-

0%

-

-

0.0%

-

-

0. 0%

2,390.47

46,829.31

100.0%

ml ml ml ml ml ml ml

56

 

1.3.4.1.2.2.1.3.2 1.3.4.1.2.2.1.3.3 1.3.4.1.2.2.1.4 1.3.4.1.2.2.1.4.1 1.3.4.1.2.2.1.4.2 1.3.4.1.2.2.1.4.3 1.3.4.1.2.2.1.5 1.3.4.1.2.2.1.5.1 1.3.4.1.2.2.1.5.2 1.3.4.1.2.2.1.5.3 1.3.4.1.2.2.1.5.4 1.3.4.1.2.2.1.5.5 1.3.4.1.2.2.1.5.6 1.3.4.1.2.2.1.5.7 1.3.4.1.2.2.1.5.8 1.3.4.1.2.2.1.5.9 1.3.4.1.2.2.1.5.10 1.3.4.1.2.2.1.5.11 1.3.4.1.2.2.1.5.12 1.3.4.1.2.2.1.5.13 1.3.4.1.2. 2.1.6 1.3.4.1.2.2.1.6.1 1.3.4.1.2.2.1.6.2 1.3.4.1.2.2.1.7 1.3.4.1.2.2.1.7.1 1.3.4.1.2.2.1.7.2 1.3.4.1.2.2.1.7.3 1.3.4.1.2.2.1.7.4 1.3.4.1.2.2.1.7.5 1.3.4.1.2.2.1.7.6 1.3.4.1.2.2.1.7.7 1.3.4.1.2.2.1.7.8 1.3.4.1.2.2.1.7.9 1.3.4.1.2. 2.2 1.3.4.1.2.2.2.1 1.3.4.1.2.2.2.1.1 1.3.4.1.2.2.2.1.2 1.3.4.1.2.2.2.1.3 1.3.4.1.2.2.2.1.4 1.3.4.1.2.2.2.1.5

SUMI. E INST. TUBERIA PVC UF, PN7. 5, P/AGUA POTABLE DN 160 mm. NTP 16423 SUMI. E INST. TUBERIA PVC UF, PN10, P/AGUA POTABLE DN 200 mm. NTP 16424 PRUEBA HIDRAULICA Y DESINFECCION DE TUBERIA ZANJA TAPADA PRUEBA HIDRAULICA Y DESINFECCION DE TUBERIA DN 100mm PRUEBA HIDRAULICA Y DESINFECCION DE TUBERIA DN 160mm PRUEBA HIDRAULICA Y DESINFECCION DE TUBERIA DN 200mm INSTALACION DE ACCESORIOS PVC AGUA POTABLE (INC. SUMINISTRO) SUMI. E INST. TEE PVC 110 x 110mm; PN=10 SUMI. E INST. TEE PVC 160 x 160mm; PN=10 SUMI. E INST. TEE PVC 200 x 200mm; PN=10 SUMI. E INST. CODO DE PVC DN 90º x 110mm SUMI. E INST. CODO DE PVC DN 45º x 110mm SUMI. E INST. CODO DE PVC DN 45º x 160mm SUMI. E INST. CODO DE PVC DN 22.5º x 110mm SUMI. E INST. CODO DE PVC DN 22.5º x 160mm SUMI. E INST. REDUCCIONES PVC DN 160mm a 110mm SUMI. E INST. REDUCCIONES DN 200mm a 160mm SUMI.PVC E INST. DE TAPON PVC UF DN 110mm SUMI. E INST. DE TAPON PVC UF DN 160mm SUMI. E INST. DE TAPON PVC UF DN 200mm ANCLAJES Y/O APOYOS CONCRETO F'C=175KG/CM2 PARA ANCLAJE DE ACCESORIOS EMPALME A TUBERIA EXISTENTE VALVULAS Y ACCESORIOS DE HIERRO DUCTIL SUMI. E INST. VALVULA DE COMPUERTA HD 110mm SUMI. E INST. VALVULA DE COMPUERTA HD 160mm SUMI. E INST. VALVULA DE COMPUERTA HD 200mm SUMI. E INST. VALVULA DE PURGA DN 100mm INCLUYE ACCESORIOS, EXCA. CONCRETO 210, TUB. 110mm SUMI. E INST. VALVULA DE PURGA DN 160mm INCLUYE ACCESORIOS, EXCA. CONCRETO 210, TUB. 160mm SUMI. E INST. VALVULA DE AIRE BB DN 25mm INC. ACCESO. CAJA, P/TUB. DN 110mm. SUMI. E INST. VALVULA DE AIRE BB DN 25mm INC. ACCESO. CAJA, P/TUB. DN 160mm. SUMI. E INST. DE GRIFO CONTRA INCENDIOS FºFº, 02 SALIDAS CAJA DE VALVULA COMPUERTA CONEXIONES DOMICILIARIA S CONEXIÓN DOMICILIARIA DE AGUA POTABLE RIEGO DE LA ZONA DE TRABAJO PARA MITIGAR LA CONTAMINACION POR POLVO TRAZO Y REPLANTEOS CONEXIÓN DOMICILIARIA GUA EXCAVACION DE ZANJA T.NORMAL (0.4x1.20m); CONEX. AGUA REFINE Y NIVELACION DE ZANJA CONEXIÓN AGUA CAMA DE ARENA DE P/TUB. 1/2, C/MATERIAL PROPIO ZARANDEADO; CONEXIÓN DOMIL.

ml ml

ml

2,390.5

1.49

3,561.80

-

-

0%

-

-

0.0 %

-

-

0.0%

2,390.47

3,561.80

100.0%

28.0

92.76

2,597.28

-

-

0%

-

-

0.0%

-

-

0.0%

28.00

2,597.28

100.0%

26.0

86.19

2,240.94

-

-

0%

-

-

0.0%

-

-

0.0%

26.00

2,240.94

100.0%

7.0

68.36

478.52

-

-

0%

-

-

0.0%

-

-

0.0%

7.00

478.52

100.0%

ml ml

und und und und und und und und und und und und und und

79.0

68.42

5,405.18

-

-

0%

-

-

0.0%

-

-

0.0%

79.00

5,405.18

100.0%

und

7.0

167.16

1,170.12

-

-

0%

-

-

0.0%

-

-

0.0%

7.00

1,170.12

100.0%

und

9.0

358.98

3,230.82

-

-

0%

-

-

0.0%

-

-

0.0%

9.00

3,230.82

100.0%

1.0

1155.65

1,155.65

-

-

0%

-

-

0.0%

-

-

0.0%

1.00

1,155.65

100.0%

und

1.0

882.21

882.21

-

-

0%

-

-

0.0%

-

-

0.0%

1.00

882.21

100.0%

und

9.0

180.59

1,625.31

-

-

0%

-

-

0.0%

-

-

0.0%

9.00

1,625.31

100.0%

und und und und und und

ml

3,096.0

2.84

8,792.64

-

-

0%

-

-

0.0 %

-

-

0.0%

3,096.00

8,792.64

100.0%

ml

3,096.0

1.2

3,715.20

-

-

0%

-

-

0.0%

-

-

0.0%

3,096.00

3,715.20

100.0%

ml

3,096.0

22.35

69,195.60

-

-

0%

-

-

0.0%

-

-

0. 0%

3,096.00

69,195.60

100.0%

ml

3,096.0

0.65

2,012.40

-

-

0%

-

-

0.0 %

-

-

0.0%

3,096.00

2,012.40

100.0%

ml

3,096.0

2.16

6,687.36

-

-

0%

-

-

0.0 %

-

-

0.0%

3,096.00

6,687.36

100.0%

57

 

1.3.4.1.2.2.2.1.6 1.3.4.1.2.2.2.1.7 1.3.4.1.2.2.2.1.8 1.3.4.1.2.2.2.1.9 1.3.4.1.2.2.2.1.10 1.3.4.1.2.2.2.1.11 1.3.4.1.2.2.3 1.3.4.1.2.2.3.1 1.3.4.1.2.2.3.1.1 1.3.4.1.2.2.3.1.2 1.3.4.1.2.3 1.3.4.1.2.3.1 1.3.4.1.2. 3.1.1 1.3.4.1.2.3.1.1.1 1.3.4.1.2.3.1.1.2 1.3.4.1.2.3.1.1.3 1.3.4.1.2. 3.1.2 1.3.4.1.2. 3.1.2.1 1.3.4.1.2.3.1.2.1.1 1.3.4.1.2.3.1.2.1.2 1.3.4.1.2.3.1.2.2 1.3.4.1.2.3.1.2.2.1 1.3.4.1.2.3.1.2.2.2 1.3.4.1.2.3.1.2.3 1.3.4.1.2.3.1.2.3.1 1.3.4.1.2.3.1.2.3.2 1.3.4.1.2.3.1.2.3.3 1.3.4.1.2. 3.1.2.4 1.3.4.1.2.3.1.2.4.1 1.3.4.1.2.3.1.3 1.3.4.1.2.3.1.3.1 1.3.4.1.2.3.1.3.2 1.3.4.1.2.3.1.4 1.3.4.1.2.3.1.4.1 1.3.4.1.2.3.1.4.2 1.3.4.1.2.3.1.4.3 1.3.4.1.2.3.1.4.4 1.3.4.1.2. 3.2 1.3.4.1.2.3.2.1 1.3.4.1.2.3.2.1.1 1.3.4.1.2.3.2.1.2 1.3.4.1.2.3.2.1.3

RELLENO Y COMP. DE ZANJA CONEXIÓN ELIMINACION MATERIAL EXCEDENTE C/EQUIPO HASTA 1KM CONEXIÓN DOMICILIARIA AGUA TUB. PVC 1/2; LPROM=6m. CONEXIÓN DOMICILIARIA AGUA TUB. PVC 3/4; LPROM=6m. SUM. E INST. DE MICROMEDIDORES CONEXIÓN DOMIC.AGUA,INCL. INSTALACION Y ACCESORIOS HIDRAULICA DESINFECCIONPRUEBA DE TUBERIA PVC Ø 1/2Y PRUEBAS DE CONTROL DE CALIDAD PRUEBAS DE CONTROL DE CALIDAD PRUEBA COMPACTACION SUELOS (PROCTOR MODIFICADO) PRUEBA COMPACTACION SUELOS (DENSIDAD DE CAMPO) ALCANTARILLADO RED DE COLECTORES SECUNDARIOS TRABAJOS PRELIMINARES RIEGO DE LA ZONA DE TRABAJO PARA MITIGAR LA CONTAMINACION POR POLVO TRAZO Y REPLANTEOS INICIALES DEL PROYECTO TRAZO Y REPLANTEO DURANTE EL PROCESO CONSTRUCTIVO DE LA OBRA MOVIMIENTO DE TIERRAS EXCAVACIONES DE ZANJAS EXCAVACION DE ZANJA C/MAQ. T. NORMAL HASTA 1.50MPP EXCAVACION DE ZANJA C/MAQ. T. NORMAL HASTA 2.00MPP REFINE, NIVELACION Y CONFORMACION DE ZANJAS REFINE, NIVELACION Y CONFORMACION DE FONDO DE ZANJA HASTA HPROM=3.00m CAMA DE ARENA DE APOYO DE TUBERIA PVC DN (200-250) E=0.10M; A=0.60m; C/MATERIAL PROPIO ZARANDEADO RELLENO Y COMPACTACION DE ZANJAS RELLENO COMP. ZANJA T. NORMAL HASTA 1.50MPP RELLENO COMP. ZANJA T. NORMAL HASTA 2.00MPP ELIMINACION MATERIAL EXCEDENTE C/EQUIPO EN TERRENO ANEXO ENTIBADO DE ZANJAS ENTIBADO DE PROTECCION DE ZANJAS H>2.00m SUMINISTRO E INSTALACION TUBOS COLECTOR/EMISOR SUMIN. E INSTAL. TUBO PVC UF, SN-4, DN 200MM, ISO 4435 PRUEBA HIDRAULICA TUBO PVC DN 200MM CONSTRUCCION DE BUZONES Y EMPALMES BUZON TIPO I, C/MARCO Y TAPA DE CONCRETO Di=1.20m x h=1.20MPP BUZON TIPO I, C/MARCO Y TAPA DE CONCRETO Di=1.20m x h=1.50MPP BUZON TIPO I, C/MARCO Y TAPA DE CONCRETO Di=1.20m x h=2.00MPP EMPALME A BUZON DE TUB. PVC CON DADO DE CONCRETO SIMPLE CONEXIONES DOMICILIARIA S CONEXION DOMICILIARIA DESAGUE RIEGO DE LA ZONA DE TRABAJO PARA MITIGAR LA CONTAMINACION POR POLVO TRAZOS Y REPLANTEOS DURANTE EL PROCESO CONSTRUCTIVO DE LA OBRA EXCAVACION DE ZANJA T.NORMAL (0.4x1.20m); CONEX. AGUA

ml

3,096.0

13.56

41,981.76

-

-

0%

-

-

0.0%

-

-

0. 0%

3,096.00

41,981.76

100.0%

m3

1,337.5

8.31

11,114.38

-

-

0%

-

-

0.0%

-

-

0. 0%

1,337.47

11,114.38

100.0%

und

516.0

218.22

112,601.52

-

-

0%

-

-

0.0%

-

-

0.0%

516.00

112,601.52

100.0%

ml

516.0

154.6

79,773.60

-

-

0%

-

-

0.0 %

-

-

0.0%

516.00

79,773.60

100.0%

ml

3,096.0

1.14

3,529.44

-

-

0%

-

-

0.0 %

-

-

0.0%

3,096.00

3,529.44

100.0%

und

ml

1.0

70

70.00

-

-

0%

-

-

0.0%

-

-

0.0%

1.00

70.00

100.0%

ml

23.0

60

1,380.00

-

-

0%

-

-

0.0%

-

-

0.0%

23.00

1,380.00

100.0%

m

2,050.6

2.84

5,823.70

-

-

0%

-

-

0.0 %

-

-

0.0%

2,050.60

5,823.70

100.0%

m

2,050.6

1.24

2,542.74

-

-

0%

-

-

0.0 %

-

-

0.0%

2,050.60

2,542.74

100.0%

m

2,050.6

1.72

3,527.03

-

-

0%

-

-

0.0 %

-

-

0.0%

2,050.60

3,527.03

100.0%

m

1,064.7

14.88

15,842.29

-

-

0%

-

-

0.0%

-

-

0. 0%

1,064.67

15,842.29

100.0%

m

985.9

17.01

16,770.67

-

-

0%

-

-

0.0 %

-

-

0.0%

985.93

16,770.67

100.0%

m

2,050.6

2.17

4,449.80

-

-

0%

-

-

0.0 %

-

-

0.0%

2,050.60

4,449.80

100.0%

m

2,050.6

3.89

7,976.83

-

-

0%

-

-

0.0 %

-

-

0.0%

2,050.60

7,976.83

100.0%

m

1,064.7

15.46

16,459.80

-

-

0%

-

-

0.0%

-

-

0. 0%

1,064.67

16,459.80

100.0%

m

985.9

20.51

20,221.42

-

-

0%

-

-

0.0 %

-

-

0.0%

985.93

20,221.42

100.0%

m3

885.9

8.31

7,361.50

-

-

0%

-

-

0.0%

-

-

0.0%

885.86

7,361.50

100.0%

m

985.9

39.01

38,461.13

-

-

0%

-

-

0.0 %

-

-

0.0%

985.93

38,461.13

100.0%

ml

2,050.6

30.46

62,461.28

-

-

0%

-

-

0.0%

-

-

0. 0%

2,050.60

62,461.28

100.0%

ml

2,050.6

1.8

3,691.08

-

-

0%

-

-

0.0%

-

-

0.0%

2,050.60

3,691.08

100.0%

und

5.0

1909.31

9,546.55

-

-

0%

-

-

0.0%

-

-

0.0%

5.00

9,546.55

100.0%

und

21.0

2485.81

52,202.01

-

-

0%

-

-

0.0%

-

-

0.0%

21.00

52,202.01

100.0%

und

9.0

2765.76

24,891.84

-

-

0%

-

-

0.0%

-

-

0.0%

9.00

24,891.84

100.0%

und

96.0

159.24

15,287.04

-

-

0%

-

-

0.0%

-

-

0.0%

96.00

15,287.04

100.0%

ml

3,096.0

2.84

8,792.64

-

-

0%

-

-

0.0 %

-

-

0.0%

3,096.00

8,792.64

100.0%

ml

3,096.0

1.31

4,055.76

-

-

0%

-

-

0.0 %

-

-

0.0%

3,096.00

4,055.76

100.0%

ml

3,096.0

22.35

69,195.60

-

-

0%

-

-

0.0%

-

-

0. 0%

3,096.00

69,195.60

100.0%

58

 

1.3.4.1.2.3.2.1.4 1.3.4.1.2.3.2.1.5 1.3.4.1.2.3.2.1.6 1.3.4.1.2.3.2.1.7 1.3.4.1.2.3.2.1.8 1.3.4.1.2.3.2.1.9 1.3.4.1.2.3.2.1.10 1.3.4.1.2.3.2.1.11 1.3.4.1.2.3.3 1.3.4.1.2.3.3.1 1.3.4.1.2.3.3.1.1 1.3.4.1.2.3.3.1.2 1.3.4.1.2.3.3.1.3 1.3.4.1.2.3.4 1.3.4.1.2.3.4.1 1.3.4.1.2. 3.4.1.1 1.3.4.1.3 1.3.4.1.3. 2 1.3.4.1.3. 2.1 1.3.4.1.3.2.1.1 1.3.4.1.3.2.1.2 1.3.4.1.3. 2.2 1.3.4.1.3.2.2.1 1.3.4.1.3.2.2.2 1.3.4.1.3.2.2.3 1.3.4.1.3.2.2.4 1.3.4.1.3.2.2.5 1.3.4.1.3.2.3 1.3.4.1.3.2.3.1 1.3.4.1.3. 2.3.2 1.3.4.1.3. 2.3.3 1.3.4.1.3.2.3.4 1.3.4.1.3. 2.3.5 1.3.4.1.3.2.3.6 1.3.4.1.3.3 1.3.4.1.3. 3.1 1.3.4.1.3.3.1.1 1.3.4.1.3. 3.2 1.3.4.1.3.3.2.1 1.3.4.1.3.3.2.2 1.3.4.1.3.3.2.3 1.3.4.1.3. 3.3 1.3.4.1.3.3.3.1 1.3.4.1.3.3.3.2 1.3.4.1.3.3.3.3 1.3.4.1.3.3.3.4 1.3.4.1.3.3.3.5 1.3.4.1.3.4

REFINE Y NIVELACION DE ZANJA CONEXIÓN AGUA CAMA DE ARENA DE P/TUB. 1/2, CMATERIAL PROPIO ZARANDEADO; CONEXIÓN DOMIL. RELLENO Y COMP. DE ZANJA CONEXIÓN ELIMINACION MATERIAL EXCEDENTE C/EQUIPO EN TERRENO ANEXO SUMIN. E INSTALACION DE TUBO PVC, SN-4, DN 160 MM, ISO 4435 SUMIN. E INSTALACION CAJA DE REGISTRO DE DESAGUE Y MEDIA CAÑA EMPALME A COLECTOR PVC DN 200MM PRUEBA HIDRAULICA CONEX. DOMICILIARIA DESAGUE PRUEBAS DE CONTROL DE CALIDAD PRUEBAS DE CONTROL DE CALIDAD PRUEBA COMPACTACION SUELOS (PROMOTOR MODIFICADO) PRUEBA COMPACTACION SUELOS (DENSIDAD DE CAMPO) PRUEBA DE CALIDAD DE CONCRETO VARIOS VARIOS LIMPIEZA FINAL DE OBRA PISTAS Y VEREDAS PISTAS Y ESTACIONAMIENTO OBRAS PROVISIONALES TRAZO, NIVELES Y REPLANTEO INICIAL DE OBRA REPLANTEO TOPOGRAFICO TRAZO DE EJES Y NIVELES YDECONTRO PISTAS DURANTE LA EJECUCION DE LA OBRA MOVIMIENTO DE TIERRAS CORTE HASTA NIVEL DE SUBRASANTE EXTRACCION Y APILAMIENTO DE MATERIAL DE PRESTAMO CARGUIO Y TRANSPORTE DE MATERIAL PROPIO RELLENO Y COMPACTACION CON MATERIAL PROPIO ELIMINACION DE MATERIAL PROPIO EXCEDENTE EN TERRENO ANEXO PAVIMENTOS CONFORMACION Y COMPACTACION DE SUBRASANTE PARA PISTAS SUB-BASE DE 20 CMS BASE DE 15 CMS BARRIDO Y LIMPIEZA P/CARPETA ASFALTICA IMPRIMACION ASFALTICA CARPETA ASFALTICA EN CALIENTE DE 2" VEREDAS OBRAS PROVISIONALES TRAZO, REPLANTEO Y CONTROL TOPOGRAFICO DE EJES Y NIVELES DE VEREDAS MOVIMIENTO DE TIERRAS PERFILADO, NIVELACION Y COMPACTACION DE SUBRASANTE VEREDAS COLOCACION DE AFIRMADO/BASE GRANULAR PARA VEREDAS EXCAVACION MANUAL PARA SARDINELES DE VEREDAS VEREDAS Y SARDINELES ENCOFRADO Y DESENCOFRADO DE VEREDAS CONCRETO PARA SARDINELES DE VEREDAS h=35 cm F'C=175 kg/cm2 CONCRETO PARA VEREDAS DE H=10CM F'C=175 KG/CM2 JUNTA DE DILATACION ASFALTICA PARA VEREDAS; e=1/2 CURADO QUIMICO PARA VEREDAS

ml

3,096.0

1.31

4,055.76

-

-

0%

-

-

0.0 %

-

-

0.0%

3,096.00

4,055.76

100.0%

ml

3,096.0

2.81

8,699.76

-

-

0%

-

-

0.0 %

-

-

0.0%

3,096.00

8,699.76

100.0%

ml

3,096.0

13.56

41,981.76

-

-

0%

-

-

0.0%

-

-

0. 0%

3,096.00

41,981.76

100.0%

m3

1,337.5

8.31

11,114.38

-

-

0%

-

-

0.0%

-

-

0. 0%

1,337.47

11,114.38

100.0%

m

3,096.0

20.6

63,777.60

-

-

0%

-

-

0. 0%

-

-

0.0%

3,096.00

63,777.60

100.0%

und

516.0

130.56

67,368.96

-

-

0%

-

-

0.0%

-

-

0.0%

516.00

67,368.96

100.0%

und

516.0

95.42

49,236.72

-

-

0%

-

-

0.0%

-

-

0.0%

516.00

49,236.72

100.0%

und

3,096.0

1.8

5,572.80

-

-

0%

-

-

0.0%

-

-

0.0%

3,096.00

5,572.80

100.0%

100.0%

und

1.0

70

70.00

-

-

0%

-

-

0.0%

-

-

0.0%

1.00

70.00

und

20.0

60

1,200.00

-

-

0%

-

-

0.0%

-

-

0.0%

20.00

1,200.00

100.0%

und

1.0

2000

2,000.00

-

-

0%

-

-

0.0%

-

-

0.0%

1.00

2,000.00

100.0%

m

2,050.6

1.31

2,686.29

-

-

0%

-

-

0.0%

-

-

0 .0%

2,050.60

2,686.29

100.0%

m2

15,192.9

0.73

11,090.80

-

-

0%

-

-

0.0%

-

-

0 .0%

15,192.88

11,090.80

100.0%

m2

15,192.9

1.81

27,499.11

-

-

0%

-

-

0.0%

-

-

0 .0%

15,192.88

27,499.11

100.0%

m3

15,845.9

8.01

126,925.34

-

-

0%

-

-

0.0%

-

-

0.0%

15,845.86

126,925.34

100.0%

m3

12,863.4

4.56

58,657.01

-

-

0%

-

-

0.0%

-

-

0 .0%

12,863.38

58,657.01

100.0%

m3

12,863.4

4.25

54,669.37

-

-

0%

-

-

0.0%

-

-

0 .0%

12,863.38

54,669.37

100.0%

m3

12,863.4

19.36

249,035.04

-

-

0%

-

-

0.0%

-

-

0.0%

12,863.38

249,035.04

100.0%

m3

3,579.0

6.36

22,762.29

-

-

0%

-

-

0.0%

-

-

0. 0%

3,578.98

22,762.29

100.0%

m2

15,192.9

2.03

30,841.55

-

-

0%

-

-

0.0%

-

-

0 .0%

15,192.88

30,841.55

100.0%

m2 m2

15,192.9 15,192.9

16.85 18.65

256,000.03 283,347.21

-

-

0% 0%

-

-

0.0% 0.0%

-

-

0.0% 0 .0%

15,192.88 15,192.88

256,000.03 283,347.21

100.0% 100.0%

m2

15,192.9

0.45

6,836.80

-

-

0%

-

-

0.0%

-

-

0. 0%

15,192.88

6,836.80

100.0%

m2

15,192.9

4.29

65,177.46

-

-

0%

-

-

0.0%

-

-

0.0%

15,192.88

65,177.46

100.0%

m2

15,192.9

35.71

542,537.74

-

-

0%

-

-

0.0%

-

-

0.0%

15,192.88

542,537.74

100.0%

m2

5,197.2

2.15

11,173.96

-

-

0%

-

-

0.0%

-

-

0. 0%

5,197.19

11,173.96

100.0%

m2

5,197.2

6.83

35,496.81

-

-

0%

-

-

0.0%

-

-

0. 0%

5,197.19

35,496.81

100.0%

m2

5,197.2

14.8

76,918.41

-

-

0%

-

-

0.0%

-

-

0. 0%

5,197.19

76,918.41

100.0%

m

3,933.2

4.03

15,850.68

-

-

0%

-

-

0. 0%

-

-

0.0%

3,933.17

15,850.68

100.0%

m2

732.3

41.58

30,449.78

-

-

0%

-

-

0.0 %

-

-

0.0%

732.32

30,449.78

100.0% 100.0%

m

3,933.2

17.7

69,617.11

-

-

0%

-

-

0. 0%

-

-

0.0%

3,933.17

69,617.11

m2

5,197.2

48.2

250,504.56

-

-

0%

-

-

0.0%

-

-

0 .0%

5,197.19

250,504.56

100.0%

ml

1,100.4

4.87

5,358.95

-

-

0%

-

-

0.0 %

-

-

0.0%

1,100.40

5,358.95

100.0%

m2

5,197.2

1.67

8,679.31

-

-

0%

-

-

0.0 %

-

-

0.0%

5,197.19

8,679.31

100.0%

PAVIMENTO RÍGIDO: PASAJE PEATONAL

59

 

1.3.4.1.3. 4.1 1.3.4.1.3.4.1.1 1.3.4.1.3.4.1.2 1.3.4.1.3.4.1.3 1.3.4.1.3.4.2 1.3.4.1.3.4.2.1 1.3.4.1.3.4.2.2 1.3.4.1.3.4.2.3 1.3.4.1.3.4.2.4 1.3.4.1.3. 5 1.3.4.1.3. 5.1 1.3.4.1.3.5.1.1 1.3.4.1.3.5.1.2 1.3.4.1.3.5.1.3 1.3.4.1.3. 5.2 1.3.4.1.3.5.2.1 1.3.4.1.3.5.2.2 1.3.4.1.3.5.2.3 1.3.4.1.3.5.2.4 1.3.4.1.3. 5.2.5 1.3.4.1.3.6 1.3.4.1.3.6.1 1.3.4.1.3.6.1.1 1.3.4.1.3.6.1.2 1.3.4.1.3.6.1.3 1.3.4.1.3.6.1.4 1.3.4.1.3.6.1.5 1.3.4.1.3. 7 1.3.4.1.3. 7.1 1.3.4.1.3. 7.1.1 1.3.4.1.3. 8 1.3.4.1.3. 8.1 1.3.4.1.3.8.1.1 1.3.4.1.3.8.1.2 1.3.4.1.3.8.1.3 1.3.4.1.3. 9 1.3.4.1.3. 9.1 1.3.4.1.3.9.1.1 1.3.4.1.3.9.1.2 1.3.4.1.3.9.1.3 1.3.4.1.3.9.1.4 1.3.4.1.3.9.1.5 1.3.4.1.4 1.3.4.1.4. 1 1.3.4.1.4. 2 1.3.4.2 1.3.4.2.1 1.3.4.2.1.1 1.3.4.2.1.2 1.3.4.2.1.3

MOVIMIENTO DE TIERRAS PERFILADO, NIVELACION Y COMPACTACION DE SUBRASANTE COLOCACION DE AFIRMADO/BASE GRANULAR EXCAVACION MANUAL PARA SADINELES SUMERGIDOS CONCRETO EN PASAJES PEATONALES CONCRETO PARA SARDINEL SUMERGID; H=0.25cm; F'C=210 kg/cm2 PAVIMENTO RIGIDO DE CONCRETO EN PASAJE PEATONAL; H=12.5cm; F'C=210 KG/CM2 JUNTA DE DILATACION ASFALTICA EN PAVIMIENTO RIGIDO; e=1/2 CURADO QUIMICO PARA PAVIMENTO RIGIDO RAMPAS PEATONALES MOVIMIENTO DE TIERRAS PERFILADO, NIVELACION Y COMPACTACION DE SUBRASANTE COLOCACION DE AFIRMADO/BASE GRANULAR EXCAVACION MANUAL PARA SARDINELES SUMERGIDOS CONCRETO EN RAMPAS ENCOFRADO Y DESENCOFRADO DE RAMPAS CONCRETO PARA SARDINELES DE RAMPAS h=20cm F'C=175kg/cm2 CONCRETO PARA RAMPAS DE H=10CM F'C=175 KG/CM2 CURADO QUIMICO PARA RAMPAS BRUÑADO DE RAMPAS SEÑALIZACIÓN SEÑALIZACION PINTADO EN BLANCO DE LETRAS, CRUCES PEATONALES Y SIMBOLOS EN PAVIMENTO PINTADO DE AMARILLO EN PSJE. PEATONAL PINTADO DE AMARILLO EN SARDINELES, MARTILLOS, RAMPAS Y ESTACIONAMIENTO PINTADO DE BLANCO DE LINEAS DISCONTINUAS Y CONTINUAS EN PAVIMENTO SEÑALIZACION VERTICAL (PREVENTIVA Y REGLAMENTARIA) LIMPIEZA DE OBRA LIMPIEZA DE OBRA LIMPIEZA FINAL DE OBRA PRUEBAS DE CALIDAD PRUEBAS DE CALIDAD PRUEBAS DE CALIDAD DE SUBRASANTE PRUEBAS DE CALIDAD DE LA SUB BASE Y BASE PRUEBAS DE CALIDAD DEL CONCRETO SARDINEL CENTRAL SARDINEL CENTRAL EXCAVACION MANUAL PARA SARDINEL CENTRAL ENCOFRADO Y DESENCOFRADO DE SARDINEL CENTRAL CONCRETO PARA SARDINELES CENTRALES DE CALLE F'C=210 kg/cm2 JUNTA DE DILATACION ASFALTICA PARA SARDINEL CENTRAL; e=1/2 CURADO QUIMICO DE SARDINEL CENTRAL RED ELÉCTRICA RED PRIMARIA RED SECUNDARIA VIVIENDAS MOV. TIERRAS CASA Corte de Terreno con maquinaria h=0.35 (0.15 Platea + 0.20 Afirmado) Inc. Eliminación Excavación de Zanjas cimentación manual (Uñas de Platea) Inc Eliminación Relleno con material de préstamo (Afirmado e= 0.20m) Proctor 95%

m2

1,655.9

6.83

11,309.46

-

-

0%

-

-

0.0%

-

-

0. 0%

1,655.85

11,309.46

100.0%

m2

1,655.9

19.35

32,040.70

-

-

0%

-

-

0.0%

-

-

0 .0%

1,655.85

32,040.70

100.0%

m

1,034.6

4.03

4,169.48

-

-

0%

-

-

0.0 %

-

-

0.0%

1,034.61

4,169.48

100.0%

m

1,034.6

19.96

20,650.82

-

-

0%

-

-

0.0%

-

-

0. 0%

1,034.61

20,650.82

100.0%

m2

1,655.9

61.18

101,304.90

-

-

0%

-

-

0.0%

-

-

0.0%

1,655.85

101,304.90

100.0%

m

378.0

4.87

1,840.86

-

-

0%

-

-

0.0%

-

-

0.0%

378.00

1,840.86

100.0%

m2

1,655.9

1.67

2,765.27

-

-

0%

-

-

0.0 %

-

-

0.0%

1,655.85

2,765.27

100.0%

m2

205.5

6.83

1,403.57

-

-

0%

-

-

0.0%

-

-

0.0%

205.50

1,403.57

100.0%

m2

205.5

14.8

3,041.40

-

-

0%

-

-

0.0%

-

-

0.0%

205.50

3,041.40

100.0%

m

154.7

4.03

623.36

-

-

0%

-

-

0.0%

-

-

0.0%

154.68

6 23.36

100.0% 100.0%

m2

47.1

46.43

2,184.62

-

-

0%

-

-

0.0%

-

-

0.0%

47.05

2,1 84.62

m

154.7

15.99

2,473.33

-

-

0%

-

-

0.0%

-

-

0.0%

154.68

2,473.33

100.0%

m2

205.5

48.2

9,905.10

-

-

0%

-

-

0.0%

-

-

0.0%

205.50

9,905.10

100.0%

m2

205.5

1.67

343.19

-

-

0%

-

-

0.0%

-

-

0.0%

205.50

3 43.19

100.0%

m2

205.5

13.73

2,821.52

-

-

0%

-

-

0.0%

-

-

0.0%

205.50

2,821.52

100.0%

m2

922.8

23.01

21,232.94

-

-

0%

-

-

0.0 %

-

-

0.0%

922.77

21,232.94

100.0%

m2

258.3

21.08

5,444.96

-

-

0%

-

-

0.0%

-

-

0.0%

258.30

5,444.96

100.0%

m

1,374.5

9.52

13,084.86

-

-

0%

-

-

0. 0%

-

-

0.0%

1,374.46

13,084.86

100.0%

m

1,243.2

7.99

9,933.41

-

-

0%

-

-

0.0 %

-

-

0.0%

1,243.23

9,933.41

100.0%

und

11.0

580.95

6,390.45

-

-

0%

-

-

0.0%

-

-

0.0%

11.00

6,390.45

100.0%

Ha

6.4

3024

19,444.32

-

-

0%

-

-

0.0 %

-

-

0.0%

6.43

19,444.32

100.0%

glb

1.0

2680

2,680.00

-

-

0%

-

-

0.0%

-

-

0.0%

1.00

2,680.00

100.0%

glb

1.0

15480

15,480.00

-

-

0%

-

-

0.0%

-

-

0.0%

1.00

15,4 80.00

100.0%

glb

1.0

1850

1,850.00

-

-

0%

-

-

0.0%

-

-

0.0%

1.00

1,850.00

100.0%

m

327.4

3.02

988.81

-

-

0%

-

-

0.0%

-

-

0.0%

327.42

9 88.81

100.0%

m2

654.8

41.58

27,228.25

-

-

0%

-

-

0.0 %

-

-

0.0%

654.84

27,228.25

100.0%

m

327.4

25.77

8,437.61

-

-

0%

-

-

0.0%

-

-

0.0%

327.42

8,437.61

100.0%

m

49.1

4.87

239.18

-

-

0%

-

-

0.0%

-

-

0.0%

49.11

239.18

100.0%

m

327.4

1.26

412.55

-

-

0%

-

-

0.0%

-

-

0.0%

327.42

4 12.55

100.0%

glb glb

1.0 1.0

173,802.40 609,595.81

173,802.40 609,595.81

-

-

0% 0%

-

-

0.0% 0.0%

-

-

0.0% 0.0%

1.00 1.00

173,802.40 609,595.81

100.0% 100.0%

m3

5,882.4

17.94

105,530.26

-

-

0%

-

-

0.0%

-

-

0.0%

5,882.40

105,530.26

100.0%

m3

381.8

46.80

17,870.11

-

-

0%

-

-

0.0 %

-

-

0.0%

381.84

17,870.11

100.0%

m3

2,518.1

86.88

218,770.79

-

-

0%

-

-

0.0%

-

-

0.0%

2,518.08

218,770.79

100.0%

60

 

1.3.4.2.1.4 1.3.4.2.1. 5 1.3.4.2.2 1.3.4.2.2.1 1.3.4.2.2.1.1 1.3.4.2.2. 1.2 1.3.4.2.2.1.3 1.3.4.2.2. 1.4 1.3.4.2.2.2 1.3.4.2.2.2.1 1.3.4.2.2.2.2 1.3.4.2.2.2.3 1.3.4.2.2. 3 1.3.4.2.2.3.1 1.3.4.2.2.3.2 1.3.4.2.2.3.3 1.3.4.2.2.3.4 1.3.4.2.3 1.3.4.2.3. 1 1.3.4.2.3.2 1.3.4.2.3. 3 1.3.4.2.3.4 1.3.4.2.3.5 1.3.4.2.3.6 1.3.4.2.3. 7 1.3.4.2.3. 8 1.3.4.2.3.9 1.3.4.2.3.10 1.3.4.2.3. 11 1.3.4.2.3.12 1.3.4.2.4 1.3.4.2.4. 1 1.3.4.2.4. 2 1.3.4.2.4. 3 1.3.4.2.4.4 1.3.4.2.4. 5 1.3.4.2.4. 6 1.3.4.2.4. 7 1.3.4.2.4.8 1.3.4.2.4.9 1.3.4.2.4.10 1.3.4.2.4. 11 1.3.4.2.4. 12 1.3.4.2.4. 13 1.3.4.2.4.14 1.3.4.2.4. 15 1.3.4.2.5 1.3.4.2.5.1 1.3.4.2.5.1.1 1.3.4.2.5.1.2 1.3.4.2.5.2 1.3.4.2.5.2.1 1.3.4.2.5. 2.2 1.3.4.2.5. 2.3 1.3.4.2.5.3 1.3.4.2.5.3.1 1.3.4.2.5.3.2 1.3.4.2.5.3.3 1.3.4.2.5.3.4 1.3.4.2.5.4 1.3.4.2.5.4.1 1.3.4.2.5.4.2 1.3.4.2.5.4.3 1.3.4.2.5.4.4 1.3.4.2.5.4.5 1.3.4.2.5.5

