Updated Project Schedule
Short Description
schedule...
Description
Acti vity ID
Acti vity Description
Orig Dur
Rem Dur
%
Ear l y Start
Early Finish
2011 2012 2013 J A S O N D J F M A M J J A S O N D J F M A M J J A S
Total Float
W5J9JR-10-D-0005-0006 ANA Gardez Total Total
773 773
158 158
68 26J 26J UL11A UL11A
100 26J UL11A
05SEP 05SEP 13
-32 -32
Milestones Contract Milestones
KE Y-0001
Notice to P roceed (NTP )
KE Y-0002
P roject Duration
KE Y-0003
E nd Date of P roject
0
0
773*
158*
0
0
0 26J UL11A
05S EP 13
-32
0
05S EP 13
-32
Project Milestones
KE Y-0004
S tart Work on P roject
0
0
100 27J UL11A
KE Y-0005
R elease P artial Letter for CON
1
0
100 09 09MAY12A
KE Y-0006
R elease Letter for Full CON
1
1
0 01AP R13
09MAY 12A 01AP R 13
-7
Pre-construction Pre-construction Meetings
KE Y-0007
P rovide Documents for P re-CON
6
0
100 27 27J UL11A
01AUG11A
KE Y-0008
Hold P re-CON Meeting
1
0
100 02AUG11A
02AUG11A
Pre-construction Submittals
KE Y-0009
S ubmit ActivityHazard Analysis
1
0
100 02 02AUG11A
02AUG11A
KE Y-0010
S ubmit Baseline Schedule
1
0
100 02AUG11A
02AUG11A
KE Y-0011
S ubmit Accidend P reventionP lan
1
0
100 02 02AUG11A
02AUG11A
KE Y-0012
S ubmit Quality Control P lan
1
0
100 02 02AUG11A
02AUG11A
KE Y-0013
S ubmit Security P lan
1
0
100 02AUG11A
02AUG11A
KE Y-0014
Approve Activity Hazard Analysis
14
0
100 03 03AUG11A
16AUG11A
KE Y-0015
Approve Baseline S chedule
14
0
100 03 03AUG11A
16AUG11A
KE Y-0016
Approve AccidentP reventionP lan
14
0
100 03 03AUG11A
16AUG11A
KE Y-0017
Approve QC P lan by US ACE
14
0
100 03AUG11A
16AUG11A
KE Y-0018
Approved Security P lan by AED
14
0
100 03 03AUG11A
16AUG11A
S tart Date Finish Date Data Date Run Date
26J UL11 05S EP 13 01AP R13 13AP R13 10:09
Early Bar Progress Bar Critical Activity
P S 19
FCEC UIP rojects J V W5J 9J R-10-D-0005 R-10-D-0005-000 -0006 6 ANA Gardez P roject Management Layout
Sheet 1 of 38 Date
Revision
Checked
Approved
Acti vity ID
Acti vity Description
Orig Dur
Rem Dur
%
Ear l y Start
Early Finish
Total Float
2011 2012 2013 J A S O N D J F M A M J J A S O N D J F M A M J J A S
DBA Insurance
KE Y-0019
DBA Insurance
1
0
100 26J UL11A
26AUG11A
Design 10% Design Submittal
DES -0001
S ite Survey
22
0
100 10AUG11A
05S EP 11A
DES -0003
10% Site Design Submittal
13
0
100 10 10OCT11A
25OCT11A
DES -0002
Geotechnical R eport
12
0
100 26OCT11A
06NOV11A
DES -0004
10% Site Design Conference / Approval
14
0
100 26 26OCT11A
08NOV11A
DES -0014
P ay Request 10% Desgin
1
0
100 09NOV11A
09NOV11A
65% Design Submittal
DES -0005
65% Design S ubmittal
DES -0016
65% Design Conference / Approval
DES -0006
P ay Request 65% Design
4
0
100 24MAR 12A
27MAR 12A
14
0
100 29 29MAR 12A
08AP R 12A
1
0
100 05J UN12A
05J UN12A
100% Design Submittall
DES -0009
100% Design Submittal
10
0
100 10OCT12A
24OCT12A
DES -0010
100% Design Conference / Approval
14
0
100 25 25OCT12A
31OCT12A
DES -0020
P ay Request 100% Design
1
0
100 01NOV12A
01NOV12A
Procurement Civil/Structural Concrete Reinforecement
P R O-0001
S ubmit R einforcement S teel
P R O-0002
Approved Reinforcement S teel
5
0
100 13 13NOV11A
17NOV11A
14
0
100 18 18NOV11A
01DEC11A
P R O-0003
Issue P archase Order for SS
2
0
100 17 17DE C11A
19DEC11A
P R O-0004
Delivery of SS to J obsite
5
0
100 08MAY12A
11MAY 12A
S tart Date Finish Date Data Date Run Date
26J UL11 05S EP 13 01AP R13 13AP R13 10:09
Early Bar Progress Bar Critical Activity
P S 19
FCEC UIP rojects J V W5J 9J R-10-D-0005 R-10-D-0005-000 -0006 6 ANA Gardez P roject Management Layout
Sheet 2 of 38 Date
Revision
Checked
Approved
Acti vity ID
Acti vity Description
Orig Dur
Rem Dur
%
Ear l y Start
Early Finish
Total Float
2011 2012 2013 J A S O N D J F M A M J J A S O N D J F M A M J J A S
DBA Insurance
KE Y-0019
DBA Insurance
1
0
100 26J UL11A
26AUG11A
Design 10% Design Submittal
DES -0001
S ite Survey
22
0
100 10AUG11A
05S EP 11A
DES -0003
10% Site Design Submittal
13
0
100 10 10OCT11A
25OCT11A
DES -0002
Geotechnical R eport
12
0
100 26OCT11A
06NOV11A
DES -0004
10% Site Design Conference / Approval
14
0
100 26 26OCT11A
08NOV11A
DES -0014
P ay Request 10% Desgin
1
0
100 09NOV11A
09NOV11A
65% Design Submittal
DES -0005
65% Design S ubmittal
DES -0016
65% Design Conference / Approval
DES -0006
P ay Request 65% Design
4
0
100 24MAR 12A
27MAR 12A
14
0
100 29 29MAR 12A
08AP R 12A
1
0
100 05J UN12A
05J UN12A
100% Design Submittall
DES -0009
100% Design Submittal
10
0
100 10OCT12A
24OCT12A
DES -0010
100% Design Conference / Approval
14
0
100 25 25OCT12A
31OCT12A
DES -0020
P ay Request 100% Design
1
0
100 01NOV12A
01NOV12A
Procurement Civil/Structural Concrete Reinforecement
P R O-0001
S ubmit R einforcement S teel
P R O-0002
Approved Reinforcement S teel
5
0
100 13 13NOV11A
17NOV11A
14
0
100 18 18NOV11A
01DEC11A
P R O-0003
Issue P archase Order for SS
2
0
100 17 17DE C11A
19DEC11A
P R O-0004
Delivery of SS to J obsite
5
0
100 08MAY12A
11MAY 12A
S tart Date Finish Date Data Date Run Date
26J UL11 05S EP 13 01AP R13 13AP R13 10:09
Early Bar Progress Bar Critical Activity
P S 19
FCEC UIP rojects J V W5J 9J R-10-D-0005 R-10-D-0005-000 -0006 6 ANA Gardez P roject Management Layout
Sheet 2 of 38 Date
Revision
Checked
Approved
Acti vity ID
P R O-0064
Acti vity Description
Orig Dur
P roduction of Concrete
Rem Dur
10
%
0
Ear l y Start
100 12MAY12A
Early Finish
Total Float
2011 2012 2013 J A S O N D J F M A M J J A S O N D J F M A M J J A S
21MAY 12A
3D Panel
P R O-0009
S ubmit 3D Data Sheet
P R O-0010
Approve 3D Data
5
0
100 21AP R12A
25AP R 12A
14
0
100 25AP R12A
05MAY 12A
P R O-0011 P R O-0072
Issue P urchase Order for 3D
5
0
100 05 05MAY12A
09MAY 12A
P roduction of 3D for P roject
10
0
100 10 10MAY12A
P R O-0012
Deliver of 3D to J obsite
20MAY 12A
5
0
100 21MAY12A
25MAY 12A
K Span
P R O-0060
S ubmit K S pan
5
0
100 21AP R12A
25AP R 12A
P R O-0061
Approve K Span
14
0
100 25AP R12A
08MAY 12A
P R O-0062
Manufacturing of K S pan
10
0
100 09MAY12A
19MAY 12A
P R O-0063
Deliver of K S pan to J obsite
5
0
100 19MAY12A
23MAY 12A
Arch Ar chit it ectu ral Joint Sealant
P R O-0005
S ubmit J oint S ealants
P R O-0006
Approved J oint S ealants
P R O-0007
Issue P urchase Order for SJ S
P R O-0068
Material's P roduction for P roject
P R O-0008
Delivery of S J S at J obsite
5
0
100 15AP R12A
19MAY 12A
14
0
100 20AP R12A
03MAY 12A 09MAY 12A
5
0
100 05 05MAY12A
15
0
100 09 09MAY12A
23MAY 12A
5
0
100 23MAY12A
27MAY 12A
Doors & Frames Frames
P R O-0013
S ubmit Doors & F rames
P R O-0014
Approved Doors & Frames
P R O-0015
Issue P urchase Order for DR
P R O-0016
Manufacturing of Doors
P R O-0017
Delivery of Doors to J obsite
5
0
100 02OCT11A
11OCT11A
14
0
100 12OCT11A
25OCT11A
2
0
100 29 29OCT11A
30OCT11A
10
0
100 12MAY12A
21MAY 12A
5
0
100 22J UN12A
01J UL12A
Windows and Frames
P R O-0018
S ubmit Windows & F rames
P R O-0019
Approved Windows & Frames
P R O-0020
Issue P ruchase Order for WDW
P R O-0021
Manufacturing of Windows
P R O-0022
Delivery of Windows to J obsite
S tart Date Finish Date Data Date Run Date
26J UL11 05S EP 13 01AP R13 13AP R13 10:09
Early Bar Progress Bar Critical Activity
5
0
100 18S E P 11A
27S EP 11A
14
0
100 12 12MAY12A
25MAY 12A 26MAY 12A
2
0
100 25 25MAY12A
10
0
100 10 10NOV12A
19NOV12A
5
0
100 20 20NOV12A
01J AN13A
P S 19
FCEC UIP rojects J V W5J 9J R-10-D-0005 R-10-D-0005-000 -0006 6 ANA Gardez P roject Management Layout
Sheet 3 of 38 Date
Revision
Checked
Approved
Acti vity ID
Acti vity Description
Orig Dur
Rem Dur
%
Early Start
Early Finish
2011 2012 2013 J A S O N D J F M A M J J A S O N D J F M A M J J A S
Total Float
Stucco & Paint
PRO-0023
Sumbit Stucco, Paint&Coating
PRO-0024
Approve Stucco, Paint&Coating
PRO-0025
Purchase Order for Stucco & P
PRO-0066
Material's Manufacturing for Project
PRO-0026
Deliver Stucco & P at J obsite
5
0
100 20APR12A
24APR12A
14
0
100 24APR12A
07MAY12A
2
0
100 07MAY12A
08MAY12A
18
0
100 01OCT12A
07OCT12A
6
0
100 07OCT12A
14OCT12A
Electrical Generator
PRO-0027
Submit Generator Product Data
10
0
100 31MAR12A
09APR12A
PRO-0028
Approve Generator Product Data
14
0
100 09APR12A
16APR12A
PRO-0029
Purchase Order for Generator
2
0
100 21APR12A
PRO-0030
Manufacturing the Generators
30
30
0 01APR13
30APR13
7
PRO-0031
Shipment of Generator
20
20
0 01MAY13
20MAY13
7
PRO-0032
Deliver of Generator at site
15
15
0 21MAY13
04J UN13
7
22APR12A
Lighting System
PRO-0033
Submit Lighting System
10
0
100 03SEP11A
13SEP11A
PRO-0034
Approve Lighting System
14
0
100 17SEP11A
30SEP11A
PRO-0035
Purchase Order for LTG SYS
PRO-0036
Shipment Lighting System
PRO-0037
Deliver of LTG SYS Material
2
0
100 01OCT11A
02OCT11A
20
0
100 01DEC12A
01J AN13A
8
0
100 01J AN13A
28FEB13A
Pannel Board and Transfer Switch
PRO-0038
Submit EP & TRANS Switch
PRO-0039
Approve EP & TRANS Switch
PRO-0040
Purchase Order for EP/TRANS SW
PRO-0041
Manufacture EP/TRANS Switch
PRO-0042
Shipment of EP & TRANS Switch
PRO-0043
Delivere EP & TRANS SW at Site
1
0
100 29AUG11A
29AUG11A
14
0
100 29AUG11A
03SEP11A
2
0
100 10SEP11A
11SEP11A
60
60
0 01APR13
30MAY13
-31
40
40
0 31MAY13
09J UL13
-31
10
10
0 10J UL13
19J UL13
-31
Electric al Distribution System
PRO-0044
Submit ELECT Distribution MAT
1
0
100 08SEP11A
08SEP11A
PRO-0045
Approve ELECT Distribution MAT
14
0
100 08SEP11A
13SEP11A
PRO-0046
PurchaseOrder forELEC Material
1
0
100 15SEP11A
15SEP11A
Start Date Finish Date Data Date Run Date
26J UL11 05SEP13 01APR13 13APR13 10:09
Early Bar Progress Bar Critical Activity
PS19
FCEC UIProjects J V W5J 9J R-10-D-0005-0006 ANA Gardez Project Management Layout
Sheet 4 of 38 Date
Revision
Checked
Approved
Acti vity ID
Acti vity Description
Orig Dur
Rem Dur
%
Early Start
Early Finish
2011 2012 2013 J A S O N D J F M A M J J A S O N D J F M A M J J A S
Total Float
PRO-0048
Shipment of ELECT Material
6
3
50 23APR12A
03APR13
41
PRO-0049
Deliver ELECT Material at site
3
1
50 28APR12A
01APR13
41
PRO-0047
Manufacturing of ELEC Material
5
0
100 25MAY12A
05J UN12A
Mechanical
PRO-0055
Submit Mechcanical Matrials
PRO-0056
Approve Mechcanical Matrials
1
1
0 02APR13
02APR13
-7
14
14
0 03APR13
16APR13
-7
PRO-0057
Purchase Order Mechcanical Matrials
2
2
0 17APR13
18APR13
-7
PRO-0058
Shipment of Mechcanical Matrials
45
45
0 19APR13
02J UN13
-7
PRO-0059
Deliver Mechcanical Matrials to the site
15
15
0 03J UN13
17J UN13
-7
Plumbing Water and Sewer Pipes
PRO-0050
Submit Water & Sewer Pipes
30
0
100 17SEP11A
22SEP11A
PRO-0051
Approve Water & Sewer Pipes
14
0
100 23SEP11A
05OCT11A
PRO-0052
Purchase Order-W & Sewer Pipes
2
0
100 08OCT11A
09OCT11A
PRO-0053
Shipment of W & Sewer Pipes
35
0
100 16APR12A
21MAY12A
PRO-0054
Deliver W & Sewer Pipe at site
35
0
100 22APR12A
26MAY12A
Construction Mobilization
MOB-0001 Grading/Leveling the Area
19
0
100 10SEP11A
29SEP11A
MOB-0002 Install. of Fence around Camp Area
20
0
100 30SEP11A
15OCT11A
MOB-0012 Installation of Conexes
10
0
100 16OCT11A
26OCT11A
MOB-0022 Construction of Buildings
20
0
100 27OCT11A
08DEC11A
Sitework Site Demolition/Grading
SDG-0001
Grubbing of Site
SDG-0002
Grading & Demolising
SDG-0003
Removing Materials from site
