Te Testing sting and Commissi Commissi oning Procedure for Chemical Che mical Dosing Unit
PRO
10.1
00024 PRO - Procedure
03 -- Issued Issued for 04 forApproval SONO
REDCO
07-02-2019 20/02/2019
20/02/2019 07-02-2019
07-02-2019 20/02/2019
20/02/2019 07-02-2019
07-02-2019 20/02/2019
0.1 1
20/02/2019 07-02-2019
~
: J q
S
c
U
w I
BINl
OIN
G R OUP
SPH SP H - JV
GREEN GREE N LI NE - ELEVATED
Testing and for
III K
Xq..o:;a.c
l l L: J :JU
f\edco nternational
AT -GRADE
ommissioning Procedure hemical Dosing Unit (REDCO)
RTC 082 2013 Document No. No.::
Document Type
PRO - Procedure
Reason for Issue
04 - Issued for SONO
T C Engineer Prepared by:
Checked by:
Reviewed by:
Approved by:
Signature
~
Muneeb Asfaq
~
T C Manager dnan Aslam
Signature Signa ture
~
~
~
QA/QC QA/Q C Manag er
Signature Signa ture
Monib Ampuan
,
Project Manager
Signature
Wessam AIAhmedy
id
Date 3 February 2019 Date 3 February 2019 Date 3 February 2019 Date 3 February 2019
Revision History Rev.. No Rev No.. 01
Description of Revision Fir irst st Issue
M009-SPH-TCH-PR0-00024 Testing and Commissi Commissioning oning Procedure for Chemical Dosing Unit (R (REDCO EDCO))
Date of Revision 3 February 2019
Page 1 o f 2 0
~ ~ q . c : . SAUDI
W I L
:
J ~ U L Jf
BINLADIN
U :
III K
~
G RO U P
w
S P H JV GREEN L I N E ELEVATED
lgCompany
AT GRADE
\edco International
Total Number of Pages: 20 including fro nt page and and excludi ng appendices
TABLE TAB LE OF CONTENTS CONTENTS M009-SPH-TCH-PRO-00024 M009-SPH-TCH-PRO-00 024
Page 2 of 20
Testing and Commissioning Procedure for Chemical Dosing Unit (REDCO)
LIST OF APPENDICES ..................................................................................................... 4 HARDCOPY DISTRIBUTION LIST ................................................................................... 5 ABBREVIA AB BREVIATIONS TIONS ................... ...................................... ...................................... ....................................... ....................................... ................................ ............. 6 1
General is su es ........................................ ........................................................ ................................. ................................. ................................. ...................... ..... 7 Purp os ose e ................. .................................. .................................. ................................. ................................. .................................. .................................. ..................... .... 7
T&C Sit Site e Engi neer .............. ............................. ............................... ............................... ............................... ............................... ............................1 .............11 1
Super vi visi si on Engi neer ...................... ..................................... .............................. .............................. .............................. .............................. .................12 ..12
3.8
Super vi viso so r/For eman ................. .................................. .................................. ................................. ................................. ..................................1 .................12 2
3.9
Techni ci ans ans/Helpers /Helpers ............... .............................. ............................... ............................... ............................... ............................... ........................12 .........12
Risk Ass essm ent ........ ................. .................. .................. ................. ................. .................. .................. .................. ................. ................. .............. ..... 15
8
METHODOLOGY ...................................................................................................... 16 8.1.1 Pre-Requi Pre-Requisi site te For PSAT ............................. ............................................ ............................... ............................... ............................... ................18 18 8.1.2 Pre-Comm Pre-Commis is si sioni oni ng ................. .................................. ................................. ................................. .................................. ...............................1 ..............18 8 8.1.3 Pre-C Pre-Comm omm iss ion ing of Water Treatment Contro ller: .... ......... .......... .......... ......... ......... .......... .......... .......... .......1 ..18 8 8.1.4 Pre-C Pre-Comm omm iss ion ing of Dosin g Pum p/Ta p/Tank nk & Level Switc h: ........... ............... ......... .......... .......... ........1 ...18 8
