PROJECT PROCEDURE CRITERIA FOR SELECTION OF SUBCONTRACTORS AND VENDORS

Contents 1. PURPOSE ............................................................................................................................... 3 2. SCOPE .................................................................................................................................... 3 3. DEFINITIONS AND ABBREVIATIONS .................................................................................... 3 3.1 Definitions ............................................................................................................................ 3 3.2 Abbreviation ......................................................................................................................... 3 4. REFERENCED DOCUMENTS ................................................................................................ 3 5. RESPONSIBILITIES ................................................................................................................ 4 6. PROCEDURE .......................................................................................................................... 4 6.1 EQUIPMENT STANDARDISATION PHILOSOPHY ............................................................. 4 7. SELECTION OF SUBCONTRACTORS ................................................................................... 4 7.1 Subcontracting Plan ............................................................................................................. 4 7.2 SUBCONTRACTOR Bid Lists .............................................................................................. 4 7.3 Pre-Qualification Requirements ............................................................................................ 6 7.4 Subcontractor Evaluation & Award ....................................................................................... 6 7.5 Commercial Terms and Conditions ...................................................................................... 8 8. SELECTION OF VENDORS .................................................................................................... 8 8.1 Procurement Plan ................................................................................................................ 8 8.2 Vendor Lists ......................................................................................................................... 8 8.3 Pre-Qualification Requirements .......................................................................................... 10 8.4 Vendor Evaluation & Award................................................................................................ 10 8.5 Commercial Terms and Conditions .................................................................................... 11 9. LOCAL AND REGIONAL RESOURCES ................................................................................ 11 10. COMPANY SELECTION OF OTHER THAN RECOMMENDED SUBCONTRACTOR / VENDOR ...................................................................................................................................... 12 ATTACHMENT 1: PRELIMINARY SUBCONTRACTING PLAN.................................................. 13 ATTACHMENT 2: SUBCONTRACTOR LIST ............................................................................. 14 ATTACHMENT 3: FORM FOR PROPOSING SUBCONTRACTORS ......................................... 17 ATTACHMENT 4: COMPANY WORK GROUP LISTING ........................................................... 18 ATTACHMENT 5: PRE-QUALIFICATION REQUIREMENT FOR SUBCONTRACTORS ........... 41 ATTACHMENT 6: NOMINATED/RESTRICTED VENDOR LIST................................................. 43 ATTACHMENT 7: VENDOR LIST FOR MAJOR GOODS .......................................................... 45 ATTACHMENT 8: FORM FOR PROPOSING ADDITIONAL VENDORS .................................. 115 ATTACHMENT 9: COMPANY PRODUCT GROUP LISTING ................................................... 116 ATTACHMENT 10: PRE-QUALIFICATION REQUIREMENTS FOR VENDORS ...................... 143 ATTACHMENT 11: VENDOR LIST FOR STANDARDISED EQUIPMENT ............................... 145

Page 2 of 154

CC01A-0-00000-PS-PRO-0004 Rev3 DSN : 848

PROJECT PROCEDURE CRITERIA FOR SELECTION OF SUBCONTRACTORS AND VENDORS

1.

PURPOSE The purpose of this document is to ensure that CONTRACTOR shall perform all procurement activities necessary for completion of the WORK following this criteria for selection of SUBCONTRACTORS and VENDORS.

2.

SCOPE This document defines the process for selecting SUBCONTRACTORS and VENDORS for procurement of major GOODS and / or services. COMPANY’S strategy is to provide CONTRACTOR with a degree of flexibility in sourcing GOODS utilising its own experience and market knowledge to enhance quality and reduce overall cost. At the same time, COMPANY requires the CONTRACTOR to comply with COMPANY’S standard requirements.

3.

DEFINITIONS AND ABBREVIATIONS

3.1

Definitions Refer to ARTICLES OF AGREEMENT.

3.2

4.

Abbreviation AVL

Additional Vendors List

EPC

Engineering, Procurement and Construction

ICS

Integrated Control System

Q

Qualified

SL

SUBCONTRACTOR List

TBQ

To be Qualified

VL

VENDOR List

REFERENCED DOCUMENTS This document shall be read and construed in accordance with the relevant provisions contained in the documents listed below: Document Number

Document Title

CC01A-0-00000-PM-PHL-0001

Equipment Standardisation Philosophy

CC01A-0-00000-PS-PRO-0003

Procurement Guidelines

CC01A-0-00000-PS-PRO-0002

Procurement Services

Page 3 of 154

CC01A-0-00000-PS-PRO-0004 Rev3 DSN : 848

PROJECT PROCEDURE CRITERIA FOR SELECTION OF SUBCONTRACTORS AND VENDORS

The edition of the Reference Documents shall be the edition current at the EFFECTIVE DATE of the AGREEMENT. CONTRACTOR shall comply with COMPANY instruction to comply with any changed Reference Documents. CONTRACTOR shall advise COMPANY of any conflict between the referenced documents and any technical specification. COMPANY shall determine which shall govern.

5.

RESPONSIBILITIES The CONTRACTOR is responsible to comply with the implementation of this Procedure.

6.

PROCEDURE

6.1

EQUIPMENT STANDARDISATION PHILOSOPHY The document Equipment Standardisation Philosophy advises the basis for the Standardisation Philosophy and identifies the equipment types which are subject to this philosophy (Refer to Document No CC01A-0-00000-PM-PHL-0001). For equipment types not listed in the Equipment Standardisation Philosophy, the CONTRACTOR is free to nominate VENDORS and SUBCONTRACTORS in accordance with the procedure contained in this document.

7.

SELECTION OF SUBCONTRACTORS Selection of any SUBCONTRACTOR for performance of any portion of the WORK shall be based, amongst other factors, on technical merit and the ability to comply with the SCHEDULE. For the purpose of this Section 7, SUBCONTRACTORS excludes VENDORS. Refer to Section 8 of this document for requirements for selection of VENDORS.

7.1

Subcontracting Plan CONTRACTOR’S preliminary Subcontracting Plan is included as Attachment 1 (Preliminary Subcontracting Plan). The requirements relating to the establishment and updating of the Subcontracting Plan are covered in Procurement Services (Refer to Document No. CC01A-0-00000-PS-PRO-0002).

7.2

SUBCONTRACTOR Bid Lists CONTRACTOR shall comply with the following provisions for selection of SUBCONTRACTORS to be included on the SUBCONTRACTOR lists for the WORK (refer to Attachment 2 SUBCONTRACTORS List)

Page 4 of 154

CC01A-0-00000-PS-PRO-0004 Rev3 DSN : 848

PROJECT PROCEDURE CRITERIA FOR SELECTION OF SUBCONTRACTORS AND VENDORS

7.2.1

SUBCONTRACTOR List (SL) The SUBCONTRACTOR List (SL) in Attachment-2 contains the approved potential SUBCONTRACTORS being categorized under Class “Q” of the first tier and other subcontracts of significance. CONTRACTOR shall be free to issue enquiries to any/all SUBCONTRACTORS included in the SL for their respective scope.

potential

It is anticipated during the EPC selection process an approved SUBCONTRACTORS list will be developed from CONTRACTOR’S input at Tender stage. CONTRACTOR shall submit for COMPANY’S approval its SUBCONTRACTOR List utilizing the qualified SUBCONTRACTOR List given in attachment 2 along with its request for deviation from this list (with justification therefore) during the Technical Evaluation of CONTRACTOR’S Tender. A Pre-qualification Dossier containing information as stated in Attachment 5 Method A of this document shall be submitted for all proposed SUBCONTRACTORS deviated from the qualified list of Attachment 2 for COMPANY’S review and approval. It is COMPANY’S intention to review the proposed SUBCONTRACTORS and classify them as “Q”, “TBQ”, or “Not Acceptable” in accordance with “Criteria for Selection of Subcontractors and Vendors” as stated in Attachment 5 Method A and shall advise the CONTRACTOR accordingly. This Subcontractor List shall constitute the Contractor’s Approved List CONTRACTOR shall ensure, prior to issuing Invitation to Tender, that there are at least three (3) SUBCONTRACTORS in Category “Q” for each item. CONTRACTOR shall not issue enquiries to any SUBCONTRACTOR other than those included in the Approved SL under Class “Q” except with prior approval of COMPANY, which will be granted only under exceptional circumstances The SUBCONTRACTORS List agreed by COMPANY with the CONTRACTOR shall contain all the SUBCONTRACTORS classified as “Q” or “TBQ” and will be included as Attachment 2 of this document CC000-0-00000-PS-PRO-0004 - Criteria for Selection of Subcontractors and Vendors. This list will ultimately become an exhibit to the AGREEMENT. 7.2.2

Additional SUBCONTRACTORS For any proposed additional WORK and WORK where a list of SUBCONTRACTORS has not been pre-approved, CONTRACTOR shall submit to COMPANY within forty five (45) days of the EFFECTIVE DATE or four (4) weeks prior to the date set for issuance of inquiry for a SUBCONTRACTOR, whichever is the earlier, its list proposing SUBCONTRACTORS. This submission shall use the form in Attachment 3, and CONTRACTOR shall complete the forms using the COMPANY’S Work Group Listing in Attachment 4. COMPANY will evaluate CONTRACTOR’S proposed SUBCONTRACTOR lists and assign one of the following classifications: Page 5 of 154

CC01A-0-00000-PS-PRO-0004 Rev3 DSN : 848

PROJECT PROCEDURE CRITERIA FOR SELECTION OF SUBCONTRACTORS AND VENDORS

Class ‘‘Q’’ This classification will be given to SUBCONTRACTORS who comply with COMPANY’S registration requirements and who are known to COMPANY from a previous project. An inquiry can be issued Class “Q” SUBCONTRACTORS without further approvals from COMPANY. Class ‘‘TBQ’’ This classification will be given to SUBCONTRACTORS who do not comply with COMPANY’s registration requirements and/or who are not known to COMPANY. CONTRACTOR may issue enquiries to Class “TBQ” SUBCONTRACTORS at its discretion, however, these shall be considered for evaluation only after upgrade from Class “TBQ” to Class “Q”. However, CONTRACTOR shall issue enquiries to all “Q” category SUBCONTRACTORS before considering any “TBQ” VENDOR for issue of enquiry. Class ‘‘Not Acceptable’’ This will be given by COMPANY to those SUBCONTRACTORS in respect of which information is available confirming inadequate capability or unacceptable past performance or other reason. COMPANY reserves the right to reject any subcontractor nominated by CONTRACTOR. CONTRACTOR shall not issue inquires to such SUBCONTRACTORS.