Start Date Finish Date Data Date Run Date
26J UL11 05SEP13 01APR13 13APR13 10:09
Early Bar Progress Bar Critical Activity
10
0
100 01APR12A
05J UN12A
9
0
100 04APR12A
20OCT12A
12
0
100 10APR12A
23OCT12A
PS19
FCEC UIProjects J V W5J 9J R-10-D-0005-0006 ANA Gardez Project Management Layout
Sheet 5 of 38 Date
Revision
Checked
Approved
Acti vity ID
Acti vity Description
Orig Dur
Rem Dur
%
Early Start
Early Finish
2011 2012 2013 J A S O N D J F M A M J J A S O N D J F M A M J J A S
Total Float
Soccer Field Irrigation System
STO-0001
Layout for Irrigation Pipes
10
10
0 01APR13
11APR13
27
STO-0002
Excavation/leveling/Lay Pipes
20
20
0 13APR13
05MAY13
27
STO-0003
Backfilling/Compaction
20
20
0 06MAY13
28MAY13
27
STO-0004
Punchlist Correction
8
8
0 29MAY13
06J UN13
27
STO-0005
Finish & Handover
1
1
0 08J UN13
08J UN13
27
Road Network, Walkways, Parking Roads RPS-0007
Road Layout
2
0
100 01MAY12A
RPS-0008
Road Sub-Grade
15
0
100 07MAY12A
15MAY12A 23MAY12A
RPS-0009
Compact Sub-Grade of Road
15
0
100 12MAY12A
03J UN12A
RPS-0010
Road Base Course
14
0
100 17MAY12A
22MAY12A
RPS-0011
Compact Base-Course of Road
10
0
100 24MAY12A
15SEP12A
RPS-0012
Asphalt pavement
10
0
100 12SEP12A
23SEP12A
RPS-0024
Soil Ditch
10
0
100 18SEP12A
29SEP12A
RPS-0013
Test & Completion
2
2
0 01APR13
02APR13
35
57
Crush Around Building RPS-0014
Layout/Level of Crush
1
1
0 13APR13
13APR13
RPS-0015
Sub Grade for Crush
10
10
0 14APR13
24APR13
57
RPS-0017
Compaction of Crush all arround Building
15
15
0 16APR13
02MAY13
57
RPS-0018
Test & Completion for Crush
1
1
0 04MAY13
04MAY13
57
35
Concrete walkways RPS-0019
Layout for Sidewalks
2
2
0 03APR13
04APR13
RPS-0020
Sub Base for Sidewalks
15
15
0 06APR13
22APR13
35
RPS-0021
Base Course for Sidewalks
15
15
0 23APR13
09MAY13
35
RPS-0022
Pour Concrete for Sidewalks
15
15
0 11MAY13
27MAY13
35
RPS-0023
Test & Completion of Sidewalks
2
2
0 28MAY13
29MAY13
35
Athletic Field & Track Field & Track RPS-0025
Layout Athletic Field & Track
1
0
100 12MAY12A
12MAY12A
RPS-0026
Excavation Athletic Field & Track
10
0
100 15MAY12A
26MAY12A
RPS-0027
Backfiling/Compaction Athletic Field & Track
14
0
100 21MAY12A
18J UL12A
RPS-0028
Grass/Cursh for Athletic
10
10
0 01APR13
11APR13
75
RPS-0029
Test & Completion of Field & Track
1
1
0 13APR13
13APR13
75
Start Date Finish Date Data Date Run Date
26J UL11 05SEP13 01APR13 13APR13 10:09
Early Bar Progress Bar Critical Activity
PS19
FCEC UIProjects J V W5J 9J R-10-D-0005-0006 ANA Gardez Project Management Layout
Sheet 6 of 38 Date
Revision
Checked
Approved
Acti vity ID
Acti vity Description
Orig Dur
Rem Dur
%
Early Start
Early Finish
2011 2012 2013 J A S O N D J F M A M J J A S O N D J F M A M J J A S
Total Float
Volleyball Fields 1st Field RPS-0030
Layout Volleyball Fields
1
0
100 12MAY12A
12MAY12A
RPS-0031
Excavation Volleyball Fields
10
0
100 20MAY12A
16J UL12A
RPS-0032
Backfiling / Compaction Volleyball Fields
10
0
100 03J UL12A
16J UL12A
RPS-0033
Sand for Volleyball Fields
10
0
100 22J UL12A
26AUG12A
RPS-0034
Test & Completion Volleyball Fields
1
1
0 01APR13
01APR13
85
2nd Field RPS-0035
Layout Volleyball Fields
1
0
100 12MAY12A
12MAY12A
RPS-0036
Excavation Volleyball Fields
12
0
100 16MAY12A
24J UL12A
RPS-0037
Backfiling / Compaction Volleyball Fields
12
0
100 04J UN12A
26AUG12A
RPS-0038
Sand for Volleyball Fields
12
0
100 18NOV12A
RPS-0039
Test & Completion Volleyball Fields
1
1
0 01APR13
01DEC12A 01APR13
85
Force Protection Personnel Bunker BUNKER #1,2,3 FPR-0001
Layout for Bunker #1,2,3
1
0
100 18NOV12A
18NOV12A
FPR-0002
Casting for Bunker #1,2,3
8
0
100 19NOV12A
27NOV12A
FPR-0003
Construct Bunker #1,2,3
4
0
100 21NOV12A
09J AN13A
FPR-0004
Cmplt Sandbag & T. Barriers of B. #1,2,3
6
6
70 10DEC12A
07APR13
79
FPR-0005
Test & Completion of Bunker #1,2,3
1
1
0 08APR13
08APR13
79
BUNKER #4,5,6 FPR-0006
Layout for Bunker #4,5,6
1
0
100 02DEC12A
02DEC12A
FPR-0007
Casting for Bunker #4,5,6
8
0
100 03DEC12A
17DEC12A
FPR-0008
Construct Bunker #4,5,6
4
0
100 18DEC12A
09J AN13A
FPR-0009
Cmplt Sandbag & T. Barriers of B. #4,5,6
6
6
70 10FEB13A
07APR13
78
FPR-0010
Test & Completion of Bunker #4,5,6
1
1
0 08APR13
08APR13
78
BUNKER #7,8,9 FPR-0012
Casting Bunker #7,8,9
8
0
100 18DEC12A
26DEC12A
FPR-0011
Layout for Bunker #7,8,9
1
0
96 18DEC12A
31MAR13
FPR-0013
Construct Bunker #7,8,9
4
0
100 20DEC12A
14J AN13A
FPR-0014
Cmplt Sandbag & T. Barriers of B. #7,8,9
6
6
25 10J AN13A
07APR13
79
FPR-0015
Test & Completion of Bunker #7,8,9
1
1
0 09APR13
09APR13
78
85
BUNKER #10,11,12,13 FPR-0016
Layout for Bunker #10,11,12,13
1
0
100 31DEC12A
31DEC12A
FPR-0017
Casting for Bunker #10,11,12,13
10
0
100 31DEC12A
03J AN13A
FPR-0018
Construct Bunker #10,11,12,13
4
0
100 06J AN13A
FPR-0019
Cmplt Sandbag & T.Barriers of B.#10,11,12,13
6
6
25 18MAR13A
07APR13
78
FPR-0020
Test & Completion of Bunker#10,11,12,13
1
1
0 08APR13
08APR13
78
14J AN13A
BUNKER #14,15,16,17 FPR-0021
Layout for Bunker #14,15,16,17
1
0
100 31DEC12A
31DEC12A
FPR-0022
Casting for Bunker #14,15,16,17
10
0
100 31DEC12A
06J AN13A
Start Date Finish Date Data Date Run Date
26J UL11 05SEP13 01APR13 13APR13 10:09
Early Bar Progress Bar Critical Activity
PS19
FCEC UIProjects J V W5J 9J R-10-D-0005-0006 ANA Gardez Project Management Layout
Sheet 7 of 38 Date
Revision
Checked
Approved
Acti vity ID
Acti vity Description
Orig Dur
Rem Dur
%
Early Start
2011 2012 2013 J A S O N D J F M A M J J A S O N D J F M A M J J A S
Total Float
FPR-0023
Construct Bunker #14,15,16,17
4
0
FPR-0024
Cmplt Sandbag & T.Barriers of B. #14,15,16,17
6
6
0 01APR13
07APR13
79
FPR-0025
Test & Completion of Bunker #14,15,16,17
1
1
0 09APR13
09APR13
78
FPR-0026
Layout for Bunker #18,19,20,21
1
0
100 10DEC12A
11DEC12A
FPR-0027
Casting for Bunker #18,19,20,21
10
0
100 12DEC12A
22DEC12A
FPR-0028
Construct Bunker #18,19,20,21
4
0
100 23DEC12A
14J AN13A
FPR-0029
Cmplt Sandbag & T.Barriers of B.#18,19,20,21
6
6
25 18MAR13A
07APR13
79
FPR-0030
Test & Completion of Bunker#18,19,20,21
1
1
0 08APR13
08APR13
79
FPR-0031
Layout for Bunker #22,23,24,25
1
0
100 10DEC12A
11DEC12A
FPR-0032
Casting for Bunker #22,23,24,25
10
0
100 12DEC12A
23DEC12A
FPR-0033
Construct Bunker #22,23,24,25
4
0
100 24DEC12A
14J AN13A
FPR-0034
Cmplt Sandbag & T.Barriers of B.#22,23,24,25
6
6
25 18MAR13A
07APR13
79
FPR-0035
Test & Completion of Bunker#22,23,24,25
1
1
0 08APR13
08APR13
79
FPR-0036
Area Layout for ECP
1
0
100 12MAY12A
12MAY12A
FPR-0044
ECP Construct Main Drop Gate
7
0
100 19MAY12A
25MAY12A
FPR-0037
ECP FDN Works
8
0
100 02J UN12A
09J UN12A
FPR-0038
Slab on Grade Work for ECP
12
0
100 12AUG12A
28AUG12A
FPR-0039
CMU Wall&Slab Work for ECP
14
0
100 15AUG12A
28AUG12A
FPR-0040
ECP Plaster & Insulation
15
0
100 10NOV12A
17MAR13A
FPR-0042
ECP Internal & External Paint
10
10
50 14J AN13A
10APR13
86
FPR-0041
ECP Install Doors & Windows
4
4
0 01APR13
04APR13
82
FPR-0043
ECP Install Barriers
12
12
0 05APR13
16APR13
82
FPR-0045
Test & Completion for ECP
2
2
0 17APR13
18APR13
82
FPR-0046
Area Layout for Wall
1
0
100 01APR12A
12MAY12A
FPR-0047
Excavation for Wall
8
0
100 03APR12A
12MAY12A
FPR-0048
Wall Backfilling/Compaction
7
0
95 12APR12A
31MAR13
FPR-0049
Wall PCC Works
5
0
100 14MAY12A
12SEP12A
FPR-0050
Wall Masonary Work
18
18
96 14MAY12A
18APR13
FPR-0051
Wall Copping
18
0
100 13SEP12A
FPR-0052
Wall-Install Concertina Wire
15
15
75 10NOV12A
15APR13
80
FPR-0053
Wall-Test & Completion
5
5
0 16APR13
20APR13
80
FPR-0054
FPs Layout
1
0
100 12MAY12A
12MAY12A
FPR-0055
FPs Excavation
4
0
100 13MAY12A
13J AN13A
FPR-0057
FPs HESCO Installation
14
0
100 28MAY12A
09J AN13A
FPR-0056
FPs Backfilling & Compaction
5
0
100 11SEP12A
14J AN13A
FPR-0058
FPs Sand Bag
9
9
Start Date Finish Date Data Date Run Date
26J UL11 05SEP13 01APR13 13APR13 10:09
Early Bar Progress Bar Critical Activity
PS19
100 06J AN13A
Early Finish
0 01APR13
14J AN13A
69 80
31MAR13A
09APR13
FCEC UIProjects J V W5J 9J R-10-D-0005-0006 ANA Gardez Project Management Layout
89 Sheet 8 of 38 Date
Revision
Checked
Approved
Acti vity ID
FPR-0059
Acti vity Description
Orig Dur
FPs Test & Completion
Rem Dur
2
%
2
Early Start
Early Finish
0 10APR13
11APR13
2011 2012 2013 J A S O N D J F M A M J J A S O N D J F M A M J J A S
Total Float
89
Guard Tower FPR-0060
GT - Layout
1
0
100 08APR12A
10MAY12A
FPR-0061
GT - Excavation
4
0
100 12MAY12A
15MAY12A
FPR-0063
GT - Foundation & Ring Beam Works
10
0
100 12MAY12A
22MAY12A
FPR-0062
GT - Watering, Backfilling & Compaction
5
0
100 14MAY12A
19MAY12A
FPR-0064
GT - Formwork & RFT for Slab on Grade
15
0
100 18J UN12A
05J UL12A
FPR-0065
GT - Concrete Works for Slab on Grade
7
0
100 23J UN12A
02J UL12A
FPR-0066
GT - Installation of CMU Wall&Slab
10
0
100 13SEP12A
20DEC12A
FPR-0067
GT - Plaster and Insulation
15
15
65 10FEB13A
17APR13
63
FPR-0068
GT - Electrical Works
8
8
80 18FEB13A
09APR13
63
FPR-0070
GT - Internal & External Painting
10
10
70 27FEB13A
11APR13
67
FPR-0069
GT - Bitumens&Corregated Sheets Inst.
6
6
0 10APR13
16APR13
63
FPR-0071
GT - Door&Windows Installation
4
4
0 17APR13
21APR13
63
FPR-0072
GT - Test & Commissioning
1
1
0 22APR13
22APR13
63
FPR-0073
GT - Punch list Correction
4
4
0 23APR13
27APR13
63
Trash Collection Point Trash Collect ion Point #1,2,3,4,5 TCP-0001
TPT#1 - Construct
14
14
80 06MAY12A
16APR13
67
TCP-0002
TPT#1 - Install Fence
4
4
0 17APR13
21APR13
67
TCP-0003
TPT#1 - Inspection
1
1
0 22APR13
22APR13
67
Trash Collection Point #6,7,8,9 TCP-0004
TPT#2 - Construct
14
14
80 07MAY12A
16APR13
67
TCP-0005
TPT#2 - Install Fence
4
4
0 17APR13
21APR13
67
TCP-0006
TPT#2 - Inspection
1
1
0 22APR13
22APR13
67
Trash Collect ion Point #10,11,12 TCP-0007
TPT#3 - Construct
14
14
80 08MAY12A
16APR13
67
TCP-0008
TPT#3 - InstalI Fence
4
4
0 17APR13
21APR13
67
TCP-0009
TPT#3 - Inspection
1
1
0 22APR13
22APR13
67
Trash Collect ion Point #13,14,15 TCP-0010
TPT#4 - Construct
14
14
80 08MAY12A
16APR13
67
TCP-0011
TPT#4 - Install Fence
4
4
0 17APR13
21APR13
67
TCP-0012
TPT#4 - Inspection
1
1
0 22APR13
22APR13
67
1
0
100 12MAY12A
Cover Walkway for Corps Headquarters Foundations CWW-0001 CW- Layout Start Date Finish Date Data Date Run Date
26J UL11 05SEP13 01APR13 13APR13 10:09
Early Bar Progress Bar Critical Activity
PS19
12MAY12A
FCEC UIProjects J V W5J 9J R-10-D-0005-0006 ANA Gardez Project Management Layout
Sheet 9 of 38 Date
Revision
Checked
Approved
Acti vity ID
Acti vity Description
Orig Dur
Rem Dur
%
Early Start
Early Finish
2011 2012 2013 J A S O N D J F M A M J J A S O N D J F M A M J J A S
Total Float
CWW-0002 CW- Excavation
7
0
100 13MAY12A
CWW-0003 CW- Watering, Backfilling & Compaction
4
4
25 20MAY12A
04APR13
36
CWW-0004 CW- Graveling
7
7
0 06APR13
13APR13
36
10
10
0 14APR13
24APR13
36
10
10
0 25APR13
06MAY13
36
8
8
0 07MAY13
15MAY13
36
CWW-0010 CW- Test & Commission
2
2
0 16MAY13
18MAY13
36
CWW-0011 CW- Punchlist Correction
8
8
0 19MAY13
27MAY13
36
CWW-0012 CW- Finish and Handover
1
1
0 28MAY13
28MAY13
36
CWW-0005 CW- Foundation & Ring Beam
03OCT12A
Superstru cture & Close-in CWW-0008 CW- Column Installation
Archi tect ural - Exter ior CWW-0009 CW- Corregated Sheet Inst.
