Task Risk Assessment For Sandblasting and Painting of Sheets Spools
December 4, 2022 | Author: Anonymous | Category: N/A
Short Description
Download Task Risk Assessment For Sandblasting and Painting of Sheets Spools...
Description
TASK RISK ASSESSMENT ENTER COMPANY NAME TASK TITLE: TITLE: Sandblastng and paintng Acvity:
Date: TRA No.
Sand Blastng of Shees/Spool Shees/Spoolss
Locaon: Locaon: Descripon: Sandblasng and painng of Sheets/Spools S / N o .
RISK EVALUATION (Refer o Evaluaton form)
HAZARD
HAZARD EFFECT
CONTROLS S
P
R
DESCRIBE ACTION
2.
3.
Unrained Personnel
Inhalaton of dus maerial
Hi High gh Pr Pres essu sure re
Personnel Injury
Occupatonal Illness wih respec o lungs
Pe Pers rson onne nell Injury, Propery loss
G
G
F
7
8
5
8
9
7
MANPOWER
>Contnuous monioring of actvites.
1. PA Supervisor
>Use of sandard manual handling echnique.
>Adhere o Equipmen Handling procedure. >Ensure o barricade he area wih signage and barricade ape.
(SPA) 2. Safey Supervisor
>GCM/Tool Box alk /Task Brieng o be conduced before sartng actviy. > Personal oher hen specic job resriced. >Wase maerials
>Dead man handle shall no be modied, o avoid acciden >Blastng area shall be covered properly wih arpaulin. >Concerned workforce workforce o wear blastng sui and proectve shield for face and neck
colleced immediaely and bagged. >Safey pins & Whip Lashes a couplings / connectons. >Prior arrangemen of equipmens & oher relaed accessories. >Resric unauhorized movemen of personnel
proecton. > Usage of inspeced equipmen mandaory. >Hoses o be inspeced and whip lash checked. >Hose layou minimized and managed o reduce ripping hazards. >Gri blastng equipmens certed & calibraed. >Use of high pressure indusrial hoses according o pressure ratng.
in job area. >Pressure ratng undersanding by operaor. >Experienced personal
> Contnuous Monioring for any abnormaliy during pressure holding. >Personal rained for positoning during Gri blastng. >Esablish communicaton proocol o
>Skilled personnel. 1.
RESIDUAL RISK
ACTION TO BE TAKEN
PA Supervisor
SPA: Sand Blastng, Supervisor, Safey Wach
A L A R P Y / N
S
P
R
G
2
3
Y
G
2
3
Yes
F
2
4
Yes
4.
5.
6.
Unsafe placemen of compressor wih sand blastng equipmen
High Noise
Unsafe placemen of compressor wih sand blastng equipmen
involvemen on hazardous job. >Personal positon during gri blastng.
swich OFF equipmen in case of emergency.
Safe placemen of equipmen, Barricade Barricaded. d.
Place he equipmen a plane locaton, area barricaded.
Poor audibiliy
> Ear proecton
> Ensure use of ear plugs / ear mu.
Equipmen roll over, Hi people, equipmen
Safe placemen of equipmen, Barricade Barricaded. d.
Equipmen roll over, Hi people,
G
4
5
equipmen damage,
G
4
5
Place he equipmen a plane locaton, area barricaded.
SPA: Sand Blastng, Supervisor, Safey Wach
G
2
3
Yes
SPA: Sand Blastng, Supervisor, Safey Wach SPA: Sand Blastng, Supervisor, Safey Wach
G
2
3
Yes
damage, Paintng & Coatng.
1.
2.
3.
Vapor In Inhalaton
Thinner/Pain Conac wih body, Eye, Skin
Fire
Dizziness lungs eeced Suocaton
Injury
Serious Injury
GENERAL COMMENTS: 1. TBT will be conduced prior o sar.
G
G
E
8
8
6
9
9
9
1. Personal oher han specic job resriced. 2.Tool Box alk o be conduced prior o sar of actviy 3. MSDS available on sie and clearly undersood.
1. MSDS shall be provided for epoxy and heir conens. 2. Concerned workforce o wear respiraory or dus mask 3. Drinking/eatng in coatng area is prohibied. 4. Use of carridge Mask mandaory. 5. Ventlaton plan cleared o person
1. Use Rubber gloves Separaton Sorage 2. Tool Box Brieng o be conduced before sartng actviy. 3. Immediae rinsing in area.
Certed Painer Safey Supervisor
G
2
3
Yes
prior of job. Gloves mandaory. 1. Usesar of suiable 2. In case of skin conac, rinse aeced areas wih clean waer and wash genly wih soap. 3. Eye proecton, appropriae safey goggles. 4. Follow he insructon as mentoned in he MSDS.
Paintng Sup(SPA) Safey Wach
G
2
3
Yes
1. Area prohibied near Ho Work actviy area.
1. Fire extnguishe extnguisherr available in paintng area.
Paintng Sup(SPA)
E
2
5
Yes
2. Epoxy sorage no onsie work locaton.
2. Fire wach depued in area of job. 3. Housekeeping before and aer job.
Safey /Fire Wach
2. Unauhorized person are no allowed in work premises. 3. Safey wach man does his designaed job. 4. Proper PPE is a mus for sand blastng and paintng crew. 5. Sand by vehicle wih driver mus be presen a he sie in case of emergency. 6. Firs Aid Box mus be in place near he actviy. 7. Housekeeping of he area mus be done on prior basis. RISK ASSISMENT APPROVAL I’m satsed ha he safeguard pu in place will reduce he level of Risk o an accepable level
NAME OF TEAM MEMBERS
and he Task/Acton is permied o proceed. Reviewed by: ___________ _______________________ ______________ __
(Projec Manager) (Sand Blastng ) HITRA ( HSE Engineer) Engineer)
Dae: _______________________ ________________________ _ Time: __________ ____________________ __________
Authorizing S = Severiy; P = Probabiliy, R = Risk
Signaory:: _______________ Signaory
DATE: ________________
View more...
Comments