7.3

Pre-Qualification Requirements In order to upgrade a proposed SUBCONTRACTOR from Class “TBQ” to Class “Q”, CONTRACTOR shall submit a Pre-qualification Dossier containing information as stated in Attachment 5 Method A and Method B for COMPANY’S review. CONTRACTOR shall plan its activities in a manner so as to allow sufficient time for pre-qualification of the proposed SUBCONTRACTORS without affecting the SCHEDULE.

7.4

Subcontractor Evaluation & Award

7.4.1

CONTRACTOR shall technically evaluate the SUBCONTRACTORS and submit evaluations for COMPANY approval. Following COMPANY approval of the technical evaluation, CONTRACTOR shall submit the award recommendation at least four (4) weeks prior to the date set for award of the subcontract. COMPANY requirements for technical evaluation and award recommendation are contained in Procurement Services procedure (document no. CC01A-0-00000-PSPRO-0002).

Page 6 of 154

CC01A-0-00000-PS-PRO-0004 Rev3 DSN : 848

PROJECT PROCEDURE CRITERIA FOR SELECTION OF SUBCONTRACTORS AND VENDORS

7.4.2

CONTRACTOR’S Technical Evaluation shall address COMPANY’S selection criteria that follow: Registration Requirements      

Valid Trade License from Abu Dhabi Municipality covering the services to be provided. Valid Registration Certificate from Abu Dhabi Chamber of Commerce & Industry covering the services to be provided. Oil and Gas Classification for above. Contractor Classification from Abu Dhabi Planning Department, if available. Valid Consultant Registration Certificate from Abu Dhabi Planning Department (for Consultant only), if available. Registration with COMPANY.

Technical Requirements          

7.4.3

Compliance with SUBCONTRACT scope of work. Compliance with SPECIFICATIONS. Structured organisation, manpower and equipment in a condition that allows safe operation and in quantities that would meet job requirements. Adequate direct experience in jobs of similar scope and order of magnitude in the last five years, especially in the UAE or Gulf region. Current workload and availability of resources to comply with SCHEDULE requirements. Documented Quality Assurance / Quality Control Programs (typically ISO 9001). Documented Health, Safety and Environmental Systems and Procedures (typically compliance with ISO 14001). Excellent Safety Record. Financial soundness and solvency. Compliance with Insurance Coverage requirements.

Subject to compliance with the registration and technical requirements of the selection criteria, COMPANY will approve the technical bid evaluation recommendations submitted by CONTRACTOR. Final approval of selected SUBCONTRACTOR and approval for award shall be subject to the provisions of Section 10 of this document.

Page 7 of 154

CC01A-0-00000-PS-PRO-0004 Rev3 DSN : 848

PROJECT PROCEDURE CRITERIA FOR SELECTION OF SUBCONTRACTORS AND VENDORS

7.5

Commercial Terms and Conditions CONTRACTOR shall be responsible for finalising with the SUBCONTRACTORS commercial terms and conditions which comply with the requirements of the AGREEMENT.

8.

SELECTION OF VENDORS Selection of any VENDOR for supply of GOODS for the WORK shall be based, amongst other factors, on technical merit and lowest life cycle value. In this context life cycle cost means the total cost over a ten year period considering capital, maintenance and operating cost associated with the equipment.

8.1

Procurement Plan CONTRACTOR’S Procurement Plan shall be established and updated in accordance with the Procurement Services procedure (document no. CC01A-0-00000-PS-PRO0002).

8.2

Vendor Lists

8.2.1

Nominated/Restricted VENDORS The lists of nominated/restricted VENDORS based on requirements such as technical compatibility and/or standardisation is enclosed in Attachment 6 and Attachment 11. CONTRACTOR shall negotiate directly with such nominated/restricted VENDORS for the supply of the specific GOODS in question. In some cases, Attachment 11 contains more than one VENDOR for Standardised Equipment. It is anticipated that during EPC selection / execution, one single VENDOR will be confirmed and advised by COMPANY. If a single VENDOR has not been confirmed, CONTRACTOR may issue inquiries to any/all VENDORS listed. In this case, CONTRACTOR’s inquiry shall also specify that VENDOR’s pricing shall be applicable to the entire PROJECT, including any future enquiries from other L/EPC CONTRACTORS. CONTRACTOR’S bid evaluation shall be submitted to COMPANY as defined elsewhere in the AGREEMENT. If COMPANY accepts CONTRACTOR’s proposed VENDOR, the VENDOR shall become the single APPROVED VENDOR for that category of Standardised Equipment.

8.2.2

VENDOR List for Major GOODS (VL) The VL in Attachment 7 contains the pre-approved VENDORS from which CONTRACTOR may procure major GOODS. CONTRACTOR must also comply with the requirements of the nominated/restricted VENDOR list. Page 8 of 154

CC01A-0-00000-PS-PRO-0004 Rev3 DSN : 848

PROJECT PROCEDURE CRITERIA FOR SELECTION OF SUBCONTRACTORS AND VENDORS

CONTRACTOR may proceed to issue inquiries to any/all potential VENDORS that are Class “Q” from the pre-approved VENDORS for their respective GOODS. It is anticipated during the EPC selection process an approved VENDORS list will be developed from CONTRACTOR’S input at Tender stage. CONTRACTOR shall submit for COMPANY’S approval its VENDORS List utilizing the qualified VENDORS List given in attachment 7 along with its request for deviation if any from this list (with justification therefore) during the Technical Evaluation of CONTRACTOR’S Tender. A Pre-qualification Dossier containing information as stated in Attachment 10 Method A of this document shall be submitted for all proposed VENDORS deviated from the qualified list of Attachment 7 for COMPANY’S review and approval. It is COMPANY’S intention to review the proposed VENDORS and classify them as “Q”, “TBQ”, or “Not Acceptable” in accordance with “Criteria for Selection of Subcontractors and Vendors” as stated in Attachment 10 Method A and shall advise the CONTRACTOR accordingly. This VENDOR List shall constitute the CONTRACTOR’S Approved List CONTRACTOR shall ensure, prior to issuing Invitation to Tender, that there are at least three (3) VENDORS in Category “Q” for each item. CONTRACTOR shall not issue enquiries to any VENDOR other than those included in the Approved VL under Class “Q” except with prior approval of COMPANY, which will be granted only under exceptional circumstances. The VENDOR List agreed by COMPANY with the CONTRACTOR shall contain all the VENDORS classified as “Q” or “TBQ” and will be included as Attachment 7 of this document CC01A-0-00000-PS-PRO-0004 - Criteria for Selection of Subcontractors and Vendors. This list will ultimately become an exhibit to the AGREEMENT. 8.2.3

Additional VENDOR List for Other GOODS (AVL) CONTRACTOR shall submit the detailed list of additional GOODS required for the WORK. Within forty five (45) days of the EFFECTIVE DATE or four (4) weeks prior to the date set for issuance of an inquiry for a purchase order, whichever is earlier, CONTRACTOR shall submit to COMPANY a detailed list identifying proposed VENDORS for additional GOODS utilising the form in Attachment 8. CONTRACTOR shall refer to COMPANY’S Product Group Listing in Attachment 9 to complete the forms. COMPANY will evaluate CONTRACTOR’S proposed VENDOR lists and assign the following classification: Class ‘‘Q’’ This classification will be given to VENDORS who comply with COMPANY’S registration requirements and who are known to COMPANY from a previous project. An enquiry can be issued Class “Q” VENDORS without further approvals from COMPANY. Class ‘‘TBQ’’ Page 9 of 154

CC01A-0-00000-PS-PRO-0004 Rev3 DSN : 848

PROJECT PROCEDURE CRITERIA FOR SELECTION OF SUBCONTRACTORS AND VENDORS

This classification will be given to VENDORS who do not comply with COMPANY’s registration requirements and/or who are not known to COMPANY. CONTRACTOR may issue inquiries to Class “TBQ” VENDORS at its discretion, however, these shall be considered for evaluation only after upgrade from Class “TBQ” to Class “Q”. However, CONTRACTOR shall issue enquiries to all “Q” category VENDORS before considering any ‘T.B.Q’ VENDOR for issue of enquiry. Class ‘‘Not Acceptable’’ This will be from VENDOR’s list in Attachment 7 as “Not Acceptable VENDORS” in respect of which information is available confirming inadequate capability or unacceptable past performance. CONTRACTOR shall not issue enquires to such VENDORS.