Nivelación y compactación de Terreno Acarreo de Material excedente ESTRUCTURAS PLATEA Concreto premezclado fc=175kg/cm2 Encofrado y desencofrad o Acero de refuerzo de fy =4200kg/cm2 Acabado de Losa Platea MUROS Concreto premezclado fc=175kg/cm2 Encofrado y desencofrado Acero de refuerzo de fy =4200kg/cm2 LOSA TECHO Concreto premezclado fc=175kg/cm2 Encofrado y desencofrado Acero de refuerzo de fy =4200kg/cm2 Junta de dilatación tecnopor 1 INSTALACIONES ELÉCTRICAS Salida p/centro de luz Salida p/braquetes Tomacorrie nte bipolar Interruptor de 01 golpe Salida p/timbre Salida p/pulsador de timbre Alimentad or de TD a Caja Medidor Tubo PVC SAP 25mm Tablero Electrico de Distribucion Tubo PVC SAP 25mm acometida para futura conexión pozo de tierra. Prueba electrica Conexión a banco de medidores INSTALACION ES SANITARIAS Excavacion y relleno de zanja Tuberia PVC SAL 4 Tuberia PVC SAL 2 Caja registro 12x24 Salida de desague 2 Salida de desague 4 Salida de ventilacio n 2 Sumidero de bronce 2 Registro de bronce 4 Sombrero de ventilacion 2 Salida de agua fria 1/2 Tuberia PVC C10 Agua Fria 1/2 Tuberia PVC C10 Agua Fria 3/4 Valvula compuerta 1/2 Valvula compuerta 3/4 ACABADOS LAVANDERÍA Concreto premezclado fc=175kg/cm2 Encofrado BAÑO Concreto simple 1:6 en sardinel ducha 0.10x0.20 Piso Cerámico 30x30 Ducha Zócalo cerámico 30x30 Ducha CARPINTERA DE MADERA P1 - Puerta Principal de HDF contraplacada - 0.90x2.60 - Sin Pintura P2 - Puerta Dormitorio y Lavandería de HDF contraplacada - 0.80x2.60 - Sin Pintura P3 - Puerta Baño de HDF contraplacada - 0.70x2.6 - Sin Pintura Instalación de Puertas CARPINTERA DE ALUMINIO V1 - Ventana de Aluminio Sala 0.85x1.4 V2 - Ventana de Aluminio Dormitorios - 1.0x1.4 V3 - Ventana de Aluminio Baño 0.30x0.50 V4 - Ventana de Aluminio Patio 0.95x1.4 Instalación Ventanas CERRAJERA

m2 m3

13,921.7 6,264.2

2.64 5.40

36,753.24 33,826.90

-

-

0% 0%

-

-

0.0% 0.0%

-

-

0.0% 0.0%

13,921.68 6,264.24

36,753.24 33,826.90

100.0% 100.0%

m3

2,348.8

311.32

731,231.73

-

-

0%

-

-

0.0%

-

-

0.0%

2,348.80

731,231.73

100.0%

m2

5,172.6

14.95

77,315.18

-

-

0%

-

-

0.0%

-

-

0.0%

5,172.55

77,315.18

100.0%

kg

131,548.3

4.10

539,874.06

-

-

0%

-

-

0.0%

-

-

0.0%

131,548.26

539,874.06

100.0%

m2

12,900.0

6.77

87,353.64

-

-

0%

-

-

0.0%

-

-

0.0%

12,900.00

87,353.64

100.0%

2,828.1

333.63

943,530.75

-

0%

-

0.0%

-

m2

m3

56,561.7

9.55

540,304.30

-

-

0%

-

-

0.0%

-

-

0.0%

56,561.71

540,304.30

100.0%

kg

114,775.4

4.10

471,038.20

-

-

-

0%

-

-

-

0.0%

-

-

-

0.0%

0.0%

114,775.39

2,828.09

471,038.20

943,530.75

100.0%

100.0%

m3

1,290.0

333.63

430,381.15

-

-

0%

-

-

0.0%

-

-

0.0%

1,290.00

430,381.15

100.0%

m2

12,900.0

10.24

132,090.47

-

-

0%

-

-

0.0%

-

-

0.0%

12,900.00

132,090.47

100.0% 100.0%

kg

52,557.9

4.10

215,697.75

-

-

0%

-

-

0.0%

-

-

0.0%

52,557.93

215,697.75

m2

1,924.7

5.19

9,998.33

-

-

0%

-

-

0.0%

-

-

0.0%

1,924.68

9,998.33

100.0%

pto pto pto pto pto pto ml ml und

2,580.0 516.0 3,612.0 2,580.0 516.0 516.0 4,128.0 3,612.0 516.0

57.20 57.20 57.20 57.20 27.50 27.50 9.35 11.55 154.00

147,576.00 29,515.20 206,606.40 147,576.00 14,190.00 14,190.00 38,596.8 0 41,718.60 79,464.00

-

-

0% 0% 0% 0% 0% 0% 0% 0% 0%

-

-

0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0. 0% 0.0%

-

-

0 .0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%

2,580.00 516.00 3,612.00 2,580.00 516.00 516.00 4,128.00 3,612.00 516.00

147,576.00 29,515.20 206,606.40 147,576.00 14,190.00 14,190.00 38,596. 80 41,718.60 79,464.00

100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%

ml

3,096.0

11.55

35,758.80

-

-

0%

-

-

0.0%

-

-

0. 0%

3,096.00

35,758.80

100.0%

glb glb

516.0 516.0

27.50 27.50

14,190.00 14,190.00

-

-

0% 0%

-

-

0.0% 0.0%

-

-

0.0% 0.0%

516.00 516.00

14,190.00 14,190.00

100.0% 100.0%

ml ml ml und pto pto pto und und und pto ml ml und und

3,612.0 2,580.0 1,032.0 516.0 1,548.0 516.0 2,064.0 1,032.0 516.0 2,064.0 2,580.0 1,548.0 2,373.6 516.0 1,032.0

19.80 26.95 16.83 275.00 61.60 85.80 44.00 23.10 35.20 8.25 61.60 15.95 18.37 64.35 70.95

71,517.60 69,531.00 17,368.56 141,900.00 95,356.80 44,272.80 90,816.00 23,839.20 18,163.20 17,028.00 158,928.00 24,690.60 43,603.03 33,204.60 73,220.40

-

-

0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

-

-

0.0% 0.0 % 0.0 % 0.0% 0. 0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%

-

-

0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0. 0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%

3,612.00 2,580.00 1,032.00 516.00 1,548.00 516.00 2,064.00 1,032.00 516.00 2,064.00 2,580.00 1,548.00 2,373.60 516.00 1,032.00

71,517.60 69,531.00 17,368.56 141,900.00 95,356.80 44,272.80 90,816.00 23,839.20 18,163.20 17,028.00 158,928.00 24,690.6 0 43,603.0 3 33,204.60 73,220.40

100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%

m3

86.0

288.26

24,780.45

-

-

0%

-

-

0.0%

-

-

0.0%

85.97

24,780.45

100.0%

m2

138.3

13.84

1,913.91

-

-

0%

-

-

0.0%

-

-

0.0%

138.29

1,913.91

100.0%

und

516.0

21.06

10,866.96

-

-

0%

-

-

0.0%

-

-

0.0%

516.00

10,866.96

100.0%

m2 m2

371.5 2,827.7

44.98 44.98

16,711.58 127,193.67

-

-

0% 0%

-

-

0.0% 0.0%

-

-

0.0% 0.0%

371.52 2,827.68

16,711.58 127,193.67

100.0% 100.0%

und

516.0

165.96

85,635.36

-

-

0%

-

-

0.0%

-

-

0.0%

516.00

85,635.36

100.0%

und

1,548.0

140.52

217,524.96

-

-

0%

-

-

0.0%

-

-

0.0%

1,548.00

217,524.96

100.0%

und

516.0

129.85

67,002.60

-

-

0%

-

-

0.0%

-

-

0.0%

516.00

67,002.60

100.0%

und

2,580.0

53.94

139,165.20

-

-

0%

-

-

0.0%

-

-

0.0%

2,580.00

139,165.20

100.0%

und

516.0

186.66

96,316.15

-

-

0%

-

-

0.0%

-

-

0.0%

516.00

96,316.15

100.0%

und

1,032.0

239.12

246,771.84

-

-

0%

-

-

0.0%

-

-

0.0%

1,032.00

246,771.84

100.0%

und

516.0

67.84

35,004.61

-

-

0%

-

-

0.0%

-

-

0.0%

516.00

35,004.61

100.0%

und

516.0

229.45

118,398.47

-

-

0%

-

-

0.0%

-

-

0.0%

516.00

118,398.47

100.0%

und

2,580.0

69.04

178,114.94

-

-

0%

-

-

0.0%

-

-

0.0%

2,580.00

178,114.94

100.0%

61

 

1.3.4.2.5.5.1 1.3.4.2.5.5.2 1.3.4.2.5.5.3 1.3.4.2.5.5.4 1.3.4.2.5.6 1.3.4.2.5.6.1 1.3.4.2.5.6.2 1.3.4.2.5.6.3 1.3.4.2.5.6.4 1.3.4.2.5.6.5 1.3.4.2.5.6.6 1.3.4.2.5.6.7 1.3.4.2.5.6.8 1.3.4.2.5.6.9 1.3.4.2.5.6.10 1.3.4.2.5.6.11 1.3.4.2.5.6.12 1.3.4.2.5.7 1.3.4.2.5.7.1 1.3.4.2.6 1.3.4.2.6.1 1.3.4.2.6.1.1 1.3.4.2.6.1.2 1.3.4.2.6.2 1.3.4.2.6. 2.1 1.3.4.3 1.3.5 1.3.5.1 1.3.5.1.1 1.3.5.1.1. 1 1.3.5.1.1. 2 1.3.5.1.1. 3 1.3.5.1.1. 4 1.3.5.1.1. 6 1.3.5.1.2 1.3.5.1.2. 2 1.3.5.1.2. 2.1 1.3.5.1.2. 2.1.1 1.3.5.1.2.2.1.1.1 1.3.5.1.2.2.1.1.2 1.3.5.1.2.2.1.1.3 1.3.5.1.2. 2.1.2 1.3.5.1.2.2.1.2.1 1.3.5.1.2.2.1.2.2 1.3.5.1.2.2.1.2.3 1.3.5.1.2.2.1.2.4 1.3.5.1.2.2.1.2.5 1.3.5.1.2.2.1.2.6 1.3.5.1.2.2.1.2.7 1.3.5.1.2.2.1.2.8 1.3.5.1.2.2.1.2.9 1.3.5.1.2.2.1.3 1.3.5.1.2.2.1.3.1

Cerradura Fixer Puerta Principal llave exterior/boton interior acero inoxidable Cerradura Fixer Baño Ranura ext./botoninterior Cerradura Fixer Puerta Jardin llave exterior/botoninterior acero inoxidable Cerradura Fixer Dormitorio Ranura ext./botoninterior APARATOS Y ACCESORIOS SANITARIOS Inodoro Rapid Jet Blanco Lavatorio Fontana de Baño Lavadero de Cocina Luxor 1 Poza sin Escurridero 50cm Lavarropa de Granito Jorss 1 Poza 80cm Griferia p/ducha Trebol ECO Griferia p/lavatorio de baño Trebol ECO Griferia p/lavadero cocina a Pared Trebol ECO Llave para Lavadero de Ropa Hubolt 1/2 Instalacion de Inodoro Instalacion de Lavatorio y Lavarropa Instalacion de Lavadero Cocina Instalacion Llave y Pico de Ducha COBERTURA Cobertura Techo de Fibraforte incluida parrilla de madera PINTURA INTERIOR Limpeza e imprimado de Muro Limpeza e imprimado de Techo EXTERIOR Pintura Latex en Muros Exteriores URBANISMO ETAPA 5 HABILITACI ÓN URBANA MOVIMIENTO DE TIERRAS LIMPIEZA Y DESBROCE CORTE RELLENO ELIMINACIÓN DE MATERIAL PLATAFORMADO DE CASAS AGUA POTABLE Y ALCANTARILL ADO AGUA POTABLE RED DE DISTRIBUCIÓN TRABAJOS PRELIMINARES RIEGO DE LA ZONA DE TRABAJO PARA MITIGAR LA CONTAMINACION POR POLVO TRAZO Y REPLANTEO INICIAL DE LA LINEA TRAZO Y REPLANTEO DURANTE LA INSTALACION DE TUBERIAS MOVIMIENTO DE TIERRAS EXC. S/INTERF. TERRENO SUELTO P/TUB. DN=110-160mm HastaTERRENO H=1.20m. EXC. S/INTERF. SUELTO P/TUB. DN=200-250mm Hasta H=1.20m. REFINES Y NIVELACION FONDO DE ZANJA P/TUB DN 110-160MM EN TERRENO NORMAL REFINES Y NIVELACION FONDO DE ZANJA P/TUB DN 200-250MM EN TERRENO NORMAL CAMA DE ARENA MANUAL E=0.1M ZANJA P/TUB DN 110-160; MATERIAL PROPIO ZARANDEADO CAMA DE ARENA MANUAL E=0.1M ZANJA P/TUB DN 200-250; MATERIAL PROPIO ZARANDEADO RELL. D/ZANJ. D/MAT. PROPIO COMP. C/EQ P/TUB 110-160mm,H=1.20m RELL. D/ZANJ. D/MAT. PROPIO COMP. C/EQ P/TUB 200-250mm,H=1.20m ELIMINACION MATERIAL EXCEDENTE C/EQUIPO HASTA 1KM INSTALACION DE TUBERIAS DE AGUA POTABLE (INC.SUMINISTRO) SUMI. E INST. TUBERIA PVC UF, PN7. 5, P/AGUA POTABLE DN 110 mm. NTP 16422

und

516.0

17.91

9,240.53

-

-

0%

-

-

0.0%

-

-

0.0%

516.00

9,240.53

100.0%

und

516.0

17.91

9,240.53

-

-

0%

-

-

0.0%

-

-

0.0%

516.00

9,240.53

100.0%

und

516.0

17.91

9,240.53

-

-

0%

-

-

0.0%

-

-

0.0%

516.00

9,240.53

100.0%

und

1,032.0

17.91

18,481.06

-

-

0%

-

-

0.0%

-

-

0 .0%

1,032.00

18,481.06

100.0%

und und und

516.0 516.0 516.0

187.38 70.63 60.63

96,685.50 36,442.50 31,282.50

-

-

0% 0% 0%

-

-

0.0% 0.0% 0.0%

-

-

0.0% 0.0% 0.0%

516.00 516.00 516.00

96,685.50 36,442.50 31,282.50

100.0% 100.0% 100.0%

und

516.0

104.75

54,051.00

-

-

0%

-

-

0.0%

-

-

0.0%

516.00

54,051.00

100.0%

und

516.0

68.50

35,346.00

-

-

0%

-

-

0.0%

-

-

0.0%

516.00

35,346.00

100.0%

und

516.0

50.75

26,187.00

-

-

0%

-

-

0.0%

-

-

0.0%

516.00

26,187.00

100.0%

und

516.0

58.50

30,186.00

-

-

0%

-

-

0.0%

-

-

0.0%

516.00

30,186.00

100.0%

und

516.0

29.38

15,157.50

-

-

0%

-

-

0.0%

-

-

0.0%

516.00

15,157.50

100.0%

und und und und

516.0 1,032.0 516.0 516.0

31.25 31.25 31.25 31.25

16,125.00 32,250.00 16,125.00 16,125.00

-

-

0% 0% 0% 0%

-

-

0.0% 0.0% 0.0% 0.0%

-

-

0.0% 0.0% 0.0% 0.0%

516.00 1,032.00 516.00 516.00

16,125.00 32,250.00 16,125.00 16,125.00

100.0% 100.0% 100.0% 100.0%

m2

13,029.0

25.41

331,066.89

-

-

0%

-

-

0.0%

-

-

0.0%

13,029.00

331,066.89

100.0%

m2 m2

50,629.9 11,811.2

9.91 9.91

501,843.77 117,073.01

-

-

0% 0%

-

-

0.0% 0.0%

-

-

0.0% 0.0%

50,629.92 11,811.24

501,843.77 117,073.01

100.0% 100.0%

m2 glb

8,385.0 1.0

12.15 250,000.00

101,894.52 250,000.00

-

-

0% 0%

-

-

0.0% 0.0%

-

-

0.0% 0.0%

8,385.00 1.00

101,894.52 250,000.00

100.0% 100.0%

m2 m3 m3 m2 m2

62,500.0 26,192.3 26,669.6 62,500.0 13,000.0

0.35 3.69 6.09 0.08 25.64

21,875.00 96,649.40 162,418.02 5,000.00 333,362.06

-

-

0% 0% 0% 0% 0%

-

-

0.0% 0.0% 0.0% 0.0% 0.0%

-

-

0.0% 0.0% 0.0% 0.0% 0 .0%

62,500.00 26,192.25 26,669.63 62,500.00 13,000.00

21,875.00 96,649.40 162,418.02 5,000.00 333,362.06

100.0% 100.0% 100.0% 100.0% 100.0%

ml

2,396.3

2.84

6,805.38

-

-

0%

-

-

0.0 %

-

-

0.0%

2,396.26

6,805.38

100.0%

ml

2,396.3

1.18

2,827.59

-

-

0%

-

-

0.0 %

-

-

0.0%

2,396.26

2,827.59

100.0%

ml

2,396.3

1.86

4,457.04

-

-

0%

-

-

0.0 %

-

-

0.0%

2,396.26

4,457.04

100.0%

ml

2,396.3

11.26

26,981.89

-

-

0%

-

-

0.0%

-

-

0. 0%

2,396.26

26,981.89

100.0%

2,396.3

1.33

3,187.03

-

-

0%

-

-

0.0 %

-

-

0.0%

2,396.26

3,187.03

100.0%

2,396.3

3.71

8,890.12

-

-

0%

-

-

0.0 %

-

-

0.0%

2,396.26

8,890.12

100.0%

2,396.3

14.69

35,201.06

-

-

0%

-

-

0.0%

-

-

0. 0%

2,396.26

35,201.06

100.0%

m3

1,035.2

8.31

8,602.35

-

-

0%

-

-

0.0 %

-

-

0.0%

1,035.18

8,602.35

100.0%

ml

2,396.3

19.59

46,942.73

-

-

0%

-

-

0.0%

-

-

0. 0%

2,396.26

46,942.73

100.0%

ml ml ml ml ml ml ml

62

 

1.3.5.1.2.2.1.3.2 1.3.5.1.2.2.1.3.3 1.3.5.1.2.2.1.4 1.3.5.1.2.2.1.4.1 1.3.5.1.2.2.1.4.2 1.3.5.1.2.2.1.4.3 1.3.5.1.2.2.1.5 1.3.5.1.2.2.1.5.1 1.3.5.1.2.2.1.5.2 1.3.5.1.2.2.1.5.3 1.3.5.1.2.2.1.5.4 1.3.5.1.2.2.1.5.5 1.3.5.1.2.2.1.5.6 1.3.5.1.2.2.1.5.7 1.3.5.1.2.2.1.5.8 1.3.5.1.2.2.1.5.9 1.3.5.1.2.2.1.5.10 1.3.5.1.2.2.1.5.11 1.3.5.1.2.2.1.5.12 1.3.5.1.2.2.1.5.13 1.3.5.1.2. 2.1.6 1.3.5.1.2.2.1.6.1 1.3.5.1.2.2.1.6.2 1.3.5.1.2.2.1.7 1.3.5.1.2.2.1.7.1 1.3.5.1.2.2.1.7.2 1.3.5.1.2.2.1.7.3 1.3.5.1.2.2.1.7.4 1.3.5.1.2.2.1.7.5 1.3.5.1.2.2.1.7.6 1.3.5.1.2.2.1.7.7 1.3.5.1.2.2.1.7.8 1.3.5.1.2.2.1.7.9 1.3.5.1.2. 2.2 1.3.5.1.2.2.2.1 1.3.5.1.2.2.2.1.1 1.3.5.1.2.2.2.1.2 1.3.5.1.2.2.2.1.3 1.3.5.1.2.2.2.1.4 1.3.5.1.2.2.2.1.5

SUMI. E INST. TUBERIA PVC UF, PN7. 5, P/AGUA POTABLE DN 160 mm. NTP 16423 SUMI. E INST. TUBERIA PVC UF, PN10, P/AGUA POTABLE DN 200 mm. NTP 16424 PRUEBA HIDRAULICA Y DESINFECCION DE TUBERIA ZANJA TAPADA PRUEBA HIDRAULICA Y DESINFECCION DE TUBERIA DN 100mm PRUEBA HIDRAULICA Y DESINFECCION DE TUBERIA DN 160mm PRUEBA HIDRAULICA Y DESINFECCION DE TUBERIA DN 200mm INSTALACION DE ACCESORIOS PVC AGUA POTABLE (INC. SUMINISTRO) SUMI. E INST. TEE PVC 110 x 110mm; PN=10 SUMI. E INST. TEE PVC 160 x 160mm; PN=10 SUMI. E INST. TEE PVC 200 x 200mm; PN=10 SUMI. E INST. CODO DE PVC DN 90º x 110mm SUMI. E INST. CODO DE PVC DN 45º x 110mm SUMI. E INST. CODO DE PVC DN 45º x 160mm SUMI. E INST. CODO DE PVC DN 22.5º x 110mm SUMI. E INST. CODO DE PVC DN 22.5º x 160mm SUMI. E INST. REDUCCIONES PVC DN 160mm a 110mm SUMI. E INST. REDUCCIONES DN 200mm a 160mm SUMI.PVC E INST. DE TAPON PVC UF DN 110mm SUMI. E INST. DE TAPON PVC UF DN 160mm SUMI. E INST. DE TAPON PVC UF DN 200mm ANCLAJES Y/O APOYOS CONCRETO F'C=175KG/CM2 PARA ANCLAJE DE ACCESORIOS EMPALME A TUBERIA EXISTENTE VALVULAS Y ACCESORIOS DE HIERRO DUCTIL SUMI. E INST. VALVULA DE COMPUERTA HD 110mm SUMI. E INST. VALVULA DE COMPUERTA HD 160mm SUMI. E INST. VALVULA DE COMPUERTA HD 200mm SUMI. E INST. VALVULA DE PURGA DN 100mm INCLUYE ACCESORIOS, EXCA. CONCRETO 210, TUB. 110mm SUMI. E INST. VALVULA DE PURGA DN 160mm INCLUYE ACCESORIOS, EXCA. CONCRETO 210, TUB. 160mm SUMI. E INST. VALVULA DE AIRE BB DN 25mm INC. ACCESO. CAJA, P/TUB. DN 110mm. SUMI. E INST. VALVULA DE AIRE BB DN 25mm INC. ACCESO. CAJA, P/TUB. DN 160mm. SUMI. E INST. DE GRIFO CONTRA INCENDIOS FºFº, 02 SALIDAS CAJA DE VALVULA COMPUERTA CONEXIONES DOMICILIARIA S CONEXIÓN DOMICILIARIA DE AGUA POTABLE RIEGO DE LA ZONA DE TRABAJO PARA MITIGAR LA CONTAMINACION POR POLVO TRAZO Y REPLANTEOS CONEXIÓN DOMICILIARIA GUA EXCAVACION DE ZANJA T.NORMAL (0.4x1.20m); CONEX. AGUA REFINE Y NIVELACION DE ZANJA CONEXIÓN AGUA CAMA DE ARENA DE P/TUB. 1/2, C/MATERIAL PROPIO ZARANDEADO; CONEXIÓN DOMIL.

ml ml

ml

2,396.3

1.49

3,570.43

-

-

0%

-

-

0.0 %

-

-

0.0%

2,396.26

3,570.43

100.0%

26.0

92.76

2,411.76

-

-

0%

-

-

0.0%

-

-

0.0%

26.00

2,411.76

100.0%

26.0

86.19

2,240.94

-

-

0%

-

-

0.0%

-

-

0.0%

26.00

2,240.94

100.0%

7.0

68.36

478.52

-

-

0%

-

-

0.0%

-

-

0.0%

7.00

478.52

100.0%

ml ml

und und und und und und und und und und und und und und

66.0

68.42

4,515.72

-

-

0%

-

-

0.0%

-

-

0.0%

66.00

4,515.72

100.0%

und

7.0

167.16

1,170.12

-

-

0%

-

-

0.0%

-

-

0.0%

7.00

1,170.12

100.0%

und und und und und und und und und

ml

3,126.0

2.84

8,877.84

-

-

0%

-

-

0.0 %

-

-

0.0%

3,126.00

8,877.84

100.0%

ml

3,126.0

1.2

3,751.20

-

-

0%

-

-

0.0%

-

-

0.0%

3,126.00

3,751.20

100.0%

ml

3,126.0

22.35

69,866.10

-

-

0%

-

-

0.0%

-

-

0. 0%

3,126.00

69,866.10

100.0%

ml

3,126.0

0.65

2,031.90

-

-

0%

-

-

0.0 %

-

-

0.0%

3,126.00

2,031.90

100.0%

ml

3,126.0

2.16

6,752.16

-

-

0%

-

-

0.0 %

-

-

0.0%

3,126.00

6,752.16

100.0%

63

 

1.3.5.1.2.2.2.1.6 1.3.5.1.2.2.2.1.7 1.3.5.1.2.2.2.1.8 1.3.5.1.2.2.2.1.9 1.3.5.1.2.2.2.1.10 1.3.5.1.2.2.2.1.11 1.3.5.1.2.2.3 1.3.5.1.2.2.3.1 1.3.5.1.2.2.3.1.1 1.3.5.1.2.2.3.1.2 1.3.5.1.2.3 1.3.5.1.2.3.1 1.3.5.1.2. 3.1.1 1.3.5.1.2.3.1.1.1 1.3.5.1.2.3.1.1.2 1.3.5.1.2.3.1.1.3 1.3.5.1.2. 3.1.2 1.3.5.1.2. 3.1.2.1 1.3.5.1.2.3.1.2.1.1 1.3.5.1.2.3.1.2.1.2 1.3.5.1.2.3.1.2.2 1.3.5.1.2.3.1.2.2.1 1.3.5.1.2.3.1.2.2.2 1.3.5.1.2.3.1.2.3 1.3.5.1.2.3.1.2.3.1 1.3.5.1.2.3.1.2.3.2 1.3.5.1.2.3.1.2.3.3 1.3.5.1.2. 3.1.2.4 1.3.5.1.2.3.1.2.4.1 1.3.5.1.2.3.1.3 1.3.5.1.2.3.1.3.1 1.3.5.1.2.3.1.3.2 1.3.5.1.2.3.1.4 1.3.5.1.2.3.1.4.1 1.3.5.1.2.3.1.4.2 1.3.5.1.2.3.1.4.3 1.3.5.1.2.3.1.4.4 1.3.5.1.2. 3.2 1.3.5.1.2.3.2.1 1.3.5.1.2.3.2.1.1 1.3.5.1.2.3.2.1.2 1.3.5.1.2.3.2.1.3

RELLENO Y COMP. DE ZANJA CONEXIÓN ELIMINACION MATERIAL EXCEDENTE C/EQUIPO HASTA 1KM CONEXIÓN DOMICILIARIA AGUA TUB. PVC 1/2; LPROM=6m. CONEXIÓN DOMICILIARIA AGUA TUB. PVC 3/4; LPROM=6m. SUM. E INST. DE MICROMEDIDORES CONEXIÓN DOMIC.AGUA,INCL. INSTALACION Y ACCESORIOS PRUEBA HIDRAULICA Y DESINFECCION DE TUBERIA PVC Ø 1/2 PRUEBAS DE CONTROL DE CALIDAD PRUEBAS DE CONTROL DE CALIDAD PRUEBA COMPACTACION SUELOS (PROCTOR MODIFICADO) PRUEBA COMPACTACION SUELOS (DENSIDAD DE CAMPO) ALCANTARILLADO RED DE COLECTORES SECUNDARIOS TRABAJOS PRELIMINARES RIEGO DE LA ZONA DE TRABAJO PARA MITIGAR LA CONTAMINACION POR POLVO TRAZO Y REPLANTEOS INICIALES DEL PROYECTO TRAZO Y REPLANTEO DURANTE EL PROCESO CONSTRUCTIVO DE LA OBRA MOVIMIENTO DE TIERRAS EXCAVACIONES DE ZANJAS EXCAVACION DE ZANJA C/MAQ. T. NORMAL HASTA 1.50MPP EXCAVACION DE ZANJA C/MAQ. T. NORMAL HASTA 2.00MPP REFINE, NIVELACION Y CONFORMACION DE ZANJAS REFINE, NIVELACION Y CONFORMACION DE FONDO DE ZANJA HASTA HPROM=3.00m CAMA DE ARENA DE APOYO DE TUBERIA PVC DN (200-250) E=0.10M; A=0.60m; C/MATERIAL PROPIO ZARANDEADO RELLENO Y COMPACTACION DE ZANJAS RELLENO COMP. ZANJA T. NORMAL HASTA 1.50MPP RELLENO COMP. ZANJA T. NORMAL HASTA 2.00MPP ELIMINACION MATERIAL EXCEDENTE C/EQUIPO EN TERRENO ANEXO ENTIBADO DE ZANJAS ENTIBADO DE PROTECCION DE ZANJAS H>2.00m SUMINISTRO E INSTALACION TUBOSECOLECTOR/EMISOR SUMIN. INSTAL. TUBO PVC UF, SN-4, DN 200MM, ISO 4435 PRUEBA HIDRAULICA TUBO PVC DN 200MM CONSTRUCCION DE BUZONES Y EMPALMES BUZON TIPO I, C/MARCO Y TAPA DE CONCRETO Di=1.20m x h=1.20MPP BUZON TIPO I, C/MARCO Y TAPA DE CONCRETO Di=1.20m x h=1.50MPP BUZON TIPO I, C/MARCO Y TAPA DE CONCRETO Di=1.20m x h=2.00MPP EMPALME A BUZON DE TUB. PVC CON DADO DE CONCRETO SIMPLE CONEXIONES DOMICILIARIA S CONEXION DOMICILIARIA DESAGUE RIEGO DE LA ZONA DE TRABAJO PARA MITIGAR LA CONTAMINACION POR POLVO TRAZOS Y REPLANTEOS DURANTE EL PROCESO CONSTRUCTIVO DE LA OBRA EXCAVACION DE ZANJA T.NORMAL (0.4x1.20m); CONEX. AGUA

ml

3,126.0

13.56

42,388.56

-

-

0%

-

-

0.0%

-

-

0. 0%

3,126.00

42,388.56

100.0%

m3

1,350.4

8.31

11,222.07

-

-

0%

-

-

0.0%

-

-

0. 0%

1,350.43

11,222.07

100.0%

und

520.0

218.22

113,474.40

-

-

0%

-

-

0.0%

-

-

0.0%

520.00

113,474.40

100.0%

und

1.0

247.51

247.51

-

-

0%

-

-

0.0%

-

-

0.0%

1.00

247.51

100.0%

ml

520.0

154.6

80,392.00

-

-

0%

-

-

0.0 %

-

-

0.0%

520.00

80,392.00

100.0%

ml

3,126.0

1.14

3,563.64

-

-

0%

-

-

0.0 %

-

-

0.0%

3,126.00

3,563.64

100.0%

ml

1.0

70

70.00

-

-

0%

-

-

0.0%

-

-

0.0%

1.00

70.00

100.0%

ml

23.0

60

1,380.00

-

-

0%

-

-

0.0%

-

-

0.0%

23.00

1,380.00

100.0%

m

2,053.6

2.84

5,832.11

-

-

0%

-

-

0.0 %

-

-

0.0%

2,053.56

5,832.11

100.0%

m

2,053.6

1.24

2,546.41

-

-

0%

-

-

0.0 %

-

-

0.0%

2,053.56

2,546.41

100.0%

m

2,053.6

1.72

3,532.12

-

-

0%

-

-

0.0 %

-

-

0.0%

2,053.56

3,532.12

100.0%

m

1,548.2

14.88

23,037.51

-

-

0%

-

-

0.0%

-

-

0. 0%

1,548.22

23,037.51

100.0%

m

505.3

17.01

8,595.83

-

-

0%

-

-

0.0%

-

-

0.0%

505.34

8,595.83

100.0%

m

2,053.6

2.17

4,456.23

-

-

0%

-

-

0.0 %

-

-

0.0%

2,053.56

4,456.23

100.0%

m

2,053.6

3.89

7,988.35

-

-

0%

-

-

0.0 %

-

-

0.0%

2,053.56

7,988.35

100.0%

m

1,548.2

15.46

23,935.48

-

-

0%

-

-

0.0%

-

-

0. 0%

1,548.22

23,935.48

100.0%

m

505.3

20.51

10,364.52

-

-

0%

-

-

0.0 %

-

-

0.0%

505.34

10,364.52

100.0%

m3

616.1

8.31

5,119.54

-

-

0%

-

-

0.0%

-

-

0.0%

616.07

5,119.54

100.0%

m

505.3

39.01

19,713.31

-

-

0%

-

-

0.0 %

-

-

0.0%

505.34

19,713.31

100.0%

ml

2,053.6

30.46

62,551.44

-

-

0%

-

-

0.0%

-

-

0. 0%

2,053.56

62,551.44

100.0%

ml

2,053.6

1.8

3,696.41

-

-

0%

-

-

0.0%

-

-

0.0%

2,053.56

3,696.41

100.0%

und

6.0

1909.31

11,455.86

-

-

0%

-

-

0.0%

-

-

0.0%

6.00

11,455.86

100.0%

und

25.0

2485.81

62,145.25

-

-

0%

-

-

0.0%

-

-

0.0%

25.00

62,145.25

100.0%

und

4.0

2765.76

11,063.04

-

-

0%

-

-

0.0%

-

-

0.0%

4.00

11,063.04

100.0%

und

95.0

159.24

15,127.80

-

-

0%

-

-

0.0%

-

-

0.0%

95.00

15,127.80

100.0%

ml

3,126.0

2.84

8,877.84

-

-

0%

-

-

0.0 %

-

-

0.0%

3,126.00

8,877.84

100.0%

ml

3,126.0

1.31

4,095.06

-

-

0%

-

-

0.0 %

-

-

0.0%

3,126.00

4,095.06

100.0%

ml

3,126.0

22.35

69,866.10

-

-

0%

-

-

0.0%

-

-

0. 0%

3,126.00

69,866.10

100.0%

64

 

1.3.5.1.3.3.2.2

REFINE Y NIVELACION DE ZANJA CONEXIÓN AGUA CAMA DE ARENA DE P/TUB. 1/2, CMATERIAL PROPIO ZARANDEADO; CONEXIÓN DOMIL. RELLENO Y COMP. DE ZANJA CONEXIÓN ELIMINACION MATERIAL EXCEDENTE C/EQUIPO EN TERRENO ANEXO SUMIN. E INSTALACION DE TUBO PVC, SN-4, DN 160 MM, ISO 4435 SUMIN. E INSTALACION CAJA DE REGISTRO DE DESAGUE Y MEDIA CAÑA EMPALME A COLECTOR PVC DN 200MM PRUEBA HIDRAULICA CONEX. DOMICILIARIA DESAGUE PRUEBAS DE CONTROL DE CALIDAD PRUEBAS DE CONTROL DE CALIDAD PRUEBA COMPACTACION SUELOS (PROMOTOR MODIFICADO) PRUEBA COMPACTACION SUELOS (DENSIDAD DE CAMPO) PRUEBA DE CALIDAD DE CONCRETO VARIOS VARIOS LIMPIEZA FINAL DE OBRA PISTAS Y VEREDAS OBRAS PRELIMINARES, SEÑALIZACIÓN Y SEGURIDAD EN OBRA MOVILIZACION Y DESMOVILIZACION DE EQUIPO CINTA Y MALLA PLASTI A SEÑALIZADORA P/LIMITE DE SEGURIDAD DE OBRA TRANQUERAS Y MADERA 1.20x1m O/SEÑALIZACION Y PROTECCION DE OBRA EQUIPAMIENTO DE SEGURIDAD RIEGO PERMANENTE DE LA ZONA DE TRABAJO PARA MITIGAR LA CONTAMINACION POR POLVO PISTAS Y ESTACIONAMIENTO OBRAS PROVISIONALES TRAZO, NIVELES Y REPLANTEO INICIAL DE OBRA TRAZO REPLANTEO Y CONTRO TOPOGRAFICO DE EJES Y NIVELES DE PISTAS DURANTE LA EJECUCION DE LA OBRA MOVIMIENTO DE TIERRAS CORTE HASTA NIVEL DE SUBRASANTE EXTRACCION Y APILAMIENTO DE MATERIAL DE PRESTAMO CARGUIO Y TRANSPORTE DE MATERIAL PROPIO RELLENO Y COMPACTACION CON MATERIAL PROPIO ELIMINACION DE MATERIAL PROPIO EXCEDENTE EN TERRENO ANEXO PAVIMENTOS CONFORMACION Y COMPACTACION DE SUBRASANTE PARA PISTAS SUB-BASE DE 20 CMS BASE DE 15 CMS BARRIDO Y LIMPIEZA P/CARPETA ASFALTICA IMPRIMACION ASFALTICA CARPETA ASFALTICA EN CALIENTE DE 2" VEREDAS OBRAS PROVISIONALES TRAZO, REPLANTEO Y CONTROL TOPOGRAFICO DE EJES Y NIVELES DE VEREDAS MOVIMIENTO DE TIERRAS PERFILADO, NIVELACION Y COMPACTACION DE SUBRASANTE VEREDAS COLOCACION DE AFIRMADO/BASE GRANULAR PARA VEREDAS

1.3.5.1.3.3.2.3

EXCAVACION PARA SARDINELESMANUAL DE VEREDAS

1.3.5.1.2.3.2.1.4 1.3.5.1.2.3.2.1.5 1.3.5.1.2.3.2.1.6 1.3.5.1.2.3.2.1.7 1.3.5.1.2.3.2.1.8 1.3.5.1.2.3.2.1.9 1.3.5.1.2.3.2.1.10 1.3.5.1.2.3.2.1.11 1.3.5.1.2.3.3 1.3.5.1.2.3.3.1 1.3.5.1.2.3.3.1.1 1.3.5.1.2.3.3.1.2 1.3.5.1.2.3.3.1.3 1.3.5.1.2.3.4 1.3.5.1.2.3.4.1 1.3.5.1.2. 3.4.1.1 1.3.5.1.3 1.3.5.1.3.1 1.3.5.1.3.1.1 1.3.5.1.3.1.2 1.3.5.1.3.1.3 1.3.5.1.3. 1.4 1.3.5.1.3.1.5 1.3.5.1.3. 2 1.3.5.1.3. 2.1 1.3.5.1.3.2.1.1 1.3.5.1.3.2.1.2 1.3.5.1.3. 2.2 1.3.5.1.3.2.2.1 1.3.5.1.3.2.2.2 1.3.5.1.3.2.2.3 1.3.5.1.3.2.2.4 1.3.5.1.3.2.2.5 1.3.5.1.3.2.3 1.3.5.1.3.2.3.1 1.3.5.1.3. 2.3.2 1.3.5.1.3. 2.3.3 1.3.5.1.3.2.3.4 1.3.5.1.3. 2.3.5 1.3.5.1.3.2.3.6 1.3.5.1.3.3 1.3.5.1.3. 3.1 1.3.5.1.3.3.1.1 1.3.5.1.3. 3.2 1.3.5.1.3.3.2.1

ml

3,126.0

1.31

4,095.06

-

-

0%

-

-

0.0 %

-

-

0.0%

3,126.00

4,095.06

100.0%

ml

3,126.0

2.81

8,784.06

-

-

0%

-

-

0.0 %

-

-

0.0%

3,126.00

8,784.06

100.0%

ml

3,126.0

13.56

42,388.56

-

-

0%

-

-

0.0%

-

-

0. 0%

3,126.00

42,388.56

100.0%

m3

1,350.4

8.31

11,222.07

-

-

0%

-

-

0.0%

-

-

0. 0%

1,350.43

11,222.07

100.0%

m

3,126.0

20.6

64,395.60

-

-

0%

-

-

0. 0%

-

-

0.0%

3,126.00

64,395.60

100.0%

und

521.0

130.56

68,021.76

-

-

0%

-

-

0.0%

-

-

0.0%

521.00

68,021.76

100.0%

und

521.0

95.42

49,713.82

-

-

0%

-

-

0.0%

-

-

0.0%

521.00

49,713.82

100.0%

und

3,126.0

1.8

5,626.80

-

-

0%

-

-

0.0%

-

-

0.0%

3,126.00

5,626.80

100.0%

100.0%

und

1.0

70

70.00

-

-

0%

-

-

0.0%

-

-

0.0%

1.00

70.00

und

20.0

60

1,200.00

-

-

0%

-

-

0.0%

-

-

0.0%

20.00

1,200.00

100.0%

und

1.0

2000

2,000.00

-

-

0%

-

-

0.0%

-

-

0.0%

1.00

2,000.00

100.0%

m

2,053.6

1.31

2,690.16

-

-

0%

-

-

0.0%

-

-

0 .0%

2,053.56

2,690.16

100.0%

glb m

2.34

-

und

100

-

glb

988.64

-

Ha

4517.34

-

m2

15,318.1

0.73

11,182.22

-

-

0%

-

-

0.0%

-

-

0 .0%

15,318.11

11,182.22

100.0%

m2

15,318.1

1.81

27,725.78

-

-

0%

-

-

0.0%

-

-

0 .0%

15,318.11

27,725.78

100.0%

m3

8,357.0

8.01

66,939.33

-

-

0%

-

-

0.0%

-

-

0. 0%

8,356.97

66,939.33

100.0%

m3

8,531.4

4.56

38,903.23

-

-

0%

-

-

0.0%

-

-

0. 0%

8,531.41

38,903.23

100.0%

m3

8,531.4

4.25

36,258.49

-

-

0%

-

-

0.0%

-

-

0. 0%

8,531.41

36,258.49

100.0%

m3

8,531.4

19.36

165,168.10

-

-

0%

-

-

0.0%

-

-

0.0%

8,531.41

165,168.10

100.0%

m3

m2

15,318.1

2.03

31,095.76

-

-

0%

-

-

0.0%

-

-

0 .0%

15,318.11

31,095.76

100.0%

m2 m2

15,318.1 15,318.1

16.85 18.65

258,110.15 285,682.75

-

-

0% 0%

-

-

0.0% 0.0%

-

-

0.0% 0 .0%

15,318.11 15,318.11

258,110.15 285,682.75

100.0% 100.0%

m2

15,318.1

0.45

6,893.15

-

-

0%

-

-

0.0%

-

-

0. 0%

15,318.11

6,893.15

100.0%

m2

15,318.1

4.29

65,714.69

-

-

0%

-

-

0.0%

-

-

0.0%

15,318.11

65,714.69

100.0%

m2

15,318.1

35.71

547,009.71

-

-

0%

-

-

0.0%

-

-

0.0%

15,318.11

547,009.71

100.0%

m2

5,260.8

2.15

11,310.76

-

-

0%

-

-

0.0%

-

-

0. 0%

5,260.82

11,310.76

100.0%

m2

5,260.8

6.83

35,931.40

-

-

0%

-

-

0.0%

-

-

0. 0%

5,260.82

35,931.40

100.0%

m2

5,260.8

14.8

77,860.14

-

-

0%

-

-

0.0%

-

-

0. 0%

5,260.82

77,860.14

100.0%

m

4,027.6

4.03

16,231.03

-

-

0%

-

-

0. 0%

-

-

0.0%

4,027.55

16,231.03

100.0%

65

 

