MTR CORPORATION / CONTRACTOR Contract No. 3288.66-02E Upgrade & Reinforcement of Power Supply System at PRE & ADM
DAR NO:
DESIGN APPROVAL REOUEST DATE FORWARDED TO MTRC:
C3288.66-02E/06/02/01/07/001
10 Sep. 03
CONTRACTOR REF:
RELEVANT CLAUSE(S) IN THE PS: N/A
3536-L/03/P041/05/02 SUBJECT Design Submission DOCUMENT SUBMITTED: T & C Procedure for Transformer DETAILS: Site testing procedure for transformer (10 pages)
MTRC CONTRACT NO. C3288.66-02E Upgrade and Reinforcement of Power Supply System at PRE and ADM Date: 9 Sept 2003 DAR No. C3288.66-02E/06/02/01/07/001 Rev. 0 Site Testin2 Procedure for Transformer
I.
CONSTRUCTION INSPECTION General inspection for the construction of the transformer shall be carried out as per the check list in the test form.
2.
VISUAL CHECK OF EARTH CONTINUITY Check the earthing connection of the transformer frame, HV & LV cable box, LV neutral, control and marshalling cubicle visually.
3.
INSULATION RESISTANCE BEFORE PRESSURE TEST Insulation resistance test (Megger Test) for HV to LV windings, HV & LV windings to earth shall be tested by 5kV d.c. megger tester before pressure test.
4.
PRESSURE TEST AC high voltage shall be increased gradually to 19.2kV between I IkV to 415V/earth and to 3 .5kV between 415V to 11 kV/earth for I minute.
5.
INSULATION RESISTANCE AFTER PRESSURE TEST Insulation resistance test (Megger Test) for HV to LV windings, HV & LV windings to earth shall be tested by 5kV d.c. megger tester after pressure test.
6.
TRANSFORMER RATIO TEST Check the transformer ratio by connecting a three-phase, four wire, low voltage supply (auto-transformer) to the H.V. terminals. Measure and record the data at the L.V. side.
7.
VECTOR GROUP CHECK Measure the phase voltages for HV & LV side (refer to the test form) to check the vector group of the transformer.
8.
FUNCTION TEST ON TEMPERATURE INDICATORS (A). Check the Winding Temperature Indicator 1. Adjust and calibrate the winding temperature indicators. Insert a thermometer (as reference) and the winding temperature indicator in boiling oil. Record the readings of the thermometer and calibrate the indicator.
FILE NAME: Transformer
Page I of 10
ALE'.,1 It LU
MTRC CONTRACT NO. C3288.66-02E Upgrade and Reinforcement of Power Supply System at PRE and ADM Date: 9 Sept 2003 DAR No. C3288.66-02E/06/02/01/07/001 Rev. 0
|P
2. Simulate winding temperature alarm with boiled oil. The winding temperature alarm contact closes. Record the switch setting with the reading of thermometer. (Alarm setting 1050 C) 3. Simulate winding temperature trip with boiled oil. The winding temperature trip contact closes. Record the switch setting with the reading of thermometer. (Trip setting 11 50 C) (B). Check the Liquid Temperature Indicator 1. Adjust and calibrate the liquid temperature indicators. Insert a thermometer (as reference) and the liquid temperature indicator in boiling oil. Record the readings of the thermometer and calibrate the indicator. 2. Simulate liquid temperature alarm with boiled oil. The liquid temperature alarm contact closes. Record the switch setting with the reading of thermometer. (Alarm setting 85 0 C) 3. Simulate liquid temperature trip with boiled oil. The liquid temperature trip contact closes. Record the switch setting with the reading of thermometer. (Trip setting 950 C )
9.
WINDING RESISTANCE MEASUREMENT Measure the winding resistance for H.V. side and L.V. side.
10.
PHASE SOUENCE CHECK & OUTPUT VOLTAGE MEASUREMENT Check the phase sequence at L.V. side by phase sequence meter. Measure the output voltage at L.V. side.
11.
NOISE LEVEL MEASUREMENT Check the noise level with the transformer on no load at rated voltage and frequency. The position of the noise level meter shall be I metre from transformer body.
FILE NAME: Transformer
Page 2 of 10
MTRC CONTRACT NO. C3288.66-02E Upgrade and Reinforcement of Power Supply System at PRE and ADM Date :9 Sept2003 DAR No. C3288.66-02E/06/02/01/07/001 Rev. 0 12.
