Dual String Casing Milling Challenges for the North Sea

CARY BOWMAN APRIL 2013

Deltide Energy Services 

60 + years operating history in GoM



2012 began operations in North Sea, partnering with Halliburton



ISO 9001 compliant



Originator/Inventor of – Fit for Purpose applications – Best in Class tooling and equipment



Focused provider of niche services in casing severing and section milling, including multi-string milling 2

Multiple String Section Milling Sustained Casing Pressure and Bubbling Wells

3

Inflatable Packer

Multi-String Section Milling - Challenges 

Un-cemented casing strings



Casing centralizers



Severe casing eccentricity



Corroded or damaged casing



Debris left in the well



Pressures and hydraulics



Centralization & Stabilization Affecting - Milling times, Blade life, AND footage (collectively “ROP”) VARIABLE – WELL SPECIFIC

4

Multi-String Section Milling - Challenges

5

Dual String Section Milling – Proven success  Technology /Experience – Over 6 years milling multi-string windows – 150+ multiple string milled windows to date – K-55 to HCP-125 casings

 Design / Blade improvements – Optimum performance – Longevity / Increased footage / ROP – Customizable

 Bi-directional Section Milling  Simultaneous Under-reaming while Section Milling

6

Dual String Section Milling – North Sea Challenges Transfer of Technology

Well Casing Profiles  7 5/8” inside 9 5/8” (13.5” UR) 

9 5/8” inside 13 3/8” (18.5” UR)

Desired Milling Windows  +100’ inner string

7



~ 85’ dual string window



~ 66’ under ream to formation

Dual String Section Milling – North Sea Challenges Transfer of Technology Gulf of Mexico

North Sea

20’ to 30’

100’+

Milling Depths

< 1000’

2000’ to 10,000’

Hole angle

straight

> 65°

20k to 50k

>200K

Shallow - stiff assemblies

Deep - tapered drill string

Shallow - Rat Hole

Deep - Mill swarf management program

N/A

Loss of hole issues

Accepted Practice

Developing

Window Lengths

Daily Spread Costs

Work string dynamics – WOB and Stabilization Hydraulics

Formation Issues Performance Benchmarks

8

North Sea Dual String Section Milling – Results to Date 





First Dual String SM – 7 5/8” x 9 5/8” (13.5” UR) – 18º Deviation – Cemented and Abandoned Second Dual String SM – 7 5/8” x 9 5/8” (13.5” UR) – 16º Deviation – Currently ongoing

Milling 9-5/8“ from inside 7-5/8"

12 10 8 # of Milling Trips

6

Operational Challenges – Smaller casing, smaller tooling – Tool and blade longevity – Minimize trips – Customize blades to achieve performance objectives



Under-reaming while milling successful



9-5/8” x 13-3/8” (18.5”) upcoming

4

2 0 1

9

2

Acknowledgements