1.3.5.1.3. 3.3 1.3.5.1.3.3.3.1 1.3.5.1.3.3.3.2 1.3.5.1.3.3.3.3 1.3.5.1.3.3.3.4 1.3.5.1.3.3.3.5 1.3.5.1.3.4 1.3.5.1.3. 4.1 1.3.5.1.3.4.1.1 1.3.5.1.3.4.1.2 1.3.5.1.3.4.1.3 1.3.5.1.3.4.2 1.3.5.1.3.4.2.1 1.3.5.1.3.4.2.2 1.3.5.1.3.4.2.3 1.3.5.1.3.4.2.4 1.3.5.1.3. 5 1.3.5.1.3. 5.1 1.3.5.1.3.5.1.1 1.3.5.1.3.5.1.2 1.3.5.1.3.5.1.3 1.3.5.1.3. 5.2 1.3.5.1.3.5.2.1 1.3.5.1.3.5.2.2 1.3.5.1.3.5.2.3 1.3.5.1.3.5.2.4 1.3.5.1.3. 5.2.5 1.3.5.1.3.6 1.3.5.1.3.6.1 1.3.5.1.3.6.1.1 1.3.5.1.3.6.1.2 1.3.5.1.3.6.1.3 1.3.5.1.3.6.1.4 1.3.5.1.3.6.1.5 1.3.5.1.3. 7 1.3.5.1.3. 7.1 1.3.5.1.3. 7.1.1 1.3.5.1.3. 8 1.3.5.1.3. 8.1 1.3.5.1.3.8.1.1 1.3.5.1.3.8.1.2 1.3.5.1.3.8.1.3 1.3.5.1.3. 9 1.3.5.1.3. 9.1 1.3.5.1.3.9.1.1 1.3.5.1.3.9.1.2 1.3.5.1.3.9.1.3 1.3.5.1.3.9.1.4

VEREDAS Y SARDINELES ENCOFRADO Y DESENCOFRADO DE VEREDAS CONCRETO PARA SARDINELES DE VEREDAS h=35 cm F'C=175 kg/cm2 CONCRETO PARA VEREDAS DE H=10CM F'C=175 KG/CM2 JUNTA DE DILATACION ASFALTICA PARA VEREDAS; e=1/2 CURADO QUIMICO PARA VEREDAS PAVIMENTO RGIDO: PASAJE PEATONAL MOVIMIENTO DE TIERRAS PERFILADO, NIVELACION Y COMPACTACION DE SUBRASANTE COLOCACION DE AFIRMADO/BASE GRANULAR EXCAVACION MANUAL PARA SADINELES SUMERGIDOS CONCRETO EN PASAJES PEATONALES CONCRETO PARA SARDINEL SUMERGID; H=0.25cm; F'C=210 kg/cm2 PAVIMENTO RIGIDO DE CONCRETO EN PASAJE PEATONAL; H=12.5cm; F'C=210 KG/CM2 JUNTA DE DILATACION ASFALTICA EN PAVIMIENTO RIGIDO; e=1/2 CURADO QUIMICO PARA PAVIMENTO RIGIDO RAMPAS PEATONALES MOVIMIENTO DE TIERRAS PERFILADO, NIVELACION Y COMPACTACION DE SUBRASANTE COLOCACION DE AFIRMADO/BASE GRANULAR EXCAVACION MANUAL PARA SARDINELES SUMERGIDOS CONCRETO EN RAMPAS ENCOFRADO Y DESENCOFRADO DE RAMPAS CONCRETO PARA SARDINELES DE RAMPAS h=20cm F'C=175kg/cm2 CONCRETO PARA RAMPAS DE H=10CM F'C=175 KG/CM2 CURADO QUIMICO PARA RAMPAS BRUÑADO DE RAMPAS SEÑALIZACIÓN SEÑALIZACION PINTADO EN BLANCO DE LETRAS, CRUCES PEATONALES Y SIMBOLOS EN PAVIMENTO PINTADO DE AMARILLO EN PSJE. PEATONAL PINTADO DE AMARILLO EN SARDINELES, MARTILLOS, RAMPAS Y ESTACIONAMIENTO PINTADO DE BLANCO DE LINEAS DISCONTINUAS Y CONTINUAS EN PAVIMENTO SEÑALIZACION VERTICAL (PREVENTIVA Y REGLAMENTARIA) LIMPIEZA DE OBRA LIMPIEZA DE OBRA LIMPIEZA FINAL DE OBRA PRUEBAS DE CALIDAD PRUEBAS DE CALIDAD PRUEBAS DE CALIDAD DE SUBRASANTE PRUEBAS DE CALIDAD DE LA SUB BASE Y BASE PRUEBAS DE CALIDAD DEL CONCRETO SARDINEL CENTRAL SARDINEL CENTRAL EXCAVACION MANUAL PARA SARDINEL CENTRAL ENCOFRADO Y DESENCOFRADO DE SARDINEL CENTRAL CONCRETO PARA SARDINELES CENTRALES DE CALLE F'C=210 kg/cm2 JUNTA DE DILATACION ASFALTICA PARA SARDINEL CENTRAL; e=1/2

m2

801.5

41.58

33,326.95

-

-

0%

-

-

0.0 %

-

-

0.0%

801.51

33,326.95

100.0%

m

4,027.6

17.7

71,287.64

-

-

0%

-

-

0. 0%

-

-

0.0%

4,027.55

71,287.64

100.0%

m2

5,260.8

48.2

253,571.52

-

-

0%

-

-

0.0%

-

-

0 .0%

5,260.82

253,571.52

100.0%

ml

1,203.6

4.87

5,861.53

-

-

0%

-

-

0.0 %

-

-

0.0%

1,203.60

5,861.53

100.0%

m2

5,260.8

1.67

8,785.57

-

-

0%

-

-

0.0 %

-

-

0.0%

5,260.82

8,785.57

100.0%

m2

1,655.9

6.83

11,309.46

-

-

0%

-

-

0.0%

-

-

0. 0%

1,655.85

11,309.46

100.0%

m2

1,655.9

19.35

32,040.70

-

-

0%

-

-

0.0%

-

-

0 .0%

1,655.85

32,040.70

100.0%

m

1,036.5

4.03

4,177.14

-

-

0%

-

-

0.0 %

-

-

0.0%

1,036.51

4,177.14

100.0%

m

1,036.5

19.96

20,688.74

-

-

0%

-

-

0.0%

-

-

0. 0%

1,036.51

20,688.74

100.0%

m2

1,655.9

61.18

101,304.90

-

-

0%

-

-

0.0%

-

-

0.0%

1,655.85

101,304.90

100.0%

m

378.0

4.87

1,840.86

-

-

0%

-

-

0.0%

-

-

0.0%

378.00

1,840.86

100.0%

m2

1,655.9

1.67

2,765.27

-

-

0%

-

-

0.0 %

-

-

0.0%

1,655.85

2,765.27

100.0%

m2

213.2

6.83

1,456.02

-

-

0%

-

-

0.0%

-

-

0.0%

213.18

1,456.02

100.0%

m2

213.2

14.8

3,155.06

-

-

0%

-

-

0.0%

-

-

0.0%

213.18

3,155.06

100.0%

m

161.3

4.03

650.08

-

-

0%

-

-

0.0%

-

-

0.0%

161.31

6 50.08

100.0% 100.0%

m2

47.2

46.43

2,191.10

-

-

0%

-

-

0.0%

-

-

0.0%

47.19

2,1 91.10

m

161.3

15.99

2,579.35

-

-

0%

-

-

0.0%

-

-

0.0%

161.31

2,579.35

100.0%

m2

213.2

48.2

10,275.28

-

-

0%

-

-

0.0%

-

-

0.0%

213.18

10,275.28

100.0%

m2

213.2

1.67

356.01

-

-

0%

-

-

0.0%

-

-

0.0%

213.18

3 56.01

100.0%

m2

213.2

13.73

2,926.96

-

-

0%

-

-

0.0%

-

-

0.0%

213.18

2,926.96

100.0%

m2

861.9

23.01

19,833.01

-

-

0%

-

-

0.0 %

-

-

0.0%

861.93

19,833.01

100.0%

m2

258.3

21.08

5,444.96

-

-

0%

-

-

0.0%

-

-

0.0%

258.30

5,444.96

100.0%

m

1,440.5

9.52

13,713.46

-

-

0%

-

-

0. 0%

-

-

0.0%

1,440.49

13,713.46

100.0%

m

1,250.5

7.99

9,991.18

-

-

0%

-

-

0.0 %

-

-

0.0%

1,250.46

9,991.18

100.0%

und

11.0

580.95

6,390.45

-

-

0%

-

-

0.0%

-

-

0.0%

11.00

6,390.45

100.0%

Ha

6.9

3024

20,865.60

-

-

0%

-

-

0.0 %

-

-

0.0%

6.90

20,865.60

100.0%

glb

1.0

2680

2,680.00

-

-

0%

-

-

0.0%

-

-

0.0%

1.00

2,680.00

100.0%

glb

1.0

15480

15,480.00

-

-

0%

-

-

0.0%

-

-

0.0%

1.00

15,4 80.00

100.0%

glb

1.0

1850

1,850.00

-

-

0%

-

-

0.0%

-

-

0.0%

1.00

1,850.00

100.0%

m

326.2

3.02

984.97

-

-

0%

-

-

0.0%

-

-

0.0%

326.15

9 84.97

100.0%

m2

652.3

41.58

27,122.63

-

-

0%

-

-

0.0 %

-

-

0.0%

652.30

27,122.63

100.0%

m

326.2

25.77

8,404.89

-

-

0%

-

-

0.0%

-

-

0.0%

326.15

8,404.89

100.0%

m

49.1

4.87

239.18

-

-

0%

-

-

0.0%

-

-

0.0%

49.11

239.18

100.0%

66

 

1.3.5.1.3.9.1.5 1.3.5.1.4 1.3.5.1.4. 1 1.3.5.1.4. 2 1.3.5.2 1.3.5.2.1 1.3.5.2.1.1 1.3.5.2.1.2 1.3.5.2.1.3 1.3.5.2.1.4 1.3.5.2.1. 5 1.3.5.2.2 1.3.5.2.2.1 1.3.5.2.2.1.1 1.3.5.2.2. 1.2 1.3.5.2.2.1.3 1.3.5.2.2. 1.4 1.3.5.2.2.2 1.3.5.2.2.2.1 1.3.5.2.2.2.2 1.3.5.2.2.2.3 1.3.5.2.2. 3 1.3.5.2.2.3.1 1.3.5.2.2.3.2 1.3.5.2.2.3.3 1.3.5.2.2.3.4 1.3.5.2.3 1.3.5.2.3. 1 1.3.5.2.3.2 1.3.5.2.3. 3 1.3.5.2.3.4 1.3.5.2.3.5 1.3.5.2.3.6 1.3.5.2.3. 7 1.3.5.2.3. 8 1.3.5.2.3.9 1.3.5.2.3.10 1.3.5.2.3. 11 1.3.5.2.3.12 1.3.5.2.4 1.3.5.2.4. 1 1.3.5.2.4. 2 1.3.5.2.4. 3 1.3.5.2.4.4 1.3.5.2.4. 5 1.3.5.2.4. 6 1.3.5.2.4. 7 1.3.5.2.4.8 1.3.5.2.4.9 1.3.5.2.4.10 1.3.5.2.4. 11 1.3.5.2.4. 12 1.3.5.2.4. 13 1.3.5.2.4.14 1.3.5.2.4. 15 1.3.5.2.5 1.3.5.2.5.1 1.3.5.2.5.1.1 1.3.5.2.5.1.2 1.3.5.2.5.2 1.3.5.2.5.2.1 1.3.5.2.5. 2.2 1.3.5.2.5. 2.3 1.3.5.2.5.3 1.3.5.2.5.3.1 1.3.5.2.5.3.2

CURADO QUIMICO DE SARDINEL CENTRAL RED ELÉCTRICA RED PRIMARIA RED SECUNDARIA VIVIENDAS MOV. TIERRAS CASA Corte de Terreno con maquinaria h=0.35 (0.15 Platea + 0.20 Afirmado) Inc. Eliminación Excavación de Zanjas cimentación manual (Uñas de Platea) Inc Eliminación Relleno con material de préstamo (Afirmado e= 0.20m) Proctor 95% Nivelación y compactación de Terreno Acarreo de Material excedente ESTRUCTURAS PLATEA Concreto premezclado fc=175kg/cm2 Encofrado y desencofrad o Acero de refuerzo de fy =4200kg/cm2 Acabado de Losa Platea MUROS Concreto premezclado fc=175kg/cm2 Encofrado y desencofrado Acero de refuerzo de fy =4200kg/cm2 LOSA TECHO Concreto premezclado fc=175kg/cm2 Encofrado y desencofrado Acero de refuerzo de fy =4200kg/cm2 Junta de dilatación tecnopor 1 INSTALACIONES ELÉCTRICAS Salida p/centro de luz Salida p/braquetes Tomacorrie nte bipolar Interruptor de 01 golpe Salida p/timbre Salida p/pulsador de timbre Alimentad or de TD a Caja Medidor Tubo PVC SAP 25mm Tablero Electrico de Distribucion Tubo PVC SAP 25mm acometida para futura conexión pozo de tierra. Prueba electrica Conexión a banco de medidores INSTALACION ES SANITARIAS Excavacion y relleno de zanja Tuberia PVC SAL 4 Tuberia PVC SAL 2 Caja registro 12x24 Salida de desague 2 Salida de desague 4 Salida de ventilacio n 2 Sumidero de bronce 2 Registro de bronce 4 Sombrero de ventilacion 2 Salida de agua fria 1/2 Tuberia PVC C10 Agua Fria 1/2 Tuberia PVC C10 Agua Fria 3/4 Valvula compuerta 1/2 Valvula compuerta 3/4 ACABADOS LAVANDERA Concreto premezclado fc=175kg/cm2 Encofrado BAÑO Concreto simple 1:6 en sardinel ducha 0.10x0.20 Piso Cerámico 30x30 Ducha Zócalo cerámico 30x30 Ducha CARPINTERA DE MADERA P1 - Puerta Principal de HDF contraplacada - 0.90x2.60 - Sin Pintura P2 - Puerta Dormitorio y Lavandería

m

326.2

1.26

410.95

-

-

0%

-

-

0.0%

-

-

0.0%

326.15

4 10.95

100.0%

glb glb

1.0 1.0

175,149.70 614,321.36

175,149.70 614,321.36

-

-

0% 0%

-

-

0.0% 0.0%

-

-

0.0% 0.0%

1.00 1.00

175,149.70 614,321.36

100.0% 100.0%

m3

6,669.0

17.94

119,641.86

-

-

0%

-

-

0.0%

-

-

0.0%

6,669.00

119,641.86

100.0%

m3

432.9

46.80

20,259.72

-

-

0%

-

-

0.0 %

-

-

0.0%

432.90

20,259.72

100.0%

m3

2,854.8

86.88

248,025.02

-

-

0%

-

-

0.0%

-

-

0.0%

2,854.80

248,025.02

100.0%

m2 m3

15,783.3 7,101.9

2.64 5.40

41,667.91 38,350.26

-

-

0% 0%

-

-

0.0% 0.0%

-

-

0.0% 0.0%

15,783.30 7,101.90

41,667.91 38,350.26

100.0% 100.0%

m3

2,662.9

311.32

829,012.72

-

-

0%

-

-

0.0%

-

-

0.0%

2,662.89

829,012.72

100.0%

m2

5,864.2

14.95

87,653.83

-

-

0%

-

-

0.0%

-

-

0.0%

5,864.23

87,653.83

100.0%

kg

149,139.0

4.10

612,066.52

-

-

0%

-

-

0.0%

-

-

0.0%

##########

612,066.52

100.0%

m2

14,625.0

6.77

99,034.65

-

-

0%

-

-

0.0%

-

-

0.0%

14,625.00

99,034.65

100.0% 100.0%

m3

3,206.3

333.63

1,069,700. 56

-

-

0%

-

-

0.0%

-

-

0.0%

3,206.26

1,069,700.56

m2

64,125.2

9.55

612,554.29

-

-

0%

-

-

0.0%

-

-

0.0%

64,125.19

612,554.29

100.0%

kg

130,123.3

4.10

534,025.86

-

-

0%

-

-

0.0%

-

-

0.0%

##########

534,025.86

100.0%

m3

1,462.5

333.63

487,932.12

-

-

0%

-

-

0.0%

-

-

0.0%

1,462.50

487,932.12

100.0%

m2

14,625.0

10.24

149,753.73

-

-

0%

-

-

0.0%

-

-

0.0%

14,625.00

149,753.73

100.0%

kg m2

59,586.0 2,182.1

4.10 5.19

244,541.06 11,335.31

-

-

0% 0%

-

-

0.0% 0.0%

-

-

0.0% 0.0%

59,586.03 2,182.05

244,541.06 11,335.31

100.0% 100.0%

pto pto pto pto pto pto ml ml und

2,925.0 585.0 4,095.0 2,925.0 585.0 585.0 4,680.0 4,095.0 585.0

57.20 57.20 57.20 57.20 27.50 27.50 9.35 11.55 154.00

167,310.00 33,462.00 234,234.00 167,310.00 16,087.50 16,087.50 43,758.0 0 47,297.25 90,090.00

-

-

0% 0% 0% 0% 0% 0% 0% 0% 0%

-

-

0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0. 0% 0.0%

-

-

0 .0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%

2,925.00 585.00 4,095.00 2,925.00 585.00 585.00 4,680.00 4,095.00 585.00

167,310.00 33,462.00 234,234.00 167,310.00 16,087.50 16,087.50 43,758. 00 47,297.25 90,090.00

100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%

ml

3,510.0

11.55

40,540.50

-

-

0%

-

-

0.0%

-

-

0. 0%

3,510.00

40,540.50

100.0%

glb glb

585.0 585.0

27.50 27.50

16,087.50 16,087.50

-

-

0% 0%

-

-

0.0% 0.0%

-

-

0.0% 0.0%

585.00 585.00

16,087.50 16,087.50

100.0% 100.0%

ml ml ml und pto pto pto und und und pto ml ml und und

4,095.0 2,925.0 1,170.0 585.0 1,755.0 585.0 2,340.0 1,170.0 585.0 2,340.0 2,925.0 1,755.0 2,691.0 585.0 1,170.0

19.80 26.95 16.83 275.00 61.60 85.80 44.00 23.10 35.20 8.25 61.60 15.95 18.37 64.35 70.95

81,081.00 78,828.75 19,691.10 160,875.00 108,108.00 50,193.00 102,960.00 27,027.00 20,592.00 19,305.00 180,180.00 27,992.25 49,433.67 37,644.75 83,011.50

-

-

0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

-

-

0.0% 0.0 % 0.0 % 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%

-

-

0.0% 0.0% 0.0% 0.0% 0. 0% 0.0% 0 .0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%

4,095.00 2,925.00 1,170.00 585.00 1,755.00 585.00 2,340.00 1,170.00 585.00 2,340.00 2,925.00 1,755.00 2,691.00 585.00 1,170.00

81,081.00 78,828.75 19,691.10 160,875.00 108,108.00 50,193.00 102,960.00 27,027.00 20,592.00 19,305.00 180,180.00 27,992.2 5 49,433.6 7 37,644.75 83,011.50

100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%

m3

97.5

288.26

28,094.11

-

-

0%

-

-

0.0%

-

-

0.0%

97.46

28,094.11

100.0%

m2

156.8

13.84

2,169.84

-

-

0%

-

-

0.0%

-

-

0.0%

156.78

2,169.84

100.0%

und

585.0

21.06

12,320.10

-

-

0%

-

-

0.0%

-

-

0.0%

585.00

12,320.10

100.0%

m2 m2

421.2 3,205.8

44.98 44.98

18,946.27 144,202.13

-

-

0% 0%

-

-

0.0% 0.0%

-

-

0.0% 0.0%

421.20 3,205.80

18,946.27 144,202.13

100.0% 100.0%

und

585.0

165.96

97,086.60

-

-

0%

-

-

0.0%

-

-

0.0%

585.00

97,086.60

100.0%

und

1,755.0

140.52

246,612.60

-

-

0%

-

-

0.0%

-

-

0.0%

1,755.00

246,612.60

100.0%

de HDF contraplacada - 0.80x2.60 - Sin Pintura

67

 

1.3.5.2.5.3.3 1.3.5.2.5.3.4 1.3.5.2.5. 4 1.3.5.2.5.4.1 1.3.5.2.5.4.2 1.3.5.2.5.4.3 1.3.5.2.5.4.4 1.3.5.2.5.4.5 1.3.5.2.5.5 1.3.5.2.5.5.1 1.3.5.2.5.5.2 1.3.5.2.5.5.3 1.3.5.2.5.5.4 1.3.5.2.5.6 1.3.5.2.5.6.1 1.3.5.2.5.6.2 1.3.5.2.5.6.3 1.3.5.2.5.6.4 1.3.5.2.5.6.5 1.3.5.2.5.6.6 1.3.5.2.5.6.7 1.3.5.2.5.6.8 1.3.5.2.5.6.9 1.3.5.2.5.6.10 1.3.5.2.5.6.11 1.3.5.2.5.6.12 1.3.5.2.5.7 1.3.5.2.5.7.1 1.3.5.2.6 1.3.5.2.6.1 1.3.5.2.6.1.1 1.3.5.2.6.1.2 1.3.5.2.6.2 1.3.5.2.6. 2.1 1.3.5.3 1.3.6 1.3.6.1 1.3.6.1.1 1.3.6.1.1. 1 1.3.6.1.1. 2 1.3.6.1.1. 3 1.3.6.1.1. 4 1.3.6.1.1. 6 1.3.6.1.2 1.3.6.1.2. 2 1.3.6.1.2. 2.1 1.3.6.1.2. 2.1.1 1.3.6.1.2.2.1.1.1 1.3.6.1.2.2.1.1.2 1.3.6.1.2.2.1.1.3 1.3.6.1.2. 2.1.2 1.3.6.1.2.2.1.2.1 1.3.6.1.2.2.1.2.2 1.3.6.1.2.2.1.2.3 1.3.6.1.2.2.1.2.4 1.3.6.1.2.2.1.2.5

P3 - Puerta Baño de HDF contraplacada - 0.70x2.6 - Sin Pintura Instalación de Puertas CARPINTERÍA DE ALUMINIO V1 - Ventana de Aluminio Sala 0.85x1.4 V2 - Ventana de Aluminio Dormitorios - 1.0x1.4 V3 - Ventana de Aluminio Baño 0.30x0.50 V4 - Ventana de Aluminio Patio 0.95x1.4 Instalación Ventanas CERRAJERÍA Cerradura Fixer Puerta Principal llave exterior/boton interior acero inoxidable Cerradura Fixer Baño Ranura ext./botoninterior Cerradura Fixer Puerta Jardin llave exterior/botoninterior acero inoxidable Cerradura Fixer Dormitorio Ranura ext./botoninterior APARATOS Y ACCESORIOS SANITARIOS Inodoro Rapid Jet Blanco Lavatorio Fontana de Baño Lavadero de Cocina Luxor 1 Poza sin Escurridero 50cm Lavarropa de Granito Jorss 1 Poza 80cm Griferia p/ducha Trebol ECO Griferia p/lavatorio de baño Trebol ECO Griferia p/lavadero cocina a Pared Trebol ECO Llave para Lavadero de Ropa Hubolt 1/2 Instalacion de Inodoro Instalacion de Lavatorio y Lavarropa Instalacion de Lavadero Cocina Instalacion Llave y Pico de Ducha COBERTURA Cobertura Techo de Fibraforte incluida parrilla de madera PINTURA INTERIOR Limpeza e imprimado de Muro Limpeza e imprimado de Techo EXTERIOR Pintura Latex en Muros Exteriores URBANISMO ETAPA 6 HABILITACI ÓN URBANA MOVIMIENTO DE TIERRAS LIMPIEZA Y DESBROCE CORTE RELLENO ELIMINACIÓN DE MATERIAL PLATAFORMADO DE CASAS AGUA POTABLE Y ALCANTARILL ADO AGUA POTABLE RED DE DISTRIBUCIÓN TRABAJOS PRELIMINARES RIEGO DE LA ZONA DE TRABAJO PARA MITIGAR LA CONTAMINACION POR POLVO TRAZO Y REPLANTEO INICIAL DE LA LINEA TRAZO Y REPLANTEO DURANTE LA INSTALACION DE TUBERIAS MOVIMIENTO DE TIERRAS EXC. S/INTERF. TERRENO SUELTO P/TUB. DN=110-160mm Hasta H=1.20m. EXC. S/INTERF. TERRENO SUELTO P/TUB. DN=200-250mm Hasta H=1.20m. REFINES Y NIVELACION FONDO DE ZANJA P/TUB DN 110-160MM EN TERRENO NORMAL REFINES Y NIVELACION FONDO DE ZANJA P/TUB DN 200-250MM EN TERRENO NORMAL CAMA DE ARENA MANUAL E=0.1M ZANJA P/TUB DN 110-160; MATERIAL PROPIO ZARANDEADO

und

585.0

129.85

75,962.25

-

-

0%

-

-

0.0%

-

-

0.0%

585.00

75,962.25

100.0%

und

2,925.0

53.94

157,774.50

-

-

0%

-

-

0.0%

-

-

0.0%

2,925.00

157,774.50

100.0%

und

585.0

186.66

109,195.63

-

-

0%

-

-

0.0%

-

-

0.0%

585.00

109,195.63

100.0%

und

1,170.0

239.12

279,770.40

-

-

0%

-

-

0.0%

-

-

0.0%

1,170.00

279,770.40

100.0%

und

585.0

67.84

39,685.46

-

-

0%

-

-

0.0%

-

-

0.0%

585.00

39,685.46

100.0%

und und

585.0 2,925.0

229.45 69.04

134,230.82 201,932.64

-

-

0% 0%

-

-

0.0% 0.0%

-

-

0.0% 0.0%

585.00 2,925.00

134,230.82 201,932.64

100.0% 100.0%

und

585.0

17.91

10,476.18

-

-

0%

-

-

0.0%

-

-

0.0%

585.00

10,476.18

100.0%

und

585.0

17.91

10,476.18

-

-

0%

-

-

0.0%

-

-

0.0%

585.00

10,476.18

100.0%

und

585.0

17.91

10,476.18

-

-

0%

-

-

0.0%

-

-

0.0%

585.00

10,476.18

100.0%

und

1,170.0

17.91

20,952.36

-

-

0%

-

-

0.0%

-

-

0 .0%

1,170.00

20,952.36

100.0%

und und

585.0 585.0

187.38 70.63

109,614.38 41,315.63

-

-

0% 0%

-

-

0.0% 0.0%

-

-

0.0% 0.0%

585.00 585.00

109,614.38 41,315.63

100.0% 100.0%

und

585.0

60.63

35,465.63

-

-

0%

-

-

0.0%

-

-

0.0%

585.00

35,465.63

100.0%

und

585.0

104.75

61,278.75

-

-

0%

-

-

0.0%

-

-

0.0%

585.00

61,278.75

100.0%

und

585.0

68.50

40,072.50

-

-

0%

-

-

0.0%

-

-

0.0%

585.00

40,072.50

100.0%

und

585.0

50.75

29,688.75

-

-

0%

-

-

0.0%

-

-

0.0%

585.00

29,688.75

100.0%

und

585.0

58.50

34,222.50

-

-

0%

-

-

0.0%

-

-

0.0%

585.00

34,222.50

100.0%

und

585.0

29.38

17,184.38

-

-

0%

-

-

0.0%

-

-

0.0%

585.00

17,184.38

100.0%

und und und und

585.0 1,170.0 585.0 585.0

31.25 31.25 31.25 31.25

18,281.25 36,562.50 18,281.25 18,281.25

-

-

0% 0% 0% 0%

-

-

0.0% 0.0% 0.0% 0.0%

-

-

0.0% 0.0% 0.0% 0.0%

585.00 1,170.00 585.00 585.00

18,281.25 36,562.50 18,281.25 18,281.25

100.0% 100.0% 100.0% 100.0%

m2

14,771.3

25.41

375,337.46

-

-

0%

-

-

0.0%

-

-

0.0%

14,771.25

375,337.46

100.0%

m2 m2

57,400.2 13,390.7

9.91 9.91

568,950.78 132,728.12

-

-

0% 0%

-

-

0.0% 0.0%

-

-

0.0% 0.0%

57,400.20 13,390.65

568,950.78 132,728.12

100.0% 100.0%

m2 glb

9,506.3 1.0

12.15 250,000.00

115,519.95 250,000.00

-

-

0% 0%

-

-

0.0% 0.0%

-

-

0.0% 0.0%

9,506.25 1.00

115,519.95 250,000.00

100.0% 100.0%

m2 m3 m3 m2

62,500.0 26,192.3 26,669.6 62,500.0

0.35 3.69 6.09 0.08

21,875.00 96,649.40 162,418.02 5,000.00

-

-

0% 0% 0% 0%

-

-

0.0% 0.0% 0.0% 0.0%

-

-

0.0% 0.0% 0.0% 0.0%

62,500.00 26,192.25 26,669.63 62,500.00

21,875.00 96,649.40 162,418.02 5,000.00

100.0% 100.0% 100.0% 100.0%

m2

13,925.0

34.41

479,113.69

-

-

0%

-

-

0.0%

-

-

0 .0%

13,925.00

479,113.69

100.0%

ml

2,258.9

2.84

6,415.13

-

-

0%

-

-

0.0 %

-

-

0.0%

2,258.85

6,415.13

100.0%

ml

2,258.9

1.18

2,665.44

-

-

0%

-

-

0.0 %

-

-

0.0%

2,258.85

2,665.44

100.0%

ml

2,258.9

1.86

4,201.46

-

-

0%

-

-

0.0 %

-

-

0.0%

2,258.85

4,201.46

100.0%

ml

2,258.9

11.26

25,434.65

-

-

0%

-

-

0.0%

-

-

0. 0%

2,258.85

25,434.65

100.0%

2,258.9

1.33

3,004.27

-

-

0%

-

-

0.0 %

-

-

0.0%

2,258.85

3,004.27

100.0%

2,258.9

3.71

8,380.33

-

-

0%

-

-

0.0 %

-

-

0.0%

2,258.85

8,380.33

100.0%

ml ml ml ml

68

 

1.3.6.1.2.2.1.2.6 1.3.6.1.2.2.1.2.7 1.3.6.1.2.2.1.2.8 1.3.6.1.2.2.1.2.9 1.3.6.1.2.2.1.3 1.3.6.1.2.2.1.3.1 1.3.6.1.2.2.1.3.2 1.3.6.1.2.2.1.3.3 1.3.6.1.2.2.1.4 1.3.6.1.2.2.1.4.1 1.3.6.1.2.2.1.4.2 1.3.6.1.2.2.1.4.3 1.3.6.1.2.2.1.5 1.3.6.1.2.2.1.5.1 1.3.6.1.2.2.1.5.2 1.3.6.1.2.2.1.5.3 1.3.6.1.2.2.1.5.4 1.3.6.1.2.2.1.5.5 1.3.6.1.2.2.1.5.6 1.3.6.1.2.2.1.5.7 1.3.6.1.2.2.1.5.8 1.3.6.1.2.2.1.5.9 1.3.6.1.2.2.1.5.10 1.3.6.1.2.2.1.5.11 1.3.6.1.2.2.1.5.12 1.3.6.1.2.2.1.5.13 1.3.6.1.2. 2.1.6 1.3.6.1.2.2.1.6.1 1.3.6.1.2.2.1.6.2 1.3.6.1.2.2.1.7 1.3.6.1.2.2.1.7.1 1.3.6.1.2.2.1.7.2 1.3.6.1.2.2.1.7.3 1.3.6.1.2.2.1.7.4 1.3.6.1.2.2.1.7.5 1.3.6.1.2.2.1.7.6 1.3.6.1.2.2.1.7.7 1.3.6.1.2.2.1.7.8 1.3.6.1.2.2.1.7.9 1.3.6.1.2. 2.2

CAMA DE ARENA MANUAL E=0.1M ZANJA P/TUB DN 200-250; MATERIAL PROPIO ZARANDEADO RELL. D/ZANJ. D/MAT. PROPIO COMP. C/EQ P/TUB 110-160mm,H=1.20m RELL. D/ZANJ. D/MAT. PROPIO COMP. C/EQ P/TUB 200-250mm,H=1.20m ELIMINACION MATERIAL EXCEDENTE C/EQUIPO HASTA 1KM INSTALACION DE TUBERIAS DE AGUA POTABLE (INC.SUMINISTRO) SUMI. E INST. TUBERIA PVC UF, PN7. 5, P/AGUA POTABLE DN 110 mm. NTP 16422 SUMI. E INST. TUBERIA PVC UF, PN7. 5, P/AGUA POTABLE DN 160 mm. NTP 16423 SUMI. E INST. TUBERIA PVC UF, PN10, P/AGUA POTABLE DN 200 mm. NTP 16424 PRUEBA HIDRAULICA Y DESINFECCION DE TUBERIA ZANJA TAPADA PRUEBA HIDRAULICA Y DESINFECCION DE TUBERIA DN 100mm PRUEBA HIDRAULICA Y DESINFECCION DE TUBERIA DN 160mm PRUEBA HIDRAULICA Y DESINFECCION DE TUBERIA DN 200mm INSTALACION DE ACCESORIOS PVC AGUA POTABLE (INC. SUMINISTRO) SUMI. E INST. TEE PVC 110 x 110mm; PN=10 SUMI. E INST. TEE PVC 160 x 160mm; PN=10 SUMI. E INST. TEE PVC 200 x SUMI. E INST. 200mm; CODO DEPN=10 PVC DN 90º x 110mm SUMI. E INST. CODO DE PVC DN 45º x 110mm SUMI. E INST. CODO DE PVC DN 45º x 160mm SUMI. E INST. CODO DE PVC DN 22.5º x 110mm SUMI. E INST. CODO DE PVC DN 22.5º x 160mm SUMI. E INST. REDUCCIONES PVC DN 160mm a 110mm SUMI. E INST. REDUCCIONES PVC DN 200mm a 160mm SUMI. E INST. DE TAPON PVC UF DN 110mm SUMI. E INST. DE TAPON PVC UF DN 160mm SUMI. E INST. DE TAPON PVC UF DN 200mm ANCLAJES Y/O APOYOS CONCRETO F'C=175KG/CM2 PARA ANCLAJE DE ACCESORIOS EMPALME A TUBERIA EXISTENTE VALVULAS Y ACCESORIOS DE HIERRO DUCTIL SUMI. E INST. VALVULA DE COMPUERTA HD 110mm SUMI. E INST. VALVULA DE COMPUERTA HD 160mm SUMI. E INST. VALVULA DE COMPUERTA HD 200mm SUMI. E INST. VALVULA DE PURGA DN 100mm INCLUYE ACCESORIOS, EXCA. CONCRETO 210, TUB. 110mm SUMI. E INST. VALVULA DE PURGA DN 160mm INCLUYE ACCESORIOS, EXCA. CONCRETO 210, TUB. 160mm SUMI. E INST. VALVULA DE AIRE BB DN 25mm INC. ACCESO. CAJA, P/TUB. DN 110mm. SUMI. E INST. VALVULA DE AIRE BB DN 25mm INC. ACCESO. CAJA, P/TUB. DN 160mm. SUMI. E INST. DE GRIFO CONTRA INCENDIOS FºFº, 02 SALIDAS CAJA DE VALVULA COMPUERTA CONEXIONES DOMICILIARIA S

ml ml

2,258.9

14.69

33,182.51

-

-

0%

-

-

0.0%

-

-

0. 0%

2,258.85

33,182.51

100.0%

m3

975.8

8.31

8,109.06

-

-

0%

-

-

0.0%

-

-

0.0%

975.82

8,109.06

100.0%

ml

2,065.6

19.59

40,464.52

-

-

0%

-

-

0.0%

-

-

0. 0%

2,065.57

40,464.52

100.0%

ml

193.3

36.61

7,075.98

-

-

0%

-

-

0.0%

-

-

0.0%

193.28

7,075.98

100.0%

ml

ml

ml

2,065.6

1.49

3,077.70

-

-

0%

-

-

0.0 %

-

-

0.0%

2,065.57

3,077.70

100.0%

ml

193.3

1.88

363.37

-

-

0%

-

-

0.0%

-

-

0.0%

193.28

3 63.37

100.0%

ml

und

18.0

92.76

1,669.68

-

-

0%

-

-

0.0%

-

-

0.0%

18.00

1,669.68

100.0%

und

5.0

220.98

1,104.90

-

-

0%

-

-

0.0%

-

-

0.0%

5.00

1,104.90

100.0%

1.0

88.19

88.19

-

-

0%

-

-

0.0%

-

-

0.0%

1.00

88.19

100.0%

und und und und und

16.0

86.19

1,379.04

-

-

0%

-

-

0.0%

-

-

0.0%

16.00

1,379.04

100.0%

und

4.0

140.17

560.68

-

-

0%

-

-

0.0%

-

-

0.0%

4.00

560.68

100.0%

und

5.0

125.65

628.25

-

-

0%

-

-

0.0%

-

-

0.0%

5.00

628.25

100.0%

1.0

128.63

128.63

-

-

0%

-

-

0.0%

-

-

0.0%

1.00

128.63

100.0%

und und und und und

64.0

68.42

4,378.88

-

-

0%

-

-

0.0%

-

-

0.0%

64.00

4,378.88

100.0%

und

7.0

167.16

1,170.12

-

-

0%

-

-

0.0%

-

-

0.0%

7.00

1,170.12

100.0%

und

2.0

358.98

717.96

-

-

0%

-

-

0.0%

-

-

0.0%

2.00

717.96

100.0%

und

1.0

623.1

623.10

-

-

0%

-

-

0.0%

-

-

0.0%

1.00

623.10

100.0%

und

1.0

4536.59

4,536.59

-

-

0%

-

-

0.0%

-

-

0.0%

1.00

4,536.59

100.0%

und

1.0

1155.65

1,155.65

-

-

0%

-

-

0.0%

-

-

0.0%

1.00

1,155.65

100.0%

und

1.0

882.21

882.21

-

-

0%

-

-

0.0%

-

-

0.0%

1.00

882.21

100.0%

und

1.0

882.21

882.21

-

-

0%

-

-

0.0%

-

-

0.0%

1.00

882.21

100.0%

und

3.0

180.59

541.77

-

-

0%

-

-

0.0%

-

-

0.0%

3.00

541.77

100.0%

und

und

69

 