A,
Upop
STANDBY EARTH FAULT C.T. TEST Test the CT magnetisation with a.c. voltage to measure the knee point voltage. Test the ratio of CT up to 100% rated current by primary injection. Check insulation resistance and measure resistance of CT.
13.
INSULATING OIL SAMPLE TEST Test the insulating oil sample in compliance with IEC 60156 (Dielectric Test) & IEC 60814 (Water Content Test) by accredit laboratory.
FILE NAME: Transformer
Page 3 of 10
MTRC CONTRACT NO. C3288.66-02E Upgrade and Reinforcement of Power Supply System at PRE and ADM Date: 9 Sept2003 DAR No. C3288.66-02E/06/02/01/07/001 Rev. 0
P UPI
"
Transformer Site Test Report Date of Testing
Site Location
:
Voltage Ratio
11000/433V
Serial No.
Transformer Rating
1500KVA
Vector Group
Place of Manufacture 1.
:
Cooling Type
CONSTRUCTION INSPECTION
_
: Dynll
: ONAN RESULT
- Check Transformer Body - Check HV & LV Cable Box - Check Standby Earth CT & Bushing - Check Cable Terminal Condition - Check Winding Temperature Indicator - Check Liquid Temperature Indicator - Check the Condition of Liquid Level Gauge - Check Gasket Joints Transformer Tank Joint Cable Box Covers Valve Flanges & Pipe Joints - Check Liquid Drain Valves are closed - Check Pressure Relief Valve - Check Radiator Valves are fully opened 2.
INSULATION RESISTANCE BEFORE PRESSURE TEST (Megger Test) Using a 5kV Megger HI.V. Windings (I IkV) to Earth (5kV) LV. Windings (415V) to Earth (IkV) H.V. Windings to L.V. Windings (5kV) Control Circuit to Earth (0.5kV)
FILE NAME: Transformer
RESULT
0 0 0 0
Page 4 of 10
LP
MTRC CONTRACT NO. C3288.66-02E
MP
Upgrade and Reinforcement of Power Supply System at PRE and ADM
Date: 9 Sept 2003
DAR No. C3288.66-02E/06/02/01/07/001 Rev. 0
RESULT
PRESSURE TEST
4.
mA nmA
11kV to 415V/earth (19.2kV AC I mins.) 415V to I IkV/earth (3.5kV AC I min.)
RESULT
INSULATION RESISTANCE AFTER PRESSURE TEST (Megger Test)
5.
Using a 5kV Megger H.V. Windings (I kV) to Earth (5kV) L.V. Windings (415V) to Earth (IkV) H.V. Windings to L.V. Windings (5kV)
Q
0 0
TRANSFORMER RATIO TEST
6.
Connect a three-phase, four wire, low voltage supply (auto-transformer) to the H.V. terminals, the following data is recorded: T A
P
.
.
1 2 3 4
415 415 415 415
415 415 415 415
5
415
415
415 415 415 415 415
CAL 15.52 15.93 16.34 16.75 17.16
FILE NAME: Transformer
ACT
CAL 15.52 15.93 16.34 16.75 17.16
ACT
CAL 15.52 15.93 16.34 16.75 17.16
ACT
CAL 8.96 9.20 9.43 9.67 9.91
c-n
b-n
a-n
b-ca-c
a-b
A-C
B-C
A-B
LV PHASE VOLTS
LV LINE VOLTS
APPLIED HV LINE VOLTS
ACT
_
CAL 8.96 9.20 9.43 9.67 9.91
ACT
Page 5 of 10
CAL 8.96 9.20 9.43 9.67 9.91
ACT
MTRC CONTRACT NO. C3288.66-02E Upgrade and Reinforcement of Power Supply System at PRE and ADM Date: 9 Sept 2003 DAR No. C3288.66-02E/06/02/01/07/001 Rev. 0 7.