Inspections, Punchlists
Bleacher Enclosures Bleacher #1 OTH-0001
Bleacher #1- Layout
1
0
100 14MAY12A
OTH-0002
Bleacher #1 - Construct FDN
15
0
100 15MAY12A
14MAY12A 18J UL12A
OTH-0004
Bleacher #1- Construct COL
12
0
100 03J UN12A
18J UL12A
OTH-0005
Bleacher #1-Construct Stairs
12
0
100 07J UN12A
18J UL12A
OTH-0006
Bleacher #1- Install CORR Sheet
12
0
100 14AUG12A
30AUG12A
OTH-0003
Bleacher #1- Slab on Grade
18
2
90 18NOV12A
02APR13
76
OTH-0010
Bleacher #1 Test & Commission
2
2
0 03APR13
04APR13
76
OTH-0011
Bleacher #1 Punchlist Correction
5
5
0 06APR13
10APR13
76
OTH-0012
Bleacher #1 Finish and Handover
1
1
0 11APR13
11APR13
76
Bleacher #2 OTH-0013
Bleacher #2- Layout
1
0
100 14MAY12A
25J UN12A
OTH-0014
Bleacher #2 - Construct FDN
15
0
100 26J UN12A
17J UL12A
OTH-0015
Bleacher #2- Slab on Grade
18
18
0 01APR13
21APR13
48
OTH-0016
Bleacher #2- Construct COL
12
12
0 10APR13
23APR13
48
OTH-0017
Bleacher #2-Construct Stairs
12
12
0 17APR13
30APR13
48
OTH-0018
Bleacher #2- Install CORR Sheet
12
12
0 22APR13
05MAY13
48
OTH-0019
Bleacher #2 Test & Commission
2
2
0 06MAY13
07MAY13
48
OTH-0020
Bleacher #2 Punchlist Correction
5
5
0 08MAY13
13MAY13
48
OTH-0021
Bleacher #2 Finish and Handover
1
1
0 14MAY13
14MAY13
48
Start Date Finish Date Data Date Run Date
26J UL11 05SEP13 01APR13 13APR13 10:09
Early Bar Progress Bar Critical Activity
PS19
FCEC UIProjects J V W5J 9J R-10-D-0005-0006 ANA Gardez Project Management Layout
Sheet 10 of 38 Date
Revision
Checked
Approved
Acti vity ID
Acti vity Description
Orig Dur
Rem Dur
%
Early Start
Early Finish
2011 2012 2013 J A S O N D J F M A M J J A S O N D J F M A M J J A S
Total Float
Utilities Water Supply and Dist ribution System Water Distribut ion WSD-0004 Layout for Water Pipes
1
0
100 07APR12A
10J AN13A
WSD-0005 Excavation for Water Pipes
8
8
96 25J UN12A
09APR13
66
WSD-0006 Lay Site Water Pipes
10
10
90 04J UL12A
11APR13
66
WSD-0008 Construction of Water Manholes
12
12
70 09J UL12A
14APR13
66
WSD-0009 Test & Completion for W Pipes
10
10
60 05OCT12A
11APR13
70
2
2
80 02DEC12A
16APR13
66
WSD-0007 Check W Pipes & Backfill WSD-0010 Punchlist Correction - W Pipes
5
5
0 17APR13
22APR13
66
WSD-0011 Finish and Handover - W Pipes
1
1
0 23APR13
23APR13
66
Sanitary Sewer System Sewage Collection SSS-0001
Layout for Sewer Pipes
1
0
100 04APR12A
21J UN12A
SSS-0002
Excavation for Sewer Pipe
8
8
97 07APR12A
09APR13
62
SSS-0003
Install Sewer Pipes
10
10
96 13MAY12A
11APR13
62
SSS-0004
Checking & Backfill Sewer Pipe
10
10
96 18J UN12A
11APR13
62
SSS-0005
Construction of Sewer Manholes
18
18
83 27J UN12A
21APR13
62
SSS-0006
Test & Completion - Sewer Pipe
18
18
75 05OCT12A
21APR13
62
SSS-0007
Correct Punchlist - Sewer Pipe
5
5
0 22APR13
27APR13
62
SSS-0008
Finish & Handover - Sewer Pipe
1
1
0 28APR13
28APR13
62
Site Electrical Distribu tion Network Power Distri bution ELE-0015
Layout for ELECT Pipes
2
0
100 07APR12A
ELE-0016
Excavation for ELECT Pipes
6
6
96 09APR12A
07APR13
16MAY12A 35
ELE-0018
Lay Electrical Pipes
10
10
80 06MAY12A
11APR13
35
ELE-0019
Concrete Work for Duct Bank
12
12
91 18J UN12A
14APR13
35
ELE-0024
Checking & Backfill Elect Pipes
10
10
93 20J UN12A
11APR13
42
ELE-0017
Electrical Manholes
20
20
90 23J UN12A
23APR13
42
ELE-0020
Electrical Cable Pulling
15
15
0 15APR13
01MAY13
35
ELE-0021
Test & Commission
4
4
0 02MAY13
06MAY13
47
ELE-0022
Puchlist Correction
5
5
0 07MAY13
12MAY13
49
ELE-0023
Finish and Handover
1
1
0 13MAY13
13MAY13
49
Power Generation Emergency Generator f or Headquarter ELE-0009
Install Emergncy Generator
ELE-0010
Install Control Panel for Generator
ELE-0011 ELE-0012 Start Date Finish Date Data Date Run Date
9
9
0 05J UN13
15J UN13
6
12
12
0 10J UN13
23J UN13
6
Test & Commission
2
2
0 24J UN13
25J UN13
6
Puchlist Correction
5
5
0 26J UN13
01J UL13
6
26J UL11 05SEP13 01APR13 13APR13 10:09
Early Bar Progress Bar Critical Activity
PS19
FCEC UIProjects J V W5J 9J R-10-D-0005-0006 ANA Gardez Project Management Layout
Sheet 11 of 38 Date
Revision
Checked
Approved
Acti vity ID
ELE-0013
Acti vity Description
Orig Dur
Finishing & Handover
Rem Dur
1
%
Early Start
1
0 02J UL13
Early Finish
2011 2012 2013 J A S O N D J F M A M J J A S O N D J F M A M J J A S
Total Float
02J UL13
6
Site Communication System
COM-0001 Layout for Communication SYS
1
0
100 13MAY12A
COM-0002 Excavation for Conduits
7
5
90 16MAY12A
06APR13
17
17
80 20J UN12A
20APR13
62
9
5
80 11OCT12A
06APR13
74
COM-0005 Construct Communication Manholes COM-0003 Install Counduits
15MAY12A 62
COM-0004 Backfilling & Compaction
3
5
75 18OCT12A
06APR13
74
COM-0006 Testing & Completion - Com Sys
2
2
0 21APR13
22APR13
62
COM-0007 Punchlist Correction - Com Sys
4
4
0 23APR13
27APR13
62
COM-0008 Finish & Handover - Com Sys
1
1
0 28APR13
28APR13
62
Buildings Arms Sto rage Bui ldings #100 Foundations AB1-0001
100 S.ASB - Layout
1
0
100 01J AN12A
02J AN12A
AB1-0002
100 S.ASB - Excavation Work
6
0
100 03J AN12A
12J AN12A
AB1-0003
100 S.ASB - Concrete Work for Footings
9
0
100 05J UN12A
14J UN12A
AB1-0004
100 S.ASB - Under Ground Electrical Works
6
0
100 09J UN12A
17J UN12A
AB1-0005
100 S.ASB - Backfilling/Capillary Water Barrier
3
0
100 16J UN12A
14J UL12A
AB1-0006
100 S.ASB - Slab on Grade
6
0
100 13SEP12A
19SEP12A
Superstru cture & Close-in AB1-0008
100 S.ASB - Construction of Shear walls
10
0
100 15OCT12A
25OCT12A
AB1-0007
100 S.ASB - Construction of CMU Walls
10
0
100 10NOV12A
20NOV12A
AB1-0012
100 S.ASB - Steel J oists, Welding Plate& Purlins
6
6
0 01APR13
07APR13
52
02APR13
67
Archi tect ural - Exter ior AB1-0010
100 S.ASB - Exterior Door Installation
2
2
90 10FEB13A
AB1-0014
100 S.ASB - Roof insullation
8
0
100 20MAR13A
AB1-0015
100 S.ASB - External Paint
12
4
60 27MAR13A
04APR13
65
AB1-0013
100 S.ASB - Seam Metal Roof (Corr. Sheet)
6
6
0 14APR13
20APR13
52
28MAR13A
Archi tect ural - Int erio r AB1-0016
100 S.ASB - Plastering
10
0
100 29NOV12A
AB1-0017
100 S.ASB - Internal Painting
10
4
80 27FEB13A
04APR13
30NOV12A 65
AB1-0018
100 S.ASB - Conduits & Fittings
10
4
90 01DEC12A
04APR13
63
AB1-0019
100 S.ASB - Electrical Wiring Works
10
4
50 28MAR13A
04APR13
63
AB1-0020
100 S.ASB - Lighting Fix ,Cover Plates Inst.
1
1
0 06APR13
06APR13
63
Electrical
Start Date Finish Date Data Date Run Date
26J UL11 05SEP13 01APR13 13APR13 10:09
Early Bar Progress Bar Critical Activity
PS19
FCEC UIProjects J V W5J 9J R-10-D-0005-0006 ANA Gardez Project Management Layout
Sheet 12 of 38 Date
Revision
Checked
Approved
Acti vity ID
AB1-0022
Acti vity Description
Orig Dur
100 S.ASB - Panel Boards
Rem Dur
5
%
Early Start
Early Finish
5
0 20J UL13
24J UL13
2011 2012 2013 J A S O N D J F M A M J J A S O N D J F M A M J J A S
Total Float
-25
Mechanical AB1-0024
100 S.ASB - Electric Heater Install
4
4
80 28MAR13A
04APR13
65
AB1-0021
100 S.ASB - Exhaust Fans install
1
1
0 07APR13
07APR13
63
-25
Inspections, Punchlists AB1-0023
100 S.ASB - Test & Commission
2
2
0 25J UL13
27J UL13
AB1-0025
100 S.ASB - Punchlist Works
5
5
0 28J UL13
03AUG13
-25
AB1-0026
100 S.ASB - Finishing & Handover
1
1
0 04AUG13
04AUG13
-25
Arms Sto rage Bui ldings #101 Foundations AB2-0001
101 S.ASB - Layout
1
0
100 04APR12A
07APR12A
AB2-0002
101 S.ASB - Excavation Work
4
0
100 05APR12A
09APR12A
AB2-0003
101 S.ASB - Concrete Work for Footings
9
0
100 21APR12A
02MAY12A
AB2-0004
101 S.ASB - Backfilling/Capillary Water Barrier
6
0
100 14MAY12A
20MAY12A
AB2-0006
101 S.ASB - Slab On Grade
6
0
100 23MAY12A
02J UL12A
AB2-0005
101 S.ASB - Under Ground Electrical Works
6
0
100 21J UN12A
16J UL12A
Superstru cture & Close-in AB2-0007
101 S.ASB - Construction of CMU Walls
10
0
100 03J UL12A
17J UL12A
AB2-0008
101 S.ASB - Construction of Shear walls
10
0
100 05J UL12A
17J UL12A
AB2-0009
101 S.ASB - Steel J oists, Welding Plate& Purlins
7
7
90 18MAR13A
08APR13
61
Archi tect ural - Exter ior AB2-0012
101 S.ASB - External Paint
12
0
100 15OCT12A
AB2-0010
101 S.ASB - Roof insulation
10
7
75 09MAR13A
23J AN13A 08APR13
AB2-0011
101 S.ASB - Seam Metal Roof (Corr. Sheet)
7
7
85 28MAR13A
08APR13
61
AB2-0013
101 S.ASB - Ext Door Installation
8
8
0 01APR13
09APR13
61
61
Archi tect ural - Int erio r AB2-0014
101 S.ASB - Plastering
10
0
100 30SEP12A
AB2-0015
101 S.ASB - Internal Painting
10
7
90 01NOV12A
08APR13
09OCT12A 61
AB2-0016
101 S.ASB - Conduits & Fittings
10
7
95 01DEC12A
08APR13
61
AB2-0017
101 S.ASB - Electrical Wiring Works
10
7
95 01J AN13A
08APR13
61
AB2-0018
101 S.ASB - Lighting Fix ,Cover Plates Inst
7
7
10 05FEB13A
08APR13
61
AB2-0019
101 S.ASB - Panel Boards
9
9
0 20J UL13
29J UL13
-25
Electrical
Start Date Finish Date Data Date Run Date
26J UL11 05SEP13 01APR13 13APR13 10:09
Early Bar Progress Bar Critical Activity
PS19
FCEC UIProjects J V W5J 9J R-10-D-0005-0006 ANA Gardez Project Management Layout
Sheet 13 of 38 Date
Revision
Checked
Approved
Acti vity ID
Acti vity Description
Orig Dur
Rem Dur
%
Early Start
Early Finish
2011 2012 2013 J A S O N D J F M A M J J A S O N D J F M A M J J A S
Total Float
Mechanical AB2-0021
101 S.ASB - Exhaust Fans inst
AB2-0020
101 S.ASB - Electric Heater Inst
10
7
60 03J AN13A
08APR13
62
1
1
0 09APR13
09APR13
61
-25
Inspections, Punchlists AB2-0022
101 S.ASB - Test & Commission
2
2
0 30J UL13
31J UL13
AB2-0023
101 S.ASB - Punchlist Works
5
5
0 01AUG13
06AUG13
-25
AB2-0024
101 S.ASB - Finishing & Handover
1
1
0 07AUG13
07AUG13
-25
Arms Sto rage Bui ldings #102 Foundations AB3-0001
102 S.ASB - Layout
2
0
100 01J AN12A
02J AN12A
AB3-0002
102 S.ASB - Excavation Work
6
0
100 03J AN12A
09J AN12A
AB3-0003
102 S.ASB - Concrete Work for Footings
9
0
100 12MAY12A
21MAY12A
AB3-0004
102 S.ASB - Backfilling/Capillary Water Barrier
6
0
100 04J UN12A
21J UN12A
AB3-0005
102 S.ASB - Under Ground Electrical Works
6
0
100 07J UN12A
21J UN12A
AB3-0006
102 S.ASB - Slab on Grade
6
0
100 09J UN12A
23J UN12A
Superstru cture & Close-in AB3-0007
102 S.ASB - Construction of CMU Walls
10
0
100 24J UN12A
04J UL12A
AB3-0008
102 S.ASB - Construction of Shear walls
10
0
100 05J UL12A
16J UL12A
AB3-0009
102 S.ASB - Steel J oists, Welding Plate& Purlins
7
7
0 01APR13
08APR13
57
Archi tect ural - Exter ior AB3-0012
102 S.ASB - External Paint
18
0
100 01J AN13A
30J AN13A
AB3-0013
102 S.ASB - Ext Door Instalation
10
10
90 20FEB13A
16APR13
AB3-0010
102 S.ASB - Roof Insulation
12
0
100 27MAR13A
AB3-0011
102 S.ASB - Seam Metal Roof (Corr. Sheet)
8
8
0 09APR13
57
29MAR13A 17APR13
57
Archi tect ural - Int erio r AB3-0014