8.3

Pre-Qualification Requirements In order to upgrade a proposed VENDOR from Class “TBQ” to Class “Q”, CONTRACTOR shall submit a Pre-qualification Dossier containing information as stated in Attachment 10 Method A and Method B for COMPANY’s review. CONTRACTOR shall plan its activities in a manner so as to allow sufficient time for pre-qualification of the proposed VENDORS without affecting the SCHEDULE.

8.4

Vendor Evaluation & Award

8.4.1

CONTRACTOR shall technically evaluate the VENDORS offers and submit evaluations for APPROVAL. Following COMPANY approval of the technical evaluation, CONTRACTOR shall submit the award recommendation at least four (4) weeks prior to the date set for award of purchase order. COMPANY requirements for technical evaluation and award recommendation are contained in Procurement Services procedure (document no. CC01A-0-00000-PSPRO-0002).

8.4.2

CONTRACTOR’S Technical Evaluation shall address COMPANY’S selection criteria that follow: Registration Requirements Agency Agreement with an Abu Dhabi company endorsed by the required UAE authorities (applicable to non Abu Dhabi based VENDORS). Registration with COMPANY. Technical Requirements   

Compliance with scope of supply. Compliance with SPECIFICATIONS. Internationally recognised for high quality and reliability. Page 10 of 154

CC01A-0-00000-PS-PRO-0004 Rev3 DSN : 848

PROJECT PROCEDURE CRITERIA FOR SELECTION OF SUBCONTRACTORS AND VENDORS

     

 

     

 

Advanced level of technology with capability to upgrade in future. Compliance with the essential requirements of ISO 9001:2008. Excellent Safety Record. Compliance with SCHEDULE. Current workload and availability of resources. Availability of after sales support facilities in Abu Dhabi such as stock of spare parts, repair facility, technical support and training centres for plant operators and technician. Good performance track record in terms of quality, responsiveness, cost control, safety, completion schedule, business ethics, etc. Adequate past experience in supply of similar items in the last five years, especially in the UAE or the Gulf region. Past experience with ADNOC Group of Companies will be preferred. Commitment for continued provision of spares for the life of the GOODS. Financial soundness and solvency. Life cycle operating cost. Operating spare parts cost. All Stockists / Distributors / Trading Houses shall only be considered subject to COMPANY acceptance of satisfactory source of manufacturer/origin. GOODS supplied for piping materials, or mechanical valves must be supplied by reputable VENDORS or mills which can provide experience of similar GOODS supply. COMPANY reserves the right to reject any Vendor nominated by CONTRACTOR. Engineering companies and packagers shall be considered subject to approval of major sub-suppliers by COMPANY.

Subject to compliance with the registration and technical requirements of the selection criteria, COMPANY will approve the technical bid evaluation recommendations submitted by CONTRACTOR. Final approval of the selected VENDOR and approval for award shall be subject to the provisions contained in section 10 of this document.

8.5

Commercial Terms and Conditions CONTRACTOR shall be responsible for finalising with the VENDORS the commercial terms and conditions which comply with the requirements of the AGREEMENT.

9.

LOCAL AND REGIONAL RESOURCES COMPANY requires that the CONTRACTOR maximises, wherever possible, the involvement of local and regional resources in the implementation of the WORK.

Page 11 of 154

CC01A-0-00000-PS-PRO-0004 Rev3 DSN : 848

PROJECT PROCEDURE CRITERIA FOR SELECTION OF SUBCONTRACTORS AND VENDORS

10.

COMPANY SELECTION OF OTHER THAN RECOMMENDED SUBCONTRACTOR / VENDOR COMPANY reserves the right to select, from amongst the technically acceptable SUBCONTRACTORS/VENDORS, a SUBCONTRACTOR/VENDOR other than the one recommended by CONTRACTOR. Frequent exercising of this right by COMPANY is not anticipated. Any additional costs to CONTRACTOR, directly attributable to exercising of this right by COMPANY, shall be reimbursed to CONTRACTOR in accordance with the provisions of the AGREEMENT. Should COMPANY exercise this right, COMPANY shall have the right of access to the original priced quotations by SUBCONTRACTORS/VENDORS. CONTRACTOR’s award recommendations shall accordingly include the difference payable by COMPANY to CONTRACTOR for each of the technically approved SUBCONTRACTORS/VENDORS other than the one recommended by CONTRACTOR. In addition to above, COMPANY may require CONTRACTOR to provide in respect of certain equipment/items a detailed life cycle cost analysis. This information shall be provided as part of the award recommendations wherever required by COMPANY.

Page 12 of 154

CC01A-0-00000-PS-PRO-0004 Rev3 DSN : 848

PROJECT PROCEDURE CRITERIA FOR SELECTION OF SUBCONTRACTORS AND VENDORS

ATTACHMENT 1:

PRELIMINARY SUBCONTRACTING PLAN

CONTRACTOR’s approved Preliminary Subcontracting Plan to be inserted here.

Page 13 of 154

CC01A-0-00000-PS-PRO-0004 Rev3 DSN : 848

PROJECT PROCEDURE CRITERIA FOR SELECTION OF SUBCONTRACTORS AND VENDORS

ATTACHMENT 2:

SUBCONTRACTOR LIST

SL WORK DESCRIPTION 1

TEMPORARY SITE FACILITIES AND CAMP

WORK GROUP No.

SUBCONTRACTOR NAME

BOROUGE/ GASCO/ TAKREER REGISTRATION No.

REMARKS

280010 GALFAR GRANITE TARGET IMECO DYWIDAG AL MASSOD EMCO KENTZ

2

CIVIL WORKS

230000

AL JABER GALFAR GRANITE DAEWOO TARGET DYWIDAG BELHASA SIX CONSTRUCT AL GEEMI KETTANEH KHANSAHEB NASSER AL HAJRI EMCO

3

PILING

210090

SWISS BORING DUTCH FOUNDATION BAUER

4

MARINE WORKS

210020

BELHASA SIX CONSTRUCT ARCHIRODON CONSTRUCTION INTERBETON TARGET

5

MECHANICAL WORKS

240000

DAEWOO PUNJ LLOYED DESCON LAHOUD TARGET LERSEN & TOUBRO DODSAL AL JABER GALFAR NASSER AL HAJRI CCC

Page 14 of 154

CC01A-0-00000-PS-PRO-0004 Rev3 DSN : 848

PROJECT PROCEDURE CRITERIA FOR SELECTION OF SUBCONTRACTORS AND VENDORS

SL WORK DESCRIPTION 6

ELECTRICAL WORKS

WORK GROUP No. 260000

SUBCONTRACTOR NAME

BOROUGE/ GASCO/ TAKREER REGISTRATION No.

REMARKS

TICB DAEWOO TOZZI SUD TARGET KENTZ CONTROL APPLICATION EMIRATES CEGELEC OIL

7

ICS EPC SERVICES

270020

8

INSTRUMENTATION WORKS

270020

DODSAL HONEYWELL MIDDLE EAST LTD ABU DHABI

NOMINATED CONTRACTOR

TICB DAEWOO TOZZI SUD TARGET KENTZ CONTROL APPLICATION EMIRATES CEGELEC OIL DODSAL

9

INSULATION & PAINTING WORKS

372000

CAPE EAST LIMETED W.L.L KEFER LLC INSULCO EMIRATES INCO LTD MAZRUI & HAWI GLOBAL ESSA COATING FAME

10

BUILDINGS WORKS

230095

ZAMIL STEEL GALFAR GRANITE DYWIDAG TARGET AL JABER AL GEEMI GROUP3 KIRBY BUILDING SYSTEM

11

PRE ENGINEERED BUILDINGS

230095

AMANA KIRBY BUILDING SYSTEM BUTLER

12

HVAC WORKS

240060

CCTC KETTANEH ETA EMCO KENTZ

Page 15 of 154

CC01A-0-00000-PS-PRO-0004 Rev3 DSN : 848

PROJECT PROCEDURE CRITERIA FOR SELECTION OF SUBCONTRACTORS AND VENDORS

SL

13

WORK DESCRIPTION

WORK GROUP No.

FREIGHT FORWARDING & CLEARANCE

374025

SERVICES

SUBCONTRACTOR NAME

BOROUGE/ GASCO/ TAKREER REGISTRATION No.

REMARKS

MICCO SALEM FREIGHT INTERNATIONAL KUHNE & NAGEL MATRIX GAC

14

HEAVY TRANSPORTATION SERVICES

280042

AL JABER TRANSPORT MAMOET ALE

Page 16 of 154

CC01A-0-00000-PS-PRO-0004 Rev3 DSN : 848

PROJECT PROCEDURE CRITERIA FOR SELECTION OF SUBCONTRACTORS AND VENDORS

ATTACHMENT 3:

FORM FOR PROPOSING SUBCONTRACTORS

Work SL. Work Description Group No.

Proposed SubContractor

Company Registration No.

Remarks

1

2

3

4

5

NOTE: CONTRACTOR to insert more lines as appropriate.

Page 17 of 154

CC01A-0-00000-PS-PRO-0004 Rev3 DSN : 848

PROJECT PROCEDURE CRITERIA FOR SELECTION OF SUBCONTRACTORS AND VENDORS

ATTACHMENT 4:

COMPANY WORK GROUP LISTING

CONTENTS DESCRIPTION 1.0

2.0

3.0

PAGE NO.