VECTOR GROUP CHECK (refer to diagram 1) Theoretical calculation: AB = 415V BC = 415V CA = 415V ab = 16.34V bc = 16.34V ca = 16.34V Aa = OV Ab = 16.34V Ac = 16.34V Ba = 415V Bb = ' [AB 2 + ab2 - 2(AB)(ab)cos ZBAb] = I[4152± 16.342- 2(415)(16.34)cos 300] = 401V
ZBAb
=
300
ZAcC
=
300
ZbcC
=
151.16°
Bc = Bb = 401V Ca = 415V Cc = I [AC 2 + Ac2 - 2(AC)(Ac)cos ZAcC] = 1[4152+ 16.342- 2(415)(16.34)cos 30°] = 401V Cb
A at HV side is connected to Phase a at LV side during testing. *. Neutral terminal at LV side is isolated to earth during testing. *. Phase
FILE NAME: Transformer
Page 6 of 10
MTRC CONTRACT NO. C3288.66-02E Upgrade and Reinforcement of Power Supply System at PRE and ADM Date: 9 Sept 2003 DAR No. C3288.66-02E/06/02/01/07/001 Rev. 0
::EPEP
Diagram 1
Aa
FILE NAME: Transformer
Page 7 of 10
,
MTRC CONTRACT NO. C3288.66-02E Upgrade and Reinforcement of Power Supply System at PRE and ADM Date: 9 Sept 2003 DAR No. C3288.66-02E/06/02/01/07/001 Rev. 0 8.
LEpIp
RESULT
FUNCTION TEST ON TEMPERATURE INDICATORS (A). Check the Winding Temperature Indicator 1. Adjust and calibrate the winding temperature indicators. Insert a thermometer (as reference) and the winding temperature indicator in boiling oil. Record the readings of the thermometer and calibrate the indicator. 2. Simulate winding temperature alarm with boiled oil. The winding temperature alarm contact closes. Record the switch setting with the reading of thermometer. (Alarm setting 105 0C) 3. Simulate winding temperature trip with boiled oil. The winding temperature trip contact closes. Record the switch setting with the reading of thermometer. (Trip setting 11 50 C) (B). Check the Liquid Temperature Indicator 1. Adjust and calibrate the liquid temperature indicators. Insert a thermometer (as reference) and the liquid temperature indicator in boiling oil. Record the readings of the thermometer and calibrate the indicator. 2. Simulate liquid temperature alarm with boiled oil. The liquid temperature alarm contact closes. Record the switch setting with the reading of thermometer. (Alarm setting 850 C) 3. Simulate liquid temperature trip with boiled oil. The liquid temperature trip contact closes. Record the switch setting with the reading of thermometer. (Trip setting 95 0 C)
9.
WINDING RESISTANCE MEASUREMENT H.V. Side
A-B1 B-C A-C
L.V. Side
a-b b-c a-c
FILE NAME: Transformer
a-n b-n c-n
Page 8 of 10
EPE11P
MTRC CONTRACT NO. C3288.66-02E Upgrade and Reinforcement of Power Supply System at PRE and ADM Date: 9 Sept 2003
DAR No. C3288.66-02E/06/02/01/07/001 Rev. 0
10.
PHASE SEQUENCE CHECK & OUTPUT VOLTAGE MEASUREMENT (Measured after energization) Phase Sequence Check Secondary Output Voltage
11.
RY
YB
RB
RN
YN
BN
NOISE LEVEL MEASUREMENT Check the noise level with the transformer on no load at rated voltage and frequency. The position of the noise level meter shall be 1 metre from transformer body. Ambient Noise Level: _dB Noise (dB) at 1/2 tank height
Position of Tester East South West North
12.
STANDBY EARTH FAULTC.T. TEST
Substation: Transformer No: Current Ratio:
Rating:
Serial No._
I. Inject a.c. voltage to CT coil to measure the knee point voltage Neutral C.T. V A
FILE NAME. Transformer
Page 9 of 10
UPUP
MTRC CONTRACT NO. C3288.66-02E Upgrade and Reinforcement of Power Supply System at PRE and ADM Date: 9 Sept 2003 DAR No. C3288.66-02E/06/02/01/07/001 Rev. 0 2. Inject primary current to test the C.T. accuracy
OHM
MEASURED SECONDARY CURRENT (A)
INJECTED PRIMARY CURRENT (A)
CT RESISTANCE 25%
75%
50%
100%
25%
50%
75%
3. CT Insulation Test (500V d.c.) CT to Earth 13.
M ohm
INSULATING OIL SAMPLE TEST Referring to the attached test report from accredit laboratory: Dielectric Test