1.3.6.1.2.2.2.1 1.3.6.1.2.2.2.1.1 1.3.6.1.2.2.2.1.2 1.3.6.1.2.2.2.1.3 1.3.6.1.2.2.2.1.4 1.3.6.1.2.2.2.1.5 1.3.6.1.2.2.2.1.6 1.3.6.1.2.2.2.1.7 1.3.6.1.2.2.2.1.8 1.3.6.1.2.2.2.1.9 1.3.6.1.2.2.2.1.10 1.3.6.1.2.2.2.1.11 1.3.6.1.2.2.3 1.3.6.1.2.2.3.1 1.3.6.1.2.2.3.1.1 1.3.6.1.2.2.3.1.2 1.3.6.1.2.3 1.3.6.1.2.3.1 1.3.6.1.2. 3.1.1 1.3.6.1.2.3.1.1.1 1.3.6.1.2.3.1.1.2 1.3.6.1.2.3.1.1.3 1.3.6.1.2. 3.1.2 1.3.6.1.2. 3.1.2.1 1.3.6.1.2.3.1.2.1.1 1.3.6.1.2.3.1.2.1.2 1.3.6.1.2.3.1.2.2 1.3.6.1.2.3.1.2.2.1

1.3.6.1.2.3.1.2.2.2 1.3.6.1.2.3.1.2.3 1.3.6.1.2.3.1.2.3.1 1.3.6.1.2.3.1.2.3.2 1.3.6.1.2.3.1.2.3.3 1.3.6.1.2. 3.1.2.4 1.3.6.1.2.3.1.2.4.1 1.3.6.1.2.3.1.3 1.3.6.1.2.3.1.3.1 1.3.6.1.2.3.1.3.2 1.3.6.1.2.3.1.4 1.3.6.1.2.3.1.4.1 1.3.6.1.2.3.1.4.2 1.3.6.1.2.3.1.4.3

CONEXIÓN DOMICILIARIA DE AGUA POTABLE RIEGO DE LA ZONA DE TRABAJO PARA MITIGAR LA CONTAMINACION POR POLVO TRAZO Y REPLANTEOS CONEXIÓN DOMICILIARIA GUA EXCAVACION DE ZANJA T.NORMAL (0.4x1.20m); CONEX. AGUA REFINE Y NIVELACION DE ZANJA CONEXIÓN AGUA CAMA DE ARENA DE P/TUB. 1/2, C/MATERIAL PROPIO ZARANDEADO; CONEXIÓN DOMIL. RELLENO Y COMP. DE ZANJA CONEXIÓN ELIMINACION MATERIAL EXCEDENTE C/EQUIPO HASTA 1KM CONEXIÓN DOMICILIARIA AGUA TUB. PVC 1/2; LPROM=6m. CONEXIÓN DOMICILIARIA AGUA TUB. PVC 3/4; LPROM=6m. SUM. E INST. DE MICROMEDIDORES CONEXIÓN DOMIC.AGUA,INCL. INSTALACION Y ACCESORIOS PRUEBA HIDRAULICA Y DESINFECCION DE TUBERIA PVC Ø 1/2 PRUEBAS DE CONTROL DE CALIDAD PRUEBAS DE CONTROL DE CALIDAD PRUEBA COMPACTACION SUELOS (PROCTOR MODIFICADO) PRUEBA COMPACTACION SUELOS (DENSIDAD DE CAMPO) ALCANTARILLADO RED DE COLECTORES SECUNDARIOS TRABAJOS PRELIMINARES RIEGO DE LA ZONA DE TRABAJO PARA MITIGAR LA CONTAMINACION POR POLVO TRAZO Y REPLANTEOS INICIALES DEL PROYECTO TRAZO Y REPLANTEO DURANTE EL PROCESO CONSTRUCTIVO DE LA OBRA MOVIMIENTO DE TIERRAS EXCAVACIONES DE ZANJAS EXCAVACION DE ZANJA C/MAQ. T. NORMAL HASTA 1.50MPP EXCAVACION DE ZANJA C/MAQ. T. NORMAL HASTA 2.00MPP REFINE, NIVELACION Y CONFORMACION DE ZANJAS REFINE, NIVELACION Y CONFORMACION DE FONDO DE ZANJA HASTA HPROM=3.00m CAMA DE ARENA DE APOYO DE TUBERIA PVCPROPIO DN (200-250) E=0.10M; A=0.60m; C/MATERIAL ZARANDEADO RELLENO Y COMPACTACION DE ZANJAS RELLENO COMP. ZANJA T. NORMAL HASTA 1.50MPP RELLENO COMP. ZANJA T. NORMAL HASTA 2.00MPP ELIMINACION MATERIAL EXCEDENTE C/EQUIPO EN TERRENO ANEXO ENTIBADO DE ZANJAS ENTIBADO DE PROTECCION DE ZANJAS H>2.00m SUMINISTRO E INSTALACION TUBOS COLECTOR/EMISOR SUMIN. E INSTAL. TUBO PVC UF, SN-4, DN 200MM, ISO 4435 PRUEBA HIDRAULICA TUBO PVC DN 200MM CONSTRUCCION DE BUZONES Y EMPALMES BUZON TIPO I, C/MARCO Y TAPA DE CONCRETO Di=1.20m x h=1.20MPP BUZON TIPO I, C/MARCO Y TAPA DE CONCRETO Di=1.20m x h=1.50MPP BUZON TIPO I, C/MARCO Y TAPA DE CONCRETO Di=1.20m x h=2.00MPP

ml

3,348.0

2.84

9,508.32

-

-

0%

-

-

0.0 %

-

-

0.0%

3,348.00

9,508.32

100.0%

ml

3,348.0

1.2

4,017.60

-

-

0%

-

-

0.0%

-

-

0.0%

3,348.00

4,017.60

100.0%

ml

3,348.0

22.35

74,827.80

-

-

0%

-

-

0.0%

-

-

0. 0%

3,348.00

74,827.80

100.0%

ml

3,348.0

0.65

2,176.20

-

-

0%

-

-

0.0 %

-

-

0.0%

3,348.00

2,176.20

100.0%

ml

3,348.0

2.16

7,231.68

-

-

0%

-

-

0.0 %

-

-

0.0%

3,348.00

7,231.68

100.0%

ml

3,348.0

13.56

45,398.88

-

-

0%

-

-

0.0%

-

-

0. 0%

3,348.00

45,398.88

100.0%

m3

1,446.3

8.31

12,019.09

-

-

0%

-

-

0.0%

-

-

0. 0%

1,446.34

12,019.09

100.0%

und

557.0

218.22

121,548.54

-

-

0%

-

-

0.0%

-

-

0.0%

557.00

121,548.54

100.0%

und

1.0

570.96

570.96

-

-

0%

-

-

0.0%

-

-

0.0%

1.00

570.96

100.0%

ml

557.0

154.6

86,112.20

-

-

0%

-

-

0.0 %

-

-

0.0%

557.00

86,112.20

100.0%

ml

3,348.0

1.14

3,816.72

-

-

0%

-

-

0.0 %

-

-

0.0%

3,348.00

3,816.72

100.0%

ml

1.0

70

70.00

-

-

0%

-

-

0.0%

-

-

0.0%

1.00

70.00

100.0%

ml

22.0

60

1,320.00

-

-

0%

-

-

0.0%

-

-

0.0%

22.00

1,320.00

100.0%

m

1,707.1

2.84

4,848.11

-

-

0%

-

-

0.0 %

-

-

0.0%

1,707.08

4,848.11

100.0%

m

1,707.1

1.24

2,116.78

-

-

0%

-

-

0.0 %

-

-

0.0%

1,707.08

2,116.78

100.0%

m

1,707.1

1.72

2,936.18

-

-

0%

-

-

0.0 %

-

-

0.0%

1,707.08

2,936.18

100.0%

m

874.7

14.88

13,015.68

-

-

0%

-

-

0.0 %

-

-

0.0%

874.71

13,015.68

100.0%

m

832.4

17.01

14,158.61

-

-

0%

-

-

0.0 %

-

-

0.0%

832.37

14,158.61

100.0%

m

1,707.1

2.17

3,704.36

-

-

0%

-

-

0.0 %

-

-

0.0%

1,707.08

3,704.36

100.0%

m

1,707.1

3.89

6,640.54

-

-

0%

-

-

0.0 %

-

-

0.0%

1,707.08

6,640.54

100.0%

m

874.7

15.46

13,523.02

-

-

0%

-

-

0.0 %

-

-

0.0%

874.71

13,523.02

100.0%

m

832.4

20.51

17,071.91

-

-

0%

-

-

0.0 %

-

-

0.0%

832.37

17,071.91

100.0%

m3

737.5

8.31

6,128.29

-

-

0%

-

-

0.0%

-

-

0.0%

737.46

6,128.29

100.0%

m

832.4

39.01

32,470.75

-

-

0%

-

-

0.0 %

-

-

0.0%

832.37

32,470.75

100.0%

ml

1,707.1

30.46

51,997.66

-

-

0%

-

-

0.0%

-

-

0. 0%

1,707.08

51,997.66

100.0%

ml

1,707.1

1.8

3,072.74

-

-

0%

-

-

0.0%

-

-

0.0%

1,707.08

3,072.74

100.0%

und

8.0

1909.31

15,274.48

-

-

0%

-

-

0.0%

-

-

0.0%

8.00

15,274.48

100.0%

und

12.0

2485.81

29,829.72

-

-

0%

-

-

0.0%

-

-

0.0%

12.00

29,829.72

100.0%

und

7.0

2765.76

19,360.32

-

-

0%

-

-

0.0%

-

-

0.0%

7.00

19,360.32

100.0%

70

 

1.3.6.1.2.3.1.4.4 1.3.6.1.2. 3.2 1.3.6.1.2.3.2.1 1.3.6.1.2.3.2.1.1 1.3.6.1.2.3.2.1.2 1.3.6.1.2.3.2.1.3 1.3.6.1.2.3.2.1.4 1.3.6.1.2.3.2.1.5 1.3.6.1.2.3.2.1.6 1.3.6.1.2.3.2.1.7 1.3.6.1.2.3.2.1.8 1.3.6.1.2.3.2.1.9 1.3.6.1.2.3.2.1.10 1.3.6.1.2.3.2.1.11 1.3.6.1.2.3.3 1.3.6.1.2.3.3.1 1.3.6.1.2.3.3.1.1 1.3.6.1.2.3.3.1.2 1.3.6.1.2.3.3.1.3 1.3.6.1.2.3.4 1.3.6.1.2.3.4.1 1.3.6.1.2. 3.4.1.1 1.3.6.1.3 1.3.6.1.3. 2 1.3.6.1.3. 2.1 1.3.6.1.3.2.1.1 1.3.6.1.3.2.1.2 1.3.6.1.3. 2.2 1.3.6.1.3.2.2.1 1.3.6.1.3.2.2.2 1.3.6.1.3.2.2.3 1.3.6.1.3.2.2.4 1.3.6.1.3.2.2.5 1.3.6.1.3.2.3 1.3.6.1.3.2.3.1 1.3.6.1.3. 2.3.2 1.3.6.1.3. 2.3.3 1.3.6.1.3.2.3.4 1.3.6.1.3. 2.3.5 1.3.6.1.3.2.3.6 1.3.6.1.3.3 1.3.6.1.3. 3.1 1.3.6.1.3.3.1.1 1.3.6.1.3. 3.2 1.3.6.1.3.3.2.1 1.3.6.1.3.3.2.2 1.3.6.1.3.3.2.3

EMPALME A BUZON DE TUB. PVC CON DADO DE CONCRETO SIMPLE CONEXIONES DOMICILIARIA S CONEXION DOMICILIARIA DESAGUE RIEGO DE LA ZONA DE TRABAJO PARA MITIGAR LA CONTAMINACION POR POLVO TRAZOS Y REPLANTEOS DURANTE EL PROCESO CONSTRUCTIVO DE LA OBRA EXCAVACION DE ZANJA T.NORMAL (0.4x1.20m); CONEX. AGUA REFINE Y NIVELACION DE ZANJA CONEXIÓN AGUA CAMA DE ARENA DE P/TUB. 1/2, CMATERIAL PROPIO ZARANDEADO; CONEXIÓN DOMIL. RELLENO Y COMP. DE ZANJA CONEXIÓN ELIMINACION MATERIAL EXCEDENTE C/EQUIPO EN TERRENO ANEXO SUMIN. E INSTALACION DE TUBO PVC, SN-4, DN 160 MM, ISO 4435 SUMIN. E INSTALACION CAJA DE REGISTRO DE DESAGUE Y MEDIA CAÑA EMPALME A COLECTOR PVC DN 200MM PRUEBA HIDRAULICA CONEX. DOMICILIARIA DESAGUE PRUEBAS DE CONTROL DE CALIDAD PRUEBAS DE CONTROL DE CALIDAD PRUEBA COMPACTACION SUELOS (PROMOTOR MODIFICADO) PRUEBA COMPACTACION SUELOS (DENSIDAD DE CAMPO) PRUEBA DE CALIDAD DE CONCRETO VARIOS VARIOS LIMPIEZA FINAL DE OBRA PISTAS Y VEREDAS PISTAS Y ESTACIONAMIENTO OBRAS PROVISIONALES TRAZO, NIVELES Y REPLANTEO INICIAL DE OBRA TRAZO REPLANTEO Y CONTRO TOPOGRAFICO DE EJES Y NIVELES DE PISTAS DURANTE LA EJECUCION DE LA OBRA MOVIMIENTO DE TIERRAS CORTE HASTA NIVEL DE SUBRASANTE EXTRACCION Y APILAMIENTO DE MATERIAL DE PRESTAMO CARGUIO Y TRANSPORTE DE MATERIAL PROPIO RELLENO Y COMPACTACION CON MATERIAL PROPIO ELIMINACION DE MATERIAL PROPIO EXCEDENTE EN TERRENO ANEXO PAVIMENTOS CONFORMACION Y COMPACTACION DE SUBRASANTE PARA PISTAS SUB-BASE DE 20 CMS BASE DE 15 CMS BARRIDO Y LIMPIEZA P/CARPETA ASFALTICA IMPRIMACION ASFALTICA CARPETA ASFALTICA EN CALIENTE DE 2" VEREDAS OBRAS PROVISIONALES TRAZO, REPLANTEO Y CONTROL TOPOGRAFICO DE EJES Y NIVELES DE VEREDAS MOVIMIENTO DE TIERRAS PERFILADO, NIVELACION Y COMPACTACION DE SUBRASANTE VEREDAS COLOCACION DE AFIRMADO/BASE GRANULAR PARA VEREDAS EXCAVACION MANUAL PARA SARDINELES DE VEREDAS

und

74.0

159.24

11,783.76

-

-

0%

-

-

0.0%

-

-

0.0%

74.00

11,783.76

100.0%

ml

3,348.0

2.84

9,508.32

-

-

0%

-

-

0.0 %

-

-

0.0%

3,348.00

9,508.32

100.0%

ml

3,348.0

1.31

4,385.88

-

-

0%

-

-

0.0 %

-

-

0.0%

3,348.00

4,385.88

100.0%

ml

3,348.0

22.35

74,827.80

-

-

0%

-

-

0.0%

-

-

0. 0%

3,348.00

74,827.80

100.0%

ml

3,348.0

1.31

4,385.88

-

-

0%

-

-

0.0 %

-

-

0.0%

3,348.00

4,385.88

100.0%

ml

3,348.0

2.81

9,407.88

-

-

0%

-

-

0.0 %

-

-

0.0%

3,348.00

9,407.88

100.0%

ml

3,348.0

13.56

45,398.88

-

-

0%

-

-

0.0%

-

-

0. 0%

3,348.00

45,398.88

100.0%

m3

1,446.3

8.31

12,019.09

-

-

0%

-

-

0.0%

-

-

0. 0%

1,446.34

12,019.09

100.0%

m

3,348.0

20.6

68,968.80

-

-

0%

-

-

0. 0%

-

-

0.0%

3,348.00

68,968.80

100.0%

und

558.0

130.56

72,852.48

-

-

0%

-

-

0.0%

-

-

0.0%

558.00

72,852.48

100.0%

und

558.0

95.42

53,244.36

-

-

0%

-

-

0.0%

-

-

0.0%

558.00

53,244.36

100.0%

und

3,348.0

1.8

6,026.40

-

-

0%

-

-

0.0%

-

-

0.0%

3,348.00

6,026.40

100.0%

und und

1.0 17.0

70 60

70.00 1,020.00

-

-

0% 0%

-

-

0.0% 0.0%

-

-

0.0% 0.0%

1.00 17.00

70.00 1,020.00

100.0% 100.0%

und

1.0

2000

2,000.00

-

-

0%

-

-

0.0%

-

-

0.0%

1.00

2,000.00

100.0%

m

1,707.1

1.31

2,236.27

-

-

0%

-

-

0.0%

-

-

0 .0%

1,707.08

2,236.27

100.0%

m2

15,999.1

0.73

11,679.35

-

-

0%

-

-

0.0%

-

-

0 .0%

15,999.11

11,679.35

100.0%

m2

15,999.1

1.81

28,958.39

-

-

0%

-

-

0.0%

-

-

0 .0%

15,999.11

28,958.39

100.0%

m3

11,829.1

8.01

94,750.77

-

-

0%

-

-

0.0%

-

-

0 .0%

11,829.06

94,750.77

100.0%

m3

9,264.1

4.56

42,244.07

-

-

0%

-

-

0.0%

-

-

0. 0%

9,264.05

42,244.07

100.0% 100.0%

Ge

m3

9,264.1

4.25

39,372.21

-

-

0%

-

-

0.0%

-

-

0. 0%

9,264.05

39,372.21

m3

9,264.1

19.36

179,352.01

-

-

0%

-

-

0.0%

-

-

0.0%

9,264.05

179,352.01

100.0%

m3

3,078.0

6.36

19,576.16

-

-

0%

-

-

0.0%

-

-

0. 0%

3,078.01

19,576.16

100.0%

m2

15,999.1

2.03

32,478.19

-

-

0%

-

-

0.0%

-

-

0 .0%

15,999.11

32,478.19

100.0%

m2 m2

15,999.1 15,999.1

16.85 18.65

269,585.00 298,383.40

-

-

0% 0%

-

-

0.0% 0.0%

-

-

0.0% 0 .0%

15,999.11 15,999.11

269,585.00 298,383.40

100.0% 100.0%

m2

15,999.1

0.45

7,199.60

-

-

0%

-

-

0.0%

-

-

0. 0%

15,999.11

7,199.60

100.0%

m2

15,999.1

4.29

68,636.18

-

-

0%

-

-

0.0%

-

-

0.0%

15,999.11

68,636.18

100.0%

m2

15,999.1

35.71

571,328.22

-

-

0%

-

-

0.0%

-

-

0.0%

15,999.11

571,328.22

100.0%

m2

5,453.6

2.15

11,725.13

-

-

0%

-

-

0.0%

-

-

0. 0%

5,453.55

11,725.13

100.0%

m2

5,453.6

6.83

37,247.75

-

-

0%

-

-

0.0%

-

-

0. 0%

5,453.55

37,247.75

100.0%

m2

5,453.6

14.8

80,712.54

-

-

0%

-

-

0.0%

-

-

0. 0%

5,453.55

80,712.54

100.0%

m

4,084.1

4.03

16,458.92

-

-

0%

-

-

0. 0%

-

-

0.0%

4,084.10

16,458.92

100.0%

71

 

1.3.6.1.3. 3.3 1.3.6.1.3.3.3.1 1.3.6.1.3.3.3.2 1.3.6.1.3.3.3.3 1.3.6.1.3.3.3.4 1.3.6.1.3.3.3.5 1.3.6.1.3.4 1.3.6.1.3. 4.1 1.3.6.1.3.4.1.1 1.3.6.1.3.4.1.2 1.3.6.1.3.4.1.3 1.3.6.1.3.4.2 1.3.6.1.3.4.2.1 1.3.6.1.3.4.2.2 1.3.6.1.3.4.2.3 1.3.6.1.3.4.2.4 1.3.6.1.3. 5 1.3.6.1.3. 5.1 1.3.6.1.3.5.1.1 1.3.6.1.3.5.1.2 1.3.6.1.3.5.1.3 1.3.6.1.3. 5.2 1.3.6.1.3.5.2.1 1.3.6.1.3.5.2.2 1.3.6.1.3.5.2.3 1.3.6.1.3.5.2.4 1.3.6.1.3. 5.2.5 1.3.6.1.3.6 1.3.6.1.3.6.1 1.3.6.1.3.6.1.1 1.3.6.1.3.6.1.2 1.3.6.1.3.6.1.3 1.3.6.1.3.6.1.4 1.3.6.1.3.6.1.5 1.3.6.1.3. 7 1.3.6.1.3. 7.1 1.3.6.1.3. 7.1.1 1.3.6.1.3. 8 1.3.6.1.3. 8.1 1.3.6.1.3.8.1.1 1.3.6.1.3.8.1.2 1.3.6.1.3.8.1.3 1.3.6.1.3. 9 1.3.6.1.3. 9.1 1.3.6.1.3.9.1.1 1.3.6.1.3.9.1.2 1.3.6.1.3.9.1.3 1.3.6.1.3.9.1.4

VEREDAS Y SARDINELES ENCOFRADO Y DESENCOFRADO DE VEREDAS CONCRETO PARA SARDINELES DE VEREDAS h=35 cm F'C=175 kg/cm2 CONCRETO PARA VEREDAS DE H=10CM F'C=175 KG/CM2 JUNTA DE DILATACION ASFALTICA PARA VEREDAS; e=1/2 CURADO QUIMICO PARA VEREDAS PAVIMENTO RGIDO: PASAJE PEATONAL MOVIMIENTO DE TIERRAS PERFILADO, NIVELACION Y COMPACTACION DE SUBRASANTE COLOCACION DE AFIRMADO/BASE GRANULAR EXCAVACION MANUAL PARA SADINELES SUMERGIDOS CONCRETO EN PASAJES PEATONALES CONCRETO PARA SARDINEL SUMERGID; H=0.25cm; F'C=210 kg/cm2 PAVIMENTO RIGIDO DE CONCRETO EN PASAJE PEATONAL; H=12.5cm; F'C=210 KG/CM2 JUNTA DE DILATACION ASFALTICA EN PAVIMIENTO RIGIDO; e=1/2 CURADO QUIMICO PARA PAVIMENTO RIGIDO RAMPAS PEATONALES MOVIMIENTO DE TIERRAS PERFILADO, NIVELACION Y COMPACTACION DE SUBRASANTE COLOCACION DE AFIRMADO/BASE GRANULAR EXCAVACION MANUAL PARA SARDINELES SUMERGIDOS CONCRETO EN RAMPAS ENCOFRADO Y DESENCOFRADO DE RAMPAS CONCRETO PARA SARDINELES DE RAMPAS h=20cm F'C=175kg/cm2 CONCRETO PARA RAMPAS DE H=10CM F'C=175 KG/CM2 CURADO QUIMICO PARA RAMPAS BRUÑADO DE RAMPAS SEÑALIZACIÓN SEÑALIZACION PINTADO EN BLANCO DE LETRAS, CRUCES PEATONALES Y SIMBOLOS EN PAVIMENTO PINTADO DE AMARILLO EN PSJE. PEATONAL PINTADO DE AMARILLO EN SARDINELES, MARTILLOS, RAMPAS Y ESTACIONAMIENTO PINTADO DE BLANCO DE LINEAS DISCONTINUAS Y CONTINUAS EN PAVIMENTO SEÑALIZACION VERTICAL (PREVENTIVA Y REGLAMENTARIA) LIMPIEZA DE OBRA LIMPIEZA DE OBRA LIMPIEZA FINAL DE OBRA PRUEBAS DE CALIDAD PRUEBAS DE CALIDAD PRUEBAS DE CALIDAD DE SUBRASANTE PRUEBAS DE CALIDAD DE LA SUB BASE Y BASE PRUEBAS DE CALIDAD DEL CONCRETO SARDINEL CENTRAL SARDINEL CENTRAL EXCAVACION MANUAL PARA SARDINEL CENTRAL ENCOFRADO Y DESENCOFRADO DE SARDINEL CENTRAL CONCRETO PARA SARDINELES CENTRALES DE CALLE F'C=210 kg/cm2 JUNTA DE DILATACION ASFALTICA PARA SARDINEL CENTRAL; e=1/2

m2

819.2

41.58

34,063.08

-

-

0%

-

-

0.0 %

-

-

0.0%

819.22

34,063.08

100.0%

m

4,082.1

17.7

72,253.17

-

-

0%

-

-

0. 0%

-

-

0.0%

4,082.10

72,253.17

100.0%

m2

5,453.6

48.2

262,861.11

-

-

0%

-

-

0.0%

-

-

0 .0%

5,453.55

262,861.11

100.0%

ml

1,230.0

4.87

5,990.10

-

-

0%

-

-

0.0 %

-

-

0.0%

1,230.00

5,990.10

100.0%

m2

5,453.6

1.67

9,107.43

-

-

0%

-

-

0.0 %

-

-

0.0%

5,453.55

9,107.43

100.0%

m2

1,671.9

6.83

11,419.08

-

-

0%

-

-

0.0%

-

-

0. 0%

1,671.90

11,419.08

100.0%

m2

1,671.9

19.35

32,351.27

-

-

0%

-

-

0.0%

-

-

0 .0%

1,671.90

32,351.27

100.0%

m

1,036.5

4.03

4,177.14

-

-

0%

-

-

0.0 %

-

-

0.0%

1,036.51

4,177.14

100.0%

m

1,036.5

19.96

20,688.74

-

-

0%

-

-

0.0%

-

-

0. 0%

1,036.51

20,688.74

100.0%

m2

1,671.9

61.18

102,286.84

-

-

0%

-

-

0.0%

-

-

0.0%

1,671.90

102,286.84

100.0%

m

385.2

4.87

1,875.92

-

-

0%

-

-

0.0%

-

-

0.0%

385.20

1,875.92

100.0%

m2

1,671.9

1.67

2,792.07

-

-

0%

-

-

0.0 %

-

-

0.0%

1,671.90

2,792.07

100.0%

m2

202.5

6.83

1,382.87

-

-

0%

-

-

0.0%

-

-

0.0%

202.47

1,382.87

100.0%

m2

202.5

14.8

2,996.56

-

-

0%

-

-

0.0%

-

-

0.0%

202.47

2,996.56

100.0%

m

155.0

4.03

624.69

-

-

0%

-

-

0.0%

-

-

0.0%

155.01

6 24.69

100.0% 100.0%

m2

47.4

46.43

2,200.85

-

-

0%

-

-

0.0%

-

-

0.0%

47.40

2,2 00.85

m

155.0

15.99

2,478.61

-

-

0%

-

-

0.0%

-

-

0.0%

155.01

2,478.61

100.0%

m2

202.5

48.2

9,759.05

-

-

0%

-

-

0.0%

-

-

0.0%

202.47

9,759.05

100.0%

m2

202.5

1.67

338.12

-

-

0%

-

-

0.0%

-

-

0.0%

202.47

3 38.12

100.0%

m2

202.5

13.73

2,779.91

-

-

0%

-

-

0.0%

-

-

0.0%

202.47

2,779.91

100.0%

m2

935.4

23.01

21,523.78

-

-

0%

-

-

0.0 %

-

-

0.0%

935.41

21,523.78

100.0%

m2

259.6

21.08

5,471.31

-

-

0%

-

-

0.0%

-

-

0.0%

259.55

5,471.31

100.0%

m

1,421.0

9.52

13,527.82

-

-

0%

-

-

0. 0%

-

-

0.0%

1,420.99

13,527.82

100.0%

m

1,348.7

7.99

10,776.27

-

-

0%

-

-

0. 0%

-

-

0.0%

1,348.72

10,776.27

100.0%

und

10.0

580.95

5,809.50

-

-

0%

-

-

0.0%

-

-

0.0%

10.00

5,809.50

100.0%

Ha

7.3

3024

22,165.92

-

-

0%

-

-

0.0 %

-

-

0.0%

7.33

22,165.92

100.0%

glb

1.0

2680

2,680.00

-

-

0%

-

-

0.0%

-

-

0.0%

1.00

2,680.00

100.0%

glb

1.0

15480

15,480.00

-

-

0%

-

-

0.0%

-

-

0.0%

1.00

15,4 80.00

100.0%

glb

1.0

1850

1,850.00

-

-

0%

-

-

0.0%

-

-

0.0%

1.00

1,850.00

100.0%

m

345.7

3.02

1,044.04

-

-

0%

-

-

0.0%

-

-

0.0%

345.71

1,044.04

100.0%

m2

691.4

41.58

28,749.24

-

-

0%

-

-

0.0 %

-

-

0.0%

691.42

28,749.24

100.0%

m

345.7

25.77

8,908.95

-

-

0%

-

-

0.0%

-

-

0.0%

345.71

8,908.95

100.0%

m

51.9

4.87

252.54

-

-

0%

-

-

0.0%

-

-

0.0%

51.86

252.54

100.0%

72

 

1.3.6.1.3.9.1.5 1.3.6.1.4 1.3.6.1.4. 1 1.3.6.1.4. 2 1.3.6.2 1.3.6.2.1 1.3.6.2.1.1 1.3.6.2.1.2 1.3.6.2.1.3 1.3.6.2.1.4 1.3.6.2.1. 5 1.3.6.2.2 1.3.6.2.2.1 1.3.6.2.2.1.1 1.3.6.2.2. 1.2 1.3.6.2.2.1.3 1.3.6.2.2. 1.4 1.3.6.2.2.2 1.3.6.2.2.2.1 1.3.6.2.2.2.2 1.3.6.2.2.2.3 1.3.6.2.2. 3 1.3.6.2.2.3.1 1.3.6.2.2.3.2 1.3.6.2.2.3.3 1.3.6.2.2.3.4 1.3.6.2.3 1.3.6.2.3. 1 1.3.6.2.3.2 1.3.6.2.3. 3 1.3.6.2.3.4 1.3.6.2.3.5 1.3.6.2.3.6 1.3.6.2.3. 7 1.3.6.2.3. 8 1.3.6.2.3.9 1.3.6.2.3.10 1.3.6.2.3. 11 1.3.6.2.3.12 1.3.6.2.4 1.3.6.2.4. 1 1.3.6.2.4. 2 1.3.6.2.4. 3 1.3.6.2.4.4 1.3.6.2.4. 5 1.3.6.2.4. 6 1.3.6.2.4. 7 1.3.6.2.4.8 1.3.6.2.4.9 1.3.6.2.4.10 1.3.6.2.4. 11 1.3.6.2.4. 12 1.3.6.2.4. 13 1.3.6.2.4.14 1.3.6.2.4. 15 1.3.6.2.5 1.3.6.2.5.1 1.3.6.2.5.1.1 1.3.6.2.5.1.2 1.3.6.2.5.2 1.3.6.2.5.2.1 1.3.6.2.5. 2.2 1.3.6.2.5. 2.3 1.3.6.2.5.3 1.3.6.2.5.3.1 1.3.6.2.5.3.2

CURADO QUIMICO DE SARDINEL CENTRAL RED ELÉCTRICA RED PRIMARIA RED SECUNDARIA VIVIENDAS MOV. TIERRAS CASA Corte de Terreno con maquinaria h=0.35 (0.15 Platea + 0.20 Afirmado) Inc. Eliminación Excavación de Zanjas cimentación manual (Uñas de Platea) Inc Eliminación Relleno con material de préstamo (Afirmado e= 0.20m) Proctor 95% Nivelación y compactación de Terreno Acarreo de Material excedente ESTRUCTURAS PLATEA Concreto premezclado fc=175kg/cm2 Encofrado y desencofrad o Acero de refuerzo de fy =4200kg/cm2 Acabado de Losa Platea MUROS Concreto premezclado fc=175kg/cm2 Encofrado y desencofrado Acero de refuerzo de fy =4200kg/cm2 LOSA TECHO Concreto premezclado fc=175kg/cm2 Encofrado y desencofrado Acero de refuerzo de fy =4200kg/cm2 Junta de dilatación tecnopor 1 INSTALACIONES ELÉCTRICAS Salida p/centro de luz Salida p/braquetes Tomacorrie nte bipolar Interruptor de 01 golpe Salida p/timbre Salida p/pulsador de timbre Alimentad or de TD a Caja Medidor Tubo PVC SAP 25mm Tablero Electrico de Distribucion Tubo PVC SAP 25mm acometida para futura conexión pozo de tierra. Prueba electrica Conexión a banco de medidores INSTALACION ES SANITARIAS Excavacion y relleno de zanja Tuberia PVC SAL 4 Tuberia PVC SAL 2 Caja registro 12x24 Salida de desague 2 Salida de desague 4 Salida de ventilacio n 2 Sumidero de bronce 2 Registro de bronce 4 Sombrero de ventilacion 2 Salida de agua fria 1/2 Tuberia PVC C10 Agua Fria 1/2 Tuberia PVC C10 Agua Fria 3/4 Valvula compuerta 1/2 Valvula compuerta 3/4 ACABADOS LAVANDERA Concreto premezclado fc=175kg/cm2 Encofrado BAÑO Concreto simple 1:6 en sardinel ducha 0.10x0.20 Piso Cerámico 30x30 Ducha Zócalo cerámico 30x30 Ducha CARPINTERA DE MADERA P1 - Puerta Principal de HDF contraplacada - 0.90x2.60 - Sin Pintura P2 - Puerta Dormitorio y Lavandería

m

345.7

1.26

435.59

-

-

0%

-

-

0.0%

-

-

0.0%

345.71

4 35.59

100.0%

glb glb

1.0 1.0

187,612.28 658,032.68

187,612.28 658,032.68

-

-

0% 0%

-

-

0.0% 0.0%

-

-

0.0% 0.0%

1.00 1.00

187,612.28 658,032.68

100.0% 100.0%

m3

7,143.5

17.94

128,154.84

-

-

0%

-

-

0.0%

-

-

0.0%

7,143.53

128,154.84

100.0%

m3

463.7

46.80

21,701.28

-

-

0%

-

-

0.0 %

-

-

0.0%

463.70

21,701.28

100.0%

m3

3,057.9

86.88

265,672.96

-

-

0%

-

-

0.0%

-

-

0.0%

3,057.93

265,672.96

100.0%

m2 m3

16,906.3 7,607.2

2.64 5.40

44,632.74 41,079.03

-

-

0% 0%

-

-

0.0% 0.0%

-

-

0.0% 0.0%

16,906.34 7,607.23

44,632.74 41,079.03

100.0% 100.0%

m3

2,852.4

311.32

888,000.16

-

-

0%

-

-

0.0%

-

-

0.0%

2,852.36

888,000.16

100.0%

m2

6,281.5

14.95

93,890.74

-

-

0%

-

-

0.0%

-

-

0.0%

6,281.49

93,890.74

100.0%

kg

159,750.8

4.10

655,617.41

-

-

0%

-

-

0.0%

-

-

0.0%

##########

655,617.41

100.0%

m2

15,665.6

6.77

106,081.35

-

-

0%

-

-

0.0%

-

-

0.0%

15,665.63

106,081.35

100.0% 100.0%

m3

3,434.4

333.63

1,145,813. 86

-

-

0%

-

-

0.0%

-

-

0.0%

3,434.40

1,145,813.86

m2

68,687.9

9.55

656,139.89

-

-

0%

-

-

0.0%

-

-

0.0%

68,687.95

656,139.89

100.0%

kg

139,382.0

4.10

572,023.86

-

-

0%

-

-

0.0%

-

-

0.0%

##########

572,023.86

100.0%

m3

1,566.6

333.63

522,650.37

-

-

0%

-

-

0.0%

-

-

0.0%

1,566.56

522,650.37

100.0%

m2

15,665.6

10.24

160,409.28

-

-

0%

-

-

0.0%

-

-

0.0%

15,665.63

160,409.28

100.0%

kg m2

63,825.8 2,337.3

4.10 5.19

261,941.10 12,141.86

-

-

0% 0%

-

-

0.0% 0.0%

-

-

0.0% 0.0%

63,825.80 2,337.31

261,941.10 12,141.86

100.0% 100.0%

pto pto pto pto pto pto ml ml und

3,133.1 626.6 4,386.4 3,133.1 626.6 626.6 5,013.0 4,386.4 626.6

57.20 57.20 57.20 57.20 27.50 27.50 9.35 11.55 154.00

179,214.75 35,842.95 250,900.65 179,214.75 17,232.19 17,232.19 46,871.5 5 50,662.63 96,500.25

-

-

0% 0% 0% 0% 0% 0% 0% 0% 0%

-

-

0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0. 0% 0.0%

-

-

0 .0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%

3,133.13 626.63 4,386.38 3,133.13 626.63 626.63 5,013.00 4,386.38 626.63

179,214.75 35,842.95 250,900.65 179,214.75 17,232.19 17,232.19 46,871. 55 50,662.63 96,500.25

100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%

ml

3,759.8

11.55

43,425.11

-

-

0%

-

-

0.0%

-

-

0. 0%

3,759.75

43,425.11

100.0%

glb glb

626.6 626.6

27.50 27.50

17,232.19 17,232.19

-

-

0% 0%

-

-

0.0% 0.0%

-

-

0.0% 0.0%

626.63 626.63

17,232.19 17,232.19

100.0% 100.0%

ml ml ml und pto pto pto und und und pto ml ml und und

4,386.4 3,133.1 1,253.3 626.6 1,879.9 626.6 2,506.5 1,253.3 626.6 2,506.5 3,133.1 1,879.9 2,882.5 626.6 1,253.3

19.80 26.95 16.83 275.00 61.60 85.80 44.00 23.10 35.20 8.25 61.60 15.95 18.37 64.35 70.95

86,850.23 84,437.72 21,092.20 172,321.88 115,800.30 53,764.43 110,286.00 28,950.08 22,057.20 20,678.63 193,000.50 29,984.01 52,951.07 40,323.32 88,918.09

-

-

0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

-

-

0.0% 0.0 % 0.0 % 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%

-

-

0.0% 0.0% 0.0% 0.0% 0. 0% 0.0% 0 .0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%

4,386.38 3,133.13 1,253.25 626.63 1,879.88 626.63 2,506.50 1,253.25 626.63 2,506.50 3,133.13 1,879.88 2,882.48 626.63 1,253.25

86,850.23 84,437.72 21,092.20 172,321.88 115,800.30 53,764.43 110,286.00 28,950.08 22,057.20 20,678.63 193,000.50 29,984.0 1 52,951.0 7 40,323.32 88,918.09

100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%

m3

104.4

288.26

30,093.12

-

-

0%

-

-

0. 0%

-

-

0.0%

104.40

30,093.12

100.0%

m2

167.9

13.84

2,324.23

-

-

0%

-

-

0.0%

-

-

0.0%

167.94

2,324.23

100.0%

und

626.6

21.06

13,196.72

-

-

0%

-

-

0.0%

-

-

0.0%

626.63

13,196.72

100.0%

m2 m2

451.2 3,433.9

44.98 44.98

20,294.36 154,462.66

-

-

0% 0%

-

-

0.0% 0.0%

-

-

0.0% 0.0%

451.17 3,433.91

20,294.36 154,462.66

100.0% 100.0%

und

626.6

165.96

103,994.69

-

-

0%

-

-

0.0%

-

-

0.0%

626.63

103,994.69

100.0%

und

1,879.9

140.52

264,160.04

-

-

0%

-

-

0.0%

-

-

0.0%

1,879.88

264,160.04

100.0%

de HDF contraplacada - 0.80x2.60 - Sin Pintura

73

 