PROJECTS & PLANT CONSULTANCY/ENGINEERING 1.1

PROJECT CONSULTANCY/ENGINEERING

1.2

OPERATING PLANT CONSULTANCY

CONSTRUCTION WORKS (MAJOR PROJECTS) 2.1

EPC CONTRACTS

2.2

EPCM CONTRACTS

2.3

CIVIL WORKS

2.4

MECHANICAL WORKS

2.5

PIPELINE WORKS

2.6

ELECTRICAL WORKS

2.7

INSTRUMENTATION & TELECOM. WORKS

2.8

GENERAL CONTRACTS (MAJOR PROJECTS)

PLANT OPERATION & MAINTENANCE 3.1

CIVIL WORKS/MAINTENANCE

3.2

MECHANICAL PLANT/EQUIPMENT WORKS/MAINT.

3.3

3.4

3.2.1

Turbines - Maintenance

3.2.2

Pumps, Compressors, Other Rotating Eqpt. – Maintenance

3.2.3

Processing Plant & Equipments - Maintenance

3.2.4

Boilers, Furnaces & Reactors - Maintenance

3.2.5

Heat Exchangers - Maintenance

3.2.6

Material Handling Equipments - Maintenance

3.2.7

Shut Down Maintenance

3.2.8

Other Mechanical Plants - Maintenance

PIPING, COLUMNS AND TANKS - MAINTENANCE 3.3.1

Piping - Maintenance

3.3.2

Columns, Tanks, Vessels & Others - Maintenance

ELECTRICAL PLANT & EQUIPMENT - MAINT. 3.4.1

Motors & Generators - Maintenance

3.4.2

Sub-Stations, Switch Gears & Transformers - Maintenance Page 18 of 154

CC01A-0-00000-PS-PRO-0004 Rev3 DSN : 848

PROJECT PROCEDURE CRITERIA FOR SELECTION OF SUBCONTRACTORS AND VENDORS

DESCRIPTION

PAGE NO.

3.4.3

Cables, Transmission And Distribution - Maintenance

3.4.4

Other Electrical Plant & Equipment - Maintenance.

3.5

INSTRUMENTATION & TELECOM. SYSTEMS - MAINTENANCE

3.6

INSPECTION/TESTING/COMMISSIONING SERVICES 3.6.1

Inspection & Testing Services

3.6.2

Commissioning Services

3.7

GENERAL PLANT MAINTENANCE SERVICES

3.7.1

Hiring Services - Plants

3.7.2

Painting Services - Plants

3.7.3

Plant Cleaning Services

3.7.4

Other Plant Operation/Maintenance Services

4.0

INFORMATION SYSTEMS & TECHNOLOGIES

5.0

EXPLORATION & PRODUCTION RELATED SERVICES

6.0

PERSONNEL & MANPOWER SERVICES 6.1

MANPOWER SUPPLY - ENGINEERS

6.2

MANPOWER SUPPLY - SUPERVISORS/TECHNICIANS

6.3

MANPOWER SUPPLY - NON TECHNICAL PERSONNEL

6.4

OTHER PERSONNEL CONTRACTS/SERVICES

7.0

FINANCE SERVICES

8.0

MARKETING SERVICES

9.0

ADMINISTRATION & GENERAL SERVICES 9.1

CATERING SERVICES

9.2

LEASING SERVICES

9.3

MEDICAL & HSE SERVICES

9.4

OFFICES, BUILDINGS AND VILLAS MAINTENANCE

9.5

TRANSPORTATION SERVICES

9.6

CLEANING SERVICES

9.7

OTHER GENERAL SERVICES

Page 19 of 154

CC01A-0-00000-PS-PRO-0004 Rev3 DSN : 848

PROJECT PROCEDURE CRITERIA FOR SELECTION OF SUBCONTRACTORS AND VENDORS

WG CODE

WORK GROUP (WG) DESCRIPTION

GROUP1.0 – PROJECTS & PLANT CONSULTANCY/ENGINEERING Sub-Group 1.1 covers Front End Engineering and Design (FEED), Basic Engineering, Project Management/Consultancy Detailed Engineering, for major project. 1.1 – PROJECT CONSULTANCY/ENGINEERING 110010

Advanced Process Control

110020

Aerial Surveys

110030

Architecture & Interior Decoration

110040

Cathodic Protection Systems – Consultancy

110050

Chemical Injection Systems

110060

Civil & Structural (Industrial)

110070

Civil & Structural (Non Industrial)

110080

Cold Industrial Insulation Consultancy

110085

Conceptual Design

110090

De-Salination/Water Treatment Consultancy

110100

Environmental Eng. (Pollution Control/Effluent Treatment)

110110

Front End Engineering Design (Feed)

110115

Optimization Studies

110117

Special Studies/Design

110120

Gas Processing

110135

Gas Production – Onshore

110140

Gas Treatment Equipment

110150

Gas Gathering Centers

110160

Instrumentation And Control Systems

110165

Landscaping Consultancy

110167

LNG/LPG Tanks - Consultancy

110170

Management Information Systems

110180

Marine Engineering

110190

Marine Surveys

110200

Material Selection For Corrosion Control consultancy

110210

Onshore Surveys

110220

Packaged Process Module

110260

Pipeline - Onshore (Oil & Gas)

110270

Power Generation, Transmission & Distribution Page 20 of 154

CC01A-0-00000-PS-PRO-0004 Rev3 DSN : 848

PROJECT PROCEDURE CRITERIA FOR SELECTION OF SUBCONTRACTORS AND VENDORS

WG CODE

WORK GROUP (WG) DESCRIPTION

GROUP1.0 – PROJECTS & PLANT CONSULTANCY/ENGINEERING 110280

Process Licensors

110290

Project Management – Industrial

110295

Project Management – Non-Industrial

110300

Quality Control Consultants

110305

Scada System Consultancy

110320

Soil Investigation - Onshore

110325

Sulphur Recovery/Forming & Handling Consultancy

110330

Telecommunication Network And Telemetry

110333

Techno - Economic Feasibility Study

110335

Town Planning/Master Plan

110340

Water Injection Systems

110345

Gas Injection Systems

110350

Water Supply/Distribution Networks Consultancy

110360

Sewage / Drainage Networks Consultancy

Sub-Group 1.2 Covers Operating Plant, Consultancy Services. 1.2 – Operating Plant Consultancy 120010

Air Conditioning & Electro Mechanical Domestic/Industrial

120020

Concrete Rehabilitation Studies

120030

Corrosion Audit/Surveys

120040

Energy Conservation Studies

120060

Field Testing Of New Applications

120070

Fire & Safety Consultancy

120080

Industrial Engineering/Productivity Studies

120081

ISO 14000/HSE Systems & Procedures

120082

ISO 9000/Qc Systems & Procedures

120083

ISO 9000/Qc Certification

120084

ISO 14000/Qc Certification

120085

Materials Management Consultancy

120100

Mech. Plant & Materials Handling System - Onshore

120110

Noise Surveys & Analysis

120115

Operating Procedures - Plant Operation/Maint. Page 21 of 154

CC01A-0-00000-PS-PRO-0004 Rev3 DSN : 848

PROJECT PROCEDURE CRITERIA FOR SELECTION OF SUBCONTRACTORS AND VENDORS

WG CODE

WORK GROUP (WG) DESCRIPTION

GROUP1.0 – PROJECTS & PLANT CONSULTANCY/ENGINEERING 120120

Plant Inspection Consultancy Services

120130

Plant Operation Studies (Reliability, Performance, Failure Etc.)

120140

Plant Surveys - Mechanical/Electrical

120150

Preservation Studies & Services - Equipments & Spares

120160

Risk/Hazard/Safety Studies

120165

Accident, Damage Investigation Consultancy

120170

Security Related Consultancy

120190

Studies On Construction Material And Testing Laboratory

120200

Technical Audit/Surveys

120220

Vibration Surveys Of Rotating Equipment

120230

Waste Control/Effluent Treatment

120240

Structural Steel Frame Analysis

WG CODE

WORK GROUP (WG) DESCRIPTION

GROUP 2.0 – CONSTRUCTION WORKS (MAJOR PROJECTS) Sub-Group 2.1 covers EPC and Sub-Group 2.2 covers EPCM contracts for major projects: 2.1 – ENGINEERING, PROCUREMENT & CONSTRUCTION (EPC) CONTRACTS 210010

Desalination Units - EPC

210015

LNG/LPG Tanks- EPC

210020

Marine Works - EPC

210025

Nitrogen/Oxygen Plants - EPC

210040

Oil & Gas Plants - Onshore - EPC

210045

Oil & Gas Unit Of Plants - Onshore - EPC

210070

Pipelines Onshore - EPC

210080

Power Generation Plants - EPC

210090

Tank Farms – EPC

2.2 – ENGINEERING, PROCUREMENT & CONSTRUCTIONS MANAGEMENT (EPCM) CONTRACTS 220010

Marine Works – EPCM

220030

Gas Plants Onshore - EPCM

220060

Pipelines Onshore - EPCM

220070

Power Generation Plants - EPCM Page 22 of 154

CC01A-0-00000-PS-PRO-0004 Rev3 DSN : 848

PROJECT PROCEDURE CRITERIA FOR SELECTION OF SUBCONTRACTORS AND VENDORS

WG CODE

WORK GROUP (WG) DESCRIPTION

GROUP 2.0 – CONSTRUCTION WORKS (MAJOR PROJECTS) Sub-Groups 2.3 to 2.8 cover Construction Works for all engineering disciplines for major projects: 2.3 – CIVIL WORKS 230020

Buildings, Offices, Etc. - Construction

230030

Ceiling And Internal Partitions Works

230035

Drainage / Sewerage Works

230040

Dredging/ Reclamation - Offshore

230050

Industrial Civil Works

230055

Infrastructure Works

230060

Interior Decoration Works

230070

Marine Construction - Jetty, Harbour Etc.

