TECHNICAL QUERY REGISTER CLIENT

PC KETAPANG II LTD

PROJECT NAME

PROVISION OF TRANSPORTATION AND INSTALLATION OF BTJT-A PLATFORM AND

MAIN CONTRACTOR

PT TIMAS SUPLINDO

PIPELINES FOR BUKIT TUA DEVELOPMENT PROJECT Issued To PCK2L No.

TQ no

Document Title

Originator

Date :

6/26/2019

PCK2L Status

Remarks

Response From PCK2L

Discipline Date

Transmittal

Date

Transmittal

1-Apr-13

TRS-009

Rejected

Closed

Closed

ENGINEERING PIPELINE 1

BTJT-TI-TEQ-PL-0001

Subsea Tie-ins for Infield Pipelines to Risers

TIMAS

Pipeline

27-Mar-13

TRS-0015

2

BTJT-TI-TEQ-PL-0002

Dewatering of Infield Pipelines

TIMAS

Pipeline

04-Apr-13

TRS-0022

3

BTJT-TI-TEQ-PL-0003

Relocation of Beachpull Pipeline Alignment

TIMAS

Pipeline

09-Apr-13

TRS-0028

10-Apr-13

TRS-014

 Accepted with with comment comment

4

BTJT-TI-TEQ-PL-0004

Replacement of Flange on Riser Top

TIMAS

Pipeline

23-Apr-13

TRS-0042

21-May-13

TRS-030

Rejected

Closed

5

BTJT-TI-TEQ-PL-0005

Pipeline Gauging Plates for Pre-commissioning

TIMAS

Pipeline

22-May-13

TRS-0077

30-May-13

TRS-007/I

Rejected

Closed

6

BTJT-TI-TEQ-PL-0005 Rev.1

Pipeline Gauging Plates for Pre-commissioning

TIMAS

Pipeline

01-Jul-13

TRS-0149

2-Jul-13

TRS-067/I

 Accepted

Closed

7

BTJT-TI-TEQ-PL-0006

Export Pipeline Riser Splash Zone Joint Coating

TIMAS

Pipeline

22-May-13

TRS-0077

31-May-13

TRS-010/I

Rejected

Closed

8

BTJT-TI-TEQ-PL-0007

Chemical for Pipeline Flooding and Hydrotest

TIMAS

Pipeline

22-May-13

TRS-0077

18-Jun-13

TRS-040/I

 Accepted

Closed

9

BTJT-TI-TEQ-PL-0008

Confirmation of ORF Tie-in Flange

TIMAS

Pipeline

24-May-13

TRS-0082

31-May-13

TRS-009/I

 Accepted

Closed

10

BTJT-TI-TEQ-PL-0009

Waiver of Buckle Detection System for Infield Flowlines

TIMAS

Pipeline

27-May-13

TRS-0084

29-May-13

TRS-006/I

 Accepted w with ith note

Closed

11

BTJT A-TEQ-PL-0010

Magnesium Anodes for Onshore Pipeline

TIMAS

Pipeline

10-Jun-13

TRS-0104

18-Jun-13

TRS-040/I

 Accepted

Closed

12

BTJT A-TEQ-PL-0011

Field Joint Coating - Cold Tape

TIMAS

Pipeline

11-Jun-13

TRS-0108

8-Jul-13

TRS-075/I

Rejected

Closed Closed

13

BTJT A-TEQ-PL-0012

Hanger Flange Coating

TIMAS

Pipeline

11-Jun-13

TRS-0111

21-Jun-13

TRS-050/I

 Accepted

14

BTJT A-TEQ-PL-0013

Field Joint Coating System for Export Pipeline

TIMAS

Pipeline

19-Jun-13

TRS-0120

20-Jun-13

TRS-048/I

 Accepted

Closed

15

BTJT A-PL-TEQ-0014

Anode Manufacturer and Testing

TIMAS

Pipeline

13-Jun-13

TRS-0111

13-Jun-13

TRS-030/I

 Accepted w/ w/ Condition

Closed

16

BTJT A-PL-TEQ-0015

Pipeline Crossing Design Drawings Approval for Fabrication

TIMAS

Pipeline

25-Jun-13

TRS-0132

2-Aug-13

TRS-161

 Accepted

