PROJECT PROCEDURE CRITERIA FOR SELECTION OF SUBCONTRACTORS AND VENDORS
Contents 1. PURPOSE ............................................................................................................................... 3 2. SCOPE .................................................................................................................................... 3 3. DEFINITIONS AND ABBREVIATIONS .................................................................................... 3 3.1 Definitions ............................................................................................................................ 3 3.2 Abbreviation ......................................................................................................................... 3 4. REFERENCED DOCUMENTS ................................................................................................ 3 5. RESPONSIBILITIES ................................................................................................................ 4 6. PROCEDURE .......................................................................................................................... 4 6.1 EQUIPMENT STANDARDISATION PHILOSOPHY ............................................................. 4 7. SELECTION OF SUBCONTRACTORS ................................................................................... 4 7.1 Subcontracting Plan ............................................................................................................. 4 7.2 SUBCONTRACTOR Bid Lists .............................................................................................. 4 7.3 Pre-Qualification Requirements ............................................................................................ 6 7.4 Subcontractor Evaluation & Award ....................................................................................... 6 7.5 Commercial Terms and Conditions ...................................................................................... 8 8. SELECTION OF VENDORS .................................................................................................... 8 8.1 Procurement Plan ................................................................................................................ 8 8.2 Vendor Lists ......................................................................................................................... 8 8.3 Pre-Qualification Requirements .......................................................................................... 10 8.4 Vendor Evaluation & Award................................................................................................ 10 8.5 Commercial Terms and Conditions .................................................................................... 11 9. LOCAL AND REGIONAL RESOURCES ................................................................................ 11 10. COMPANY SELECTION OF OTHER THAN RECOMMENDED SUBCONTRACTOR / VENDOR ...................................................................................................................................... 12 ATTACHMENT 1: PRELIMINARY SUBCONTRACTING PLAN.................................................. 13 ATTACHMENT 2: SUBCONTRACTOR LIST ............................................................................. 14 ATTACHMENT 3: FORM FOR PROPOSING SUBCONTRACTORS ......................................... 17 ATTACHMENT 4: COMPANY WORK GROUP LISTING ........................................................... 18 ATTACHMENT 5: PRE-QUALIFICATION REQUIREMENT FOR SUBCONTRACTORS ........... 41 ATTACHMENT 6: NOMINATED/RESTRICTED VENDOR LIST................................................. 43 ATTACHMENT 7: VENDOR LIST FOR MAJOR GOODS .......................................................... 45 ATTACHMENT 8: FORM FOR PROPOSING ADDITIONAL VENDORS .................................. 115 ATTACHMENT 9: COMPANY PRODUCT GROUP LISTING ................................................... 116 ATTACHMENT 10: PRE-QUALIFICATION REQUIREMENTS FOR VENDORS ...................... 143 ATTACHMENT 11: VENDOR LIST FOR STANDARDISED EQUIPMENT ............................... 145
Page 2 of 154
CC01A-0-00000-PS-PRO-0004 Rev3 DSN : 848
PROJECT PROCEDURE CRITERIA FOR SELECTION OF SUBCONTRACTORS AND VENDORS
1.
PURPOSE The purpose of this document is to ensure that CONTRACTOR shall perform all procurement activities necessary for completion of the WORK following this criteria for selection of SUBCONTRACTORS and VENDORS.
2.
SCOPE This document defines the process for selecting SUBCONTRACTORS and VENDORS for procurement of major GOODS and / or services. COMPANY’S strategy is to provide CONTRACTOR with a degree of flexibility in sourcing GOODS utilising its own experience and market knowledge to enhance quality and reduce overall cost. At the same time, COMPANY requires the CONTRACTOR to comply with COMPANY’S standard requirements.
3.
DEFINITIONS AND ABBREVIATIONS
3.1
Definitions Refer to ARTICLES OF AGREEMENT.
3.2
4.
Abbreviation AVL
Additional Vendors List
EPC
Engineering, Procurement and Construction
ICS
Integrated Control System
Q
Qualified
SL
SUBCONTRACTOR List
TBQ
To be Qualified
VL
VENDOR List
REFERENCED DOCUMENTS This document shall be read and construed in accordance with the relevant provisions contained in the documents listed below: Document Number
Document Title
CC01A-0-00000-PM-PHL-0001
Equipment Standardisation Philosophy
CC01A-0-00000-PS-PRO-0003
Procurement Guidelines
CC01A-0-00000-PS-PRO-0002
Procurement Services
Page 3 of 154
CC01A-0-00000-PS-PRO-0004 Rev3 DSN : 848
PROJECT PROCEDURE CRITERIA FOR SELECTION OF SUBCONTRACTORS AND VENDORS
The edition of the Reference Documents shall be the edition current at the EFFECTIVE DATE of the AGREEMENT. CONTRACTOR shall comply with COMPANY instruction to comply with any changed Reference Documents. CONTRACTOR shall advise COMPANY of any conflict between the referenced documents and any technical specification. COMPANY shall determine which shall govern.
5.
RESPONSIBILITIES The CONTRACTOR is responsible to comply with the implementation of this Procedure.
6.
PROCEDURE
6.1
EQUIPMENT STANDARDISATION PHILOSOPHY The document Equipment Standardisation Philosophy advises the basis for the Standardisation Philosophy and identifies the equipment types which are subject to this philosophy (Refer to Document No CC01A-0-00000-PM-PHL-0001). For equipment types not listed in the Equipment Standardisation Philosophy, the CONTRACTOR is free to nominate VENDORS and SUBCONTRACTORS in accordance with the procedure contained in this document.
7.
SELECTION OF SUBCONTRACTORS Selection of any SUBCONTRACTOR for performance of any portion of the WORK shall be based, amongst other factors, on technical merit and the ability to comply with the SCHEDULE. For the purpose of this Section 7, SUBCONTRACTORS excludes VENDORS. Refer to Section 8 of this document for requirements for selection of VENDORS.
7.1
Subcontracting Plan CONTRACTOR’S preliminary Subcontracting Plan is included as Attachment 1 (Preliminary Subcontracting Plan). The requirements relating to the establishment and updating of the Subcontracting Plan are covered in Procurement Services (Refer to Document No. CC01A-0-00000-PS-PRO-0002).
7.2
SUBCONTRACTOR Bid Lists CONTRACTOR shall comply with the following provisions for selection of SUBCONTRACTORS to be included on the SUBCONTRACTOR lists for the WORK (refer to Attachment 2 SUBCONTRACTORS List)
Page 4 of 154
CC01A-0-00000-PS-PRO-0004 Rev3 DSN : 848
PROJECT PROCEDURE CRITERIA FOR SELECTION OF SUBCONTRACTORS AND VENDORS
7.2.1
SUBCONTRACTOR List (SL) The SUBCONTRACTOR List (SL) in Attachment-2 contains the approved potential SUBCONTRACTORS being categorized under Class “Q” of the first tier and other subcontracts of significance. CONTRACTOR shall be free to issue enquiries to any/all SUBCONTRACTORS included in the SL for their respective scope.