230090

Piling/Sheet Piling

230095

Pre-Engineering Buildings/Steel Structure

230100

Roads/Culverts Works

230120

Site Preparation Works

230130

Soil/Foundation Grouting

230140

Steel Structural Works - Erection

230145

Steel Structural Works - Fabrication

230150

Tunnelling/Non-Destructive Road Crossings

230155

Horizontal Direction Drilling “HDD”

230160

Water Supply Networks Works

2.4 Mechanical Works 240020

Crane/Overhead Bridge - Erection

240030

Desalination Units - Erection

240040

Effluent Treatment Plants

240045

Environmental Related Works (Pollution Control/Monitoring, Etc.)

240050

Fabrication Works – General

240060

HV & Ac Works – Industrial

240065

Air-Conditioning – High Rise Buildings (Central Chilled Water Systems) - Supply & Installation.

240070

LPG/LNG Tanks – Erection

240080

Mechanical Equipments - Erection Page 23 of 154

CC01A-0-00000-PS-PRO-0004 Rev3 DSN : 848

PROJECT PROCEDURE CRITERIA FOR SELECTION OF SUBCONTRACTORS AND VENDORS

WG CODE

WORK GROUP (WG) DESCRIPTION

GROUP 2.0 – CONSTRUCTION WORKS (MAJOR PROJECTS) 240090

Molten Sulphur Tanks

240095

Sulphur Recovery/Forming & Handling Plant - Erection

240100

Oil & Gas Plants - Erection

240120

Power Stations - Erection

240130

Site Work - Tank Farms/Floating Roof

240140

Telecom Towers

240145

Water Pumping Station - Erection

240148

Sewerage Pumping Station – Erection

240150

Water Treatment Plant Works

2.5 – Pipeline Works 250010

Cement Linings Of Pipes

250020

Cold & Cryogenic Insulation Works

250030

Fire Fighting Systems - Piping

250040

Pipelines - Insulation Work

250050

Pipelines - Coatings (FBE/PE)

250051

Pipelines - Coatings Pp (Polypropylene)

250052

Pipelines - Coating & Wrapping (Coal Tar/Bitumen Enamel)

250065

Pipelines: Tie-Ins

250080

Pipelines Construction - Onshore

250090

Sandblasting & Painting Works

2.6 – Electrical Works 260005

Building Management Systems

260010

Cathodic Protection Systems Works

260020

Electrical Works – Industrial

260030

Electro-Mechanical (Buildings/Domestic)

260045

Cable Laying And Trench Excavation

260055

Street Lighting & Accessories

260060

Power Transmission/Distribution - Overhead

2.7 – Instrumentation & Telecom. Works 270010

Fire And Safety Works

270020

Instrumentation & Control Works - Industrial Page 24 of 154

CC01A-0-00000-PS-PRO-0004 Rev3 DSN : 848

PROJECT PROCEDURE CRITERIA FOR SELECTION OF SUBCONTRACTORS AND VENDORS

WG CODE

WORK GROUP (WG) DESCRIPTION

GROUP 2.0 – CONSTRUCTION WORKS (MAJOR PROJECTS) 270030

Telecommunication Works

2.8 – General Contracts (Major Projects) 280010

Camp Catering For Major Projects – Onshore

280020

Certification (Design/Statutory Requirements)

280030

Freight Forwarding & Clearing – Major Projects

280040

Land Transportation

280042

Heavy Lift Transportation Services

280045

Transportation – Aggregate, Sand, Rocks, Etc.

280070

NDT - Radiographic, Ultrasonic Etc.

280075

NDT - Radiographic Digitization

280080

Third Party Inspection

WG CODE

WORK GROUP (WG) DESCRIPTION

GROUP 3.0 – PLANT OPERATION & MAINTENANCE Group 3 covers Plant, Maintenance, Rehabilitation, Refurbishment, Minor Construction Works for plant operation, covering all engineering disciplines: 3.1 – CIVIL WORKS / MAINTENANCE 310010

Aluminium & Glass Works

310020

Building Construction - Minor

310021

Civil Industrial Work - Minor

310022

Building Maintenance

310024

Building Maintenance/Service Agreements

310030

Concrete - Pre-Cast

310032

Concrete - Pre-Stress

310035

GRC - Glass Reinforced Concrete

310040

Concrete - Rehabilitation Work

310045

Concrete - Ready Mix

310050

Demolition (Plant/Equipment/Foundation)

310060

Drainage / Sewerage – Minor Works

310065

Excavation And Back Filling

310070

Earthwork

310080

Fencing And Gates Page 25 of 154

CC01A-0-00000-PS-PRO-0004 Rev3 DSN : 848

PROJECT PROCEDURE CRITERIA FOR SELECTION OF SUBCONTRACTORS AND VENDORS

WG CODE

WORK GROUP (WG) DESCRIPTION

GROUP 3.0 – PLANT OPERATION & MAINTENANCE 310085

Guniting / Shotcreting Services

310090

Marine - Rehabilitation

310095

Masonry Works

310100

Road Maintenance/Repairs

310110

Soil Reclamation

310115

Soil Treatment/Cleaning/Sterilization

310120

Soil Containment/Stabilization

310130

Specialist Construction (Glazing, Domes, Shells etc.)

310140

Fabrication (General)/Steel Structure – Minor Works

310150

Water Proofing Works

310170

Aerial Survey Works

3.2 – Mechanical Plant/Equipment Works / Maintenance 3.2.1 – Turbines - Maintenance 321010

Turbines - Gas

321020

Turbines - Solar

321030

Turbines - Steam

32 1040

Turbines Major Components Reconditioning & Repairs

3.2.2 – Pumps, Compressors, Other Rotating Eqpt. - Maintenance 322010

Air Blowers

322020

Pumps Overhaul – Other Than Cryogenic

322025

Pumps Overhaul – Cryogenic (LNG / LPG / Other Liquid Gases)

322030

Compressors Overhaul

322040

Diesel Engines Overhaul

322050

Gas Compressor Stations Overhaul

322080

Rotating Equipment - Others

322090

Rotor Balancing

3.2.3 – Processing Plant & Equipments - Maintenance 323010

Filters - Air/Process

323030

Fuel Filtration Equipments

323040

Process Equipments

323060

Sulphur Forming Plants Page 26 of 154

CC01A-0-00000-PS-PRO-0004 Rev3 DSN : 848

PROJECT PROCEDURE CRITERIA FOR SELECTION OF SUBCONTRACTORS AND VENDORS

WG CODE

WORK GROUP (WG) DESCRIPTION

GROUP 3.0 – PLANT OPERATION & MAINTENANCE 323070

Sulphur Handling Plants

323080

Sulphur Recovery Plants

323090

Water Treatment Plants - Clean Water (Feed)

323100

Water Treatment Plants - Dirty Water/Effluent

3.2.4 – Boilers, Furnaces & Reactors - Maintenance 324010

Boilers And H.R.B.

324020

Heaters & Dryers

324040

Furnaces

324060

Reactors

324070

Refractory Linings - Boilers, Furnaces etc.

3.2.5 – Heat Exchangers - Maintenance 325010

Heat Exchangers - Refurbishment

325020

Heat Exchangers Maint. – Bundle Refurbishment

325030

Heat Exchangers Maint. – Chemical Cleaning

325040

Heat Exchangers Maint. – Mechanical Cleaning

325050

Heat Exchangers Maint. – Water Jetting

3.2.6 – Material Handling Equipments – Maintenance 326010

Material Handling Systems : Conveyers, Belts etc.

326020

Earth Moving Equipment – Maintenance

326030

Loading Arms

3.2.7 – Shut Down - Maintenance 327010

Refinery Shutdown Maintenance - Full Responsibility

327020

Unit Shutdown Maintenance - Full Responsibility

3.2.8 – Other Mechanical Plants - Maintenance 328010

Air Cooler Cleaning/Retubing

328030

Flare Systems & Burn Pits

328040

HV & AC Maintenance

328050

Machining And Welding Services

328075

Platform Maintenance - Onshore

328100

Valves Refurbishment

3.3 – Piping, Columns And Tanks - Maintenance Page 27 of 154

CC01A-0-00000-PS-PRO-0004 Rev3 DSN : 848

PROJECT PROCEDURE CRITERIA FOR SELECTION OF SUBCONTRACTORS AND VENDORS

WG CODE

WORK GROUP (WG) DESCRIPTION

GROUP 3.0 – PLANT OPERATION & MAINTENANCE 3.3.1 – Piping - Maintenance 331030

Heat Tracing Systems (Steam/Electrical)

331040

Hot Tapping Works

331050

On-Line Leak Sealing

331060

Insulations, Cladding Repairs – Piping

331070

Piping - Low Temperature Service

331100

Piping & Spools (Steel)–Fabrication/Installation/Repairs/Renewal

331110

Piping (R.T.R.P. & G.R.P.) – Fabrication/Installation/Repairs/Renewal

331120

Duplex Piping – Fabrication/Repair/Replacement/Renewal

3.3.2 – Columns, Tanks, Vessels & Other – Maintenance 332010

Columns - Trays & Internals

332020

Cooling Towers Maintenance

332030

Rubber Linings (Tanks, Vessels, Columns)

332040

Insulation, Cladding Repairs – Columns, Tanks, Vessels

332050

Tanks – Sludge Removal

332055

Tanks – Overhaul Including Cleaning, Inspection, Repairs etc.