Closed

17

BTJT A-PL-TEQ-0016

ORF Tie In Flange Coating and Isolation

TIMAS

Pipeline

2-Jul-13

TRS-0154

10-Jul-13

TRS-080/I

 Accepted

Closed

18

BTJT A-PL-TEQ-0017

BTJT A Jacket Riser Clamp Bolt Tension

TIMAS

Pipeline

2-Jul-13

TRS-0154

28-Aug-13

TRS-206

 Accepted

Closed

19

BTJT A-PL-TEQ-0018

12 Gas Export-Burial Requirement (KP101.0-104.0)

TIMAS

Pipeline

2-Jul-13

TRS-0155

12-Sep-13

TRS-232

For Info

Closed

20

BTJT A-PL-TEQ-0019

Riser Splash Zone Coating Details

TIMAS

Pipeline

3-Jul-13

TRS-0158

22-Jul-13

TRS-122

 Accepted

Closed

21

BTJT A-PL-TEQ-0020

Anode For Insulated Linepipe

TIMAS

Pipeline

3-Jul-13

TRS-0158

3-Jul-13

TRS-069/I

 Accepted

Closed

22

BTJT A-PL-TEQ-0021

Request For Information 12" Onshore Pipeline

TIMAS

Pipeline

5-Jul-13

TRS-0170

5-Aug-13

TRS-168/I

 Accepted

Closed

23

BTJT A-PL-TEQ-0022

waiver on Heat Shrink Sleeve (WPC100M) PQT for Fie

TIMAS

Pipeline

12-Jul-13

TRS-0195

16-Jul-13

TRS-091/I

 Accepted

Closed

24

BTJT A-PL-TEQ-0023

TQ for Flowline Gauging Plates For Pre-Commisioning

TIMAS

Pipeline

15-Jul-13

TRS-0199

18-Jul-13

TRS-112/I

 ACCEPTED

Closed

25

BTJT A-PL-TEQ-0024

TQ for Inline Inspection Tools Pipeline Baseline Surve

TIMAS

Pipeline

16-Jul-13

TRS-0200

27-Aug-13

TRS-200

Rejected

Closed

26

BTJT A-PL-TEQ-0025

Field Joint Coating System for Infield Pipeline

TIMAS

Pipeline

18-Jul-13

TRS-0219

18-Jul-13

TRS-111/I

 ACCEPTED

Closed

27

BTJT A-PL-TEQ-0026

Change to Pre Engineering Survey Methodology

TIMAS

Pipeline

18-Jul-13

TRS-0224

18-Jul-13

TRS-112/I

 ACCEPTED

Closed

28

BTJT A-PL-TEQ-0027

Updated 12"Gas Export Burial B urial Requirement (KP101.0-104.0)

TIMAS

Pipeline

19-Jul-13

TRS-0230

12-Sep-13

TRS-232

For Info

Closed

29

BTJT A-PL-TEQ-0028

TQ Telkom Cable Crossing

TIMAS

Pipeline

29-Jul-13

TRS-0253

3-Sep-13

TRS-211

 ACCEPTED

Closed

30

BTJT A-PL-TEQ-0029

Concrete Sleeper Rebar Alteration

TIMAS

Pipeline

30-Jul-13

TRS-0257

31-Jul-13

TRS-150

 ACCEPTED

Closed

31

BTJT A-PL-TEQ-0030

Subsea Concrete Mattress -cement Type

TIMAS

Pipeline

5-Aug-13

TRS-0275

13-Aug-13

TRS-176

NOT ACCEPTED

Closed

32

BTJT A-PL-TEQ-0031

Concrete Matress Cement Type Subsea Applicable

TIMAS

Pipeline

21-Aug-13

TRS-0304

22-Aug-13

TRS-187

 ACCEPTED

Closed

BTJT A-PL-TEQ-0032

BTJT A Riser Stalk on Field Joint Coating

TIMAS

Pipeline

5-Sep-13

TRS-0353

06/26/2019

Page 1

06/26/2019

 

 

 

TECHNICAL QUERY REGISTER CLIENT

PC KETAPANG II LTD

PROJECT NAME

PROVISION OF TRANSPORTATION AND INSTALLATION OF BTJT-A PLATFORM AND

MAIN CONTRACTOR

PT TIMAS SUPLINDO

PIPELINES FOR BUKIT TUA DEVELOPMENT PROJECT Issued To PCK2L No.