potential
It is anticipated during the EPC selection process an approved SUBCONTRACTORS list will be developed from CONTRACTOR’S input at Tender stage. CONTRACTOR shall submit for COMPANY’S approval its SUBCONTRACTOR List utilizing the qualified SUBCONTRACTOR List given in attachment 2 along with its request for deviation from this list (with justification therefore) during the Technical Evaluation of CONTRACTOR’S Tender. A Pre-qualification Dossier containing information as stated in Attachment 5 Method A of this document shall be submitted for all proposed SUBCONTRACTORS deviated from the qualified list of Attachment 2 for COMPANY’S review and approval. It is COMPANY’S intention to review the proposed SUBCONTRACTORS and classify them as “Q”, “TBQ”, or “Not Acceptable” in accordance with “Criteria for Selection of Subcontractors and Vendors” as stated in Attachment 5 Method A and shall advise the CONTRACTOR accordingly. This Subcontractor List shall constitute the Contractor’s Approved List CONTRACTOR shall ensure, prior to issuing Invitation to Tender, that there are at least three (3) SUBCONTRACTORS in Category “Q” for each item. CONTRACTOR shall not issue enquiries to any SUBCONTRACTOR other than those included in the Approved SL under Class “Q” except with prior approval of COMPANY, which will be granted only under exceptional circumstances The SUBCONTRACTORS List agreed by COMPANY with the CONTRACTOR shall contain all the SUBCONTRACTORS classified as “Q” or “TBQ” and will be included as Attachment 2 of this document CC000-0-00000-PS-PRO-0004 - Criteria for Selection of Subcontractors and Vendors. This list will ultimately become an exhibit to the AGREEMENT. 7.2.2
Additional SUBCONTRACTORS For any proposed additional WORK and WORK where a list of SUBCONTRACTORS has not been pre-approved, CONTRACTOR shall submit to COMPANY within forty five (45) days of the EFFECTIVE DATE or four (4) weeks prior to the date set for issuance of inquiry for a SUBCONTRACTOR, whichever is the earlier, its list proposing SUBCONTRACTORS. This submission shall use the form in Attachment 3, and CONTRACTOR shall complete the forms using the COMPANY’S Work Group Listing in Attachment 4. COMPANY will evaluate CONTRACTOR’S proposed SUBCONTRACTOR lists and assign one of the following classifications: Page 5 of 154
CC01A-0-00000-PS-PRO-0004 Rev3 DSN : 848
PROJECT PROCEDURE CRITERIA FOR SELECTION OF SUBCONTRACTORS AND VENDORS
Class ‘‘Q’’ This classification will be given to SUBCONTRACTORS who comply with COMPANY’S registration requirements and who are known to COMPANY from a previous project. An inquiry can be issued Class “Q” SUBCONTRACTORS without further approvals from COMPANY. Class ‘‘TBQ’’ This classification will be given to SUBCONTRACTORS who do not comply with COMPANY’s registration requirements and/or who are not known to COMPANY. CONTRACTOR may issue enquiries to Class “TBQ” SUBCONTRACTORS at its discretion, however, these shall be considered for evaluation only after upgrade from Class “TBQ” to Class “Q”. However, CONTRACTOR shall issue enquiries to all “Q” category SUBCONTRACTORS before considering any “TBQ” VENDOR for issue of enquiry. Class ‘‘Not Acceptable’’ This will be given by COMPANY to those SUBCONTRACTORS in respect of which information is available confirming inadequate capability or unacceptable past performance or other reason. COMPANY reserves the right to reject any subcontractor nominated by CONTRACTOR. CONTRACTOR shall not issue inquires to such SUBCONTRACTORS.
7.3
Pre-Qualification Requirements In order to upgrade a proposed SUBCONTRACTOR from Class “TBQ” to Class “Q”, CONTRACTOR shall submit a Pre-qualification Dossier containing information as stated in Attachment 5 Method A and Method B for COMPANY’S review. CONTRACTOR shall plan its activities in a manner so as to allow sufficient time for pre-qualification of the proposed SUBCONTRACTORS without affecting the SCHEDULE.
7.4
Subcontractor Evaluation & Award
7.4.1
CONTRACTOR shall technically evaluate the SUBCONTRACTORS and submit evaluations for COMPANY approval. Following COMPANY approval of the technical evaluation, CONTRACTOR shall submit the award recommendation at least four (4) weeks prior to the date set for award of the subcontract. COMPANY requirements for technical evaluation and award recommendation are contained in Procurement Services procedure (document no. CC01A-0-00000-PSPRO-0002).
Page 6 of 154
CC01A-0-00000-PS-PRO-0004 Rev3 DSN : 848
PROJECT PROCEDURE CRITERIA FOR SELECTION OF SUBCONTRACTORS AND VENDORS
7.4.2
CONTRACTOR’S Technical Evaluation shall address COMPANY’S selection criteria that follow: Registration Requirements
Valid Trade License from Abu Dhabi Municipality covering the services to be provided. Valid Registration Certificate from Abu Dhabi Chamber of Commerce & Industry covering the services to be provided. Oil and Gas Classification for above. Contractor Classification from Abu Dhabi Planning Department, if available. Valid Consultant Registration Certificate from Abu Dhabi Planning Department (for Consultant only), if available. Registration with COMPANY.
Technical Requirements
7.4.3
Compliance with SUBCONTRACT scope of work. Compliance with SPECIFICATIONS. Structured organisation, manpower and equipment in a condition that allows safe operation and in quantities that would meet job requirements. Adequate direct experience in jobs of similar scope and order of magnitude in the last five years, especially in the UAE or Gulf region. Current workload and availability of resources to comply with SCHEDULE requirements. Documented Quality Assurance / Quality Control Programs (typically ISO 9001). Documented Health, Safety and Environmental Systems and Procedures (typically compliance with ISO 14001). Excellent Safety Record. Financial soundness and solvency. Compliance with Insurance Coverage requirements.
Subject to compliance with the registration and technical requirements of the selection criteria, COMPANY will approve the technical bid evaluation recommendations submitted by CONTRACTOR. Final approval of selected SUBCONTRACTOR and approval for award shall be subject to the provisions of Section 10 of this document.
Page 7 of 154
CC01A-0-00000-PS-PRO-0004 Rev3 DSN : 848
PROJECT PROCEDURE CRITERIA FOR SELECTION OF SUBCONTRACTORS AND VENDORS
7.5
Commercial Terms and Conditions CONTRACTOR shall be responsible for finalising with the SUBCONTRACTORS commercial terms and conditions which comply with the requirements of the AGREEMENT.
8.
SELECTION OF VENDORS Selection of any VENDOR for supply of GOODS for the WORK shall be based, amongst other factors, on technical merit and lowest life cycle value. In this context life cycle cost means the total cost over a ten year period considering capital, maintenance and operating cost associated with the equipment.
8.1
Procurement Plan CONTRACTOR’S Procurement Plan shall be established and updated in accordance with the Procurement Services procedure (document no. CC01A-0-00000-PS-PRO0002).
8.2
Vendor Lists
8.2.1
Nominated/Restricted VENDORS The lists of nominated/restricted VENDORS based on requirements such as technical compatibility and/or standardisation is enclosed in Attachment 6 and Attachment 11. CONTRACTOR shall negotiate directly with such nominated/restricted VENDORS for the supply of the specific GOODS in question. In some cases, Attachment 11 contains more than one VENDOR for Standardised Equipment. It is anticipated that during EPC selection / execution, one single VENDOR will be confirmed and advised by COMPANY. If a single VENDOR has not been confirmed, CONTRACTOR may issue inquiries to any/all VENDORS listed. In this case, CONTRACTOR’s inquiry shall also specify that VENDOR’s pricing shall be applicable to the entire PROJECT, including any future enquiries from other L/EPC CONTRACTORS. CONTRACTOR’S bid evaluation shall be submitted to COMPANY as defined elsewhere in the AGREEMENT. If COMPANY accepts CONTRACTOR’s proposed VENDOR, the VENDOR shall become the single APPROVED VENDOR for that category of Standardised Equipment.
8.2.2
VENDOR List for Major GOODS (VL) The VL in Attachment 7 contains the pre-approved VENDORS from which CONTRACTOR may procure major GOODS. CONTRACTOR must also comply with the requirements of the nominated/restricted VENDOR list. Page 8 of 154
CC01A-0-00000-PS-PRO-0004 Rev3 DSN : 848
PROJECT PROCEDURE CRITERIA FOR SELECTION OF SUBCONTRACTORS AND VENDORS
CONTRACTOR may proceed to issue inquiries to any/all potential VENDORS that are Class “Q” from the pre-approved VENDORS for their respective GOODS. It is anticipated during the EPC selection process an approved VENDORS list will be developed from CONTRACTOR’S input at Tender stage. CONTRACTOR shall submit for COMPANY’S approval its VENDORS List utilizing the qualified VENDORS List given in attachment 7 along with its request for deviation if any from this list (with justification therefore) during the Technical Evaluation of CONTRACTOR’S Tender. A Pre-qualification Dossier containing information as stated in Attachment 10 Method A of this document shall be submitted for all proposed VENDORS deviated from the qualified list of Attachment 7 for COMPANY’S review and approval. It is COMPANY’S intention to review the proposed VENDORS and classify them as “Q”, “TBQ”, or “Not Acceptable” in accordance with “Criteria for Selection of Subcontractors and Vendors” as stated in Attachment 10 Method A and shall advise the CONTRACTOR accordingly. This VENDOR List shall constitute the CONTRACTOR’S Approved List CONTRACTOR shall ensure, prior to issuing Invitation to Tender, that there are at least three (3) VENDORS in Category “Q” for each item. CONTRACTOR shall not issue enquiries to any VENDOR other than those included in the Approved VL under Class “Q” except with prior approval of COMPANY, which will be granted only under exceptional circumstances. The VENDOR List agreed by COMPANY with the CONTRACTOR shall contain all the VENDORS classified as “Q” or “TBQ” and will be included as Attachment 7 of this document CC01A-0-00000-PS-PRO-0004 - Criteria for Selection of Subcontractors and Vendors. This list will ultimately become an exhibit to the AGREEMENT. 8.2.3
Additional VENDOR List for Other GOODS (AVL) CONTRACTOR shall submit the detailed list of additional GOODS required for the WORK. Within forty five (45) days of the EFFECTIVE DATE or four (4) weeks prior to the date set for issuance of an inquiry for a purchase order, whichever is earlier, CONTRACTOR shall submit to COMPANY a detailed list identifying proposed VENDORS for additional GOODS utilising the form in Attachment 8. CONTRACTOR shall refer to COMPANY’S Product Group Listing in Attachment 9 to complete the forms. COMPANY will evaluate CONTRACTOR’S proposed VENDOR lists and assign the following classification: Class ‘‘Q’’ This classification will be given to VENDORS who comply with COMPANY’S registration requirements and who are known to COMPANY from a previous project. An enquiry can be issued Class “Q” VENDORS without further approvals from COMPANY. Class ‘‘TBQ’’ Page 9 of 154
CC01A-0-00000-PS-PRO-0004 Rev3 DSN : 848
PROJECT PROCEDURE CRITERIA FOR SELECTION OF SUBCONTRACTORS AND VENDORS
This classification will be given to VENDORS who do not comply with COMPANY’s registration requirements and/or who are not known to COMPANY. CONTRACTOR may issue inquiries to Class “TBQ” VENDORS at its discretion, however, these shall be considered for evaluation only after upgrade from Class “TBQ” to Class “Q”. However, CONTRACTOR shall issue enquiries to all “Q” category VENDORS before considering any ‘T.B.Q’ VENDOR for issue of enquiry. Class ‘‘Not Acceptable’’ This will be from VENDOR’s list in Attachment 7 as “Not Acceptable VENDORS” in respect of which information is available confirming inadequate capability or unacceptable past performance. CONTRACTOR shall not issue enquires to such VENDORS.
