Romfor International Ltd.

Backup Hand TRIP OUT OF HOLE TRIP OUT OF HOLE

PRACTICE: POSITION:

DRILL COLLARS

Romfor International Ltd.

TRIPPING IN OR OUT OF THE HOLE UPDATE FOR ALL POSITIONS

BEFORE ANY TRIP OR AFTER ANY CHANGE OF OPERATIONS DURING THE TRIP:

100% TIE-OFF VERIFICATION OF THE DERRICKMAN ALL MEMBERS OF THE CREW ARE TO VERIFY THAT THE DERRICKMAN IS PROPERLY TIEDOFF AND READY TO WORK BEFORE THE BLOCKS ARE MOVED. VERIFY THAT TWO-WAY COMMUNICATION IS ESTABLISHED BETWEEN THE DRILLER AND THE DERRICKMAN.

TOP DRIVE DRILL PIPE

Romfor International Ltd.

Backup Hand TRIP OUT OF HOLE TOP DRIVE DRILL PIPE

Backup Hand

Romfor International Ltd. T R I P OUT OF H O L E TOP DRIVE

DRILL PIPE

STEP

SUB

PROCEDURE

0

1

PPE Requirements - Hard Hat, Safety Glasses, Work Gloves, Steel Toe Shoes, Back Support.

2

Review JSA for tripping out of hole with drill pipe.

1

REMARKS

Inspect Equipment:

Look for:

Tongs, Lines, Shackles, Slips, dies, keepers, tong heads, clamps.

Slack, Missing parts, Damage, Wear, Broken cables, Shackles, Dies, Keepers, tong heads, Lines (proper length and proper size). Slips - Bolts, Inserts, Keepers (Cleaned and Doped), and Handle Conditions.

2

Upon the Driller's signal, assist in setting the slips when the top drive is in the breakout position and elevators are latched.

Minimum of two people to set slips.

3

Stand clear while Driller latches elevators, breaks out top drive, and picks up elevators against tool joint.

Avoid drilling fluids.

4

After releasing the back-up tongs from the A-leg place tongs on the bottom tool joint, using proper handles.

5

Stand clear while lead-tong is latched onto top tool joint.

DO NOT assist in latching lead tongs.

6

Make the back up tongs bite at the same time the lead tongs bite, using the proper tong handles.

Avoid pinch points. Avoid jerk chain.

7

Keep the back-up tongs biting while the Driller breaks the connection.

8

After connection is broken, unlatch lead tongs, using proper handles. Assist in installing pipe wiper based on operating procedures or hole conditions as directed by the Driller. READY FOR TRIP OUT OF THE HOLE

1

Backup Hand

Romfor International Ltd. T R I P OUT OF H O L E TOP DRIVE STEP SUB

DRILL PIPE PROCEDURE

REMARKS

9

Stand clear while Driller latches elevators onto drill pipe.

10

Assist in pulling the slips using the proper handles.

Use proper lifting procedures. Minimum of three people to pull slips.

11

After the stand is pulled and in the proper position, assist in setting slips using the proper handles.

Minimum of two people to set slips.

12

Place back-up tongs on bottom tool joint.

DO NOT assist in latching lead tongs.

13

Stand clear while lead-tong is latched onto top tool joint.

Avoid pinch points. Avoid jerk chain.

14

Make the back up tongs bite at the same time the lead tongs bite, using the proper tong handles.

15

Keep the back up tongs biting while the Driller breaks the connection. THE CONNECTION IS BROKEN

16

1

ROTATING OUT WITH ROTARY TABLE - Before rotating out, unlatch the lead tongs using the proper handles.

2

After the back-up tongs are unlatched, STAND CLEAR while the Driller rotates out stand.

Do not get in Driller's view. Keep feet clear of the rotary table and slip handles. Avoid drilling fluids.

3

After the rotary table is stopped, assist the motorman in racking the stand into the proper position.

Make sure feet are clear of pin end of stand.

4

When the elevators are in the proper position, stand clear while elevators are latched around drill pipe in rotary table.

Be aware of the traveling equipment as it is being lowered to the proper latching position. Keep hands clear of elevators.

OR 16

1

REVERSING OUT WITH SPINNING CHAIN - Before spinning out, unlatch the top set of tongs, using the proper tong handles.

Make sure spinning chain is placed into one-gallon bucket while stand is being raised.

2

Backup Hand

Romfor International Ltd. T R I P OUT OF H O L E TOP DRIVE STEP

SUB

DRILL PIPE PROCEDURE

REMARKS

2

After Lead Tong Hand unlatches back-up tongs, remove tongs from pipe in rotary.

3

Wrap chain, clockwise, around stand of drill pipe.

Make sure not to cross chain wraps.

4

While Driller is pulling on chain, make sure your hands and fingers are in proper position. Control spinning chain, especially tail, while reversing out stand of drill pipe.

Make sure to hold proper tension on chain.

5

AFTER STAND STOPS TURNING, remove excess chain from stand.

6

STAND CLEAR while the Driller picks up stand.

Avoid drilling fluids.

7

Assist the motorman in racking the stand into the proper position.

Make sure feet are clear of pin end of stand.

8

While the traveling equipment is being lowered to the floor, place the spinning chain into the bucket.

9

When the elevators are in the proper position, stand clear while Driller latches drill pipe.

Do not get in Driller's view.

OR 16

1

SPINNING OUT WITH PIPE SPINNER - Before spinning out, unlatch the top set of tongs, using the proper tong handles.

2

After Lead Tong Hand unlatches back-up tongs, remove tongs from pipe in rotary.

3

Stand clear while the stand is spun out with pipe spinner and Driller picks up on stand.

4

Assist the Motorman in racking the stand into the proper position.

DO NOT assist in latching pipe spinner onto drill pipe.

Do not get in Driller's view. Make sure feet are clear of pin end of stand.

3

Backup Hand

Romfor International Ltd. T R I P OUT OF H O L E TOP DRIVE STEP SUB

DRILL PIPE PROCEDURE

REMARKS

5

While the traveling equipment is being lowered to the floor, stand clear of Driller's view.

Be aware of the traveling equipment as it is being lowered to the proper latching position. Keep hands clear of elevators.

6

When the elevators are in the proper position, stand clear while Driller latches onto pipe.

Do not get in Driller's view.

17

Repeat Steps 8 through 16 until reaching BHA.

18

Upon reaching BHA, refer to TOH - DRILL COLLARS WITH TOP DRIVE. END OF PROCEDURE

4

Romfor International Ltd.

TRIP OUT OF HOLE TOP DRIVE DRILL COLLAR

TOP DRIVE DRILL COLLAR

Backup Hand

Backup Hand

Romfor International Ltd. T R I P OUT OF H O L E TOP DRIVE

DRILL COLLARS

STEP

SUB

0

1

PPE Requirements - Hard Hat, Safety Glasses, Work Gloves, Steel Toe Shoes, Back Support.

2

Review JSA on tripping out of the hole with drill collars.

1

PROCEDURE

REMARKS

Inspect Equipment:

Look for:

Tong, Lines, Shackles, Slips, Keepers, Tong Heads, Clamps, Cables, drill collar clamps and wrench.

Slack, Missing parts, Damage, Wear, Broken Cable, Shackles, Dies, Keepers, Tong Heads, Lines (proper length and proper size). Slips - Bolts, Inserts, Keepers, (Cleaned and Doped), Handle Conditions.

PROCEDURE IS BASED ON THE ASSUMPTION THAT THE FIRST DRILL COLLAR IS RACKED WITH DRILL PIPE. 2

Upon the Driller's signal, assist in setting the slips, using proper lifting procedures.

Minimum of two people to set slips.

3

Place pin in collar clamp and tighten using the proper clamp wrench.

DO NOT use pipe wrench. Make sure each clamp segment is aligned properly.

4

Release the BACKUP tongs from the A-leg and latch onto the bottom drill collar connection, using proper handles.

Avoid pinch points. DO NOT USE LATCH HANDLE.

5

STAND CLEAR while the LEAD tong is latched onto the top drill collar connection.

DO NOT assist in latching LEAD tongs.

6

Make the BACK UP tongs bite at the same time the LEAD tongs bite, using the proper tong handles.

Avoid pinch points. DO NOT USE LATCH HANDLE. Avoid jerk chain or line.

7

After the tongs bite move to a safe area while Driller breaks the drill collar connection.

Be aware of tight connections. Be aware of trip hazards.

THE CONNECTION IS BROKEN

1

Backup Hand

Romfor International Ltd. T R I P OUT OF H O L E TOP DRIVE STEP SUB 8

1

DRILL COLLARS PROCEDURE

REMARKS

ROTATING OUT WITH ROTARY TABLE: After Lead tong hand unlatches backup tongs, secure tongs to A-leg.

2

STAND CLEAR while the Driller rotates out and picks up on stand.

Do not get in Driller's view. Make sure feet are clear of rotary table and slip handles. Avoid drilling fluids.

3

After the rotary table stops, assist the Motorman in racking the stand into the proper position.

Do not get in the Drillers view. Make sure feet are clear of pin end of stand.

OR 8

1

REVERSING OUT WITH SPINNING CHAIN:

Using the proper tong handles.

Unlatch LEAD tongs and remove BACKUP tongs after Lead Tong Hand unlatches. 2

Do not secure tongs to A-leg.

BE AWARE of Tong Position at all times.

3

Wrap chain, clockwise, around stand of drill collars.

Make sure not to cross chain wraps.

4

While Driller is pulling on chain, make sure your hands and fingers are in proper position. Control chain, especially tail, while spinning out stand.

Make sure to hold proper tension on chain.

5

AFTER STAND STOPS TURNING, remove the excess chain from drill collars.

6

STAND CLEAR while Driller picks up on stand.

Avoid drilling fluids.

7

Assist in racking the stand into the proper position.

Do not get in the Drillers view. Make sure feet are clear of pin end of stand.

2

Backup Hand

Romfor International Ltd. T R I P OUT OF H O L E TOP DRIVE STEP

SUB

DRILL COLLARS PROCEDURE

REMARKS

OR 8

1

SPINNING OUT WITH PIPE SPINNER: Unlatch LEAD tongs and remove BACKUP tongs after Lead Tong Hand unlatches, using the proper tong handles.

2

Secure tongs to A-leg.

3

STAND CLEAR while the stand is spun out with pipe spinner and Driller picks up on stand.

Avoid drilling fluids.

4

Assist in racking the stand into the proper position.

Do not get in the Drillers view. Make sure feet are clear of pin end of stand.

9

Using air Hoist with proper sling, tie onto lift sub and tail into place.

10

Assist in stabbing drill collar lift sub and make-up hand tight. Remove sling and secure air hoist line out the way of traveling equipment.

Keep fingers out of threads while tightening by hand.

11

STAND CLEAR while driller lowers elevators for latching.

Be aware of the traveling equipment as it is being lowered to the proper latching position. Do not get into Drillers View.

12

After elevators are latched onto lift sub STAND CLEAR while LEAD tongs are latched onto drill collar connection in rotary.

Do not assist in latching LEAD tongs.

13

Release BACKUP tongs from A-leg and latch onto lift sub connection, using the proper handles.

14

Make BACKUP tongs bite at the same time the LEAD tongs bite, using the proper handles until the connection is tightened.

Avoid pinch points and do not use latch handles.

3

Backup Hand

Romfor International Ltd. T R I P OUT OF H O L E TOP DRIVE STEP SUB

DRILL COLLARS PROCEDURE

REMARKS

LIFT SUB CONNECTION IS TIGHTENED 15

Unlatch LEAD tongs using the proper handles.

16

After LEAD Tong Hand unlatches BACKUP tongs, secure tongs to A-leg.

17

After Driller raises stand to proper height, assist in removing the drill collar clamp by loosening nut and pulling pin. Use the proper clamp wrench.

DO NOT hold the bottom of the clamp with hands or knees.

18

Assist in pulling the slips using proper handles. Keep track of the number of drill collars coming through the rotary table.

Minimum of two people to pull slips.

19

Repeat Steps 2 through 18 for remaining drill collars. END OF PROCEDURE

4

Romfor International Ltd.

Backup Hand

PIPE SPINNER DRILL PIPE

PIPE SPINNER DRILL PIPE

TRIP OUT OF HOLE

Backup Hand

Romfor International Ltd. T R I P OUT OF H O L E PIPE SPINNER

DRILL PIPE

STEP

SUB

0

1

PPE Requirements - Hard Hat, Safety Glasses, Work Gloves, Steel Toe Shoes, Back Support.

2

Review JSA for tripping out of hole with Drill Pipe.

1

PROCEDURE

REMARKS

Inspect Equipment:

Look for:

Tongs, Lines, Shackles, Slips, dies, keepers, tong heads, clamps.

Slack, Missing parts, Damage, Wear, Broken cables, Shackles, Dies, Keepers, tong heads, Lines (proper length and proper size). Slips - Bolts, Inserts, Keepers (Cleaned and Doped), and Handle Conditions.

2

Upon the Driller's signal, assist in setting the slips, using proper lifting procedures.

3

After releasing the Back-up tongs from the A-leg place tongs on the bottom tool joint, using proper handles.

4

Stand clear while lead-tong is latched onto Kelly saver sub.

DO NOT assist in latching lead tongs.

5

Make the back up tongs bite at the same time the lead tongs bite, using the proper tong handles.

Avoid pinch points. Avoid jerk chain.

6

Keep the back-up tongs biting while the Driller breaks the Kelly connection, using proper handles.

Minimum of two people to set slips.

KELLY CONNECTION IS BROKEN 7

1

ROTATING KELLY OUT WITH KELLY SPINNER Before spinning out, unlatch top set of tongs, using proper tong handles.

2

Make back-up tongs bite on joint in rotary table, using proper tong handles, while Driller reverses out Kelly with Kelly spinner.

3

AFTER KELLY STOPS TURNING, Lead Tong Hand unlatches bottom set of tongs.

1

Backup Hand

Romfor International Ltd. T R I P OUT OF H O L E PIPE SPINNER STEP SUB

DRILL PIPE PROCEDURE

REMARKS

OR 7

1

ROTATING KELLY OUT WITH SPINNING CHAIN Before spinning out with chain, unlatch top set of tongs using proper tong handles.

Make sure spinning chain is placed in one-gallon bucket while Kelly is being raised.

2

Wrap chain, clockwise, around Kelly saver sub.

Make sure not to cross chain wraps.

3

While Driller is pulling on chain, make sure your hands and fingers are in proper position. Control chain, especially tail, while reversing out Kelly.

Make sure to hold proper tension on chain.

4

AFTER KELLY STOPS TURNING, remove the excess chain from Kelly.

5

STAND CLEAR while Driller picks up on Kelly, secure back-up tongs to A-leg and prepare to assist setting Kelly back.

Avoid drilling fluids.

SET BACK THE KELLY 8

Secure pull back line to Kelly.

Insure the pull-back line is properly secured to Kelly for pull-back.

9

Stand clear while the Driller slacks-off stabbing the Kelly into the Kelly Shuck.

DO NOT get in Drillers' view. Keep out of area between Driller and Kelly Shuck.

10

After the Kelly is stabbed into the Kelly Shuck and traveling equipment is stopped (air hoist is slacked-off) remove pull-back cable from Kelly.

11

Once the Kelly is fully in the Kelly Shuck, tie off Elevators to pull-back cable.

12

Stand clear while the traveling equipment is unlatched from the Swivel.

13

Once the traveling equipment is in the proper position, stopped and the air hoist is slacked-off, remove pullback cable.

14

Assist Motorman in positioning elevators to proper tripout position.

Assist Lead-Tong Hand, if required.

Keep hands clear of elevators.

2

Backup Hand

Romfor International Ltd. T R I P OUT OF H O L E PIPE SPINNER STEP

SUB

DRILL PIPE PROCEDURE

REMARKS

Assist in installing pipe wiper based on operating procedures or hole conditions as directed by the Driller. READY FOR TRIP OUT OF THE HOLE 15

Assist in pulling the slips using the proper handles. If required, keep track of the number of joints being pulled through the rotary table.

Minimum of three people to pull slips. Use proper lifting procedures. As required, hose off mud from pipe.

16

After the stand is pulled and in the proper position, assist in setting slips using the proper handles.

Minimum of two people to set slips.

17

After releasing the back-up tongs from the A-leg, place tongs on bottom tool joint, using proper handles.

18

Stand clear while lead-tong is latched onto top tool joint.

DO NOT assist in latching lead tongs.

19

Make the back up tongs bite at the same time the lead tongs bite, using the proper tong handles.

Avoid pinch points. Avoid jerk chain.

20

Keep the back up tongs biting while the Driller breaks the connection. THE CONNECTION IS BROKEN

21

Before spinning out, unlatch the top set tongs, using the proper tong handles.

22

Stand clear while the stand is spun out with pipe spinner and Driller picks up on stand.

23

Assist the Motorman in racking the stand into the proper position.

Do not get in Driller's view. Make sure feet are clear of pin end of stand.

24

While the traveling equipment is being lowered to the floor, stand clear of Driller’s view.

Be aware of the traveling equipment as it is being lowered to the proper latching position. Keep hands clear of elevators until at proper latching position.

.

DO NOT assist in latching pipe spinner onto drill pipe.

3

Backup Hand

Romfor International Ltd. T R I P OUT OF H O L E PIPE SPINNER STEP SUB

DRILL PIPE PROCEDURE

25

When the elevators are in the proper position, assist Motorman in latching onto the tool joint in the rotary table.

26

Repeat Steps 15 through 25 until reaching BHA.

27

Upon reaching BHA, refer to TOH - DRILL COLLARS WITH PIPE SPINNER.

REMARKS Do not get in the Driller’s view.

END OF PROCEDURE

4

Romfor International Ltd.

Backup Hand TRIP OUT OF HOLE

DRILL COLLAR

PIPE SPINNER DRILL COLLAR

PIPE SPINNER

Backup Hand

Romfor International Ltd. T R I P OUT OF H O L E PIPE SPINNER

DRILL COLLARS

STEP

SUB

0

1

PPE Requirements - Hard Hat, Safety Glasses, Work Gloves, Steel Toe Shoes, Back Support.

2

Review JSA on tripping out of the hole with drill collars.

1

PROCEDURE

REMARKS

Inspect Equipment:

Look for:

Tong, Lines, Shackles, Slips, Keepers, Tong Heads, Clamps, Cables, Drill Collar Clamps and Wrench.

Slack, Missing parts, Damage, Wear, Broken Cable, Shackles, Dies, Keepers, Tong Heads, Lines (proper length and proper size). Slips - Bolts, Inserts, Keepers, (Cleaned and Doped), Handle Conditions.

PROCEDURE IS BASED ON THE ASSUMPTION THAT THE FIRST DRILL COLLAR IS RACKED WITH DRILL PIPE 2

Upon the Driller's signal, assist in setting the slips, using proper lifting procedures.

Minimum of two people to set slips.

3

Place pin in collar clamp and tighten using the proper clamp wrench.

DO NOT use pipe wrench. Make sure each clamp segment is aligned properly.

4

Release the BACKUP tongs from the A-leg and latch onto the bottom drill collar connection, using proper handles.

Avoid pinch points. DO NOT USE LATCH HANDLE.

5

STAND CLEAR while the LEAD tong is latched onto the top drill collar connection.

DO NOT assist in latching LEAD tongs.

6

Make the BACK UP tongs bite at the same time the LEAD tongs bite, using the proper tong handles.

Avoid pinch points. DO NOT USE LATCH HANDLE. Avoid jerk chain or line.

7

After the tongs bite move to a safe area while Driller breaks the drill collar connection.

Be aware of tight connections. Be aware of trip hazards.

THE CONNECTION IS BROKEN

.

1

Backup Hand

Romfor International Ltd. T R I P OUT OF H O L E PIPE SPINNER STEP SUB

DRILL COLLARS PROCEDURE

REMARKS

8

Before spinning out, unlatch LEAD tongs and remove BACKUP tongs after Lead Tong Hand unlatches, using the proper tong handles.

9

Secure tongs to A-leg.

10

STAND CLEAR while the stand is spun out with pipe spinner and Driller picks up on stand.

Avoid drilling fluids.

11

Assist in racking the stand into the proper position.

Do not get in the Drillers view. Make sure feet are clear of pin end of stand.

12

Using air Hoist with proper sling, tie onto lift sub and tail into place.

13

Assist in stabbing drill collar lift sub and make-up hand tight. Remove sling and secure air hoist line out the way of traveling equipment.

14

STAND CLEAR while driller lowers elevators for latching.

15

When the elevators are in the proper position, assist Motorman in latching onto the lift sub.

Be aware of the traveling equipment as it is being lowered to the proper latching position. Keep hands clear of elevators until at proper latching position. Do not get into Drillers View.

16

After elevators are latched onto lift sub STAND CLEAR while LEAD tongs are latched onto drill collar connection in rotary.

Do not assist in latching LEAD tongs.

17

Release BACKUP tongs from A-leg and latch onto lift sub connection, using the proper handles.

18

Make BACKUP tongs bite at the same time the LEAD tongs bite, using the proper handles until the connection is tightened.

.

Keep fingers out of threads while tightening by hand.

Avoid pinch points and do not use latch handles.

2

Backup Hand

Romfor International Ltd. T R I P OUT OF H O L E PIPE SPINNER STEP

SUB

DRILL COLLARS PROCEDURE

REMARKS

19

Unlatch LEAD tongs using the proper handles.

20

After LEAD Tong Hand unlatches BACKUP tongs, secure tongs to A-leg.

21

After Driller raises stand to proper height, assist in removing the drill collar clamp by loosening nut and pulling pin. Use the proper clamp wrench.

DO NOT hold the bottom of the clamp with hands or knees.

22

Assist in pulling the slips using proper handles. Keep track of the number of drill collars coming through the rotary table.

Minimum of two people to pull slips.

23

Repeat Steps 2 through 22 for remaining drill collars. END OF PROCEDURE

3

Romfor International Ltd.

Backup Hand TRIP OUT OF HOLE SPINNING CHAIN SPINNING CHAIN DRILL PIPE

DRILL PIPE

Backup Hand

Romfor International Ltd. T R I P OUT OF H O L E SPINNING CHAIN

DRILL PIPE

STEP

SUB

0

1

PPE Requirements - Hard Hat, Safety Glasses, Work Gloves, Steel Toe Shoes, Back Support.

2

Review JSA for tripping out of hole with drill pipe.

1

PROCEDURE

REMARKS

Inspect Equipment:

Look for:

Tongs, Lines, Shackles, Slips, dies, keepers, tong heads, clamps.

Slack, Missing parts, Damage, Wear, Broken cables, Shackles, Dies, Keepers, tong heads, Lines (proper length and proper size). Slips - Bolts, Inserts, Keepers (Cleaned and Doped), and Handle Conditions.

2

Upon the Driller's signal, assist in setting the slips, using proper lifting procedures.

3

After releasing the back-up tongs from the A-leg place tongs on the bottom tool joint, using proper handles.