TQ no

Document Title

Originator

Date

Date :

6/26/2019

PCK2L Status

Remarks

Response From PCK2L

Discipline Transmittal

Date

Transmittal

BTJT A-PL-TEQ-0033

TEQ For Pipeline Intelligent Pigging

TIMAS

Pipeline

4-Sep-13

TRS-0348

15-Nov-13

TRS-318

Rejected

Closed

BTJT A-PL-TEQ-0034

Telkom Cable Crossing Installation

TIMAS

Pipeline

5-Sep-13

TRS-0353

6-Sep-13

TRS-220

REJECTED

Closed

BTJT A-PL-TEQ-0035

HDD string onboard Adinda Fadilla

TIMAS

Pipeline

7-Oct-13

TRS-0455

8-Oct-13

TRS-269

 ACCEPTED

Closed

28-Oct-13

TRS-297

 ACCEPTED

Closed

BTJT A-PL-TEQ-0035 Rev.2 BTJT A-PL-TEQ-0036

HDD string onboard Adinda Fadilla

TIMAS

Pipeline

22-Oct-13

TRS-0495

Neoprene Field Joint and Hanger Flange Coating For Splash Zone

TIMAS

Pipeline

22-Oct-13

TRS-0495

06/26/2019

Page 2

06/26/2019

 

 

 

TECHNICAL QUERY REGISTER

CLIENT

PC KETAPANG II LTD

PROJECT NAME

PROVISION OF TRANSPORTATION AND INSTALLATION OF BTJT-A PLATFORM AND

MAIN CONTRACTOR

PT TIMAS SUPLINDO

PIPELINES FOR BUKIT TUA DEVELOPMENT PROJECT Issued To PCK2L No.

TQ no

Document Title

Originator

Date

Transmittal

Date :

6/26/2019

PCK2L Status

Remarks

Response From PCK2L

Discipline Date

Transmittal

STRUCTURE 1

BTJT-TI-SJ-TEQ-0001

2-Block Upending

TIMAS

Structure

24-Apr-13

2

BTJT A-SJ-TEQ-0002

Grouting and Locking Pins in PLEM Piles

TIMAS

Structure

31-May-13

TRS-0093

03-Jun-13

TRS-012/I

 Accepted

Closed

3

BTJT A-SJ-TEQ-0003

Loadout details for structures

TIMAS

Structure

10-Jun-13

TRS-0104

15-Jun-13

TRS-036/I

Rejected

Closed

4

BTJT A-SJ-TEQ-0004

Vessel Inspections for Kepodang Part

TIMAS

Structure

28-Jun-13

TRS-0140

1-Jul-13

TRS-064/I

Rejected

Closed

5

BTJT A-SJ-TEQ-0006

TQ Company Free Issue Material - BTJA-A Conductor (12 ins Tubular)