8.3
Pre-Qualification Requirements In order to upgrade a proposed VENDOR from Class “TBQ” to Class “Q”, CONTRACTOR shall submit a Pre-qualification Dossier containing information as stated in Attachment 10 Method A and Method B for COMPANY’s review. CONTRACTOR shall plan its activities in a manner so as to allow sufficient time for pre-qualification of the proposed VENDORS without affecting the SCHEDULE.
8.4
Vendor Evaluation & Award
8.4.1
CONTRACTOR shall technically evaluate the VENDORS offers and submit evaluations for APPROVAL. Following COMPANY approval of the technical evaluation, CONTRACTOR shall submit the award recommendation at least four (4) weeks prior to the date set for award of purchase order. COMPANY requirements for technical evaluation and award recommendation are contained in Procurement Services procedure (document no. CC01A-0-00000-PSPRO-0002).
8.4.2
CONTRACTOR’S Technical Evaluation shall address COMPANY’S selection criteria that follow: Registration Requirements Agency Agreement with an Abu Dhabi company endorsed by the required UAE authorities (applicable to non Abu Dhabi based VENDORS). Registration with COMPANY. Technical Requirements
Compliance with scope of supply. Compliance with SPECIFICATIONS. Internationally recognised for high quality and reliability. Page 10 of 154
CC01A-0-00000-PS-PRO-0004 Rev3 DSN : 848
PROJECT PROCEDURE CRITERIA FOR SELECTION OF SUBCONTRACTORS AND VENDORS
Advanced level of technology with capability to upgrade in future. Compliance with the essential requirements of ISO 9001:2008. Excellent Safety Record. Compliance with SCHEDULE. Current workload and availability of resources. Availability of after sales support facilities in Abu Dhabi such as stock of spare parts, repair facility, technical support and training centres for plant operators and technician. Good performance track record in terms of quality, responsiveness, cost control, safety, completion schedule, business ethics, etc. Adequate past experience in supply of similar items in the last five years, especially in the UAE or the Gulf region. Past experience with ADNOC Group of Companies will be preferred. Commitment for continued provision of spares for the life of the GOODS. Financial soundness and solvency. Life cycle operating cost. Operating spare parts cost. All Stockists / Distributors / Trading Houses shall only be considered subject to COMPANY acceptance of satisfactory source of manufacturer/origin. GOODS supplied for piping materials, or mechanical valves must be supplied by reputable VENDORS or mills which can provide experience of similar GOODS supply. COMPANY reserves the right to reject any Vendor nominated by CONTRACTOR. Engineering companies and packagers shall be considered subject to approval of major sub-suppliers by COMPANY.
Subject to compliance with the registration and technical requirements of the selection criteria, COMPANY will approve the technical bid evaluation recommendations submitted by CONTRACTOR. Final approval of the selected VENDOR and approval for award shall be subject to the provisions contained in section 10 of this document.
8.5
Commercial Terms and Conditions CONTRACTOR shall be responsible for finalising with the VENDORS the commercial terms and conditions which comply with the requirements of the AGREEMENT.
9.
LOCAL AND REGIONAL RESOURCES COMPANY requires that the CONTRACTOR maximises, wherever possible, the involvement of local and regional resources in the implementation of the WORK.
Page 11 of 154
CC01A-0-00000-PS-PRO-0004 Rev3 DSN : 848
PROJECT PROCEDURE CRITERIA FOR SELECTION OF SUBCONTRACTORS AND VENDORS
10.
COMPANY SELECTION OF OTHER THAN RECOMMENDED SUBCONTRACTOR / VENDOR COMPANY reserves the right to select, from amongst the technically acceptable SUBCONTRACTORS/VENDORS, a SUBCONTRACTOR/VENDOR other than the one recommended by CONTRACTOR. Frequent exercising of this right by COMPANY is not anticipated. Any additional costs to CONTRACTOR, directly attributable to exercising of this right by COMPANY, shall be reimbursed to CONTRACTOR in accordance with the provisions of the AGREEMENT. Should COMPANY exercise this right, COMPANY shall have the right of access to the original priced quotations by SUBCONTRACTORS/VENDORS. CONTRACTOR’s award recommendations shall accordingly include the difference payable by COMPANY to CONTRACTOR for each of the technically approved SUBCONTRACTORS/VENDORS other than the one recommended by CONTRACTOR. In addition to above, COMPANY may require CONTRACTOR to provide in respect of certain equipment/items a detailed life cycle cost analysis. This information shall be provided as part of the award recommendations wherever required by COMPANY.
Page 12 of 154
CC01A-0-00000-PS-PRO-0004 Rev3 DSN : 848
PROJECT PROCEDURE CRITERIA FOR SELECTION OF SUBCONTRACTORS AND VENDORS
ATTACHMENT 1:
PRELIMINARY SUBCONTRACTING PLAN
CONTRACTOR’s approved Preliminary Subcontracting Plan to be inserted here.
Page 13 of 154
CC01A-0-00000-PS-PRO-0004 Rev3 DSN : 848
PROJECT PROCEDURE CRITERIA FOR SELECTION OF SUBCONTRACTORS AND VENDORS
ATTACHMENT 2:
SUBCONTRACTOR LIST
SL WORK DESCRIPTION 1
TEMPORARY SITE FACILITIES AND CAMP
WORK GROUP No.
SUBCONTRACTOR NAME
BOROUGE/ GASCO/ TAKREER REGISTRATION No.
REMARKS
280010 GALFAR GRANITE TARGET IMECO DYWIDAG AL MASSOD EMCO KENTZ
2
CIVIL WORKS
230000
AL JABER GALFAR GRANITE DAEWOO TARGET DYWIDAG BELHASA SIX CONSTRUCT AL GEEMI KETTANEH KHANSAHEB NASSER AL HAJRI EMCO
3
PILING
210090
SWISS BORING DUTCH FOUNDATION BAUER
4
MARINE WORKS
210020
BELHASA SIX CONSTRUCT ARCHIRODON CONSTRUCTION INTERBETON TARGET
5
MECHANICAL WORKS
240000
DAEWOO PUNJ LLOYED DESCON LAHOUD TARGET LERSEN & TOUBRO DODSAL AL JABER GALFAR NASSER AL HAJRI CCC
Page 14 of 154
CC01A-0-00000-PS-PRO-0004 Rev3 DSN : 848
PROJECT PROCEDURE CRITERIA FOR SELECTION OF SUBCONTRACTORS AND VENDORS
SL WORK DESCRIPTION 6
ELECTRICAL WORKS
WORK GROUP No. 260000
SUBCONTRACTOR NAME
BOROUGE/ GASCO/ TAKREER REGISTRATION No.
