B. API Q1 Chapter 4, is all about ? C. API Q1 Chapter = 3 D.
CGA
E. API Q1 Chapter 4 =
9. Known accuracy A.
No answer given
B. 1.4 Collection C. 1.5 Compliance D. 1.21 Servicing E.
1.3 Calibration
10. Minimum 5 yrs or as required by customer, legal, and any other requirements to whichever is longer A.
No answer given
B. ANZI Z49.1 Safety Safety in Welding, Welding, Cutting and Allied Processes Processes C. API Q1 Chapter 4, is all about ? D. INGAA construction safety guidelines E.
Documentation needs to be keep for how long???
11. Responsibility for the organization A.
No answer given
B. 1.11 First Article C.
1.14 Management
D. 1.4 Collection E. 1.18 Procedure
12. Minimize equipment failure A.
No answer given
B.
1.17 Preventive Maintenance
C. 1.2. Acceptance inspection: D. 1.10 Design Verific Verification ation E. 1.18 Procedure http https: s:// //qu quiz izle let. t.co com/ m/38 3831 3165 6537 371/ 1/te test st?a ?ans nswe werT rTermS ermSid ides es=2 =2&p &pro romp mptT tTermS ermSid ides es=6 =6&q &que uest stio ionC nCou ount nt=3 =33& 3&qu ques esti tion onT Types ypes=4 =4&s &sho howI wIma mage ges= s=tr true ue
3/ 3/8 8
5/8/2019
Test: API Q1 Quality Programs | Quizlet
13. Documentation & Records control A.
No answer given
B. API Q1 Chapter 5 = C. API Q1 Chapter = 3 D.
API Q1 Chapter 4, is all about ?
E. API Q1 Chapter 4 =
14. Defined limits placed on characteristics of materials & products A.
No answer given
B. 1.9 Design Va Validation lidation C. 1.10 Design Verific Verification ation D.
1.8 Design acceptance criteria (DAC)
E. 1.2. Acceptance inspection:
15. Demonstrate conformity of the product to design requirements A.
No answer given
B. 1.8 Design acceptance criteria (DAC) C.
1.9 Design Validation
D. 1.6 Critical
Verification ation E. 1.10 Design Verific
16. Ecternal supplier on behalf of the organization A.
Planning Risk Assessment Assessment and Management Design and Development Design and Development Planning Design and Development Inputs Design and Development Outputs Design and Development Review D & D Val Validation idation and Approval D & D Changes No answer given
A.
B. API Q1 Chapter 4 = C. API Q1 Chapter = 3 D.
API Q1 Chapter 5 =
E. API Q1 Chapter 4, is all about ?
23. CEPA
INGAA Practical Guide for Pipeline Construction Inspectors A.
No answer given
B. INGAA construction safety guidelines C. API Q1 Chapter = 3 D.
Testing on all of :
E. API Q1 Chapter 4 =
24. Management Representative
Organization Capability Provision of Resources Personnel Competence A.
No answer given
B. API Q1 Chapter 4 = QMS C. 1.20 Service D. 1.14 Management E.
30. Conformity to the manufacturing / servicing requirements A.
No answer given
B. 1.5 Compliance C. 1.12 KPI D. 1.19 Risk E.
1.15 MAC
31. Chapter 4 protection of personnel / general area
cha 5 = Ventilation chp 6 = Fire prevention and protection chp 8 = Public exhibitions and demonstrations A.
B.
No answer given
ANZI Z49.1 Safety Safety in Welding, Cutting and Allied Processes
C. INGAA construction safety guidelines D. Documentation needs to be keep for how long??? E. API Q1 Chapter 4 = 32. Proof of meeting the requirements A.
No answer given
B. 1.21 Servicing C. 1.7 Delivery D. 1.18 Procedure E.
1.4 Collection
33. Pipeline crossing guidelines
Section II Definitions A.
No answer given
B. API Q1 Chapter 4, is all about ? C. API Q1 Chapter 4 = D.
Thank you for interesting in our services. We are a non-profit group that run this website to share documents. We need your help to maintenance this website.