332060

Internal Linings (Tanks, Vessels, Columns)

3.4 – Electrical Plant & Equipment - Maintenance 3.4.1 – Motors And Generators – Maintenance 341010

Balancing Of Motor Shafts

341020

Electric Motors Dc/Variable Speed

341030

Electric Motors Maintenance

341050

Emergency Diesel Generators

341060

Generators Overhaul And Repairs

341070

Motor Operated Valves (M.O.V.)

341080

Power Generation Maintenance

341090

Rewinding & Servicing Of Generators

341100

Rewinding/Repairs Of Motors

341120

Solar Power Panels

341140

Thyrister Drives

3.4.2 – Sub Stations, Switch Gears & Transformers - Maintenance Page 28 of 154

CC01A-0-00000-PS-PRO-0004 Rev3 DSN : 848

PROJECT PROCEDURE CRITERIA FOR SELECTION OF SUBCONTRACTORS AND VENDORS

WG CODE

WORK GROUP (WG) DESCRIPTION

GROUP 3.0 – PLANT OPERATION & MAINTENANCE 342010

Transformers Servicing & Rewinding

342020

Short Circuit Current Limitors

342030

Substation Equipments Maintenance

342050

Switch Gears Ht/Lt/MCC Maintenance

342070

Switchyards

3.4.3 – Cables, Transmission And Distribution - Maintenance 343010

Cable Trays/Racks Maintenance

343030

Overhead Transmission Lines Maintenance

344035

Corrosion Prevention/Monitoring System

344040

Lighting Maintenance - General

3.4.4 – Other Electrical Plant & Equipments - Maintenance 344010

Batteries/Battery Chargers / U.P.S.

344020

Cathodic Protection Systems Maintenance

344030

Control Panels/Stations Maintenance

3.4.4 – Other Electrical Plant & Equipments - Maintenance 344035

Corrosion Prevention/Monitoring System

344040

Lighting Maintenance - General

344050

Earthing Systems

344060

Electrical Testing Equipments

344070

Street Lighting & Accessories - Maintenance

344080

Industrial Lighting Systems - Hazardous Area

344090

Industrial Wiring

344100

Navigational Signalling Systems

3.5 – Instrumentation & Telecom. Systems - Maintenance 350010

Analyzers

350030

Anti - Surge Control Systems

350040

Blending Systems

350050

CCTV/CATV/MATV/LV Instrumentation Systems - Inst. & Maint.

350090

Electronic Card Repairs

350100

Emergency Shutdown Systems

350110

Explosion & Weatherproof Telephones, Acoustic Booth etc. Page 29 of 154

CC01A-0-00000-PS-PRO-0004 Rev3 DSN : 848

PROJECT PROCEDURE CRITERIA FOR SELECTION OF SUBCONTRACTORS AND VENDORS

WG CODE

WORK GROUP (WG) DESCRIPTION

GROUP 3.0 – PLANT OPERATION & MAINTENANCE 350120

Fire & Gas System Repairs

350130

Instrument Shelter Cabins

350135

Scada/ Supervisory & Management Control (SMC) Shelters

350140

Instrumentation & Comm. Cabling (Underground)

350150

Instrumentation & Communication Cabling (Overhead)

350160

Instrumentation Tubing

350170

Instrumentation Test/Repair Services

350180

Instruments Measurement/Calibration Services

350190

Lab Instruments Maintenance/Repairs

350230

Metering Systems

350240

Microwave Systems

350250

Scada Systems/PLC

350260

Pop Testing Of Safety Relief Valves

350270

Pressure Regulating Stations

350280

Process Control & Automation

350300

Radio Paging Systems

350320

Safety Control Systems

350330

Satellite Systems

350340

Telecommunication Cabling - Fiber Optic

350350

Telecommunication Cabling - General

350360

Telecommunication Equipment Repairs

350370

Telephone Systems

350380

Training Simulation Systems

350390

Uhf Radiation

350400

Vibration Monitoring Systems

3.6 – Inspection/Testing/Commissioning Services 3.6.1 – Inspection And Testing Services 361010

Combustion/Gas Path Inspection Of Gas Turbines

361020

Corrosion Inspection

361030

Crude Assay/Testing

361040

Heat Exchanger - Eddy Current Testing Page 30 of 154

CC01A-0-00000-PS-PRO-0004 Rev3 DSN : 848

PROJECT PROCEDURE CRITERIA FOR SELECTION OF SUBCONTRACTORS AND VENDORS

WG CODE

WORK GROUP (WG) DESCRIPTION

GROUP 3.0 – PLANT OPERATION & MAINTENANCE 361050

Heat Exchanger - Hydraulic Testing

361060

Hydraulic/Hydrostatic Testing

361080

Inspection & Testing Of Lifts, Cranes, Slings, Tackles etc.

361095

Material Testing – Civil

361096

Material Final Inspection

361097

Laboratory Testing - Oil/Gas/Water etc.

361098

Material Testing - Metallurgical

361099

Material Testing – Painting/Coating

361100

Marine/Diving/Sub-Sea Inspection

361120

Inspection – Pipelines

361125

Inspection – Tanks/Vessels etc.

361130

Soil Testing

361140

Stress Analysis

361150

Vibration Testing Of Rotating Equipments

3.6.2 – Commissioning Services 362010

Commissioning & Start Up Services - Plant

362020

Pipelines - Nitrogen Purging

362030

Pipelines - Pigging Services

362035

Pipelines – Intelligent Pigging Services

362040

Pipelines -

Swabbing, Hydrotesting, Dewatering Drying

3.7 – General Plant Maintenance Services 3.7.1 – Hiring Services – Plants 371010

Hire of Cranes

371020

Hire of Earth Moving Equipments

371030

Hire of Heavy Lifts And Trailer Beds

371040

Hire of Other Mechanical/Electrical Equipments

371050

Hire of Test Equipments/Instruments

371060

Hire of Transportation - Bulk Material

3.7.2 – Painting Services - Plants 372010

Blasting & Painting - Steel Structure

372020

Blasting & Painting – Tanks, Vessels & Columns Page 31 of 154

CC01A-0-00000-PS-PRO-0004 Rev3 DSN : 848

PROJECT PROCEDURE CRITERIA FOR SELECTION OF SUBCONTRACTORS AND VENDORS

WG CODE

WORK GROUP (WG) DESCRIPTION

GROUP 3.0 – PLANT OPERATION & MAINTENANCE 372025

Blasting & Painting - Piping

372030

Blasting & Painting - Other Equipment

372035

Blasting & Painting - Special

372040

Marine Structure - Painting

372050

Fire Proofing By Intumescent Painting

372055

Fireproofing Works General

3.7.3 – Plant Cleaning Services 373010

Chemical/Toxic Cleaning

373025

Water Tanks Cleaning – Industrial

373030

Dumping Site Clearing

373040

Excavation, Disposal & Treatment Of Contaminated Soils

373050

Removal/Disposal of Waste Materials

373060

Sewage Cleaning/Drainage Clearing Services

373070

Dewatering Services

373080

Hydrojetting

3.7.4 – Other Plant Operation/Maintenance Services 374020

Camp Operation & Maintenance

374025

Freight Forwarding & Clearance Services

374027

Custom Clearance

374029

Liquid Sulphur Transportation By Tankers

374030

Carpentry Works

374040

Catalyst Reclamation / Regeneration / Disposal

374045

Corrosion Protection/Prevention Works

374060

Dismantling

374080

Heat Treatment - Post Weld (P.W.H.T.)/Stress Relieving

374100

Industrial Doors (For Workshop & Factories)

374110

Industrial Security Systems

374130

Metal Spraying/Rebuilding

374140

Cranes Maintenance (O.H)

374160

Scaffolding Services

374170

Sign Boards Page 32 of 154

CC01A-0-00000-PS-PRO-0004 Rev3 DSN : 848

PROJECT PROCEDURE CRITERIA FOR SELECTION OF SUBCONTRACTORS AND VENDORS

WG CODE

WORK GROUP (WG) DESCRIPTION

GROUP 3.0 – PLANT OPERATION & MAINTENANCE 374180

Road Markings

374205

Thermal Insulation - Other Than Pipeline & Pipings

WG CODE

WORK GROUP (WG) DESCRIPTION

GROUP 4.0 – INFORMATION SYSTEMS & TECHNOLOGIES Group 4 covers Consultancy, Development, Installation and Maintenance Contracts related to Information Systems & Technologies: 400010

Computer Hardware (PC Servers & PCS) Maintenance

400012

Super Computer, Mainframes And Mini Computer Systems (Branded) Maintenance

400015

Electronic Document Management Systems (Imaging System etc.)