4

Stand clear while lead-tong is latched onto Kelly saver sub.

DO NOT assist in latching lead tongs.

5

Make the back up tongs bite at the same time the lead tongs bite, using the proper tong handles.

Avoid pinch points. Avoid jerk chain.

6

Keep the back-up tongs biting while the Driller breaks the Kelly connection, using proper handles.

Minimum of two people to set slips.

KELLY CONNECTION IS BROKEN 7

1

ROTATING KELLY OUT WITH KELLY SPINNER Before spinning out, unlatch top set of tongs, using proper tong handles.

2

Make back-up tongs bite on joint in rotary table, using proper tong handles, while Driller reverses out Kelly with Kelly spinner.

3

AFTER KELLY STOPS TURNING, Lead Tong Hand unlatches bottom set of tongs.

1

Backup Hand

Romfor International Ltd. T R I P OUT OF H O L E SPINNING CHAIN STEP SUB

DRILL PIPE PROCEDURE

REMARKS

OR 7

1

ROTATING KELLY OUT WITH SPINNING CHAIN Before spinning out with chain, unlatch top set of tongs using proper tong handles.

Make sure spinning chain is placed in one-gallon bucket while Kelly is being raised.

2

Wrap chain, clockwise, around Kelly saver sub.

Make sure not to cross chain wraps.

3

While Driller is pulling on chain, make sure your hands and finger are in proper position. Control chain, especially tail, while reversing out Kelly.

Make sure to hold proper tension on chain.

4

AFTER KELLY STOPS TURNING, remove the excess chain from Kelly.

5

STAND CLEAR while Driller picks up on Kelly, secure back-up tongs to A-leg and prepare to assist setting Kelly back.

Avoid drilling fluids.

SET BACK THE KELLY 8

Secure pull back line to Kelly.

Insure the pull-back line is properly secured to Kelly for pulled-back.

9

Stand clear while the Driller slacks-off stabbing the Kelly into the Kelly Shuck.

DO NOT get in Drillers' view. Keep out of area between Driller and Kelly Shuck.

10

After the Kelly is stabbed into the Kelly Shuck and traveling equipment is stopped (air hoist is slacked-off) remove pull-back cable from Kelly.

11

Once the Kelly is fully in the Kelly Shuck, tie off Elevators to pull-back cable.

12

Stand clear while the traveling equipment is unlatched from the Swivel.

13

Once the traveling equipment is in the proper position, stopped and the air hoist is slacked-off, remove pullback cable.

14

Assist Motorman in positioning elevators to proper tripout position.

Assist Lead-Tong Hand if required.

Keep hands clear of elevators.

2

Backup Hand

Romfor International Ltd. T R I P OUT OF H O L E SPINNING CHAIN STEP

SUB

DRILL PIPE PROCEDURE

REMARKS

Assist in installing pipe wiper based on operating procedures or hole conditions as directed by the Driller. READY FOR TRIP OUT OF THE HOLE 15

Assist in pulling the slips using the proper handles. If required, keep track of the number of joints being pulled through the rotary table.

Minimum of three people to pull slips. Use proper lifting procedures. As required, hose off mud from pipe.

16

After the stand is pulled and in the proper position, assist in setting slips using the proper handles.

Minimum of two people to set slips.

17

After releasing the tongs from the A-leg, place backup tongs on bottom tool joint, using proper handles.

18

Stand clear while lead-tong is latched onto top tool joint.

DO NOT assist in latching lead tongs.

19

Make the back up tongs bite at the same time the lead tongs bite, using the proper tong handles.

Avoid pinch points. Avoid jerk chain.

20

Keep the back up tongs biting while the Driller breaks the connection. THE CONNECTION IS BROKEN

21

Before spinning out with chain, unlatch top set of tongs using proper tong handles.

22

After Lead Tong Hand unlatches back-up tongs, remove tongs from pipe in rotary.

23

Wrap chain, clockwise, around stand of pipe.

Make sure not to cross chain wraps.

24

While Driller is pulling on chain, make sure your hands and fingers are in proper position. Control chain, especially tail, while spinning out stand.

Make sure to hold proper tension on chain.

.

Make sure spinning chain is placed in one-gallon bucket while stand is being raised.

3

Backup Hand

Romfor International Ltd. T R I P OUT OF H O L E SPINNING CHAIN STEP SUB

DRILL PIPE PROCEDURE

REMARKS

25

AFTER STAND STOPS TURNING, remove the excess chain from drill pipe.

26

STAND CLEAR while Driller picks up on stand of drill pipe, secure back-up tongs to A-leg.

Avoid drilling fluids.

27

Assist the motorman in racking the stand into the proper position.

Do not get in Driller's view. Make sure feet are clear of pin end of stand.

28

While the traveling equipment is being lowered to the floor, stand clear of Driller's view.

Be aware of the traveling equipment as it is being lowered to the proper latching position. Keep hands clear of elevators until at proper latching position.

29

When the elevators are in the proper position, assist Motorman in latching onto the tool joint in the rotary table.

Do not get in Driller's view.

30

Repeat Steps 17 through 29 until reaching BHA.

31

Upon reaching BHA, refer to TOH - DRILL COLLARS WITH SPINNING CHAIN. END OF PROCEDURE

4

Romfor International Ltd.

Backup Hand TRIP OUT OF HOLE SPINNING CHAIN DRILL COLLAR SPINNING CHAIN DRILL COLLAR

Backup Hand

Romfor International Ltd. T R I P OUT OF H O L E SPINNING CHAIN

DRILL COLLARS

STEP

SUB

0

1

PPE Requirements - Hard Hat, Safety Glasses, Work Gloves, Steel Toe Shoes, Back Support.

2

Review JSA on tripping out of the hole with drill collars.

1

PROCEDURE

REMARKS

Inspect Equipment:

Look for:

Tong, Lines, Shackles, Slips, Keepers, Tong Heads, Clamps, Cables, drill collar clamps and wrench.

Slack, Missing parts, Damage, Wear, Broken Cable, Shackles, Dies, Keepers, Tong Heads, Lines (proper length and proper size). Slips - Bolts, Inserts, Keepers, (Cleaned and Doped), Handle Conditions.

PROCEDURE IS BASED ON THE ASSUMPTION THAT THE FIRST DRILL COLLAR IS RACKED WITH DRILL PIPE 2

Upon the Driller's signal, assist in setting the slips, using proper lifting procedures.

Minimum of two people to set slips.

3

Place pin in collar clamp and tighten using the proper clamp wrench.

DO NOT use pipe wrench. Make sure each clamp segment is aligned properly.

4

Release the BACKUP tongs from the A-leg and latch onto the bottom drill collar connection, using proper handles.

Avoid pinch points. DO NOT USE LATCH HANDLE.

5

STAND CLEAR while the LEAD tong is latched onto the top drill collar connection.

DO NOT assist in latching LEAD tongs.

6

Make the BACK UP tongs bite at the same time the LEAD tongs bite, using the proper tong handles.

Avoid pinch points. DO NOT USE LATCH HANDLE. Avoid jerk chain or line.

7

After the tongs bite move to a safe area while Driller breaks the drill collar connection.

Be aware of tight connections. Be aware of trip hazards.

THE CONNECTION IS BROKEN

.

1

Backup Hand

Romfor International Ltd. T R I P OUT OF H O L E SPINNING CHAIN STEP SUB

DRILL COLLARS PROCEDURE

REMARKS

8

Before spinning out, unlatch LEAD tongs and remove BACKUP tongs after Lead Tong Hand unlatches, using the proper tong handles.

9

DO NOT secure tongs to A-leg.

10

Wrap chain, clockwise, around stand of drill collars.

Make sure not to cross chain wraps. BE AWARE of Tong Position.

11

While Driller is pulling on chain, make sure your hands and fingers are in proper position. Control chain, especially tail, while spinning out stand.

Make sure to hold proper tension on chain.

12

AFTER STAND STOPS TURNING, remove the excess chain from drill collars.

BE AWARE of Tong Position.

13

STAND CLEAR while Driller picks up on stand.

Avoid drilling fluids.

14

Assist in racking the stand into the proper position.

Do not get in the Drillers view. Make sure feet are clear of pin end of stand.

15

Using air hoist with proper sling, tie onto lift sub and tail into place.

16

Assist in stabbing drill collar lift sub and make-up hand tight. Remove sling and secure air hoist line out the way of traveling equipment.

17

STAND CLEAR while Driller lowers elevators for latching.

18

When the elevators are in the proper position, assist Motorman in latching onto the lift sub.

Be aware of the traveling equipment as it is being lowered to the proper latching position. Keep hands clear of elevators until at proper latching position.

19

After elevators are latched onto lift sub STAND CLEAR while LEAD tongs are latched onto drill collar connection in rotary.

Do not get into Drillers View. Do not assist in latching LEAD tongs.

.

Keep fingers out of threads while tightening by hand.

2

Backup Hand

Romfor International Ltd. T R I P OUT OF H O L E SPINNING CHAIN STEP

SUB

DRILL COLLARS PROCEDURE

20

Release BACKUP tongs from A-leg and latch onto lift sub connection, using the proper handles.

21

Make BACKUP tongs bite at the same time the LEAD tongs bite, using the proper handles until the connection is tightened.

REMARKS

Avoid pinch points and do not use latch handles.

LIFT SUB CONNECTION IS TIGHTENED 22

Unlatch LEAD tongs using the proper handles.

23

After LEAD Tong Hand unlatches BACKUP tongs, secure tongs to A-leg.

24

After Driller raises stand to proper height, assist in removing the drill collar clamp by loosening nut and pulling pin. Use the proper clamp wrench.

DO NOT hold the bottom of the clamp with hands or knees.

25

Assist in pulling the slips using proper handles. Keep track of the number of drill collars coming through the rotary table.

Minimum of two people to pull slips.

26

Repeat Steps 2 through 25 for remaining drill collars. END OF PROCEDURE

3

Romfor International Ltd.

Backup Hand TRIP OUT OF HOLE ROTARY TABLE DRILL PIPE

ROTARY TABLE DRILL PIPE

Backup Hand

Romfor International Ltd. T R I P OUT OF H O L E ROTARY TABLE

DRILL PIPE

STEP

SUB

0

1

PPE Requirements - Hard Hat, Safety Glasses, Work Gloves, Steel Toe Shoes, Back Support.

2

Review JSA for tripping out of hole with drill pipe.

1

PROCEDURE

REMARKS

Inspect Equipment:

Look for:

Tongs, Lines, Shackles, Slips, dies, keepers, tong heads, clamps.

Slack, Missing parts, Damage, Wear, Broken cables, Shackles, Dies, Keepers, tong heads, Lines (proper length and proper size). Slips - Bolts, Inserts, Keepers (Cleaned and Doped), and Handle Conditions. Minimum of two people to set slips.

2

Upon the Driller's signal, assist in setting the slips, using proper lifting procedures.

3

After releasing the back-up tongs from the A-leg place tongs on the bottom tool joint, using proper handles.

4

Stand clear while lead-tong is latched onto Kelly saver sub.

DO NOT assist in latching lead tongs.

5

Make the back up tongs bite at the same time the lead tongs bite, using the proper tong handles.

Avoid pinch points. Avoid jerk chain.

6

Keep the back-up tongs biting while the Driller breaks the Kelly connection, using proper handles.

7

After Kelly connection is broken, and back-up tongs are unlatched by Lead Tong Hand, remove tongs from pipe and secure to A-leg.

8

Stand clear while the Driller rotates out.

9

AFTER ROTARY STOPS, unlatch lead tongs, using proper tong handles.

10

Stand clear and prepare to assist setting Kelly back while Driller picks up Kelly.

Avoid drilling fluids.

SET BACK THE KELLY

1

Backup Hand

Romfor International Ltd. T R I P OUT OF H O L E ROTARY TABLE STEP SUB

DRILL PIPE PROCEDURE

REMARKS

11

Secure pull back line to Kelly.

Insure the pull-back line is properly secured to Kelly for pull-back.

12

Stand clear while the Driller slacks-off stabbing the Kelly into the Kelly Shuck.

DO NOT get in Drillers' view. Keep out of area between Driller and Kelly Shuck.

13

After the Kelly is stabbed into the Kelly Shuck and traveling equipment is stopped (air hoist is slackedoff) remove pull-back cable from Kelly.

14

Once the Kelly is fully in the Kelly Shuck, tie off Elevators to pull-back cable.

15

Stand clear while the traveling equipment is unlatched from the Swivel.

16

Once the traveling equipment is in the proper position, stopped and the air hoist is slacked-off, remove pullback cable.

17

Assist Motorman in positioning elevators to proper trip-out position.

Assist Lead-Tong Hand if required.

Keep hands clear of elevators.

Assist in installing pipe wiper based on operating procedures or hole conditions as directed by the Driller. READY FOR TRIP OUT OF THE HOLE Assist in pulling the slips using the proper handles. If required, keep track of the number of joints being pulled through the rotary table.

Minimum of three people to pull slips. Use proper lifting procedures. As required, hose off mud from pipe.

19

After the stand is pulled and in the proper position, assist in setting slips using the proper handles.

Minimum of two people to set slips.

20

After releasing the back-up tongs from the A-leg, place tongs on bottom tool joint, using proper handles.

18

2

Backup Hand

Romfor International Ltd. T R I P OUT OF H O L E ROTARY TABLE STEP

SUB

DRILL PIPE PROCEDURE

REMARKS

21

Stand clear while lead-tong is latched onto top tool joint.

DO NOT assist in latching lead tongs.

22

Make the back up tongs bite at the same time the lead tongs bite, using the proper tong handles.

Avoid pinch points. Avoid jerk chain.

23

Keep the back up tongs biting while the Driller breaks the connection. THE CONNECTION IS BROKEN

24

Before rotating out, unlatch lead tongs, using the proper tong handles.

25

After back-up tongs are unlatched, stand clear while the Driller rotates out.

Do not get in Driller's view. Make sure feet are clear of rotary table and slip handles. Avoid drilling fluids.

26

After the rotary table stops, assist the motorman in racking the stand into the proper position.

Make sure feet are clear of pin end of stand.

27

When the elevators are in the proper position, assist Motorman in latching onto the tool joint in the rotary table.

Do not get in Driller's view. Be aware of the traveling equipment as it is being lowered to the proper latching position. Keep hands clear of elevators until at proper latching position.

28

Repeat Steps 18 through 27 until reaching BHA.

29

Upon reaching BHA, refer to TOH - DRILL COLLARS WITH ROTARY TABLE. END OF PROCEDURE

3

Romfor International Ltd.

Backup Hand TRIP OUT OF HOLE ROTARY TABLE DRILL COLLAR

ROTARY TABLE DRILL COLLAR

Backup Hand

Romfor International Ltd. T R I P OUT OF H O L E ROTARY TABLE

DRILL COLLARS

STEP

SUB

0

1

PPE Requirements - Hard Hat, Safety Glasses, Work Gloves, Steel Toe Shoes, Back Support.

2

Review JSA on tripping out of the hole with drill collars.

1

PROCEDURE

REMARKS

Inspect Equipment:

Look for:

Tong, Lines, Shackles, Slips, Keepers, Tong Heads, Clamps, Cables, drill collar clamps and wrench.

Slack, Missing parts, Damage, Wear, Broken Cable, Shackles, Dies, Keepers, Tong Heads, Lines (proper length and proper size). Slips - Bolts, Inserts, Keepers, (Cleaned and Doped), Handle Conditions.

PROCEDURE IS BASED ON THE ASSUMPTION THAT THE FIRST DRILL COLLAR IS RACKED WITH DRILL PIPE 2

Upon the Driller's signal, assist in setting the slips, using proper lifting procedures.

Minimum of two people to set slips.

3

Place pin in collar clamp and tighten using the proper clamp wrench.

DO NOT use pipe wrench. Make sure each clamp segment is aligned properly.

4

Release the BACKUP tongs from the A-leg and latch onto the bottom drill collar connections, using proper handles.

Avoid pinch points. DO NOT USE LATCH HANDLE.

5

STAND CLEAR while the LEAD tong is latched onto the top drill collar connection.

DO NOT assist in latching LEAD tongs.

6

Make the BACK UP tongs bite at the same time the LEAD tongs bite, using the proper tong handles.

Avoid pinch points. DO NOT USE LATCH HANDLE. Avoid jerk chain or line.

7

After the tongs bite move to a safe area while Driller breaks the drill collar connection.

Be aware of tight connections. Be aware of trip hazards.

THE CONNECTION IS BROKEN

.

1

Backup Hand

Romfor International Ltd. T R I P OUT OF H O L E ROTARY TABLE STEP SUB

DRILL COLLARS PROCEDURE

REMARKS

8

After Lead tong hand unlatches backup tongs, secure tongs to A-leg.

9

STAND CLEAR while the Driller rotates out and picks up on stand.

Do not get in Driller's view. Make sure feet are clear of rotary table and slip handles. Avoid drilling fluids.

10

After the rotary table stops, assist the motorman in racking the stand into the proper position.

Do not get in the Drillers view. Make sure feet are clear of pin end of stand.

11

Using air Hoist with proper sling, tie onto lift sub and tail into place.

12

Assist in stabbing drill collar lift sub and make up hand tight. Remove sling and secure air hoist line out the way of traveling equipment.

13

STAND CLEAR while driller lowers elevators for latching.

14

When the elevators are in the proper position, assist Motorman in latching onto the lift sub.

Be aware of the traveling equipment as it is being lowered to the proper latching position. Keep hands clear of elevators until at proper latching position. Do not get into Drillers View.

15

After elevators are latched onto lift sub STAND CLEAR while LEAD tongs are latched onto drill collar connection in rotary.

Do not assist in latching LEAD tongs.

16

Release BACKUP tongs from A-leg and latch onto lift sub connection, using the proper handles.

17

Make BACKUP tongs bite at the same time the LEAD tongs bite, using the proper handles until the connection is tightened.

Keep fingers out of threads while tightening by hand.

Avoid pinch points and do not use latch handles.

LIFT SUB CONNECTION IS TIGHTENED

2

Backup Hand

Romfor International Ltd. T R I P OUT OF H O L E ROTARY TABLE STEP

SUB

DRILL COLLARS PROCEDURE

REMARKS

18

Unlatch LEAD tongs using the proper handles.

19

After LEAD Tong Hand unlatches BACKUP tongs, secure tongs to A-leg.

20

After Driller raises stand to proper height, assist in removing the drill collar clamp by loosening nut and pulling pin. Use the proper clamp wrench.

DO NOT hold the bottom of the clamp with hands or knees.

21

Assist in pulling the slips using proper handles. Keep track of the number of drill collars coming through the rotary table.

Minimum of two people to pull slips.

22

Repeat Steps 2 through 21 for remaining drill collars. END OF PROCEDURE

3

Romfor International Ltd.

Derrickman TRIP OUT OF HOLE TRIP OUT OF HOLE

TOP DRIVE DRILL PIPE

Romfor International Ltd.

Derrickman TRIP OUT OF HOLE TOP DRIVE DRILL PIPE

Romfor International Ltd.

Derrickman

T R I P OUT OF H O L E TOP DRIVE

DRILL PIPE

STEP

SUB

PROCEDURE

REMARKS

0

1

PPE Requirements - Hard Hat, Safety Glasses, Work Gloves, Steel Toe Shoes, Back Support, Fall Protection.

2

Review JSA for climbing and working derricks.

Review fall protection guidelines.

3

Discuss TOH procedures with Driller to include:

Review derrick evacuation procedures.

• PROPER TIE-OFF PROCEDURES. • anticipated slug requirements. • number of stands to be pulled and BHA, or any drill string design changes. • fill up requirements. • pit requirements. READY TO TRIP OUT OF HOLE - SET KELLY BACK 1

1

Report following items are ready/available to Driller, as required: • • • •

2

slug is ready and pumped. trip tank is full with proper fluid. fill up line is properly lined up. mud system is ready for trip out of hole.

2

Review prior trip with Driller.

Discuss prior hole problems/ conditions.

3

Verify that two-way communication with the driller is working properly.

Communicate to Driller when properly tied-off and ready to work.

Put on Derrickman full-body harness, hook up to the derrick climber & keep hands and feet on every rung of the ladder until reaching board.

Climb derrick using proper procedure and fall protection. BE 100% TIED OFF AT ALL TIMES. If required tie-off swivel bails to derrick leg.

3

When reaching derrick board, attach shockabsorbing-lanyard to back "D" ring of full body harness which is attached to hand rail or safety cable.

4

Then proceed onto board and Inspect belly belt and rope before hooking up to derrick belt. Hook up derrick belt to full body harness.

.

1

Romfor International Ltd.

Derrickman

T R I P OUT OF H O L E TOP DRIVE STEP SUB 5

DRILL PIPE PROCEDURE Inspect pull back rope and adjust the length of belly rope and pull back rope. Inspect fingers & diving board.

REMARKS Position Pull Back Rope At Corner Of Board.

READY TO PULL BACK PIPE 6

After the stand is broke out, ready for set back and elevators are extended; place rope around stand for pull back.

Use Half wrap.

7

When the stand is being lowered to the racking board, keep rope positioned for un-latching elevators.

Keep moving rope and keep hand clear of the elevators.

8

After unlatching the elevators, keep pulling on the rope until the stand is clear of the traveling equipment.

Beware of elevators hangingup on tool joints. Beware of problems with short stands.

9

Using the rope, guide the stand to the proper finger for racking.

Beware of slippery racking fingers.

10

After the stand is racked, secure with no. 10 or larger sash-cord as required.

Replace worn sash-cord as required.

11

Repeat Steps 7 through 10 until reaching BHA.

12

Upon reaching BHA, refer to TOH - DRILL COLLARS WITH TOP DRIVE. END OF PROCEDURE

2

Romfor International Ltd.

TRIP OUT OF HOLE TOP DRIVE DRILL COLLAR

TOP DRIVE DRILL COLLAR

Derrickman

Romfor International Ltd.

Derrickman

T R I P OUT OF H O L E TOP DRIVE STEP

SUB

0

1

DRILL COLLARS PROCEDURE

REMARKS

PPE Requirements - Hard Hat, Safety Glasses, Work Gloves, Steel Toe Shoes, Back Support, Fall Protection PROCEDURE IS BASED ON THE ASSUMPTION THAT THE FIRST DRILL COLLAR IS RACKED WITH DRILL PIPE.

2

Review JSA for climbing and working derricks.

Review fall protection guidelines.

3

Discuss TOH procedures with Driller to include:

Review derrick evacuation procedures.

• PROPER TIE-OFF PROCEDURES • anticipated slug requirements. • number of stands to be pulled and BHA, or any drill string design changes • fill up requirements. • pit requirements READY TO TRIP OUT OF HOLE 1

1

Report following items are ready/available to Driller, as required: • • • • •

2

slug is ready and pumped. trip tank is full with proper fluid. fill up line is properly lined up. insure strapping tape is ready. mud system is ready for trip out of hole.