1.3.6.2.5.3.3 1.3.6.2.5.3.4 1.3.6.2.5. 4 1.3.6.2.5.4.1 1.3.6.2.5.4.2 1.3.6.2.5.4.3 1.3.6.2.5.4.4 1.3.6.2.5.4.5 1.3.6.2.5.5 1.3.6.2.5.5.1 1.3.6.2.5.5.2 1.3.6.2.5.5.3 1.3.6.2.5.5.4 1.3.6.2.5.6 1.3.6.2.5.6.1 1.3.6.2.5.6.2 1.3.6.2.5.6.3 1.3.6.2.5.6.4 1.3.6.2.5.6.5 1.3.6.2.5.6.6 1.3.6.2.5.6.7 1.3.6.2.5.6.8 1.3.6.2.5.6.9 1.3.6.2.5.6.10 1.3.6.2.5.6.11 1.3.6.2.5.6.12 1.3.6.2.5.7 1.3.6.2.5.7.1 1.3.6.2.6 1.3.6.2.6.1 1.3.6.2.6.1.1 1.3.6.2.6.1.2 1.3.6.2.6.2 1.3.6.2.6. 2.1 1.3.6.3 1.3.7 1.3.7.1 1.3.7.1.1 1.3.7.1.1. 1 1.3.7.1.1. 2 1.3.7.1.1. 3 1.3.7.1.1. 4 1.3.7.1.1. 6 1.3.7.1.2 1.3.7.1.2. 2 1.3.7.1.2. 2.1 1.3.7.1.2. 2.1.1 1.3.7.1.2.2.1.1.1 1.3.7.1.2.2.1.1.2 1.3.7.1.2.2.1.1.3 1.3.7.1.2. 2.1.2 1.3.7.1.2.2.1.2.1 1.3.7.1.2.2.1.2.2 1.3.7.1.2.2.1.2.3 1.3.7.1.2.2.1.2.4 1.3.7.1.2.2.1.2.5

P3 - Puerta Baño de HDF contraplacada - 0.70x2.6 - Sin Pintura Instalación de Puertas CARPINTERÍA DE ALUMINIO V1 - Ventana de Aluminio Sala 0.85x1.4 V2 - Ventana de Aluminio Dormitorios - 1.0x1.4 V3 - Ventana de Aluminio Baño 0.30x0.50 V4 - Ventana de Aluminio Patio 0.95x1.4 Instalación Ventanas CERRAJERÍA Cerradura Fixer Puerta Principal llave exterior/boton interior acero inoxidable Cerradura Fixer Baño Ranura ext./botoninterior Cerradura Fixer Puerta Jardin llave exterior/botoninterior acero inoxidable Cerradura Fixer Dormitorio Ranura ext./botoninterior APARATOS Y ACCESORIOS SANITARIOS Inodoro Rapid Jet Blanco Lavatorio Fontana de Baño Lavadero de Cocina Luxor 1 Poza sin Escurridero 50cm Lavarropa de Granito Jorss 1 Poza 80cm Griferia p/ducha Trebol ECO Griferia p/lavatorio de baño Trebol ECO Griferia p/lavadero cocina a Pared Trebol ECO Llave para Lavadero de Ropa Hubolt 1/2 Instalacion de Inodoro Instalacion de Lavatorio y Lavarropa Instalacion de Lavadero Cocina Instalacion Llave y Pico de Ducha COBERTURA Cobertura Techo de Fibraforte incluida parrilla de madera PINTURA INTERIOR Limpeza e imprimado de Muro Limpeza e imprimado de Techo EXTERIOR Pintura Latex en Muros Exteriores URBANISMO ETAPA 7 HABILITACI ÓN URBANA MOVIMIENTO DE TIERRAS LIMPIEZA Y DESBROCE CORTE RELLENO ELIMINACIÓN DE MATERIAL PLATAFORMADO DE CASAS AGUA POTABLE Y ALCANTARILL ADO AGUA POTABLE RED DE DISTRIBUCIÓN TRABAJOS PRELIMINARES RIEGO DE LA ZONA DE TRABAJO PARA MITIGAR LA CONTAMINACION POR POLVO TRAZO Y REPLANTEO INICIAL DE LA LINEA TRAZO Y REPLANTEO DURANTE LA INSTALACION DE TUBERIAS MOVIMIENTO DE TIERRAS EXC. S/INTERF. TERRENO SUELTO P/TUB. DN=110-160mm Hasta H=1.20m. EXC. S/INTERF. TERRENO SUELTO P/TUB. DN=200-250mm Hasta H=1.20m. REFINES Y NIVELACION FONDO DE ZANJA P/TUB DN 110-160MM EN TERRENO NORMAL REFINES Y NIVELACION FONDO DE ZANJA P/TUB DN 200-250MM EN TERRENO NORMAL CAMA DE ARENA MANUAL E=0.1M ZANJA P/TUB DN 110-160; MATERIAL PROPIO ZARANDEADO

und

626.6

129.85

81,367.26

-

-

0%

-

-

0.0%

-

-

0.0%

626.63

81,367.26

100.0%

und

3,133.1

53.94

169,000.76

-

-

0%

-

-

0.0%

-

-

0.0%

3,133.13

169,000.76

100.0%

und

626.6

186.66

116,965.32

-

-

0%

-

-

0.0%

-

-

0.0%

626.63

116,965.32

100.0%

und

1,253.3

239.12

299,677.14

-

-

0%

-

-

0.0%

-

-

0.0%

1,253.25

299,677.14

100.0%

und

626.6

67.84

42,509.24

-

-

0%

-

-

0.0%

-

-

0.0%

626.63

42,509.24

100.0%

und und

626.6 3,133.1

229.45 69.04

143,781.86 216,300.92

-

-

0% 0%

-

-

0.0% 0.0%

-

-

0.0% 0.0%

626.63 3,133.13

143,781.86 216,300.92

100.0% 100.0%

und

626.6

17.91

11,221.60

-

-

0%

-

-

0.0%

-

-

0.0%

626.63

11,221.60

100.0%

und

626.6

17.91

11,221.60

-

-

0%

-

-

0.0%

-

-

0.0%

626.63

11,221.60

100.0%

und

626.6

17.91

11,221.60

-

-

0%

-

-

0.0%

-

-

0.0%

626.63

11,221.60

100.0%

und

1,253.3

17.91

22,443.20

-

-

0%

-

-

0.0%

-

-

0 .0%

1,253.25

22,443.20

100.0%

und und

626.6 626.6

187.38 70.63

117,413.86 44,255.39

-

-

0% 0%

-

-

0.0% 0.0%

-

-

0.0% 0.0%

626.63 626.63

117,413.86 44,255.39

100.0% 100.0%

und

626.6

60.63

37,989.14

-

-

0%

-

-

0.0%

-

-

0.0%

626.63

37,989.14

100.0%

und

626.6

104.75

65,638.97

-

-

0%

-

-

0.0%

-

-

0.0%

626.63

65,638.97

100.0%

und

626.6

68.50

42,923.81

-

-

0%

-

-

0.0%

-

-

0.0%

626.63

42,923.81

100.0%

und

626.6

50.75

31,801.22

-

-

0%

-

-

0.0%

-

-

0.0%

626.63

31,801.22

100.0%

und

626.6

58.50

36,657.56

-

-

0%

-

-

0.0%

-

-

0.0%

626.63

36,657.56

100.0%

und

626.6

29.38

18,407.11

-

-

0%

-

-

0.0%

-

-

0.0%

626.63

18,407.11

100.0%

und und und und

626.6 1,253.3 626.6 626.6

31.25 31.25 31.25 31.25

19,582.03 39,164.06 19,582.03 19,582.03

-

-

0% 0% 0% 0%

-

-

0.0% 0.0% 0.0% 0.0%

-

-

0.0% 0.0% 0.0% 0.0%

626.63 1,253.25 626.63 626.63

19,582.03 39,164.06 19,582.03 19,582.03

100.0% 100.0% 100.0% 100.0%

m2

15,822.3

25.41

402,044.17

-

-

0%

-

-

0.0%

-

-

0.0%

15,822.28

402,044.17

100.0%

m2 m2

61,484.4 14,343.4

9.91 9.91

609,433.82 142,172.24

-

-

0% 0%

-

-

0.0% 0.0%

-

-

0.0% 0.0%

61,484.45 14,343.45

609,433.82 142,172.24

100.0% 100.0%

m2 glb

10,182.7 1.0

12.15 250,000.00

123,739.64 250,000.00

-

-

0% 0%

-

-

0.0% 0.0%

-

-

0.0% 0.0%

10,182.66 1.00

123,739.64 250,000.00

100.0% 100.0%

m2 m3 m3 m2 m2

62,500.0 26,192.3 26,669.6 62,500.0 11,450.0

0.35 3.69 6.09 0.08 14.47

21,875.00 96,649.40 162,418.02 5,000.00 165,695.83

-

-

0% 0% 0% 0% 0%

-

-

0.0% 0.0% 0.0% 0.0% 0.0%

-

-

0.0% 0.0% 0.0% 0.0% 0 .0%

62,500.00 26,192.25 26,669.63 62,500.00 11,450.00

21,875.00 96,649.40 162,418.02 5,000.00 165,695.83

100.0% 100.0% 100.0% 100.0% 100.0%

ml

2,168.3

2.84

6,157.92

-

-

0%

-

-

0.0 %

-

-

0.0%

2,168.28

6,157.92

100.0%

ml

2,168.3

1.18

2,558.57

-

-

0%

-

-

0.0 %

-

-

0.0%

2,168.28

2,558.57

100.0%

ml

2,168.3

1.86

4,033.00

-

-

0%

-

-

0.0 %

-

-

0.0%

2,168.28

4,033.00

100.0%

ml

2,168.3

11.26

24,414.83

-

-

0%

-

-

0.0%

-

-

0. 0%

2,168.28

24,414.83

100.0%

2,168.3

1.33

2,883.81

-

-

0%

-

-

0.0 %

-

-

0.0%

2,168.28

2,883.81

100.0%

2,168.3

3.71

8,044.32

-

-

0%

-

-

0.0 %

-

-

0.0%

2,168.28

8,044.32

100.0%

ml ml ml ml

74

 

1.3.7.1.2.2.1.2.6 1.3.7.1.2.2.1.2.7 1.3.7.1.2.2.1.2.8 1.3.7.1.2.2.1.2.9 1.3.7.1.2.2.1.3 1.3.7.1.2.2.1.3.1 1.3.7.1.2.2.1.3.2 1.3.7.1.2.2.1.3.3 1.3.7.1.2.2.1.4 1.3.7.1.2.2.1.4.1 1.3.7.1.2.2.1.4.2 1.3.7.1.2.2.1.4.3 1.3.7.1.2.2.1.5 1.3.7.1.2.2.1.5.1 1.3.7.1.2.2.1.5.2 1.3.7.1.2.2.1.5.3 1.3.7.1.2.2.1.5.4 1.3.7.1.2.2.1.5.5 1.3.7.1.2.2.1.5.6 1.3.7.1.2.2.1.5.7 1.3.7.1.2.2.1.5.8 1.3.7.1.2.2.1.5.9 1.3.7.1.2.2.1.5.10 1.3.7.1.2.2.1.5.11 1.3.7.1.2.2.1.5.12 1.3.7.1.2.2.1.5.13 1.3.7.1.2. 2.1.6 1.3.7.1.2.2.1.6.1 1.3.7.1.2.2.1.6.2 1.3.7.1.2.2.1.7 1.3.7.1.2.2.1.7.1 1.3.7.1.2.2.1.7.2 1.3.7.1.2.2.1.7.3 1.3.7.1.2.2.1.7.4 1.3.7.1.2.2.1.7.5 1.3.7.1.2.2.1.7.6 1.3.7.1.2.2.1.7.7 1.3.7.1.2.2.1.7.8 1.3.7.1.2.2.1.7.9 1.3.7.1.2. 2.2

CAMA DE ARENA MANUAL E=0.1M ZANJA P/TUB DN 200-250; MATERIAL PROPIO ZARANDEADO RELL. D/ZANJ. D/MAT. PROPIO COMP. C/EQ P/TUB 110-160mm,H=1.20m RELL. D/ZANJ. D/MAT. PROPIO COMP. C/EQ P/TUB 200-250mm,H=1.20m ELIMINACION MATERIAL EXCEDENTE C/EQUIPO HASTA 1KM INSTALACION DE TUBERIAS DE AGUA POTABLE (INC.SUMINISTRO) SUMI. E INST. TUBERIA PVC UF, PN7. 5, P/AGUA POTABLE DN 110 mm. NTP 16422 SUMI. E INST. TUBERIA PVC UF, PN7. 5, P/AGUA POTABLE DN 160 mm. NTP 16423 SUMI. E INST. TUBERIA PVC UF, PN10, P/AGUA POTABLE DN 200 mm. NTP 16424 PRUEBA HIDRAULICA Y DESINFECCION DE TUBERIA ZANJA TAPADA PRUEBA HIDRAULICA Y DESINFECCION DE TUBERIA DN 100mm PRUEBA HIDRAULICA Y DESINFECCION DE TUBERIA DN 160mm PRUEBA HIDRAULICA Y DESINFECCION DE TUBERIA DN 200mm INSTALACION DE ACCESORIOS PVC AGUA POTABLE (INC. SUMINISTRO) SUMI. E INST. TEE PVC 110 x 110mm; PN=10 SUMI. E INST. TEE PVC 160 x 160mm; PN=10 SUMI. E INST. TEE PVC 200 x 200mm; PN=10 SUMI. E INST. CODO DE PVC DN 90º x 110mm SUMI. E INST. CODO DE PVC DN 45º x 110mm SUMI. E INST. CODO DE PVC DN 45º x 160mm SUMI. E INST. CODO DE PVC DN 22.5º x 110mm SUMI. E INST. CODO DE PVC DN 22.5º x 160mm SUMI. E INST. REDUCCIONES PVC DN 160mm a 110mm SUMI. E INST. REDUCCIONES PVC DN 200mm a 160mm SUMI. E INST. DE TAPON PVC UF DN 110mm SUMI. E INST. DE TAPON PVC UF DN 160mm SUMI. E INST. DE TAPON PVC UF DN 200mm ANCLAJES Y/O APOYOS CONCRETO F'C=175KG/CM2 PARA ANCLAJE DE ACCESORIOS EMPALME A TUBERIA EXISTENTE VALVULAS Y ACCESORIOS DE HIERRO DUCTIL SUMI. E INST. VALVULA DE COMPUERTA HD 110mm SUMI. E INST. VALVULA DE COMPUERTA HD 160mm SUMI. E INST. VALVULA DE COMPUERTA HD 200mm SUMI. E INST. VALVULA DE PURGA DN 100mm INCLUYE ACCESORIOS, EXCA. CONCRETO 210, TUB. 110mm SUMI. E INST. VALVULA DE PURGA DN 160mm INCLUYE ACCESORIOS, EXCA. CONCRETO 210, TUB. 160mm SUMI. E INST. VALVULA DE AIRE BB DN 25mm INC. ACCESO. CAJA, P/TUB. DN 110mm. SUMI. E INST. VALVULA DE AIRE BB DN 25mm INC. ACCESO. CAJA, P/TUB. DN 160mm. SUMI. E INST. DE GRIFO CONTRA INCENDIOS FºFº, 02 SALIDAS CAJA DE VALVULA COMPUERTA CONEXIONES DOMICILIARIA S

ml ml

2,168.3

14.69

31,852.03

-

-

0%

-

-

0.0%

-

-

0. 0%

2,168.28

31,852.03

100.0%

m3

936.7

8.31

7,783.98

-

-

0%

-

-

0.0%

-

-

0.0%

936.70

7,783.98

100.0%

ml

1,971.5

19.59

38,621.69

-

-

0%

-

-

0.0%

-

-

0. 0%

1,971.50

38,621.69

100.0%

ml

196.8

36.61

7,204.12

-

-

0%

-

-

0.0%

-

-

0.0%

196.78

7,204.12

100.0%

ml

ml

ml

1,971.5

1.49

2,937.54

-

-

0%

-

-

0.0 %

-

-

0.0%

1,971.50

2,937.54

100.0%

ml

196.8

1.88

369.95

-

-

0%

-

-

0.0%

-

-

0.0%

196.78

3 69.95

100.0%

ml

und

21.0

92.76

1,947.96

-

-

0%

-

-

0.0%

-

-

0.0%

21.00

1,947.96

100.0%

und

4.0

220.98

883.92

-

-

0%

-

-

0.0%

-

-

0.0%

4.00

883.92

100.0%

und und und und und

20.0

86.19

1,723.80

-

-

0%

-

-

0.0%

-

-

0.0%

20.00

1,723.80

100.0%

und

4.0

140.17

560.68

-

-

0%

-

-

0.0%

-

-

0.0%

4.00

560.68

100.0%

und

4.0

125.65

502.60

-

-

0%

-

-

0.0%

-

-

0.0%

4.00

502.60

100.0%

und und

5.0

68.36

341.80

-

-

0%

-

-

0.0%

-

-

0.0%

5.00

341.80

100.0%

und

1.0

128.63

128.63

-

-

0%

-

-

0.0%

-

-

0.0%

1.00

128.63

100.0%

und und

67.0

68.48

4,588.16

-

-

0%

-

-

0.0%

-

-

0.0%

67.00

4,588.16

100.0%

und

6.0

167.16

1,002.96

-

-

0%

-

-

0.0%

-

-

0.0%

6.00

1,002.96

100.0%

und

1.0

358.98

358.98

-

-

0%

-

-

0.0%

-

-

0.0%

1.00

358.98

100.0%

und

1.0

1155.65

1,155.65

-

-

0%

-

-

0.0%

-

-

0.0%

1.00

1,155.65

100.0%

und

1.0

180.59

180.59

-

-

0%

-

-

0.0%

-

-

0.0%

1.00

180.59

100.0%

und und und und und und

75

 

1.3.7.1.2.2.2.1 1.3.7.1.2.2.2.1.1 1.3.7.1.2.2.2.1.2 1.3.7.1.2.2.2.1.3 1.3.7.1.2.2.2.1.4 1.3.7.1.2.2.2.1.5 1.3.7.1.2.2.2.1.6 1.3.7.1.2.2.2.1.7 1.3.7.1.2.2.2.1.8 1.3.7.1.2.2.2.1.9 1.3.7.1.2.2.2.1.10 1.3.7.1.2.2.2.1.11 1.3.7.1.2.2.3 1.3.7.1.2.2.3.1 1.3.7.1.2.2.3.1.1 1.3.7.1.2.2.3.1.2 1.3.7.1.2.3 1.3.7.1.2.3.1 1.3.7.1.2. 3.1.1 1.3.7.1.2.3.1.1.1 1.3.7.1.2.3.1.1.2 1.3.7.1.2.3.1.1.3 1.3.7.1.2. 3.1.2 1.3.7.1.2. 3.1.2.1 1.3.7.1.2.3.1.2.1.1 1.3.7.1.2.3.1.2.1.2 1.3.7.1.2.3.1.2.2 1.3.7.1.2.3.1.2.2.1

1.3.7.1.2.3.1.2.2.2 1.3.7.1.2.3.1.2.3 1.3.7.1.2.3.1.2.3.1 1.3.7.1.2.3.1.2.3.2 1.3.7.1.2.3.1.2.3.3 1.3.7.1.2. 3.1.2.4 1.3.7.1.2.3.1.2.4.1 1.3.7.1.2.3.1.3 1.3.7.1.2.3.1.3.1 1.3.7.1.2.3.1.3.2 1.3.7.1.2.3.1.4 1.3.7.1.2.3.1.4.1 1.3.7.1.2.3.1.4.2 1.3.7.1.2.3.1.4.3

CONEXIÓN DOMICILIARIA DE AGUA POTABLE RIEGO DE LA ZONA DE TRABAJO PARA MITIGAR LA CONTAMINACION POR POLVO TRAZO Y REPLANTEOS CONEXIÓN DOMICILIARIA GUA EXCAVACION DE ZANJA T.NORMAL (0.4x1.20m); CONEX. AGUA REFINE Y NIVELACION DE ZANJA CONEXIÓN AGUA CAMA DE ARENA DE P/TUB. 1/2, C/MATERIAL PROPIO ZARANDEADO; CONEXIÓN DOMIL. RELLENO Y COMP. DE ZANJA CONEXIÓN ELIMINACION MATERIAL EXCEDENTE C/EQUIPO HASTA 1KM CONEXIÓN DOMICILIARIA AGUA TUB. PVC 1/2; LPROM=6m. CONEXIÓN DOMICILIARIA AGUA TUB. PVC 3/4; LPROM=6m. SUM. E INST. DE MICROMEDIDORES CONEXIÓN DOMIC.AGUA,INCL. INSTALACION Y ACCESORIOS PRUEBA HIDRAULICA Y DESINFECCION DE TUBERIA PVC Ø 1/2 PRUEBAS DE CONTROL DE CALIDAD PRUEBAS DE CONTROL DE CALIDAD PRUEBA COMPACTACION SUELOS (PROCTOR MODIFICADO) PRUEBA COMPACTACION SUELOS (DENSIDAD DE CAMPO) ALCANTARILLADO RED DE COLECTORES SECUNDARIOS TRABAJOS PRELIMINARES RIEGO DE LA ZONA DE TRABAJO PARA MITIGAR LA CONTAMINACION POR POLVO TRAZO Y REPLANTEOS INICIALES DEL PROYECTO TRAZO Y REPLANTEO DURANTE EL PROCESO CONSTRUCTIVO DE LA OBRA MOVIMIENTO DE TIERRAS EXCAVACIONES DE ZANJAS EXCAVACION DE ZANJA C/MAQ. T. NORMAL HASTA 1.50MPP EXCAVACION DE ZANJA C/MAQ. T. NORMAL HASTA 2.00MPP REFINE, NIVELACION Y CONFORMACION DE ZANJAS REFINE, NIVELACION Y CONFORMACION DE FONDO DE ZANJA HASTA HPROM=3.00m CAMA DE ARENA DE APOYO DE TUBERIA PVCPROPIO DN (200-250) E=0.10M; A=0.60m; C/MATERIAL ZARANDEADO RELLENO Y COMPACTACION DE ZANJAS RELLENO COMP. ZANJA T. NORMAL HASTA 1.50MPP RELLENO COMP. ZANJA T. NORMAL HASTA 2.00MPP ELIMINACION MATERIAL EXCEDENTE C/EQUIPO EN TERRENO ANEXO ENTIBADO DE ZANJAS ENTIBADO DE PROTECCION DE ZANJAS H>2.00m SUMINISTRO E INSTALACION TUBOS COLECTOR/EMISOR SUMIN. E INSTAL. TUBO PVC UF, SN-4, DN 200MM, ISO 4435 PRUEBA HIDRAULICA TUBO PVC DN 200MM CONSTRUCCION DE BUZONES Y EMPALMES BUZON TIPO I, C/MARCO Y TAPA DE CONCRETO Di=1.20m x h=1.20MPP BUZON TIPO I, C/MARCO Y TAPA DE CONCRETO Di=1.20m x h=1.50MPP BUZON TIPO I, C/MARCO Y TAPA DE CONCRETO Di=1.20m x h=2.00MPP

ml

2,748.0

2.84

7,804.32

-

-

0%

-

-

0.0 %

-

-

0.0%

2,748.00

7,804.32

100.0%

ml

2,748.0

1.2

3,297.60

-

-

0%

-

-

0.0%

-

-

0.0%

2,748.00

3,297.60

100.0%

ml

2,748.0

22.35

61,417.80

-

-

0%

-

-

0.0%

-

-

0. 0%

2,748.00

61,417.80

100.0%

ml

2,748.0

0.65

1,786.20

-

-

0%

-

-

0.0 %

-

-

0.0%

2,748.00

1,786.20

100.0%

ml

2,748.0

2.16

5,935.68

-

-

0%

-

-

0.0 %

-

-

0.0%

2,748.00

5,935.68

100.0% 100.0%

ml

2,748.0

13.56

37,262.88

-

-

0%

-

-

0.0%

-

-

0. 0%

2,748.00

37,262.88

m3

1,187.1

8.31

9,865.13

-

-

0%

-

-

0.0 %

-

-

0.0%

1,187.14

9,865.13

100.0%

und

458.0

218.22

99,944.76

-

-

0%

-

-

0.0%

-

-

0.0%

458.00

99,944.76

100.0%

ml

458.0

154.6

70,806.80

-

-

0%

-

-

0.0 %

-

-

0.0%

458.00

70,806.80

100.0%

ml

2,748.0

1.14

3,132.72

-

-

0%

-

-

0.0 %

-

-

0.0%

2,748.00

3,132.72

100.0%

und

ml

1.0

70

70.00

-

-

0%

-

-

0.0%

-

-

0.0%

1.00

70.00

100.0%

ml

21.0

60

1,260.00

-

-

0%

-

-

0.0%

-

-

0.0%

21.00

1,260.00

100.0%

m

1,838.2

2.84

5,220.35

-

-

0%

-

-

0.0 %

-

-

0.0%

1,838.15

5,220.35

100.0%

m

1,838.2

1.24

2,279.31

-

-

0%

-

-

0.0 %

-

-

0.0%

1,838.15

2,279.31

100.0%

m

1,838.2

1.72

3,161.62

-

-

0%

-

-

0.0 %

-

-

0.0%

1,838.15

3,161.62

100.0%

m

1,838.2

14.88

27,351.67

-

-

0%

-

-

0.0%

-

-

0. 0%

1,838.15

27,351.67

100.0%

m

1,838.2

2.17

3,988.79

-

-

0%

-

-

0.0 %

-

-

0.0%

1,838.15

3,988.79

100.0%

m

1,838.2

3.89

7,150.40

-

-

0%

-

-

0.0 %

-

-

0.0%

1,838.15

7,150.40

100.0%

m

1,838.2

15.46

28,417.80

-

-

0%

-

-

0.0%

-

-

0. 0%

1,838.15

28,417.80

100.0%

794.1

8.31

6,598.80

-

-

0%

-

-

0.0%

-

-

0.0%

794.08

6,598.80

100.0%

ml

1,838.2

30.46

55,990.05

-

-

0%

-

-

0.0%

-

-

0. 0%

1,838.15

55,990.05

100.0%

ml

1,838.2

1.8

3,308.67

-

-

0%

-

-

0.0%

-

-

0.0%

1,838.15

3,308.67

100.0%

und

29.0

1909.31

55,369.99

-

-

0%

-

-

0.0%

-

-

0.0%

29.00

55,369.99

100.0%

und

3.0

2485.81

7,457.43

-

-

0%

-

-

0.0%

-

-

0.0%

3.00

7,457.43

100.0%

m

m m3 m

und

76

 

1.3.7.1.2.3.1.4.4 1.3.7.1.2. 3.2 1.3.7.1.2.3.2.1 1.3.7.1.2.3.2.1.1 1.3.7.1.2.3.2.1.2 1.3.7.1.2.3.2.1.3 1.3.7.1.2.3.2.1.4 1.3.7.1.2.3.2.1.5 1.3.7.1.2.3.2.1.6 1.3.7.1.2.3.2.1.7 1.3.7.1.2.3.2.1.8 1.3.7.1.2.3.2.1.9 1.3.7.1.2.3.2.1.10 1.3.7.1.2.3.2.1.11 1.3.7.1.2.3.3 1.3.7.1.2.3.3.1 1.3.7.1.2.3.3.1.1 1.3.7.1.2.3.3.1.2 1.3.7.1.2.3.3.1.3 1.3.7.1.2.3.4 1.3.7.1.2.3.4.1 1.3.7.1.2. 3.4.1.1 1.3.7.1.3 1.3.7.1.3. 2 1.3.7.1.3. 2.1 1.3.7.1.3.2.1.1 1.3.7.1.3.2.1.2 1.3.7.1.3. 2.2 1.3.7.1.3.2.2.1 1.3.7.1.3.2.2.2 1.3.7.1.3.2.2.3 1.3.7.1.3.2.2.4 1.3.7.1.3.2.2.5 1.3.7.1.3.2.3 1.3.7.1.3.2.3.1 1.3.7.1.3. 2.3.2 1.3.7.1.3. 2.3.3 1.3.7.1.3.2.3.4 1.3.7.1.3. 2.3.5 1.3.7.1.3.2.3.6 1.3.7.1.3.3 1.3.7.1.3. 3.1 1.3.7.1.3.3.1.1 1.3.7.1.3. 3.2 1.3.7.1.3.3.2.1 1.3.7.1.3.3.2.2 1.3.7.1.3.3.2.3

EMPALME A BUZON DE TUB. PVC CON DADO DE CONCRETO SIMPLE CONEXIONES DOMICILIARIA S CONEXION DOMICILIARIA DESAGUE RIEGO DE LA ZONA DE TRABAJO PARA MITIGAR LA CONTAMINACION POR POLVO TRAZOS Y REPLANTEOS DURANTE EL PROCESO CONSTRUCTIVO DE LA OBRA EXCAVACION DE ZANJA T.NORMAL (0.4x1.20m); CONEX. AGUA REFINE Y NIVELACION DE ZANJA CONEXIÓN AGUA CAMA DE ARENA DE P/TUB. 1/2, CMATERIAL PROPIO ZARANDEADO; CONEXIÓN DOMIL. RELLENO Y COMP. DE ZANJA CONEXIÓN ELIMINACION MATERIAL EXCEDENTE C/EQUIPO EN TERRENO ANEXO SUMIN. E INSTALACION DE TUBO PVC, SN-4, DN 160 MM, ISO 4435 SUMIN. E INSTALACION CAJA DE REGISTRO DE DESAGUE Y MEDIA CAÑA EMPALME A COLECTOR PVC DN 200MM PRUEBA HIDRAULICA CONEX. DOMICILIARIA DESAGUE PRUEBAS DE CONTROL DE CALIDAD PRUEBAS DE CONTROL DE CALIDAD PRUEBA COMPACTACION SUELOS (PROMOTOR MODIFICADO) PRUEBA COMPACTACION SUELOS (DENSIDAD DE CAMPO) PRUEBA DE CALIDAD DE CONCRETO VARIOS VARIOS LIMPIEZA FINAL DE OBRA PISTAS Y VEREDAS PISTAS Y ESTACIONAMIENTO OBRAS PROVISIONALES TRAZO, NIVELES Y REPLANTEO INICIAL DE OBRA TRAZO REPLANTEO Y CONTRO TOPOGRAFICO DE EJES Y NIVELES DE PISTAS DURANTE LA EJECUCION DE LA OBRA MOVIMIENTO DE TIERRAS CORTE HASTA NIVEL DE SUBRASANTE EXTRACCION Y APILAMIENTO DE MATERIAL DE PRESTAMO CARGUIO Y TRANSPORTE DE MATERIAL PROPIO RELLENO Y COMPACTACION CON MATERIAL PROPIO ELIMINACION DE MATERIAL PROPIO EXCEDENTE EN TERRENO ANEXO PAVIMENTOS CONFORMACION Y COMPACTACION DE SUBRASANTE PARA PISTAS SUB-BASE DE 20 CMS BASE DE 15 CMS BARRIDO Y LIMPIEZA P/CARPETA ASFALTICA IMPRIMACION ASFALTICA CARPETA ASFALTICA EN CALIENTE DE 2" VEREDAS OBRAS PROVISIONALES TRAZO, REPLANTEO Y CONTROL TOPOGRAFICO DE EJES Y NIVELES DE VEREDAS MOVIMIENTO DE TIERRAS PERFILADO, NIVELACION Y COMPACTACION DE SUBRASANTE VEREDAS COLOCACION DE AFIRMADO/BASE GRANULAR PARA VEREDAS EXCAVACION MANUAL PARA SARDINELES DE VEREDAS

und

89.0

159.24

14,172.36

-

-

0%

-

-

0.0%

-

-

0.0%

89.00

14,172.36

100.0%

ml

2,748.0

2.84

7,804.32

-

-

0%

-

-

0.0 %

-

-

0.0%

2,748.00

7,804.32

100.0%

ml

2,748.0

1.31

3,599.88

-

-

0%

-

-

0.0 %

-

-

0.0%

2,748.00

3,599.88

100.0%

ml

2,748.0

22.35

61,417.80

-

-

0%

-

-

0.0%

-

-

0. 0%

2,748.00

61,417.80

100.0%

ml

2,748.0

1.31

3,599.88

-

-

0%

-

-

0.0 %

-

-

0.0%

2,748.00

3,599.88

100.0%

ml

2,748.0

2.81

7,721.88

-

-

0%

-

-

0.0 %

-

-

0.0%

2,748.00

7,721.88

100.0% 100.0%

ml

2,748.0

13.56

37,262.88

-

-

0%

-

-

0.0%

-

-

0. 0%

2,748.00

37,262.88

m3

1,187.1

8.31

9,865.13

-

-

0%

-

-

0.0 %

-

-

0.0%

1,187.14

9,865.13

100.0%

m

2,748.0

20.6

56,608.80

-

-

0%

-

-

0. 0%

-

-

0.0%

2,748.00

56,608.80

100.0%

und

458.0

130.56

59,796.48

-

-

0%

-

-

0.0%

-

-

0.0%

458.00

59,796.48

100.0%

und

458.0

95.42

43,702.36

-

-

0%

-

-

0.0%

-

-

0.0%

458.00

43,702.36

100.0%

und

2,748.0

1.8

4,946.40

-

-

0%

-

-

0.0%

-

-

0.0%

2,748.00

4,946.40

100.0%

und und

1.0 18.0

70 60

70.00 1,080.00

-

-

0% 0%

-

-

0.0% 0.0%

-

-

0.0% 0.0%

1.00 18.00

70.00 1,080.00

100.0% 100.0%

und

1.0

2000

2,000.00

-

-

0%

-

-

0.0%

-

-

0.0%

1.00

2,000.00

100.0%

m

1,838.2

1.31

2,407.98

-

-

0%

-

-

0.0%

-

-

0 .0%

1,838.15

2,407.98

100.0%

m2

12,313.8

0.73

8,989.04

-

-

0%

-

-

0.0%

-

-

0. 0%

12,313.75

8,989.04

100.0%

m2

12,313.8

1.81

22,287.89

-

-

0%

-

-

0.0%

-

-

0 .0%

12,313.75

22,287.89

100.0%

m3

10,332.1

8.01

82,760.44

-

-

0%

-

-

0.0%

-

-

0 .0%

10,332.14

82,760.44

100.0%

m3

2,241.1

4.56

10,219.55

-

-

0%

-

-

0.0%

-

-

0. 0%

2,241.13

10,219.55

100.0%

m3

2,241.1

4.25

9,524.80

-

-

0%

-

-

0.0 %

-

-

0.0%

2,241.13

9,524.80

100.0%

m3

2,241.1

19.36

43,388.28

-

-

0%

-

-

0.0%

-

-

0 .0%

2,241.13

43,388.28

100.0%

m3

9,709.2

6.36

61,750.59

-

-

0%

-

-

0.0%

-

-

0. 0%

9,709.21

61,750.59

100.0%

m2

12,313.8

2.03

24,996.91

-

-

0%

-

-

0.0%

-

-

0 .0%

12,313.75

24,996.91

100.0%

m2 m2

12,313.8 12,313.8

16.85 18.65

207,486.69 229,651.44

-

-

0% 0%

-

-

0.0% 0.0%

-

-

0.0% 0 .0%

12,313.75 12,313.75

207,486.69 229,651.44

100.0% 100.0%

m2

12,313.8

0.45

5,541.19

-

-

0%

-

-

0.0%

-

-

0. 0%

12,313.75

5,541.19

100.0%

m2

12,313.8

4.29

52,825.99

-

-

0%

-

-

0.0%

-

-

0.0%

12,313.75

52,825.99

100.0%

m2

12,313.8

35.71

439,724.01

-

-

0%

-

-

0.0%

-

-

0.0%

12,313.75

439,724.01

100.0%

m2

4,513.1

2.15

9,703.21

-

-

0%

-

-

0.0 %

-

-

0.0%

4,513.12

9,703.21

100.0%

m2

4,513.1

6.83

30,824.61

-

-

0%

-

-

0.0%

-

-

0. 0%

4,513.12

30,824.61

100.0%

m2

4,513.1

14.8

66,794.18

-

-

0%

-

-

0.0%

-

-

0. 0%

4,513.12

66,794.18

100.0%

m

3,473.1

4.03

13,996.55

-

-

0%

-

-

0. 0%

-

-

0.0%

3,473.09

13,996.55

100.0%

77

 

1.3.7.1.3. 3.3 1.3.7.1.3.3.3.1 1.3.7.1.3.3.3.2 1.3.7.1.3.3.3.3 1.3.7.1.3.3.3.4 1.3.7.1.3.3.3.5 1.3.7.1.3.4 1.3.7.1.3. 4.1 1.3.7.1.3.4.1.1 1.3.7.1.3.4.1.2 1.3.7.1.3.4.1.3 1.3.7.1.3.4.2 1.3.7.1.3.4.2.1 1.3.7.1.3.4.2.2 1.3.7.1.3.4.2.3 1.3.7.1.3.4.2.4 1.3.7.1.3. 5 1.3.7.1.3. 5.1 1.3.7.1.3.5.1.1 1.3.7.1.3.5.1.2 1.3.7.1.3.5.1.3 1.3.7.1.3. 5.2 1.3.7.1.3.5.2.1 1.3.7.1.3.5.2.2 1.3.7.1.3.5.2.3 1.3.7.1.3.5.2.4 1.3.7.1.3. 5.2.5 1.3.7.1.3.6 1.3.7.1.3.6.1 1.3.7.1.3.6.1.1 1.3.7.1.3.6.1.2 1.3.7.1.3.6.1.3 1.3.7.1.3.6.1.4 1.3.7.1.3.6.1.5 1.3.7.1.3. 7 1.3.7.1.3. 7.1 1.3.7.1.3. 7.1.1 1.3.7.1.3. 8 1.3.7.1.3. 8.1 1.3.7.1.3.8.1.1 1.3.7.1.3.8.1.2 1.3.7.1.3.8.1.3 1.3.7.1.4 1.3.7.1.4. 1 1.3.7.1.4. 2 1.3.7.2 1.3.7.2.1 1.3.7.2.1.1 1.3.7.2.1.2