400020

Computer Network Maintenance – Site Work

400030

Computer Networking And Network Management – Turnkey

400040

Business Application Software Packages (Development, Supply, Installation & Maintenance)

400050

PCS., Printer, Plotter & Scanners (Supply & Installation)

400055

Computer Peripherals & Components (Supply & Installation)

400060

Computerization/It/Automation Studies/Consultancy

400080

Branded Super Computers, Mainframes And Minicomputer Systems – Supply, Installation & Maintenance

400090

Networking Components (Bridges, Gateways, Routers, Hubs, Analyzer) - Supply & Installation

400095

Structured Cabling/UTPS/Fiber Optics (Supply, Installation & Maintenance)

400120

Software Development

400125

Software – Standard And Miscellaneous

400130

IT Hardware Support Services – Hardware Engineers

400140

IT Software Support Services – Software Engineers

400150

Document Scanning & Indexing Services

WG CODE

WORK GROUP (WG) DESCRIPTION

GROUP 5.0 – EXPLORATION AND PRODUCTION RELATED SERVICES Group 5 covers Consultancy, Development, Installation and Maintenance Contracts related to Exploration and Production services: Page 33 of 154

CC01A-0-00000-PS-PRO-0004 Rev3 DSN : 848

PROJECT PROCEDURE CRITERIA FOR SELECTION OF SUBCONTRACTORS AND VENDORS

WG CODE

WORK GROUP (WG) DESCRIPTION

GROUP 5.0 – EXPLORATION AND PRODUCTION RELATED SERVICES 500010

Cartographics – Mapping

500020

Cartographics – Studies

500030

Cartographics – Topography

500040

Drilling - Offshore Development

500050

Drilling - Offshore Exploration

500060

Drilling - Onshore Development

500070

Drilling - Onshore Exploration

500075

Exploration Related Software

500080

Enhanced Oil Recovery Studies

500090

Geological Studies

500100

Gravitational Studies

500105

Hydrographic Inspection Survey

500110

Navigation & Positioning - Onshore

500120

Oil Exploration Related Studies - Others

500130

Reservoir Description Studies

500140

Reservoir Development Studies

500150

Reservoir Engineering Laboratory Software

500160

Reservoir Simulation Software

500170

Reservoir Studies – Others

500180

Reservoir Visualization Software

500185

Remote Sensing & Image Processing Services

500190

Seismic Data Acquisition

500200

Seismic Data Processing / Evaluation

500210

Seismic Data Interpretation

500220

Seismic Studies – Others

500230

Seismic Tape Copying

500240

Well – Design

500250

Well - Log Processing

500260

Well - Logging & Perforating

500270

Well – Testing

500280

Coiled Tubing Services Page 34 of 154

CC01A-0-00000-PS-PRO-0004 Rev3 DSN : 848

PROJECT PROCEDURE CRITERIA FOR SELECTION OF SUBCONTRACTORS AND VENDORS

WG CODE

WORK GROUP (WG) DESCRIPTION

GROUP 5.0 – EXPLORATION AND PRODUCTION RELATED SERVICES 500290

Redressing Completion Equipment & SSS Valves

500300

Wireline Services

WG CODE

WORK GROUP (WG) DESCRIPTION

GROUP 6.0 – PERSONNEL & MANPOWER SERVICES Group 6 covers Manpower Supply and other Personnel related Contracts and services: 6.1 – MANPOWER SUPPLY - ENGINEERS 610010

Architects

610020

Automation Engineers

610030

Civil Engineers

610040

Commissioning Engineers

610050

Computer Hardware Engineers

610060

Computer Software Engineers

610070

Construction Engineers

610080

Contracts Engineers

610100

Corrosion Engineers

610110

Cost Engineers

610120

Data Network Engineers

610130

Electrical Engineers

610135

Geophysicist Engineers

610140

QA/Qc/Inspection Engineers

610150

Instrumentation Engineers

610160

Operation Engineers

610170

Materials Engineers

610180

Mechanical Engineers

610190

Pipeline Engineers

610200

Process / Operation Engineers

610210

Project Engineers

610220

Purchasing Engineers/Buyers

610222

Reliability Engineers

Page 35 of 154

CC01A-0-00000-PS-PRO-0004 Rev3 DSN : 848

PROJECT PROCEDURE CRITERIA FOR SELECTION OF SUBCONTRACTORS AND VENDORS

WG CODE

WORK GROUP (WG) DESCRIPTION

GROUP 6.0 – PERSONNEL & MANPOWER SERVICES 610225

Quantity Surveyors Engineers

610230

Rotating Eqpt. Engineers

610240

HSE Engineers (Health, Safety & Environmental)

610245

System Analysts

610250

Telecommunication Engineers

610260

Planning / Scheduling Engineers

610270

Supplier Qualification Engineers

610900

Specialist Manpower

610980

Engineers - Various Disciplines (For Main Consultants Only)

6.2 – MANPOWER SUPPLY - SUPERVISORS/TECHNICIANS 620010

NDT Supervisor/Technicians

620020

Coded Welders

620030

Supervisors - Mech./Elec./Instr./Civil

620040

Technicians - Mech/Elec./Instr & Pipe Fitters

620045

Draftsman

620050

Painters

620060

Divers

6.2 – MANPOWER SUPPLY - SUPERVISORS/TECHNICIANS 620070

Programmers

6.3 – MANPOWER SUPPLY – NON TECHNICAL PERSONNEL 630010

Financial Accountants

630015

Legal Advisor

630020

Staff For Clerical/Administration Services

630030

Cleaning Supervisors/Officers

630040

Catering Supervisors/Officers

630042

Data Entry Clerks

630045

Doctors And Medical Staff

630050

Labours

630060

Drivers / Operators (For Fork Lift etc.)

6.4 – OTHER PERSONNEL CONTRACTS/SERVICES 640010

Management, Organisation & Development Consultancy Page 36 of 154

CC01A-0-00000-PS-PRO-0004 Rev3 DSN : 848

PROJECT PROCEDURE CRITERIA FOR SELECTION OF SUBCONTRACTORS AND VENDORS

WG CODE

WORK GROUP (WG) DESCRIPTION

GROUP 6.0 – PERSONNEL & MANPOWER SERVICES 640015

Procedure Manuals & Systems Consultancy

640020

Recruitment Services For Admin. & Non Technical Personnel

640030

Recruitment Services For Managerial Personnel & Technical

640040

Secondment Of Manpower

640050

Specialized Training Services

640060

Specialized Training Services – HSE

WG CODE

WORK GROUP (WG) DESCRIPTION

GROUP 7.0 – FINANCE & LEGAL SERVICES Group 7 covers all Studies and Consultancy Contracts related to Financial Services: 700010

Accounting Consultancy

700020

Assets/Inventory And Records Management

700030

Cost Engineering Consultancy

700040

Financial Audit

700045

Insurance Policies

700050

Contractual/Claims Consultancy

700052

Claims Consultants/Experts

700055

Finance Related Policies & Procedure Manuals

700060

System Audit

700070

Risk Management & Insurance Consultancy

710080

Legal Services Consultancy

WG CODE

WORK GROUP (WG) DESCRIPTION

GROUP 8.0 – MARKETING SERVICES Group 8 covers all Studies and Consultancy Contracts related to Marketing Services: 800010

Marketing Studies

800020

Ship Construction Supervision

800030

Ship Loading Supervision

800040

Ship Management

Page 37 of 154

CC01A-0-00000-PS-PRO-0004 Rev3 DSN : 848

PROJECT PROCEDURE CRITERIA FOR SELECTION OF SUBCONTRACTORS AND VENDORS

WG CODE

WORK GROUP (WG) DESCRIPTION

GROUP 9.0 – ADMINISTRATION & GENERAL SERVICES Group 9 covers General Services related to Administration Services including maintenance for Offices, Buildings, Villas, Medical, etc.: 9.1 – CATERING SERVICES 910020

Catering Services Clubs, Offices etc. – Operation & Maintenance

9.2 – LEASING SERVICES 920010

Leasing - Buses/Cars

920020

Leasing - Industrial Areas

920030

Leasing - Office Equipments/Machines

920040

Leasing – Transportation & Material Handling Equipments

9.3 – Medical & Hse Services 930010

Medical Services (Pharmaceutical etc.)

930020

Medical Services – Management Of Hospitals/Clinics

930030

Medical Equipment – Maintenance

930040

Studies On Health, Safety & Environment (HSE)

930045

Study On Oil Spills/Marine Environment Protection

930047

Harbour Pollution Control/Skimming/Debris Clean-Up Services

930050

Medical Services – Dental Clinics

9.4 – OFFICES, BUILDINGS AND VILLAS MAINTENANCE 940010

Air Conditioning – Central Plant (Chilled Water System) - Supply & Inst.

940015

Air Conditioning – Central Plant (Chilled Water System) Operation & Maint.

940020

Air Conditioning – Package/Split/Window Type - Supply & Inst.

940022

Air Conditioning – Package/Split/Window Type (Operation & Maint.)

940023

Cold Storage Construction & Maintenance

940025

Centralized Cooking Gas System

940028

Fire Alarm & Detection System - Domestic

940030

Plumbing & Sanitation - Supply & Inst.

940032

Plumbing & Sanitation - Maintenance

940040

General Building Maint. (Civil, Elect. & Plumbing)

940050

Kitchen Cabinets & Fittings – Supply, Installation & Maint.

940060

Lifts / Elevators, Erection/Maintenance

940070

Office Equipments, Furniture & Fixtures - Supply & Fixing

940072

Office Equipment - Maintenance Page 38 of 154

CC01A-0-00000-PS-PRO-0004 Rev3 DSN : 848

PROJECT PROCEDURE CRITERIA FOR SELECTION OF SUBCONTRACTORS AND VENDORS

WG CODE

WORK GROUP (WG) DESCRIPTION

GROUP 9.0 – ADMINISTRATION & GENERAL SERVICES 940075

Office Refurbishment & Furnishings - Projects

940080

Partition (Metal) And Aluminium Claddings

940090

Portable Buildings (Caravan, Rigid, Butler Buildings)

940100

Potable Water Tankers For Buildings & Villas

940102

Hire Of Portacabins/Caravans/Temporary Accommodation Units

940105

Potable/Bottled Water And Water Cooler Services

940110

Public Address Systems

940120

Rubber Floorings (Sports, General)

940130

H.T. Power Station/Substation/Switch Gear/Transmission Network - Supply & Inst.