REMARKS
TICB DAEWOO TOZZI SUD TARGET KENTZ CONTROL APPLICATION EMIRATES CEGELEC OIL
7
ICS EPC SERVICES
270020
8
INSTRUMENTATION WORKS
270020
DODSAL HONEYWELL MIDDLE EAST LTD ABU DHABI
NOMINATED CONTRACTOR
TICB DAEWOO TOZZI SUD TARGET KENTZ CONTROL APPLICATION EMIRATES CEGELEC OIL DODSAL
9
INSULATION & PAINTING WORKS
372000
CAPE EAST LIMETED W.L.L KEFER LLC INSULCO EMIRATES INCO LTD MAZRUI & HAWI GLOBAL ESSA COATING FAME
10
BUILDINGS WORKS
230095
ZAMIL STEEL GALFAR GRANITE DYWIDAG TARGET AL JABER AL GEEMI GROUP3 KIRBY BUILDING SYSTEM
11
PRE ENGINEERED BUILDINGS
230095
AMANA KIRBY BUILDING SYSTEM BUTLER
12
HVAC WORKS
240060
CCTC KETTANEH ETA EMCO KENTZ
Page 15 of 154
CC01A-0-00000-PS-PRO-0004 Rev3 DSN : 848
PROJECT PROCEDURE CRITERIA FOR SELECTION OF SUBCONTRACTORS AND VENDORS
SL
13
WORK DESCRIPTION
WORK GROUP No.
FREIGHT FORWARDING & CLEARANCE
374025
SERVICES
SUBCONTRACTOR NAME
BOROUGE/ GASCO/ TAKREER REGISTRATION No.
REMARKS
MICCO SALEM FREIGHT INTERNATIONAL KUHNE & NAGEL MATRIX GAC
14
HEAVY TRANSPORTATION SERVICES
280042
AL JABER TRANSPORT MAMOET ALE
Page 16 of 154
CC01A-0-00000-PS-PRO-0004 Rev3 DSN : 848
PROJECT PROCEDURE CRITERIA FOR SELECTION OF SUBCONTRACTORS AND VENDORS
ATTACHMENT 3:
FORM FOR PROPOSING SUBCONTRACTORS
Work SL. Work Description Group No.
Proposed SubContractor
Company Registration No.
Remarks
1
2
3
4
5
NOTE: CONTRACTOR to insert more lines as appropriate.
Page 17 of 154
CC01A-0-00000-PS-PRO-0004 Rev3 DSN : 848
PROJECT PROCEDURE CRITERIA FOR SELECTION OF SUBCONTRACTORS AND VENDORS
ATTACHMENT 4:
COMPANY WORK GROUP LISTING
CONTENTS DESCRIPTION 1.0
2.0
3.0
PAGE NO.
PROJECTS & PLANT CONSULTANCY/ENGINEERING 1.1
PROJECT CONSULTANCY/ENGINEERING
1.2
OPERATING PLANT CONSULTANCY
CONSTRUCTION WORKS (MAJOR PROJECTS) 2.1
EPC CONTRACTS
2.2
EPCM CONTRACTS
2.3
CIVIL WORKS
2.4
MECHANICAL WORKS
2.5
PIPELINE WORKS
2.6
ELECTRICAL WORKS
2.7
INSTRUMENTATION & TELECOM. WORKS
2.8
GENERAL CONTRACTS (MAJOR PROJECTS)
PLANT OPERATION & MAINTENANCE 3.1
CIVIL WORKS/MAINTENANCE
3.2
MECHANICAL PLANT/EQUIPMENT WORKS/MAINT.
3.3
3.4
3.2.1
Turbines - Maintenance
3.2.2
Pumps, Compressors, Other Rotating Eqpt. – Maintenance
3.2.3
Processing Plant & Equipments - Maintenance
3.2.4
Boilers, Furnaces & Reactors - Maintenance
3.2.5
Heat Exchangers - Maintenance
3.2.6
Material Handling Equipments - Maintenance
3.2.7
Shut Down Maintenance
3.2.8
Other Mechanical Plants - Maintenance
PIPING, COLUMNS AND TANKS - MAINTENANCE 3.3.1
Piping - Maintenance
3.3.2
Columns, Tanks, Vessels & Others - Maintenance
ELECTRICAL PLANT & EQUIPMENT - MAINT. 3.4.1
Motors & Generators - Maintenance
3.4.2
Sub-Stations, Switch Gears & Transformers - Maintenance Page 18 of 154
CC01A-0-00000-PS-PRO-0004 Rev3 DSN : 848
PROJECT PROCEDURE CRITERIA FOR SELECTION OF SUBCONTRACTORS AND VENDORS
DESCRIPTION
PAGE NO.
3.4.3
Cables, Transmission And Distribution - Maintenance
3.4.4
Other Electrical Plant & Equipment - Maintenance.
3.5
INSTRUMENTATION & TELECOM. SYSTEMS - MAINTENANCE
3.6
INSPECTION/TESTING/COMMISSIONING SERVICES 3.6.1
Inspection & Testing Services
3.6.2
Commissioning Services
3.7
GENERAL PLANT MAINTENANCE SERVICES
3.7.1
Hiring Services - Plants
3.7.2
Painting Services - Plants
3.7.3
Plant Cleaning Services
3.7.4
Other Plant Operation/Maintenance Services
4.0
INFORMATION SYSTEMS & TECHNOLOGIES
5.0
EXPLORATION & PRODUCTION RELATED SERVICES
6.0
PERSONNEL & MANPOWER SERVICES 6.1
MANPOWER SUPPLY - ENGINEERS
6.2
MANPOWER SUPPLY - SUPERVISORS/TECHNICIANS
6.3
MANPOWER SUPPLY - NON TECHNICAL PERSONNEL
6.4
OTHER PERSONNEL CONTRACTS/SERVICES
7.0
FINANCE SERVICES
8.0
MARKETING SERVICES
9.0
ADMINISTRATION & GENERAL SERVICES 9.1
CATERING SERVICES
9.2
LEASING SERVICES
9.3
MEDICAL & HSE SERVICES
9.4
OFFICES, BUILDINGS AND VILLAS MAINTENANCE
9.5
TRANSPORTATION SERVICES
9.6
CLEANING SERVICES
9.7
OTHER GENERAL SERVICES
Page 19 of 154
CC01A-0-00000-PS-PRO-0004 Rev3 DSN : 848
PROJECT PROCEDURE CRITERIA FOR SELECTION OF SUBCONTRACTORS AND VENDORS
WG CODE
WORK GROUP (WG) DESCRIPTION
GROUP1.0 – PROJECTS & PLANT CONSULTANCY/ENGINEERING Sub-Group 1.1 covers Front End Engineering and Design (FEED), Basic Engineering, Project Management/Consultancy Detailed Engineering, for major project. 1.1 – PROJECT CONSULTANCY/ENGINEERING 110010
Advanced Process Control
110020
Aerial Surveys
110030
Architecture & Interior Decoration
110040
Cathodic Protection Systems – Consultancy
110050
Chemical Injection Systems
110060
Civil & Structural (Industrial)
110070
Civil & Structural (Non Industrial)
110080
Cold Industrial Insulation Consultancy
110085
Conceptual Design
110090
De-Salination/Water Treatment Consultancy
110100
Environmental Eng. (Pollution Control/Effluent Treatment)
110110
Front End Engineering Design (Feed)
110115
Optimization Studies
110117
Special Studies/Design
110120
Gas Processing
110135
Gas Production – Onshore
110140
Gas Treatment Equipment
110150
Gas Gathering Centers
110160
Instrumentation And Control Systems
110165
Landscaping Consultancy
110167
LNG/LPG Tanks - Consultancy
110170
Management Information Systems
110180
Marine Engineering
110190
Marine Surveys
110200
Material Selection For Corrosion Control consultancy
110210
Onshore Surveys
110220
Packaged Process Module
110260
Pipeline - Onshore (Oil & Gas)
110270
Power Generation, Transmission & Distribution Page 20 of 154
CC01A-0-00000-PS-PRO-0004 Rev3 DSN : 848
PROJECT PROCEDURE CRITERIA FOR SELECTION OF SUBCONTRACTORS AND VENDORS
WG CODE
WORK GROUP (WG) DESCRIPTION
GROUP1.0 – PROJECTS & PLANT CONSULTANCY/ENGINEERING 110280
Process Licensors
110290
Project Management – Industrial
110295
Project Management – Non-Industrial
110300
Quality Control Consultants
110305
Scada System Consultancy
110320
Soil Investigation - Onshore
110325
Sulphur Recovery/Forming & Handling Consultancy
110330
Telecommunication Network And Telemetry
110333
Techno - Economic Feasibility Study
110335
Town Planning/Master Plan
110340
Water Injection Systems
110345
Gas Injection Systems
110350
Water Supply/Distribution Networks Consultancy
110360
Sewage / Drainage Networks Consultancy
Sub-Group 1.2 Covers Operating Plant, Consultancy Services. 1.2 – Operating Plant Consultancy 120010
Air Conditioning & Electro Mechanical Domestic/Industrial
120020
Concrete Rehabilitation Studies
120030
Corrosion Audit/Surveys
120040
Energy Conservation Studies
120060
Field Testing Of New Applications
120070
Fire & Safety Consultancy
120080
Industrial Engineering/Productivity Studies
120081
ISO 14000/HSE Systems & Procedures
120082
ISO 9000/Qc Systems & Procedures
120083
ISO 9000/Qc Certification
120084
ISO 14000/Qc Certification
120085
Materials Management Consultancy
120100
Mech. Plant & Materials Handling System - Onshore
120110
Noise Surveys & Analysis
120115
Operating Procedures - Plant Operation/Maint. Page 21 of 154
CC01A-0-00000-PS-PRO-0004 Rev3 DSN : 848
PROJECT PROCEDURE CRITERIA FOR SELECTION OF SUBCONTRACTORS AND VENDORS
WG CODE
WORK GROUP (WG) DESCRIPTION
GROUP1.0 – PROJECTS & PLANT CONSULTANCY/ENGINEERING 120120
Plant Inspection Consultancy Services
120130
Plant Operation Studies (Reliability, Performance, Failure Etc.)