VEREDAS Y SARDINELES ENCOFRADO Y DESENCOFRADO DE VEREDAS CONCRETO PARA SARDINELES DE VEREDAS h=35 cm F'C=175 kg/cm2 CONCRETO PARA VEREDAS DE H=10CM F'C=175 KG/CM2 JUNTA DE DILATACION ASFALTICA PARA VEREDAS; e=1/2 CURADO QUIMICO PARA PAVIMENTO RGIDO:VEREDAS PASAJE PEATONAL MOVIMIENTO DE TIERRAS PERFILADO, NIVELACION Y COMPACTACION DE SUBRASANTE COLOCACION DE AFIRMADO/BASE GRANULAR EXCAVACION MANUAL PARA SADINELES SUMERGIDOS CONCRETO EN PASAJES PEATONALES CONCRETO PARA SARDINEL SUMERGID; H=0.25cm; F'C=210 kg/cm2 PAVIMENTO RIGIDO DE CONCRETO EN PASAJE PEATONAL; H=12.5cm; F'C=210 KG/CM2 JUNTA DE DILATACION ASFALTICA EN PAVIMIENTO RIGIDO; e=1/2 CURADO QUIMICO PARA PAVIMENTO RIGIDO RAMPAS PEATONALES MOVIMIENTO DE TIERRAS PERFILADO, NIVELACION Y COMPACTACION DE SUBRASANTE COLOCACION DE AFIRMADO/BASE GRANULAR EXCAVACION MANUAL PARA SARDINELES SUMERGIDOS CONCRETO EN RAMPAS ENCOFRADO Y DESENCOFRADO DE RAMPAS CONCRETO PARA SARDINELES DE RAMPAS h=20cm F'C=175kg/cm2 CONCRETO PARA RAMPAS DE H=10CM F'C=175 KG/CM2 CURADO QUIMICO PARA RAMPAS BRUÑADO DE RAMPAS SEÑALIZACIÓN SEÑALIZACION PINTADO EN BLANCO DE LETRAS, CRUCES PEATONALES Y SIMBOLOS EN PAVIMENTO PINTADO DE AMARILLO EN PSJE. PEATONAL PINTADO DE AMARILLO EN SARDINELES, MARTILLOS, RAMPAS Y ESTACIONAMIENTO PINTADO DE BLANCO DE LINEAS DISCONTINUAS Y CONTINUAS EN PAVIMENTO SEÑALIZACION VERTICAL (PREVENTIVA Y REGLAMENTARIA) LIMPIEZA DE OBRA LIMPIEZA DE OBRA LIMPIEZA FINAL DE OBRA PRUEBAS DE CALIDAD PRUEBAS DE CALIDAD PRUEBAS DE CALIDAD DE SUBRASANTE PRUEBAS DE CALIDAD DE LA SUB BASE Y BASE PRUEBAS DE CALIDAD DEL CONCRETO RED ELÉCTRICA RED PRIMARIA RED SECUNDARIA VIVIENDAS MOV. TIERRAS CASA Corte de Terreno con maquinaria h=0.35 (0.15 Platea + 0.20 Afirmado) Inc. Eliminación Excavación de Zanjas cimentación manual (Uñas de Platea) Inc Eliminación

m2

683.0

41.58

28,397.06

-

-

0%

-

-

0.0 %

-

-

0.0%

682.95

28,397.06

100.0%

m

3,473.1

17.7

61,473.69

-

-

0%

-

-

0. 0%

-

-

0.0%

3,473.09

61,473.69

100.0%

m2

4,513.1

48.2

217,532.38

-

-

0%

-

-

0.0%

-

-

0 .0%

4,513.12

217,532.38

100.0%

ml

1,048.2

4.87

5,104.73

-

-

0%

-

-

0.0 %

-

-

0.0%

1,048.20

5,104.73

100.0%

m2

4,513.1

1.67

7,536.91

-

-

0%

-

-

0.0 %

-

-

0.0%

4,513.12

7,536.91

100.0%

m2

1,655.9

6.83

11,309.46

-

-

0%

-

-

0.0%

-

-

0. 0%

1,655.85

11,309.46

100.0%

m2

1,655.9

19.35

32,040.70

-

-

0%

-

-

0.0%

-

-

0 .0%

1,655.85

32,040.70

100.0%

m

1,036.5

4.03

4,177.14

-

-

0%

-

-

0.0 %

-

-

0.0%

1,036.51

4,177.14

100.0%

m

962.8

19.96

19,217.09

-

-

0%

-

-

0.0 %

-

-

0.0%

962.78

19,217.09

100.0%

m2

1,655.9

61.18

101,304.90

-

-

0%

-

-

0.0%

-

-

0.0%

1,655.85

101,304.90

100.0%

m

385.2

4.87

1,875.92

-

-

0%

-

-

0.0%

-

-

0.0%

385.20

1,875.92

100.0%

m2

1,655.9

1.67

2,765.27

-

-

0%

-

-

0.0 %

-

-

0.0%

1,655.85

2,765.27

100.0%

m2

186.5

6.83

1,273.45

-

-

0%

-

-

0.0%

-

-

0.0%

186.45

1,273.45

100.0%

m2

186.5

14.8

2,759.46

-

-

0%

-

-

0.0%

-

-

0.0%

186.45

2,759.46

100.0%

m

130.8

4.03

527.12

-

-

0%

-

-

0.0%

-

-

0.0%

130.80

5 27.12

100.0% 100.0%

m2

40.6

46.43

1,883.90

-

-

0%

-

-

0.0%

-

-

0.0%

40.58

1,8 83.90

m

130.8

15.99

2,091.49

-

-

0%

-

-

0.0%

-

-

0.0%

130.80

2,091.49

100.0%

m2

186.5

48.2

8,986.89

-

-

0%

-

-

0.0%

-

-

0.0%

186.45

8,986.89

100.0%

m2

186.5

1.67

311.37

-

-

0%

-

-

0.0%

-

-

0.0%

186.45

3 11.37

100.0%

m2

186.5

13.73

2,559.96

-

-

0%

-

-

0.0%

-

-

0.0%

186.45

2,559.96

100.0%

m2

650.5

23.01

14,968.93

-

-

0%

-

-

0.0 %

-

-

0.0%

650.54

14,968.93

100.0%

m2

258.3

21.08

5,444.96

-

-

0%

-

-

0.0%

-

-

0.0%

258.30

5,444.96

100.0%

m

1,187.6

9.52

11,306.05

-

-

0%

-

-

0. 0%

-

-

0.0%

1,187.61

11,306.05

100.0%

m

981.6

7.99

7,842.90

-

-

0%

-

-

0.0%

-

-

0.0%

981.59

7,842.90

100.0%

und

9.0

580.95

5,228.55

-

-

0%

-

-

0.0%

-

-

0.0%

9.00

5,228.55

100.0%

Ha

5.1

3024

15,361.92

-

-

0%

-

-

0.0 %

-

-

0.0%

5.08

15,361.92

100.0%

glb

1.0

2680

2,680.00

-

-

0%

-

-

0.0%

-

-

0.0%

1.00

2,680.00

100.0%

glb

1.0

15480

15,480.00

-

-

0%

-

-

0.0%

-

-

0.0%

1.00

15,4 80.00

100.0%

glb

1.0

1850

1,850.00

-

-

0%

-

-

0.0%

-

-

0.0%

1.00

1,850.00

100.0%

glb glb

1.0 1.0

154,266.47 541,075.35

154,266.47 541,075.35

-

-

0% 0%

-

-

0.0% 0.0%

-

-

0.0% 0.0%

1.00 1.00

154,266.47 541,075.35

100.0% 100.0%

m3

5,873.9

17.94

105,376.87

-

-

0%

-

-

0.0%

-

-

0.0%

5,873.85

105,376.87

100.0%

m3

381.3

46.80

17,844.14

-

-

0%

-

-

0.0 %

-

-

0.0%

381.29

17,844.14

100.0%

78

 

1.3.7.2.1.3 1.3.7.2.1.4 1.3.7.2.1. 5 1.3.7.2.2 1.3.7.2.2.1 1.3.7.2.2.1.1 1.3.7.2.2. 1.2 1.3.7.2.2.1.3 1.3.7.2.2. 1.4 1.3.7.2.2.2 1.3.7.2.2.2.1 1.3.7.2.2.2.2 1.3.7.2.2.2.3 1.3.7.2.2. 3 1.3.7.2.2.3.1 1.3.7.2.2.3.2 1.3.7.2.2.3.3 1.3.7.2.2.3.4 1.3.7.2.3 1.3.7.2.3. 1 1.3.7.2.3.2 1.3.7.2.3. 3 1.3.7.2.3.4 1.3.7.2.3.5 1.3.7.2.3.6 1.3.7.2.3. 7 1.3.7.2.3. 8 1.3.7.2.3.9 1.3.7.2.3.10 1.3.7.2.3. 11 1.3.7.2.3.12 1.3.7.2.4 1.3.7.2.4. 1 1.3.7.2.4. 2 1.3.7.2.4. 3 1.3.7.2.4.4 1.3.7.2.4. 5 1.3.7.2.4. 6 1.3.7.2.4. 7 1.3.7.2.4.8 1.3.7.2.4.9 1.3.7.2.4.10 1.3.7.2.4. 11 1.3.7.2.4. 12 1.3.7.2.4. 13 1.3.7.2.4.14 1.3.7.2.4. 15 1.3.7.2.5 1.3.7.2.5.1 1.3.7.2.5.1.1 1.3.7.2.5.1.2 1.3.7.2.5.2 1.3.7.2.5.2.1 1.3.7.2.5. 2.2 1.3.7.2.5. 2.3 1.3.7.2.5.3 1.3.7.2.5.3.1 1.3.7.2.5.3.2 1.3.7.2.5.3.3 1.3.7.2.5.3.4 1.3.7.2.5.4 1.3.7.2.5.4.1 1.3.7.2.5.4.2 1.3.7.2.5.4.3 1.3.7.2.5.4.4 1.3.7.2.5.4.5

Relleno con material de préstamo (Afirmado e= 0.20m) Proctor 95% Nivelación y compactación de Terreno Acarreo de Material excedente ESTRUCTURAS PLATEA Concreto premezclado fc=175kg/cm2 Encofrado y desencofrad o Acero de refuerzo de fy =4200kg/cm2 Acabado de Losa Platea MUROS Concreto premezclado fc=175kg/cm2 Encofrado y desencofrado Acero de refuerzo de fy =4200kg/cm2 LOSA TECHO Concreto premezclado fc=175kg/cm2 Encofrado y desencofrado Acero de refuerzo de fy =4200kg/cm2 Junta de dilatación tecnopor 1 INSTALACIONES ELÉCTRICAS Salida p/centro de luz Salida p/braquetes Tomacorrie nte bipolar Interruptor de 01 golpe Salida p/timbre Salida p/pulsador de timbre Alimentad or de TD a Caja Medidor Tubo PVC SAP 25mm Tablero Electrico de Distribucion Tubo PVC SAP 25mm acometida para futura conexión pozo de tierra. Prueba electrica Conexión a banco de medidores INSTALACION ES SANITARIAS Excavacion y relleno de zanja Tuberia PVC SAL 4 Tuberia PVC SAL 2 Caja registro 12x24 Salida de desague 2 Salida de desague 4 Salida de ventilacio n 2 Sumidero de bronce 2 Registro de bronce 4 Sombrero de ventilacion 2 Salida de agua fria 1/2 Tuberia PVC C10 Agua Fria 1/2 Tuberia PVC C10 Agua Fria 3/4 Valvula compuerta 1/2 Valvula compuerta 3/4 ACABADOS LAVANDERA Concreto premezclado fc=175kg/cm2 Encofrado BAÑO Concreto simple 1:6 en sardinel ducha 0.10x0.20 Piso Cerámico 30x30 Ducha Zócalo cerámico 30x30 Ducha CARPINTERA DE MADERA P1 - Puerta Principal de HDF contraplacada - 0.90x2.60 - Sin Pintura P2 - Puerta Dormitorio y Lavandería de HDF contraplacada - 0.80x2.60 - Sin Pintura P3 - Puerta Baño de HDF contraplacada - 0.70x2.6 - Sin Pintura Instalación de Puertas CARPINTERA DE ALUMINIO V1 - Ventana de Aluminio Sala 0.85x1.4 V2 - Ventana de Aluminio Dormitorios - 1.0x1.4 V3 - Ventana de Aluminio Baño 0.30x0.50 V4 - Ventana de Aluminio Patio 0.95x1.4 Instalación Ventanas

m3

2,514.4

86.88

218,452.81

-

-

0%

-

-

0.0%

-

-

0.0%

2,514.42

218,452.81

100.0%

m2 m3

13,901.4 6,255.1

2.64 5.40

36,699.81 33,777.73

-

-

0% 0%

-

-

0.0% 0.0%

-

-

0.0% 0.0%

13,901.45 6,255.14

36,699.81 33,777.73

100.0% 100.0%

2,345.4

311.32

730,168.89

-

0%

-

-

0.0%

-

0.0%

m2

m3

5,165.0

14.95

77,202.80

-

-

0%

-

-

0.0%

-

-

0.0%

5,165.03

77,202.80

100.0%

kg

131,357.1

4.10

539,089.36

-

-

0%

-

-

0.0%

-

-

0.0%

##########

539,089.36

100.0%

m2

12,881.3

6.77

87,226.67

-

-

0%

-

-

0.0%

-

-

0.0%

12,881.25

87,226.67

100.0%

m3

2,824.0

333.63

942,159.34

-

-

0%

-

-

0.0%

-

-

0.0%

2,823.97

942,159.34

100.0%

m2

56,479.5

9.55

539,518.97

-

-

0%

-

-

0.0%

-

-

0.0%

56,479.50

539,518.97

100.0%

kg

114,608.6

4.10

470,353.55

-

-

0%

-

-

0.0%

-

-

0.0%

##########

470,353.55

100.0%

m3

429,755.60

-

-

-

0%

-

-

0.0%

-

-

-

0.0%

2,345.39

1,288.13

730,168.89

429,755.60

100.0%

1,288.1

333.63

m2

12,881.3

10.24

131,898.48

-

-

0%

-

-

0.0%

-

-

0.0%

12,881.25

131,898.48

100.0%

kg

52,481.5

4.10

215,384.24

-

-

0%

-

-

0.0%

-

-

0.0%

52,481.54

215,384.24

100.0%

100.0%

m2

1,921.9

5.19

9,983.80

-

-

0%

-

-

0.0%

-

-

0.0%

1,921.88

9,983.80

100.0%

pto pto pto pto pto pto ml ml und ml

2,576.3 515.3 3,606.8 2,576.3 515.3 515.3 4,122.0 3,606.8 515.3 3,091.5

57.20 57.20 57.20 57.20 27.50 27.50 9.35 11.55 154.00 11.55

147,361.50 29,472.30 206,306.10 147,361.50 14,169.38 14,169.38 38,540.7 0 41,657.96 79,348.50 35,706.83

-

-

0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

-

-

0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0. 0% 0.0% 0.0%

-

-

0 .0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0. 0%

2,576.25 515.25 3,606.75 2,576.25 515.25 515.25 4,122.00 3,606.75 515.25 3,091.50

147,361.50 29,472.30 206,306.10 147,361.50 14,169.38 14,169.38 38,540. 70 41,657.96 79,348.50 35,706.83

100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%

glb glb

515.3 515.3

27.50 27.50

14,169.38 14,169.38

-

-

0% 0%

-

-

0.0% 0.0%

-

-

0.0% 0.0%

515.25 515.25

14,169.38 14,169.38

100.0% 100.0%

ml ml ml und pto pto pto und und und pto ml ml und und

3,606.8 2,576.3 1,030.5 515.3 1,545.8 515.3 2,061.0 1,030.5 515.3 2,061.0 2,576.3 1,545.8 2,370.2 515.3 1,030.5

19.80 26.95 16.83 275.00 61.60 85.80 44.00 23.10 35.20 8.25 61.60 15.95 18.37 64.35 70.95

71,413.65 69,429.94 17,343.32 141,693.75 95,218.20 44,208.45 90,684.00 23,804.55 18,136.80 17,003.25 158,697.00 24,654.71 43,539.66 33,156.34 73,113.98

-

-

0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

-

-

0.0% 0.0 % 0.0 % 0.0% 0. 0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%

-

-

0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0. 0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%

3,606.75 2,576.25 1,030.50 515.25 1,545.75 515.25 2,061.00 1,030.50 515.25 2,061.00 2,576.25 1,545.75 2,370.15 515.25 1,030.50

71,413.65 69,429.94 17,343.32 141,693.75 95,218.20 44,208.45 90,684.00 23,804.55 18,136.80 17,003.25 158,697.00 24,654.7 1 43,539.6 6 33,156.34 73,113.98

100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%

m3

85.8

288.26

24,744.43

-

-

0%

-

-

0.0%

-

-

0.0%

85.84

24,744.43

100.0%

m2

138.1

13.84

1,911.12

-

-

0%

-

-

0.0%

-

-

0.0%

138.09

1,911.12

100.0%

und

515.3

21.06

10,851.17

-

-

0%

-

-

0.0%

-

-

0.0%

515.25

10,851.17

100.0%

m2 m2

371.0 2,823.6

44.98 44.98

16,687.29 127,008.80

-

-

0% 0%

-

-

0.0% 0.0%

-

-

0.0% 0.0%

370.98 2,823.57

16,687.29 127,008.80

100.0% 100.0%

und

515.3

165.96

85,510.89

-

-

0%

-

-

0.0%

-

-

0.0%

515.25

85,510.89

100.0%

und

1,545.8

140.52

217,208.79

-

-

0%

-

-

0.0%

-

-

0.0%

1,545.75

217,208.79

100.0%

und

515.3

129.85

66,905.21

-

-

0%

-

-

0.0%

-

-

0.0%

515.25

66,905.21

100.0%

und

2,576.3

53.94

138,962.93

-

-

0%

-

-

0.0%

-

-

0.0%

2,576.25

138,962.93

100.0%

und

515.3

186.66

96,176.15

-

-

0%

-

-

0.0%

-

-

0.0%

515.25

96,176.15

100.0%

und

1,030.5

239.12

246,413.16

-

-

0%

-

-

0.0%

-

-

0.0%

1,030.50

246,413.16

100.0%

und

515.3

67.84

34,953.74

-

-

0%

-

-

0.0%

-

-

0.0%

515.25

34,953.74

100.0%

und und

515.3 2,576.3

229.45 69.04

118,226.38 177,856.06

-

-

0% 0%

-

-

0.0% 0.0%

-

-

0.0% 0.0%

515.25 2,576.25

118,226.38 177,856.06

100.0% 100.0%

79

 

1.3.7.2.5.5 1.3.7.2.5.5.1 1.3.7.2.5.5.2 1.3.7.2.5.5.3 1.3.7.2.5.5.4 1.3.7.2.5.6 1.3.7.2.5.6.1 1.3.7.2.5.6.2 1.3.7.2.5.6.3 1.3.7.2.5.6.4 1.3.7.2.5.6.5 1.3.7.2.5.6.6 1.3.7.2.5.6.7 1.3.7.2.5.6.8 1.3.7.2.5.6.9 1.3.7.2.5.6.10 1.3.7.2.5.6.11 1.3.7.2.5.6.12 1.3.7.2.5.7 1.3.7.2.5.7.1 1.3.7.2.6 1.3.7.2.6.1 1.3.7.2.6.1.1 1.3.7.2.6.1.2 1.3.7.2.6.2 1.3.7.2.6. 2.1 1.3.7.3 1.3.8 1.3.8.1 1.3.8.1.1 1.3.8.1.1. 1 1.3.8.1.1. 2 1.3.8.1.1. 3 1.3.8.1.1. 4 1.3.8.1.1. 6 1.3.8.1.2 1.3.8.1.2. 2 1.3.8.1.2. 2.1 1.3.8.1.2. 2.1.1 1.3.8.1.2.2.1.1.1 1.3.8.1.2.2.1.1.2 1.3.8.1.2.2.1.1.3 1.3.8.1.2. 2.1.2 1.3.8.1.2.2.1.2.1 1.3.8.1.2.2.1.2.2 1.3.8.1.2.2.1.2.3 1.3.8.1.2.2.1.2.4 1.3.8.1.2.2.1.2.5 1.3.8.1.2.2.1.2.6 1.3.8.1.2.2.1.2.7 1.3.8.1.2.2.1.2.8 1.3.8.1.2.2.1.2.9 1.3.8.1.2.2.1.3 1.3.8.1.2.2.1.3.1

CERRAJERA Cerradura Fixer Puerta Principal llave exterior/boton interior acero inoxidable Cerradura Fixer Baño Ranura ext./botoninterior Cerradura Fixer Puerta Jardin llave exterior/botoninterior acero inoxidable Cerradura Fixer Dormitorio Ranura ext./botoninterior APARATOS Y ACCESORIOS SANITARIOS Inodoro Rapid Jet Blanco Lavatorio Fontana de Baño Lavadero de Cocina Luxor 1 Poza sin Escurridero 50cm Lavarropa de Granito Jorss 1 Poza 80cm Griferia p/ducha Trebol ECO Griferia p/lavatorio de baño Trebol ECO Griferia p/lavadero cocina a Pared Trebol ECO Llave para Lavadero de Ropa Hubolt 1/2 Instalacion de Inodoro Instalacion de Lavatorio y Lavarropa Instalacion de Lavadero Cocina Instalacion Llave y Pico de Ducha COBERTURA Cobertura Techo de Fibraforte incluida parrilla de madera PINTURA INTERIOR Limpeza e imprimado de Muro Limpeza e imprimado de Techo EXTERIOR Pintura Latex en Muros Exteriores URBANISMO ETAPA 8 HABILITACI ÓN URBANA MOVIMIENTO DE TIERRAS LIMPIEZA Y DESBROCE CORTE RELLENO ELIMINACIÓN DE MATERIAL PLATAFORMADO DE CASAS AGUA POTABLE Y ALCANTARILL ADO AGUA POTABLE RED DE DISTRIBUCIÓN TRABAJOS PRELIMINARES RIEGO DE LA ZONA DE TRABAJO PARA MITIGAR LA CONTAMINACION POR POLVO TRAZO Y REPLANTEO INICIAL DE LA LINEA TRAZO Y REPLANTEO DURANTE LA INSTALACION DE TUBERIAS MOVIMIENTO DE TIERRAS EXC. S/INTERF. TERRENO SUELTO P/TUB. DN=110-160mm Hasta H=1.20m. EXC. S/INTERF. TERRENO SUELTO P/TUB. DN=200-250mm Hasta H=1.20m. REFINES Y NIVELACION FONDO DE ZANJA P/TUB DN 110-160MM EN TERRENO NORMAL REFINES Y NIVELACION FONDO DE ZANJA P/TUB DN 200-250MM EN TERRENO NORMAL CAMA DE ARENA MANUAL E=0.1M ZANJA P/TUB DN 110-160; MATERIAL PROPIO ZARANDEADO CAMA DE ARENA MANUAL E=0.1M ZANJA P/TUB DN 200-250; MATERIAL PROPIO ZARANDEADO RELL. D/ZANJ. D/MAT. PROPIO COMP. C/EQ P/TUB 110-160mm,H=1.20m RELL. D/ZANJ. D/MAT. PROPIO COMP. C/EQ P/TUB 200-250mm,H=1.20m ELIMINACION MATERIAL EXCEDENTE C/EQUIPO HASTA 1KM INSTALACION DE TUBERIAS DE AGUA POTABLE (INC.SUMINISTRO) SUMI. E INST. TUBERIA PVC UF, PN7. 5, P/AGUA POTABLE DN 110 mm. NTP

und

515.3

17.91

9,227.10

-

-

0%

-

-

0.0%

-

-

0.0%

515.25

9,227.10

100.0%

und

515.3

17.91

9,227.10

-

-

0%

-

-

0.0%

-

-

0.0%

515.25

9,227.10

100.0%

und

515.3

17.91

9,227.10

-

-

0%

-

-

0.0%

-

-

0.0%

515.25

9,227.10

100.0%

und

1,030.5

17.91

18,454.19

-

-

0%

-

-

0.0%

-

-

0 .0%

1,030.50

18,454.19

100.0%

und und

515.3 515.3

187.38 70.63

96,544.97 36,389.53

-

-

0% 0%

-

-

0.0% 0.0%

-

-

0.0% 0.0%

515.25 515.25

96,544.97 36,389.53

100.0% 100.0%

und

515.3

60.63

31,237.03

-

-

0%

-

-

0.0%

-

-

0.0%

515.25

31,237.03

100.0%

und

515.3

104.75

53,972.44

-

-

0%

-

-

0.0%

-

-

0.0%

515.25

53,972.44

100.0%

und

515.3

68.50

35,294.63

-

-

0%

-

-

0.0%

-

-

0.0%

515.25

35,294.63

100.0%

und

515.3

50.75

26,148.94

-

-

0%

-

-

0.0%

-

-

0.0%

515.25

26,148.94

100.0%

und

515.3

58.50

30,142.13

-

-

0%

-

-

0.0%

-

-

0.0%

515.25

30,142.13

100.0%

und

515.3

29.38

15,135.47

-

-

0%

-

-

0.0%

-

-

0.0%

515.25

15,135.47

100.0%

und und und und

515.3 1,030.5 515.3 515.3

31.25 31.25 31.25 31.25

16,101.56 32,203.13 16,101.56 16,101.56

-

-

0% 0% 0% 0%

-

-

0.0% 0.0% 0.0% 0.0%

-

-

0.0% 0.0% 0.0% 0.0%

515.25 1,030.50 515.25 515.25

16,101.56 32,203.13 16,101.56 16,101.56

100.0% 100.0% 100.0% 100.0%

m2

13,010.1

25.41

330,585.69

-

-

0%

-

-

0.0%

-

-

0.0%

13,010.06

330,585.69

100.0%

m2 m2

50,556.3 11,794.1

9.91 9.91

501,114.34 116,902.85

-

-

0% 0%

-

-

0.0% 0.0%

-

-

0.0% 0.0%

50,556.33 11,794.07

501,114.34 116,902.85

100.0% 100.0%

m2 glb

8,372.8 1.0

12.15 250,000.00

101,746.42 250,000.00

-

-

0% 0%

-

-

0.0% 0.0%

-

-

0.0% 0.0%

8,372.81 1.00

101,746.42 250,000.00

100.0% 100.0%

m2 m3 m3 m2 m2

62,500.0 26,192.3 26,669.6 62,500.0 11,800.0

0.35 3.69 6.09 0.08 23.64

21,875.00 96,649.40 162,418.02 5,000.00 278,915.20

-

-

0% 0% 0% 0% 0%

-

-

0.0% 0.0% 0.0% 0.0% 0.0%

-

-

0.0% 0.0% 0.0% 0.0% 0 .0%

62,500.00 26,192.25 26,669.63 62,500.00 11,800.00

21,875.00 96,649.40 162,418.02 5,000.00 278,915.20

100.0% 100.0% 100.0% 100.0% 100.0%

ml

2,147.2

2.84

6,097.93

-

-

0%

-

-

0.0 %

-

-

0.0%

2,147.16

6,097.93

100.0%

ml

2,147.2

1.18

2,533.65

-

-

0%

-

-

0.0 %

-

-

0.0%

2,147.16

2,533.65

100.0%

ml

2,147.2

1.86

3,993.72

-

-

0%

-

-

0.0 %

-

-

0.0%

2,147.16

3,993.72

100.0%

ml

2,147.2

11.26

24,177.02

-

-

0%

-

-

0.0%

-

-

0. 0%

2,147.16

24,177.02

100.0%

2,147.2

1.33

2,855.72

-

-

0%

-

-

0.0 %

-

-

0.0%

2,147.16

2,855.72

100.0%

2,147.2

3.71

7,965.96

-

-

0%

-

-

0.0 %

-

-

0.0%

2,147.16

7,965.96

100.0%

2,147.2

14.69

31,541.78

-

-

0%

-

-

0.0%

-

-

0. 0%

2,147.16

31,541.78

100.0%

m3

927.6

8.31

7,708.11

-

-

0%

-

-

0.0%

-

-

0.0%

927.57

7,708.11

100.0%

ml

1,834.5

19.59

35,937.86

-

-

0%

-

-

0.0%

-

-

0. 0%

1,834.50

35,937.86

100.0%

ml ml ml ml ml ml ml

16422

80

 

1.3.8.1.2.2.1.3.2 1.3.8.1.2.2.1.3.3 1.3.8.1.2.2.1.4 1.3.8.1.2.2.1.4.1 1.3.8.1.2.2.1.4.2 1.3.8.1.2.2.1.4.3 1.3.8.1.2.2.1.5 1.3.8.1.2.2.1.5.1 1.3.8.1.2.2.1.5.2 1.3.8.1.2.2.1.5.3 1.3.8.1.2.2.1.5.4 1.3.8.1.2.2.1.5.5 1.3.8.1.2.2.1.5.6 1.3.8.1.2.2.1.5.7 1.3.8.1.2.2.1.5.8 1.3.8.1.2.2.1.5.9 1.3.8.1.2.2.1.5.10 1.3.8.1.2.2.1.5.11 1.3.8.1.2.2.1.5.12 1.3.8.1.2.2.1.5.13 1.3.8.1.2. 2.1.6 1.3.8.1.2.2.1.6.1 1.3.8.1.2.2.1.6.2 1.3.8.1.2.2.1.7 1.3.8.1.2.2.1.7.1 1.3.8.1.2.2.1.7.2 1.3.8.1.2.2.1.7.3 1.3.8.1.2.2.1.7.4 1.3.8.1.2.2.1.7.5 1.3.8.1.2.2.1.7.6 1.3.8.1.2.2.1.7.7 1.3.8.1.2.2.1.7.8 1.3.8.1.2.2.1.7.9 1.3.8.1.2. 2.2 1.3.8.1.2.2.2.1 1.3.8.1.2.2.2.1.1 1.3.8.1.2.2.2.1.2 1.3.8.1.2.2.2.1.3 1.3.8.1.2.2.2.1.4 1.3.8.1.2.2.2.1.5

SUMI. E INST. TUBERIA PVC UF, PN7. 5, P/AGUA POTABLE DN 160 mm. NTP 16423 SUMI. E INST. TUBERIA PVC UF, PN10, P/AGUA POTABLE DN 200 mm. NTP 16424 PRUEBA HIDRAULICA Y DESINFECCION DE TUBERIA ZANJA TAPADA PRUEBA HIDRAULICA Y DESINFECCION DE TUBERIA DN 100mm PRUEBA HIDRAULICA Y DESINFECCION DE TUBERIA DN 160mm PRUEBA HIDRAULICA Y DESINFECCION DE TUBERIA DN 200mm INSTALACION DE ACCESORIOS PVC AGUA POTABLE (INC. SUMINISTRO) SUMI. E INST. TEE PVC 110 x 110mm; PN=10 SUMI. E INST. TEE PVC 160 x 160mm; PN=10 SUMI. E INST. TEE PVC 200 x 200mm; PN=10 SUMI. E INST. CODO DE PVC DN 90º x 110mm SUMI. E INST. CODO DE PVC DN 45º x 110mm SUMI. E INST. CODO DE PVC DN 45º x 160mm SUMI. E INST. CODO DE PVC DN 22.5º x 110mm SUMI. E INST. CODO DE PVC DN 22.5º x 160mm SUMI. E INST. REDUCCIONES PVC DN 160mm a 110mm SUMI. E INST. REDUCCIONES PVC DN 200mm a 160mm SUMI. E INST. DE TAPON PVC UF DN 110mm SUMI. E INST. DE TAPON PVC UF DN 160mm SUMI. E INST. DE TAPON PVC UF DN 200mm ANCLAJES Y/O APOYOS CONCRETO F'C=175KG/CM2 PARA ANCLAJE DE ACCESORIOS EMPALME A TUBERIA EXISTENTE VALVULAS Y ACCESORIOS DE HIERRO DUCTIL SUMI. E INST. VALVULA DE COMPUERTA HD 110mm SUMI. E INST. VALVULA DE COMPUERTA HD 160mm SUMI. E INST. VALVULA DE COMPUERTA HD 200mm SUMI. E INST. VALVULA DE PURGA DN 100mm INCLUYE ACCESORIOS, EXCA. CONCRETO 210, TUB. 110mm SUMI. E INST. VALVULA DE PURGA DN 160mm INCLUYE ACCESORIOS, EXCA. CONCRETO 210, TUB. 160mm SUMI. E INST. VALVULA DE AIRE BB DN 25mm INC. ACCESO. CAJA, P/TUB. DN 110mm. SUMI. E INST. VALVULA DE AIRE BB DN 25mm INC. ACCESO. CAJA, P/TUB. DN 160mm. SUMI. E INST. DE GRIFO CONTRA INCENDIOS FºFº, 02 SALIDAS CAJA DE VALVULA COMPUERTA CONEXIONES DOMICILIARIA S CONEXIÓN DOMICILIARIA DE AGUA POTABLE RIEGO DE LA ZONA DE TRABAJO PARA MITIGAR LA CONTAMINACION POR POLVO TRAZO Y REPLANTEOS CONEXIÓN DOMICILIARIA GUA EXCAVACION DE ZANJA T.NORMAL (0.4x1.20m); CONEX. AGUA REFINE Y NIVELACION DE ZANJA CONEXIÓN AGUA CAMA DE ARENA DE P/TUB. 1/2, C/MATERIAL PROPIO ZARANDEADO; CONEXIÓN DOMIL.

ml

312.7

36.61

11,446.48

-

-

0%

-

-

0.0 %

-

-

0.0%

312.66

11,446.48

100.0%

ml

ml

1,834.5

1.49

2,733.41

-

-

0%

-

-

0.0 %

-

-

0.0%

1,834.50

2,733.41

100.0%

ml

312.7

1.88

587.80

-

-

0%

-

-

0.0%

-

-

0.0%

312.66

5 87.80

100.0%

ml

und

18.0

92.76

1,669.68

-

-

0%

-

-

0.0%

-

-

0.0%

18.00

1,669.68

100.0%

und

6.0

220.98

1,325.88

-

-

0%

-

-

0.0%

-

-

0.0%

6.00

1,325.88

100.0%

1.0

88.86

88.86

-

-

0%

-

-

0.0%

-

-

0.0%

1.00

88.86

100.0%

und und und und und

16.0

86.19

1,379.04

-

-

0%

-

-

0.0%

-

-

0.0%

16.00

1,379.04

100.0%

und

6.0

140.17

841.02

-

-

0%

-

-

0.0%

-

-

0.0%

6.00

841.02

100.0%

und

6.0

125.65

753.90

-

-

0%

-

-

0.0%

-

-

0.0%

6.00

753.90

100.0%

und und und und und

67.0

68.42

4,584.14

-

-

0%

-

-

0.0%

-

-

0.0%

67.00

4,584.14

100.0%

und

7.0

167.16

1,170.12

-

-

0%

-

-

0.0%

-

-

0.0%

7.00

1,170.12

100.0%

und

3.0

358.98

1,076.94

-

-

0%

-

-

0.0%

-

-

0.0%

3.00

1,076.94

100.0%

und

1.0

623.1

623.10

-

-

0%

-

-

0.0%

-

-

0.0%

1.00

623.10

100.0%

1.0

882.21

882.21

-

-

0%

-

-

0.0%

-

-

0.0%

1.00

882.21

100.0%

und

2.0

1155.65

2,311.30

-

-

0%

-

-

0.0%

-

-

0.0%

2.00

2,311.30

100.0%

und

4.0

180.59

722.36

-

-

0%

-

-

0.0%

-

-

0.0%

4.00

722.36

100.0%

und und und und und

ml

2,838.0

2.84

8,059.92

-

-

0%

-

-

0.0 %

-

-

0.0%

2,838.00

8,059.92

100.0%

ml

2,838.0

1.2

3,405.60

-

-

0%

-

-

0.0%

-

-

0.0%

2,838.00

3,405.60

100.0%

ml

2,838.0

22.35

63,429.30

-

-

0%

-

-

0.0%

-

-

0. 0%

2,838.00

63,429.30

100.0%

ml

2,838.0

0.65

1,844.70

-

-

0%

-

-

0.0 %

-

-

0.0%

2,838.00

1,844.70

100.0%

ml

2,838.0

2.16

6,130.08

-

-

0%

-

-

0.0 %

-

-

0.0%

2,838.00

6,130.08

100.0%

81

 

1.3.8.1.2.2.2.1.6 1.3.8.1.2.2.2.1.7 1.3.8.1.2.2.2.1.8 1.3.8.1.2.2.2.1.9 1.3.8.1.2.2.2.1.10 1.3.8.1.2.2.2.1.11 1.3.8.1.2.2.3 1.3.8.1.2.2.3.1 1.3.8.1.2.2.3.1.1 1.3.8.1.2.2.3.1.2 1.3.8.1.2.3 1.3.8.1.2.3.1 1.3.8.1.2. 3.1.1 1.3.8.1.2.3.1.1.1 1.3.8.1.2.3.1.1.2 1.3.8.1.2.3.1.1.3 1.3.8.1.2. 3.1.2 1.3.8.1.2. 3.1.2.1 1.3.8.1.2.3.1.2.1.1 1.3.8.1.2.3.1.2.1.2 1.3.8.1.2.3.1.2.2 1.3.8.1.2.3.1.2.2.1 1.3.8.1.2.3.1.2.2.2 1.3.8.1.2.3.1.2.3 1.3.8.1.2.3.1.2.3.1 1.3.8.1.2.3.1.2.3.2 1.3.8.1.2.3.1.2.3.3 1.3.8.1.2. 3.1.2.4 1.3.8.1.2.3.1.2.4.1 1.3.8.1.2.3.1.3 1.3.8.1.2.3.1.3.1 1.3.8.1.2.3.1.3.2 1.3.8.1.2.3.1.4 1.3.8.1.2.3.1.4.1 1.3.8.1.2.3.1.4.2 1.3.8.1.2.3.1.4.3 1.3.8.1.2.3.1.4.4 1.3.8.1.2. 3.2 1.3.8.1.2.3.2.1 1.3.8.1.2.3.2.1.1 1.3.8.1.2.3.2.1.2 1.3.8.1.2.3.2.1.3