102 S.ASB - Plastering
10
0
100 28OCT12A
AB3-0015
102 S.ASB - Internal Painting
10
10
90 10DEC12A
20NOV12A 11APR13
57
67
Electrical AB3-0016
102 S.ASB - Conduits & Fittings
4
4
90 10NOV12A
04APR13
AB3-0017
102 S.ASB - Electrical Wiring Works
8
4
90 20FEB13A
04APR13
67
AB3-0018
102 S.ASB - Lighting Fix ,Cover Plates Inst
1
1
0 04APR13
04APR13
67
AB3-0019
102 S.ASB - Panel Boards
2
2
0 19J UN13
20J UN13
4
1
1
0 17APR13
17APR13
57
Mechanical AB3-0021 Start Date Finish Date Data Date Run Date
102 S.ASB - Exhaust Fans Inst 26J UL11 05SEP13 01APR13 13APR13 10:09
Early Bar Progress Bar Critical Activity
PS19
FCEC UIProjects J V W5J 9J R-10-D-0005-0006 ANA Gardez Project Management Layout
Sheet 14 of 38 Date
Revision
Checked
Approved
Acti vity ID
AB3-0020
Acti vity Description
Orig Dur
102 S.ASB - Electric Heater Inst
Rem Dur
%
Early Start
Early Finish
2011 2012 2013 J A S O N D J F M A M J J A S O N D J F M A M J J A S
Total Float
1
1
0 18J UN13
18J UN13
4
4
Inspections, Punchlists AB3-0022
102 S.ASB - Test & Commission
2
2
0 22J UN13
23J UN13
AB3-0023
102 S.ASB - Punchlist Works
5
5
0 24J UN13
29J UN13
4
AB3-0024
102 S.ASB - Finishing & Handover
1
1
0 30J UN13
30J UN13
4
Arms Sto rage Bui ldings #103 Foundations AB4-0001
103 S.ASB - Layout
1
0
100 02J AN12A
02J AN12A
AB4-0002
103 S.ASB - Excavation Work
6
0
100 03J AN12A
09J AN12A
AB4-0003
103 S.ASB - Concrete Work for Footings
4
0
100 14J AN12A
20MAY12A
AB4-0004
103 S.ASB - Backfilling/Capillary Water Barrier
6
0
100 03J UN12A
23J UN12A
AB4-0005
103 S.ASB - Under Ground Electrical Works
6
0
100 06J UN12A
23J UN12A
AB4-0006
103 S.ASB - Slab on Grade
6
0
100 12J UN12A
23J UN12A
Superstru cture & Close-in AB4-0007
103 S.ASB - Construction of CMU Walls
15
0
100 24J UN12A
10J UL12A
AB4-0008
103 S.ASB - Construction of Shear walls
18
0
100 11J UL12A
30J UL12A
AB4-0009
103 S.ASB - Steel J oists, Welding Plate& Purlins
10
10
0 01APR13
11APR13
50
Archi tect ural - Exter ior AB4-0012
103 S.ASB - External Paint
AB4-0013
103 S.ASB - Ext Door Installation
AB4-0010
103 S.ASB - Roof insullation
AB4-0011
103 S.ASB - Seam Metal Roof (Corr. Sheet)
10
2
95 18NOV12A
02APR13
60
5
5
90 21FEB13A
06APR13
57
10
10
90 27MAR13A
11APR13
49
5
5
0 13APR13
17APR13
50
Archi tect ural - Int erio r AB4-0014
103 S.ASB - Plastering
10
0
100 18SEP12A
AB4-0015
103 S.ASB - Internal Painting
10
5
90 04DEC12A
28SEP12A 06APR13
57
Electrical AB4-0017
103 S.ASB - Electrical Wiring Works
12
12
95 03J AN13A
14APR13
47
AB4-0016
103 S.ASB - Conduits & Fittings
10
10
90 10J AN13A
11APR13
49
AB4-0018
103 S.ASB - Lighting Fix ,Cover Plates Inst
2
2
0 15APR13
16APR13
47
AB4-0019
103 S.ASB - Panel Boards
9
9
0 23J UN13
02J UL13
-6
Mechanical AB4-0021
103 S.ASB - Exhaust Fans Inst
1
1
0 17APR13
17APR13
47
AB4-0020
103 S.ASB - Electric Heater Inst
1
1
0 18J UN13
18J UN13
-6
Start Date Finish Date Data Date Run Date
26J UL11 05SEP13 01APR13 13APR13 10:09
Early Bar Progress Bar Critical Activity
PS19
FCEC UIProjects J V W5J 9J R-10-D-0005-0006 ANA Gardez Project Management Layout
Sheet 15 of 38 Date
Revision
Checked
Approved
Acti vity ID
Acti vity Description
Orig Dur
Rem Dur
%
Early Start
Early Finish
2011 2012 2013 J A S O N D J F M A M J J A S O N D J F M A M J J A S
Total Float
Inspections, Punchlists AB4-0022
103 S.ASB - Test & Commission
2
2
0 03J UL13
04J UL13
AB4-0023
103 S.ASB - Punchlist Works
5
5
0 06J UL13
10J UL13
-6 -6
AB4-0024
103 S.ASB - Finishing & Handover
1
1
0 11J UL13
11J UL13
-6
Arms Sto rage Bui ldings #104 Foundations AB5-0001
104 S.ASB - Layout
1
0
100 01APR12A
01APR12A
AB5-0002
104 S.ASB - Excavation Work
5
0
100 02APR12A
07APR12A
AB5-0003
104 S.ASB - Concrete Work for Footings
AB5-0004
104 S.ASB - Backfilling/Capillary Water Barrier
AB5-0006
104 S.ASB - Slab on Grade
AB5-0005
104 S.ASB - Under Ground Electrical Works
12
0
100 14APR12A
20MAY12A
6
0
100 03J UN12A
27J UN12A
10
0
100 05J UN12A
30J UN12A
6
0
100 06J UN12A
26J UN12A
Superstru cture & Close-in AB5-0008
104 S.ASB - Construction of Shear walls
10
0
100 01J UL12A
12J UL12A
AB5-0007
104 S.ASB - Construction of CMU Walls
10
0
100 14AUG12A
27AUG12A
AB5-0009
104 S.ASB - Steel J oists, Welding Plate& Purlins
8
8
0 01APR13
13
10
70 03FEB13A
11APR13
57
6
6
90 20FEB13A
07APR13
62
12
10
90 27MAR13A
11APR13
57
6
6
0 10APR13
16APR13
54
09APR13
54
Archi tect ural - Exter ior AB5-0012
104 S.ASB - External Paint
AB5-0013
104 S.ASB - Ext Door Installation
AB5-0010
104 S.ASB - Roof Insulation
AB5-0011
104 S.ASB - Seam Metal Roof (Corr. Sheet)
Archi tect ural - Int erio r AB5-0014
104 S.ASB - Plastering
15
0
100 26NOV12A
AB5-0015
104 S.ASB - Internal Painting
15
6
90 10DEC12A
07APR13
05DEC12A
AB5-0016
104 S.ASB - Conduits & Fittings
10
0
100 10DEC12A
20FEB13A
AB5-0017
104 S.ASB - Electrical Wiring Works
10
10
95 21FEB13A
11APR13
57
AB5-0018
104 S.ASB - Lighting Fix ,Cover Plates Inst
10
10
95 22FEB13A
11APR13
57
AB5-0019
104 S.ASB - Panel Boards
6
6
0 19J UN13
25J UN13
0
62
Electrical
Mechanical AB5-0020
104 S.ASB - Electric Heater Inst
1
1
0 13APR13
13APR13
57
AB5-0021
104 S.ASB - Exhaust Fans inst
1
1
0 18J UN13
18J UN13
0
2
2
0 26J UN13
27J UN13
0
Inspections, Punchlists AB5-0022 Start Date Finish Date Data Date Run Date
104 S.ASB - Test & Commission 26J UL11 05SEP13 01APR13 13APR13 10:09
Early Bar Progress Bar Critical Activity
PS19
FCEC UIProjects J V W5J 9J R-10-D-0005-0006 ANA Gardez Project Management Layout
Sheet 16 of 38 Date
Revision
Checked
Approved
Acti vity ID
Acti vity Description
Orig Dur
Rem Dur
%
Early Start
Early Finish
2011 2012 2013 J A S O N D J F M A M J J A S O N D J F M A M J J A S
Total Float
Mechanical GFC-0029
Nrth Prt Exhaust Fan Installation
10
10
40 27MAR13A
29J UN13
GFC-0030
Nrth Prt Unit Heater Installation
10
10
10 28MAR13A
29J UN13
1 1
GFC-0031
Nrth Prt AC Split Installation
10
10
0 30APR13
11MAY13
43
GFC-0032
Nrth Prt Hot & Cold Water Piping
15
15
25 01DEC12A
17APR13
44
GFC-0034
Nrth Prt Toilet & Misc.Accessories
4
4
0 18APR13
22APR13
44
GFC-0033
Nrth Prt Toilet Sanitry Fixture Installation
15
15
0 23APR13
09MAY13
44
Plumbing
Fire Protection System GFC-0035
Nrth Prt Smoke Detector Installation
1
1
10 29MAR13A
02APR13
83
GFC-0036
Nrth Prt Fire Extinguisher Installation
1
1
0 18J UN13
18J UN13
10
15
15
35 02J AN13A
17APR13
63
-21
Communications GFC-0037
Nrth Prt Telephone and Data wall recepticle Inst
Inspections, Punchlists GFC-0038
Nrth Prt Test & Commission
2
2
0 25J UL13
27J UL13
GFC-0039
Nrth Prt Punchlist Works
5
5
0 28J UL13
01AUG13
-21
GFC-0040
Nrth Prt Finishing & Handover
1
1
0 03AUG13
03AUG13
-21
Corps Headquarters (West) Foundations GFC-0042
West Prt GFCC Building Layout
1
0
100 07APR12A
07APR12A
GFC-0043
West Prt GFCC Excavation
4
0
100 14MAY12A
17MAY12A
GFC-0044
West Prt GFCC Watering, Backfilling & Compaction
5
0
100 20MAY12A
16J UN12A
GFC-0047
West Prt GFCC Formwork & RFT for Slab on Grade
14
0
100 18J UN12A
12J UL12A
GFC-0048
West Prt San Sewer Piping under Slab on Grade
5
0
100 21J UN12A
14AUG12A
GFC-0045
West Prt GFCC Foundation & Ring Beam Works
15
0
100 21J UN12A
12SEP12A
GFC-0046
West Prt GFCC BKFLNG, CMPCTN, CAP. & Vap. Bars
5
0
100 25J UN12A
12J UL12A
GFC-0049
West Prt Concrete Works for Slab on Grade
6
0
100 14J UL12A
15NOV12A
Superstru cture & Close-in GFC-0050
West Prt Installation of Shear Walls
GFC-0051
West Prt Installation of 3D Panels Walls
GFC-0052
West Prt Scaffolding for 3D Roof Slab
3
0
100 25SEP12A
12DEC12A
GFC-0053
West Prt Instalaltion of 3D Panels Roof Slabs
10
0
100 28SEP12A
12DEC12A
GFC-0054
West Prt Shotcreting for 3D Panels Roof & Walls
10
3
85 03OCT12A
03APR13
GFC-0055
West Prt Pouring Concrete on Roof
10
0
100 06OCT12A
13J AN13A
GFC-0073
West Prt Truss Installation
12
12
75 13DEC12A
14APR13
Start Date Finish Date Data Date Run Date
26J UL11 05SEP13 01APR13 13APR13 10:09
Early Bar Progress Bar Critical Activity
8
0
100 17J UL12A
22SEP12A
15
0
100 04AUG12A
12DEC12A
PS19
FCEC UIProjects J V W5J 9J R-10-D-0005-0006 ANA Gardez Project Management Layout
50 53 Sheet 18 of 38 Date
Revision
Checked
Approved
Acti vity ID
Acti vity Description
Orig Dur
Rem Dur
%
Early Start
Early Finish
2011 2012 2013 J A S O N D J F M A M J J A S O N D J F M A M J J A S
Total Float
Archi tect ural - Exter ior GFC-0058
West Prt Exterior Doors Installation
10
10
40 01DEC12A
11APR13
GFC-0056
West Prt Cold Asphalt Damp Proofing
15
0
100 13DEC12A
27J AN13A
68
GFC-0057
West Prt Corregated Sheet Installation for 3D
12
10
67 13FEB13A
11APR13
68
GFC-0059
West Prt Window Installation
10
10
50 14FEB13A
11APR13
68
GFC-0060
West Prt External Painting
15
10
30 27FEB13A
11APR13
68
GFC-0085
West Prt Corregated Sheet Installation for Truss
12
12
50 27MAR13A
14APR13
53
Archi tect ural - Int erio r GFC-0062
West Prt Plaster Works
15
10
80 21NOV12A
11APR13
55
GFC-0063
West Prt Interior Doors Installation
10
10
36 28J AN13A
11APR13
60
GFC-0064
West Prt Internal Painting
15
10
55 01FEB13A
11APR13
60
GFC-0084
West Prt Glass Wool Insulation
12
12
70 28MAR13A
14APR13
53
GFC-0061
West Prt Terrazzo Tiles
15
15
0 04APR13
21APR13
50
GFC-0086
West Prt False Ceiling
15
15
0 01APR13
17APR13
53
GFC-0065
West Prt Sealed Concrete
7
7
0 20J UL13
27J UL13
-23
Electrical GFC-0066
West Prt Elec PVC Conduits & Fittings & Boxes
GFC-0068
West Prt Duplex and switch installation
5
0
100 01J AN13A
10
10
45 03J AN13A
GFC-0067
23MAR13A 11APR13
West Prt Electrical Wiring Works
5
5
50 10J AN13A
06APR13
65
GFC-0069
West Prt Lighting Fix. & Cover Plates Inst
2
2
0 22APR13
23APR13
50
GFC-0070
West Prt Panel Board Installation
5
5
0 20J UL13
24J UL13
-23
68
Mechanical GFC-0071
West Prt AC Split Installation
1
1
0 18J UN13
18J UN13
10
GFC-0072
West Prt Exhaust Fan Installation
1
1
0 18J UN13
18J UN13
10
GFC-0074
West Prt Hot & Cold Water Piping
15
15
25 01DEC12A
17APR13
55
GFC-0075
West Prt Kitchen & Misc.Accessories
5
5
0 18APR13
23APR13
57
GFC-0076
West Prt Kithen Fixture Installation
8
8
0 18APR13
27APR13
55
Plumbing
Fire Protection System GFC-0077
West Prt Smoke Detector Installation
1
1
0 23APR13
23APR13
58
GFC-0078
West Prt Fire Extinguisher Installation
1
1
0 18J UN13
18J UN13
10
15
15
40 02J AN13A
17APR13
63
Communications GFC-0079
Start Date Finish Date Data Date Run Date
West Prt Tele and Data wall receptacle Insta
26J UL11 05SEP13 01APR13 13APR13 10:09
Early Bar Progress Bar Critical Activity
PS19
FCEC UIProjects J V W5J 9J R-10-D-0005-0006 ANA Gardez Project Management Layout