2

Review prior trip with Driller.

Discuss prior hole problems/ conditions.

3

Verify that two way communication with the driller is working properly.

Communicate to Driller when properly tied-off and ready to work.

Put on Derrickman full-body harness, hook up to the derrick climber & keep hands and feet on every rung of the ladder until reaching board.

Climb derrick using proper procedure and fall protection. BE 100% TIED OFF AT ALL TIMES. If required tie-off swivel bails to derrick leg.

3

When reaching derrick board, attach shockabsorbing-lanyard, which is attached to hand rail or safety cable to back "D" ring of full body harness.

4

Then proceed onto board, inspect Belly-Belt, rope and hook up to full body harness. .

1

Romfor International Ltd.

Derrickman

T R I P OUT OF H O L E TOP DRIVE STEP SUB 5

DRILL COLLARS PROCEDURE Inspect pull back and drill collar rope (or mechanical Derrickman assist) and adjust the length of belly rope and pull back rope. Inspect fingers & diving board.

REMARKS Position Pull Back Rope At Corner Of Board.

READY TO PULL BACK COLLARS 6

7

When the elevators reach the proper position and Floor Hands set slips and installed drill collar clamp, place the pull-back-rope (or mechanical Derrickman assist) around stand of drill collars keeping the collar centered for proper spin out.

Use only half-wrap and watch elevators while being lowered. After the stand is rotated-out, be aware of driller picking up on the stand before lowering.

When the stand is being lowered slide rope or assist line up to proper unlatching position for the elevators.

8

While the stand is lowered to the rig floor racking board, and elevators are extended, keep tension on assist line or pull back rope.

Be aware of elevators moving down on lift sub and elevator ropes.

9

When the stand, elevators and assist line are in proper position and completely stopped, unlatch elevators.

For tall stands use rope that is tied through elevator latch handle for unlatching.

10

Move drill collars into proper tie-off position with assist line or pull back rope.

Watch for finger pinch points.

11

Secure stand of drill collars, as required.

Use proper tie-off procedures.

12

Repeat Steps 7 through 12 for remaining drill collars. END OF PROCEDURE

2

Romfor International Ltd.

Derrickman

PIPE SPINNER DRILL PIPE

PIPE SPINNER DRILL PIPE

TRIP OUT OF HOLE

Romfor International Ltd.

Derrickman

T R I P OUT OF H O L E PIPE SPINNER

DRILL PIPE

STEP

SUB

PROCEDURE

0

1

PPE Requirements - Hard Hat, Safety Glasses, Work Gloves, Steel Toe Shoes, Back Support, Fall Protection.

2

Review JSA for climbing and working derricks.

3

Discuss TOH procedures with Driller to include: • PROPER TIE-OFF PROCEDURES. • anticipated slug requirements. • number of stands to be pulled and BHA, or any drill string design changes. • fill up requirements. • pit requirements.

REMARKS

Review fall protection guidelines. Review derrick evacuation procedures.

READY TO TRIP OUT OF HOLE - SET KELLY BACK 1

1

Report following items are ready/available to Driller, as required: • • • • •

2

slug is ready and pumped. trip tank is full with proper fluid. fill up line is properly lined up. insure strapping tape is ready. mud system is ready for trip out of hole.

2

Review prior trip with Driller.

Discuss prior hole problems/ conditions.

3

Verify that two way communication with the driller is working properly.

Communicate to Driller when properly tied-off and ready to work.

Put on Derrickman full-body harness, hook up to the derrick climber & keep hands and feet on every rung of the ladder until reaching board.

Climb derrick using proper procedure and fall protection. BE 100% TIED OFF AT ALL TIMES. If required tie-off swivel bails to derrick leg.

3

When reaching derrick board, attach shockabsorbing-lanyard, which is attached to hand rail or safety cable to back "D" ring of full body harness.

4

Then proceed onto board and Inspect Belly-Belt and rope before hooking up to derrick belt. Hook up derrick belt to full body harness.

.

1

Romfor International Ltd.

Derrickman

T R I P OUT OF H O L E PIPE SPINNER STEP SUB 5

DRILL PIPE PROCEDURE Inspect pull back rope (or mechanical Derrickman assist) and adjust the length of belly rope and pull back rope. Inspect fingers & diving board.

REMARKS Position Pull Back Rope At Corner Of Board.

READY TO PULL BACK PIPE When the elevators reach the proper position and Floor Hands set slips, place the pull-back-rope (or mechanical Derrickman assist) around stand of drill pipe keeping the pipe centered for proper spin out.

Use only half-wrap and watch elevators while being lowered. After the stand is spun-out, be aware of driller picking up on the stand before lowering.

7

When the stand is being lowered to the racking board, keep rope positioned for un-latching elevators.

Keep moving rope and keep hand clear of the elevators.

8

After un-latching the elevators, keep pulling on the rope until the stand is clear of the traveling equipment.

Beware of elevator hanging-up on tool joints. Beware of problems with short stands.

9

Using the rope, guide the stand to the proper finger for racking.

Beware of slippery racking fingers.

10

After the stand is racked, secure with no. 10 or larger sash-cord as required.

Replace worn sash-cord as required.

11

Repeat Steps 7 through 10 until reaching BHA.

12

Upon reaching BHA, refer to TOH - DRILL COLLARS WITH PIPE SPINNERS.

6

END OF PROCEDURE

2

Romfor International Ltd.

Derrickman TRIP OUT OF HOLE

DRILL COLLAR

PIPE SPINNER DRILL COLLAR

PIPE SPINNER

Romfor International Ltd.

Derrickman

T R I P OUT OF H O L E PIPE SPINNER STEP

SUB

0

1

DRILL COLLARS PROCEDURE

REMARKS

PPE Requirements - Hard Hat, Safety Glasses, Work Gloves, Steel Toe Shoes, Back Support, Fall Protection. PROCEDURE IS BASED ON THE ASSUMPTION THAT THE FIRST DRILL COLLAR IS RACKED WITH DRILL PIPE.

2

Review JSA for climbing and working derricks.

Review fall protection guidelines.

3

Discuss TOH procedures with Driller to include:

Review derrick evacuation procedures.

• • • • •

PROPER TIE-OFF PROCEDURES anticipated slug requirements. number of stands to be pulled and BHA, or any drill string design changes. fill up requirements. pit requirements. READY TO TRIP OUT OF HOLE

1

2

1

Report following items are ready/available to Driller, as required: • anticipated slug requirements. • number of stands to be pulled and BHA, or any drill string design changes. • fill up requirements. • pit requirements.

2

Review prior trip with Driller.

3

Verify that two-way communication with the driller Communicate to Driller when is working properly properly tied-off and ready to work. Put on Derrickman full-body harness, hook up to the derrick climber & keep hands and feet on every rung of the ladder until reaching board.

Discuss prior hole problems/ conditions.

Climb derrick using proper procedure and fall protection. BE 100% TIED OFF AT ALL TIMES. If required tie-off swivel bails to derrick leg.

3

When reaching derrick board, attach shockabsorbing-lanyard, which is attached to hand rail or safety cable to back "D" ring of full body harness.

4

Then proceed onto board, inspect Belly-Belt, rope and hook up to full body harness.

1

1

Romfor International Ltd.

Derrickman

T R I P OUT OF H O L E PIPE SPINNER STEP 5

SUB

DRILL COLLARS PROCEDURE Derrickman will then inspect pull back and drill collar rope (or mechanical Derrickman assist) and adjust the length of belly rope and pull back rope. Inspect fingers & diving board.

REMARKS Position Pull Back Rope At Corner Of Board.

READY TO PULL BACK COLLARS 6

When the elevators reach the proper position and Floor Hands set slips and has installed drill collar clamp, the Derrickman should place the pull-back-rope (or mechanical Derrickman assist) around stand of drill collars keeping the collar centered for proper spin out.

7

When the stand is being lowered slide rope or assist line up to proper unlatching position for the elevators.

8

While the stand is lowered to the rig floor racking board, keep tension on assist line or pull back rope.

Be aware of elevators moving down on lift sub and elevator ropes.

9

When the stand, elevators and assist line; are in proper position and completely stopped, unlatch elevators.

For tall stands use rope that is tied through elevator latch handle for unlatching.

10

Move drill collars into proper tie-off position with assist line or pull back rope.

Watch for finger pinch points.

11

Secure stand of drill collars, as required.

Use proper tie-off procedures.

12

Repeat Steps 7 through 11 for remaining drill collars.

Use only half-wrap and watch elevators while being lowered. After the stand is spun-out, be aware of driller picking up on the stand before lowering.

END OF PROCEDURE

2

Romfor International Ltd.

Derrickman TRIP OUT OF HOLE SPINNING CHAIN SPINNING CHAIN DRILL PIPE

DRILL PIPE

Romfor International Ltd.

Derrickman

T R I P OUT OF H O L E SPINNING CHAIN

DRILL PIPE

STEP

SUB

PROCEDURE

REMARKS

0

1

PPE Requirements - Hard Hat, Safety Glasses, Work Gloves, Steel Toe Shoes, Back Support, Fall Protection.

2

Review JSA for climbing and working derricks.

Review fall protection guidelines.

3

Discuss TOH procedures with Driller to include:

Review derrick evacuation procedures.

• PROPER TIE-OFF PROCEDURES • anticipated slug requirements. • number of stands to be pulled and BHA, or any drill string. • design changes. • fill up requirements. • pit requirements. READY TO TRIP OUT OF HOLE - SET KELLY BACK 1

2

1

Report following items are ready/available to Driller, as required: • slug is ready and pumped. • trip tank is full with proper fluid. • fill up line is properly lined up. • insure strapping tape is ready. • mud system is ready for trip out of hole.

2

Review prior trip with Driller.

Discuss prior hole problems/ conditions.

3

Verify that two way communication with driller is working properly.

Communicate to Driller when properly tied-off and ready to work.

Put on Derrickman full-body harness, hook up to the derrick climber & keep hands and feet on every rung of the ladder until reaching board.

Climb derrick using proper procedure and fall protection. BE 100% TIED OFF AT ALL TIMES. If required tie-off swivel bails to derrick leg.

3

When reaching derrick board, attach shockabsorbing-lanyard to back "D" ring of full body harness which is attached to hand rail or safety cable.

4

Then proceed onto board and Inspect belly belt and rope before hooking up to derrick belt. Hook up derrick belt to full body harness.

.

1

Romfor International Ltd.

Derrickman

T R I P OUT OF H O L E SPINNING CHAIN STEP SUB 5

DRILL PIPE PROCEDURE

Inspect pull back rope (or mechanical Derrickman assist) and adjust the length of belly rope and pull back rope. Inspect fingers & diving board.

REMARKS Position Pull Back Rope At Corner Of Board

READY TO PULL BACK PIPE 6

When the elevators reach the proper position and Floor Hands set slips, place the pull-back-rope (or mechanical Derrickman assist) around stand of drill pipe keeping the pipe centered for proper spin out.

Use only half wrap and watch elevators while being lowered. After the stand is spun-out, be aware of driller picking up on the stand before lowering.

7

When the stand is being lowered to the racking board, keep rope positioned for unlatching elevators.

Keep moving rope and keep hand clear of the elevators.

8

After unlatching the elevators, keep pulling on the rope until the stand is clear of the traveling equipment.

Beware of elevators hangingup on tool joints. Beware of problems with short stands.

9

Using the rope, guide the stand to the proper finger for racking.

Beware of slippery racking fingers.

10

After the stand is racked, secure with no. 10 or larger sash-cord as required.

Replace worn sash-cord as required.

11

Repeat Steps 7 through 10 until reaching BHA.

12

Upon reaching BHA, refer to TOH - DRILL COLLARS WITH SPINNING CHAIN. END OF PROCEDURE

2

Romfor International Ltd.

Derrickman TRIP OUT OF HOLE SPINNING CHAIN DRILL COLLAR SPINNING CHAIN DRILL COLLAR

Romfor International Ltd.

Derrickman

T R I P OUT OF H O L E SPINNING CHAIN DRILL COLLARS STEP

SUB

PROCEDURE

0

1

PPE Requirements - Hard Hat, Safety Glasses, Work Gloves, Steel Toe Shoes, Back Support, Fall Protection. PROCEDURE IS BASED ON THE ASSUMPTION THAT THE FIRST DRILL COLLAR IS RACKED WITH DRILL PIPE.

2

Review JSA for climbing and working derricks.

Review fall protection guidelines.

3

Discuss TOH procedures with Driller to include:

Review derrick evacuation procedures.

• • • • •

REMARKS

PROPER TIE-OFF PROCEDURES. anticipated slug requirements. number of stands to be pulled and BHA, or any drill string design changes. fill up requirements. pit requirements. READY TO TRIP OUT OF HOLE

1

1

Report following items are ready/available to Driller, as required: • • • • •

2

slug is ready and pumped. trip tank is full with proper fluid. fill up line is properly lined up. insure strapping tape is ready. mud system is ready for trip out of hole.

2

Review prior trip with Driller.

Discuss prior hole problems/ conditions.

3

Verify that two-way communication with driller is working properly.

Communicate to Driller when properly tied-off and ready to work.

Put on Derrickman full-body harness, hook up to the derrick climber & keep hands and feet on every rung of the ladder until reaching board.

Climb derrick using proper procedure and fall protection. BE 100% TIED OFF AT ALL TIMES. If required tie-off swivel bails to derrick leg.

3

When reaching derrick board, attach shockabsorbing-lanyard, which is attached to hand rail or safety cable to back "D" ring of full body harness.

4

Then proceed onto board, inspect Belly-Belt, rope and hook up to full body harness.

.

1

Romfor International Ltd.

Derrickman

T R I P OUT OF H O L E SPINNING CHAIN DRILL COLLARS STEP SUB 5

PROCEDURE Inspect pull back and drill collar rope (or mechanical Derrickman assist). Adjust the length of belly rope and pull back rope. Inspect fingers & diving board.

REMARKS Position Pull Back Rope At Corner Of Board.

READY TO PULL BACK COLLARS 6

When the elevators reach the proper position, place the pull-back-rope (or mechanical Derrickman assist) around stand of drill collars keeping the collar centered for proper spin out.

7

When the stand is being lowered slide rope or assist line up to proper unlatching position for the elevators.

8

While the stand is lowered to the rig floor racking board, keep tension on assist line or pull back rope.

Be aware of elevators moving down on lift sub and elevator ropes.

9

When the stand, elevators and assist line are in proper position and completely stopped, unlatch elevators.

For tall stands use rope that is tied through elevator latch handle for unlatching.

10

Move drill collars into proper tie-off position with assist line or pull back rope.

Watch for finger pinch points.

11

Secure stand of drill collars, as required.

Use proper tie-off procedures.

12

Repeat Steps 7 through 11 for remaining drill collars.

Use only half-wrap and watch elevators while being lowered. After the stand is spun-out, be aware of driller picking up on the stand before lowering.

END OF PROCEDURE

2

Romfor International Ltd.

Derrickman TRIP OUT OF HOLE ROTARY TABLE DRILL PIPE

ROTARY TABLE DRILL PIPE

Romfor International Ltd.

Derrickman

T R I P OUT OF H O L E ROTARY TABLE

DRILL PIPE

STEP

SUB

PROCEDURE

REMARKS

0

1

PPE Requirements - Hard Hat, Safety Glasses, Work Gloves, Steel Toe Shoes, Back Support, Fall Protection.

2

Review JSA for climbing and working derricks.

Review fall protection guidelines.

3

Discuss TOH procedures with Driller to include:

Review derrick evacuation procedures.

• PROPER TIE-OFF PROCEDURES. • anticipated slug requirements. • number of stands to be pulled and BHA, or any drill string design changes. • fill up requirements. • pit requirements. READY TO TRIP OUT OF HOLE - SET KELLY BACK 1

1

Report following items are ready/available to Driller, as required: • • • • •

2

slug is ready and pumped. trip tank is full with proper fluid. fill up line is properly lined up. insure strapping tape is ready. mud system is ready for trip out of hole.

2

Review prior trip with Driller.

Discuss prior hole problems/ conditions.

3

Verify that two-way communication with the driller is working properly.

Communicate to Driller when properly tied-off and ready to work.

Put on Derrickman full-body harness, hook up to the derrick climber & keep hands and feet on every rung of the ladder until reaching board.

Climb derrick using proper procedure and fall protection. BE 100% TIED OFF AT ALL TIMES. If required tie-off swivel bails to derrick leg.

3

When reaching derrick board, attach shockabsorbing-lanyard, which is attached to hand rail or safety cable to back "D" ring of full body harness.

4

Then proceed onto board, inspect Belly-Belt, rope and hook up to full body harness.

.

1

Romfor International Ltd.

Derrickman

T R I P OUT OF H O L E ROTARY TABLE STEP SUB

DRILL PIPE PROCEDURE

5

Then proceed onto board and Inspect belly belt and rope before hooking up to derrick belt. Hook up derrick belt to full body harness.

6

Inspect pull back rope (or mechanical Derrickman assist) and adjust the length of Belly-Rope and pull back rope. Inspect fingers & diving board.

REMARKS

Position Pull Back Rope At Corner Of Board

READY TO PULL BACK PIPE 7

When the elevators reach the proper position and Floor Hands set slips, place the pull-back-rope (or mechanical Derrickman assist) around stand of drill pipe.

Use only half- wrap.

8

When the stand is being lowered to the racking board, keep rope positioned for unlatching elevators.

Keep moving rope and keep hand clear of the elevators.

9

After un-latching the elevators, keep pulling on the rope until the stand is clear of the traveling equipment.

Beware of elevators hanging-up on tool joints. Beware of problems with short stands.

10

Using the rope, guide the stand to the proper finger for racking.

Beware of slippery racking fingers.

11

After the stand is racked, secure with no. 10 or larger sash-cord as required.

Replace worn sash-cord as required.

12

Repeat Steps 7 through 11 until reaching BHA.

13

Upon reaching BHA, refer to TOH - DRILL COLLARS W/ROTARY TABLE. END OF PROCEDURE

2

Romfor International Ltd.

Derrickman TRIP OUT OF HOLE ROTARY TABLE DRILL COLLAR

ROTARY TABLE DRILL COLLAR

Romfor International Ltd.

Derrickman

T R I P OUT OF H O L E ROTARY TABLE STEP

SUB

0

1

DRILL COLLARS PROCEDURE

REMARKS

PPE Requirements - Hard Hat, Safety Glasses, Work Gloves, Steel Toe Shoes, Back Support, Fall Protection. PROCEDURE IS BASED ON THE ASSUMPTION THAT THE FIRST DRILL COLLAR IS RACKED WITH DRILL PIPE.

2

Review JSA for climbing and working derricks.

3

Discuss TOH procedures with Driller to include: • • • • •

Review fall protection guidelines. Review derrick evacuation procedures.

PROPER TIE-OFF PROCEDURES anticipated slug requirements. number of stands to be pulled and BHA, or any drill string design changes. fill up requirements. pit requirements. READY TO TRIP OUT OF HOLE

1

1

Report following items are ready/available to Driller, as required: • • • •

2

anticipated slug requirements. number of stands to be pulled and BHA, or any drill string design changes. fill up requirements. pit requirements.

2

Review prior trip with Driller.

Discuss prior hole problems/ conditions.

3

Verify that two-way communication wih the driller is working properly.

Communicate to Driller when properly tied-off and ready to work.

Put on Derrickman full-body harness, hook up to the derrick climber & keep hands and feet on every rung of the ladder until reaching board.

Climb derrick using proper procedure and fall protection. BE 100% TIED OFF AT ALL TIMES. If required tie-off swivel bails to derrick leg.

3

When reaching derrick board, attach shock-absorbinglanyard, which is attached to hand rail or safety cable to back "D" ring of full body harness.

4

Then proceed onto board, inspect Belly-Belt, rope and hook up to full body harness. 1

Romfor International Ltd.

Derrickman

T R I P OUT OF H O L E ROTARY TABLE STEP SUB 5

DRILL COLLARS PROCEDURE

Inspect pull back and drill collar rope (or mechanical Derrickman assist) and adjust the length of belly rope and pull back rope. Inspect fingers & diving board.

REMARKS Position Pull Back Rope At Corner Of Board.

READY TO PULL BACK COLLARS 6

When the elevators reach the proper position and Floor Hands set slips and installed drill collar clamp, the Derrickman should place the pull-back-rope (or mechanical Derrickman assist) around stand of drill collars keeping the collar centered for proper spin out.

7

When the stand is being lowered slide rope or assist line up to proper unlatching position for the elevators.

8

While the stand is lowered to the rig floor racking board, keep tension on assist line or pull back rope.

Be aware of elevators moving down on lift sub and elevator ropes.

9

When the stand, elevators and assist line are in proper position and completely stopped, unlatch elevators.

For tall stands use rope that is tied through elevator latch handle for unlatching.

10

Move drill collars into proper tie-off position with assist line or pull back rope.

Watch for finger pinch points.

11

Secure stand of drill collars, as required.

Use proper tie-off procedures.

12

Repeat Steps 7 through 11 for remaining drill collars.

Use only half-wrap and watch elevators while being lowered. After the stand is spun-out, be aware of driller picking up on the stand before lowering.

END OF PROCEDURE

2

Romfor International Ltd.

Driller TRIP OUT OF HOLE TRIP OUT OF HOLE

TOP DRIVE DRILL PIPE

Romfor International Ltd.

Driller TRIP OUT OF HOLE TOP DRIVE DRILL PIPE

Romfor International Ltd.

Driller

T R I P OUT OF H O L E TOP DRIVE

DRILL PIPE

STEP

SUB

PROCEDURE

0

1

PPE Requirements - Hard Hat, Safety Glasses, Work Gloves, Steel Toe Shoes, Back Support

2

Review JSA for tripping out of hole with Drill Pipe

3

Know string weight, maximum over-pull, fill volumes, pipe tally, BHA design, etc.

4

Fit for duty check on all hands.

REMARKS

DISCUSS PROPER TIE-OFF PROCEDURES WITH DERRICKMAN. 1

1

Verify that equipment has been inspected and is in good working condition.

2

Verify following items are ready/available, if required: - slug is ready. - trip tank is full with proper fluid. - survey tool. - strapping tape. - mud bucket. - wiper rubber available and in good condition. - Inside BOP, safety valve w/wrench, and proper x-over subs.

Trip sheet available for recording fill up.

3

Review prior trip with Rig Manager.

Discuss prior hole problems/ conditions.

4

Change drill pipe breaks on each trip.

Review prior trip.

BEFORE THE BLOCKS LEAVE THE FLOOR: • • •

Verify that the Derrickman understands the proper tie-off procedures. Verify that the Derrickman is properly tied-off. (100% Tie-off). Derrickman will communicate with Driller that he is properly Tied-off and ready to work.

BPS recommends the use of two-way communications between the Derrickman and the Driller.

READY TO TRIP OUT OF HOLE 2

Kick out Auto-Driller and drilling recorder, if applicable.

3

Unchain brake handle.