120140
Plant Surveys - Mechanical/Electrical
120150
Preservation Studies & Services - Equipments & Spares
120160
Risk/Hazard/Safety Studies
120165
Accident, Damage Investigation Consultancy
120170
Security Related Consultancy
120190
Studies On Construction Material And Testing Laboratory
120200
Technical Audit/Surveys
120220
Vibration Surveys Of Rotating Equipment
120230
Waste Control/Effluent Treatment
120240
Structural Steel Frame Analysis
WG CODE
WORK GROUP (WG) DESCRIPTION
GROUP 2.0 – CONSTRUCTION WORKS (MAJOR PROJECTS) Sub-Group 2.1 covers EPC and Sub-Group 2.2 covers EPCM contracts for major projects: 2.1 – ENGINEERING, PROCUREMENT & CONSTRUCTION (EPC) CONTRACTS 210010
Desalination Units - EPC
210015
LNG/LPG Tanks- EPC
210020
Marine Works - EPC
210025
Nitrogen/Oxygen Plants - EPC
210040
Oil & Gas Plants - Onshore - EPC
210045
Oil & Gas Unit Of Plants - Onshore - EPC
210070
Pipelines Onshore - EPC
210080
Power Generation Plants - EPC
210090
Tank Farms – EPC
2.2 – ENGINEERING, PROCUREMENT & CONSTRUCTIONS MANAGEMENT (EPCM) CONTRACTS 220010
Marine Works – EPCM
220030
Gas Plants Onshore - EPCM
220060
Pipelines Onshore - EPCM
220070
Power Generation Plants - EPCM Page 22 of 154
CC01A-0-00000-PS-PRO-0004 Rev3 DSN : 848
PROJECT PROCEDURE CRITERIA FOR SELECTION OF SUBCONTRACTORS AND VENDORS
WG CODE
WORK GROUP (WG) DESCRIPTION
GROUP 2.0 – CONSTRUCTION WORKS (MAJOR PROJECTS) Sub-Groups 2.3 to 2.8 cover Construction Works for all engineering disciplines for major projects: 2.3 – CIVIL WORKS 230020
Buildings, Offices, Etc. - Construction
230030
Ceiling And Internal Partitions Works
230035
Drainage / Sewerage Works
230040
Dredging/ Reclamation - Offshore
230050
Industrial Civil Works
230055
Infrastructure Works
230060
Interior Decoration Works
230070
Marine Construction - Jetty, Harbour Etc.
230090
Piling/Sheet Piling
230095
Pre-Engineering Buildings/Steel Structure
230100
Roads/Culverts Works
230120
Site Preparation Works
230130
Soil/Foundation Grouting
230140
Steel Structural Works - Erection
230145
Steel Structural Works - Fabrication
230150
Tunnelling/Non-Destructive Road Crossings
230155
Horizontal Direction Drilling “HDD”
230160
Water Supply Networks Works
2.4 Mechanical Works 240020
Crane/Overhead Bridge - Erection
240030
Desalination Units - Erection
240040
Effluent Treatment Plants
240045
Environmental Related Works (Pollution Control/Monitoring, Etc.)
240050
Fabrication Works – General
240060
HV & Ac Works – Industrial
240065
Air-Conditioning – High Rise Buildings (Central Chilled Water Systems) - Supply & Installation.
240070
LPG/LNG Tanks – Erection
240080
Mechanical Equipments - Erection Page 23 of 154
CC01A-0-00000-PS-PRO-0004 Rev3 DSN : 848
PROJECT PROCEDURE CRITERIA FOR SELECTION OF SUBCONTRACTORS AND VENDORS
WG CODE
WORK GROUP (WG) DESCRIPTION
GROUP 2.0 – CONSTRUCTION WORKS (MAJOR PROJECTS) 240090
Molten Sulphur Tanks
240095
Sulphur Recovery/Forming & Handling Plant - Erection
240100
Oil & Gas Plants - Erection
240120
Power Stations - Erection
240130
Site Work - Tank Farms/Floating Roof
240140
Telecom Towers
240145
Water Pumping Station - Erection
240148
Sewerage Pumping Station – Erection
240150
Water Treatment Plant Works
2.5 – Pipeline Works 250010
Cement Linings Of Pipes
250020
Cold & Cryogenic Insulation Works
250030
Fire Fighting Systems - Piping
250040
Pipelines - Insulation Work
250050
Pipelines - Coatings (FBE/PE)
250051
Pipelines - Coatings Pp (Polypropylene)
250052
Pipelines - Coating & Wrapping (Coal Tar/Bitumen Enamel)
250065
Pipelines: Tie-Ins
250080
Pipelines Construction - Onshore
250090
Sandblasting & Painting Works
2.6 – Electrical Works 260005
Building Management Systems
260010
Cathodic Protection Systems Works
260020
Electrical Works – Industrial
260030
Electro-Mechanical (Buildings/Domestic)
260045
Cable Laying And Trench Excavation
260055
Street Lighting & Accessories
260060
Power Transmission/Distribution - Overhead
2.7 – Instrumentation & Telecom. Works 270010
Fire And Safety Works
270020
Instrumentation & Control Works - Industrial Page 24 of 154
CC01A-0-00000-PS-PRO-0004 Rev3 DSN : 848
PROJECT PROCEDURE CRITERIA FOR SELECTION OF SUBCONTRACTORS AND VENDORS
WG CODE
WORK GROUP (WG) DESCRIPTION
GROUP 2.0 – CONSTRUCTION WORKS (MAJOR PROJECTS) 270030
Telecommunication Works
2.8 – General Contracts (Major Projects) 280010
Camp Catering For Major Projects – Onshore
280020
Certification (Design/Statutory Requirements)
280030
Freight Forwarding & Clearing – Major Projects
280040
Land Transportation
280042
Heavy Lift Transportation Services
280045
Transportation – Aggregate, Sand, Rocks, Etc.
280070
NDT - Radiographic, Ultrasonic Etc.
280075
NDT - Radiographic Digitization
280080
Third Party Inspection
WG CODE
WORK GROUP (WG) DESCRIPTION
GROUP 3.0 – PLANT OPERATION & MAINTENANCE Group 3 covers Plant, Maintenance, Rehabilitation, Refurbishment, Minor Construction Works for plant operation, covering all engineering disciplines: 3.1 – CIVIL WORKS / MAINTENANCE 310010
Aluminium & Glass Works
310020
Building Construction - Minor
310021
Civil Industrial Work - Minor
310022
Building Maintenance
310024
Building Maintenance/Service Agreements
310030
Concrete - Pre-Cast
310032
Concrete - Pre-Stress
310035
GRC - Glass Reinforced Concrete
310040
Concrete - Rehabilitation Work
310045
Concrete - Ready Mix
310050
Demolition (Plant/Equipment/Foundation)
310060
Drainage / Sewerage – Minor Works
310065
Excavation And Back Filling
310070
Earthwork
310080
Fencing And Gates Page 25 of 154
CC01A-0-00000-PS-PRO-0004 Rev3 DSN : 848
PROJECT PROCEDURE CRITERIA FOR SELECTION OF SUBCONTRACTORS AND VENDORS
WG CODE
WORK GROUP (WG) DESCRIPTION
GROUP 3.0 – PLANT OPERATION & MAINTENANCE 310085
Guniting / Shotcreting Services
310090
Marine - Rehabilitation
310095
Masonry Works
310100
Road Maintenance/Repairs
310110
Soil Reclamation
310115
Soil Treatment/Cleaning/Sterilization
310120
Soil Containment/Stabilization
310130
Specialist Construction (Glazing, Domes, Shells etc.)