RELLENO Y COMP. DE ZANJA CONEXIÓN ELIMINACION MATERIAL EXCEDENTE C/EQUIPO HASTA 1KM CONEXIÓN DOMICILIARIA AGUA TUB. PVC 1/2; LPROM=6m. CONEXIÓN DOMICILIARIA AGUA TUB. PVC 3/4; LPROM=6m. SUM. E INST. DE MICROMEDIDORES CONEXIÓN DOMIC.AGUA,INCL. INSTALACION ACCESORIOS PRUEBAYHIDRAULICA Y DESINFECCION DE TUBERIA PVC Ø 1/2 PRUEBAS DE CONTROL DE CALIDAD PRUEBAS DE CONTROL DE CALIDAD PRUEBA COMPACTACION SUELOS (PROCTOR MODIFICADO) PRUEBA COMPACTACION SUELOS (DENSIDAD DE CAMPO) ALCANTARILLADO RED DE COLECTORES SECUNDARIOS TRABAJOS PRELIMINARES RIEGO DE LA ZONA DE TRABAJO PARA MITIGAR LA CONTAMINACION POR POLVO TRAZO Y REPLANTEOS INICIALES DEL PROYECTO TRAZO Y REPLANTEO DURANTE EL PROCESO CONSTRUCTIVO DE LA OBRA MOVIMIENTO DE TIERRAS EXCAVACIONES DE ZANJAS EXCAVACION DE ZANJA C/MAQ. T. NORMAL HASTA 1.50MPP EXCAVACION DE ZANJA C/MAQ. T. NORMAL HASTA 2.00MPP REFINE, NIVELACION Y CONFORMACION DE ZANJAS REFINE, NIVELACION Y CONFORMACION DE FONDO DE ZANJA HASTA HPROM=3.00m CAMA DE ARENA DE APOYO DE TUBERIA PVC DN (200-250) E=0.10M; A=0.60m; C/MATERIAL PROPIO ZARANDEADO RELLENO Y COMPACTACION DE ZANJAS RELLENO COMP. ZANJA T. NORMAL HASTA 1.50MPP RELLENO COMP. ZANJA T. NORMAL HASTA 2.00MPP ELIMINACION MATERIAL EXCEDENTE C/EQUIPO EN TERRENO ANEXO ENTIBADO DE ZANJAS ENTIBADO DE PROTECCION DE ZANJAS H>2.00m SUMINISTRO E INSTALACION TUBOS COLECTOR/EMISOR SUMIN. E INSTAL. TUBO PVC UF, SN-4, DN 200MM, ISO 4435 PRUEBA HIDRAULICA TUBO PVC DN 200MM CONSTRUCCION DE BUZONES Y EMPALMES BUZON TIPO I, C/MARCO Y TAPA DE CONCRETO Di=1.20m x h=1.20MPP BUZON TIPO I, C/MARCO Y TAPA DE CONCRETO Di=1.20m x h=1.50MPP BUZON TIPO I, C/MARCO Y TAPA DE CONCRETO Di=1.20m x h=2.00MPP EMPALME A BUZON DE TUB. PVC CON DADO DE CONCRETO SIMPLE CONEXIONES DOMICILIARIA S CONEXION DOMICILIARIA DESAGUE RIEGO DE LA ZONA DE TRABAJO PARA MITIGAR LA CONTAMINACION POR POLVO TRAZOS Y REPLANTEOS DURANTE EL PROCESO CONSTRUCTIVO DE LA OBRA EXCAVACION DE ZANJA T.NORMAL (0.4x1.20m); CONEX. AGUA

ml

2,838.0

13.56

38,483.28

-

-

0%

-

-

0.0%

-

-

0. 0%

2,838.00

38,483.28

100.0%

m3

1,226.0

8.31

10,188.23

-

-

0%

-

-

0.0%

-

-

0. 0%

1,226.02

10,188.23

100.0%

und

473.0

218.22

103,218.06

-

-

0%

-

-

0.0%

-

-

0.0%

473.00

103,218.06

100.0%

ml

473.0

154.6

73,125.80

-

-

0%

-

-

0.0 %

-

-

0.0%

473.00

73,125.80

100.0%

ml

2,838.0

1.14

3,235.32

-

-

0%

-

-

0.0 %

-

-

0.0%

2,838.00

3,235.32

100.0%

und

ml

1.0

70

70.00

-

-

0%

-

-

0.0%

-

-

0.0%

1.00

70.00

100.0%

ml

23.0

60

1,380.00

-

-

0%

-

-

0.0%

-

-

0.0%

23.00

1,380.00

100.0%

m

1,576.6

2.84

4,477.57

-

-

0%

-

-

0.0 %

-

-

0.0%

1,576.61

4,477.57

100.0%

m

1,576.6

1.24

1,955.00

-

-

0%

-

-

0.0 %

-

-

0.0%

1,576.61

1,955.00

100.0%

m

1,576.6

1.72

2,711.77

-

-

0%

-

-

0.0 %

-

-

0.0%

1,576.61

2,711.77

100.0%

m

1,576.6

14.88

23,459.96

-

-

0%

-

-

0.0%

-

-

0. 0%

1,576.61

23,459.96

100.0%

m

1,576.6

2.17

3,421.24

-

-

0%

-

-

0.0 %

-

-

0.0%

1,576.61

3,421.24

100.0%

m

1,576.6

3.89

6,133.01

-

-

0%

-

-

0.0 %

-

-

0.0%

1,576.61

6,133.01

100.0%

m

1,576.6

15.46

24,374.39

-

-

0%

-

-

0.0%

-

-

0. 0%

1,576.61

24,374.39

100.0%

681.0

8.31

5,659.11

-

-

0%

-

-

0.0%

-

-

0.0%

681.00

5,659.11

100.0%

ml

1,576.6

30.46

48,023.54

-

-

0%

-

-

0.0%

-

-

0. 0%

1,576.61

48,023.54

100.0%

ml

1,576.6

1.8

2,837.90

-

-

0%

-

-

0.0%

-

-

0.0%

1,576.61

2,837.90

100.0%

und

19.0

1909.31

36,276.89

-

-

0%

-

-

0.0%

-

-

0.0%

19.00

36,276.89

100.0%

und

6.0

2485.81

14,914.86

-

-

0%

-

-

0.0%

-

-

0.0%

6.00

14,914.86

100.0%

und

69.0

159.24

10,987.56

-

-

0%

-

-

0.0%

-

-

0.0%

69.00

10,987.56

100.0%

ml

2,838.0

2.84

8,059.92

-

-

0%

-

-

0.0 %

-

-

0.0%

2,838.00

8,059.92

100.0%

m

m m3 m

und

ml

2,838.0

1.31

3,717.78

-

-

0%

-

-

0.0 %

-

-

0.0%

2,838.00

3,717.78

100.0%

ml

2,838.0

22.35

63,429.30

-

-

0%

-

-

0.0%

-

-

0. 0%

2,838.00

63,429.30

100.0%

82

 

1.3.8.1.2.3.2.1.4 1.3.8.1.2.3.2.1.5 1.3.8.1.2.3.2.1.6 1.3.8.1.2.3.2.1.7 1.3.8.1.2.3.2.1.8 1.3.8.1.2.3.2.1.9 1.3.8.1.2.3.2.1.10 1.3.8.1.2.3.2.1.11 1.3.8.1.2.3.3 1.3.8.1.2.3.3.1 1.3.8.1.2.3.3.1.1 1.3.8.1.2.3.3.1.2 1.3.8.1.2.3.3.1.3 1.3.8.1.2.3.4 1.3.8.1.2.3.4.1 1.3.8.1.2. 3.4.1.1 1.3.8.1.3 1.3.8.1.3. 2 1.3.8.1.3. 2.1 1.3.8.1.3.2.1.1 1.3.8.1.3.2.1.2 1.3.8.1.3. 2.2 1.3.8.1.3.2.2.1 1.3.8.1.3.2.2.2 1.3.8.1.3.2.2.3 1.3.8.1.3.2.2.4 1.3.8.1.3.2.2.5 1.3.8.1.3.2.3 1.3.8.1.3.2.3.1 1.3.8.1.3. 2.3.2 1.3.8.1.3. 2.3.3 1.3.8.1.3.2.3.4 1.3.8.1.3. 2.3.5 1.3.8.1.3.2.3.6 1.3.8.1.3.3 1.3.8.1.3. 3.1 1.3.8.1.3.3.1.1 1.3.8.1.3. 3.2 1.3.8.1.3.3.2.1 1.3.8.1.3.3.2.2 1.3.8.1.3.3.2.3 1.3.8.1.3. 3.3 1.3.8.1.3.3.3.1 1.3.8.1.3.3.3.2 1.3.8.1.3.3.3.3 1.3.8.1.3.3.3.4 1.3.8.1.3.3.3.5 1.3.8.1.3.4

REFINE Y NIVELACION DE ZANJA CONEXIÓN AGUA CAMA DE ARENA DE P/TUB. 1/2, CMATERIAL PROPIO ZARANDEADO; CONEXIÓN DOMIL. RELLENO Y COMP. DE ZANJA CONEXIÓN ELIMINACION MATERIAL EXCEDENTE C/EQUIPO EN TERRENO ANEXO SUMIN. E INSTALACION DE TUBO PVC, SN-4, DN 160 MM, ISO 4435 SUMIN. E INSTALACION CAJA DE REGISTRO DE DESAGUE Y MEDIA CAÑA EMPALME A COLECTOR PVC DN 200MM PRUEBA HIDRAULICA CONEX. DOMICILIARIA DESAGUE PRUEBAS DE CONTROL DE CALIDAD PRUEBAS DE CONTROL DE CALIDAD PRUEBA COMPACTACION SUELOS (PROMOTOR MODIFICADO) PRUEBA COMPACTACION SUELOS (DENSIDAD DE CAMPO) PRUEBA DE CALIDAD DE CONCRETO VARIOS VARIOS LIMPIEZA FINAL DE OBRA PISTAS Y VEREDAS PISTAS Y ESTACIONAMIENTO OBRAS PROVISIONALES TRAZO, NIVELES Y REPLANTEO INICIALYDE OBRA TRAZO REPLANTEO CONTRO TOPOGRAFICO DE EJES Y NIVELES DE PISTAS DURANTE LA EJECUCION DE LA OBRA MOVIMIENTO DE TIERRAS CORTE HASTA NIVEL DE SUBRASANTE EXTRACCION Y APILAMIENTO DE MATERIAL DE PRESTAMO CARGUIO Y TRANSPORTE DE MATERIAL PROPIO RELLENO Y COMPACTACION CON MATERIAL PROPIO ELIMINACION DE MATERIAL PROPIO EXCEDENTE EN TERRENO ANEXO PAVIMENTOS CONFORMACION Y COMPACTACION DE SUBRASANTE PARA PISTAS SUB-BASE DE 20 CMS BASE DE 15 CMS BARRIDO Y LIMPIEZA P/CARPETA ASFALTICA IMPRIMACION ASFALTICA CARPETA ASFALTICA EN CALIENTE DE 2" VEREDAS OBRAS PROVISIONALES TRAZO, REPLANTEO Y CONTROL TOPOGRAFICO DE EJES Y NIVELES DE VEREDAS MOVIMIENTO DE TIERRAS PERFILADO, NIVELACION Y COMPACTACION DE SUBRASANTE VEREDAS COLOCACION DE AFIRMADO/BASE GRANULAR PARA VEREDAS EXCAVACION MANUAL PARA SARDINELES DE VEREDAS VEREDAS Y SARDINELES ENCOFRADO Y DESENCOFRADO DE VEREDAS CONCRETO PARA SARDINELES DE VEREDAS h=35 cm F'C=175 kg/cm2 CONCRETO PARA VEREDAS DE H=10CM F'C=175 KG/CM2 JUNTA DE DILATACION ASFALTICA PARA VEREDAS; e=1/2 CURADO QUIMICO PARA VEREDAS PAVIMENTO RÍGIDO: PASAJE PEATONAL

ml

2,838.0

1.31

3,717.78

-

-

0%

-

-

0.0 %

-

-

0.0%

2,838.00

3,717.78

100.0%

ml

2,838.0

2.81

7,974.78

-

-

0%

-

-

0.0 %

-

-

0.0%

2,838.00

7,974.78

100.0%

ml

2,838.0

13.56

38,483.28

-

-

0%

-

-

0.0%

-

-

0. 0%

2,838.00

38,483.28

100.0%

m3

1,226.0

8.31

10,188.23

-

-

0%

-

-

0.0%

-

-

0. 0%

1,226.02

10,188.23

100.0%

m

2,838.0

20.6

58,462.80

-

-

0%

-

-

0. 0%

-

-

0.0%

2,838.00

58,462.80

100.0%

und

473.0

130.56

61,754.88

-

-

0%

-

-

0.0%

-

-

0.0%

473.00

61,754.88

100.0%

und

473.0

95.42

45,133.66

-

-

0%

-

-

0.0%

-

-

0.0%

473.00

45,133.66

100.0%

und

2,838.0

1.8

5,108.40

-

-

0%

-

-

0.0%

-

-

0.0%

2,838.00

5,108.40

100.0%

100.0%

und

1.0

70

70.00

-

-

0%

-

-

0.0%

-

-

0.0%

1.00

70.00

und

15.0

60

900.00

-

-

0%

-

-

0.0%

-

-

0.0%

15.00

900.00

100.0%

und

1.0

2000

2,000.00

-

-

0%

-

-

0.0%

-

-

0.0%

1.00

2,000.00

100.0%

m

1,576.6

1.31

2,065.36

-

-

0%

-

-

0.0%

-

-

0 .0%

1,576.61

2,065.36

100.0%

m2

13,388.8

0.73

9,773.84

-

-

0%

-

-

0.0%

-

-

0. 0%

13,388.82

9,773.84

100.0%

m2

13,388.8

1.81

24,233.76

-

-

0%

-

-

0.0%

-

-

0 .0%

13,388.82

24,233.76

100.0%

m3

7,847.6

8.01

62,858.96

-

-

0%

-

-

0.0%

-

-

0. 0%

7,847.56

62,858.96

100.0%

m3

1,677.9

4.56

7,651.32

-

-

0%

-

-

0.0 %

-

-

0.0%

1,677.92

7,651.32

100.0%

m3

1,677.9

4.25

7,131.16

-

-

0%

-

-

0.0 %

-

-

0.0%

1,677.92

7,131.16

100.0%

m3

1,677.9

19.36

32,484.53

-

-

0%

-

-

0.0%

-

-

0 .0%

1,677.92

32,484.53

100.0%

m3

7,403.6

6.36

47,086.69

-

-

0%

-

-

0.0%

-

-

0. 0%

7,403.57

47,086.69

100.0%

m2

13,388.8

2.03

27,179.30

-

-

0%

-

-

0.0%

-

-

0 .0%

13,388.82

27,179.30

100.0%

m2 m2

13,388.8 13,388.8

16.85 18.65

225,601.62 249,701.49

-

-

0% 0%

-

-

0.0% 0.0%

-

-

0.0% 0 .0%

13,388.82 13,388.82

225,601.62 249,701.49

100.0% 100.0%

m2

13,388.8

0.45

6,024.97

-

-

0%

-

-

0.0%

-

-

0. 0%

13,388.82

6,024.97

100.0%

m2

13,388.8

4.29

57,438.04

-

-

0%

-

-

0.0%

-

-

0.0%

13,388.82

57,438.04

100.0%

m2

13,388.8

35.71

478,114.76

-

-

0%

-

-

0.0%

-

-

0.0%

13,388.82

478,114.76

100.0%

m2

4,747.9

2.15

10,207.94

-

-

0%

-

-

0.0%

-

-

0. 0%

4,747.88

10,207.94

100.0%

m2

4,747.9

6.83

32,428.02

-

-

0%

-

-

0.0%

-

-

0. 0%

4,747.88

32,428.02

100.0%

m2

4,747.9

14.8

70,268.62

-

-

0%

-

-

0.0%

-

-

0. 0%

4,747.88

70,268.62

100.0%

m

3,475.6

4.03

14,006.55

-

-

0%

-

-

0. 0%

-

-

0.0%

3,475.57

14,006.55

100.0%

m2

718.4

41.58

29,871.57

-

-

0%

-

-

0.0 %

-

-

0.0%

718.41

29,871.57

100.0%

m

3,475.6

17.7

61,517.59

-

-

0%

-

-

0. 0%

-

-

0.0%

3,475.57

61,517.59

100.0%

m2

4,747.9

48.2

228,847.82

-

-

0%

-

-

0.0%

-

-

0 .0%

4,747.88

228,847.82

100.0%

ml

1,104.0

4.87

5,376.48

-

-

0%

-

-

0.0 %

-

-

0.0%

1,104.00

5,376.48

100.0%

m2

4,747.9

1.67

7,928.96

-

-

0%

-

-

0.0 %

-

-

0.0%

4,747.88

7,928.96

100.0%

83

 

1.3.8.1.3. 4.1 1.3.8.1.3.4.1.1 1.3.8.1.3.4.1.2 1.3.8.1.3.4.1.3 1.3.8.1.3.4.2 1.3.8.1.3.4.2.1 1.3.8.1.3.4.2.2 1.3.8.1.3.4.2.3 1.3.8.1.3.4.2.4 1.3.8.1.3. 5 1.3.8.1.3. 5.1 1.3.8.1.3.5.1.1 1.3.8.1.3.5.1.2 1.3.8.1.3.5.1.3 1.3.8.1.3. 5.2 1.3.8.1.3.5.2.1 1.3.8.1.3.5.2.2 1.3.8.1.3.5.2.3 1.3.8.1.3.5.2.4 1.3.8.1.3. 5.2.5 1.3.8.1.3.6 1.3.8.1.3.6.1 1.3.8.1.3.6.1.1 1.3.8.1.3.6.1.2 1.3.8.1.3.6.1.3 1.3.8.1.3.6.1.4 1.3.8.1.3.6.1.5 1.3.8.1.3. 7 1.3.8.1.3. 7.1 1.3.8.1.3. 7.1.1 1.3.8.1.3. 8 1.3.8.1.3. 8.1 1.3.8.1.3.8.1.1 1.3.8.1.3.8.1.2 1.3.8.1.3.8.1.3 1.3.8.1.4 1.3.8.1.4. 1 1.3.8.1.4. 2 1.3.8.2 1.3.8.2.1 1.3.8.2.1.1 1.3.8.2.1.2 1.3.8.2.1.3 1.3.8.2.1.4 1.3.8.2.1. 5 1.3.8.2.2 1.3.8.2.2.1 1.3.8.2.2.1.1 1.3.8.2.2. 1.2 1.3.8.2.2.1.3 1.3.8.2.2. 1.4

MOVIMIENTO DE TIERRAS PERFILADO, NIVELACION Y COMPACTACION DE SUBRASANTE COLOCACION DE AFIRMADO/BASE GRANULAR EXCAVACION MANUAL PARA SADINELES SUMERGIDOS CONCRETO EN PASAJES PEATONALES CONCRETO PARA SARDINEL SUMERGID; H=0.25cm; F'C=210 kg/cm2 PAVIMENTO RIGIDO DE CONCRETO EN PASAJE PEATONAL; H=12.5cm; F'C=210 KG/CM2 JUNTA DE DILATACION ASFALTICA EN PAVIMIENTO RIGIDO; e=1/2 CURADO QUIMICO PARA PAVIMENTO RIGIDO RAMPAS PEATONALES MOVIMIENTO DE TIERRAS PERFILADO, NIVELACION Y COMPACTACION DE SUBRASANTE COLOCACION DE AFIRMADO/BASE GRANULAR EXCAVACION MANUAL PARA SARDINELES SUMERGIDOS CONCRETO EN RAMPAS ENCOFRADO Y DESENCOFRADO DE RAMPAS CONCRETO PARA SARDINELES DE RAMPAS h=20cm F'C=175kg/cm2 CONCRETO PARA RAMPAS DE H=10CM F'C=175 KG/CM2 CURADO QUIMICO PARA RAMPAS BRUÑADO DE RAMPAS SEÑALIZACIÓN SEÑALIZACION PINTADO EN BLANCO DE LETRAS, CRUCES PEATONALES Y SIMBOLOS EN PAVIMENTO PINTADO DE AMARILLO EN PSJE. PEATONAL PINTADO DE AMARILLO EN SARDINELES, MARTILLOS, RAMPAS Y ESTACIONAMIENTO PINTADO DE BLANCO DE LINEAS DISCONTINUAS Y CONTINUAS EN PAVIMENTO SEÑALIZACION VERTICAL (PREVENTIVA Y REGLAMENTARIA) LIMPIEZA DE OBRA LIMPIEZA DE OBRA LIMPIEZA FINAL DE OBRA PRUEBAS DE CALIDAD PRUEBAS DE CALIDAD PRUEBAS DE CALIDAD DE SUBRASANTE PRUEBAS DE CALIDAD DE LA Y BASE PRUEBASSUB DE BASE CALIDAD DEL CONCRETO RED ELÉCTRICA RED PRIMARIA RED SECUNDARIA VIVIENDAS MOV. TIERRAS CASA Corte de Terreno con maquinaria h=0.35 (0.15 Platea + 0.20 Afirmado) Inc. Eliminación Excavación de Zanjas cimentación manual (Uñas de Platea) Inc Eliminación Relleno con material de préstamo (Afirmado e= 0.20m) Proctor 95% Nivelación y compactación de Terreno Acarreo de Material excedente ESTRUCTURAS PLATEA Concreto premezclado fc=175kg/cm2 Encofrado y desencofrad o Acero de refuerzo de fy =4200kg/cm2 Acabado de Losa Platea

m2

1,655.9

6.83

11,309.46

-

-

0%

-

-

0.0%

-

-

0. 0%

1,655.85

11,309.46

100.0%

m2

1,655.9

19.35

32,040.70

-

-

0%

-

-

0.0%

-

-

0 .0%

1,655.85

32,040.70

100.0%

m

1,036.5

4.03

4,177.14

-

-

0%

-

-

0.0 %

-

-

0.0%

1,036.51

4,177.14

100.0%

m

1,036.5

19.96

20,688.74

-

-

0%

-

-

0.0%

-

-

0. 0%

1,036.51

20,688.74

100.0%

m2

1,655.9

61.18

101,304.90

-

-

0%

-

-

0.0%

-

-

0.0%

1,655.85

101,304.90

100.0%

m

406.8

4.87

1,981.12

-

-

0%

-

-

0.0%

-

-

0.0%

406.80

1,981.12

100.0%

m2

1,655.9

1.67

2,765.27

-

-

0%

-

-

0.0 %

-

-

0.0%

1,655.85

2,765.27

100.0%

m2

184.5

6.83

1,259.93

-

-

0%

-

-

0.0%

-

-

0.0%

184.47

1,259.93

100.0%

m2

184.5

14.8

2,730.16

-

-

0%

-

-

0.0%

-

-

0.0%

184.47

2,730.16

100.0%

m

133.9

4.03

539.46

-

-

0%

-

-

0.0%

-

-

0.0%

133.86

5 39.46

100.0%

m2

43.0

46.43

1,994.35

-

-

0%

-

-

0.0%

-

-

0.0%

42.95

1,9 94.35

100.0%

m

133.9

15.99

2,140.42

-

-

0%

-

-

0.0%

-

-

0.0%

133.86

2,140.42

100.0%

m2

184.5

48.2

8,891.45

-

-

0%

-

-

0.0%

-

-

0.0%

184.47

8,891.45

100.0%

m2

184.5

1.67

308.06

-

-

0%

-

-

0.0%

-

-

0.0%

184.47

3 08.06

100.0%

m2

184.5

13.73

2,532.77

-

-

0%

-

-

0.0%

-

-

0.0%

184.47

2,532.77

100.0%

m2

680.4

23.01

15,656.92

-

-

0%

-

-

0.0 %

-

-

0.0%

680.44

15,656.92

100.0%

m2

259.6

21.08

5,471.31

-

-

0%

-

-

0.0%

-

-

0.0%

259.55

5,471.31

100.0%

m

1,163.6

9.52

11,077.85

-

-

0%

-

-

0. 0%

-

-

0.0%

1,163.64

11,077.85

100.0%

m

1,040.9

7.99

8,316.71

-

-

0%

-

-

0.0 %

-

-

0.0%

1,040.89

8,316.71

100.0%

und

10.0

580.95

5,809.50

-

-

0%

-

-

0.0%

-

-

0.0%

10.00

5,809.50

100.0%

Ha

5.5

3024

16,601.76

-

-

0%

-

-

0.0 %

-

-

0.0%

5.49

16,601.76

100.0%

glb

1.0

2680

2,680.00

-

-

0%

-

-

0.0%

-

-

0.0%

1.00

2,680.00

100.0%

glb

1.0

15480

15,480.00

-

-

0%

-

-

0.0%

-

-

0.0%

1.00

15,4 80.00

100.0%

glb

1.0

1850

1,850.00

-

-

0%

-

-

0.0%

-

-

0.0%

1.00

1,850.00

100.0%

glb glb

1.0 1.0

158,982.04 557,614.77

158,982.04 557,614.77

-

-

0% 0%

-

-

0.0% 0.0%

-

-

0.0% 0.0%

1.00 1.00

158,982.04 557,614.77

100.0% 100.0%

m3

6,053.4

17.94

108,598.00

-

-

0%

-

-

0.0%

-

-

0.0%

6,053.40

108,598.00

100.0%

m3

392.9

46.80

18,389.59

-

-

0%

-

-

0.0 %

-

-

0.0%

392.94

18,389.59

100.0%

m3

2,591.3

86.88

225,130.41

-

-

0%

-

-

0.0%

-

-

0.0%

2,591.28

225,130.41

100.0%

m2 m3

14,326.4 6,446.3

2.64 5.40

37,821.64 34,810.24

-

-

0% 0%

-

-

0.0% 0.0%

-

-

0.0% 0.0%

14,326.38 6,446.34

37,821.64 34,810.24

100.0% 100.0%

2,417.1

311.32

752,488.47

-

0%

-

-

0.0%

-

0.0%

m2

m3

5,322.9

14.95

79,562.71

-

-

0%

-

-

0.0%

-

-

0.0%

5,322.92

79,562.71

100.0%

kg

135,372.3

4.10

555,568.07

-

-

-

0%

-

-

0.0%

-

-

-

0.0%

##########

2,417.08

555,568.07

752,488.47

100.0%

100.0%

m2

13,275.0

6.77

89,892.99

-

-

0%

-

-

0.0%

-

-

0.0%

13,275.00

89,892.99

100.0%

1.3.8.2.2.2

MUROS

84

 

1.3.8.2.2.2.1 1.3.8.2.2.2.2 1.3.8.2.2.2.3 1.3.8.2.2. 3 1.3.8.2.2.3.1 1.3.8.2.2.3.2 1.3.8.2.2.3.3 1.3.8.2.2.3.4 1.3.8.2.3 1.3.8.2.3. 1 1.3.8.2.3.2 1.3.8.2.3. 3 1.3.8.2.3.4 1.3.8.2.3.5 1.3.8.2.3.6 1.3.8.2.3. 7 1.3.8.2.3. 8 1.3.8.2.3.9 1.3.8.2.3.10 1.3.8.2.3. 11 1.3.8.2.3.12 1.3.8.2.4 1.3.8.2.4. 1 1.3.8.2.4. 2 1.3.8.2.4. 3 1.3.8.2.4.4 1.3.8.2.4. 5 1.3.8.2.4. 6 1.3.8.2.4. 7 1.3.8.2.4.8 1.3.8.2.4.9 1.3.8.2.4.10 1.3.8.2.4. 11 1.3.8.2.4. 12 1.3.8.2.4. 13 1.3.8.2.4.14 1.3.8.2.4. 15 1.3.8.2.5 1.3.8.2.5.1 1.3.8.2.5.1.1 1.3.8.2.5.1.2 1.3.8.2.5.2 1.3.8.2.5.2.1 1.3.8.2.5. 2.2 1.3.8.2.5. 2.3 1.3.8.2.5. 3 1.3.8.2.5.3.1 1.3.8.2.5.3.2 1.3.8.2.5.3.3 1.3.8.2.5.3.4 1.3.8.2.5. 4 1.3.8.2.5.4.1 1.3.8.2.5.4.2 1.3.8.2.5.4.3 1.3.8.2.5.4.4 1.3.8.2.5.4.5 1.3.8.2.5.5 1.3.8.2.5.5.1 1.3.8.2.5.5.2 1.3.8.2.5.5.3 1.3.8.2.5.5.4 1.3.8.2.5.6 1.3.8.2.5.6.1 1.3.8.2.5.6.2

Concreto premezclado fc=175kg/cm2 Encofrado y desencofrado Acero de refuerzo de fy =4200kg/cm2 LOSA TECHO Concreto premezclado fc=175kg/cm2 Encofrado y desencofrado Acero de refuerzo de fy =4200kg/cm2 Junta de dilatación tecnopor 1 INSTALACIONES ELÉCTRICAS Salida p/centro de luz Salida p/braquetes Tomacorrie nte bipolar Interruptor de 01 golpe Salida p/timbre Salida p/pulsador de timbre Alimentad or de TD a Caja Medidor Tubo PVC SAP 25mm Tablero Electrico de Distribucion Tubo PVC SAP 25mm acometida para futura conexión pozo de tierra. Prueba electrica Conexión a banco de medidores INSTALACION ES SANITARIAS Excavacion y relleno de zanja Tuberia PVC SAL 4 Tuberia PVC SAL 2 Caja registro 12x24 Salida de desague 2 Salida de desague 4 Salida de ventilacio n 22 Sumidero de bronce Registro de bronce 4 Sombrero de ventilacion 2 Salida de agua fria 1/2 Tuberia PVC C10 Agua Fria 1/2 Tuberia PVC C10 Agua Fria 3/4 Valvula compuerta 1/2 Valvula compuerta 3/4 ACABADOS LAVANDERA Concreto premezclado fc=175kg/cm2 Encofrado BAÑO Concreto simple 1:6 en sardinel ducha 0.10x0.20 Piso Cerámico 30x30 Ducha Zócalo cerámico 30x30 Ducha CARPINTERÍA DE MADERA P1 - Puerta Principal de HDF contraplacada - 0.90x2.60 - Sin Pintura P2 - Puerta Dormitorio y Lavandería de HDF contraplacada - 0.80x2.60 - Sin Pintura P3 - Puerta Baño de HDF contraplacada - 0.70x2.6 - Sin Pintura Instalación de Puertas CARPINTERÍA DE ALUMINIO V1 - Ventana de Aluminio Sala 0.85x1.4 V2 - Ventana de Aluminio Dormitorios - 1.0x1.4 V3 - Ventana de Aluminio Baño 0.30x0.50 V4 - Ventana de Aluminio Patio 0.95x1.4 Instalación Ventanas CERRAJERA Cerradura Fixer Puerta Principal llave exterior/boton interior acero inoxidable Cerradura Fixer Baño Ranura ext./botoninterior Cerradura Fixer Puerta Jardin llave exterior/botoninterior acero inoxidable Cerradura Fixer Dormitorio Ranura ext./botoninterior APARATOS Y ACCESORIOS SANITARIOS Inodoro Rapid Jet Blanco Lavatorio Fontana de Baño

m3

2,910.3

333.63

970,958.97

-

0%

-

-

0.0%

-

-

0.0%

2,910.30

970,958.97

100.0%

m2

58,205.9

9.55

556,010.82

-

-

0%

-

-

0.0%

-

-

0.0%

58,205.94

556,010.82

100.0%

kg

118,111.9

4.10

484,731.17

-

-

0%

-

-

0.0%

-

-

0.0%

##########

484,731.17

100.0%

m3

442,892.23

-

1,327.5

333.63

m2

13,275.0

10.24

135,930.31

-

-

0%

-

-

0.0%

-

-

0.0%

13,275.00

135,930.31

100.0%

kg

54,085.8

4.10

221,968.04

-

-

-

-

0%

0%

-

-

-

-

0.0%

0.0%

-

-

-

-

0.0%

0.0%

54,085.78

1,327.50

221,968.04

442,892.23

100.0%

100.0%

m2

1,980.6

5.19

10,288.98

-

-

0%

-

-

0.0%

-

-

0.0%

1,980.63

10,288.98

100.0%

pto pto pto pto pto pto ml ml und

2,655.0 531.0 3,717.0 2,655.0 531.0 531.0 4,248.0 3,717.0 531.0

57.20 57.20 57.20 57.20 27.50 27.50 9.35 11.55 154.00

151,866.00 30,373.20 212,612.40 151,866.00 14,602.50 14,602.50 39,718.8 0 42,931.35 81,774.00

-

-

0% 0% 0% 0% 0% 0% 0% 0% 0%

-

-

0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0. 0% 0.0%

-

-

0 .0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%

2,655.00 531.00 3,717.00 2,655.00 531.00 531.00 4,248.00 3,717.00 531.00

151,866.00 30,373.20 212,612.40 151,866.00 14,602.50 14,602.50 39,718. 80 42,931.35 81,774.00

100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%

ml

3,186.0

11.55

36,798.30

-

-

0%

-

-

0.0%

-

-

0. 0%

3,186.00

36,798.30

100.0%

glb glb

531.0 531.0

27.50 27.50

14,602.50 14,602.50

-

-

0% 0%

-

-

0.0% 0.0%

-

-

0.0% 0.0%

531.00 531.00

14,602.50 14,602.50

100.0% 100.0%

ml ml ml und pto pto

3,717.0 2,655.0 1,062.0 531.0 1,593.0 531.0

19.80 26.95 16.83 275.00 61.60 85.80

73,596.60 71,552.25 17,873.46 146,025.00 98,128.80 45,559.80

-

-

0% 0% 0% 0% 0% 0%

-

-

0.0% 0.0 % 0.0 % 0.0% 0. 0% 0.0%

-

-

0.0% 0.0% 0.0% 0.0% 0.0% 0.0%

3,717.00 2,655.00 1,062.00 531.00 1,593.00 531.00

73,596.60 71,552.25 17,873.46 146,025.00 98,128.80 45,559.80

100.0% 100.0% 100.0% 100.0% 100.0% 100.0%

pto und und und pto ml ml und und

2,124.0 1,062.0 531.0 2,124.0 2,655.0 1,593.0 2,442.6 531.0 1,062.0

44.00 23.10 35.20 8.25 61.60 15.95 18.37 64.35 70.95

93,456.00 24,532.20 18,691.20 17,523.00 163,548.00 25,408.35 44,870.56 34,169.85 75,348.90

--

--

0% 0% 0% 0% 0% 0% 0% 0% 0%

--

--

0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%

--

--

0. 0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%

2,124.00 1,062.00 531.00 2,124.00 2,655.00 1,593.00 2,442.60 531.00 1,062.00

93,456.00 24,532.20 18,691.20 17,523.00 163,548.00 25,408.3 5 44,870.5 6 34,169.85 75,348.90

100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%

m3

88.5

288.26

25,500.81

-

-

0%

-

-

0.0%

-

-

0.0%

88.46

25,500.81

100.0%

m2

142.3

13.84

1,969.54

-

-

0%

-

-

0.0%

-

-

0.0%

142.31

1,969.54

100.0%

und

531.0

21.06

11,182.86

-

-

0%

-

-

0.0%

-

-

0.0%

531.00

11,182.86

100.0%

m2 m2

382.3 2,909.9

44.98 44.98

17,197.38 130,891.16

-

-

0% 0%

-

-

0.0% 0.0%

-

-

0.0% 0.0%

382.32 2,909.88

17,197.38 130,891.16

100.0% 100.0%

und

531.0

165.96

88,124.76

-

-

0%

-

-

0.0%

-

-

0.0%

531.00

88,124.76

100.0%

und

1,593.0

140.52

223,848.36

-

-

0%

-

-

0.0%

-

-

0.0%

1,593.00

223,848.36

100.0%

und

531.0

129.85

68,950.35

-

-

0%

-

-

0.0%

-

-

0.0%

531.00

68,950.35

100.0%

und

2,655.0

53.94

143,210.70

-

-

0%

-

-

0.0%

-

-

0.0%

2,655.00

143,210.70

100.0%

und

531.0

186.66

99,116.04

-

-

0%

-

-

0.0%

-

-

0.0%

531.00

99,116.04

100.0%

und

1,062.0

239.12

253,945.44

-

-

0%

-

-

0.0%

-

-

0.0%

1,062.00

253,945.44

100.0%

und

531.0

67.84

36,022.19

-

-

0%

-

-

0.0%

-

-

0.0%

531.00

36,022.19

100.0%

und

531.0

229.45

121,840.29

-

-

0%

-

-

0.0%

-

-

0.0%

531.00

121,840.29

100.0%

und

2,655.0

69.04

183,292.70

-

-

0%

-

-

0.0%

-

-

0.0%

2,655.00

183,292.70

100.0%

und

531.0

17.91

9,509.15

-

-

0%

-

-

0.0%

-

-

0.0%

531.00

9,509.15

100.0%

und

531.0

17.91

9,509.15

-

-

0%

-

-

0.0%

-

-

0.0%

531.00

9,509.15

100.0%

und

531.0

17.91

9,509.15

-

-

0%

-

-

0.0%

-

-

0.0%

531.00

9,509.15

100.0%

und

1,062.0

17.91

19,018.30

-

-

0%

-

-

0.0%

-

-

0 .0%

1,062.00

19,018.30

100.0%

und und

531.0 531.0

187.38 70.63

99,496.13 37,501.88

-

-

0% 0%

-

-

0.0% 0.0%

-

-

0.0% 0.0%

531.00 531.00

99,496.13 37,501.88

100.0% 100.0%

85

 

1.3.8.2.5.6.3 1.3.8.2.5.6.4 1.3.8.2.5.6.5 1.3.8.2.5.6.6 1.3.8.2.5.6.7 1.3.8.2.5.6.8 1.3.8.2.5.6.9 1.3.8.2.5.6.10 1.3.8.2.5.6.11 1.3.8.2.5.6.12 1.3.8.2.5.7 1.3.8.2.5.7.1 1.3.8.2.6 1.3.8.2.6.1 1.3.8.2.6.1.1 1.3.8.2.6.1.2 1.3.8.2.6.2 1.3.8.2.6. 2.1 1.3.8.3 8.83% 3.17% 18%

Lavadero de Cocina Luxor 1 Poza sin Escurridero 50cm Lavarropa de Granito Jorss 1 Poza 80cm Griferia p/ducha Trebol ECO Griferia p/lavatorio de baño Trebol ECO Griferia p/lavadero cocina a Pared Trebol ECO Llave para Lavadero de Ropa Hubolt 1/2 Instalacion de Inodoro Instalacion de Lavatorio y Lavarropa Instalacion de Lavadero Cocina Instalacion Llave y Pico de Ducha COBERTURA Cobertura Techo de Fibraforte incluida parrilla de madera PINTURA INTERIOR Limpeza e imprimado de Muro Limpeza e imprimado de Techo EXTERIOR Pintura Latex en Muros Exteriores URBANISMO

und

531.0

60.63

32,191.88

-

-

0%

-

-

0.0%

-

-

0.0%

531.00

32,191.88

100.0%

und

531.0

104.75

55,622.25

-

-

0%

-

-

0.0%

-

-

0.0%

531.00

55,622.25

100.0%

und

531.0

68.50

36,373.50

-

-

0%

-

-

0.0%

-

-

0.0%

531.00

36,373.50

100.0%

und

531.0

50.75

26,948.25

-

-

0%

-

-

0.0%

-

-

0.0%

531.00

26,948.25

100.0%

und

531.0

58.50

31,063.50

-

-

0%

-

-

0.0%

-

-

0.0%

531.00

31,063.50

100.0%

und

531.0

29.38

15,598.13

-

-

0%

-

-

0.0%

-

-

0.0%

531.00

15,598.13

100.0%

und und und und

531.0 1,062.0 531.0 531.0

31.25 31.25 31.25 31.25

16,593.75 33,187.50 16,593.75 16,593.75

-

-

0% 0% 0% 0%

-

-

0.0% 0.0% 0.0% 0.0%

-

-

0.0% 0.0% 0.0% 0.0%

531.00 1,062.00 531.00 531.00

16,593.75 33,187.50 16,593.75 16,593.75

100.0% 100.0% 100.0% 100.0%

m2

13,407.8

25.41

340,690.93

-

-

0%

-

-

0.0%

-

-

0.0%

13,407.75

340,690.93

100.0%

m2 m2

52,101.7 12,154.6

9.91 9.91

516,432.25 120,476.30

-

-

0% 0%

-

-

0.0% 0.0%

-

-

0.0% 0.0%

52,101.72 12,154.59

516,432.25 120,476.30

100.0% 100.0%

m2 glb

8,628.8 1.0

12.15 250,000.00

104,856.57 250,000.00

-

-

0% 0%

-

-

0.0% 0.0%

-

-

0.0% 0.0%

8,628.75 1.00

104,856.57 250,000.00

100.0% 100.0%

-

0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

629,262.85 52,873.94 19,951.51 702,088.31 126,375. 89 828,464.20

0.49% 0.47% 0.49% 0.49% 0.49% 0.49%

629,262.85 52,873.94 19,951.51 702,088.31 126,375.89 828,464.20

0.49% 0.47% 0.49% 0.49% 0.49% 0.49%

126,786,21 1.90 11,197,126.0 6 4,019,904.23 142,003,24 2.19 25,560,583.6 0 167,563,82 5.79

99.51% 99.53% 99.51% 99.51% 99.51% 99.51%

A - COSTO DIRECTO DE CONSTRUCCIÓN B - GASTOS GENERALES C - UTILIDAD D - SUB TOTAL E - IGV F - TOTAL VALORIZADO

127,415,474. 75 11,250,000. 00 4,039,855. 74 142,705,330. 50 25,686,959. 49 168,392,289. 99

Tabla 34: Valorización N°0 del Presupuesto General de Obra (8 Etapas)

86

 

ANEXO 3: VALORIZACIÓN DE GASTOS INDIRECTOS:

87

 

VALORIZACION DE GASTOS INDIRECTOS N° 0 CORRESPONDIENTE AL PERIODO 01 JULIO 2019 @ 31 D E AGOSTO DEL 2019  ITEM

PARTIDA

1.00

ETAPA I

1.01 1.01.01

ADQUISICIÓN DEL TERRENO COSTO DEL TERRENO INCL.  ALCABALA Y OTROS DESARROLLO DEL PROYECTO PROYECTO LICENCIAS LICENCIA S LICENCIAS DEL PROYECTO GASTOS ADMINISTRATIVOS PERSONAL ADMINISTRTIVO EN OFICINA (ADMINISTRACIÓN DEL PROYECTO) GASTOS DE REPRESENTACIÓN (VIATICOS Y OTROS) GASTOS DE VENTAS MATERIAL PUBLICITARIO Y PUBLICIDAD,MARKETING PERSONAL DE OFICINA EN VENTAS CONSTRUCCIÓ ÓN N DE SALA DE VENTAS PILOTO SUPERVISIÓN Y SEGUROS SEGURO DE OBRA (CAR) SUPERVISIÓN SANEAMIENTO FÍSICO LEGAL INDEPENDIZACIÓN INDEPENDIZAC IÓN IMPUESTO PREDIAL (ARBITRIOS PREDIAL) COSTOS DE VINCULACIÓN PORTES Y COMISIONES FINANCIEROS(CARGOS FINANCIEROS) INSCRIPCIÓN DE HIPOTECA + GASTOS NOTARIALES +ADICIONALES DE OBRA COSTOS DE CARTA FIANZA BFH COMISIÓN DE ESTRUCTURACIÓN ESTRUCTURACIÓN VARIOS ASESORES EXTERNOSDIRECTORES ITF