8.2
SAT (Stand -Alo n Test) ...................... ....................................... .................................. .................................. ................................. .........................19 .........19
M009-SPH-TCH-PROM009-SPHTCH-PRO-00024 00024 Testing and Commissioning Procedure for Chemical Dosing Unit (REDCO)
Page 3 of 20
8.2.1 Pre-Request For SAT ................ ................................ ................................ ................................ ................................ ...............................1 ...............19 9 8.2.2 Comm is si sioni oni ng ................ ............................... ............................... ................................ ................................ ................................ .........................19 .........19 8.3
MEP System Sys tem Int Integrati egrati on Test (SIT)................. ................................. ................................. ................................. ............................1 ............19 9
8.4
Syst em Perfo rman ce Test (SPT (SPT)) ................. .................................. ................................... ................................... ..............................2 .............20 0
LIST OF APPENDICES Appendix 1 – Risk Assessment Appendix 2 – Check List
M009-SPH-TCH-PROM009-SPHTCH-PRO-00024 00024 Testing and Commissioning Procedure for Chemical Dosing Unit (REDCO)
Page 4 of 20
HARDCOPY DISTRIBUTION LIST This document is not controlled when printed. The controlled version is held by the Document Controller on the Project Server’s valid Documents Folder. Hardcopy Distribution List* Copy No.
Name
Company
Position
001
Qatar Rail
Project Owner
002
Qatar Rail
Employer’s Personnel
003
SPH
Project Director
004
SPH
Construction Director
005
SPH
Station Manager
006
SPH
QA / QC Manager
007
SPH
HSE Manager
Signature
008 010 011 012
*
The final distribution may be modified after consultation with Main Contractor.
**
It is the responsibili responsibility ty of the Station Manager to provide this Procedure to the respective Project or Site Engineers and obtain sign off that they have received and understood the document. Please refer to the communication protocol.
M009-SPH-TCH-PROM009-SPHTCH-PRO-00024 00024 Testing and Commissioning Procedure for Chemical Dosing Unit (REDCO)
Page 5 of 20
ABBREVIA AB BREVIATIONS TIONS ARCH
Project Archive
BS HSE
British Standard Health, Safety and Environment
IFC
Issued for Construction
IT
Information Technology
MS
Method Statement
MSDS
Material Safety Data Sheet
NCR
Nonconformity Report
PD
Project Director
PMC
Project Management Consultant
PPE
Personal Protective Equipment
SPH QA / QC
Joint Venture of Saudi Binladin Group, PORR and HBK Quality Assurance / Quality Control
QCS
Qatar Construction Specification
QMS
Quality Management System
QS
Qatar Standard
SONO
Statement of No Objection
QND
Qatar National Datum
IRE
Inspection Request
T&C
Testing and Commissioning.
NFPA
National Fire Protection Association
MAR IRN
Material Approval Request Installation Release Note
PRO
Procedure
MCC
Motor Control Centre
ANSI
American National National Standard Standard Institute Institute..
ASTM
American Society Society for Testing Testing and Materials. Materials.
PTW
Permit to Work
COSHH
Control of Substances Hazardous to Health Regulation.
BACS
Building Automation Control System. System.
M009-SPH-TCH-PRO-00024 M009-SPH-TCH-PRO-0 0024 Testing and Commissioning Procedure for Chemical Dosing Unit (REDCO)
Page 6 of 20
1
PURPOSE
1.1 1. 1 Ge General neral iss ues This document is to present the T&C Procedure as required by subcontract documents for Green Line Elevated & At Grade Project .
This document was composed exclusively for the Qatar Railway ‘Green Line Elevated & at Grade’ Grade’ Project. All the requirements listed in the above referred tender document were taken into account. The company has Quality Management System Certificate of ISO 9001: 2008, Certificate of ISO 14001: 2004 of Environmental Management System. Furthermore, it applies the BS OSHAS 18001: 2007 on Occupational Health and Safety Management System.