310140
Fabrication (General)/Steel Structure – Minor Works
310150
Water Proofing Works
310170
Aerial Survey Works
3.2 – Mechanical Plant/Equipment Works / Maintenance 3.2.1 – Turbines - Maintenance 321010
Turbines - Gas
321020
Turbines - Solar
321030
Turbines - Steam
32 1040
Turbines Major Components Reconditioning & Repairs
3.2.2 – Pumps, Compressors, Other Rotating Eqpt. - Maintenance 322010
Air Blowers
322020
Pumps Overhaul – Other Than Cryogenic
322025
Pumps Overhaul – Cryogenic (LNG / LPG / Other Liquid Gases)
322030
Compressors Overhaul
322040
Diesel Engines Overhaul
322050
Gas Compressor Stations Overhaul
322080
Rotating Equipment - Others
322090
Rotor Balancing
3.2.3 – Processing Plant & Equipments - Maintenance 323010
Filters - Air/Process
323030
Fuel Filtration Equipments
323040
Process Equipments
323060
Sulphur Forming Plants Page 26 of 154
CC01A-0-00000-PS-PRO-0004 Rev3 DSN : 848
PROJECT PROCEDURE CRITERIA FOR SELECTION OF SUBCONTRACTORS AND VENDORS
WG CODE
WORK GROUP (WG) DESCRIPTION
GROUP 3.0 – PLANT OPERATION & MAINTENANCE 323070
Sulphur Handling Plants
323080
Sulphur Recovery Plants
323090
Water Treatment Plants - Clean Water (Feed)
323100
Water Treatment Plants - Dirty Water/Effluent
3.2.4 – Boilers, Furnaces & Reactors - Maintenance 324010
Boilers And H.R.B.
324020
Heaters & Dryers
324040
Furnaces
324060
Reactors
324070
Refractory Linings - Boilers, Furnaces etc.
3.2.5 – Heat Exchangers - Maintenance 325010
Heat Exchangers - Refurbishment
325020
Heat Exchangers Maint. – Bundle Refurbishment
325030
Heat Exchangers Maint. – Chemical Cleaning
325040
Heat Exchangers Maint. – Mechanical Cleaning
325050
Heat Exchangers Maint. – Water Jetting
3.2.6 – Material Handling Equipments – Maintenance 326010
Material Handling Systems : Conveyers, Belts etc.
326020
Earth Moving Equipment – Maintenance
326030
Loading Arms
3.2.7 – Shut Down - Maintenance 327010
Refinery Shutdown Maintenance - Full Responsibility
327020
Unit Shutdown Maintenance - Full Responsibility
3.2.8 – Other Mechanical Plants - Maintenance 328010
Air Cooler Cleaning/Retubing
328030
Flare Systems & Burn Pits
328040
HV & AC Maintenance
328050
Machining And Welding Services
328075
Platform Maintenance - Onshore
328100
Valves Refurbishment
3.3 – Piping, Columns And Tanks - Maintenance Page 27 of 154
CC01A-0-00000-PS-PRO-0004 Rev3 DSN : 848
PROJECT PROCEDURE CRITERIA FOR SELECTION OF SUBCONTRACTORS AND VENDORS
WG CODE
WORK GROUP (WG) DESCRIPTION
GROUP 3.0 – PLANT OPERATION & MAINTENANCE 3.3.1 – Piping - Maintenance 331030
Heat Tracing Systems (Steam/Electrical)
331040
Hot Tapping Works
331050
On-Line Leak Sealing
331060
Insulations, Cladding Repairs – Piping
331070
Piping - Low Temperature Service
331100
Piping & Spools (Steel)–Fabrication/Installation/Repairs/Renewal
331110
Piping (R.T.R.P. & G.R.P.) – Fabrication/Installation/Repairs/Renewal
331120
Duplex Piping – Fabrication/Repair/Replacement/Renewal
3.3.2 – Columns, Tanks, Vessels & Other – Maintenance 332010
Columns - Trays & Internals
332020
Cooling Towers Maintenance
332030
Rubber Linings (Tanks, Vessels, Columns)
332040
Insulation, Cladding Repairs – Columns, Tanks, Vessels
332050
Tanks – Sludge Removal
332055
Tanks – Overhaul Including Cleaning, Inspection, Repairs etc.
332060
Internal Linings (Tanks, Vessels, Columns)
3.4 – Electrical Plant & Equipment - Maintenance 3.4.1 – Motors And Generators – Maintenance 341010
Balancing Of Motor Shafts
341020
Electric Motors Dc/Variable Speed
341030
Electric Motors Maintenance
341050
Emergency Diesel Generators
341060
Generators Overhaul And Repairs
341070
Motor Operated Valves (M.O.V.)
341080
Power Generation Maintenance
341090
Rewinding & Servicing Of Generators
341100
Rewinding/Repairs Of Motors
341120
Solar Power Panels
341140
Thyrister Drives
3.4.2 – Sub Stations, Switch Gears & Transformers - Maintenance Page 28 of 154
CC01A-0-00000-PS-PRO-0004 Rev3 DSN : 848
PROJECT PROCEDURE CRITERIA FOR SELECTION OF SUBCONTRACTORS AND VENDORS
WG CODE
WORK GROUP (WG) DESCRIPTION
GROUP 3.0 – PLANT OPERATION & MAINTENANCE 342010
Transformers Servicing & Rewinding
342020
Short Circuit Current Limitors
342030
Substation Equipments Maintenance
342050
Switch Gears Ht/Lt/MCC Maintenance
342070
Switchyards
3.4.3 – Cables, Transmission And Distribution - Maintenance 343010
Cable Trays/Racks Maintenance
343030
Overhead Transmission Lines Maintenance
344035
Corrosion Prevention/Monitoring System
344040
Lighting Maintenance - General
3.4.4 – Other Electrical Plant & Equipments - Maintenance 344010
Batteries/Battery Chargers / U.P.S.
344020
Cathodic Protection Systems Maintenance
344030
Control Panels/Stations Maintenance
3.4.4 – Other Electrical Plant & Equipments - Maintenance 344035
Corrosion Prevention/Monitoring System
344040
Lighting Maintenance - General
344050
Earthing Systems
344060
Electrical Testing Equipments
344070
Street Lighting & Accessories - Maintenance
344080
Industrial Lighting Systems - Hazardous Area
344090
Industrial Wiring
344100
Navigational Signalling Systems
3.5 – Instrumentation & Telecom. Systems - Maintenance 350010
Analyzers
350030
Anti - Surge Control Systems
350040
Blending Systems
350050
CCTV/CATV/MATV/LV Instrumentation Systems - Inst. & Maint.
350090
Electronic Card Repairs
350100
Emergency Shutdown Systems
350110
Explosion & Weatherproof Telephones, Acoustic Booth etc. Page 29 of 154
CC01A-0-00000-PS-PRO-0004 Rev3 DSN : 848
PROJECT PROCEDURE CRITERIA FOR SELECTION OF SUBCONTRACTORS AND VENDORS
WG CODE
WORK GROUP (WG) DESCRIPTION
GROUP 3.0 – PLANT OPERATION & MAINTENANCE 350120
Fire & Gas System Repairs
350130
Instrument Shelter Cabins
350135
Scada/ Supervisory & Management Control (SMC) Shelters
350140
Instrumentation & Comm. Cabling (Underground)
350150
Instrumentation & Communication Cabling (Overhead)
350160
Instrumentation Tubing
350170
Instrumentation Test/Repair Services
350180
Instruments Measurement/Calibration Services
350190
Lab Instruments Maintenance/Repairs
350230
Metering Systems
350240
Microwave Systems
350250
Scada Systems/PLC
350260
Pop Testing Of Safety Relief Valves
350270
Pressure Regulating Stations
350280
Process Control & Automation
350300
Radio Paging Systems
350320
Safety Control Systems
350330
Satellite Systems
350340
Telecommunication Cabling - Fiber Optic
350350
Telecommunication Cabling - General
350360
Telecommunication Equipment Repairs
350370
Telephone Systems
350380
Training Simulation Systems
350390
Uhf Radiation
350400
Vibration Monitoring Systems
3.6 – Inspection/Testing/Commissioning Services 3.6.1 – Inspection And Testing Services 361010
Combustion/Gas Path Inspection Of Gas Turbines
361020
Corrosion Inspection
361030
Crude Assay/Testing
361040
Heat Exchanger - Eddy Current Testing Page 30 of 154
CC01A-0-00000-PS-PRO-0004 Rev3 DSN : 848
PROJECT PROCEDURE CRITERIA FOR SELECTION OF SUBCONTRACTORS AND VENDORS
WG CODE
WORK GROUP (WG) DESCRIPTION
GROUP 3.0 – PLANT OPERATION & MAINTENANCE 361050
Heat Exchanger - Hydraulic Testing
361060
Hydraulic/Hydrostatic Testing
361080
Inspection & Testing Of Lifts, Cranes, Slings, Tackles etc.
