Transformer Vector Group

August 4, 2018 | Author: VENKATESAN R | Category: Transformer, Voltage, Electrical Impedance, Insulator (Electricity), Physics & Mathematics
Share Embed Donate


Short Description

Download Transformer Vector Group...

Description

TEST & INSPECTION PROCEDURE FOR POWER TRANSFORMERS (As per IEC 60076 & IS 2026) FAT (Factory PreType Routine Acceptance Test) Description of Test Commissioning Remarks Test Test or Inspection Test Test Measurement of Y Y Y Y Y - Yes Insulation Resistance Measurement of Y Y Y Y Winding Resistance Ratio Test Y Y Y Y Vector Group Test Y Y Y Y Magnetic Core C-Customer Y Y C Y Balance Test Choice Measurement of Noload loss & Exciting Y Y C Y Current Measurement of Impedance Voltage Y Y C Y & Load Loss Calculation of Y Y N N N - No

Efficiency & Voltage Regulation Temperature Rise Y Test Measurement of Insulation Power Y Factor Lightning Impulse Y Test on Bushing Separate Source Voltage Withstand Y Test Induced Overvolatge Y Withstand Test Test on On-Load Tap Changer (If Y applicable) Tests on Bushing CT Y (If Applicable) Tests on Protective Devices (OTI, WTI, Y Buch Holz Relay & MOG) General Inspection Vacuum Test & Oil Tightness Test Tests on Insulation Oil (If Applicable)

N

N

N

Y

N

N

N

N

N

Y

N

N

Y

N

N

Y

C

Y

Y

N

Y

Y

C

Y

Y

Y

Y

Y

Y

Y

N

N

Y

Y

C

Y

As per Approved Drawing

1. MEASUREMENT OF INSULATION RESISTANCE: Transformer Temperature : oC Make of Megger : Sl. No. of Megger : Ø Recommended Test Voltage: 2.5kV or 5kV for all HV Windings & 500V or 1000V for all LV Windings Description HV to Earth LV to Earth HV o LV

1 Minute Value The Minimum values of IR Values shall be :

Voltage Class of Winding

Minimum IR Values in Mega Ω

66 & 132 kV 22 & 33 V 6.6 & 11 V < 6.6 kV

At 30 oC 600 500 400 200

At 40 oC 300 250 200 100

At 50 oC 150 125 100 50

At 60 oC 75 62.5 50 25

2. MEASUREMENT OF WINDING RESISTANCE: Ø Use a good quality low-resistance meter or use Kelvin's Double Bridge Ø Perform measurement on all Taps Ø Check with the Transformer Routine Test Certificate Transformer Temperature: oC Make of Meter/Bridge Sl. No. of Meter/Bridge Tap No.

Winding Resistance in Ohms 1U1V 1V1W 1W1U 2u2v 2v2w 2w2u

1 2 3. RATIO TEST: Ø Perform the test on all taps Ø Apply 3 Phase, 50Hz, Low Voltage, say, 415V to the HV Winding with the LV winding open circuited and measure the voltage in the secondary winding Ø Use good quality voltmeters for measurement; use same meter for measuring HT & LT Volts

Ø Check with the ratio declared in the transformer name plate/routine test certificate Ø Caution: Do not apply voltage to LV Terminals, as this would induce dangerously high voltages at the HV Terminals Actual Measured Volts Ratio Calculated Tap Applied Volts Ratio No. 1U1V 1V1W 1W1U 2u2v 2v2w 2w2u 1U1V/2u2v 1V1W/2v2w 1W1U/2w2u 1 2 4. VECTOR GROUP TEST: Ø Short the terminals 1U & 2u using a wire of right size (say 2.5 sq.mm Cu.) Ø Apply 3 Phase, 50Hz, Low Voltage, say, 415V to the HV Winding with the LV winding open circuited and measure the voltage in the HV/LV windings Ø Use good quality voltmeters for measurement; use same meter for measuring HT & LT Volts Ø Check if the equations for the relevant vector group are satisfied Ø Caution: Do not apply voltage to LV Terminals, as this would induce dangerously high voltages at the HV Terminals For example, for Dyn 11 Vector Group, the following equations must satisfy: i) 1V2w = 1V2v ii) 1W2w < 1W2v iii) 1U2n +1V2n = 1U1V Similarly, equations could be derived for any other vector group and test results can be crosschecked. 5. MAGNETIC CORE BALANCE TEST: Ø Apply 2 Phase, 50Hz, Low Voltage, say, 415V to the HV Winding with the LV winding open circuited and measure the voltage in the HV windings Ø Use good quality voltmeters for measurement; use same meter for measuring applied & measured Volts

Ø Check if the balance conditions are satisfied Ø Caution: Do not apply voltage to LV Terminals, as this would induce dangerously high voltages at the HV Terminals Applied Volts

Measured Volts

Remarks (Equations for Balance 1U1V 1V1W 1W1U 1U1V 1V1W 1W1U Conditions) (415) ------(398) (17) 1V1W > 1W1U ------

(415) ---(212) ---(213) 1U1V =1W1U ---(415) (31) (384) ---1U1V