1.02 1.02.01 1.03 1.03.01 1.04 1.04.01 1.04.02

1.05 1.05.01 1.05.02 1.05.03

1.06 1.06.01 1.06.02 1.07 1.07.01 1.07.02 1.08 1.08.01 1.08.02 1.08.03 1.08.04 1.08.05 1.08.06 1.08.07 1.09 1.09.01 1.09.02 2.00 2.01 2.01.01

2.02 2.02.01 2.03 2.03.01 2.04 2.04.01

2.04.02

OTROS ( AUDITORIA) POST VENTA PERSONAL POST VENTAS  ACOMPAÑAMIENTO SOCIAL (CAPACITACIÓN) ETAPA II ADQUISICIÓN DEL TERRENO COSTO DEL TERRENO INCL.  ALCABALA Y OTROS DESARROLLO DEL PROYECTO PROYECTO LICENCIAS LICENCIA S LICENCIAS DEL PROYECTO GASTOS ADMINISTRATIVOS PERSONAL ADMINISTRTIVO EN OFICINA (ADMINISTRACIÓN DEL PROYECTO) GASTOS DE REPRESENTACIÓN

UND

METRADO

PRESUPUESTO PU PARCIAL SOLES SOLES 10,962,617.38

GLB

1.00

1,290,176.16

GLB

1.00

1,140,199.78

GLB

1.00

47,812.50

GLB

1.00

4,814,400.00

GLB

1.00

29,500.00

1,290,17 6.16 1,290,176.16

ACUMULADO ANTERIOR PARCIAL % SOLES

CANTIDAD

PERIODO ACTUAL PARCIAL % SOLES

CANTIDAD

ACUMULADO ACTUAL PARCIAL % SOLES

CANTIDAD

SALDO CANTIDAD

%

PARCIAL SOLES

-

0.00%

1.00

100.00%

1,290,176.16

1.00

100.00%

1,290,176.16

-

0.00%

-

-

0.00%

1.00

100.00%

1,140,199.78

1.00

100.00%

1,140,199.78

-

0.00%

-

-

0.00%

0.90

90.00%

43,031.25

0.90

90.00%

43,031.25

0.10

10.00%

4,781.25

4,814,400.00

-

0.00%

1.00

100.00%

4,814,400.00

1.00

100.00%

4,814,400.00

-

0.00%

-

29,500.00

-

0.00%

1.00

100.00%

29,500.00

1.00

100.00%

29,500.00

-

0.00%

-

1,140,19 9.78 1,140,199.78 47,812.50 47,812.50 4,843,90 0.00

1,666,29 2.16 GLB

1.00

449,646.08

449,646.08

-

0.00%

1.00

100.00%

449,646.08

1.00

100.00%

449,646.08

-

0.00%

-

GLB

1.00

449,646.08

449,646.08

-

0.00%

1.00

100.00%

449,646.08

1.00

100.00%

449,646.08

-

0.00%

-

GLB

1.00

767,000.00

767,000.00

-

0.00%

1.00

100.00%

767,000.00

1.00

100.00%

767,000.00

-

0.00%

-

0.60 -

60.00% 0.00%

41,144.64 -

0.60 -

60.00% 0.00%

41,144.64 -

0.40 1.00

40.00% 100.00%

27,429.76 84,000.00

GLB GLB

1.00 1.00

68,574.40 84,000.00

GLB

1.00

144,300.00

152,574. 40 68,574.40 84,000.00 242,830. 00 144,300.00

GLB

1.00

98,530.00

98,530.00

-

0.00% 0.00%

-

0.00%

-

0.00%

-

-

0.00%

-

1.00

100.00%

144,300.00

-

0.00%

0.50

50.00%

49,265.00

0.50

50.00%

49,265.00

0.50

50.00%

49,265.00

-

0.00%

1.00

100.00%

76,789.55

1.00

100.00%

76,789.55

-

0.00%

-

1,425,16 2.32 GLB

1.00

76,789.55

76,789.55

GLB

1.00

46,020.00

46,020.00

-

0.00%

1.00

100.00%

46,020.00

1.00

100.00%

46,020.00

-

0.00%

-

GLB GLB

1.00 1.00

484,848.00 112,534.77

484,848.00 112,534.77

-

0.00% 0.00%

-

0.00% 0.00%

-

-

0.00% 0.00%

-

1.00 1.00

100.00% 100.00%

484,848.00 112,534.77

GLB

1.00

667,290.00

667,290.00

-

0.00%

0.70

70.00%

467,103.00

0.70

70.00%

467,103.00

0.30

30.00%

200,187.00

GLB

1.00

7,000.00

7,000.00

-

0.00%

1.00

100.00%

7,000.00

1.00

100.00%

7,000.00

-

0.00%

-

GLB

1.00

30,680.00

-

0.00%

1.00

100.00%

30,680.00

1.00

100.00%

30,680.00

-

0.00%

-

GLB

1.00

104,110.06

30,680.00 153,670. 06 104,110.06

-

0.00%

-

-

0.00%

-

-

0.00%

-

1.00

100.00%

104,110.06

GLB

1.00

49,560.00

49,560.00

-

0.00%

-

-

0.00%

-

-

0.00%

-

1.00

100.00%

49,560.00

-

0.00%

1.00

100.00%

589,695.08

1.00

100.00%

589,695.08

-

0.00%

-

-

0.00%

1.00

100.00%

64,384.09

1.00

100.00%

64,384.09

-

0.00%

-

-

0.00%

0.90

90.00%

43,031.70

0.90

90.00%

43,031.70

0.10

10.00%

4,781.30

4,853,704.22 589,695. 08 GLB

1.00

589,695.08

589,695.08

64,384.0 9 64,384.09 47,813.00 47,813.00 1,823,10 0.00

GLB

1.00

64,384.09

GLB

1.00

47,813.00

GLB

1.00

1,793,600.00

1,793,600.00

-

0.00%

1.00

100.00%

1,793,600.00

1.00

100.00%

1,793,600.00

-

0.00%

-

GLB

1.00

29,500.00

29,500.00

-

0.00%

1.00

100.00%

29,500.00

1.00

100.00%

29,500.00

-

0.00%

-

(VIATICOS Y OTROS)

88

 

2.05 2.05.01 2.05.02 2.05.03

2.06 2.06.01 2.06.02 2.07 2.07.01 2.07.02 2.08 2.08.01 2.08.02 2.08.03 2.08.04 2.08.05 2.08.06 2.08.07 2.09 2.09.01 2.09.02 3.00 3.01 3.01.01

3.02 3.02.01 3.03 3.03.01 3.04 3.04.01 3.04.02

3.05 3.05.01 3.05.02 3.05.03

3.06 3.06.01 3.06.02 3.07 3.07.01 3.07.02 3.08 3.08.01 3.08.02 3.08.03 3.08.04

GASTOS DE VENTAS MATERIAL PUBLICITARIO Y PUBLICIDAD,MARKETING PERSONAL DE OFICINA EN VENTAS CONSTRUCCIÓ ÓN N DE SALA DE VENTAS PILOTO SUPERVISIÓN Y SEGUROS SEGURO DE OBRA (CAR) SUPERVISIÓN SANEAMIENTO FÍSICO LEGAL INDEPENDIZACIÓN INDEPENDIZAC IÓN IMPUESTO PREDIAL (ARBITRIOS PREDIAL) COSTOS DE VINCULACIÓN PORTES Y COMISIONES FINANCIEROS(CARGOS FINANCIEROS) INSCRIPCIÓN DE HIPOTECA + GASTOS NOTARIALES +ADICIONALES DE OBRA COSTOS DE CARTA FIANZA BFH COMISIÓN DE ESTRUCTURACIÓN ESTRUCTURACIÓN VARIOS ASESORES EXTERNOSDIRECTORES ITF OTROS ( AUDITORIA) POST VENTA PERSONAL POST VENTAS  ACOMPAÑAMIENTO SOCIAL (CAPACITACIÓN) ETAPA III ADQUISICIÓN DEL TERRENO COSTO DEL TERRENO INCL.  ALCABALA Y OTROS DESARROLLO DEL PROYECTO PROYECTO LICENCIAS LICENCIA S LICENCIAS DEL PROYECTO GASTOS ADMINISTRATIVOS PERSONAL ADMINISTRTIVO EN OFICINA (ADMINISTRACIÓN DEL PROYECTO) GASTOS DE REPRESENTACIÓN (VIATICOS Y OTROS) GASTOS DE VENTAS MATERIAL PUBLICITARIO Y PUBLICIDAD,MARKETING PERSONAL DE OFICINA EN VENTAS CONSTRUCCIÓ ÓN N DE SALA DE VENTAS PILOTO SUPERVISIÓN Y SEGUROS SEGURO DE OBRA (CAR) SUPERVISIÓN SANEAMIENTO FÍSICO LEGAL INDEPENDIZACIÓN INDEPENDIZAC IÓN IMPUESTO PREDIAL (ARBITRIOS PREDIAL) COSTOS DE VINCULACIÓN PORTES Y COMISIONES FINANCIEROS(CARGOS FINANCIEROS) INSCRIPCIÓN DE HIPOTECA + GASTOS NOTARIALES +ADICIONALES DE OBRA COSTOS DE CARTA FIANZA BFH COMISIÓN DE ESTRUCTURACIÓN ESTRUCTURACIÓN

822,832. 78 GLB

1.00

411,416.39

411,416.39

-

0.00%

1.00

100.00%

411,416.39

1.00

100.00%

411,416.39

-

0.00%

-

GLB

1.00

411,416.39

411,416.39

-

0.00%

1.00

100.00%

411,416.39

1.00

100.00%

411,416.39

-

0.00%

-

GLB

1.00

-

-

0.00% 0.00%

-

0.00% 0.00%

-

-

0.00% 0.00%

-

1.00 1.00

100.00% 100.00%

64,725.11 108,000.00

-

GLB GLB

1.00 1.00

64,725.11 108,000.00

GLB

1.00

136,200.00

172,725. 11 64,725.11 108,000.00 219,390. 00 136,200.00

GLB

1.00

83,190.00

83,190.00

-

0.00%

-

0.00%

-

-

0.00%

-

1.00

100.00%

136,200.00

-

0.00%

0.50

50.00%

41,595.00

0.50

50.00%

41,595.00

0.50

50.00%

41,595.00

-

0.00%

1.00

100.00%

77,759.72

1.00

100.00%

77,759.72

-

0.00%

-

968,100. 07 GLB

1.00

77,759.72

77,759.72

GLB

1.00

58,604.10

58,604.10

-

0.00%

-

0.00%

-

-

0.00%

-

1.00

100.00%

58,604.10

GLB GLB

1.00 1.00

457,632.00 106,244.25

457,632.00 106,244.25

-

0.00% 0.00%

-

0.00% 0.00%

-

-

0.00% 0.00%

-

1.00 1.00

100.00% 100.00%

457,632.00 106,244.25

GLB

1.00

222,430.00

222,430.00

-

0.00%

-

0.00%

-

-

0.00%

-

1.00

100.00%

222,430.00

GLB GLB

1.00 1.00

-

0.00%

-

0.00%

-

-

0.00%

-

1.00

100.00%

45,430.00

GLB

1.00

96,104.09

45,430.00 145,664. 09 96,104.09

GLB

1.00

49,560.00

49,560.00

45,430.00

-

0.00%

-

0.00%

-

-

0.00%

-

1.00

100.00%

96,104.09

-

0.00%

-

0.00%

-

-

0.00%

-

1.00

100.00%

49,560.00

-

0.00%

1.00

100.00%

697,607.81

1.00

100.00%

697,607.81

-

0.00%

-

5,629,274.08 697,607. 81 GLB

1.00

697,607.81

GLB

1.00

64,384.09

GLB

1.00

47,813.00

GLB

1.00

2,124,000.00

GLB

1.00

29,500.00

697,607.81

64,384.0 9 64,384.09 47,813.00 47,813.00 2,153,50 0.00

-

0.00%

-

0.00%

-

-

0.00%

-

1.00

100.00%

64,384.09

-

0.00%

0.50

50.00%

23,906.50

0.50

50.00%

23,906.50

0.50

50.00%

23,906.50

2,124,000.00

-

0.00%

0.19

19.44%

412,905.60

0.19

19.44%

412,905.60

0.81

80.56%

1,711,094.40

29,500.00

-

0.00%

0.20

20.00%

5,900.00

0.20

20.00%

5,900.00

0.80

80.00%

23,600.00

944,000. 00 GLB

1.00

472,000.00

472,000.00

-

0.00%

0.79

79.00%

372,880.00

0.79

79.00%

372,880.00

0.21

21.00%

99,120.00

GLB

1.00

472,000.00

472,000.00

-

0.00%

0.79

79.00%

372,880.00

0.79

79.00%

372,880.00

0.21

21.00%

99,120.00

GLB

1.00

-

-

0.00% 0.00%

-

0.00% 0.00%

-

-

0.00% 0.00%

-

1.00 1.00

100.00% 100.00%

78,411.47 138,000.00

-

GLB GLB

1.00 1.00

78,411.47 138,000.00

GLB

1.00

165,000.00

216,411. 47 78,411.47 138,000.00 240,520. 00 165,000.00

GLB

1.00

75,520.00

75,520.00

-

0.00%

-

0.00%

-

-

0.00%

-

1.00

100.00%

165,000.00

-

0.00%

-

0.00%

-

-

0.00%

-

1.00

100.00%

75,520.00

-

0.00%

0.78

77.98%

71,708.51

0.78

77.98%

71,708.51

0.22

22.02%

20,254.41

1,092,46 1.94 GLB

1.00

91,962.92

91,962.92

GLB

1.00

80,313.75

80,313.75

-

0.00%

-

0.00%

-

-

0.00%

-

1.00

100.00%

80,313.75

GLB GLB

1.00 1.00

554,400.00 128,015.27

554,400.00 128,015.27

--

0.00% 0.00%

--

0.00% 0.00%

--

--

0.00% 0.00%

--

1.00 1.00

100.00% 100.00%

554,400.00 128,015.27

222,430.00

89

 

3.08.05 3.08.06 3.08.07 3.09 3.09.01 3.09.02 4.00 4.01 4.01.01

4.02 4.02.01 4.03 4.03.01 4.04 4.04.01 4.04.02

4.05 4.05.01 4.05.02 4.05.03

4.06 4.06.01 1.06.02 4.07 4.07.01 4.07.02 4.08 4.08.01 4.08.02 4.08.03 4.08.04 4.08.05 4.08.06 4.08.07 4.09 4.09.01 4.09.02 5.00 5.01 5.01.01

5.02 5.02.01 5.03 5.03.01 5.04 5.04.01

VARIOS ASESORES EXTERNOSDIRECTORES ITF OTROS ( AUDITORIA) POST VENTA PERSONAL POST VENTAS  ACOMPAÑAMIENTO SOCIAL (CAPACITACIÓN) ETAPA IV ADQUISICIÓN DEL TERRENO COSTO DEL TERRENO INCL.  ALCABALA Y OTROS DESARROLLO DEL PROYECTO PROYECTO LICENCIAS LICENCIA S LICENCIAS DEL PROYECTO GASTOS ADMINISTRATIVOS PERSONAL ADMINISTRTIVO EN OFICINA (ADMINISTRACIÓN DEL PROYECTO) GASTOS DE REPRESENTACIÓN (VIATICOS Y OTROS) GASTOS DE VENTAS MATERIAL PUBLICITARIO Y PUBLICIDAD,MARKETING PERSONAL DE OFICINA EN VENTAS CONSTRUCCIÓ ÓN N DE SALA DE VENTAS PILOTO SUPERVISIÓN Y SEGUROS SEGURO DE OBRA (CAR) SUPERVISIÓN SANEAMIENTO FÍSICO LEGAL INDEPENDIZACIÓN INDEPENDIZAC IÓN IMPUESTO PREDIAL (ARBITRIOS PREDIAL) COSTOS DE VINCULACIÓN PORTES Y COMISIONES FINANCIEROS(CARGOS FINANCIEROS) INSCRIPCIÓN DE HIPOTECA + GASTOS NOTARIALES +ADICIONALES DE OBRA COSTOS DE CARTA FIANZA BFH COMISIÓN DE ESTRUCTURACIÓN ESTRUCTURACIÓN VARIOS ASESORES EXTERNOSDIRECTORES ITF OTROS ( AUDITORIA) POST VENTA PERSONAL POST VENTAS  ACOMPA AMIENTO SOCIAL (CAPACITACIÓN) ETAPA V ADQUISICIÓN DEL TERRENO COSTO DEL TERRENO INCL.  ALCABALA Y OTROS DESARROLLO DEL PROYECTO PROYECTO LICENCIAS LICENCIA S LICENCIAS DEL PROYECTO GASTOS ADMINISTRATIVOS PERSONAL ADMINISTRTIVO EN OFICINA (ADMINISTRACIÓN DEL PROYECTO) GASTOS DE

-

0.00%

-

0.00%

-

-

0.00%

-

1.00

100.00%

-

0.00%

-

0.00%

-

-

0.00%

-

1.00

100.00%

15,340.00

-

0.00%

-

0.00%

-

-

0.00%

-

1.00

100.00%

123,015.77

-

0.00%

-

0.00%

-

-

0.00%

-

1.00

100.00%

49,560.00

-

0.00%

1.00

100.00%

644,789.09

1.00

100.00%

644,789.09

-

0.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

1.00

100.00%

64,384.09

-

0.00%

0.50

50.00%

23,906.50

0.50

50.00%

23,906.50

0.50

50.00%

23,906.50

2,360,000.00

-

0.00%

-

0.00%

-

-

0.00%

-

1.00

100.00%

2,360,000.00

29,500.00

-

0.00%

-

0.00%

-

-

0.00%

-

1.00

100.00%

29,500.00

GLB

1.00

222,430.00

222,430.00

GLB GLB

1.00 1.00

15,340.00

GLB

1.00

123,015.77

15,340.00 172,575. 77 123,015.77

GLB

1.00

49,560.00

49,560.00

5,504,476.34 644,789. 09 GLB

1.00

644,789.09

GLB

1.00

64,384.09

GLB

1.00

47,813.00

GLB

1.00

2,360,000.00

GLB

1.00

29,500.00

644,789.09

64,384.0 9 64,384.09 47,813.00 47,813.00 2,389,50 0.00

736,074. 56 GLB

1.00

338,537.28

338,537.28

-

0.00%

-

0.00%

-

-

0.00%

-

1.00

100.00%

338,537.28

GLB

1.00

338,537.28

338,537.28

-

0.00%

-

0.00%

-

-

0.00%

-

1.00

100.00%

338,537.28

GLB

1.00

59,000.00

59,000.00

-

0.00%

-

0.00%

-

-

0.00%

-

1.00

100.00%

59,000.00

-

0.00% 0.00%

-

0.00% 0.00%

-

-

0.00% 0.00%

-

1.00 1.00

100.00% 100.00%

73,564.22 102,000.00

GLB GLB

1.00 1.00

73,564.22 102,000.00

GLB

1.00

154,800.00

175,564. 22 73,564.22 102,000.00 230,320. 00 154,800.00

GLB

1.00

75,520.00

75,520.00

-

0.00%

-

0.00%

-

-

0.00%

-

1.00

100.00%

154,800.00

-

0.00%

-

0.00%

-

-

0.00%

-

1.00

100.00%

75,520.00

-

0.00%

-

0.00%

-

-

0.00%

-

1.00

100.00%

93,476.68

1,055,34 6.66 GLB

1.00

93,476.68

93,476.68

GLB

1.00

84,634.32

84,634.32

-

0.00%

-

0.00%

-

-

0.00%

-

1.00

100.00%

84,634.32

GLB GLB

1.00 1.00

520,128.00 119,337.66

520,128.00 119,337.66

-

0.00% 0.00%

-

0.00% 0.00%

-

-

0.00% 0.00%

-

1.00 1.00

100.00% 100.00%

520,128.00 119,337.66

GLB

1.00

222,430.00

222,430.00

GLB GLB

1.00 1.00

15,340.00

GLB

1.00

111,124.72

15,340.00 160,684. 72 111,124.72

GLB

1.00

49,560.00

49,560.00

-

0.00%

-

0.00%

-

-

0.00%

-

1.00

100.00%

222,430.00

-

0.00%

-

0.00%

-

-

0.00%

-

1.00

100.00%

15,340.00

-

0.00%

-

0.00%

-

-

0.00%

-

1.00

100.00%

111,124.72

-

0.00%

-

0.00%

-

-

0.00%

-

1.00

100.00%

49,560.00

-

0.00%

1.00

100.00%

695,293.58

1.00

100.00%

695,293.58

-

0.00%

-

4,927,150.66 695,293. 58 GLB

1.00

695,293.58

GLB

1.00

64,384.09

GLB

1.00

47,813.00

GLB

1.00

1,534,000.00

695,293.58

64,384.0 9 64,384.09 47,813.00 47,813.00 1,563,50 0.00 1,534,000.00

-

0.00%

-

0.00%

-

-

0.00%

-

1.00

100.00%

64,384.09

-

0.00%

0.50

50.00%

23,906.50

0.50

50.00%

23,906.50

0.50

50.00%

23,906.50

-

0.00%

-

0.00%

-

-

0.00%

-

1.00

100.00%

1,534,000.00

5.04.02

REPRESENTACIÓN (VIATICOS Y OTROS)

GLB

1.00

29,500.00

29,500.00

-

0.00%

-

0.00%

-

-

0.00%

-

1.00

100.00%

29,500.00

90

 

5.05 5.05.01 5.05.02 5.05.03

5.06 5.06.01 5.06.02 5.07 5.07.01 5.07.02 5.08 5.08.01 5.08.02 5.08.03 5.08.04 5.08.05 5.08.06 5.08.07 5.09 5.09.01 5.09.02 6.00 6.01 6.01.01

6.02 6.02.01 6.03 6.03.01 6.04 6.04.01 6.04.02

6.05 6.05.01 6.05.02 6.05.03

6.06 6.06.01 6.06.02 6.07 6.07.01 6.07.02 6.08 6.08.01 6.08.02 6.08.03 6.08.04

GASTOS DE VENTAS MATERIAL PUBLICITARIO Y PUBLICIDAD,MARKETING PERSONAL DE OFICINA EN VENTAS CONSTRUCCIÓ ÓN N DE SALA DE VENTAS PILOTO SUPERVISIÓN Y SEGUROS SEGURO DE OBRA (CAR) SUPERVISIÓN SANEAMIENTO FÍSICO LEGAL INDEPENDIZACIÓN INDEPENDIZAC IÓN IMPUESTO PREDIAL (ARBITRIOS PREDIAL) COSTOS DE VINCULACIÓN PORTES Y COMISIONES FINANCIEROS(CARGOS FINANCIEROS) INSCRIPCIÓN DE HIPOTECA + GASTOS NOTARIALES +ADICIONALES DE OBRA COSTOS DE CARTA FIANZA BFH COMISIÓN DE ESTRUCTURACIÓN ESTRUCTURACIÓN VARIOS ASESORES EXTERNOSDIRECTORES ITF OTROS ( AUDITORIA) POST VENTA PERSONAL POST VENTAS  ACOMPAÑAMIENTO SOCIAL (CAPACITACIÓN) ETAPA VI ADQUISICIÓN DEL TERRENO COSTO DEL TERRENO INCL.  ALCABALA Y OTROS DESARROLLO DEL PROYECTO PROYECTO LICENCIAS LICENCIA S LICENCIAS DEL PROYECTO GASTOS ADMINISTRATIVOS PERSONAL ADMINISTRTIVO EN OFICINA (ADMINISTRACIÓN DEL PROYECTO) GASTOS DE REPRESENTACIÓN (VIATICOS Y OTROS) GASTOS DE VENTAS MATERIAL PUBLICITARIO Y PUBLICIDAD,MARKETING PERSONAL DE OFICINA EN VENTAS CONSTRUCCIÓ ÓN N DE SALA DE VENTAS PILOTO SUPERVISIÓN Y SEGUROS SEGURO DE OBRA (CAR) SUPERVISIÓN SANEAMIENTO FÍSICO LEGAL INDEPENDIZACIÓN INDEPENDIZAC IÓN IMPUESTO PREDIAL (ARBITRIOS PREDIAL) COSTOS DE VINCULACIÓN PORTES Y COMISIONES FINANCIEROS(CARGOS FINANCIEROS) INSCRIPCIÓN DE HIPOTECA + GASTOS NOTARIALES +ADICIONALES DE OBRA COSTOS DE CARTA FIANZA BFH COMISIÓN DE ESTRUCTURACIÓN ESTRUCTURACIÓN

865,421. 44 GLB

1.00

432,710.72

432,710.72

-

0.00%

-

0.00%

-

-

0.00%

-

1.00

100.00%

432,710.72

GLB

1.00

432,710.72

432,710.72

-

0.00%

-

0.00%

-

-

0.00%

-

1.00

100.00%

432,710.72

GLB

1.00

-

-

0.00% 0.00%

-

0.00% 0.00%

-

-

0.00% 0.00%

-

1.00 1.00

100.00% 100.00%

83,401.30 90,000.00

-

GLB GLB

1.00 1.00

83,401.30 90,000.00

GLB

1.00

156,000.00

173,401. 30 83,401.30 90,000.00 231,520. 00 156,000.00

GLB

1.00

75,520.00

75,520.00

-

0.00%

-

0.00%

-

-

0.00%

-

1.00

100.00%

156,000.00

-

0.00%

-

0.00%

-

-

0.00%

-

1.00

100.00%

75,520.00

-

0.00%

-

0.00%

-

-

0.00%

-

1.00

100.00%

106,446.95

1,113,11 4.76 GLB

1.00

106,446.95

106,446.95

GLB

1.00

108,177.68

108,177.68

-

0.00%

-

0.00%

-

-

0.00%

-

1.00

100.00%

108,177.68

GLB GLB

1.00 1.00

524,160.00 136,560.13

524,160.00 136,560.13

-

0.00% 0.00%

-

0.00% 0.00%

-

-

0.00% 0.00%

-

1.00 1.00

100.00% 100.00%

524,160.00 136,560.13

-

0.00%

-

0.00%

-

-

0.00%

-

1.00

100.00%

222,430.00

-

0.00%

-

0.00%

-

-

0.00%

-

1.00

100.00%

15,340.00

-

0.00%

-

0.00%

-

-

0.00%

-

1.00

100.00%

123,142.49

-

0.00%

-

0.00%

-

-

0.00%

-

1.00

100.00%

49,560.00

-

0.00%

1.00

100.00%

736,797.25

1.00

100.00%

736,797.25

-

0.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

1.00

100.00%

64,384.09

-

0.00%

-

0.00%

-

-

0.00%

-

1.00

100.00%

47,813.00

1,298,000.00

-

0.00%

-

0.00%

-

-

0.00%

-

1.00

100.00%

1,298,000.00

29,500.00

-

0.00%

-

0.00%

-

-

0.00%

-

1.00

100.00%

29,500.00

GLB

1.00

222,430.00

222,430.00

GLB GLB

1.00 1.00

15,340.00

GLB

1.00

123,142.49

15,340.00 172,702. 49 123,142.49

GLB

1.00

49,560.00

49,560.00

4,735,256.69 736,797. 25 GLB

1.00

736,797.25

GLB

1.00

64,384.09

GLB

1.00

47,813.00

GLB

1.00

1,298,000.00

GLB

1.00

29,500.00

736,797.25

64,384.0 9 64,384.09 47,813.00 47,813.00 1,327,50 0.00

756,442. 41 GLB

1.00

256,386.73

256,386.73

-

0.00%

-

0.00%

-

-

0.00%

-

1.00

100.00%

256,386.73

GLB

1.00

500,055.68

500,055.68

-

0.00%

-

0.00%

-

-

0.00%

-

1.00

100.00%

500,055.68

GLB

1.00

-

-

0.00% 0.00%

-

0.00% 0.00%

-

-

0.00% 0.00%

-

1.00 1.00

100.00% 100.00%

89,335.62 96,000.00

-

GLB GLB

1.00 1.00

89,335.62 96,000.00

GLB

1.00

167,100.00

185,335. 62 89,335.62 96,000.00 242,620. 00 167,100.00

GLB

1.00

75,520.00

75,520.00

-

0.00%

-

0.00%

-

-

0.00%

-

1.00

100.00%

167,100.00

-

0.00%

-

0.00%

-

-

0.00%

-

1.00

100.00%

75,520.00

1,196,14 9.71 GLB

1.00

125,042.20

125,042.20

-

0.00%

-

0.00%

-

-

0.00%

-

1.00

100.00%

125,042.20

GLB

1.00

125,013.92

125,013.92

-

0.00%

-

0.00%

-

-

0.00%

-

1.00

100.00%

125,013.92

GLB GLB

1.00 1.00

561,456.00 146,867.59

561,456.00 146,867.59

-

0.00% 0.00%

-

0.00% 0.00%

-

-

0.00% 0.00%

-

1.00 1.00

100.00% 100.00%

561,456.00 146,867.59

222,430.00

91

 

6.08.05 6.08.06 6.08.07 6.09 6.09.01 6.09.02 7.00 7.01 7.01.01

7.02 7.02.01 7.03 7.03.01 7.04 7.04.01 7.04.02

7.05 7.05.01 7.05.02 7.05.03

7.06 7.06.01 7.06.02 7.07 7.07.01 7.07.02 7.08 7.08.01 7.08.02 7.08.03 7.08.04 7.08.05 7.08.06 7.08.07 7.09 7.09.01 7.09.02 8.00 8.01 8.01.01

8.02 8.02.01 8.03 8.03.01 8.04 8.04.01

VARIOS ASESORES EXTERNOSDIRECTORES ITF OTROS ( AUDITORIA) POST VENTA PERSONAL POST VENTAS  ACOMPAÑAMIENTO SOCIAL (CAPACITACIÓN) ETAPA VII ADQUISICIÓN DEL TERRENO COSTO DEL TERRENO INCL.  ALCABALA Y OTROS DESARROLLO DEL PROYECTO PROYECTO LICENCIAS LICENCIA S LICENCIAS DEL PROYECTO GASTOS ADMINISTRATIVOS PERSONAL ADMINISTRTIVO EN OFICINA (ADMINISTRACIÓN DEL PROYECTO) GASTOS DE REPRESENTACIÓN (VIATICOS Y OTROS) GASTOS DE VENTAS MATERIAL PUBLICITARIO Y PUBLICIDAD,MARKETING PERSONAL DE OFICINA EN VENTAS PERSONAL CONSTRUCCIÓ ÓN N DE SALA DE VENTAS PILOTO SUPERVISIÓN Y SEGUROS SEGURO DE OBRA (CAR) SUPERVISIÓN SANEAMIENTO FÍSICO LEGAL INDEPENDIZACIÓN INDEPENDIZAC IÓN IMPUESTO PREDIAL (ARBITRIOS PREDIAL) COSTOS DE VINCULACIÓN PORTES Y COMISIONES FINANCIEROS(CARGOS FINANCIEROS) INSCRIPCIÓN DE HIPOTECA + GASTOS NOTARIALES +ADICIONALES DE OBRA COSTOS DE CARTA FIANZA BFH COMISIÓN DE ESTRUCTURACIÓN ESTRUCTURACIÓN VARIOS ASESORES EXTERNOSDIRECTORES ITF OTROS ( AUDITORIA) POST VENTA PERSONAL POST VENTAS  ACOMPA AMIENTO SOCIAL (CAPACITACIÓN) ETAPA VIII ADQUISICIÓN DEL TERRENO COSTO DEL TERRENO INCL.  ALCABALA Y OTROS DESARROLLO DEL PROYECTO PROYECTO LICENCIAS LICENCIA S LICENCIAS DEL PROYECTO GASTOS ADMINISTRATIVOS PERSONAL ADMINISTRTIVO EN OFICINA (ADMINISTRACIÓN DEL PROYECTO)

GLB

1.00

222,430.00

222,430.00

GLB GLB

1.00 1.00

15,340.00

GLB

1.00

128,654.61

15,340.00 178,214. 61 128,654.61

GLB

1.00

49,560.00

49,560.00

-

0.00%

-

0.00%

-

-

0.00%

-

1.00

100.00%

-

0.00%

-

0.00%

-

-

0.00%

-

1.00

100.00%

15,340.00

-

0.00%

-

0.00%

-

-

0.00%

-

1.00

100.00%

128,654.61

-

0.00%

-

0.00%

-

-

0.00%

-

1.00

100.00%

49,560.00

-

0.00%

1.00

100.00%

536,104.21

1.00

100.00%

536,104.21

-

0.00%

-

3,658,686.85 536,104. 21 GLB

1.00

536,104.21

536,104.21

64,384.0 9 64,384.09 47,813.00 47,813.00 1,504,50 0.00

-

0.00%

-

0.00%

-

-

0.00%

-

1.00

100.00%

64,384.09

-

0.00%

-

0.00%

-

-

0.00%

-

1.00

100.00%

47,813.00

1.00

100.00%

1,475,000.00

1.00

100.00%

29,500.00

1.00

100.00%

53,269.92

1.00 1.00

100.00% 100.00%

73,457.30 108,000.00

GLB

1.00

64,384.09

GLB

1.00

47,813.00

GLB

1.00

1,475,000.00

1,475,000.00

-

0.00%

-

0.00%

-

-

0.00%

-

GLB

1.00

29,500.00

29,500.00

-

0.00%

-

0.00%

-

-

0.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

0.00% 0.00%

-

0.00% 0.00%

-

-

0.00% 0.00%

-

53,269.9 2 GLB

1.00

-

-

GLB

1.00

53,269.92

53,269.92

GLB

1.00

-

-

GLB GLB

1.00 1.00

73,457.30 108,000.00

GLB

1.00

137,400.00

181,457. 30 73,457.30 108,000.00 212,920. 00 137,400.00

GLB

1.00

75,520.00

75,520.00

-

0.00%

-

0.00%

-

-

0.00%

-

1.00

100.00%

137,400.00

-

0.00%

-

0.00%

-

-

0.00%

-

1.00

100.00%

75,520.00

-

0.00%

-

0.00%

-

-

0.00%

-

1.00

100.00%

109,780.42

1,034,56 2.51 GLB

1.00

109,780.42

109,780.42

GLB

1.00

102,345.83

102,345.83

-

0.00%

-

0.00%

-

-

0.00%

-

1.00

100.00%

102,345.83

GLB GLB

1.00 1.00

461,664.00 123,002.26

461,664.00 123,002.26

-

0.00% 0.00%

-

0.00% 0.00%

-

-

0.00% 0.00%

-

1.00 1.00

100.00% 100.00%

461,664.00 123,002.26

-

0.00%

-

0.00%

-

-

0.00%

-

1.00

100.00%

222,430.00

-

0.00%

-

0.00%

-

-

0.00%

-

1.00

100.00%

15,340.00

-

0.00%

-

0.00%

-

-

0.00%

-

1.00

100.00%

16,115.82

-

0.00%

-

0.00%

-

-

0.00%

-

1.00

100.00%

7,560.00

-

0.00%

1.00

100.00%

579,456.32

1.00

100.00%

579,456.32

-

0.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

1.00

100.00%

64,384.09

-

0.00%

-

0.00%

-

-

0.00%

-

1.00

100.00%

47,813.00

-

0.00%

-

0.00%

-

-

0.00%

-

1.00

100.00%

1,475,000.00

GLB

1.00

222,430.00

222,430.00

GLB GLB

1.00 1.00

15,340.00

GLB

1.00

16,115.82

15,340.00 23,675.8 2 16,115.82

GLB

1.00

7,560.00

7,560.00

3,823,682.14 579,456. 32 GLB

1.00

579,456.32

GLB

1.00

64,384.09

GLB

1.00

47,813.00

GLB

1.00

1,475,000.00

579,456.32

64,384.0 9 64,384.09 47,813.00 47,813.00 1,504,50 0.00 1,475,000.00

92

 

8.04.02

8.05 8.05.01 8.05.02 8.05.03

8.06 8.06.01 8.06.02 8.07 8.07.01 8.07.02 8.08 8.08.01 8.08.02 8.08.03 8.08.04 8.08.05 8.08.06 8.08.07 8.09 8.09.01 8.09.02

GASTOS DE REPRESENTACIÓN (VIATICOS Y OTROS)

GASTOS DE VENTAS MATERIAL PUBLICITARIO Y PUBLICIDAD,MARKETING PERSONAL DE OFICINA EN VENTAS CONSTRUCCIÓ ÓN N DE SALA DE VENTAS PILOTO SUPERVISIÓN Y SEGUROS SEGURO DE OBRA (CAR) SUPERVISIÓN SANEAMIENTO FÍSICO LEGAL INDEPENDIZACIÓN INDEPENDIZAC IÓN IMPUESTO PREDIAL (ARBITRIOS PREDIAL) COSTOS DE VINCULACIÓN PORTES Y COMISIONES FINANCIEROS(CARGOS FINANCIEROS) INSCRIPCIÓN DE HIPOTECA + GASTOS NOTARIALES +ADICIONALES DE OBRA COSTOS DE CARTA FIANZA BFH COMISIÓN DE ESTRUCTURACIÓN ESTRUCTURACIÓN VARIOS ASESORES EXTERNOSDIRECTORES ITF OTROS ( AUDITORIA) POST VENTA PERSONAL POST VENTAS  ACOMPAÑAMIENTO SOCIAL (CAPACITACIÓN) PRESUPUESTO TOTAL

GLB

1.00

29,500.00

29,500.00

-

0.00%

-

0.00%

-

-

0.00%

-

1.00

100.00%

29,500.00

-

0.00% 0.00%

-

0.00% 0.00%

-

-

0.00% 0.00%

-

1.00 1.00

100.00% 100.00%

75,702.72 96,000.00

GLB

1.00

-

GLB

1.00

-

-

GLB

1.00

-

-

GLB GLB

1.00 1.00

75,702.72 96,000.00

GLB

1.00

141,600.00

171,702. 72 75,702.72 96,000.00 217,120. 00 141,600.00

GLB

1.00

75,520.00

75,520.00

-

0.00%

-

0.00%

-

-

0.00%

-

1.00

100.00%

141,600.00

-

0.00%

-

0.00%

-

-

0.00%

-

1.00

100.00%

75,520.00

-

0.00%

-

0.00%

-

-

0.00%

-

1.00

100.00%

118,741.56

1,078,47 4.91 GLB

1.00

118,741.56

118,741.56

GLB

1.00

117,834.29

117,834.29

-

0.00%

-

0.00%

-

-

0.00%

-

1.00

100.00%

117,834.29

GLB GLB

1.00 1.00

475,776.00 128,353.06

475,776.00 128,353.06

-

0.00% 0.00%

-

0.00% 0.00%

-

-

0.00% 0.00%

-

1.00 1.00

100.00% 100.00%

475,776.00 128,353.06

GLB GLB GLB

1.00 1.00 1.00

222,430.00 15,340.00

-

0.00%

-

0.00%

-

-

0.00%

-

1.00

100.00%

222,430.00

-

0.00%

-

0.00%

-

-

0.00%

-

1.00

100.00%

15,340.00

GLB

1.00

110,671.10

222,430.00 15,340.00 160,231. 10 110,671.10

-

0.00%

-

0.00%

-

-

0.00%

-

1.00

100.00%

110,671.10

GLB

1.00

49,560.00

49,560.00

-

0.00%

-

0.00%

-

-

0.00%

-

1.00

100.00%

49,560.00

41.64%

18,362,041.78

41.64%

18,362,041.78

58.36%

25,732,806.58

44,094, 848.36

0.00%

S/. -

Tabla 35: Valorización N°0 de Gastos Indirectos del proyecto 