361095
Material Testing – Civil
361096
Material Final Inspection
361097
Laboratory Testing - Oil/Gas/Water etc.
361098
Material Testing - Metallurgical
361099
Material Testing – Painting/Coating
361100
Marine/Diving/Sub-Sea Inspection
361120
Inspection – Pipelines
361125
Inspection – Tanks/Vessels etc.
361130
Soil Testing
361140
Stress Analysis
361150
Vibration Testing Of Rotating Equipments
3.6.2 – Commissioning Services 362010
Commissioning & Start Up Services - Plant
362020
Pipelines - Nitrogen Purging
362030
Pipelines - Pigging Services
362035
Pipelines – Intelligent Pigging Services
362040
Pipelines -
Swabbing, Hydrotesting, Dewatering Drying
3.7 – General Plant Maintenance Services 3.7.1 – Hiring Services – Plants 371010
Hire of Cranes
371020
Hire of Earth Moving Equipments
371030
Hire of Heavy Lifts And Trailer Beds
371040
Hire of Other Mechanical/Electrical Equipments
371050
Hire of Test Equipments/Instruments
371060
Hire of Transportation - Bulk Material
3.7.2 – Painting Services - Plants 372010
Blasting & Painting - Steel Structure
372020
Blasting & Painting – Tanks, Vessels & Columns Page 31 of 154
CC01A-0-00000-PS-PRO-0004 Rev3 DSN : 848
PROJECT PROCEDURE CRITERIA FOR SELECTION OF SUBCONTRACTORS AND VENDORS
WG CODE
WORK GROUP (WG) DESCRIPTION
GROUP 3.0 – PLANT OPERATION & MAINTENANCE 372025
Blasting & Painting - Piping
372030
Blasting & Painting - Other Equipment
372035
Blasting & Painting - Special
372040
Marine Structure - Painting
372050
Fire Proofing By Intumescent Painting
372055
Fireproofing Works General
3.7.3 – Plant Cleaning Services 373010
Chemical/Toxic Cleaning
373025
Water Tanks Cleaning – Industrial
373030
Dumping Site Clearing
373040
Excavation, Disposal & Treatment Of Contaminated Soils
373050
Removal/Disposal of Waste Materials
373060
Sewage Cleaning/Drainage Clearing Services
373070
Dewatering Services
373080
Hydrojetting
3.7.4 – Other Plant Operation/Maintenance Services 374020
Camp Operation & Maintenance
374025
Freight Forwarding & Clearance Services
374027
Custom Clearance
374029
Liquid Sulphur Transportation By Tankers
374030
Carpentry Works
374040
Catalyst Reclamation / Regeneration / Disposal
374045
Corrosion Protection/Prevention Works
374060
Dismantling
374080
Heat Treatment - Post Weld (P.W.H.T.)/Stress Relieving
374100
Industrial Doors (For Workshop & Factories)
374110
Industrial Security Systems
374130
Metal Spraying/Rebuilding
374140
Cranes Maintenance (O.H)
374160
Scaffolding Services
374170
Sign Boards Page 32 of 154
CC01A-0-00000-PS-PRO-0004 Rev3 DSN : 848
PROJECT PROCEDURE CRITERIA FOR SELECTION OF SUBCONTRACTORS AND VENDORS
WG CODE
WORK GROUP (WG) DESCRIPTION
GROUP 3.0 – PLANT OPERATION & MAINTENANCE 374180
Road Markings
374205
Thermal Insulation - Other Than Pipeline & Pipings
WG CODE
WORK GROUP (WG) DESCRIPTION
GROUP 4.0 – INFORMATION SYSTEMS & TECHNOLOGIES Group 4 covers Consultancy, Development, Installation and Maintenance Contracts related to Information Systems & Technologies: 400010
Computer Hardware (PC Servers & PCS) Maintenance
400012
Super Computer, Mainframes And Mini Computer Systems (Branded) Maintenance
400015
Electronic Document Management Systems (Imaging System etc.)
400020
Computer Network Maintenance – Site Work
400030
Computer Networking And Network Management – Turnkey
400040
Business Application Software Packages (Development, Supply, Installation & Maintenance)
400050
PCS., Printer, Plotter & Scanners (Supply & Installation)
400055
Computer Peripherals & Components (Supply & Installation)
400060
Computerization/It/Automation Studies/Consultancy
400080
Branded Super Computers, Mainframes And Minicomputer Systems – Supply, Installation & Maintenance
400090
Networking Components (Bridges, Gateways, Routers, Hubs, Analyzer) - Supply & Installation
400095
Structured Cabling/UTPS/Fiber Optics (Supply, Installation & Maintenance)
400120
Software Development
400125
Software – Standard And Miscellaneous
400130
IT Hardware Support Services – Hardware Engineers
400140
IT Software Support Services – Software Engineers
400150
Document Scanning & Indexing Services
WG CODE
WORK GROUP (WG) DESCRIPTION
GROUP 5.0 – EXPLORATION AND PRODUCTION RELATED SERVICES Group 5 covers Consultancy, Development, Installation and Maintenance Contracts related to Exploration and Production services: Page 33 of 154
CC01A-0-00000-PS-PRO-0004 Rev3 DSN : 848
PROJECT PROCEDURE CRITERIA FOR SELECTION OF SUBCONTRACTORS AND VENDORS
WG CODE
WORK GROUP (WG) DESCRIPTION
GROUP 5.0 – EXPLORATION AND PRODUCTION RELATED SERVICES 500010
Cartographics – Mapping
500020
Cartographics – Studies
500030
Cartographics – Topography
500040
Drilling - Offshore Development
500050
Drilling - Offshore Exploration
500060
Drilling - Onshore Development
500070
Drilling - Onshore Exploration
500075
Exploration Related Software
500080
Enhanced Oil Recovery Studies
500090
Geological Studies
500100
Gravitational Studies
500105
Hydrographic Inspection Survey
500110
Navigation & Positioning - Onshore
500120
Oil Exploration Related Studies - Others
500130
Reservoir Description Studies
500140
Reservoir Development Studies
500150
Reservoir Engineering Laboratory Software
500160
Reservoir Simulation Software
500170
Reservoir Studies – Others
500180
Reservoir Visualization Software
500185
Remote Sensing & Image Processing Services
500190
Seismic Data Acquisition
500200
Seismic Data Processing / Evaluation
500210
Seismic Data Interpretation
500220
Seismic Studies – Others
500230
Seismic Tape Copying
500240
Well – Design
500250
Well - Log Processing
500260
Well - Logging & Perforating
500270
Well – Testing
500280
Coiled Tubing Services Page 34 of 154
CC01A-0-00000-PS-PRO-0004 Rev3 DSN : 848
PROJECT PROCEDURE CRITERIA FOR SELECTION OF SUBCONTRACTORS AND VENDORS
WG CODE
WORK GROUP (WG) DESCRIPTION
GROUP 5.0 – EXPLORATION AND PRODUCTION RELATED SERVICES 500290
Redressing Completion Equipment & SSS Valves
500300
Wireline Services
WG CODE
WORK GROUP (WG) DESCRIPTION
GROUP 6.0 – PERSONNEL & MANPOWER SERVICES Group 6 covers Manpower Supply and other Personnel related Contracts and services: 6.1 – MANPOWER SUPPLY - ENGINEERS 610010
Architects
610020
Automation Engineers
610030
Civil Engineers
610040
Commissioning Engineers
610050
Computer Hardware Engineers
610060
Computer Software Engineers
610070
Construction Engineers
610080
Contracts Engineers
610100
Corrosion Engineers
610110
Cost Engineers
610120
Data Network Engineers
610130
Electrical Engineers
610135
Geophysicist Engineers
610140
QA/Qc/Inspection Engineers
610150
Instrumentation Engineers
610160
Operation Engineers
610170
Materials Engineers
610180
Mechanical Engineers
610190
Pipeline Engineers
610200
Process / Operation Engineers
610210
Project Engineers
610220
Purchasing Engineers/Buyers
610222
Reliability Engineers
Page 35 of 154
CC01A-0-00000-PS-PRO-0004 Rev3 DSN : 848
PROJECT PROCEDURE CRITERIA FOR SELECTION OF SUBCONTRACTORS AND VENDORS
WG CODE
WORK GROUP (WG) DESCRIPTION
GROUP 6.0 – PERSONNEL & MANPOWER SERVICES 610225
Quantity Surveyors Engineers
610230
Rotating Eqpt. Engineers
610240
HSE Engineers (Health, Safety & Environmental)
610245
System Analysts
610250
Telecommunication Engineers
610260
Planning / Scheduling Engineers
610270
Supplier Qualification Engineers
610900
Specialist Manpower
610980
Engineers - Various Disciplines (For Main Consultants Only)
6.2 – MANPOWER SUPPLY - SUPERVISORS/TECHNICIANS 620010
NDT Supervisor/Technicians
620020
Coded Welders
620030
Supervisors - Mech./Elec./Instr./Civil
620040
Technicians - Mech/Elec./Instr & Pipe Fitters
620045
Draftsman
620050
Painters
620060
Divers
6.2 – MANPOWER SUPPLY - SUPERVISORS/TECHNICIANS 620070
Programmers
6.3 – MANPOWER SUPPLY – NON TECHNICAL PERSONNEL 630010
Financial Accountants
630015
Legal Advisor
630020
Staff For Clerical/Administration Services
630030
Cleaning Supervisors/Officers
630040
Catering Supervisors/Officers
630042
Data Entry Clerks
630045
Doctors And Medical Staff
630050
Labours
630060
Drivers / Operators (For Fork Lift etc.)