1.2 Purpose The purpose of this document is to demonstrate the generic approach and procedures to be followed during Testing and Commissioning of the Chemical Dosing Unit in a safe manner to an approved and controlled methodology to demonstrate a thorough and considered understanding and approach, all in accordance with applicable standards, codes of practice and project specifications. The Job Hazard Analysis in Appendix App endix 1 identifies identifi es the hazards and the safe systems of work to be followed when conducting the activity.
2 SCOPE Scope of this Procedure for Testing and Commissioning of Chemical dosing unit in a safe manner. This document includes the following either in the main body or in the Appendices: Methodology for Testing and Commissioning of chemical dosing unit. Equipment and materials used. HSE Assessment & Risk Assessment.
2.1 2. 1 Interdependence wit h Mana Management gement Plans Standards Relevant to Document & Information Management are:
NFPA 90A Installation of Air Conditioning and Ventilating Facilities. NFPA 5000 Building Construction and Safety Code NFPA 130 Standard for Fixed Guide Way Transit and Passenger Rail System. BS CP 352 Mechanical Ventilation and Air conditioning in buildings. Qatar Construction Specifications 2010 (QCS 2010) Mechanical Specificati Specifications, ons, Vol. 7
The following documents are referred to either to support the implementation of the MS or are a prerequisite to its implementation:
M009-SPH-TCH-PRO-00024 M009-SPH-TCH-PRO-0 0024 Testing and Commissioning Procedure for Chemical Dosing Unit (REDCO)
Project Testing & Commissioni Commissioning ng Plan Project Quality Plan Project Controls Plan Health and Safety Plan Information Management Plan Electronic Document Management Plan (EDMS) Risk Management Plan Interface Management Plan
M009-SPH-EMP-PLN-00026 M009-SPH-EM P-PLN-00026
Construction Waste Management Plan
2.2 2. 2
Revisi Re visi on of Procedur e Document s
The revision of this Procedure shall be done when:
New information becomes available. Main Contractor requires modifications. The Project Director requires modifications of Procedure. There is a significant change in the works methodology. The revised MS MS shall be submitted by Main Contractor for SONO to DVE verification and PMC for review & approval.
M009-SPH-TCH-PRO-00024 M009-SPH-TCH-PRO-0 0024 Testing and Commissioning Procedure for Chemical Dosing Unit (REDCO)
Page 8 of 20
2.3 2. 3
Testi Te sti ng and Commi ssi oni ng Stages STAGE NO
STAGE ABBRE
Stage 1
FAT
Stage 2
IT
Stage 3
P-SAT
Stage 4
STAGE NAME
RESPONSIBLTY
Factor Acceptance Test
REDCO
Installation Test
REDCO
Partial Standalone Test
REDCO
SAT
Standalone Test
REDCO
Stage 5
SIT
System Integration Test
L&T
Stage 6
SPT
System Performance Test
L&T
M009-SPH-TCH-PRO-00024 M009-SPH-TCH-PRO-0 0024 Testing and Commissioning Procedure for Chemical Dosing Unit (REDCO)
REMARKS For stage (1 & 2) Covered IRN Refer to Testing & Commissioning Plan (MEP Subcontractor) # M009-SPH-MEP-PLN-00003 M009-SPH-MEP-PLN -00003 (ANNEXUTE-A2) Part of this procedure For Stage (5 & 6) by L&T (BACS PRO & ITP) M009-SPH-MEP-ITP-40003 M009-SPH-MHV-PRO-00033
Page 9 of 20
BK
W I
. . : . J : I U LJ1
SAUDI
BINLAOIN
~ : ~ q . c
i c
~
G R OUP
SPH-JV
GREEN LI N E - ELEVATED
3
IQ Company
f\ed co nternational
AT-GRADE
ROLES AND RESPON RESPONSIBIL SIBILITIES ITIES
Guideline for MEP Testing Co mm ission i ng Plan Append ix B - Attachme nt B - 2