Sheet 19 of 38 Date
Revision
Checked
Approved
Acti vity ID
Acti vity Description
Orig Dur
Rem Dur
%
Early Start
Early Finish
2011 2012 2013 J A S O N D J F M A M J J A S O N D J F M A M J J A S
Total Float
Inspections, Punchlists GFC-0080
West Prt Test & Commission
2
2
0 28J UL13
29J UL13
GFC-0081
West Prt Punchlist Works
5
5
0 30J UL13
04AUG13
-23 -23
GFC-0082
West Prt Finishing & Handover
1
1
0 05AUG13
05AUG13
-23
Corps Headquarters (South) Foundations GFC-0087
Sout Prt GFCC Building Layout
1
0
100 07APR12A
07APR12A
GFC-0088
Sout Prt GFCC Excavation
5
0
100 12MAY12A
16MAY12A
GFC-0089
Sout Prt GFCC Watering, Backfilling & Compaction
5
0
100 16MAY12A
16J UN12A
GFC-0092
Sout Prt GFCC Formwork & RFT for Slab on Grade
14
0
100 20J UN12A
10J UL12A
GFC-0091
Sout Prt GFCC BKFLNG, CMPCTN, CAP. & Vap. Bars
5
0
100 26J UN12A
18NOV12A
GFC-0093
Sout Prt San Sewer Piping under Slab on Grade
8
0
100 01J UL12A
11J UL12A
GFC-0090
Sout Prt GFCC Foundation & Ring Beam Works
15
0
100 14J UL12A
12SEP12A
GFC-0094
Sout Prt Concrete Works for Slab on Grade
6
0
100 16J UL12A
09J AN13A
Superstru cture & Close-in GFC-0095
Sout Prt Installation of Shear Walls
GFC-0096
Sout Prt Installation of 3D Panels Walls
8
0
100 13AUG12A
22SEP12A
15
0
100 13SEP12A
GFC-0097
Sout Prt Scaffolding for 3D Roof Slab
23J AN13A
3
0
100 25SEP12A
GFC-0098
12DEC12A
Sout Prt Instalaltion of 3D Panels Roof Slabs
12
0
100 28SEP12A
23DEC12A
GFC-0099
Sout Prt Shotcreting for 3D Panels Roof & Walls
15
12
87 13OCT12A
14APR13
GFC-0100
Sout Prt Pouring Concrete on roof
12
0
100 20OCT12A
23J AN13A
GFC-0101
Sout Prt Truss Installation
10
10
50 25MAR13A
11APR13
51
49
Archi tect ural - Exter ior GFC-0105
Sout Prt Exterior Doors Installation
12
10
10 01DEC12A
11APR13
68
GFC-0102
Sout Prt Cold Asphalt Damp Proofing
10
10
60 24FEB13A
11APR13
57
GFC-0103
Sout Prt Corregated Sheet Installation for 3D
10
10
40 25FEB13A
11APR13
61
GFC-0107
Sout PrtExternal Painting
10
10
45 26FEB13A
11APR13
68
GFC-0104
Sout Prt Corregated Sheet Installation for Truss
10
10
10 27MAR13A
23APR13
51
GFC-0106
Sout PrtWindow Installation
12
12
0 01APR13
14APR13
61
Archi tect ural - Int erio r GFC-0111
Sout Prt Interior Doors Installation
10
10
30 01DEC12A
11APR13
53
GFC-0109
Sout Prt Plaster Works
15
15
85 03DEC12A
17APR13
53
GFC-0113
Sout Prt Internal Painting
10
10
60 27FEB13A
11APR13
61
GFC-0110
Sout Prt Glass Wool Insulation
10
10
40 27MAR13A
23APR13
51
GFC-0108
Sout Prt Terrazzo Tiles
12
12
0 15APR13
28APR13
49
GFC-0112
Sout Prt False Ceiling
2
2
0 24APR13
25APR13
51
GFC-0114
Sout Prt Sealed Concrete
5
5
0 23J UL13
28J UL13
-24
Start Date Finish Date Data Date Run Date
26J UL11 05SEP13 01APR13 13APR13 10:09
Early Bar Progress Bar Critical Activity
PS19
FCEC UIProjects J V W5J 9J R-10-D-0005-0006 ANA Gardez Project Management Layout
Sheet 20 of 38 Date
Revision
Checked
Approved
Acti vity ID
Acti vity Description
Orig Dur
Rem Dur
%
Early Start
Early Finish
2011 2012 2013 J A S O N D J F M A M J J A S O N D J F M A M J J A S
Total Float
Electrical GFC-0115
Sout Prt Ele PVC Conduits & Fittings & Boxes
5
5
90 01FEB13A
07APR13
GFC-0116
Sout Prt Electrical Wiring Works
5
5
40 21FEB13A
07APR13
65 65
GFC-0118
Sout Prt Duplex and switch installation
10
10
20 28FEB13A
11APR13
77
GFC-0117
Sout Prt Lighting Fix. & Cover Plates Inst
2
2
0 13APR13
14APR13
61
GFC-0119
Sout Prt Panel Board Installation
5
5
0 20J UL13
24J UL13
-21
Mechanical GFC-0120
Sout Prt AC Split Installation
1
1
0 01APR13
01APR13
77
GFC-0121
Sout Prt Exhaust Fan Installation
1
1
0 18J UN13
18J UN13
10
GFC-0131
Sout Prt Unit Heater Installation
1
1
0 18J UN13
18J UN13
10
Plumbing GFC-0122
Sout Prt Hot & Cold Water Piping
15
15
25 01DEC12A
17APR13
53
GFC-0124
Sout Prt Toilet Sanitry Fixture Installation
3
3
0 18APR13
21APR13
55
GFC-0123
Sout Prt Toilet & Misc.Accessories
5
5
0 18APR13
23APR13
53
Fire Protection System GFC-0125
Sout Prt Smoke Detector Installation
2
2
0 18J UN13
19J UN13
6
GFC-0126
Sout Prt Fire Extinguisher Installation
2
2
0 20J UN13
22J UN13
7
3
3
38 01MAR13A
23J UN13
6
-24
Communications GFC-0127
Sout Prt Telephone and Data wall recepticle Inst
Inspections, Punchlists GFC-0128
Sout Prt Test & Commission
2
2
0 29J UL13
30J UL13
GFC-0129
Sout Prt Punchlist Works
5
5
0 31J UL13
05AUG13
-24
GFC-0130
Sout PrtFinishing & Handover
1
1
0 06AUG13
06AUG13
-24
Kandak Headquarters Foundations KAN-0001
KHQ - Layout
1
0
100 08APR12A
16J UN12A
KAN-0002
KHQ - Excavation Work
4
0
100 09APR12A
20J UN12A
KAN-0003
KHQ - Watering, Backfilling & Compaction
5
0
100 17J UN12A
21J UN12A
KAN-0004
KHQ - Foundation & Ring Beam Works
7
0
100 23J UN12A
11J UL12A
KAN-0005
KHQ - BKFLNG, CMPCTN, CAP. & Vap. Barriers
7
0
100 10J UL12A
12AUG12A
KAN-0006
KHQ - Formwork & RFT for Slab on Grade
8
0
100 16J UL12A
12AUG12A
KAN-0007
KHQ - Concrete Works for Slab on Grade
2
0
100 11NOV12A
09J AN13A
10
0
100 25J UL12A
12AUG12A
Superstru cture & Close-in KAN-0008 Start Date Finish Date Data Date Run Date
KHQ - Inst of Steel Bar for Stem Wall 26J UL11 05SEP13 01APR13 13APR13 10:09
Early Bar Progress Bar Critical Activity
PS19
FCEC UIProjects J V W5J 9J R-10-D-0005-0006 ANA Gardez Project Management Layout
Sheet 21 of 38 Date
Revision
Checked
Approved
Acti vity ID
Acti vity Description
Orig Dur
Rem Dur
%
Early Start
Early Finish
2011 2012 2013 J A S O N D J F M A M J J A S O N D J F M A M J J A S
Total Float
KAN-0009
KHQ - Concrete for Stem Walls
12
0
100 10SEP12A
09J AN13A
KAN-0010
KHQ - Installation of K Span
15
0
100 28OCT12A
26FEB13A
Archi tect ural - Exter ior KAN-0013
KHQ - Windows Installation
8
8
50 05DEC12A
09APR13
45
KAN-0011
KHQ - Ext Door Instalation
8
8
40 05J AN13A
09APR13
45
KAN-0012
KHQ - Ext Painting of Stem Wall
7
7
75 01MAR13A
08APR13
46
15
15
90 10NOV12A
17APR13
21
7
7
0 18APR13
25APR13
21
Archi tect ural - Int erio r KAN-0014
KHQ - Plaster for Stem Wall
KAN-0015
KHQ - Spray Insulation
KAN-0017
KHQ - Inst. gypsum board
10
10
0 27APR13
07MAY13
21
KAN-0016
KHQ - Inst. Suspended Ceiling
15
15
0 27APR13
13MAY13
26
KAN-0018
KHQ - Interior Doors Inst
5
5
0 08MAY13
13MAY13
21
KAN-0019
KHQ - Sealed Concrete for floor
5
5
0 21MAY13
26MAY13
26
KAN-0020
KHQ - Ele PVC Conduits/Fittings/Boxes
6
0
100 01MAR13A
KAN-0021
KHQ - Electrical Wiring Works
7
7
0 01APR13
08APR13
56
KAN-0022
KHQ - Lighting Fix.&Cover Plates Inst
6
6
0 14MAY13
20MAY13
26
KAN-0023
KHQ - Duplex & Switch Inst
8
8
0 14MAY13
22MAY13
21
KAN-0024
KHQ - Panel Board Inst
3
3
0 20J UL13
22J UL13
-23
Electrical 08MAR13A
Mechanical KAN-0026
KHQ - Exhaust Fan Inst.
2
2
0 18J UN13
19J UN13
2
KAN-0025
KHQ - AC Split Installation
3
3
0 18J UN13
20J UN13
-1
KAN-0027
KHQ - Unit Heater Inst.
2
2
0 22J UN13
23J UN13
-1
Plumbing KAN-0028
KHQ - Hot&Cold Water Piping
9
9
50 05DEC12A
11APR13
51
KAN-0029
KHQ - Toilet & Misc. Accessories
5
5
0 13APR13
17APR13
54
KAN-0030
KHQ - Toilet Sanitry Fixture Inst.
8
8
0 13APR13
21APR13
51
3
3
0 20J UN13
23J UN13
2
-23
Fire Protection System KAN-0031
KHQ - Fire Extinguisher Inst.
Inspections, Punchlists KAN-0032
KHQ - Test & Commission
2
2
0 23J UL13
24J UL13
KAN-0033
KHQ - Punchlist Works
5
5
0 25J UL13
30J UL13
-23
KAN-0034
KHQ - Finishing & Handover
1
1
0 31J UL13
31J UL13
-23
Start Date Finish Date Data Date Run Date
26J UL11 05SEP13 01APR13 13APR13 10:09
Early Bar Progress Bar Critical Activity
PS19
FCEC UIProjects J V W5J 9J R-10-D-0005-0006 ANA Gardez Project Management Layout
Sheet 22 of 38 Date
Revision
Checked
Approved
Acti vity ID
Acti vity Description
Orig Dur
Rem Dur
%
Early Start
Early Finish
2011 2012 2013 J A S O N D J F M A M J J A S O N D J F M A M J J A S
Total Float
Administration Building #109 Foundations ADM-0001
ADB 109 - Layout
2
0
100 09APR12A
10APR12A
ADM-0002
ADB 109 - Excavation Work
4
0
100 12APR12A
16APR12A
ADM-0003
ADB 109 - Watering, Backfilling & Compaction
ADM-0004
ADB 109 - Foundation & Ring Beam
ADM-0005
ADB 109 - BKFLNG, CMPCTN, CAP. & Vap. Barriers
ADM-0006
ADB 109 - Formwork & RFT for Slab on Grade
ADM-0007
ADB 109 - Concrete Works for Slab on Grade
4
0
100 16APR12A
22APR12A
10
0
100 10MAY12A
18NOV12A
8
0
100 16J UN12A
24J UN12A
10
0
100 19J UN12A
30J UN12A
4
0
100 26J UN12A
30J UN12A
04J UL12A
Superstru cture & Close-in ADM-0008
ADB 109 - Inst. of Steel Bar for Stem Walls
4
0
100 01J UL12A
ADM-0009
ADB 109 - Concrete for Stem Walls
7
0
100 02J UL12A
20SEP12A
ADM-0010
ADB 109 - Installation of K Span
13
0
100 01OCT12A
09OCT12A
16J AN13A
Archi tect ural - Exter ior ADM-0013
ADB 109 - Windows Inst
ADM-0012
ADB 109 - Ext. Painting of Stem Walls
ADM-0011
ADB 109 - Ext. Door Inst
6
0
100 29NOV12A
13
13
15 18MAR13A
15APR13
39
5
5
0 09APR13
14APR13
57
Archi tect ural - Int erio r ADM-0014
ADB 109 - Plaster Work for steam Walls
8
0
100 10OCT12A
ADM-0015
ADB 109 - Spray Insulation
7
7
70 10DEC12A
08APR13
18OCT12A 37
ADM-0017
ADB 109 - Inst. of gypsum Board
8
8
10 18DEC12A
09APR13
37
ADM-0019
ADB 109 - Sealed Concrete for Floor
4
4
20 23MAR13A
04APR13
68
ADM-0018
ADB 109 - Interior Doors Instalation
5
5
0 10APR13
15APR13
39
ADM-0016
ADB 109 - Inst. of Suspended Ceiling
8
8
0 10APR13
18APR13
39
ADM-0020
ADB 109 - Ele PVC Conduits/Fittings/Boxes
9
7
75 18FEB13A
08APR13
38
ADM-0023
ADB 109 - Duplex & Switch Inst
7
7
0 10APR13
17APR13
37
ADM-0021
ADB 109 - Electrical Wiring Works
6
6
0 18APR13
24APR13
37
ADM-0022
ADB 109 - Lighting Fix. & Cover Plates Inst.
7
7
0 22APR13
29APR13
37
ADM-0024
ADB 109 - Panel Board Inst.
3
3
0 20J UL13
22J UL13
-25
Electrical
Mechanical ADM-0026
ADB 109 - Exhaust Fan Installation
3
3
30 28MAR13A
20J UN13
-1
ADM-0025
ADB 109 - AC Split Installation
5
5
0 30APR13
05MAY13
37
ADM-0027
ADB 109 - Unit Heater Installation
2
2
0 06MAY13
07MAY13
37
Start Date Finish Date Data Date Run Date
26J UL11 05SEP13 01APR13 13APR13 10:09
Early Bar Progress Bar Critical Activity
PS19
FCEC UIProjects J V W5J 9J R-10-D-0005-0006 ANA Gardez Project Management Layout
Sheet 23 of 38 Date
Revision
Checked
Approved
Acti vity ID
Acti vity Description
Orig Dur
Rem Dur
%
Early Start
Early Finish
2011 2012 2013 J A S O N D J F M A M J J A S O N D J F M A M J J A S
Total Float
Plumbing ADM-0028
ADB 109 - Hot & Cold Water Piping
7
7
50 01DEC12A
08APR13
54
ADM-0029
ADB 109 - Toilet & Misc. Accessories
5
5
0 09APR13
14APR13
54
ADM-0030
ADB 109 - Toilet Sanitry Fixture Inst
6
6
0 09APR13
15APR13
54
3
3
0 08MAY13
11MAY13
37
-25
Fire Protection System ADM-0031
ADB 109 - Fire Extinguisher Inst.