940140

H.T. Power Station/Substation/Switch Gear/Transmission Network - Maintenance

940150

LV/MV Distribution Network, Panels, Protective Devices etc. - Supply & Inst.

940160

LV/MV Distribution Network, Panels, Protective Devices etc. - Maintenance

9.5 – TRANSPORTATION SERVICES 950010

Light Vehicle Maintenance

950020

Shifting Of Office Partitions Along With Doors

950030

Transport Maintenance/Repair Services

950040

Transportation – Office Furniture/Equipment & Household

950050

Transportation – Personnel

9.6 – CLEANING SERVICES 960005

Cleaning/Protection Of Carpets/Upholstery/Curtains

960010

Cleaning – Internal Cleaning Of Buildings

960015

Outdoor Cleaning & Road Sweeping

960020

Cleaning – HQ & Complex

960030

Cleaning – Public Health & Pest Control

960035

Janitorial And Hygiene Services

960040

Cleaning - Site Clearance/ Removal Service

960045

Laundry Services

960050

External Building Cleaning Using Cradles

960060

Water Tanks Domestic (G.R.P., etc.) – Cleaning / Repair / Replacement / Renewal

960070

Tankers For Sewage Removal

9.7 – OTHER GENERAL SERVICES Page 39 of 154

CC01A-0-00000-PS-PRO-0004 Rev3 DSN : 848

PROJECT PROCEDURE CRITERIA FOR SELECTION OF SUBCONTRACTORS AND VENDORS

WG CODE

WORK GROUP (WG) DESCRIPTION

GROUP 9.0 – ADMINISTRATION & GENERAL SERVICES 970010

Advertisement

970015

Photography And Videography Services

970020

Auctioning & Material Disposal

970030

Automatic Control Doors & Barriers - Inst. & Maint.

970050

Access Control Systems - Inst. & Maint.

970060

Document/Office Automation Systems

970070

Education & School Management

970080

Education & Training

970090

Fiber Glass Products Maintenance Services

970100

Insulation – Acoustic Etc. For Bldgs.

970110

Landscaping/Irrigation Works

970120

Lock-Smithy Services

970130

Marble Suppliers and Fixers

970135

Memberships - Clubs etc.

970140

Painting Services – Buildings

970160

Printing & Publishing

970170

Safety And Security - Buildings

970180

Sand/Right Of Way Clearing

970190

Spray Painting Of High Quality - Offices

970200

Technical Documentation Services

970205

Drafting Services

970210

Water Tanks Linings – Buildings

970230

Courier Services

970240

Travel & Tourism Services

970250

Security & Surveillance Services

9.7 – OTHER GENERAL SERVICES 970260

Boats : General Services/Maintenance

970270

Hotels: Accommodation, Banqueting etc.

970280

Recreational Services (Hotels, Clubs etc.)

970290

Indoor/Outdoor Plants, Garden - Maintenance

Page 40 of 154

CC01A-0-00000-PS-PRO-0004 Rev3 DSN : 848

PROJECT PROCEDURE CRITERIA FOR SELECTION OF SUBCONTRACTORS AND VENDORS

ATTACHMENT 5: PRE-QUALIFICATION REQUIREMENT FOR SUBCONTRACTORS

Method A: Approved List by ADNOC and its Operating Companies (OPCOs) Received Registration/Qualification number of Sub-Contractors holding current positive qualification with ADNOC and its Operating Companies, specifying with which Company they are qualified/registered for each relevant work group experience. a. b.

c.

Subcontractors qualified with Takreer/Gasco/Borouge will be assumed as prequalified (code Q) for the project for the same commodity code; Subcontractors holding current valid qualification with ADNOC or other OPCOs (different from the above) will need to be prequalified during the EPC execution by the awarded Contractor but exempted from the commercial section of the prequalification and subject to Company approval; Subcontractors without current qualification will all be classified as TBQ in full by the Contractor during execution and subject to Company review and approval.

Method B: Evaluating Technical and Commercial Information Technical - Experience and Capability Requirements Brief description of the organisation structure (both global and local) and resources (offices, manpower and equipment); Details of direct experience of similar jobs in the last five years, tabulating the following: 

Name of the project



Project scope



Project value



Ultimate client



SUBCONTRACTOR’s scope and value



Completion date.

Current workload and availability of resources to comply with schedule requirements; Copy of Quality Assurance Certification; Evidence of documented Health, Safety and Environmental Systems and Procedures, such as copy of ISO 14001, an index of the HSE manual, etc. Evidence of Safety Record. Page 41 of 154

CC01A-0-00000-PS-PRO-0004 Rev3 DSN : 848

PROJECT PROCEDURE CRITERIA FOR SELECTION OF SUBCONTRACTORS AND VENDORS

Commercial Copies of Balance Sheets for the last three years; Details of outstanding litigations, if any; Typical Insurance Coverage values related to workmen compensation, employer’s liability, third party liability, plant and equipment, etc; Copy of valid Registration Certificate from Abu Dhabi Chamber of Commerce & Industry covering the services to be provided; Copy of Oil and Gas Classification for above; Copy of valid CONTRACTOR Classification from Abu Dhabi Planning Department, if available; Copy of valid Consultant Registration Certificate from Abu Dhabi Planning Department (for Consultant only), if available; Copy of Registration with COMPANY.

Page 42 of 154

CC01A-0-00000-PS-PRO-0004 Rev3 DSN : 848

PROJECT PROCEDURE CRITERIA FOR SELECTION OF SUBCONTRACTORS AND VENDORS

ATTACHMENT 6:

NOMINATED/RESTRICTED VENDOR LIST

ATTACHMENT 6.1 Vendor List for Standardised Equipment Please refer to Attachment 11 for Vendor List for Standardised Equipment.

ATTACHMENT 6.2 Vendor List for Licensor Equipment (a) Where a LICENSOR specifies mandatory VENDORS, CONTRACTOR shall utilise those VENDORS, and the VENDORS listed in this Attachment 6.2 are classified by COMPANY as Class “Q” (refer to Section 8.2.3 above). Nominated/Restricted Vendor List for Licensor Equipment

SL. Item Description

Vendor Name

1 Platforming Unit Catalyst Regeneration Control System 2 Parex Unit Rotary Valve and peripheral equipment 3 Parex Unit Adsorbent Chamber Control System 4 Parex Unit Adsorbent Chamber internals 5 Packinox 6 High Capacity MD trays (UOP MD and Slotted Sieve tray decks, downcomers, installation hardware and distributors; Raschig SuperRings, distributors, bed limiters, bed supports and installation hardware) 7 Hi Flux tubing

UOP UOP UOP UOP Alfa Laval

UOP

UOP

(b) Where a Licensor recommends VENDORS, but those VENDORS are not mandatory, CONTRACTOR shall proceed in accordance with Section 8 above including checking if VENDOR is pre-approved for the GOODS (listed in Attachment 7 below) and if necessary, seeking APPROVAL for non-approved VENDORS in accordance with this Procedure.

Page 43 of 154

CC01A-0-00000-PS-PRO-0004 Rev3 DSN : 848

PROJECT PROCEDURE CRITERIA FOR SELECTION OF SUBCONTRACTORS AND VENDORS

ATTACHMENT 6.3

Nominated/Restricted Vendor List Other Goods

SL. Item Description

1

ICS GOODS

Product Group No.

318510

Vendor Name

Location

Honeywell Middle East LtdAbu Dhabi Abu Dhabi

Page 44 of 154

Local Agent Not applicable

CC01A-0-00000-PS-PRO-0004 Rev3 DSN : 848

PROJECT PROCEDURE CRITERIA FOR SELECTION OF SUBCONTRACTORS AND VENDORS

ATTACHMENT 7:

VENDOR LIST FOR MAJOR GOODS VENDOR LIST FOR MAJOR GOODS

S/NO

1

2

Material Group Description

Vendor Name

Country

Comments

Vendor Name

Country

Comments

Structural steel frame

Gas/liquid incineration plant

Al Zamil

KSA

Ak&P_Factory Abdulla B. AlKhalita

KSA

Geyad For Commerce

KSA

Energya Steel

KSA

Contech

UAE

Icom Engineering

ITALY

Anors

ITALY

Cleveland Bridge

UAE

NPCC

UAE

Tiger Steel

UAE

William Hare

UK

Severfield Reeve International

UK

AIC - Arabian International Co.

KSA

John Zinc

USA

Zeeco

USA

Hidada Hanmaek Heavy Industry Kook Jae Metal Younghwa Engineering Thai Herrick Co. Ltd. Emirates Building System Icom S.R.L.

Han Yang Industry Co., Ltd. Hwaseong Plant Flare Industry Callidus Hamworthy Technip KTI

Page 45 of 154

KSA KOREA KOREA KOREA THAILAND UAE ITALY

KOREA KOREA USA USA ITALY ITALY

CC01A-0-00000-PS-PRO-0004 Rev 3 DSN : 848

PROJECT PROCEDURE CRITERIA FOR SELECTION OF SUBCONTRACTORS AND VENDORS

3

Thermal Oxidizer Hamworthy Callidus Durr Zohn Zink

GERMANY USA ITALY

Itas

ITALY

Nao Alstom Hitachi

Carbon steel columns dia
View more...