TRNG-6 Potential Transformer
Short Description
Download TRNG-6 Potential Transformer...
Description
Doble Testing Potential Transformers ( PT’s ) Bob Sarni Doble Engineering Company
Doble Engineering Company
85 Walnut Street, Watertown, MA 02472
Potential Transformers (PTs) H1
Isurface
Secondary Windings Not Shown
H0
Cascade Type Doble Testing Potential Transformers
2
Potential Transformers (PTs) H1
CHX
CH
CHY H0 Doble Testing Potential Transformers
X1 X2 X3 Y1 Y2 Y3 Line To Ground PT 3
Potential Transformers (PTs) H1
H2
CH1
CHX
CH2 X1 X2 X3
CHY
Y1 Y2 Y3
Line To Line PT Doble Testing Potential Transformers
4
Recommended Test Voltage Liquid-Filled Line-to-Line PTs Rated Below 15 kV Insulation Class PT Voltage Rating 7.2 to 8.7 4.2 to 5.0 2.4
Test Voltage (kV) 5.0 2.5 2.0
*For Units Rated 15 kV and Above, Perform Tests at 10 kV
Doble Testing Potential Transformers
5
Recommended Test Voltage Liquid-Filled Line-to-Ground PTs a) Perform Test At the Rated Voltage of the Neutral Bushing b) Cross-Check Tests are Performed at 10 kV or at Rated Line-toGround Voltage, Whichever is Lower
Doble Testing Potential Transformers
6
Recommended Test Voltage Dry-Type Line-to-Line PTs Rated Below 15 kV Insulation Class PT Voltage Rating Test Voltage (kV) Overall a. 2 kV b. Line-to-Ground Voltage* c. 10% to 25% Above Line-to-Ground operating Voltage Cross-Check
a. 2 kV b. Line-to-Ground Operating Voltage
Exciting Current
a. Line-to-Ground Operating Voltage
*Note: Power Factor Tip Up Test Doble Testing Potential Transformers
7
Recommended Test Voltage Dry-Type Line-to-Ground PTs Rated Below 15 kV Insulation Class •Perform Test at a Voltage Not to Exceed the Neutral Bushing Rating as Outlined in Previous Section
•Cross-Checks are Performed at 10 kV or Rated Line-to-Ground Voltage, Whichever is Lower •For Units Rated Above 15 kV, Perform Tests at 2 and 10 kV to Determine Tip-Up Value
Doble Testing Potential Transformers
8
Test Procedure - Single Phase - P T Test No. 1
Test Mode Energize Ground GST H1, H2 X1,Y1
Guard UST -
Test Description Overall
2
GST
H1
X1Y1
H2
-
H1 Cross Check
3
GST
H2
X1Y1
H1
-
H2 Cross-Check
4
UST
H1
X1Y1
-
H2
Excitation H1 to H2
5
UST
H2
X1Y1
-
H1
Excitation H2 to H1
6
Supplementary Hot-Collar tests on the primary line-terminal bushings
Doble Testing Potential Transformers
9
Test Procedure - Single Phase - P T Test #1 : GST Ground - No LV Lead Required Measure: CH1+CHX+CHY+CH2 H0
H1
HV Lead
CH1
CHX
CH2 X1 X2 X3
CHY Y1 Y2 Y3
Doble Testing Potential Transformers
10
Test Procedure - Single Phase - P T Test #2: GST-Guard (Cross-Check Test #1) •Measure: CH1+ 1/2CHX + 1/2CHY H1
HV Lead
CH1
H0
CHX
LV Lead
CH2 X1 X2 X3
CHY
Y1 Y2 Y3
Doble Testing Potential Transformers
11
Test Procedure - Single Phase - P T Test #3: GST-Guard (Cross-Check Test #2) •Measure: CH2+ 1/2CHX + 1/2CHY LV Lead
CH1
H1
H0
CHX
HV Lead
CH2 X1 X2 X3
CHY
Y1 Y2 Y3
Doble Testing Potential Transformers
12
Test Procedure - Single Phase - P T Test #4: Ungrounded Specimen Test (UST) Measure: Excitation Current H1
HV Lead
CH1
H0
CHX
LV Lead
CH2 X1 X2 X3
CHY
Y1 Y2 Y3
Doble Testing Potential Transformers
13
Test Procedure - Single Phase - P T Test #5: Ungrounded Specimen Test (UST) Measure: Excitation Current LV Lead
CH1
H1
H0
CHX
HV Lead
CH2 X1 X2 X3
CHY
Y1 Y2 Y3
Doble Testing Potential Transformers
14
Supplementary Tests - Single-Phase P T Test No. 6
Test Mode UST
Energize H1, H2
Ground Yn
Guard -
UST Xn
Test Description CHX
7
UST
H1, H2
Xn
-
Yn
CHY
8
GST
H1
-
-
Bushing H1
9
GST
H2
-
H2, Xn, Yn H1, Xn, Yn
-
Bushing H2
Note: n designates any winding connection, 1, 2 or 3
Doble Testing Potential Transformers
15
Supplementary Tests - Single-Phase P T Test #6 : UST Measure: CHX
H1
H0
HV Lead
CH1
CHX
CH2 X1 X2 X3
CHY Y1 Y2 Y3
LV Lead Doble Testing Potential Transformers
16
Supplementary Tests - Single-Phase P T Test #7 : UST Measure: CHY
H1
H0
HV Lead
CH1
CHX
CH2 X1 X2 X3
CHY Y1 Y2
LV Lead
Y3 Doble Testing Potential Transformers
17
Test Procedure - Single Phase - P T Test #8: GST-Guard Red & Blue Measure: CH1 H1
LV Lead
H0
HV Lead LV Lead
CH1
CHX
CH2 X1 X2 X3
CHY
Y1 Y2 Y3
Doble Testing Potential Transformers
18