Inspections, Punchlists ADM-0032
ADB 109 - Test & Commission
2
2
0 23J UL13
24J UL13
ADM-0033
ADB 109 - Punchlist Works
7
7
0 25J UL13
01AUG13
-25
ADM-0034
ADB 109 - Finishing & Handover
1
1
0 03AUG13
03AUG13
-25
Large Latrine #110 Foundations LA1-0001
LTB 110- Layout
2
0
100 04APR12A
05APR12A
LA1-0002
LTB 110- Excavation Work
5
0
100 07APR12A
11APR12A
LA1-0003
LTB 110- Watering, Backfilling & Compaction
19APR12A
LA1-0004
LTB 110- Foundation & Ring Beam
LA1-0005
LTB 110- BKFLNG, CMPCTN, CAP. & Vap. Barriers
LA1-0006
LTB 110- Formwork & RFT for Slab on Grade
12
0
100 14J UN12A
11J UL12A
LA1-0007
LTB 110- Concrete Works for Slab on Grade
4
0
100 25J UN12A
16SEP12A
02J UL12A
5
0
100 14APR12A
12
0
100 21APR12A
11J UN12A
9
0
100 12J UN12A
11J UL12A
Superstru cture & Close-in LA1-0008
LTB 110- Inst. Steel Bar for Stem Walls
13
0
100 17J UN12A
LA1-0009
LTB 110- Concrete for Stem Walls
15
0
100 19J UN12A
27OCT12A
LA1-0010
LTB 110- Installation of K Span
20
0
100 01OCT12A
09OCT12A
Archi tect ural - Exter ior LA1-0011
LTB 110- Exterior Door Installaion
6
6
45 18DEC12A
07APR13
LA1-0013
LTB 110- Windows Installation
7
0
100 20DEC12A
26J AN13A
56
LA1-0012
LTB 110- Ext. Painting of Stem Walls
10
7
90 18FEB13A
08APR13
56
Archi tect ural - Int erio r LA1-0014
LTB 110- Plaster Work for Steam Walls
12
0
100 18NOV12A
LA1-0018
LTB 110- Int. Doors Installation
7
7
30 30DEC12A
08APR13
56
LA1-0015
LTB 110- Spray Insulation
7
7
0 01APR13
08APR13
36
LA1-0017
LTB 110- Inst of gypsum Board
12
12
0 09APR13
22APR13
36
LA1-0016
LTB 110- Inst. of gypsum Board Ceiling
12
12
0 23APR13
06MAY13
36
LA1-0019
LTB 110- Tiles for floor
10
10
0 04MAY13
14MAY13
36
Start Date Finish Date Data Date Run Date
26J UL11 05SEP13 01APR13 13APR13 10:09
Early Bar Progress Bar Critical Activity
PS19
01DEC12A
FCEC UIProjects J V W5J 9J R-10-D-0005-0006 ANA Gardez Project Management Layout
Sheet 24 of 38 Date
Revision
Checked
Approved
Acti vity ID
Acti vity Description
Orig Dur
Rem Dur
%
Early Start
Early Finish
2011 2012 2013 J A S O N D J F M A M J J A S O N D J F M A M J J A S
Total Float
Electrical LA1-0020
LTB 110- Ele PVC Conduits/Fittings/Boxes
5
0
LA1-0023
LTB 110- Duplex & Switch Inst.
5
5
100 18FEB13A 0 23APR13
23FEB13A 28APR13
40
LA1-0021
LTB 110- Electrical Wiring Works
3
3
0 06APR13
08APR13
56
LA1-0022
LTB 110- Lighting Fix. & Cover Plates Inst.
3
3
0 04MAY13
06MAY13
36
LA1-0024
LTB 110- Panel Board Inst.
3
3
0 20J UL13
22J UL13
-24
Mechanical LA1-0026
LTB 110- Exhaust Fan Inst.
1
1
90 01MAR13A
18J UN13
5
LA1-0027
LTB 110- Unit Heater Installation
1
1
0 18J UN13
18J UN13
6
Plumbing LA1-0028
LTB 110- Hot & Cold Water Piping
7
7
50 01DEC12A
08APR13
64
LA1-0030
LTB 110- Toilet Sanitry Fixture Inst.
7
7
50 02FEB13A
08APR13
67
LA1-0029
LTB 110- Toilet & Misc. Accessories
5
5
0 09APR13
14APR13
64
1
1
0 19J UN13
19J UN13
5
-23
Fire Protection System LA1-0031
LTB 110- Fire Extinguisher Inst.
Inspections, Punchlists LA1-0032
LTB 110- Test & Commission
2
2
0 23J UL13
24J UL13
LA1-0033
LTB 110- Punchlist Works
5
5
0 25J UL13
30J UL13
-23
LA1-0034
LTB 110- Finishing & Handover
1
1
0 31J UL13
31J UL13
-23
Large Latrine #111 Foundations LA2-0001
LTB 111- Layout
2
0
100 05APR12A
07APR12A
LA2-0002
LTB 111- Excavation Work
5
0
100 08APR12A
12APR12A
LA2-0003
LTB 111- Watering, Backfilling & Compaction
LA2-0004
LTB 111- Foundation & Ring Beam Works
LA2-0005
LTB 111- BKFLNG, CMPCTN, CAP. & Vap. Barriers
LA2-0006
LTB 111- Formwork & RFT for Slab on Grade
LA2-0007
LTB 111- Concrete for Slab on Grade
5
0
100 14APR12A
09OCT12A
12
0
100 15MAY12A
28MAY12A 11J UN12A
2
0
100 05J UN12A
12
0
100 12J UN12A
25J UN12A
7
0
100 14J UL12A
17SEP12A
Superstru cture & Close-in LA2-0008
LTB 111- Inst of Steel Bar for Stem Walls
12
0
100 18J UN12A
03J UL12A
LA2-0009
LTB 111- Inst. of Concrete Stem Walls
15
0
100 04J UL12A
01OCT12A
LA2-0010
LTB 111- Installation of K Span
15
0
100 01OCT12A
09OCT12A
7
0
100 24DEC12A
31J AN13A
Archi tect ural - Exter ior LA2-0013 Start Date Finish Date Data Date Run Date
LTB 111- Windows Installation 26J UL11 05SEP13 01APR13 13APR13 10:09
Early Bar Progress Bar Critical Activity
PS19
FCEC UIProjects J V W5J 9J R-10-D-0005-0006 ANA Gardez Project Management Layout
Sheet 25 of 38 Date
Revision
Checked
Approved
Acti vity ID
Acti vity Description
LA2-0011
LTB 111- Ext. Door installaion
LA2-0012
LTB 111- Ext. Painting of Stem Walls
Orig Dur
Rem Dur
%
Early Start
Early Finish
2011 2012 2013 J A S O N D J F M A M J J A S O N D J F M A M J J A S
Total Float
5
5
40 19J AN13A
06APR13
12
15
15
30 26MAR13A
17APR13
26
Archi tect ural - Int erio r LA2-0014
LTB 111- Plaster for Steam Walls
7
0
100 18NOV12A
LA2-0015
LTB 111- Spray Insulation
7
7
0 07APR13
14APR13
25NOV12A 12
LA2-0016
LTB 111- Inst of gypsum Board Ceiling
6
6
0 15APR13
21APR13
39
LA2-0017
LTB 111- Inst. of gypsum Board
10
10
0 15APR13
25APR13
12
LA2-0018
LTB 111- Int. Doors Installation
7
7
0 27APR13
04MAY13
12
LA2-0019
LTB 111- Tiles for floor
15
15
0 24APR13
11MAY13
39
Electrical LA2-0020
LTB 111- Ele PVC Conduits/Fittings/Boxes
4
0
LA2-0021
LTB 111- Electrical Wiring Works
5
5
100 18FEB13A 0 01APR13
21FEB13A 06APR13
52
LA2-0022
LTB 111- Lighting Fix. & Cover Plates Inst.
2
2
0 22APR13
23APR13
39
LA2-0024
LTB 111- Panel Board Installation
6
6
0 20J UL13
25J UL13
-26
LA2-0023
LTB 111- Duplex & Switch Inst.
2
2
0 09J UN13
10J UN13
12
Mechanical LA2-0025
LTB 111- Exhaust Fan Installation
1
1
90 01MAR13A
18J UN13
5
LA2-0026
LTB 111- Unit Heater Installation
1
1
0 19J UN13
19J UN13
5
Plumbing LA2-0027
LTB 111- Hot & Cold Water Piping
7
7
25 01DEC12A
09APR13
60
LA2-0029
LTB 111- Toilet Sanitry Fixture Inst.
7
7
10 01MAR13A
09APR13
65
LA2-0028
LTB 111- Toilet & Misc. Accessories
4
4
0 10APR13
14APR13
60
1
1
0 18J UN13
18J UN13
6
-26
Fire Protection System LA2-0030
LTB 111- Fire Extinguisher Inst.
Inspections, Punchlists LA2-0031
LTB 111- Test & Commission
2
2
0 27J UL13
28J UL13
LA2-0032
LTB 111- Punchlist Works
5
5
0 29J UL13
03AUG13
-26
LA2-0033
LTB 111- Finishing & Handover
1
1
0 04AUG13
04AUG13
-26
Large Latrine #112 Foundations LA3-0001
LTB 112- Layout
2
0
100 07APR12A
08APR12A
LA3-0002
LTB 112- Excavation Work
5
0
100 11APR12A
16APR12A
LA3-0003
LTB 112- Watering, Backfilling & Compaction
LA3-0004
LTB 112- Foundation & Ring Beam Works
LA3-0005
LTB 112- BKFLNG, CMPCTN, CAP. & Vap. Barriers
Start Date Finish Date Data Date Run Date
26J UL11 05SEP13 01APR13 13APR13 10:09
Early Bar Progress Bar Critical Activity
5
0
100 21APR12A
25APR12A
15
0
100 12MAY12A
11J UN12A
9
0
100 12J UN12A
21J UN12A
PS19
FCEC UIProjects J V W5J 9J R-10-D-0005-0006 ANA Gardez Project Management Layout
Sheet 26 of 38 Date
Revision
Checked
Approved
Acti vity ID
Acti vity Description
Orig Dur
Rem Dur
%
Early Start
Early Finish
2011 2012 2013 J A S O N D J F M A M J J A S O N D J F M A M J J A S
Total Float
LA3-0006
LTB 112- Formwork & RFT for Slab on Grade
12
0
100 23J UN12A
05J UL12A
LA3-0007
LTB 112- Concrete Works for Slab on Grade
8
0
100 07J UL12A
18SEP12A
Superstru cture & Close-in LA3-0008
LTB 112- Inst. of Steel Bar for Stem Walls
12
0
100 25J UN12A
10J UL12A
LA3-0009
LTB 112- Concrete Stem Walls
12
0
100 11J UL12A
02OCT12A
LA3-0010
LTB 112- Installation of K Span
15
0
100 02OCT12A
09OCT12A
Archi tect ural - Exter ior LA3-0011
LTB 112- Ext. Door Installaion
LA3-0012
LTB 112- Ext. Painting of Stem Walls
LA3-0013
LTB 112- Windows Installation
8
8
50 17DEC12A
08APR13
29
15
15
60 17DEC12A
17APR13
29
9
0
100 25DEC12A
04FEB13A
Archi tect ural - Int erio r LA3-0014
LTB 112- Plaster for Steam Walls
10
0
100 10NOV12A
LA3-0015
LTB 112- Spray Insulation
7
7
0 09APR13
15APR13
20NOV12A 29
LA3-0016
LTB 112- Inst. of gypsum Board ceiling
7
7
0 16APR13
22APR13
29
LA3-0017
LTB 112- Inst. of gypsum Board
15
15
0 23APR13
07MAY13
29
LA3-0019
LTB 112- Tiles for floor
10
10
0 27APR13
07MAY13
42
LA3-0018
LTB 112- Interior Doors Inst.
12
12
0 08MAY13
21MAY13
25
Electrical LA3-0020
LTB 112- Ele PVC Conduits/Fittings/Boxes
4
0
LA3-0021
LTB 112- Electrical Wiring Works
5
5
100 17FEB13A 0 01APR13
20FEB13A 06APR13
56
LA3-0022
LTB 112- Lighting Fix. & Cover Plates Inst.
3
3
0 23APR13
25APR13
42
LA3-0023
LTB 112- Duplex & Switch Inst.
2
2
0 22MAY13
23MAY13
25
LA3-0024
LTB 112- Panel Board Inst.
3
3
0 20J UL13
22J UL13
-23
Mechanical LA3-0025
LTB 112- Exhaust Fan Inst.
1
1
80 01MAR13A
18J UN13
2
LA3-0026
LTB 112- Unit Heater Inst.
1
1
0 19J UN13
19J UN13
2
Plumbing LA3-0027
LTB 112- Hot & Cold Water Piping
7
7
50 01DEC12A
09APR13
57
LA3-0029
LTB 112- Toilet Sanitry Fixture Inst.
7
7
10 01MAR13A
09APR13
62
LA3-0028
LTB 112- Toilet & Misc. Accessories
4
4
0 10APR13
14APR13
57
1
1
0 19J UN13
19J UN13
5
2
2
0 23J UL13
24J UL13
-23
Fire Protection System LA3-0030
LTB 112- Fire Extinguisher Inst.
Inspections, Punchlists LA3-0031 Start Date Finish Date Data Date Run Date
LTB 112- Test & Commission 26J UL11 05SEP13 01APR13 13APR13 10:09
Early Bar Progress Bar Critical Activity
PS19
FCEC UIProjects J V W5J 9J R-10-D-0005-0006 ANA Gardez Project Management Layout
Sheet 27 of 38 Date
Revision
Checked
Approved
Acti vity ID
Acti vity Description
Orig Dur
Rem Dur
%
Early Start
Early Finish
2011 2012 2013 J A S O N D J F M A M J J A S O N D J F M A M J J A S
Total Float
LA3-0032
LTB 112- Punchlist Works
5
5
0 25J UL13
30J UL13
-23
LA3-0033
LTB 112- Finishing & Handover
1
1
0 31J UL13
31J UL13
-23
Large Latrine #113 Foundations L4-0001
LTB 113- Layout
1
0
100 07APR12A
07APR12A
L4-0002
LTB 113- Excavation Work
5
0
100 11APR12A
16APR12A
L4-0003
LTB 113- Watering, Backfilling & Compaction
L4-0004
LTB 113- Foundation & Ring Beam Works
L4-0005
LTB 113- BKFLNG, CMPCTN, CAP. & Vap. Barriers
L4-0006
LTB 113- Formwork & RFT for Slab on Grade
L4-0007
LTB 113- Concrete for Slab on Grade
12
5
0
100 17APR12A
22APR12A
12
0
100 01MAY12A
20MAY12A
9
0
100 21MAY12A
02J UN12A
12
0
100 03J UN12A
23J UN12A
0
100 24J UN12A
08J UL12A
Superstru cture & Close-in L4-0008
LTB 113- Inst. of Steel Bar for Steam Walls
10
0
100 30J UN12A
10J UL12A
L4-0009
LTB 113- Inst. of Concrete Steam Walls
12
0
100 11J UL12A
09DEC12A
L4-0010
LTB 113- Installation of K Span
15
0
100 02DEC12A
06DEC12A
Archi tect ural - Exter ior L4-0011
LTB 113- Exterior Door Inst.
6
6
40 26DEC12A
L4-0013
LTB 113- Windows Installation
12
0
100 01J AN13A
L4-0012
LTB 113- Ext. Painting of Stem Walls
14
14
60 20MAR13A
07APR13
64
09FEB13A 16APR13
49
Archi tect ural - Int erio r L4-0014
LTB 113- Plaster Work for Steam Walls
7
7
20 10J AN13A
08APR13
19
L4-0015
LTB 113- Spray Insulation
7
7
0 09APR13
16APR13
19
L4-0016
LTB 113- Inst. of gypsum Board Ceiling
10
10
0 17APR13
28APR13
19
L4-0017
LTB 113- Inst. of gypsum Board
14
14
0 17APR13
02MAY13
35
L4-0019
LTB 113- Tiles for floor
10
10
0 01MAY13
12MAY13
19
L4-0018
LTB 113- Int. Doors Installation
15
15
0 04MAY13
20MAY13
35
Electrical L4-0020
LTB 113- Ele PVC Conduits/Fittings/Boxes
4
0
L4-0021
LTB 113- Electrical Wiring Works
5
5
100 26FEB13A 0 01APR13
02MAR13A 06APR13
39
L4-0022
LTB 113- Lighting Fix. & Cover Plates Inst
2
2
0 29APR13
30APR13
19
L4-0023
LTB 113- Duplex & Switch Inst.
5
5
0 04MAY13
08MAY13
35
L4-0024
LTB 113- Panel Board Inst.
3
3
0 20J UL13
22J UL13
-24
Mechanical L4-0025
LTB 113- Exhaust Fan Inst.
2
2
90 27MAR13A
19J UN13
-1
L4-0026
LTB 113- Unit Heater Inst.