TIMAS

Structure

5-Jul-13

TRS-0173

8-Jul-13

TRS-075/I

For Info

Closed

6

BTJT A-SJ-TEQ-0007

BTJT A Topside Deck Connection Points

TIMAS

Structure

28-Sep-13

TRS-0324

10-Sep-13

TRS-225

 ACCEPTED  ACCEPTED

Closed

7

BTJT A-SJ-TEQ-0008

TEQ PLEM Engineering Drawings Latest

TIMAS

Structure

4-Sep-13

TRS-0348

10-Sep-13

TRS-227

For Info

Closed

8

BTJT A-SJ-TEQ-0010

Bukit Tua Platform Deck Drawings Latest Lifting Node Details

TIMAS

Structure

8-Oct-13

TRS-0459

9

BTJT A-SJ-TEQ-0011

Bukit Tua Platform Deck Trunnion Check

TIMAS

Structure

11-Oct-13

TRS-0474

23-Oct-13

TRS-292

-

Closed

10

BTJT A-SJ-TEQ-0012

Bukit Tua Platform Deck Padeye Check

TIMAS

Structure

22-Oct-13

TRS-0495

23-Oct-13

TRS-292

-

Closed

11

BTJT A-SJ-TEQ-0009

BUKIT TUA PIPELINE END MANIFOLD - LIFT POINTS

TIMAS

Structure

11-Nov-13

TRS-0541

12

BTJT A-SJ-TEQ-0013

BT Topside Lift Point Orientation

TIMAS

Structure

29-Nov-13

TRS-0593

13

BTJT A-SJ-TEQ-0014

BT Topside Change To Padeye

TIMAS

Structure

29-Nov-13

TRS-0595

1

BTJT-TI-QC-TEQ-0001

QA/QC

15-Apr-13

TRS-0036

17-Apr-13

TRS-017

 Accepted

Closed

BTJT A-QA-TEQ-0002

Waiver on ECA Specification Commencement of Production of Concrete Weight Coating 30mm Thickness