Test Procedure - Single Phase - P T Test #9: GST-Guard Red & Blue Measure: CH2 H1
HV Lead H0
LV Lead LV Lead
CH1
CHX
CH2 X1 X2 X3
CHY
Y1 Y2 Y3
Doble Testing Potential Transformers
19
Single Phase Internally Grounded PT H1
CHX
CH
CHY
Neutral Shown Internally Grounded Doble Testing Potential Transformers
X1 X2 X3 Y1 Y2 Y3
H0 20
Single Phase Internally Grounded PT Test Procedure Test No. 1 2
Mode Energize UST H1 GST H1
Ground HO HO
Guard ---X1,Y1
UST X1,Y1 ----
Test No. 1: Measures Line-End Interwinding Insulation Test No. 2: Measure Excitation Current
Doble Testing Potential Transformers
21
Cascade Potential Transformers H1
H0 Ground Lead
Doble Testing Potential Transformers
22
Cascade Potential Transformers •Test Preparation - Single Phase Line-to-Ground PT •One Side Of Each Secondary Winding Grounded •Remove Ground Link From Neutral •Short Circuit H1(Line) to H0 (Neutral) •Test No. 1 Only NOTE: Test Voltage for Tests 1, 3, 4, 5 Limited by Rating of Neutral Bushing (5 kV)
Doble Testing Potential Transformers
23
Cascade Potential Transformers Test #1: GST-Ground
H1
HV Cable
Secondary Windings Not Shown H0 Ground Lead Test Voltage for Tests 1, 3, 4, 5 Limited by Rating of Neutral Bushing (5 kV) Doble Testing Potential Transformers
24
Cascade Potential Transformers Test #2: GST-Guard Measure: Cross-Check #1
H1 HV Cable
H0
LV Lead
Doble Testing Potential Transformers
Secondary Windings Not Shown
Ground Lead
25
Cascade Potential Transformers Test #3: GST-Guard Measure: Cross-Check #2
H1 LV Lead
H0
Secondary Windings Not Shown
HV Cable
Ground Lead Test Voltage for Tests 1, 3, 4, 5 Limited by Rating of Neutral Bushing (5 kV) Doble Testing Potential Transformers
26
Cascade Potential Transformers Test #4: UST Measure: Excitation Current HV Cable
H0
Secondary Windings Not Shown
Ground Lead
Doble Testing Potential Transformers
27
Cascade Potential Transformers Test #5: UST Measure: Excitation Current H1 LV Lead
H0
Secondary Windings Not Shown
HV Cable
Ground Lead Test Voltage for Tests 1, 3, 4, 5 Limited by Rating of Neutral Bushing (5 kV) Doble Testing Potential Transformers
28
Cascade Potential Transformers Alternative Method for Performing the Overall Test* Test No.
Test Mode
Energize
Ground
Floating
1A
GST
H0
X1, X2, X3
H1
Test Description Overall
Y1, Y2, Y3
Tests 2 Through 5 - Same as Conventional PT *Note: No Short Circuit Used Between H1 & H0 Doble Testing Potential Transformers
29
Cascade Potential Transformers Test #1A: GST-Ground No Short Circuit on Primary Winding H1
H0
Secondary Windings Not Shown
HV Cable
Ground Lead Test Voltage for Tests 1, 3, 4, 5 Limited by Rating of Neutral Bushing (5 kV) Doble Testing Potential Transformers
30
Use of Guard Collar on Cascade PT H1
Isurface
Secondary Windings Not Shown
Connect to Guard H0
Doble Testing Potential Transformers
31
Test Procedure-Single-Phase PT - DTA
Doble Testing Potential Transformers
32
Analysis of Results: PTs •Compare Overall Power Factor Test Values to Previous Test Results •Compare Overall Power Factor Values to Similar Units (Doble Test-Data-Reference-Book) •Compare Cross-Check Power Factors •Most PTs Test Results are Similar
Doble Testing Potential Transformers
33
Analysis of Results: PTs Examples: PT #1 Test No. 1 (Overall) 2 (H1 Cross-check) 3 (H2 Cross-check)
mA 2.540 1.256 1.248
Watts 0.104 0.056 0.046
%PF 0.41 0.45 0.37
PT #2 Test No. 1 (Overall) 2 (H1 Cross-check) 3 (H2 Cross-check)
mA 2.650 1.356 1.248
Watts 0.354 0.313 0.055
%PF 1.32 2.31 0.44
Doble Testing Potential Transformers
34
Analysis of Results: PTs
What is Wrong With PT #2?
•Consider Performing Supplemental Tests to Locate Cause of Problem •Refer to Doble Test Equipment Instruction Manual
Doble Testing Potential Transformers
35
Analysis of Results: PTs Typical Good Unit
Test No. 1 (Overall) 2 (H1 Cross-Check) 3 (H0 Cross-Check)
mA 3.040 0.278 2.810
Doble Testing Potential Transformers
Watts % Power Factor 0.152 0.50 0.0312 1.12 0.128 0.46
36
Analysis of Results: PTs Questionable Unit
Test No. 1 (Overall) 2 (H1 Cross-Check) 3 (H0 Cross-Check)
mA Watts % Power Factor 3.080 0.181 0.58 0.311 0.0682 2.19 2.810 0.128 0.46
Doble Testing Potential Transformers
37