2
2
0 20J UN13
22J UN13
-1
Start Date Finish Date Data Date Run Date
26J UL11 05SEP13 01APR13 13APR13 10:09
Early Bar Progress Bar Critical Activity
PS19
FCEC UIProjects J V W5J 9J R-10-D-0005-0006 ANA Gardez Project Management Layout
Sheet 28 of 38 Date
Revision
Checked
Approved
Acti vity ID
Acti vity Description
Orig Dur
Rem Dur
%
Early Start
Early Finish
2011 2012 2013 J A S O N D J F M A M J J A S O N D J F M A M J J A S
Total Float
Plumbing L4-0029
LTB 113- Toilet Sanitry Fixture Inst.
9
9
10 01MAR13A
10APR13
61
L4-0027
LTB 113- Hot & Cold Water Piping
7
7
0 13MAY13
20MAY13
19
L4-0028
LTB 113- Toilet & Misc. Accessories
4
4
0 21MAY13
25MAY13
19
2
2
0 23J UN13
24J UN13
1
-23
Fire Protection System L4-0030
LTB 113- Fire Extinguisher Inst.
Inspections, Punchlists L4-0031
LTB 113- Test & Commission
2
2
0 23J UL13
24J UL13
L4-0032
LTB 113- Punchlist Works
5
5
0 25J UL13
30J UL13
-23
L4-0033
LTB 113- Finishing & Handover
1
1
0 31J UL13
31J UL13
-23
Large Latrine #114 Foundations LA5-0001
LTB 114- Layout
1
0
100 08APR12A
08APR12A
LA5-0002
LTB 114- Excavation Work
5
0
100 14APR12A
19APR12A
LA5-0003
LTB 114- Watering, Backfilling & Compaction
26APR12A
LA5-0004
LTB 114- Foundation & Ring Beam Works
LA5-0005
LTB 114- BKFLNG, CMPCTN, CAP. & Vap. Barriers
LA5-0006
LTB 114- Formwork & RFT for Slab on Grade
LA5-0007
LTB 114- Concrete for Slab on Grade
5
0
100 21APR12A
12
0
100 28APR12A
10MAY12A
9
0
100 12MAY12A
21MAY12A
12
0
100 22MAY12A
05J UN12A
4
0
100 06J UN12A
11J UN12A
Superstru cture & Close-in LA5-0008
LTB 114- Inst. Steel Bar for Stem Walls
4
0
100 16J UN12A
09SEP12A
LA5-0009
LTB 114- Concrete for Stem Walls
8
0
100 11J UL12A
18SEP12A
LA5-0010
LTB 114- Installation of K Span
15
0
100 15AUG12A
26SEP12A
Archi tect ural - Exter ior LA5-0011
LTB 114- Ext. Door Installaion
15
15
40 18DEC12A
LA5-0013
LTB 114- Windows Installation
15
0
100 05J AN13A
LA5-0012
LTB 114- Ext. Painting of Stem Walls
18
18
0 27APR13
17APR13
8
09FEB13A 16MAY13
26
Archi tect ural - Int erio r LA5-0014
LTB 114- Plaster Work for Stem Walls
7
0
100 10OCT12A
LA5-0015
LTB 114- Spray Insulation
7
7
0 18APR13
25APR13
8
LA5-0016
LTB 114- Inst. of gypsum Board Ceiling
6
6
0 27APR13
02MAY13
8
LA5-0017
LTB 114- Inst. of gypsum Board
15
15
0 27APR13
13MAY13
29
LA5-0018
LTB 114- Int. Doors Installation
10
10
0 18MAY13
28MAY13
26
LA5-0019
LTB 114- Tiles for Floor
15
15
0 12MAY13
28MAY13
8
Start Date Finish Date Data Date Run Date
26J UL11 05SEP13 01APR13 13APR13 10:09
Early Bar Progress Bar Critical Activity
PS19
17OCT12A
FCEC UIProjects J V W5J 9J R-10-D-0005-0006 ANA Gardez Project Management Layout
Sheet 29 of 38 Date
Revision
Checked
Approved
Acti vity ID
Acti vity Description
Orig Dur
Rem Dur
%
Early Start
Early Finish
2011 2012 2013 J A S O N D J F M A M J J A S O N D J F M A M J J A S
Total Float
Electrical LA5-0020
LTB 114- Ele PVC Conduits/Fittings/Boxes
4
0
LA5-0021
LTB 114- Electrical Wiring Works
5
5
100 18FEB13A 0 01APR13
21FEB13A 06APR13
LA5-0022
LTB 114- Lighting Fix. & Cover Plates Inst.
3
3
0 04MAY13
06MAY13
8
LA5-0023
LTB 114- Duplex & Switch Inst.
5
5
0 20MAY13
25MAY13
26
LA5-0024
LTB 114- Panel Board Inst.
3
3
0 20J UL13
22J UL13
-24
31
Mechanical LA5-0025
LTB 114- Exhaust Fan Inst.
1
1
90 28MAR13A
18J UN13
2
LA5-0026
LTB 114- Unit Heater Inst.
1
1
0 18J UN13
18J UN13
2
LA5-0028 LA5-0027
LTB 114- Toilet & Misc. Accessories LTB 114- Hot & Cold Water Piping
5 7
5 7
10 01MAR13A 0 29MAY13
06APR13 05J UN13
64 8
LA5-0029
LTB 114- Toilet Sanitry Fixture Inst.
4
4
0 06J UN13
10J UN13
8
1
1
0 19J UN13
19J UN13
5
-23
Plumbing
Fire Protection System LA5-0030
LTB 114- Fire Extinguisher Inst.
Inspections, Punchlists LA5-0031
LTB 114- Test & Commission
2
2
0 23J UL13
24J UL13
LA5-0032
LTB 114- Punchlist Works
5
5
0 25J UL13
30J UL13
-23
LA5-0033
LTB 114- Finishing & Handover
1
1
0 31J UL13
31J UL13
-23
Large Latrine #115 Foundations LA6-0001
LTB 115- Layout
1
0
100 09APR12A
09APR12A
LA6-0002
LTB 115- Excavation Work
5
0
100 14APR12A
19APR12A
LA6-0003
LTB 115- Watering, Backfilling & Compaction
25APR12A
LA6-0004
LTB 115- Foundation & Ring Beam
LA6-0005
LTB 115- BKFLNG, CMPCTN, CAP. & Vap. Barriers
LA6-0006
LTB 115- Formwork & RFT for Slab on Grade
LA6-0007
LTB 115- Concrete for Slab on Grade
5
0
100 21APR12A
12
0
100 26APR12A
10MAY12A
9
0
100 12MAY12A
24MAY12A
12
0
100 26MAY12A
10J UN12A
4
0
100 11J UN12A
16J UN12A
25J UN12A
Superstru cture & Close-in LA6-0008
LTB 115- Inst. of Steel Bar for Stem Walls
4
0
100 20J UN12A
LA6-0009
LTB 115- Concrete Stem Walls
8
0
100 26J UN12A
19J AN13A
LA6-0010
LTB 115- Installation of K Span
15
0
100 27NOV12A
05DEC12A
10
0
100 05J AN13A
09FEB13A
Archi tect ural - Exter ior LA6-0013 Start Date Finish Date Data Date Run Date
LTB 115- Windows Installation 26J UL11 05SEP13 01APR13 13APR13 10:10
Early Bar Progress Bar Critical Activity
PS19
FCEC UIProjects J V W5J 9J R-10-D-0005-0006 ANA Gardez Project Management Layout
Sheet 30 of 38 Date
Revision
Checked
Approved
Acti vity ID
Acti vity Description
Orig Dur
Rem Dur
%
Early Start
Early Finish
2011 2012 2013 J A S O N D J F M A M J J A S O N D J F M A M J J A S
Total Float
LA6-0011
LTB 115- Ext. Door Installaion
15
15
40 05J AN13A
17APR13
11
LA6-0012
LTB 115- Ext. Painting of Steam Walls
15
15
20 21MAR13A
17APR13
27
Archi tect ural - Int erio r LA6-0014
LTB 115- Plaster for Stem Walls
7
0
100 18MAR13A
LA6-0015
LTB 115- Spray Insulation
7
7
0 18APR13
25APR13
25MAR13A 11
LA6-0016
LTB 115- Inst. of gypsum Board Ceiling
6
6
0 27APR13
02MAY13
11
LA6-0017
LTB 115- Inst. of gypsum Board
14
14
0 27APR13
12MAY13
23
LA6-0018
LTB 115- Int. Doors Installation
10
10
0 13MAY13
23MAY13
23
LA6-0019
LTB 115- Tiles for Floor
15
15
0 07MAY13
23MAY13
11
Electrical LA6-0020
LTB 115- Ele PVC Conduits/Fittings/Boxes
4
0
LA6-0021
LTB 115- Electrical Wiring Works
5
5
100 26FEB13A 0 01APR13
20MAR13A 06APR13
34
LA6-0022
LTB 115- Lighting Fix. & Cover Plates Inst.
3
3
0 04MAY13
06MAY13
11
LA6-0023
LTB 115- Duplex & Switch Inst.
4
4
0 20MAY13
23MAY13
23
LA6-0024
LTB 115- Panel Board Installation
3
3
0 20J UL13
22J UL13
-24
Mechanical LA6-0025
LTB 115- Exhaust Fan Installation
1
1
90 26MAR13A
18J UN13
2
LA6-0026
LTB 115- Unit Heater Installation
1
1
0 18J UN13
18J UN13
2
Plumbing LA6-0027
LTB 115- Hot & Cold Water Piping
7
7
0 25MAY13
01J UN13
11
LA6-0029
LTB 115- Toilet Sanitry Fixture Inst.
4
4
0 02J UN13
05J UN13
12
LA6-0028
LTB 115- Toilet & Misc. Accessories
5
5
0 02J UN13
06J UN13
11
1
1
0 19J UN13
19J UN13
5
-23
Fire Protection System LA6-0030
LTB 115- Fire Extinguisher Inst.
Inspections, Punchlists LA6-0031
LTB 115- Test & Commission
2
2
0 23J UL13
24J UL13
LA6-0032
LTB 115- Punchlist Works
5
5
0 25J UL13
30J UL13
-23
LA6-0033
LTB 115- Finishing & Handover
1
1
0 31J UL13
31J UL13
-23
MWR Building #105D Foundations MWR-0001 MWR 105D- Layout
1
0
100 01APR12A
01APR12A
MWR-0002 MWR 105D- Excavation Work
3
0
100 02APR12A
04APR12A
MWR-0003 MWR 105D- Watering, Backfilling & Compaction
4
0
100 05APR12A
09APR12A
MWR-0004 MWR 105D- Foundation & Ring Beam
8
0
100 14APR12A
25APR12A
MWR-0005 MWR 105D- BKFLNG, CMPCTN, CAP. & Vap. Barriers
8
0
100 10J UN12A
18J UN12A
Start Date Finish Date Data Date Run Date
26J UL11 05SEP13 01APR13 13APR13 10:10
Early Bar Progress Bar Critical Activity
PS19
FCEC UIProjects J V W5J 9J R-10-D-0005-0006 ANA Gardez Project Management Layout
Sheet 31 of 38 Date
Revision
Checked
Approved
Acti vity ID
Acti vity Description
Orig Dur
MWR-0006 MWR 105D- Formwork & RFT for Slab on Grade
Rem Dur
%
Early Start
Early Finish
10
0
100 19J UN12A
30J UN12A
7
0
100 01J UL12A
08J UL12A
25SEP12A
MWR-0007 MWR 105D- Concrete for Slab on Grade
2011 2012 2013 J A S O N D J F M A M J J A S O N D J F M A M J J A S
Total Float
Superstru cture & Close-in MWR-0008 MWR 105D- Inst. of Steel Bar for Stem Walls
6
0
100 09J UL12A
MWR-0009 MWR 105D- Inst of Concrete Stem Walls
9
0
100 26SEP12A
19NOV12A
13
0
100 03OCT12A
24NOV12A
MWR-0010 MWR 105D- Installation of K Span
Archi tect ural - Exter ior MWR-0011 MWR 105D- Ext. Door Installation MWR-0012 MWR 105D- Ext. Painting of Stem Walls
9
9
90 14FEB13A
15APR13
16
16
90 14FEB13A
23APR13
43
6
6
50 25FEB13A
22APR13
44
MWR-0013 MWR 105D- Windows Installation
44
Archi tect ural - Int erio r MWR-0014 MWR 105D- Plaster Work for Stem Walls
6
0
100 20NOV12A
MWR-0015 MWR 105D- Spray Insulation
4
4
25 25NOV12A
04APR13
26NOV12A
MWR-0016 MWR 105D- Fence Installation
9
9
0 06APR13
15APR13
47
DPW-0018 MWR 105D- Int. Doors Installation
6
6
0 24APR13
30APR13
43
MWR-0019 MWR 105D- Sealed Concrete for Floor
4
4
0 30APR13
04MAY13
46
43
Electrical MWR-0020 MWR 105D- Ele PVC Conduits/Fittings/Boxes
8
0
MWR-0021 MWR 105D- Electrical Wiring Works
11
11
100 14FEB13A 0 06APR13
23FEB13A 17APR13
45
MWR-0022 MWR 105D- Lighting Fix. & Cover Plates Inst.
10
10
0 18APR13
29APR13
45
MWR-0023 MWR 105D- Duplex & Switch Inst.
6
6
0 01MAY13
07MAY13
43
MWR-0024 MWR 105D- Panel Board Inst.
5
5
0 20J UL13
24J UL13
-24
MWR-0026 MWR 105D- Exhaust Fan Inst.
2
2
0 18J UN13
19J UN13
2
MWR-0027 MWR 105D- Unit Heater Inst.
2
2
0 20J UN13
22J UN13
2
2
2
0 23J UN13
24J UN13
2
MWR-0032 MWR 105D- Test & Commission
2
2
0 25J UL13
27J UL13
-24
MWR-0033 MWR 105D- Punchlist Works
4
4
0 28J UL13
31J UL13
-24
MWR-0034 MWR 105D- Finishing & Handover
1
1
0 01AUG13
01AUG13
-24
1
0
Mechanical
Fire Protection System MWR-0031 MWR 105D- Fire Extinguisher Inst.
Inspections, Punchlists
DPW Buil ding #116 Foundations DPW-0001 DPW 116- Layout Start Date Finish Date Data Date Run Date
26J UL11 05SEP13 01APR13 13APR13 10:10
Early Bar Progress Bar Critical Activity
PS19
100 09APR12A
09APR12A
FCEC UIProjects J V W5J 9J R-10-D-0005-0006 ANA Gardez Project Management Layout
Sheet 32 of 38 Date
Revision
Checked
Approved
Acti vity ID
Acti vity Description
Orig Dur
Rem Dur
%
Early Start
Early Finish
DPW-0002 DPW 116- Excavation Work
8
0
100 11APR12A
21APR12A
DPW-0003 DPW 116- Watering, Backfilling & Compaction
5
0
100 22APR12A
26APR12A
16
0
100 22APR12A
09J AN13A
9
0
100 20MAY12A
21J UN12A
DPW-0004 DPW 116- Foundation & Ring Beam DPW-0005 DPW 116- BKFLNG, CMPCTN, CAP. & Vap. Barriers
2011 2012 2013 J A S O N D J F M A M J J A S O N D J F M A M J J A S
Total Float
DPW-0006 DPW 116- Formwork & RFT for Slab on Grade
15
0
100 25J UN12A
12AUG12A
DPW-0007 DPW 116- Concrete for Slab on Grade
10
0
100 13AUG12A
09SEP12A
08J UL12A
Superstru cture & Close-in DPW-0008 DPW 116- Inst. of Steel Bar for Steam Walls
12
0
100 26J UN12A
DPW-0009 DPW 116- Inst. of Concrete Steam Walls
12
0
100 10SEP12A
14J AN13A
DPW-0010 DPW 116- Installation of K Span
15
0
100 02OCT12A
26NOV12A
DPW-0013 DPW 116- Windows Installation
10
10
95 05DEC12A
11APR13
66
DPW-0011 DPW 116- Ext. Door Installaion
8
8
30 01J AN13A
09APR13
66
18
10
20 16FEB13A
11APR13
49
Archi tect ural - Exter ior
DPW-0012 DPW 116- Ext. Painting of Stem Walls
Archi tect ural - Int erio r DPW-0014 DPW 116- Plaster for Steam Walls
15
15
85 14NOV12A
17APR13
35
DPW-0015 DPW 116- Spray Insulation
15
10
60 10DEC12A
11APR13
40
DPW-0017 DPW 116- Inst. of gypsum Board
15
10
20 16FEB13A
11APR13
66
DPW-0016 DPW 116- Inst. of Suspended Ceiling
8
8
0 18APR13
27APR13
35
DPW-0019 DPW 116- Sealed Concrete for Floor
5
5
0 29APR13
04MAY13
35
DPW-0020 DPW 116- Ele PVC Conduits/Fittings/Boxes
3
0
DPW-0023 DPW 116- Duplex & Switch Inst.