4

Disengage top drive rotation.

5

If required, release back torque - SLOWLY.

6

When top drive comes to a complete stop, raise drill string off bottom.

WATCH WEIGHT INDICATOR FOR DRAG.

1

Romfor International Ltd.

Driller

T R I P OUT OF H O L E TOP DRIVE

DRILL PIPE

STEP SUB

PROCEDURE

REMARKS

7

Depending upon hole condition, ream if necessary.

8

Raise drill string off bottom.

9

Pump slug according to hole conditions.

Discuss with Rig Manager.

10

WHEN DRILL STRING IS IN PROPER POSITION, and slug is displaced, kick out pumps.

CHECK FOR FLOW BEFORE PUMPING SLUG

11

Raise drill string to set back position (usually one stand) and latch elevators around drill pipe. Instruct hands to watch lines and proper clearance of Top Drive assembly in derrick during raising and lowering procedures.

12

Instruct hands to set slips.

13

Slack off on drill string, paying close attention to weight indicator.

DO NOT EXCEED TOP DRIVE ASSEMBLY WEIGHT.

14

Check pump gauge for zero pressure and close Top Drive Safety Valve (remote).

RE-CHECK GAUGE FOR TRAPPED PRESSURE. Make sure Top Drive handler is properly locked.

15

Close gripper around tool joint.

16

Engage torque boost to break connection 1/2 round.

17

Disengage torque boost after connection is broke. THE CONNECTION IS BROKEN (TOP DRIVE)

18

REVERSE OUT WITH THE TOP DRIVE.

19

Release gripper.

2

Romfor International Ltd.

Driller

T R I P OUT OF H O L E TOP DRIVE STEP

SUB

DRILL PIPE PROCEDURE

20

Raise Top Drive to engage elevators at tool joint.

21

When tongs, and crew members, are in proper break out position, engage break out cat head pulling lead tongs and breaking connection.

REMARKS BE AWARE OF TIGHT CONNECTIONS.

THE CONNECTION IS BROKEN (FLOOR LEVEL) 22

1

ROTATING OUT WITH THE ROTARY TABLE - After bottom tongs are removed and clear, engage rotary SLOWLY- rotating out drill string. BE AWARE OF BACK TORQUE.

Make sure crew members feet are clear of the rotary table and slip handles.

2

AFTER ROTARY STOPS - Verify tongs and crew members are in proper position.

Check Crown-O-Matic on first stand.

OR 22

1

ROTATING OUT WITH PIPE SPINNER - Lower blocks to clear elevators of tool joint.

2

After tongs are removed and cleared, wait on crew to reverse out stand with pipe spinner.

Make sure elevators are not stuck on tool joint.

OR 22

1

ROTATING OUT WITH SPINNING CHAIN - Lower blocks to clear elevators of tool joint.

Make sure elevators are not stuck on tool joint.

2

After top tongs are removed and cleared and spinning chain is wrapped, clockwise, above pin end of stand SLOWLY ENGAGE MAKE UP CATHEAD, reversing the stand out - SLOWLY.

Make sure all employees are in proper position, especially hands, before engaging cat head.

If required, work pipe until survey tool has adequate time to reach bottom. Continue to work pipe until allotted time has been reached for survey.

Allow adequate time for survey tool to go off (take picture).

3

Romfor International Ltd.

Driller

T R I P OUT OF H O L E TOP DRIVE STEP SUB

DRILL PIPE PROCEDURE

REMARKS

23

Raise stand of drill pipe to proper height.

24

Lower drill pipe as crew guides stand to proper racking position, engage link-tilt to position elevators for Derrickman to unlatch.

MAKE SURE CREW MEMBERS ARE CLEAR OF PIN END OF STAND.

25

Once pin end is set on racking board, continue lowering blocks (SLOWLY) as Derrickman unlatches elevators and pulls pipe clear.

Watch Derrickman until stand is clear of Top Drive assembly.

26

Retract link-tilt to float position as Top Drive is being lowered.

27

Lower blocks to proper position to latch elevators onto drill pipe using link-tilt.

28

Return link-tilt to float position once elevators are latched.

29

Raise drill string allowing crew members to pull slips.

Minimum of three people to pull slips. WATCH WEIGHT INDICATOR FOR DRAG. WATCH WEIGHT INDICATOR FOR DRAG.

30

Raise drill string to proper height (stand of pipe).

31

Lower the drill string to the position needed to set the slips.

32

Instruct hands to set slips.

Minimum of two people to set slips.

33

Slack off on drill string, paying close attention to weight indicator.

DO NOT EXCEED TOP DRIVE ASSEMBLY WEIGHT.

34

When tongs, and crew members, are in proper break out position, engage break out cat head pulling lead tongs and breaking connection.

BE AWARE OF TIGHT CONNECTIONS.

4

Romfor International Ltd.

Driller

T R I P OUT OF H O L E TOP DRIVE STEP

SUB

DRILL PIPE PROCEDURE

35

IInstall wiper rubber when hole condition allows or according to operator requirements.

36

Repeat Steps 22 through 35 until reaching BHA.

37

Upon reaching BHA, refer to TOH - DRILL COLLARS W/TOP DRIVE.

REMARKS

Fill hole properly EVERY FIVE STANDS and record on Trip Sheet.

END OF PROCEDURE

5

Romfor International Ltd.

TRIP OUT OF HOLE TOP DRIVE DRILL COLLAR

TOP DRIVE DRILL COLLAR

Driller

Romfor International Ltd.

Driller

T R I P OUT OF H O L E TOP DRIVE

DRILL COLLAR

STEP

SUB

PROCEDURE

0

1

PPE Requirements - Hard Hat, Safety Glasses, Work Gloves, Steel Toe Shoes, Back Support.

2

Review JSA for tripping out of hole with Drill Collars.

3

Know string weight, maximum over-pull, fill volumes, pipe tally, BHA design, proper makeup torque values etc.

4

Fit for duty check on all hands.

REMARKS

DISCUSS PROPER TIE-OFF PROCEDURES WITH DERRICKMAN. 1

1

Verify that equipment has been inspected and is in good working condition.

2

Verify following items are ready/available, if required:

Trip sheet available for recording fill up.

- slug is ready. - trip tank is full with proper fluid. - survey tool. - strapping tape. - mud bucket. - wiper rubber available and in good condition. - Inside BOP, safety valve w/wrench, and proper x-over subs, lift subs, collar clamps and wrenches, rope for elevators and proper drill collar slips. 3

Notify Rig Manager upon reaching drill collars.

Rig manager should be on rig floor when handling BHA.

4

Change drill collar breaks on each trip.

Review prior trip.

BEFORE THE BLOCKS LEAVE THE FLOOR: • • •

Verify that the Derrickman understands the proper tie-off procedures. Verify that the Derrickman is properly tied-off. (100% Tie-off). Derrickman will communicate with Driller that he is properly Tied-off and ready to work.

BPS recommends the use of two-way communications between the Derrickman and the Driller.

PROCEDURE IS BASED ON THE ASSUMPTION THAT THE FIRST DRILL COLLAR IS RACKED WITH DRILL PIPE. READY TO TRIP OUT OF HOLE 2

Raise drill collars to proper height for setting slips.

WATCH WEIGHT INDICATOR FOR DRAG. Keep track of number of drill collars pulled.

1

Romfor International Ltd.

Driller

T R I P OUT OF H O L E TOP DRIVE STEP SUB

DRILL COLLAR PROCEDURE

REMARKS

3

Driller is to verify proper setting and working condition of the Crown-O-Matic at the beginning of trip. Driller is to acknowledge Crown-O-Matic check in the IADC Tour Book.

4

Lower the drill string to the position needed to set the slips.

5

Instruct hands to set slips.

Make sure slips are set below hard band.

6

Slack off on drill string only enough weight to set slips. Pay close attention to weight indicator.

DO NOT EXCEED TRAVELING BLOCK ASSEMBLY WEIGHT.

7

Insure Hands Install drill collar clamp according to proper procedures.

8

Slack off drill string weight onto slips, clearing elevators from lift sub.

Make sure Derrickhand is in proper position.

9

When tongs, and crew members, are in proper break out position, engage break out cat head pulling lead tongs and break connection.

Instruct hands to move to a safe area while breaking connection.

THE CONNECTION IS BROKEN 10

1

ROTATING OUT WITH PIPE SPINNER - After tongs are removed and cleared, wait on crew to reverse out stand with pipe spinner.

2

Raise stand of drill collars out of tool joint in rotary table. OR

10

1

ROTATING OUT WITH SPINNING CHAIN - After top tongs are removed, cleared and spinning chain is wrapped, clockwise, above pin end of stand. SLOWLY ENGAGE MAKE UP CATHEAD, reversing the stand out - SLOWLY.

2

Raise stand of drill collars out of tool joint in rotary table.

Make sure all employees are in proper position, especially their hands, before engaging cat head.

OR 10

1

ROTATING OUT WITH ROTARY TABLE - After bottom tongs are removed and cleared; instruct Lead Tong Hand to keep tongs biting in proper position. Engage rotary - SLOWLY- rotating out drill collars. BE AWARE OF BACK TORQUE.

2

Romfor International Ltd.

Driller

T R I P OUT OF H O L E TOP DRIVE STEP

DRILL COLLAR

SUB

PROCEDURE

REMARKS

2

AFTER ROTARY STOPS - Verify tongs and crew members are in proper position, pick up on stand of collars out of tool joint.

Make sure drill collar connection is completely rotated out before picking up.

11

Lower stand of drill collars as crew guides stand to proper racking position.

Insure drill collar assist is used properly, if required. MAKE SURE CREW MEMBERS FEET ARE CLEAR OF PIN END OF STAND.

12

Once pin end is set on racking board, verify Derrickman is ready for elevators to be lowered to position for unlatching.

13

Lower elevators to clear lift sub and stop while Derrickman unlatches elevators.

Watch Derrickman until stand is cleared of traveling equipment.

14

After Derrickman unlatches elevators and stand of drill collars is cleared, instruct Floorhands to install lift sub.

Be aware of traveling equipment's position.

15

Lower traveling equipment to proper position allowing Floorhands to latch elevators onto lift sub.

16

When tongs and crew members are in proper makeup position, engage makeup cathead, tightening lift sub connection to proper torque.

17

After tongs are removed, raise drill string allowing crew members to remove drill collar clamp.

Verify crew members are using proper procedures in removing drill collar clamp.

18

Instruct Floorhands to pull drill collar slips using proper handles.

WATCH WEIGHT INDICATOR FOR DRAG. Minimum two people to pull slips.

19

Repeat Steps 2 through 19 for remaining drill collars.

Fill hole properly EVERY STAND and record on Trip Sheet.

END OF PROCEDURE

3

Romfor International Ltd.

Driller

PIPE SPINNER DRILL PIPE

PIPE SPINNER DRILL PIPE

TRIP OUT OF HOLE

Romfor International Ltd.

Driller

T R I P OUT OF H O L E PIPE SPINNER

DRILL PIPE

STEP

SUB

PROCEDURE

0

1

PPE Requirements - Hard Hat, Safety Glasses, Work Gloves, Steel Toe Shoes, Back Support

2

Review JSA for tripping out of hole with Drill Pipe

3

Know string weight, maximum over-pull, fill volumes, pipe tally, BHA design, etc.

4

Fit for duty check on all hands.

REMARKS

DISCUSS PROPER TIE-OFF PROCEDURES WITH DERRICKMAN. 1

1

Verify that equipment has been inspected and is in good working condition.

2

Verify following items are ready/available, if required:

Trip sheet available for recording fill up.

- slug is ready. - trip tank is full with proper fluid. - survey tool. - strapping tape. - mud bucket. - wiper rubber available and in good condition. - Inside BOP, safety valve w/wrench, and proper x-over subs. 3

Review prior trip with Rig Manager.

Discuss prior hole problems/ conditions.

4

Change drill pipe breaks on each trip.

Review prior trip.

BEFORE THE BLOCKS LEAVE THE FLOOR: • • •

Verify that the Derrickman understands the proper tie-off procedures. Verify that the Derrickman is properly tied-off. (100% Tie-off). Derrickman will communicate with Driller that he is properly Tied-off and ready to work.

BPS recommends the use of two-way communications between the Derrickman and the Driller.

READY TO TRIP OUT OF HOLE - SET KELLY BACK 2

Kick out Auto-Driller and drilling recorder, if applicable.

3

Unchain brake handle.

4

Kick out rotary table.

5

If required, release back torque - SLOWLY.

6

When rotary comes to a complete stop, raise drill string off bottom.

WATCH WEIGHT INDICATOR FOR DRAG. 1

Romfor International Ltd.

Driller

T R I P OUT OF H O L E PIPE SPINNER

DRILL PIPE

STEP SUB

PROCEDURE

REMARKS

7

Depending upon hole condition, ream back to bottom, if necessary.

8

Pump slug according to hole conditions.

9

Pick up Kelly.

10

WHEN KELLY BUSHING CLEARS ROTARY TABLE, and slug is displaced, kick out pumps.

11

Raise tool joint 10 ft (minimum) above rotary table.

12

Lower the drill string to the position needed to set the slips.

13

Instruct hands to set slips.

Minimum two people.

14

Slack off on drill string, paying close attention to weight indicator.

DO NOT EXCEED TRAVELING BLOCK ASSEMBLY WEIGHT.

15

As the Hands put on the tongs, the Driller checks the pump pressure gauge.

CHECK FOR TRAPPED PRESSURE.

16

When tongs, and crew members, are in proper breakout position, engage break-out cat head pulling lead tongs and breaking connection.

BE AWARE OF TIGHT CONNECTIONS.

Discuss with Rig Manager.

THE KELLY CONNECTION IS BROKEN 17

1

REVERSING OUT WITH THE KELLY SPINNER - After top tongs are removed and cleared, engage left hand Kelly spinner motor - SLOWLY - reversing out Kelly.

2

AFTER KELLY STOPS TURNING - Verify tongs and crew members are in proper position, pick up on Kelly. Drop survey tool, if required.

Make sure connection is completely rotated out.

OR 17

1

REVERSING OUT WITH SPINNING CHAIN - After top tongs are removed and cleared and spinning chain is wrapped, clockwise, around Kelly saver sub SLOWLY ENGAGE MAKE UP CATHEAD, reversing the Kelly out - SLOWLY.

Make sure all employees are in proper position, especially hands, before engaging cat head.

2

Romfor International Ltd.

Driller

T R I P OUT OF H O L E PIPE SPINNER STEP

SUB 2

DRILL PIPE PROCEDURE AFTER KELLY STOPS TURNING - Verify tongs, spinning chain, and crew -members are in proper position, pick up on Kelly. Drop survey tool, if required.

REMARKS Make sure Kelly connection is completely reversed out before picking up.

18

Wait for crew to attach pull back cable to Kelly.

19

When crew pulls Kelly into proper position, lower Kelly into shuck, SLOWLY. Once Kelly has started into shuck, STOP and wait for crew to remove cable, then continue lowering.

As Kelly lowers into shuck, pay close attention to hoses and lines for hang ups in derrick.

20

Once Kelly is lowered into shuck, lower traveling block to proper position to unlatch swivel from hook.

Watch swinging blocks & Kelly hose.

21

Wait on crew to secure elevators with air hoist line, if required.

22

Once crew unlatches from swivel, lower blocks SLOWLY to proper position to allow crew to position elevators for TOH.

Make sure hook is locked in proper position. Tie back swivel bail, if needed.

Install wiper rubber when hole condition allows or according to operator requirements. 23

Lower blocks to proper position to allow crew to latch elevators onto drill pipe in rotary table.

Close off vernier needle.

24

Raise drill string allowing crew members to pull slips.

WATCH WEIGHT INDICATOR FOR DRAG.

25

If required, work pipe until survey tool has adequate time to reach bottom. Continue to work pipe until allotted time has been reached for survey.

Allow adequate time for survey tool to go off (take picture).

READY TO TRIP OUT OF HOLE 26

Raise drill string to proper height (stand of pipe).

27

Driller is to verify proper setting and working condition of the Crown-O-Matic at the beginning of trip. Driller is to acknowledge Crown-O-Matic check in the IADC Tour Book.

WATCH WEIGHT INDICATOR FOR DRAG.

3

Romfor International Ltd.

Driller

T R I P OUT OF H O L E PIPE SPINNER STEP SUB

DRILL PIPE PROCEDURE

REMARKS

28

Lower the drill string to the position needed to set the slips.

29

Instruct hands to set slips.

30

Slack off on drill string, paying close attention to weight indicator.

DO NOT EXCEED TRAVELING BLOCK ASSEMBLY WEIGHT.

31

When tongs, and crew members, are in proper break out position, engage break out cat head pulling lead tongs and breaking connection.

BE AWARE OF TIGHT CONNECTIONS.

THE CONNECTION IS BROKEN 32

Lower blocks to clear elevators of tool joint.

33

After tongs are removed and cleared, wait on crew to reverse out stand with pipe spinner.

34

Raise stand of drill pipe out of tool joint in rotary table.

35

Lower drill pipe as crew guides stand to proper racking position.

MAKE SURE CREW MEMBERS FEET ARE CLEAR OF PIN END OF STAND.

36

Once pin end is set on racking board, continue lowering blocks (slowly) as Derrickman unlatches elevators and pulls pipe clear.

Watch Derrickman until stand is cleared of traveling equipment.

37

Lower blocks to proper position to allow crew to latch elevators onto drill pipe in rotary table.

38

Raise drill string allowing crew members to pull slips.

WATCH WEIGHT INDICATOR FOR DRAG. Minimum three people to pull slips.

39

Repeat Steps 28 through 38 until reaching BHA.

Fill hole properly EVERY FIVE STANDS and record on Trip Sheet.

40

Upon reaching BHA, refer to TOH - DRILL COLLARS W/PIPE SPINNER.

Make sure elevators are not stuck on tool joint.

END OF PROCEDURE

4

Romfor International Ltd.

Driller TRIP OUT OF HOLE

DRILL COLLAR

PIPE SPINNER DRILL COLLAR

PIPE SPINNER

Romfor International Ltd.

Driller

T R I P OUT OF H O L E PIPE SPINNER

DRILL COLLAR

STEP

SUB

PROCEDURE

0

1

PPE Requirements - Hard Hat, Safety Glasses, Work Gloves, Steel Toe Shoes, Back Support.

2

Review JSA for tripping out of hole with Drill Collars.

3

Know string weight, maximum over-pull, fill volumes, pipe tally, BHA design, proper makeup torque values etc.

4

Fit for duty check on all hands.

REMARKS

DISCUSS PROPER TIE-OFF PROCEDURES WITH DERRICKMAN. 1

1

Verify that equipment has been inspected and is in good working condition.

2

Verify following items are ready/available, if required:

Trip sheet available for recording fill up.

- slug is ready. - trip tank is full with proper fluid. - survey tool. - strapping tape. - mud bucket. - wiper rubber available and in good condition. - Inside BOP, safety valve w/wrench, and proper x-over subs, lift subs, collar clamps and wrenches, rope for elevators and proper drill collar slips. 3

Notify Rig Manager upon reaching drill collars.

Rig manager should be on rig floor when handling BHA.

4

Change drill collar breaks on each trip.

Review prior trip.

BEFORE THE BLOCKS LEAVE THE FLOOR: • • •

Verify that the Derrickman understands the proper tie-off procedures. Verify that the Derrickman is properly tied-off. (100% Tie-off). Derrickman will communicate with Driller that he is properly Tied-off and ready to work.

BPS recommends the use of two-way communications between the Derrickman and the Driller.

PROCEDURE IS BASED ON THE ASSUMPTION THAT THE FIRST DRILL COLLAR IS RACKED WITH DRILL PIPE. READY TO TRIP OUT OF HOLE 2

Raise drill collars to proper height for setting slips.

WATCH WEIGHT INDICATOR FOR DRAG. Keep track of number of drill collars pulled. 1

Romfor International Ltd.

Driller

T R I P OUT OF H O L E PIPE SPINNER STEP SUB

DRILL COLLAR PROCEDURE

REMARKS

3

Driller is to verify proper setting and working condition of the Crown-O-Matic at the beginning of trip. Driller is to acknowledge Crown-O-Matic check in the IADC Tour Book.

4

Lower the drill string to the position needed to set the slips.

5

Instruct hands to set slips.

Make sure slips are set below hard band.

6

Slack off on drill string only enough weight to set slips. Pay close attention to weight indicator.

DO NOT EXCEED TRAVELING BLOCK ASSEMBLY WEIGHT.

7

Insure Hands Install drill collar clamp according to proper procedures.

8

Slack off drill string weight onto slips, clearing elevators from lift sub.

Make sure Derrickhand is in proper position.

9

When tongs and crew members are in proper break out position, engage break out cat head pulling lead tongs and break connection.

Instruct hands to move to a safe area while breaking connection.

THE CONNECTION IS BROKEN 10

After tongs are removed and cleared, wait on crew to reverse out stand with pipe spinner.

11

Raise stand of drill collars out of tool joint in rotary table.

12

Lower stand of drill collars as crew guides stand to proper racking position.

13

Once pin end is set on racking board, verify Derrickman is ready for elevators to be lowered to position for unlatching.

14

Lower elevators to clear lift sub and stop while Derrickman unlatches elevators.

Insure drill collar assist is used properly, if required. MAKE SURE CREW MEMBERS FEET ARE CLEAR OF PIN END OF STAND.

Watch Derrickman until stand is cleared of traveling equipment.

2

Driller

Romfor International Ltd. T R I P OUT OF H O L E PIPE SPINNER STEP

SUB

DRILL COLLAR PROCEDURE

REMARKS

15

After Derrickman unlatches elevators and stand of drill collars is cleared, instruct Floorhands to install lift sub.

16

Lower traveling equipment to proper position allowing Floorhands to latch elevators onto lift sub.

17

When tongs and crew members are in proper makeup position, engage makeup cathead, tightening lift sub connection to proper torque.

18

After tongs are removed, raise drill string allowing crew members to remove drill collar clamp.

Verify crew members are using proper procedures in removing drill collar clamp.

19

Instruct Floorhands to pull drill collar slips using proper handles.

WATCH WEIGHT INDICATOR FOR DRAG. Minimum two people to pull slips.

20

Repeat Steps 2 through 19 for remaining drill collars.

Fill hole properly EVERY STAND and record on Trip Sheet.

END OF PROCEDURE

.

3

Be aware of traveling equipment's position.

Romfor International Ltd.

Driller TRIP OUT OF HOLE SPINNING CHAIN SPINNING CHAIN DRILL PIPE

DRILL PIPE

Romfor International Ltd.

Driller

T R I P OUT OF H O L E SPINNING CHAIN

DRILL PIPE

STEP

SUB

PROCEDURE

0

1

PPE Requirements - Hard Hat, Safety Glasses, Work Gloves, Steel Toe Shoes, Back Support

2

Review JSA for tripping out of hole with drill pipe.