TIMAS

2

INDAL

QA/QC

20-Jun-13

TRS-0123

21-Jun-13

TRS-051/I

 Accepted with Notes

Closed

3

BTJT A-QA-TEQ-0003

Welder Qualification Test

TIMAS

QA/QC

25-Jun-13

TRS-0132

4-Jul-13

TRS-070/I

 Accepted

Closed

4

BTJT A-QA-TEQ-0004

Evaluation Of Resistance to Water Immersion

TIMAS

QA/QC

1-Jul-13

TRS-0149

12-Jul-13

TRS-087/I

 ACCEPTED

Closed

5

BTJT A-QA-TEQ-0005

TQ Frequency For Cross Section AEC

INDAL

QA/QC

18-Jul-13

TRS-0215

18-Jul-13

TRS-0104/0107

Rejected

Closed

6

BTJT A-QA-TEQ-0006

TQ Coating Repair

INDAL

QA/QC

18-Jul-13

TRS-0215

18-Jul-13

TRS-0104

Rejected

Closed

7

BTJT A-QA-TEQ-0007

TQ Impact Test Of 33 mm CWC

INDAL

QA/QC

18-Jul-13

TRS-0214

18-Jul-13

TRS-0107

Rejected

Closed

8

BTJT A-QA-TEQ-0008

TQ For requirement for PQT on 2 nd CWC Machine

INDAL

QA/QC

18-Jul-13

TRS-0219

9

BTJT A-QA-TEQ-0008 rev 1

TQ For requirement for PQT on 2 nd CWC Machine

INDAL

QA/QC

24-Jul-13

TRS-0236

24-Jul-13

TRS-127

ACCEPTED

Closed

10

BTJT A-QA-TEQ-0009

TQ Coating Repair 

INDAL

QA/QC

19-Jul-13

TRS-0228 25-Jul-13

TRS-135

ACCEPTED

 Anode Installatio Installation n

INDAL INDAL

QA/QC QA/QC

24-Jul-13 24-Jul-13

TRS-0236 TRS-0236

26-Jul-13

TRS-137

ACCEPTED

Closed Closed

QA/QC

11 12

TQ Coating Repair 

BTJT A-QA-TEQ-0009 rev 1 BTJT A-QA-TEQ-0010

13

BTJT A-QA-TEQ-0011

Requirement of Hot Water Soak

INDAL

QA/QC

31-Jul-13

TRS-0262

1-Aug-13

TRS-152

ACCEPTED

Closed

14

BTJT A-QA-TEQ-0011 rev1

Requirement of Hot Water Soak

INDAL

QA/QC

2-Aug-13

TRS-0268

2-Aug-13

TRS-163

ACCEPTED

Closed

15

BTJT A-QA-TEQ-0012

 Field Joint Coating

TIMAS

QA/QC

25-Sep-13

TRS-0427

26-Sep-13

TRS-254

ACCEPTED

Closed

16

BTJT A-QA-TEQ-0013

NDE For Anode Installation

TIMAS

QA/QC

27-Sep-13

TRS-0433

8-Oct-13

TRS-268

ACCEPTED

Closed

17

BTJT A-QA-TEQ-0014

TEQ Requirement Of Impact Test Frequency

TIMAS

QA/QC

30-Sep-13

TRS-0438

8-Oct-13

TRS-268

Rejected

Closed

18

BTJT A-QA-TEQ-0015

TQ Hempel Painting

TIMAS

QA/QC

22-Oct-13

TRS-0495

29-Oct-13

TRS-299

ACCEPTED

Closed

TIMAS

HSE

5-Jul-13

TRS-0167

8-Jul-13

TRS-074/I

Rejected

Closed

HSE 1

BTJT A-HSE-TEQ-0001

TQ For Waiver OSP Application (MCU from AME)

06/26/2019

Page 3

06/26/2019

 

 

 

TECHNICAL QUERY REGISTER CLIENT

PC KETAPANG II LTD

PROJECT NAME

PROVISION OF TRANSPORTATION AND INSTALLATION OF BTJT-A PLATFORM AND PIPELINES FOR BUKIT TUA DEVELOPMENT PROJECT

MAIN CONTRACTOR

PT TIMAS SUPLINDO Issued To PCK2L

No.

TQ no

Document Title

Originator

Date

Transmittal

Date :

6/26/2019

PCK2L Status

Remarks

Response From PCK2L

Discipline Date

Transmittal

06/26/2019

Page 4

06/26/2019

 

 

 

TECHNICAL QUERY REGISTER CLIENT

PC KETAPANG II LTD

PROJECT NAME

PROVISION OF TRANSPORTATION AND INSTALLATION OF BTJT-A PLATFORM AND

SUBCONTRACTOR

LYE ASIA PACIFIC

PIPELINES FOR BUKIT TUA DEVELOPMENT PROJECT Issued To PCK2L No.

TQ no

Document Title

Originator

Date :

4/30/2013

PCK2L Status

Remarks

Response From PCK2L

Discipline Date

Transmittal

Date

Transmittal

ENGINEERING

1 2 3

BTJT-TI-PL-TEQ-1001

PIPELINE INCONSISTENCY IN NEOPRENE COATING COATING THICKNESS IN SPLASH ZPNE

LYE

Pipeline

25-Apr-13

TRS-0048

8-May-13

TRS-024

For Information Only

Closed

BTJT-TI-PL-TEQ-1002

REDUCTION OF CONCRETE WEI GHT COAT COATING ING FOR 12" EXPORT LINE

LYE

Pipeline

24-May-13

TRS-0082

31-May-13

TRS-008/I

Rejected

Closed

BTJT-TI-PL-TEQ-1003

Change in Flange Class Rating for 8-inch Liquid Production Flowline

LYE

Pipeline

07-Jun-13

TRS-0101

12-Jun-13

TRS-025/I

Rejected

Closed

06/26/2019

Page 5

06/26/2019

 

 

 

TECHNICAL QUERY REGISTER CLIENT PROJECT NAME

PC KETAPANG II LTD PROVISION OF TRANSPORTATION AND INSTALLATION OF BTJT-A PLATFORM AND

SUBCONTRACTOR

LYE ASIA PACIFIC

PIPELINES FOR BUKIT TUA DEVELOPMENT PROJECT Issued To PCK2L No.

TQ no

Document Title

Originator

Discipline Date

STRUCTURE

QA/QC

INSTRUMENT

PROCESS 1

STRUCTURE

Transmittal

Date :

4/30/2013

PCK2L Status

Remarks

Response From PCK2L Date

Transmittal

06/26/2019

Page 6

06/26/2019

 

 

 

TECHNICAL QUERY REGISTER CLIENT PROJECT NAME

PC KETAPANG II LTD PROVISION OF TRANSPORTATION AND INSTALLATION OF BTJT-A PLATFORM AND

SUBCONTRACTOR

LYE ASIA PACIFIC

PIPELINES FOR BUKIT TUA DEVELOPMENT PROJECT Issued To PCK2L No.

TQ no

Document Title

Originator

Discipline Date

Transmittal

Date :

4/30/2013

PCK2L Status

Remarks

Response From PCK2L Date

Transmittal

HSE 1

HSE

Closed