4
4
0 01APR13
04APR13
66
DPW-0021 DPW 116- Electrical Wiring Works
6
6
0 01APR13
07APR13
52
DPW-0022 DPW 116- Lighting Fix. & Cover Plates Inst.
2
2
0 28APR13
29APR13
35
DPW-0024 DPW 116- Panel Board Inst.
3
3
0 20J UL13
22J UL13
-23
DPW-0025 DPW 116- AC Split Installation
1
1
0 06APR13
06APR13
66
DPW-0027 DPW 116- Unit Heater Installation
1
1
0 12MAY13
12MAY13
35
DPW-0026 DPW 116- Exhaust Fan Installation
1
1
0 18J UN13
18J UN13
3
Electrical 100 16FEB13A
18FEB13A
Mechanical
Plumbing DPW-0028 DPW 116- Hot & Cold Water Piping
6
6
0 30APR13
06MAY13
35
DPW-0030 DPW 116- Toilet Sanitry Fixture Inst.
4
4
0 07MAY13
11MAY13
35
DPW-0029 DPW 116- Toilet & Misc. Accessories
5
5
0 07MAY13
12MAY13
35
1
1
0 30APR13
30APR13
Fire Protection System DPW-0031 DPW 116- Fire Extinguisher Inst. Start Date Finish Date Data Date Run Date
26J UL11 05SEP13 01APR13 13APR13 10:10
Early Bar Progress Bar Critical Activity
PS19
FCEC UIProjects J V W5J 9J R-10-D-0005-0006 ANA Gardez Project Management Layout
48 Sheet 33 of 38 Date
Revision
Checked
Approved
Acti vity ID
Acti vity Description
Orig Dur
Rem Dur
%
Early Start
Early Finish
2011 2012 2013 J A S O N D J F M A M J J A S O N D J F M A M J J A S
Total Float
Inspections, Punchlists DPW-0032 DPW 116- Test & Commission
2
2
0 23J UL13
24J UL13
DPW-0033 DPW 116- Punchlist Works
5
5
0 25J UL13
30J UL13
-23 -23
DPW-0034 DPW 116- Finishing & Handover
1
1
0 31J UL13
31J UL13
-23
Literacy Classroom #117A Foundations LCR1-001
LCR 117A - Layout
1
0
100 03APR12A
03APR12A
LCR1-002
LCR 117A - Excavation Work
3
0
100 04APR12A
07APR12A
LCR1-003
LCR 117A - Watering, Backfilling & Compaction
3
0
100 08APR12A
10APR12A
LCR1-004
LCR 117A - Foundation & Ring Beam
8
0
100 14APR12A
25APR12A
LCR1-005
LCR 117A - BKFLNG, CMPCTN, CAP. & Vap. Barriers
8
0
100 21MAY12A
05J UL12A
LCR1-007
LCR 117A - Concrete for Slab on Grade
LCR1-006
LCR 117A - Formwork & RFT for Slab on Grade
5
0
100 25J UN12A
02J UL12A
13
0
100 25J UN12A
08J UL12A
Superstru cture & Close-in LCR1-008
LCR 117A - Inst. of Steel Bar for Stem Walls
6
0
100 28J UN12A
04J UL12A
LCR1-009
LCR 117A - Concrete for Stem Walls
10
0
100 05J UL12A
02OCT12A
LCR1-010
LCR 117A - Installation of K Span
15
0
100 12AUG12A
08OCT12A
Archi tect ural - Exter ior LCR1-013
LCR 117A - Windows Installation
5
0
100 01DEC12A
29J AN13A
LCR1-011
LCR 117A - Ext. Door Installaion
5
5
90 18DEC12A
06APR13
LCR1-012
LCR 117A - Ext. Painting of Stem Walls
11
0
100 18FEB13A
60
31MAR13A
Archi tect ural - Int erio r LCR1-014
LCR 117A - Plaster Work for Steam Walls
13
0
100 10OCT12A
LCR1-015
LCR 117A - Spray Insulation
7
7
95 25NOV12A
08APR13
24OCT12A 48
LCR1-017
LCR 117A - Int. Doors Installation
5
5
30 03MAR13A
06APR13
61
LCR1-016
LCR 117A - Fence Installation
10
10
0 09APR13
20APR13
48
LCR1-018
LCR 117A - Sealed Concrete for Floor
8
8
0 21APR13
29APR13
48
LCR1-019
LCR 117A - Ele PVC Conduits/Fittings/Boxes
7
0
LCR1-020
LCR 117A - Electrical Wiring Works
6
5
30 26MAR13A
06APR13
LCR1-021
LCR 117A - Duplex & Switch Inst.
5
5
30 26MAR13A
06APR13
61
LCR1-022
LCR 117A - Lighting Fix. & Cover Plates Inst.
5
5
50 27MAR13A
20APR13
48
LCR1-023
LCR 117A - Panel Board Installation
3
3
0 20J UL13
22J UL13
-24
1
1
60 27MAR13A
18J UN13
2
Electrical 100 18FEB13A
25FEB13A 60
Mechanical LCR1-024 Start Date Finish Date Data Date Run Date
LCR 117A - Exhaust Fan Installation 26J UL11 05SEP13 01APR13 13APR13 10:10
Early Bar Progress Bar Critical Activity
PS19
FCEC UIProjects J V W5J 9J R-10-D-0005-0006 ANA Gardez Project Management Layout
Sheet 34 of 38 Date
Revision
Checked
Approved
Acti vity ID
Acti vity Description
Orig Dur
Rem Dur
%
Early Start
Early Finish
2011 2012 2013 J A S O N D J F M A M J J A S O N D J F M A M J J A S
Total Float
LCR1-025
LCR 117A - Unit Heater Installation
1
1
0 19J UN13
19J UN13
4
LCR1-026
LCR 117A - Fire Extinguisher Inst.
1
1
0 21APR13
21APR13
55
LCR1-027
LCR 117A - Test & Commission
2
2
0 23J UL13
24J UL13
-24
LCR1-028
LCR 117A - Punchlist Works
6
6
0 25J UL13
01AUG13
-24
LCR1-029
LCR 117A - Finishing & Handover
1
1
0 03AUG13
03AUG13
-24
LCR2-001
LCR 117B- Layout
1
0
100 04APR12A
04APR12A
LCR2-002
LCR 117B- Excavation Work
3
0
100 05APR12A
07APR12A
LCR2-003
LCR 117B- Watering, Backfilling & Compaction
10APR12A
LCR2-004
LCR 117B- Foundation & Ring Beam
LCR2-005
LCR 117B- BKFLNG, CMPCTN, CAP. & Vap. Barriers
LCR2-006
LCR 117B- Formwork & RFT for Slab on Grade
15
0
100 04J UN12A
26J UN12A
LCR2-007
LCR 117B- Concrete for Slab on Grade
12
0
100 20J UN12A
05J UL12A
LCR2-008
LCR 117B- Inst. of Steel Bar for Stem Walls
10
0
100 20J UN12A
02J UL12A
LCR2-009
LCR 117B- Concrete for Stem Walls
15
0
100 03J UL12A
02OCT12A
LCR2-010
LCR 117B- Installation of K Span
15
0
100 13AUG12A
08OCT12A
LCR2-013
LCR 117B- Windows Installation
8
0
100 01DEC12A
27J AN13A
LCR2-011
LCR 117B- Ext. Door Installation
8
8
90 18DEC12A
09APR13
LCR2-012
LCR 117B- Ext. Painting of Stem Walls
12
0
100 18FEB13A
LCR2-014
LCR 117B- Plaster for Stem Walls
10
0
100 10OCT12A
09FEB13A
LCR2-015
LCR 117B- Spray Insulation
7
7
90 10DEC12A
08APR13
52
LCR2-017
LCR 117B- Int. Doors Installation
5
5
30 04MAR13A
06APR13
61
LCR2-016
LCR 117B- Fence Installation
10
10
0 09APR13
20APR13
52
LCR2-018
LCR 117B- Sealed Concrete for Floor
8
8
0 10APR13
18APR13
56
LCR2-019
LCR 117B- Ele PVC Conduits/Fittings/Boxes
6
0
100 18FEB13A
LCR2-020
LCR 117B- Electrical Wiring Works
7
7
30 25FEB13A
08APR13
LCR2-021
LCR 117B- Duplex & Switch Inst.
7
7
30 27MAR13A
08APR13
61
LCR2-022
LCR 117B- Lighting Fix. & Cover Plates Inst.
7
7
60 27MAR13A
08APR13
57
Start Date Finish Date Data Date Run Date
26J UL11 05SEP13 01APR13 13APR13 10:10
Early Bar Progress Bar Critical Activity
3
0
100 08APR12A
10
0
100 11APR12A
23APR12A
9
0
100 12MAY12A
21MAY12A
PS19
56
31MAR13A
24FEB13A
FCEC UIProjects J V W5J 9J R-10-D-0005-0006 ANA Gardez Project Management Layout
57
Sheet 35 of 38 Date
Revision
Checked
Approved
Acti vity ID
LCR2-023
Acti vity Description
Orig Dur
LCR 117B- Panel Board Inst.
Rem Dur
%
Early Start
Early Finish
2011 2012 2013 J A S O N D J F M A M J J A S O N D J F M A M J J A S
Total Float
3
3
0 20J UL13
22J UL13
-25
Mechanical LCR2-024
LCR 117B- Exhaust Fan Inst.
1
1
60 27MAR13A
18J UN13
0
LCR2-025
LCR 117B- Unit Heater Inst.
1
1
0 19J UN13
19J UN13
0
1
1
0 10APR13
10APR13
63
-25
Fire Protection System LCR2-026
LCR 117B- Fire Extinguisher Inst.
Inspections, Punchlists LCR2-027
LCR 117B- Test & Commission
2
2
0 23J UL13
24J UL13
LCR2-028
LCR 117B- Punchlist Works
7
7
0 25J UL13
01AUG13
-25
LCR2-029
LCR 117B- Finishing & Handover
1
1
0 03AUG13
03AUG13
-25
Fire Station #118 Foundations FSB-0001
FSB 118- Layout
1
0
100 06APR12A
07APR12A
FSB-0002
FSB 118- Excavation Work
3
0
100 07APR12A
09APR12A
FSB-0003
FSB 118- Watering, Backfilling & Compaction
3
0
100 14APR12A
19APR12A
FSB-0004
FSB 118- FDN & Ring Beam
8
0
100 21APR12A
03MAY12A
FSB-0005
FSB 118- BKFLNG, CMPCTN, CAP. & Vap. Barriers
7
0
100 12MAY12A
05J UL12A
FSB-0006
FSB 118- Formwork & RFT for Slab on Grade
5
0
100 07J UL12A
12J UL12A
FSB-0007
FSB 118- Concrete for Slab on Grade
1
0
100 14J UL12A
12AUG12A
Superstru cture & Close-in FSB-0010
FSB 118- Installation of K Span
13
0
100 12AUG12A
24NOV12A
FSB-0008
FSB 118- Inst. of Steel Bar for Stem Walls
12
0
100 13AUG12A
29AUG12A
FSB-0009
FSB 118- Concrete Stem Walls
10
0
100 03SEP12A
21J AN13A
Archi tect ural - Exter ior FSB-0011
FSB 118- Ext. Door Installation
7
7
90 28DEC12A
07APR13
FSB-0013
FSB 118- Windows Installation
7
0
100 30DEC12A
17J AN13A
69
FSB-0012
FSB 118- Ext. Painting of Stem Walls
8
7
90 28FEB13A
08APR13
59
Archi tect ural - Int erio r FSB-0014
FSB 118- Plaster for Stem Walls
10
0
100 10DEC12A
FSB-0015
FSB 118- Spray Insulation
7
7
25 21FEB13A
07APR13
54
FSB-0017
FSB 118- Int. Doors Instalation
7
7
20 01MAR13A
08APR13
59
FSB-0016
FSB 118- Fence Installation
8
8
0 08APR13
15APR13
54
FSB-0018
FSB 118- Sealed Concrete for Floor
5
5
0 28APR13
02MAY13
46
Start Date Finish Date Data Date Run Date
26J UL11 05SEP13 01APR13 13APR13 10:10
Early Bar Progress Bar Critical Activity
PS19
28MAR13A
FCEC UIProjects J V W5J 9J R-10-D-0005-0006 ANA Gardez Project Management Layout
Sheet 36 of 38 Date
Revision
Checked
Approved
Acti vity ID
Acti vity Description
Orig Dur
Rem Dur
%
Early Start
Early Finish
2011 2012 2013 J A S O N D J F M A M J J A S O N D J F M A M J J A S
Total Float
Electrical FSB-0019
FSB 118- Ele PVC Conduits/Fittings/Boxes
10
0
FSB-0020
FSB 118- Electrical Wiring Works
12
12
100 23FEB13A 0 01APR13
01MAR13A 14APR13
47
FSB-0021
FSB 118- Duplex & Switch Inst.
9
9
0 16APR13
25APR13
53
FSB-0022
FSB 118- Lighting Fix. & Cover Plates Inst.
10
10
0 16APR13
27APR13
46
FSB-0023
FSB 118- Panel Board Installation
5
5
0 20J UL13
24J UL13
-25
Mechanical FSB-0024
FSB 118- Exhaust Fan Inst.
3
3
45 28MAR13A
20J UN13
-1
FSB-0025
FSB 118- Unit Heater Inst.
3
3
25 29MAR13A
20J UN13
-1
5
5
0 22J UN13
26J UN13
-1
-25
Fire Protection System FSB-0026
FSB 118- Fire Extinguisher Inst.
Inspections, Punchlists FSB-0027
FSB 118- Test & Commission
2
2
0 25J UL13
27J UL13
FSB-0028
FSB 118- Punchlist Works
5
5
0 28J UL13
01AUG13
-25
FSB-0029
FSB 118- Finishing & Handover
1
1
0 03AUG13
03AUG13
-25
Contract Close-out Close-out Inspections
CCO-0001
Prefinal Inspection & Correction
10
10
0 11AUG13
21AUG13
-22
CCO-0002
Final Inspection
3
3
0 22AUG13
25AUG13
-22
CCO-0003
Final Acceptance & Handover
1
1
0 26AUG13
26AUG13
-22
As-Bui lt Drawi ngs
CCO-0004
Submit As-Built Drawings
CCO-0005
Approved As-Built Drawing by AED
6
6
0 04AUG13
09AUG13
-30
14
14
0 10AUG13
23AUG13
-30
O&M Manuals & Training
CCO-0006
Submit O&M Manual
7
7
0 04AUG13
10AUG13
-24
CCO-0007
Approved O&M Manual by AED
7
7
0 11AUG13
17AUG13
-24
Start Date Finish Date Data Date Run Date
26J UL11 05SEP13 01APR13 13APR13 10:10
Early Bar Progress Bar Critical Activity
PS19
FCEC UIProjects J V W5J 9J R-10-D-0005-0006 ANA Gardez Project Management Layout