3

Know string weight, maximum over-pull, fill volumes, pipe tally, BHA design, etc.

4

Fit for duty check on all hands.

REMARKS

DISCUSS PROPER TIE-OFF PROCEDURES WITH DERRICKMAN. 1

1

Verify that equipment has been inspected and is in good working condition.

2

Verify following items are ready/available, if required: - slug is ready. - trip tank is full with proper fluid. - survey tool. - strapping tape. - mud bucket. - wiper rubber available and in good condition. - Inside BOP, safety valve w/wrench, and proper x-over subs.

Trip sheet available for recording fill up.

3

Review prior trip with Rig Manager.

Discuss prior hole problems/ conditions.

4

Change drill pipe breaks on each trip.

Review prior trip.

BEFORE THE BLOCKS LEAVE THE FLOOR: • • •

Verify that the Derrickman understands the proper tie-off procedures. Verify that the Derrickman is properly tied-off. (100% Tie-off). Derrickman will communicate with Driller that he is properly Tied-off and ready to work.

BPS recommends the use of two-way communications between the Derrickman and the Driller.

READY TO TRIP OUT OF HOLE - SET KELLY BACK 2

Kick out Auto-Driller and drilling recorder, if applicable.

3

Unchain brake handle.

4

Kick out rotary table.

5

If required, release back torque - SLOWLY.

6

When rotary comes to a complete stop, raise drill string off bottom.

WATCH WEIGHT INDICATOR FOR DRAG. 1

Romfor International Ltd.

Driller

T R I P OUT OF H O L E SPINNING CHAIN

DRILL PIPE

STEP SUB

PROCEDURE

REMARKS

7

Depending upon hole condition, ream back to bottom, if necessary.

8

Pump slug according to hole conditions.

9

Pick up Kelly.

10

WHEN KELLY BUSHING CLEARS ROTARY TABLE, and slug is displaced, kick out pumps.

11

Raise tool joint 10 ft (minimum) above rotary table.

12

Lower the drill string to the position needed to set the slips.

13

Instruct hands to set slips.

Minimum of two people to set slips.

14

Slack off on drill string, paying close attention to weight indicator.

DO NOT EXCEED TRAVELING BLOCK ASSEMBLY WEIGHT.

15

As the Hands put on the tongs, the Driller checks the pump pressure gauge.

CHECK FOR TRAPPED PRESSURE.

16

When tongs, and crew members, are in proper break out position, engage break out cat head pulling lead tongs and breaking connection.

BE AWARE OF TIGHT CONNECTIONS.

Discuss with Rig Manager.

THE KELLY CONNECTION IS BROKEN 17

1

REVERSING OUT WITH THE KELLY SPINNER - After top tongs are removed and cleared, engage left hand Kelly spinner motor - SLOWLY - reversing out Kelly.

2

AFTER KELLY STOPS TURNING - Verify tongs and crew members are in proper position, pick up on Kelly. Drop survey tool, if required.

Make sure connection is completely rotated out.

OR 17

1

REVERSING OUT WITH SPINNING CHAIN - After top tongs are removed and cleared and spinning chain is wrapped, clockwise, around Kelly saver sub SLOWLY ENGAGE MAKE UP CATHEAD, reversing the Kelly out - SLOWLY.

Make sure all employees are in proper position, especially hands, before engaging cat head.

2

Romfor International Ltd.

Driller

T R I P OUT OF H O L E SPINNING CHAIN STEP

SUB 2

DRILL PIPE PROCEDURE

AFTER KELLY STOPS TURNING - Verify tongs, spinning chain, and crew members are in proper position, pick up on Kelly. Drop survey tool, if required.

REMARKS Make sure Kelly connection is completely reversed out before picking up.

18

Wait for crew to attach pull back cable to Kelly.

19

When crew pulls Kelly into proper position, lower Kelly into shuck, SLOWLY. Once Kelly started into shuck, STOP and wait for crew to remove cable, then continue lowering.

As Kelly lowers into shuck, pay close attention to hoses and lines for hang ups in derrick.

20

Once Kelly is lowered into shuck, lower traveling block to proper position to unlatch swivel from hook.

Watch swinging blocks & Kelly hose.

21

Wait on crew to secure elevators with air hoist line, if required.

22

Once crew unlatches from swivel, lower blocks SLOWLY to proper position to allow crew to position elevators for TOH.

Make sure hook is locked in proper position. Tie back swivel bail, if needed.

Install wiper rubber when hole condition allows or according to operator requirements. 23

Lower blocks to proper position to allow crew to latch elevators onto drill pipe in rotary table.

Close off vernier needle.

24

Raise drill string allowing crew members to pull slips.

Minimum of three people to pull slips. WATCH WEIGHT INDICATOR FOR DRAG.

25

If required, work pipe until survey tool has adequate time to reach bottom. Continue to work pipe until allotted time has been reached for survey.

Allow adequate time for survey tool to go off (take picture).

READY TO TRIP OUT OF HOLE 26

Raise drill string to proper height (stand of pipe). Set Crown-o-Matic.

WATCH WEIGHT INDICATOR FOR DRAG.

3

Romfor International Ltd.

Driller

T R I P OUT OF H O L E SPINNING CHAIN STEP SUB

DRILL PIPE PROCEDURE

REMARKS

27

Driller is to verify proper setting and working condition of the Crown-O-Matic at the beginning of trip. Driller is to acknowledge Crown-O-Matic check in the IADC Tour Book.

28

Lower the drill string to the position needed to set the slips.

29

Instruct hands to set slips.

Minimum of two people.

30

Slack off on drill string, paying close attention to weight indicator.

DO NOT EXCEED TRAVELING BLOCK ASSEMBLY WEIGHT.

31

When tongs, and crew members, are in proper break out position, engage break out cat head pulling lead tongs and breaking connection.

BE AWARE OF TIGHT CONNECTIONS.

THE CONNECTION IS BROKEN 32

Lower blocks to clear elevators of tool joint.

Make sure elevators are not stuck on tool joint.

33

After top tongs are removed and cleared and spinning chain is wrapped, clockwise, above pin end of stand SLOWLY ENGAGE MAKE UP CATHEAD, reversing the stand out - SLOWLY.

Make sure all employees are in proper position, especially hands, before engaging cat head.

34

Raise stand of drill pipe out of tool joint in rotary table.

35

Lower drill pipe as crew guides stand to proper racking position.

MAKE SURE CREW MEMBERS ARE CLEAR OF PIN END OF STAND.

36

Once pin end is set on racking board, continue lowering blocks SLOWLY as Derrickman unlatches elevators and pulls pipe clear.

Watch Derrickman until stand is cleared of traveling equipment.

37

Lower blocks to proper position to allow crew to latch elevators onto drill pipe in rotary table.

38

Raise drill string allowing crew members to pull slips.

Minimum of three people to pull slips. WATCH WEIGHT INDICATOR FOR DRAG.

4

Romfor International Ltd.

Driller

T R I P OUT OF H O L E SPINNING CHAIN STEP

SUB

DRILL PIPE PROCEDURE

39

Repeat Steps 28 through 38 until reaching BHA.

40

Upon reaching BHA, refer to TOH - DRILL COLLARS W/SPINNING CHAIN.

REMARKS Fill hole properly EVERY FIVE STANDS and record on Trip Sheet.

END OF PROCEDURE

5

Romfor International Ltd.

Driller TRIP OUT OF HOLE SPINNING CHAIN DRILL COLLAR SPINNING CHAIN DRILL COLLAR

Romfor International Ltd.

Driller

T R I P OUT OF H O L E SPINNING CHAIN

DRILL COLLAR

STEP

SUB

PROCEDURE

0

1

PPE Requirements - Hard Hat, Safety Glasses, Work Gloves, Steel Toe Shoes, Back Support.

2

Review JSA for tripping out of hole with Drill Collars.

3

Know string weight, maximum over-pull, fill volumes, pipe tally, BHA design, proper makeup torque values etc.

4

Fit for duty check on all hands.

REMARKS

DISCUSS PROPER TIE-OFF PROCEDURES WITH DERRICKMAN. 1

1

Verify that equipment has been inspected and is in good working condition.

2

Verify following items are ready/available, if required:

Trip sheet available for recording fill up.

- slug is ready. - trip tank is full with proper fluid. - survey tool. - strapping tape. - mud bucket. - wiper rubber available and in good condition. - Inside BOP, safety valve w/wrench, and proper x-over subs, lift subs, collar clamps and wrenches, rope for elevators and proper drill collar slips. 3

Notify Rig Manager upon reaching drill collars.

Rig manager should be on rig floor when handling BHA.

4

Change drill collar breaks on each trip.

Review prior trip.

BEFORE THE BLOCKS LEAVE THE FLOOR: • • •

Verify that the Derrickman understands the proper tie-off procedures. Verify that the Derrickman is properly tied-off. (100% Tie-off). Derrickman will communicate with Driller that he is properly Tied-off and ready to work.

BPS recommends the use of two-way communications between the Derrickman and the Driller.

PROCEDURE IS BASED ON THE ASSUMPTION THAT THE FIRST DRILL COLLAR IS RACKED WITH DRILL PIPE. READY TO TRIP OUT OF HOLE 2

Raise drill collars to proper height for setting slips.

WATCH WEIGHT INDICATOR FOR DRAG. Keep track of number of drill collars pulled. 1

Romfor International Ltd.

Driller

T R I P OUT OF H O L E SPINNING CHAIN STEP SUB

DRILL COLLAR PROCEDURE

REMARKS

3

Driller is to verify proper setting and working condition of the Crown-O-Matic at the beginning of trip. Driller is to acknowledge Crown-O-Matic check in the IADC Tour Book.

4

Lower the drill string to the position needed to set the slips.

5

Instruct hands to set slips.

Make sure slips are set below hard band.

6

Slack off on drill string only enough weight to set slips. Pay close attention to weight indicator.

DO NOT EXCEED TRAVELING BLOCK ASSEMBLY WEIGHT.

7

Insure Hands Install drill collar clamp according to proper procedures.

8

Slack off drill string weight onto slips, clearing elevators from lift sub.

Make sure Derrickhand is in proper position.

9

When tongs, and crew members, are in proper breakout position, engage break-out cat head pulling lead tongs and break connection.

Instruct hands to move to a safe area while breaking connection.

THE CONNECTION IS BROKEN 10

After top tongs are removed, cleared and spinning chain is wrapped, clockwise, above pin end of stand. - SLOWLY ENGAGE MAKE UP CATHEAD, reversing the stand out - SLOWLY.

11

Raise stand of drill collars out of tool joint in rotary table.

12

Lower stand of drill collars as crew guides stand to proper racking position.

13

Once pin end is set on racking board, verify Derrickman is ready for elevators to be lowered to position for unlatching.

14

Lower elevators to clear lift sub and stop while Derrickman unlatches elevators.

Watch Derrickman until stand is cleared of traveling equipment.

15

After Derrickman unlatches elevators and stand of drill collars is cleared, instruct Floorhands to install lift sub.

Be aware of traveling equipment's position.

Make sure all employees are in proper position, especially their hands, before engaging cat head.

Insure drill collar assist is used properly, if required. MAKE SURE CREW MEMBERS FEET ARE CLEAR OF PIN END OF STAND.

2

Romfor International Ltd.

Driller

T R I P OUT OF H O L E SPINNING CHAIN STEP

SUB

DRILL COLLAR PROCEDURE

REMARKS

16

Lower traveling equipment to proper position allowing Floorhands to latch elevators onto lift sub.

17

When tongs and crew members are in proper makeup position, engage makeup cathead, tightening lift sub connection to proper torque.

18

After tongs are removed, raise drill string allowing crew members to remove drill collar clamp.

Verify crew members are using proper procedures in removing drill collar clamp.

19

Instruct Floorhands to pull drill collar slips using proper handles.

WATCH WEIGHT INDICATOR FOR DRAG. Minimum two people to pull slips.

20

Repeat Steps 2 through 19 for remaining drill collars.

Fill hole properly EVERY STAND and record on Trip Sheet.

END OF PROCEDURE

3

Romfor International Ltd.

Driller TRIP OUT OF HOLE ROTARY TABLE DRILL PIPE

ROTARY TABLE DRILL PIPE

Romfor International Ltd.

Driller

T R I P OUT OF H O L E ROTARY TABLE

DRILL PIPE

STEP

SUB

PROCEDURE

0

1

PPE Requirements - Hard Hat, Safety Glasses, Work Gloves, Steel Toe Shoes, Back Support

2

Review JSA for tripping out of hole with drill pipe.

3

Know string weight, maximum over-pull, fill volumes, pipe tally, BHA design, etc.

4

Fit for duty check on all hands.

REMARKS

DISCUSS PROPER TIE-OFF PROCEDURES WITH DERRICKMAN. 1

1

Verify that equipment has been inspected and is in good working condition.

2

Verify following items are ready/available, if required: - slug is ready. - trip tank is full with proper fluid. - survey tool. - strapping tape. - mud bucket. - wiper rubber available and in good condition. - Inside BOP, safety valve w/wrench, and proper x-over subs.

Trip sheet available for recording fill up.

3

Review prior trip with Rig Manager.

Discuss prior hole problems/ conditions.

4

Change drill pipe breaks on each trip.

Review prior trip.

BEFORE THE BLOCKS LEAVE THE FLOOR: • • •

Verify that the Derrickman understands the proper tie-off procedures. Verify that the Derrickman is properly tied-off. (100% Tie-off). Derrickman will communicate with Driller that he is properly Tied-off and ready to work.

BPS recommends the use of two-way communications between the Derrickman and the Driller.

READY TO TRIP OUT OF HOLE - SET KELLY BACK 2

Kick out Auto-Driller and drilling recorder, if applicable.

3

Unchain brake handle.

4

Kick out rotary table.

5

If required, release back torque - SLOWLY.

6

When rotary comes to a complete stop, raise drill string off bottom.

WATCH WEIGHT INDICATOR FOR DRAG.

1

Romfor International Ltd.

Driller

T R I P OUT OF H O L E ROTARY TABLE

DRILL PIPE

STEP SUB

PROCEDURE

REMARKS

7

Depending upon hole condition, ream back to bottom, if necessary.

8

Pump slug according to hole conditions.

9

Pick up Kelly.

10

WHEN KELLY BUSHING CLEARS ROTARY TABLE, and slug is displaced, kick out pumps.

11

Raise tool joint 10 ft (minimum) above rotary table.

12

Lower the drill string to the position needed to set the slips.

13

Instruct hands to set slips.

Minimum two people.

14

Slack off on drill string, paying close attention to weight indicator.

DO NOT EXCEED TRAVELING BLOCK ASSEMBLY WEIGHT.

15

As the Hands put on the tongs, the Driller checks the pump pressure gauge.

CHECK FOR TRAPPED PRESSURE.

16

When tongs, and crew members, are in proper breakout position, engage break-out cat head pulling lead tongs and breaking connection.

BE AWARE OF TIGHT CONNECTIONS.

Discuss with Rig Manager.

THE KELLY CONNECTION IS BROKEN 17

ROTATING OUT WITH THE ROTARY TABLE - After bottom tongs are removed and clear, engage rotary SLOWLY- rotating out drill string. BE AWARE OF BACK TORQUE.

Make sure crew members feet are clear of the rotary table and slip handles.

18

AFTER ROTARY STOPS - Verify tongs and crew members are in proper position, pick up on Kelly.

Make sure Kelly connection is completely rotated out before picking up.

19

Wait for crew to attach pull back cable to Kelly.

20

When crew pulls Kelly into proper position, lower Kelly into shuck, SLOWLY. Once Kelly started into shuck, STOP and wait for crew to remove cable.

As Kelly lowers into shuck, pay close attention to hoses and lines for hang ups in derrick.

2

Romfor International Ltd.

Driller

T R I P OUT OF H O L E ROTARY TABLE STEP

SUB

DRILL PIPE PROCEDURE

21

Once Kelly is lowered into shuck, lower traveling block to proper position to unlatch swivel from hook.

22

Wait on crew to secure elevators with air hoist line, if required.

23

Once crew unlatches from swivel, lower blocks SLOWLY to proper position to allow crew to position elevators for TOH.

REMARKS Watch swinging blocks & Kelly hose.

Make sure hook is locked in proper position. Tie back swivel bail, if needed.

Install wiper rubber when hole condition allows or according to operator requirements. 24

Lower blocks to proper position to allow crew to latch elevators onto drill pipe in rotary table.

Close off vernier needle.

25

Raise drill string allowing crew members to pull slips.

WATCH WEIGHT INDICATOR FOR DRAG.

26

If required, work pipe until survey tool has adequate time to reach bottom. Continue to work pipe until allotted time has been reached for survey.

Allow adequate time for survey tool to go off (take picture).

READY TO TRIP OUT OF HOLE 27

Raise drill string to proper height (stand of pipe).

28

Driller is to verify proper setting and working condition of the Crown-O-Matic at the beginning of trip. Driller is to acknowledge Crown-O-Matic check in the IADC Tour Book.

29

Lower the drill string to the position needed to set the slips.

30

Instruct hands to set slips.

31

Slack off on drill string, paying close attention to weight indicator.

WATCH WEIGHT INDICATOR FOR DRAG.

DO NOT EXCEED TRAVELING BLOCK ASSEMBLY WEIGHT. Keep tension on hook spring.

3

Romfor International Ltd.

Driller

T R I P OUT OF H O L E ROTARY TABLE STEP SUB 32

DRILL PIPE PROCEDURE

When tongs, and crew members, are in proper break out position, engage break out cat head pulling lead tongs and breaking connection.

REMARKS BE AWARE OF TIGHT CONNECTIONS.

THE CONNECTION IS BROKEN Make sure crew members feet are clear of the rotary table and slip handles.

33

After tongs are removed and clear, engage rotary SLOWLY- rotating drill string until connection is completely rotated out. BE AWARE OF BACK TORQUE.

34

Raise stand of drill pipe out of tool joint in rotary table, if required.

35

Lower drill pipe as crew guides stand to proper racking position.

MAKE SURE CREW MEMBERS ARE CLEAR OF PIN END OF STAND.

36

Once pin end is set on racking board, continue lowering blocks (slowly) as Derrickman unlatches elevators and pulls pipe clear.

Watch Derrickman until stand is cleared of traveling equipment.

37

Lower blocks to proper position to allow crew to latch elevators onto drill pipe in rotary table.

Make sure elevators are not set on tool joint.

38

Raise drill string allowing crew members to pull slips.

WATCH WEIGHT INDICATOR FOR DRAG. Minimum of three people to pull slips.

39

Repeat Steps 29 through 38 until reaching BHA.

Fill hole properly EVERY FIVE STANDS and record on Trip Sheet.

40

Upon reaching BHA, refer to TOH - DRILL COLLARS W/ROTARY TABLE. END OF PROCEDURE

4

Romfor International Ltd.

Driller TRIP OUT OF HOLE ROTARY TABLE DRILL COLLAR

ROTARY TABLE DRILL COLLAR

Romfor International Ltd.

Driller

T R I P OUT OF H O L E ROTARY TABLE

DRILL COLLAR

STEP

SUB

PROCEDURE

0

1

PPE Requirements - Hard Hat, Safety Glasses, Work Gloves, Steel Toe Shoes, Back Support.

2

Review JSA for tripping out of hole with Drill Collars.

3

Know string weight, maximum over-pull, fill volumes, pipe tally, BHA design, proper makeup torque values etc.

4

Fit for duty check on all hands.

REMARKS

DISCUSS PROPER TIEOFF PROCEDURES WITH DERRICKMAN. 1

1

Verify that equipment has been inspected and is in good working condition.

2

Verify following items are ready/available, if required:

Trip sheet available for recording fill up.

- slug is ready. - trip tank is full with proper fluid. - survey tool. - strapping tape. - mud bucket. - wiper rubber available and in good condition. - Inside BOP, safety valve w/wrench, and proper x-over subs, lift subs, collar clamps and wrenches, rope for elevators and proper drill collar slips. 3

Notify Rig Manager upon reaching drill collars.

Rig manager should be on rig floor when handling BHA.

4

Change drill collar breaks on each trip.

Review prior trip.

BEFORE THE BLOCKS LEAVE THE FLOOR: • • •

Verify that the Derrickman understands the proper tie-off procedures. Verify that the Derrickman is properly tied-off. (100% Tie-off). Derrickman will communicate with Driller that he is properly Tied-off and ready to work.

BPS recommends the use of two-way communications between the Derrickman and the Driller.

PROCEDURE IS BASED ON THE ASSUMPTION THAT THE FIRST DRILL COLLAR IS RACKED WITH DRILL PIPE. READY TO TRIP OUT OF HOLE 2

Raise drill collars to proper height for setting slips.

WATCH WEIGHT INDICATOR FOR DRAG. Keep track of number of drill collars pulled. 1

Romfor International Ltd.

Driller

T R I P OUT OF H O L E ROTARY TABLE STEP SUB

DRILL COLLAR PROCEDURE

REMARKS

3

Lower the drill string to the position needed to set the slips.

4

Driller is to verify proper setting and working condition of the Crown-O-Matic at the beginning of trip. Driller is to acknowledge Crown-O-Matic check in the IADC Tour Book.

5

Instruct hands to set slips.

Make sure slips are set below hard band.

6

Slack off on drill string only enough weight to set slips. Pay close attention to weight indicator.

DO NOT EXCEED TRAVELING BLOCK ASSEMBLY WEIGHT.

7

Insure Hands Install drill collar clamp according to proper procedures.

8

Slack off drill string weight onto slips, clearing elevators from lift sub.

Make sure Derrickhand is in proper position.

9

When tongs, and crew members, are in proper breakout position, engage break-out cat head pulling lead tongs and break connection.

Instruct hands to move to a safe area while breaking connection.

THE CONNECTION IS BROKEN 10

After bottom tongs are removed and clear, instruct Lead Tong Hand to keep tongs biting in proper position. Engage rotary - SLOWLY- rotating out drill collars. BE AWARE OF BACK TORQUE.

Make sure crew members feet are clear of the rotary table and slip handles.

11

AFTER ROTARY STOPS - Verify tongs and crew members are in proper position, pick up on stand of collars out of tool joint.

Make sure drill collar connection is completely rotated out before picking up.

12

Lower stand of drill collars as crew guides stand to proper racking position.

Insure drill collar assist is used properly, if required. MAKE SURE CREW MEMBERS FEET ARE CLEAR OF PIN END OF STAND.

13

Once pin end is set on racking board, verify Derrickman is ready for elevators to be lowered to position for unlatching.

14

Lower elevators to clear lift sub and stop while Derrickman unlatches elevators.

Watch Derrickman until stand is cleared of traveling equipment.

2

Romfor International Ltd.

Driller

T R I P OUT OF H O L E ROTARY TABLE STEP

SUB

DRILL COLLAR PROCEDURE

REMARKS

15

After Derrickman unlatches elevators and stand of drill collars is cleared, instruct Floorhands to install lift sub.

16

Lower traveling equipment to proper position allowing Floorhands to latch elevators onto lift sub.

17

When tongs and crew members are in proper makeup position, engage makeup cathead, tightening lift sub connection to proper torque.

18

After tongs are removed, raise drill string allowing crew members to remove drill collar clamp.

Verify crew members are using proper procedures in removing drill collar clamp.

19

Instruct Floorhands to pull drill collar slips using proper handles.

WATCH WEIGHT INDICATOR FOR DRAG. Minimum two people to pull slips.

20

Repeat Steps 2 through 19 for remaining drill collars.

Fill hole properly EVERY STAND and record on Trip Sheet.

Be aware of traveling equipment's position.

END OF PROCEDURE

3

Romfor International Ltd.

Lead Tong TRIP OUT OF HOLE TRIP OUT OF HOLE

TOP DRIVE DRILL PIPE

Romfor International Ltd.

Lead Tong Hand TRIP OUT OF HOLE TOP DRIVE DRILL PIPE

Romfor International Ltd.

Lead Tong Hand

T R I P OUT OF H O L E TOP DRIVE

DRILL PIPE

STEP

SUB

PROCEDURE

0

1

PPE Requirements - Hard Hat, Safety Glasses, Work Gloves, Steel Toe Shoes, Back Support.

2

Review JSA on tripping out of the hole with drill pipe. Inspect Equipment: Tong, Lines, Shackles, Slips, Keepers, Tong Heads, Clamps.

1

REMARKS

Look for: Slack, Missing parts, Damage, Wear, Broken Cable, Shackles, Dies, Keepers, Tong Heads, Lines (proper length and proper size). Slips - Bolts, Inserts, Keepers, (Cleaned and Doped), Handle Conditions.

PREPARE FOR TRIP OUT OF HOLE 2

Upon the Driller's signal, assist in setting the slips when the top drive is in the breakout position.

Minimum of two people.

3

Stand clear while Driller latches elevators, breaks out top drive, and picks up elevators against tool joint.

Avoid drilling fluids.

4

After releasing lead tongs from the A-leg and after bottom tongs are latched; place LEAD tongs on top tool joint, using proper handles.

5

Make the lead tongs bite at the same time the back up tongs bite, using the proper tong handles.

Avoid pinch points. Avoid break out cable.

6

Keep the lead tongs biting while the Driller breaks the connection, using the proper tong handles.

DO NOT USE LATCH HANDLE

THE CONNECTION IS BROKEN (TOP DRIVE) 7 8

Unlatch back up tongs, using proper handles.

1

ROTATING OUT WITH ROTARY TABLE STAND CLEAR while the Driller rotates out stand.

1

Romfor International Ltd.

Lead Tong Hand

T R I P OUT OF H O L E TOP DRIVE STEP SUB

DRILL PIPE PROCEDURE

REMARKS

OR 8

1

REVERSING OUT WITH SPINNING CHAIN STAND CLEAR while the Driller rotates out stand. OR

8

1

SPINNING OUT WITH PIPE SPINNER -

Short ropes can be used on handles.

Secure tongs to A-leg. Assist in placing pipe spinner on stand for spin out using proper handles. 2

STAND CLEAR while the Motorman spins out stand with pipe spinner.

9

STAND CLEAR while the Driller picks up on the stand.

Avoid drilling fluids.

10

Inspect and dope tool joint while stand is being racked. Assist in racking the stand into the proper position, if other crewmembers are not available.

PAY ATTENTION!

11

Assist in installing pipe wiper based on operating procedures or hole conditions as directed by the Driller. READY FOR TRIP OUT OF HOLE

12

STAND CLEAR while Driller lowers top drive and latches onto pipe with elevators. Watch for any cable and hose hang-ups.

Be aware of the traveling equipment as it is being lowered to the proper latching position. Keep hands clear of elevators.

13

Assist in pulling the slips using the proper handles.

Use proper lifting procedures. Minimum of three people to pull slips.

14

After the stand is pulled and in the proper position, assist in setting slips using the proper handles.

Minimum of two people.

15

After releasing the tongs from the A-leg and after bottom tongs are latched; place LEAD tongs on top tool joint.

16

Make the LEAD tongs bite using the proper tong handles.

DO NOT USE LATCH HANDLE

2

Romfor International Ltd.

Lead Tong Hand

T R I P OUT OF H O L E TOP DRIVE STEP

SUB

17

DRILL PIPE PROCEDURE

REMARKS

Keep the LEAD tongs biting while the Driller breaks the connection, using the proper tong handles. THE CONNECTION IS BROKEN

18

1

ROTATING OUT WITH ROTARY TABLE: Before rotating out, unlatch the BACKUP tongs using the proper handles.

2

After the LEAD tongs are unlatched. Hold tongs clear of rotary and stand clear while the Driller rotates out stand.

Keep feet clear of the rotary table and slip handles. Avoid drilling fluids.

3

After the rotary table is stopped, stay clear while stand is racked. Inspect and dope tool joint box in the rotary.

Be aware of traveling equipment.

OR 18

1

REVERSING OUT WITH SPINNING CHAIN: Before spinning out, remove LEAD tongs and unlatch BACKUP tongs using the proper tong handles.

2

Assist Chain Hand in wrapping chain by holding the bottom wrap up.

3

Stand clear while Driller pulls on the chain.

4

STAND CLEAR while the Driller picks up stand.

5

Inspect and dope tool joint box in the rotary. Assist in racking the stand into the proper position, if other crewmembers are not available.

Avoid drilling fluids.

OR 18

1

SPINNING OUT WITH PIPE SPINNER: Before spinning out, remove LEAD tongs and unlatch BACKUP tongs using the proper tong handles.

3

Romfor International Ltd.

Lead Tong Hand

T R I P OUT OF H O L E TOP DRIVE STEP SUB

DRILL PIPE PROCEDURE

REMARKS

2

Secure tongs to A-leg. Assist in placing pipe spinners onto stand using the proper handles.

Short ropes can be used on handles.

3

STAND CLEAR while the stand is spun out with pipe spinner and Driller picks up on stand.

Avoid drilling fluids.

4

Inspect and dope tool joint box in the rotary. Assist in racking the stand into the proper position, if other crewmembers are not available.

19

Repeat Steps 8 through 18 until reaching BHA.

20

Upon reaching BHA, refer to TOH - DRILL COLLARS WITH TOP DRIVE. END OF PROCEDURE

4

Romfor International Ltd.

TRIP OUT OF HOLE TOP DRIVE DRILL COLLAR

TOP DRIVE DRILL COLLAR

Lead Tong Hand

Romfor International Ltd.

Lead Tong Hand

T R I P OUT OF H O L E TOP DRIVE

DRILL COLLAR

STEP

SUB

0

1

PPE Requirements - Hard Hat, Safety Glasses, Work Gloves, Steel Toe Shoes, Back Support.

2

Review JSA on tripping out of the hole with drill collars.

1

PROCEDURE

REMARKS

Inspect Equipment:

Look for:

Tong, Lines, Shackles, Slips, Keepers, Tong Heads, Clamps, Cables, drill collar clamps and wrench.

Slack, Missing parts, Damage, Wear, Broken Cable, Shackles, Dies, Keepers, Tong Heads, Lines (proper length and proper size). Slips - Bolts, Inserts, Keepers, (Cleaned and Doped), Handle Conditions.

PROCEDURE IS BASED ON THE ASSUMPTION THAT THE FIRST DRILL COLLAR IS RACKED WITH DRILL PIPE. 2

Upon the Driller's signal, assist in setting the slips, using proper lifting procedures.

Minimum of two people to set slips.

3

Upon the Driller's signal, place drill collar clamp around drill collar above the hard band using the proper handles.

DO NOT hold the bottom of the clamp with hands or knees.

4

After back up tong is latched onto the drill collar connection, release the lead tongs from the A-leg. Place lead tongs on the top of the drill collar connections, using proper handles.

DO NOT assist in latching back up tongs.

5

Make the lead tongs bite at the same time the back up tongs bite, using the proper tong handles.

Avoid pinch points. Avoid break out line. DO NOT USE LATCH HANDLE.

6

After the tongs bite, move to a safe area while Driller breaks the drill collar connection.

Be aware of tight connections. Be aware of trip hazards.

THE CONNECTION IS BROKEN 7

1

Rotating out with Rotary Table Before rotating out, unlatch BACKUP tongs using the proper tong handles.

1

Romfor International Ltd.

Lead Tong Hand

T R I P OUT OF H O L E TOP DRIVE STEP SUB

DRILL COLLAR PROCEDURE

REMARKS

2

After BACKUP tongs are removed, make LEAD tongs bite, using proper handles while Driller rotates out the drill collar connection.

Keep feet clear of rotary table and slip handles.

3

After Backup Hand unlatches LEAD tongs, secure tongs to A-leg.

4

STAND CLEAR while the Driller picks up on stand.

Avoid drilling fluids.

OR 7

1

Rotating out with Pipe Spinner Before spinning out, remove LEAD tongs and unlatch BACKUP tongs using the proper tong handles.

2

Secure tongs to A-leg. Assist in placing pipe spinners onto stand using the proper handles.

Short ropes can be used.

3

STAND CLEAR while the stand is spun out with pipe spinner and Driller picks up on stand.

Avoid drilling fluids.

OR 7

1

Rotating out with Spinning Chain Before spinning out, remove LEAD tongs and unlatch BACKUP tongs using the proper tong handles.

2

Secure tongs to A-leg.

3

Assist Chain Hand in wrapping chain by holding the bottom wrap up.

4

STAND CLEAR while the stand is spun out with spinning chain and while Driller picks up on stand.

Avoid drilling fluids.

8

If necessary, assist in racking the stand into the proper position.

Do not get in the Drillers view. Make sure feet are clear of pin end of stand.

9

Assist in stabbing drill collar lift sub and make-up hand tight.

Keep fingers out of threads while tightening by hand.

10

STAND CLEAR while driller lowers elevators for latching.

2

Romfor International Ltd.

Lead Tong Hand

T R I P OUT OF H O L E TOP DRIVE STEP

SUB

DRILL COLLAR PROCEDURE

REMARKS

11

After elevators are latched on to lift sub, release lead tongs from A-leg and latch onto drill collar connection in rotary table using the proper handles.

12

STAND CLEAR while back-up tongs are latched on lift sub connection.

Do not assist in latching back-up tongs.

13

Make lead tongs bite at the same time the back-up tongs bite, using the proper handles until the connection is tightened.

Avoid pinch points and do not use latch handles.

LIFT SUB CONNECTION IS TIGHTENED 14

Unlatch back-up tongs using the proper handles.

15

After Back-Up Hand unlatches lead tongs, secure tongs to A-leg.

16

After Driller raises stand to proper height, assist in removing the drill collar clamp. Hold the drill collar clamp using proper handles while the nut is loosened and pin is removed.

17

Place drill collar clamp in front of the Drawworks, away from work area and get ready for the next stand.

18

Assist in pulling the slips using proper handles. Keep track of the number of drill collars coming through the rotary table.

19

Repeat Steps 2 through 18 for remaining drill collars.

DO NOT hold the bottom of the clamp with hands or knees.

Minimum of two people to pull slips.

END OF PROCEDURE

3

Romfor International Ltd.

Lead Tong Hand

PIPE SPINNER DRILL PIPE

PIPE SPINNER DRILL PIPE

TRIP OUT OF HOLE

Romfor International Ltd.

Lead Tong Hand

T R I P OUT OF H O L E PIPE SPINNER

DRILL PIPE

STEP

SUB

0

1

PPE Requirements - Hard Hat, Safety Glasses, Work Gloves, Steel Toe Shoes, Back Support.

2

Reviews JSA on tripping out of the hole with drill pipe.

1

PROCEDURE

REMARKS

Inspect Equipment:

Look for:

Tong, Lines, Shackles, Slips, Keepers, Tong Heads, Clamps.

Slack, Missing parts, Damage, Wear, Broken Cable, Shackles, Dies, Keepers, Tong Heads, Lines (proper length and proper size). Slips - Bolts, Inserts, Keepers, (Cleaned and Doped), Handle Conditions.

2

Upon the Driller's signal, assist in setting the slips, using proper lifting procedures.

Minimum of two people to set slips.

3

After back up tong is latched onto tool joint, release the lead tongs from the A-leg. Place lead tongs on the Kelly saver sub, using proper handles.

DO NOT assist in latching back up tongs.

4

Make the lead tongs bite at the same time the back up tongs bite, using the proper tong handles.

Avoid pinch points. Avoid break out line. DO NOT USE LATCH HANDLE.

5

Keep the lead tongs biting while the Driller breaks the Kelly connection, using proper handles. KELLY CONNECTION IS BROKEN

6

1

ROTATING KELLY OUT WITH KELLY SPINNER Remove lead tongs from Kelly saver sub, using proper tong handles and secure to A-leg.

2

Stand clear while Driller reverses out Kelly with Kelly Spinner.

3

AFTER KELLY STOPS TURNING, unlatch bottom set of tongs.

1

Romfor International Ltd.

Lead Tong Hand

T R I P OUT OF H O L E PIPE SPINNER STEP SUB

DRILL PIPE PROCEDURE

REMARKS

OR 6

1

ROTATING KELLY OUT WITH SPINNING CHAIN Before spinning out with chain, Remove lead tongs from Kelly saver-sub, using proper tong handles and secure to A-leg.

2

Assist Chain Hand in wrapping chain by holding the bottom wrap up.

3

Stand clear while Driller pulls on the chain.

4

STAND CLEAR UNTIL KELLY STOPS TURNING.

5

Unlatch back up tongs, using proper handles, and STAND CLEAR while the Driller picks up Kelly.

Avoid drilling fluids.

SET BACK THE KELLY 7

Assist in securing pull-back line to Kelly.

8

Stand clear while the Kelly is being pulled back to Kelly Shuck and Driller slacks-off.

9

After the Kelly is stabbed into the Kelly Shuck and traveling equipment is stopped (air hoist is slacked-off) inspect and dope tool joint box in the rotary.

10

Once the Kelly is fully in the Kelly Shuck, retrieve Kelly pole ("Shepherds Stick", "The Hook", etc.).

11

After traveling equipment is completely stopped and in proper position, unlatch hook from the Swivel bail.

12

STAND CLEAR until traveling equipment is properly positioned over rotary table.

13

Close hook and unlock blocks.

14

Once blocks are properly positioned, lock blocks into trip out position. Replace Kelly pole in storage position.

15

Assist in installing pipe wiper based on operating procedures or hole conditions as directed by the Driller.

DO NOT get in Drillers' view. Keep out of area between Driller and Kelly Shuck.

If required, wait until pullback line is properly secured to elevators.

2

Romfor International Ltd.

Lead Tong Hand

T R I P OUT OF H O L E PIPE SPINNER STEP

SUB

16

DRILL PIPE PROCEDURE Assist latching elevators onto pipe in rotary.

REMARKS KEEP HANDS CLEAR OF PINCH POINTS!

READY FOR TRIP OUT OF THE HOLE 17

Assist in pulling the slips using the proper handles. Keep track of the number of joints being pulled through the rotary table.

Minimum of three people to pull slips. Use proper lifting procedures.

18

After the stand is pulled and in the proper position, assist in setting slips using the proper handles.

Minimum of two people to set slips.

19

Release the tongs from the A-leg and AFTER back up tongs are latched on bottom tool joint, latch lead tongs on top tool joint (using proper handles).

DO NOT assist in latching back up tongs.

20

Make the lead tongs bite at the same time the back up tongs bite, using the proper tong handles.

Avoid pinch points. Avoid break out cable. DO NOT USE LATCH HANDLE.

21

Keep the lead tongs biting while the Driller breaks the connection, using the proper tong handles.

DO NOT USE LATCH HANDLE

THE CONNECTION IS BROKEN 22

1

SPINNING OUT WITH PIPE SPINNER - Before spinning out, remove LEAD tongs and unlatch BACKUP tongs using the proper tong handles.

2

Secure tongs to A-leg. Assist in placing pipe spinners onto stand using the proper handles.

3

Stand clear while the stand is spun out with pipe spinner and Driller picks up on stand.

4

Inspect and dope tool joint box in the rotary. Assist in racking the stand into the proper position, if other crewmembers are not available.

23

Repeat Steps 17 through 22 until reaching BHA.

24

Upon reaching BHA, refer to TOH - DRILL COLLARS WITH PIPE SPINNER

Avoid drilling fluids.

END OF PROCEDURE

3

Romfor International Ltd.

Lead Tong Hand TRIP OUT OF HOLE

DRILL COLLAR

PIPE SPINNER DRILL COLLAR

PIPE SPINNER

Romfor International Ltd.

Lead Tong Hand

T R I P OUT OF H O L E PIPE SPINNER

DRILL COLLAR

STEP

SUB

0

1

PPE Requirements - Hard Hat, Safety Glasses, Work Gloves, Steel Toe Shoes, Back Support.

2

Review JSA on tripping out of the hole with drill collars.

1

PROCEDURE

REMARKS

Inspect Equipment:

Look for:

Tong, Lines, Shackles, Slips, Keepers, Tong Heads, Clamps, Cables, drill collar clamps and wrench.

Slack, Missing parts, Damage, Wear, Broken Cable, Shackles, Dies, Keepers, Tong Heads, Lines (proper length and proper size). Slips - Bolts, Inserts, Keepers, (Cleaned and Doped), Handle Conditions.

PROCEDURE IS BASED ON THE ASSUMPTION THAT THE FIRST DRILL COLLAR IS RACKED WITH DRILL PIPE. 2

Upon the Driller's signal, assist in setting the slips, using proper lifting procedures.

Minimum of two people to set slips.

3

Upon the Driller's signal, place drill collar clamp around drill collar above the hard band using the proper handles.

DO NOT hold the bottom of the clamp with hands or knees.

4

After back up tong is latched onto the drill collar connection, release the lead tongs from the A-leg. Place lead tongs on the top of the drill collar connections, using proper handles.

DO NOT assist in latching back up tongs.

5

Make the lead tongs bite at the same time the back up Avoid pinch points. Avoid break tongs bite, using the proper tong handles. out line. DO NOT USE LATCH HANDLE.

6

After the tongs bite move to a safe area while Driller breaks the drill collar connection.

Be aware of tight connections. Be aware of trip hazards.

THE CONNECTION IS BROKEN 7

Before spinning out, remove LEAD tongs and unlatch BACKUP tongs using the proper tong handles.

8

Secure tongs to A-leg. Assist in placing pipe spinners onto stand using the proper handles.

Short ropes can be used.

1

Romfor International Ltd.

Lead Tong Hand

T R I P OUT OF H O L E PIPE SPINNER STEP SUB

DRILL COLLAR PROCEDURE

REMARKS

9

STAND CLEAR while the stand is spun out with pipe spinner and Driller picks up on stand.

Avoid drilling fluids.

10

If necessary, assist in racking the stand into the proper position.

Do not get in the Drillers view. Make sure feet are clear of pin end of stand.

11

Assist in stabbing drill collar lift sub and make-up hand tight.

Keep fingers out of threads while tightening by hand.

12

STAND CLEAR while driller lowers elevators for latching.

13

After elevators are latched on to lift sub, release lead tongs from A-leg and latch onto drill collar connection in rotary table using the proper handles.

14

Stand clear while back-up tongs are latched on lift sub connection.

Do not assist in latching backup tongs.

15

Make lead tongs bite at the same time the back-up tongs bite, using the proper handles until the connection is tightened.

Avoid pinch points and do not use latch handles.

LIFT SUB CONNECTION IS TIGHTENED 16

Unlatch back-up tongs using the proper handles.

17

After Back-Up Hand unlatched lead tongs, secure tongs to A-leg.

18

After Driller raises stand to proper height, assist in removing the drill collar clamp. Hold the drill collar clamp using proper handles while the nut is loosened and pin is removed.

19

Place drill collar clamp in front of the Drawworks, away from work area and get ready for the next stand.

20

Assist in pulling the slips using proper handles. Keep track of the number of drill collars coming through the rotary table.

21

Repeat Steps 2 through 20 for remaining drill collars.

DO NOT hold the bottom of the clamp with hands or knees.

Minimum of two people to pull slips.

END OF PROCEDURE

2

Romfor International Ltd.

Lead Tong Hand TRIP OUT OF HOLE SPINNING CHAIN SPINNING CHAIN DRILL PIPE

DRILL PIPE

Romfor International Ltd.

Lead Tong Hand

T R I P OUT OF H O L E SPINNING CHAIN

DRILL PIPE

STEP

SUB

0

1

PPE Requirements - Hard Hat, Safety Glasses, Work Gloves, Steel Toe Shoes, Back Support.

2

Review JSA on tripping out of the hole with drill pipe.

1

PROCEDURE

Inspect Equipment: Tong, Lines, Shackles, Slips, Keepers, Tong Heads, Clamps.

REMARKS

Look for: Slack, Missing parts, Damage, Wear, Broken Cable, Shackles, Dies, Keepers, Tong Heads, Lines (proper length and proper size). Slips - Bolts, Inserts, Keepers, (Cleaned and Doped), Handle Conditions.

2

Upon the Driller's signal, assist in setting the slips, using proper lifting procedures.

Minimum of two people to set slips.

3

After back-up tong is latched onto tool joint, release the lead tongs from the A-leg. Place lead tongs on the Kelly saver sub, using proper handles.

DO NOT assist in latching back up tongs.

4

Make the lead tongs bite at the same time the back up tongs bite, using the proper tong handles.

Avoid pinch points. Avoid break out line. DO NOT USE LATCH HANDLE.

5

Keep the lead tongs biting while the Driller breaks the Kelly connection, using the proper handles. KELLY CONNECTION IS BROKEN

6

1

ROTATING KELLY OUT WITH KELLY SPINNER Remove lead tongs from Kelly saver sub, using proper tong handles and secure to A-leg.

2

STAND CLEAR while Driller reverses out Kelly with Kelly spinner.

3

AFTER KELLY STOPS TURNING, unlatch bottom set of tongs. OR

1

Romfor International Ltd.

Lead Tong Hand

T R I P OUT OF H O L E SPINNING CHAIN STEP SUB 6

1

DRILL PIPE PROCEDURE

REMARKS

ROTATING KELLY OUT WITH SPINNING CHAIN Before spinning out with chain, remove lead tongs from Kelly saver sub, using proper tong handles and secure to A-leg.

2

Assist Chain Hand in wrapping chain by holding the bottom wrap up.

3

STAND CLEAR while the Driller pulls on the chain.

4

STAND CLEAR until Kelly stops turning.

5

Unlatch back up tongs, using proper handles, and STAND CLEAR while the Driller picks up Kelly.

BE AWARE of tong position.

Avoid drilling fluids.

SET BACK THE KELLY 7

Assist in securing pull-back line to Kelly.

8

Stand clear while the Kelly is being pulled back to Kelly Shuck and Driller slacks-off.

9

After the Kelly is stabbed into the Kelly Shuck and traveling equipment is stopped (air hoist is slackedoff) inspect and dope tool joint box in the rotary.

10

Once the Kelly is fully in the Kelly Shuck, retrieve Kelly pole (“Shepherds Stick”, “The Hook”, etc.).

11

After traveling equipment is completely stopped and in proper position, unlatch hook from the Swivel bail.

12

STAND CLEAR until traveling equipment is properly positioned over rotary table.

13

Close hook and unlock blocks.

14

Once blocks are prperly positioned, lock blocks into trip out position. Replace Kelly pole in storage position.

DO NOT get in Driller’s view. Keep out of area between Driller and Kelly Shuck.

If required, wait until pullback line is properly secured to elevators.

Assist in installing pipe wiper based on operating procedures or hole conditions as directed by the Driller.

2

Romfor International Ltd.

Lead Tong Hand

T R I P OUT OF H O L E SPINNING CHAIN STEP 15

SUB

DRILL PIPE PROCEDURE

Assist latching elevators onto pipe in rotary.

REMARKS KEEP HANDS CLEAR OF PINCH POINTS!

READY FOR TRIP OUT OF THE HOLE 16

Assist in pulling the slips using the proper handles. Keep track of the number of joints being pulled through the rotary table.

Minimum of three people to pull slips. Use proper lifting procedures.

17

After the stand is pulled and in the proper position, assist in setting slips using the proper handles.

Minimum of two people to set slips.

18

Release the tongs from the A-leg and AFTER back up tongs are latched on bottom tool join, latch lead tongs on top tool joint (using proper handles).

DO NOT assist in latching back up tongs.

19

Make the lead tongs bite at the same time the back up tongs bite, using the proper tong handles.

Avoid pinch points. Avoid break out cable. DO NOT USE LATCH HANDLE.

20

Keep the lead tongs biting while the Driller breaks the connection, using the proper tong handles.

DO NOT USE LATCH HANDLE

THE CONNECTION IS BROKEN 21

Before spinning out, remove LEAD tongs and unlatch BACKUP tongs using the proper tong handles.

22

Assist Chain Hand in wrapping chain by holding the bottom wrap up.

23

Stand clear while Driller pulls on the chain.

24

STAND CLEAR while the Driller picks up stand.

25

Inspect and dope tool joint box in the rotary. Assist in racking the stand into the proper position, if other crewmembers are not available.

26

Repeat Steps 17 through 25 until reaching BHA.

27

Upon reaching BHA, refer to TOH - DRILL COLLARS WITH SPINNING CHAIN.

Avoid drilling fluid.

END OF PROCEDURE

3

Romfor International Ltd.

Lead Tong Hand TRIP OUT OF HOLE SPINNING CHAIN DRILL COLLAR SPINNING CHAIN DRILL COLLAR

Romfor International Ltd.

Lead Tong Hand

T R I P OUT OF H O L E SPINNING CHAIN

DRILL COLLAR

STEP

SUB

0

1

PPE Requirements - Hard Hat, Safety Glasses, Work Gloves, Steel Toe Shoes, Back Support.

2

Review JSA on tripping out of the hole with drill collars.

1

PROCEDURE

REMARKS

Inspect Equipment:

Look for:

Tong, Lines, Shackles, Slips, Keepers, Tong Heads, Clamps, Cables, drill collar clamps and wrench.

Slack, Missing parts, Damage, Wear, Broken Cable, Shackles, Dies, Keepers, Tong Heads, Lines (proper length and proper size). Slips - Bolts, Inserts, Keepers, (Cleaned and Doped), Handle Conditions.

PROCEDURE IS BASED ON THE ASSUMPTION THAT THE FIRST DRILL COLLAR IS RACKED WITH DRILL PIPE. 2

Upon the Driller's signal, assist in setting the slips, using proper lifting procedures.

Minimum of two people to set slips.

3

Upon the Driller's signal, place drill collar clamp around drill collar above the hard band using the proper handles.

DO NOT hold the bottom of the clamp with hands or knees.

4

After back up tong is latched onto the drill collar connection, release the lead tongs from the A-leg place lead tongs on the top of the drill collar connections, using proper handles.

DO NOT assist in latching back up tongs.

5

Make the lead tongs bite at the same time the back up tongs bite, using the proper tong handles.

Avoid pinch points. Avoid break out line. DO NOT USE LATCH HANDLE.

6

After the tongs bite move to a safe area while Driller breaks the drill collar connection.

Beware of tight connections. Beware of trip hazards.

THE CONNECTION IS BROKEN 7

Before spinning out, remove LEAD tongs and unlatch BACKUP tongs using the proper tong handles.

8

Secure tongs to A-leg.

1

Romfor International Ltd.

Lead Tong Hand

T R I P OUT OF H O L E SPINNING CHAIN STEP SUB

DRILL COLLAR PROCEDURE

REMARKS

9

Assist Chain Hand in wrapping chain by holding the bottom wrap up.

10

STAND CLEAR while the stand is spun out with spinning chain and while Driller picks up on stand.

Avoid drilling fluids.

11

If necessary, assist in racking the stand into the proper position, if other crewmembers are not available.

Do not get in the Drillers view. Make sure feet are clear of pin end of stand.

12

Assist in stabbing drill collar lift sub and make-up hand tight.

13

STAND CLEAR while driller lowers elevators for latching.

14

After elevators are latched on to lift sub, release lead tongs from A-leg and latch onto drill collar connection in rotary table using the proper handles.

Keep fingers out of threads while tightening by hand.

15

STAND CLEAR while back-up tongs are latched on lift sub connection.

Do not assist in latching backup tongs.

16

Make lead tongs bite at the same time the back-up tongs bite, using the proper handles until the connection is tightened.

Avoid pinch points and do not use latch handles.

LIFT SUB CONNECTION IS TIGHTENED 17

Unlatch back-up tongs using the proper handles.

18

After Back-Up Hand unlatches lead tongs, secure tongs to A-leg.

19

After Driller raises stand to proper height, assist in removing the drill collar clamp. Hold the drill collar clamp using proper handles while the nut is loosened and pin is removed.

20

Place drill collar clamp in front of the Drawworks, away from work area and get ready for the next stand.

21

Assist in pulling the slips using proper handles. Keep track of the number of drill collars coming through the rotary table.

22

Repeat Steps 2 through 21 for remaining drill collars.

DO NOT hold the bottom of the clamp with hands or knees.

Minimum of two people to pull slips.

END OF PROCEDURE

2

Romfor International Ltd.

Lead Tong Hand TRIP OUT OF HOLE ROTARY TABLE DRILL PIPE

ROTARY TABLE DRILL PIPE

Romfor International Ltd.

Lead Tong Hand

T R I P OUT OF H O L E ROTARY TABLE

DRILL PIPE

STEP

SUB

0

1

PPE Requirements - Hard Hat, Safety Glasses, Work Gloves, Steel Toe Shoes, Back Support.

2

Review JSA on tripping out of the hole with drill pipe.

1

PROCEDURE

REMARKS

Inspect Equipment:

Look for:

Tong, Lines, Shackles, Slips, Keepers, Tong Heads, Clamps.

Slack, Missing parts, Damage, Wear, Broken Cable, Shackles, Dies, Keepers, Tong Heads, Lines (proper length and proper size). Slips - Bolts, Inserts, Keepers, (Cleaned and Doped), Handle Conditions. Minimum of two people to set slips.

2

Upon the Driller's signal, assist in setting the slips, using proper lifting procedures.

3

After back up tong is latched onto tool joint, release the DO NOT assist in latching back lead tongs from the A-leg place lead tongs on the Kelly up tongs. saver sub, using proper handles.

4

Make the lead tongs bite at the same time the back up tongs bite, using the proper tong handles.

5

Keep the lead tongs biting while the Driller breaks the Kelly connection, using proper handles.

Avoid pinch points. Avoid break out cable. DO NOT USE LATCH HANDLE.

KELLY CONNECTION IS BROKEN 6

1

ROTATING KELLY OUT WITH KELLY SPINNER Remove lead tongs from Kelly saver sub, using proper tong handles and secure to A-leg.

2

Stand clear while Driller reverses out Kelly with Kelly spinner.

3

AFTER KELLY STOPS TURNING, unlatch bottom set of tongs.

1

Romfor International Ltd.

Lead Tong Hand

T R I P OUT OF H O L E ROTARY TABLE STEP SUB

DRILL PIPE PROCEDURE

REMARKS

OR 6

1

ROTATING KELLY OUT WITH ROTARY TABLE Before rotating out, unlatch the BACKUP tongs using the proper handles.

2

Make the LEAD tongs bite while the Driller rotates out Kelly.

3

After the rotary table is stopped, and lead tongs are unlatched, secure tongs to A-leg.

Be aware of traveling equipment.

4

STAND CLEAR while the Driller picks up Kelly.

Avoid drilling fluids.

SET BACK THE KELLY 7

Assist in securing pull-back line to Kelly.

8

Stand clear while the Kelly is being pulled back to Kelly Shuck and Driller slacks-off.

10

After the Kelly is stabbed into the Kelly Shuck and traveling equipment is stopped (air hoist is slackedoff) inspect and dope tool joint box in the rotary.

11

Once the Kelly is fully in the Kelly Shuck, retrieve Kelly pole ("Shepherds Stick", "The Hook", etc.).

12

After traveling equipment is completely stopped and in proper position, unlatch hook from the Swivel bail.

13

STAND CLEAR until traveling equipment is properly positioned over rotary table.

14

Close hook and unlock blocks.

15

Once blocks are properly positioned, lock blocks into trip out position. Replace Kelly pole in storage position.

DO NOT get in Drillers' view. Keep out of area between Driller and Kelly Shuck.

If required, wait until pullback line is properly secured to elevators.

Assist in installing pipe wiper based on operating procedures or hole conditions as directed by the Driller.

2

Romfor International Ltd.

Lead Tong Hand

T R I P OUT OF H O L E ROTARY TABLE STEP

SUB

16

DRILL PIPE PROCEDURE

Assist latching elevators onto pipe in rotary.

REMARKS KEEP HANDS CLEAR OF PINCH POINTS!

READY FOR TRIP OUT OF THE HOLE 17

Assist in pulling the slips using the proper handles. Keep track of the number of joints being pulled through the rotary table.

Minimum of three people to pull slips. Use proper lifting procedures.

18

After the stand is pulled and in the proper position, assist in setting slips using the proper handles.

Minimum of two people to set slips.

19

Release the tongs from the A-leg and AFTER back up tongs are latched on bottom tool joint, latch lead tongs on top tool joint (using proper handles).

DO NOT assist in latching back up tongs.

20

Make the lead tongs bite at the same time the back up tongs bite, using the proper tong handles.

Avoid pinch points. Avoid break out cable. DO NOT USE LATCH HANDLE.

21

Keep the lead tongs biting while the Driller breaks the connection, using the proper tong handles.

DO NOT USE LATCH HANDLE

THE CONNECTION IS BROKEN 22

1

ROTATING OUT WITH ROTARY TABLE: Before rotating out, unlatch the BACKUP tongs using the proper handles.

2

After the LEAD tongs are unlatched. Hold tongs clear of rotary and stand clear while the Driller rotates out stand.

Keep feet clear of the rotary table and slip handles. Avoid drilling fluids.

3

After the rotary table is stopped, stay clear while stand is racked. Inspect and dope tool joint box in the rotary.

23

Repeat Steps 17 through 22 until reaching BHA.

24

Upon reaching BHA, refer to TOH - DRILL COLLARS WITH ROTARY TABLE.

Be aware of traveling equipment.

END OF PROCEDURE

3

Romfor International Ltd.

Lead Tong Hand TRIP OUT OF HOLE ROTARY TABLE DRILL COLLAR

ROTARY TABLE DRILL COLLAR

Romfor International Ltd.

Lead Tong Hand

T R I P OUT OF H O L E ROTARY TABLE

DRILL COLLAR

STEP

SUB

0

1

PPE Requirements - Hard Hat, Safety Glasses, Work Gloves, Steel Toe Shoes, Back Support.

2

Review JSA on tripping out of the hole with drill collars.

1

PROCEDURE

REMARKS

Inspect Equipment:

Look for:

Tong, Lines, Shackles, Slips, Keepers, Tong Heads, Clamps, Cables, drill collar clamps and wrench.

Slack, Missing parts, Damage, Wear, Broken Cable, Shackles, Dies, Keepers, Tong Heads, Lines (proper length and proper size). Slips - Bolts, Inserts, Keepers, (Cleaned and Doped), Handle Conditions.

PROCEDURE IS BASED ON THE ASSUMPTION THAT THE FIRST DRILL COLLAR IS RACKED WITH DRILL PIPE. 2

Upon the Driller's signal, assist in setting the slips, using proper lifting procedures.

Minimum of two people to set slips.

3

Upon the Driller's signal, place drill collar clamp around drill collar above the hard band using the proper handles.

DO NOT hold the bottom of the clamp with hands or knees.

4

After back up tong is latched onto the drill collar connection, release the lead tongs from the A-leg. Place lead tongs on the top of the drill collar connections, using proper handles.

DO NOT assist in latching back up tongs.

5

Make the lead tongs bite at the same time the back up Avoid pinch points. Avoid break tongs bite, using the proper tong handles. out line. DO NOT USE LATCH HANDLE.

6

After the tongs bite move to a safe area while Driller breaks the drill collar connection.

Be aware of tight connections. Be aware of trip hazards.

THE CONNECTION IS BROKEN 7

Before rotating out, unlatch BACKUP tongs using the proper tong handles.

8

After BACKUP tongs are removed, make LEAD tongs bite, using proper handles while Driller rotates out the drill collar connection.

Keep feet clear of rotary table and slip handles.

1

Romfor International Ltd.

Lead Tong Hand

T R I P OUT OF H O L E ROTARY TABLE STEP SUB

DRILL COLLAR PROCEDURE

REMARKS

9

After Backup Hand unlatches LEAD tongs, secure tongs to A-leg.

10

STAND CLEAR while the Driller picks up on stand.

Avoid drilling fluids.

11

If necessary, assist in racking the stand into the proper position.

Do not get in the Drillers view. Make sure feet are clear of pin end of stand.

12

Assist in stabbing drill collar lift sub and make-up hand tight.

Keep fingers out of threads while tightening by hand.

13

STAND CLEAR while driller lowers elevators for latching.

14

After elevators are latched on to lift sub, release lead tongs from A-leg and latch onto drill collar connection in rotary table using the proper handles.

15

STAND CLEAR while back-up tongs are latched on lift sub connection.

Do not assist in latching backup tongs.

16

Make lead tongs bite at the same time the back-up tongs bite, using the proper handles until the connection is tightened.

Avoid pinch points and do not use latch handles.

LIFT SUB CONNECTION IS TIGHTENED 17

Unlatch back-up tongs using the proper handles.

18

After Back-Up Hand unlatches lead tongs, secure tongs to A-leg.

19

After Driller raises stand to proper height, assist in removing the drill collar clamp. Hold the drill collar clamp using proper handles while the nut is loosened and pin is removed.

DO NOT hold the bottom of the clamp with hands or knees.

2

Romfor International Ltd.

Lead Tong Hand

T R I P OUT OF H O L E ROTARY TABLE STEP

SUB

DRILL COLLAR PROCEDURE

20

Place drill collar clamp in front of the Drawworks, away from work area and get ready for the next stand.

21

Assist in pulling the slips using proper handles. Keep track of the number of drill collars coming through the rotary table.

22

Repeat Steps 2 through 21 for remaining drill collars.

REMARKS

Minimum of two people to pull slips.

END OF PROCEDURE

3

Romfor International Ltd.

Motorman TRIP OUT OF HOLE TRIP OUT OF HOLE

TOP DRIVE DRILL PIPE

Romfor International Ltd.

Motorman TRIP OUT OF HOLE TOP DRIVE DRILL PIPE

Romfor International Ltd.

Motorman

T R I P OUT OF H O L E TOP DRIVE

DRILL PIPE

STEP

SUB

PROCEDURE

0

1

PPE Requirements - Hard Hat, Safety Glasses, Work Gloves, Steel Toe Shoes, Back Support.

2

Review JSA on tripping out of the hole drill pipe.

3

Discuss TOH procedures with Driller to include: - Prepares strapping tape if required. - Verify motor and compound requirements. - Cover all open holes prior to tripping (Mousehole, etc). - Insure required equipment is on the rig floor.

REMARKS

Lift subs, TIW valve, Cross-over subs, Inside BOP, drill collar clamps and wrench, paint stick, pipe jack. Proper wrench for valve. Wrench should be designed to eliminate possibility of dropping it into hole.

PREPARE FOR TRIP OUT OF HOLE 1

On first stand, and upon Driller's signal, set CrownO-Matic.

2

Upon the Driller's signal, assist in setting the slips when the top drive is in the breakout position.

Minimum of two people.

3

STAND CLEAR while Driller latches elevators, breaks out top drive, and picks up elevators against tool joint.

Avoid drilling fluids.

4

STAND CLEAR while tongs are being latched and floor level connection is broken.

DO NOT ASSIST WITH LATCHING TONGS OR MAKING THEM BITE!

ROTATING OUT WITH ROTARY TABLE -

NEVER GET IN DANGER AREA - Area between tongs. Stand next to racking area.

5

1

STAND CLEAR while the Driller rotates out stand. OR 5

1

REVERSING OUT WITH SPINNING CHAIN STAND CLEAR while the Driller rotates out stand.

NEVER GET IN DANGER AREA - Area between tongs. Stand next to racking area.

OR 5

1

SPINNING OUT WITH PIPE SPINNER With assistance place pipe spinner on stand for spin out using proper handles and close pipe spinner jaws.

Short ropes can be used on handles.

2

Engage pipe spinner and rotate stand out.

Ensure Floor Hands are in proper position before engaging pipe spinner.

3

After pipe stops rotating, disengage pipe spinner jaws and remove pipe spinner.

1

Romfor International Ltd.

Motorman

T R I P OUT OF H O L E TOP DRIVE STEP SUB

DRILL PIPE PROCEDURE

REMARKS

6

STAND CLEAR while the Driller picks up on the stand.

Avoid drilling fluids.

7

With Floor Hand's help, guide stand to proper racking position.

Make sure feet are clear of pin end of stand.

8

Write the proper number on the stand being racked. Assist in installing pipe wiper based on operating procedures or hole conditions as directed by the Driller. Operate air hoist, if required, to pull bushings. READY FOR TRIP OUT OF HOLE

9

STAND CLEAR while Driller lowers top drive and latches onto pipe with elevators. Watch for any cable and hose hang-ups.

DO NOT REACH FOR ELEVATORS UNTIL NOTIFIED BY DRILLER.

10

Verify elevators are properly latched.

11

Assist in pulling the slips using the proper handles.

Use proper lifting procedures. Minimum of three people to pull slips.

12

Keep track of the number of joints being pulled through the rotary table.

As required, hose off mud from pipe.

13

After the stand is pulled and in the proper position, assist in setting slips using the proper handles.

Minimum of two people.

14

STAND CLEAR while tongs are being latched and connection is broken.

DO NOT ASSIST WITH LATCHING TONGS OR MAKING THEM BITE!

THE CONNECTON IS BROKEN 15

1

ROTATING OUT WITH ROTARY TABLE STAND CLEAR while the Driller rotates out stand.

NEVER GET IN DANGER AREA - Area between tongs. Stand next to racking area.

OR 15

1

REVERSING OUT WITH SPINNING CHAIN STAND CLEAR while the Driller rotates out stand.

NEVER GET IN DANGER AREA - Area between tongs. Stand next to racking area.

2

Romfor International Ltd.

Motorman

T R I P OUT OF H O L E TOP DRIVE STEP

SUB

DRILL PIPE PROCEDURE

REMARKS

OR 15

1

SPINNING OUT WITH PIPE SPINNER -

Short ropes can be used on handles.

Assist in placing pipe spinner on stand for spin out using proper handles and close pipe spinner jaws. 2

Engage pipe spinner and rotate stand out.

3

After pipe stops rotating, dis-engage pipe spinner jaws and remove pipe spinner.

Ensure Floor Hands are in proper position before engaging pipe spinner.

16

STAND CLEAR while the Driller picks up on the stand.

Avoid drilling fluids.

17

With Floor Hand's help, guide stand to proper racking position.

Make sure feet are clear of pin end of stand.

18

Write the proper number on the stand being racked.

19

Repeat Steps 9 through 18 until reaching BHA.

20

Upon reaching BHA, refer to TOH - DRILL COLLARS WITH TOP DRIVE. END OF PROCEDURE

3

Romfor International Ltd.

TRIP OUT OF HOLE TOP DRIVE DRILL COLLAR

TOP DRIVE DRILL COLLAR

Motorman

Romfor International Ltd.

Motorman

T R I P OUT OF H O L E TOP DRIVE

DRILL COLLAR

STEP

SUB

PROCEDURE

0

1

PPE Requirements - Hard Hat, Safety Glasses, Work Gloves, Steel Toe Shoes, Back Support.

2

Review JSA on tripping out of the hole with drill collars. Inspect Equipment: Discuss TOH procedures with Driller to include:

1

- Prepares strapping tape if required. - Verify motor and compound requirements. - Cover all open holes prior to tripping (Mousehole, etc). - Rope for unlatching elevators. - Verify required equipment is on the rig floor. - Verify pipe spinners are in correct rotation and equipped with correct roller size.

REMARKS

Lift subs, TIW valve, Cross-over subs, Inside BOP, paint stick, drill collar clamps and wrench. Proper wrench for valve. TIW valve wrench should be designed to eliminate possibility of dropping it into hole.

PROCEDURE IS BASED ON THE ASSUMPTION THAT THE FIRST DRILL COLLAR IS RACKED WITH DRILL PIPE. 2

Upon the Driller's signal, assist in setting the slips, using proper lifting procedures.

Minimum of two people to set slips.

3

If necessary, assist installing drill collar clamp using proper handles.

DO NOT use pipe wrench. Make sure each clamp segment is aligned properly.

4

STAND CLEAR while the Floor Hands place tongs on drill collars and Driller breaks connection. THE CONNECTION IS BROKEN

5

1

ROTATING OUT WITH ROTARY TABLE: STAND CLEAR while tongs are being latched, connection is broken, and rotated out.

1

Romfor International Ltd.

Motorman

T R I P OUT OF H O L E TOP DRIVE STEP SUB

DRILL COLLAR PROCEDURE

REMARKS

OR 5

1

ROTATING OUT WITH SPINNING CHAIN: STAND CLEAR while tongs are being latched, connection is broken, and spun out with spinning chain. OR

5

1

SPINNING OUT WITH PIPE SPINNER:

Short ropes can be used on handles.

After tongs are removed, assist in placing pipe spinner on upper drill collar connection. 2

Close pipe spinner jaws around upper drill collar connection.

Keep eye on Floor Hands to verify that no one is in harm's way.

3

Verify that pipe spinner control is in the back-out position and spin stand of drill collar out of connection in the rotary table.

SLOWLY operate control lever until stand is rotating.

4

When stand is completely spun out, release pipe spinner from stand of drill collars.

5

If required, assist in securing pipe spinner to A-leg or out of the way.

6

STAND CLEAR while Driller picks up on stand of drill collars.

Avoid drilling fluids.

7

If applicable, operate air hoist using the "mule line" (operated off air hoist) to rack the stand of drill collars. If a mechanical assist ("Willy Winch") is used, rack the stand of drill collars with the assistance of the Floor Hands.

Keep feet clear of pin end of stand. Keep Drillers view unobstructed.

8

Operate air hoist while Floor Hands install lift sub into drill collar.

Watch Floor Hands signals for directions. BE AWARE of possible entanglement between air hoist line and other Top Drive lines.

2

Romfor International Ltd.

Motorman

T R I P OUT OF H O L E TOP DRIVE STEP

SUB

DRILL COLLAR PROCEDURE

9

Keep eye on traveling equipment while being lowered to latching position.

10

STAND CLEAR while Driller latches elevators on lift sub.

11

Place rope on elevator latch handle (on first stand).

12

STAND CLEAR while tongs are placed on drill collar and lift sub as Driller tightens connection.

REMARKS

For unlatching purposes of Derrickman.

LIFT SUB CONNECTION IS TIGHTENED 13

After the drill collar clamp is removed, assist in pulling slips using proper handles. Keep track of number of collars pulled through the rotary table.

14

Repeat Steps 2 through 13 for remaining drill collars.

Minimum of two people to pull slips.

END OF PROCEDURE

3

Romfor International Ltd.

Motorman

PIPE SPINNER DRILL PIPE

PIPE SPINNER DRILL PIPE

TRIP OUT OF HOLE

Romfor International Ltd.

Motorman

T R I P OUT OF H O L E PIPE SPINNER

DRILL PIPE

STEP

SUB

PROCEDURE

0

1

PPE Requirements - Hard Hat, Safety Glasses, Work Gloves, Steel Toe Shoes, Back Support.

2

Review JSA on tripping out of the hole with drill pipe.

3

Discuss TOH procedures with Driller to include: - Prepares strapping tape if required. - Verify motor and compound requirements. - Cover all open holes prior to tripping (Mousehole, etc). - Verify required equipment is on the rig floor.

REMARKS

Lift subs, TIW valve, Cross-over subs, Inside BOP, drill collar clamps and wrench, paint stick, pipe jack. Proper wrench for valve. Wrench should be designed to eliminate possibility of dropping it into hole.

PREPARE FOR TRIP OUT OF HOLE 1

While Driller pulls Kelly out of hole wash down Kelly with the hose.

2

Upon the Driller's signal, assist in setting the slips.

3

Set Slips, using proper lifting techniques.

4

Stand clear while tongs are being latched, connection is broken, and rotated out.

5

STAND CLEAR while the Driller picks up on the Kelly.

Minimum of two people.

Avoid drilling fluids.

SET BACK THE KELLY 6

Hook up air hoist to Kelly pull-back line.

Verify the pull-back line is properly secured to Kelly for pull-back.

7

Engage the air hoist, pulling the Kelly back over the Kelly Shuck maintain the center position while the Driller slacks-off stabbing the Kelly into the Kelly Shuck.

Keep eye on floor hands to verify nobody is in harm's way.

1

Romfor International Ltd.

Motorman

T R I P OUT OF H O L E PIPE SPINNER STEP SUB 8

9

DRILL PIPE PROCEDURE

REMARKS

After the Kelly is stabbed into the Kelly Shuck and traveling equipment is stopped, slack-off on the air hoist allowing the pull-back cable to be untied from the Kelly. 1

Bring the Hoist chain down to the floor and tie out of the way of the traveling equipment.

Keep eye on floor hands to verify nobody is in harm's way.

OR 9

1

After the pull back cable is tied to the elevators and the Back-up Hand unlatches the Hook from the swivel, slack-off the air hoist SLOWLY preventing the traveling equipment from swinging across the rig floor.

10

When the elevators are in the proper position and stopped of any movement, slack-off the air hoist and tie out of the way of the traveling equipment.

11

If required, assist in preparing and dropping the survey equipment; assist Derrickman in the tie-off of swivel bail. Assist in installing pipe wiper based on operating procedures or hole conditions as directed by the Driller. READY FOR TRIP OUT OF HOLE

12

When the elevators are in the proper position, latch onto the tool joint in the rotary table.

13

Assist in turning the elevator to the proper trip out of the hole position.

14

Assist in pulling the slips using the proper handles.

Keep eye on the traveling equipment as it is being lowered to the proper latching position.

Minimum of three people. Use proper lifting procedures. Keep track of the number of joints being pulled through the rotary table. As required, hose off mud from pipe.

On first stand, and upon Driller's signal, set Crown-O-Matic.

2

Romfor International Ltd.

Motorman

T R I P OUT OF H O L E PIPE SPINNER STEP

SUB

DRILL PIPE PROCEDURE

REMARKS

15

After the stand is pulled and in the proper position, assist in setting slips using the proper handles.

16

Stand clear while tongs are being latched, connection is broken.

17

With assistance place pipe spinner on stand for spin out using proper handles and close pipe spinner jaws.

Short ropes can be used on handles.

18

Engage pipe spinner and rotate stand out.

Verify Floor Hands are in proper position before engaging pipe spinner.

19

After pipe stops rotating, disengage pipe spinner jaws and remove pipe spinner. Secure Pipe Spinners.

Avoid drilling fluids.

20

STAND CLEAR while the Driller picks up on the stand.

Make sure feet are clear of pin end of stand.

21

Rack the stand into the proper position while assisted by the Floor Hand.

22

Write proper number on stand.

23

Repeat Steps 12 through 22 until reaching BHA.

24

Upon reaching BHA, refer to TOH - DRILL COLLARS WITH PIPE SPINNER.

Minimum two people to set slips.

END OF PROCEDURE

3

Romfor International Ltd.

Motorman TRIP OUT OF HOLE

DRILL COLLAR

PIPE SPINNER DRILL COLLAR

PIPE SPINNER

Romfor International Ltd.

Motorman

T R I P OUT OF H O L E PIPE SPINNER

DRILL COLLAR

STEP

SUB

0

1

PPE Requirements - Hard Hat, Safety Glasses, Work Gloves, Steel Toe Shoes, Back Support.

2

Review JSA on tripping out of the hole with drill collars.

1

PROCEDURE

Inspect Equipment: Discuss TOH procedures with Driller to include: - Prepares strapping tape if required. - Verify motor and compound requirements. - Cover all open holes prior to tripping (Mousehole, etc). - Rope for unlatching elevators. - Verify required equipment is on the rig floor. - Verify pipe spinners are in correct rotation and equipped with correct roller size.

REMARKS

Lift subs, TIW valve, Cross-over subs, Inside BOP, paint stick, drill collar clamps and wrench. Proper wrench for valve. TIW valve wrench should be designed to eliminate possibility of dropping it into hole.

PROCEDURE IS BASED ON THE ASSUMPTION THAT THE FIRST DRILL COLLAR IS RACKED WITH DRILL PIPE. 2

Upon the Driller's signal, assist in setting the slips, using proper lifting procedures.

Minimum of two people to set slips.

3

If necessary, assist installing drill collar clamp using proper handles.

DO NOT use pipe wrench. Make sure each clamp segment is aligned properly.

4

STAND CLEAR while the Floor Hands place tongs on drill collars and Driller breaks connection. THE CONNECTION IS BROKEN

5

After tongs are removed, assist in placing pipe spinner on upper drill collar connection.

Short ropes can be used on handles.

6

Close pipe spinner jaws around upper drill collar connection.

Keep eye on Floor Hands to verify that no one is in Harm's Way

7

Verify that pipe spinner control is in the back-out position and spin stand of drill collars out of connection in the rotary table.

SLOWLY operate control lever until stand is rotating.

8

When stand is completely spun out, release pipe spinner from stand of drill collars.

1

Romfor International Ltd.

Motorman

T R I P OUT OF H O L E PIPE SPINNER STEP SUB

DRILL COLLAR PROCEDURE

REMARKS

9

If required, assist in securing pipe spinner to A-leg or out of the way.

10

STAND CLEAR while Driller picks up on stand of drill collars.

Avoid drilling fluids.

11

If applicable, operate air hoist using the "mule line" (operated off air hoist) to rack the stand of drill collars. If a mechanical assist ("Willy Winch") is used, rack the stand of drill collars with the assistance of the Floor Hands.

Keep feet clear of pin end of stand. Keep Drillers view unobstructed.

12

Operate air hoist while Floor Hands install lift sub into drill collar.

Watch Floor Hands signals for directions.

13

Keep eye on traveling equipment while being lowered to latching position.

14

When the elevators are stopped and in proper position, latch elevators around lift sub.

15

Place rope on elevator latch handle (on first stand).

16

STAND CLEAR while tongs are placed on drill collar and lift sub as Driller tightens connection.

For unlatching purposes of Derrickman.

LIFT SUB CONNECTION IS TIGHTENED 17

After the drill collar clamp is removed, assist in pulling slips using proper handles. Keep track of number of collars pulled through the rotary table.

18

Repeat Steps 2 through 17 for remaining drill collars.

Minimum of two people to pull slips.

END OF PROCEDURE

2

Romfor International Ltd.

Motorman TRIP OUT OF HOLE SPINNING CHAIN SPINNING CHAIN DRILL PIPE

DRILL PIPE

Romfor International Ltd.

Motorman

T R I P OUT OF H O L E SPINNING CHAIN

DRILL PIPE

STEP

SUB

PROCEDURE

0

1

PPE Requirements - Hard Hat, Safety Glasses, Work Gloves, Steel Toe Shoes, Back Support

2

Review JSA on tripping out of the hole drill pipe.

3

Discuss TOH procedures with Driller to include: - Prepares strapping tape if required. - Verify motor and compound requirements. - Cover all open holes prior to tripping (Mousehole, etc). - Verify required equipment is on the rig floor.

REMARKS

Lift subs, TIW valve, Cross-over subs, Inside BOP, drill collar clamps and wrench, paint stick, pipe jack. Proper wrench for valve. Wrench should be designed to eliminate possibility of dropping it into hole.

PREPARE FOR TRIP OUT OF HOLE 1

While Driller pulls Kelly out-of-hole, wash down Kelly with water hose.

2

Upon the Driller's signal, assist in setting the slips.

3

Set Slips, using proper lifting techniques.

4

Stand clear while tongs are being latched, connection is broken, and rotated out.

5

STAND CLEAR while the Driller picks up on the Kelly.

Minimum of two people.

Avoid drilling fluids.

SET BACK THE KELLY 6

Hook up air hoist to Kelly pull-back line.

Verify the pull-back line is properly secured to Kelly for pull-back.

7

Engage the air hoist, pulling the Kelly back over the Kelly Shuck maintain the center position while the Driller slacks-off stabbing the Kelly into the Kelly Shuck.

Keep eye on floor hands to verify nobody is in harm's way.

1

Romfor International Ltd.

Motorman

T R I P OUT OF H O L E SPINNING CHAIN STEP SUB 8

9

DRILL PIPE PROCEDURE

REMARKS

After the Kelly is stabbed into the Kelly Shuck and traveling equipment is stopped, slack-off on the air hoist allowing the pull-back cable to be un-tied from the Kelly. 1

Bring the Hoist chain down to the floor and tie out of the way of the traveling equipment.

Keep eye on floor hands to verify nobody is in harm's way.

OR 9

1

After the pull back cable is tied to the elevators and the Back-up Hand unlatches the Hook from the swivel, slack-off the air hoist SLOWLY preventing the traveling equipment from swinging across the rig floor.

10

When the elevators are in the proper position and stopped of any movement, slack-off the air hoist and tie out of the way of the traveling equipment.

11

If required, assist in preparing and dropping the survey equipment; assist Derrickman in the tie-off of swivel bail. Assist in installing pipe wiper based on operating procedures or hole conditions as directed by the Driller. READY FOR TRIP OUT OF HOLE

12

When the elevators are in the proper position, latch onto the tool joint in the rotary table.

13

Assist in turning the elevator to the proper trip out of the hole position.

14

Assist in pulling the slips using the proper handles.

Keep eye on the traveling equipment as it is being lowered to the proper latching position.

Minimum of three people. Use proper lifting procedures. Keep track of the number of joints being pulled through the rotary table. As required, hose off mud from pipe.

On first stand, and upon Driller's signal, set Crown-O-Matic.

2

Romfor International Ltd.

Motorman

T R I P OUT OF H O L E SPINNING CHAIN STEP

SUB

DRILL PIPE PROCEDURE

REMARKS Minimum two people to set slips.

15

After the stand is pulled and in the proper position, assist in setting slips using the proper handles.

16

STAND CLEAR while tongs are being latched, connection is broken, and spun out with spinning chain.

17

STAND CLEAR while the Driller picks up on the stand.

Avoid drilling fluids.

18

Racking the stand into the proper position while assisted by the Floor Hand.

Make sure feet are clear of pin end of stand.

19

Write proper number on stand.

20

Repeat Steps 12 through 19 until reaching BHA.

21

Upon reaching BHA, refer to TOH - DRILL COLLARS WITH SPINNING CHAIN. END OF PROCEDURE

3

Romfor International Ltd.

Motorman TRIP OUT OF HOLE SPINNING CHAIN DRILL COLLAR SPINNING CHAIN DRILL COLLAR

Romfor International Ltd.

Motorman

T R I P OUT OF H O L E SPINNING CHAIN

DRILL COLLAR

STEP

SUB

0

1

PPE Requirements - Hard Hat, Safety Glasses, Work Gloves, Steel Toe Shoes, Back Support.

2

Review JSA on tripping out of the hole with drill collars.

1

PROCEDURE

Inspect Equipment: Discuss TOH procedures with Driller to include: - Prepares strapping tape if required. - Verify motor and compound requirements. - Cover all open holes prior to tripping (Mousehole, etc). - Rope for unlatching elevators. - Verify required equipment is on the rig floor.

REMARKS

Lift subs, TIW valve, Cross-over subs, Inside BOP, paint stick, drill collar clamps and wrench. Proper wrench for valve. TIW valve wrench should be designed to eliminate possibility of dropping it into hole.

PROCEDURE IS BASED ON THE ASSUMPTION THAT THE FIRST DRILL COLLAR IS RACKED WITH DRILL PIPE 2

Upon the Driller's signal, assist in setting the slips, using proper lifting procedures.

Minimum of two people to set slips.

3

If necessary, assist installing drill collar clamp using proper handles.

DO NOT use pipe wrench. Make sure each clamp segment is aligned properly.

4

STAND CLEAR while the Floor Hands place tongs on drill collars and Driller breaks connection. THE CONNECTION IS BROKEN

5

STAND CLEAR while tongs are being latched, connection is broken, and spun out with spinning chain.

6

STAND CLEAR while Driller picks up on stand of drill collars.

Avoid drilling fluids.

7

If applicable, operate air hoist using the "mule line" (operated off air hoist) to rack the stand of drill collars. If a mechanical assist ("Willy Winch") is used, rack the stand of drill collars with the assistance of the Floor Hands.

Keep feet clear of pin end of stand. Keep Drillers view unobstructed.

1

Romfor International Ltd.

Motorman

T R I P OUT OF H O L E SPINNING CHAIN STEP SUB

DRILL COLLAR PROCEDURE

REMARKS

8

Operate air hoist while Floor Hands install lift sub into drill collar.

Watch Floor Hands signals for directions.

9

Keep eye on traveling equipment while being lowered to latching position.

10

When the elevators are stopped and in proper position, latch elevators around lift sub.

11

Place rope on elevator latch handle (on first stand), if required.

12

STAND CLEAR while tongs are placed on drill collar and lift-sub as Driller tightens connection.

For unlatching purposes of Derrickman.

LIFT SUB CONNECTION IS TIGHTENED 13

After the drill collar clamp is removed, assist in pulling slips using proper handles. Keep track of number of collars pulled through the rotary table.

14

Repeat Steps 2 through 13 for remaining drill collars.

Minimum of two people to pull slips.

END OF PROCEDURE

2

Romfor International Ltd.

Motorman TRIP OUT OF HOLE ROTARY TABLE DRILL PIPE

ROTARY TABLE DRILL PIPE

Romfor International Ltd.

Motorman

T R I P OUT OF H O L E ROTARY TABLE

DRILL PIPE

STEP

SUB

PROCEDURE

0

1

PPE Requirements - Hard Hat, Safety Glasses, Work Gloves, Steel Toe Shoes, Back Support

2

Review JSA on tripping out of the hole with drill pipe.

3

Discuss TOH procedures with Driller to include: - Prepares strapping tape if required. - Verify motor and compound requirements. - Cover all open holes prior to tripping (Mousehole, etc). - Verify required equipment is on the rig floor.

REMARKS

Lift subs, TIW valve, Cross-over subs, Inside BOP, drill collar clamps and wrench, paint stick, pipe jack. Proper wrench for valve. Wrench should be designed to eliminate possibility of dropping it into hole.

PREPARE FOR TRIP OUT OF HOLE 1

While Driller pulls Kelly out of hole wash down Kelly with the water hose.

2

Upon the Driller's signal, assist in setting the slips.

3

Set Slips, using proper lifting techniques.

4

Stand clear while tongs are being latched, connection is broken, and rotated out.

5

STAND CLEAR while the Driller picks up on the Kelly.

Minimum of two people.

Avoid drilling fluids.

SET BACK THE KELLY 6

Hook up air hoist to Kelly pull-back line.

Verify the pull-back line is properly secured to Kelly for pull-back.

7

Engage the air hoist, pulling the Kelly back over the Kelly Shuck maintain the center position while the Driller slacks-off stabbing the Kelly into the Kelly Shuck.

Keep eye on floor hands to verify nobody is in harm's way.

1

Romfor International Ltd.

Motorman

T R I P OUT OF H O L E ROTARY TABLE STEP SUB 8

9

DRILL PIPE PROCEDURE

REMARKS

After the Kelly is stabbed into the Kelly Shuck and traveling equipment is stopped, slack-off on the air hoist allowing the pull-back cable to be untied from the Kelly. 1

Bring the Hoist chain down to the floor and tie out of the way of the traveling equipment. OR

9

1

After the pull back cable is tied to the elevators and the Back-up Hand unlatches the Hook from the swivel, slack-off the air hoist SLOWLY preventing the traveling equipment from swinging across the rig floor.

10

When the elevators are in the proper position and stopped of any movement, slack-off the air hoist and tie out of the way of the traveling equipment.

11

If required, assist in preparing and dropping the survey equipment; assist Derrickman in the tie-off of swivel bail.

Keep eye on floor hands to verify nobody is in harm's way.

Assist in installing pipe wiper based on operating procedures or hole conditions as directed by the Driller. READY FOR TRIP OUT OF HOLE 12

When the elevators are in the proper position, latch onto the tool joint in the rotary table.

13

Assist in turning the elevator to the proper trip out of the hole position.

14

Assist in pulling the slips using the proper handles.

Keep eye on the traveling equipment as it is being lowered to the proper latching position.

Minimum of three people. Use proper lifting procedures. Keep track of the number of joints being pulled through the rotary table. As required, hose off mud from pipe.

On first stand, and upon Driller's signal, set Crown-O-Matic.

2

Romfor International Ltd.

Motorman

T R I P OUT OF H O L E ROTARY TABLE STEP

SUB

DRILL PIPE PROCEDURE

REMARKS Minimum two people to set slips.

15

After the stand is pulled and in the proper position, assist in setting slips using the proper handles.

16

STAND CLEAR while tongs are being latched, connection is broken, and spun out with spinning chain.

17

STAND CLEAR while the Driller picks up on the stand.

Avoid drilling fluids.

18

Rack the stand into the proper position while assisted by the Floor Hand.

Make sure feet are clear of pin end of stand.

19

Write proper number on stand.

20

Repeat Steps 12 through 19 until reaching BHA.

21

Upon reaching BHA, refer to TOH - DRILL COLLARS WITH ROTARY TABLE. END OF PROCEDURE

3

Romfor International Ltd.

Motorman TRIP OUT OF HOLE ROTARY TABLE DRILL COLLAR

ROTARY TABLE DRILL COLLAR

Romfor International Ltd.

Motorman

T R I P OUT OF H O L E ROTARY TABLE

DRILL COLLAR

STEP

SUB

0

1

PPE Requirements - Hard Hat, Safety Glasses, Work Gloves, Steel Toe Shoes, Back Support.

2

Review JSA on tripping out of the hole with drill collars.

1

PROCEDURE

Inspect Equipment: Discuss TOH procedures with Driller to include: - Prepares strapping tape if required. - Verify motor and compound requirements. - Cover all open holes prior to tripping (Mousehole, etc). - Rope for unlatching elevators. - Verify required equipment is on the rig floor.

REMARKS

Lift subs, TIW valve, Cross-over subs, Inside BOP, paint stick, drill collar clamps and wrench. Proper wrench for valve. TIW valve wrench should be designed to eliminate possibility of dropping it into hole.

PROCEDURE IS BASED ON THE ASSUMPTION THAT THE FIRST DRILL COLLAR IS RACKED WITH DRILL PIPE. 2

Upon the Driller's signal, assist in setting the slips, using proper lifting procedures.

Minimum of two people to set slips.

3

If necessary, assist installing drill collar clamp using proper handles.

DO NOT use pipe wrench. Make sure each clamp segment is aligned properly.

4

STAND CLEAR while the Floor Hands place tongs on drill collars and Driller breaks connection. THE CONNECTION IS BROKEN

5

STAND CLEAR while tongs are being latched, connection is broken, and rotated out.

6

STAND CLEAR while Driller picks up on stand of drill collars.

Avoid drilling fluids.

7

If applicable, operate air hoist using the "mule line" (operated off air hoist) to rack the stand of drill collars. If a mechanical assist ("Willy Winch") is used, rack the stand of drill collars with the assistance of the Floor Hands.

Keep feet clear of pin end of stand. Keep Drillers view unobstructed.

1

Romfor International Ltd.

Motorman

T R I P OUT OF H O L E ROTARY TABLE STEP SUB

DRILL COLLAR PROCEDURE

REMARKS

8

Operate air hoist while Floor Hands install lift sub into drill collar.

Watch Floor Hands signals for directions.

9

Keep eye on traveling equipment while being lowered to latching position.

10

When the elevators are stopped and in proper position, latch elevators around lift sub.

11

Place rope on elevator latch handle (on first stand).

12

STAND CLEAR while tongs are placed on drill collar and lift sub as Driller tightens connection.

For unlatching purposes of Derrickman.

LIFT SUB CONNECTION IS TIGHTENED 13

After the drill collar clamp is removed, assist in pulling slips using proper handles. Keep track of number of collars pulled through the rotary table.

14

Repeat Steps 2 through 13 for remaining drill collars.

Minimum of two people to pull slips.

END OF PROCEDURE