6.4 – OTHER PERSONNEL CONTRACTS/SERVICES 640010
Management, Organisation & Development Consultancy Page 36 of 154
CC01A-0-00000-PS-PRO-0004 Rev3 DSN : 848
PROJECT PROCEDURE CRITERIA FOR SELECTION OF SUBCONTRACTORS AND VENDORS
WG CODE
WORK GROUP (WG) DESCRIPTION
GROUP 6.0 – PERSONNEL & MANPOWER SERVICES 640015
Procedure Manuals & Systems Consultancy
640020
Recruitment Services For Admin. & Non Technical Personnel
640030
Recruitment Services For Managerial Personnel & Technical
640040
Secondment Of Manpower
640050
Specialized Training Services
640060
Specialized Training Services – HSE
WG CODE
WORK GROUP (WG) DESCRIPTION
GROUP 7.0 – FINANCE & LEGAL SERVICES Group 7 covers all Studies and Consultancy Contracts related to Financial Services: 700010
Accounting Consultancy
700020
Assets/Inventory And Records Management
700030
Cost Engineering Consultancy
700040
Financial Audit
700045
Insurance Policies
700050
Contractual/Claims Consultancy
700052
Claims Consultants/Experts
700055
Finance Related Policies & Procedure Manuals
700060
System Audit
700070
Risk Management & Insurance Consultancy
710080
Legal Services Consultancy
WG CODE
WORK GROUP (WG) DESCRIPTION
GROUP 8.0 – MARKETING SERVICES Group 8 covers all Studies and Consultancy Contracts related to Marketing Services: 800010
Marketing Studies
800020
Ship Construction Supervision
800030
Ship Loading Supervision
800040
Ship Management
Page 37 of 154
CC01A-0-00000-PS-PRO-0004 Rev3 DSN : 848
PROJECT PROCEDURE CRITERIA FOR SELECTION OF SUBCONTRACTORS AND VENDORS
WG CODE
WORK GROUP (WG) DESCRIPTION
GROUP 9.0 – ADMINISTRATION & GENERAL SERVICES Group 9 covers General Services related to Administration Services including maintenance for Offices, Buildings, Villas, Medical, etc.: 9.1 – CATERING SERVICES 910020
Catering Services Clubs, Offices etc. – Operation & Maintenance
9.2 – LEASING SERVICES 920010
Leasing - Buses/Cars
920020
Leasing - Industrial Areas
920030
Leasing - Office Equipments/Machines
920040
Leasing – Transportation & Material Handling Equipments
9.3 – Medical & Hse Services 930010
Medical Services (Pharmaceutical etc.)
930020
Medical Services – Management Of Hospitals/Clinics
930030
Medical Equipment – Maintenance
930040
Studies On Health, Safety & Environment (HSE)
930045
Study On Oil Spills/Marine Environment Protection
930047
Harbour Pollution Control/Skimming/Debris Clean-Up Services
930050
Medical Services – Dental Clinics
9.4 – OFFICES, BUILDINGS AND VILLAS MAINTENANCE 940010
Air Conditioning – Central Plant (Chilled Water System) - Supply & Inst.
940015
Air Conditioning – Central Plant (Chilled Water System) Operation & Maint.
940020
Air Conditioning – Package/Split/Window Type - Supply & Inst.
940022
Air Conditioning – Package/Split/Window Type (Operation & Maint.)
940023
Cold Storage Construction & Maintenance
940025
Centralized Cooking Gas System
940028
Fire Alarm & Detection System - Domestic
940030
Plumbing & Sanitation - Supply & Inst.
940032
Plumbing & Sanitation - Maintenance
940040
General Building Maint. (Civil, Elect. & Plumbing)
940050
Kitchen Cabinets & Fittings – Supply, Installation & Maint.
940060
Lifts / Elevators, Erection/Maintenance
940070
Office Equipments, Furniture & Fixtures - Supply & Fixing
940072
Office Equipment - Maintenance Page 38 of 154
CC01A-0-00000-PS-PRO-0004 Rev3 DSN : 848
PROJECT PROCEDURE CRITERIA FOR SELECTION OF SUBCONTRACTORS AND VENDORS
WG CODE
WORK GROUP (WG) DESCRIPTION
GROUP 9.0 – ADMINISTRATION & GENERAL SERVICES 940075
Office Refurbishment & Furnishings - Projects
940080
Partition (Metal) And Aluminium Claddings
940090
Portable Buildings (Caravan, Rigid, Butler Buildings)
940100
Potable Water Tankers For Buildings & Villas
940102
Hire Of Portacabins/Caravans/Temporary Accommodation Units
940105
Potable/Bottled Water And Water Cooler Services
940110
Public Address Systems
940120
Rubber Floorings (Sports, General)
940130
H.T. Power Station/Substation/Switch Gear/Transmission Network - Supply & Inst.
940140
H.T. Power Station/Substation/Switch Gear/Transmission Network - Maintenance
940150
LV/MV Distribution Network, Panels, Protective Devices etc. - Supply & Inst.
940160
LV/MV Distribution Network, Panels, Protective Devices etc. - Maintenance
9.5 – TRANSPORTATION SERVICES 950010
Light Vehicle Maintenance
950020
Shifting Of Office Partitions Along With Doors
950030
Transport Maintenance/Repair Services
950040
Transportation – Office Furniture/Equipment & Household
950050
Transportation – Personnel
9.6 – CLEANING SERVICES 960005
Cleaning/Protection Of Carpets/Upholstery/Curtains
960010
Cleaning – Internal Cleaning Of Buildings
960015
Outdoor Cleaning & Road Sweeping
960020
Cleaning – HQ & Complex
960030
Cleaning – Public Health & Pest Control
960035
Janitorial And Hygiene Services
960040
Cleaning - Site Clearance/ Removal Service
960045
Laundry Services
960050
External Building Cleaning Using Cradles
960060
Water Tanks Domestic (G.R.P., etc.) – Cleaning / Repair / Replacement / Renewal
960070
Tankers For Sewage Removal
9.7 – OTHER GENERAL SERVICES Page 39 of 154
CC01A-0-00000-PS-PRO-0004 Rev3 DSN : 848
PROJECT PROCEDURE CRITERIA FOR SELECTION OF SUBCONTRACTORS AND VENDORS
WG CODE
WORK GROUP (WG) DESCRIPTION
GROUP 9.0 – ADMINISTRATION & GENERAL SERVICES 970010
Advertisement
970015
Photography And Videography Services
970020
Auctioning & Material Disposal
970030
Automatic Control Doors & Barriers - Inst. & Maint.
970050
Access Control Systems - Inst. & Maint.
970060
Document/Office Automation Systems
970070
Education & School Management
970080
Education & Training
970090
Fiber Glass Products Maintenance Services
970100
Insulation – Acoustic Etc. For Bldgs.
970110
Landscaping/Irrigation Works
970120
Lock-Smithy Services
970130
Marble Suppliers and Fixers
970135
Memberships - Clubs etc.
970140
Painting Services – Buildings
970160
Printing & Publishing
970170
Safety And Security - Buildings
970180
Sand/Right Of Way Clearing
970190
Spray Painting Of High Quality - Offices
970200
Technical Documentation Services
970205
Drafting Services
970210
Water Tanks Linings – Buildings
970230
Courier Services
970240
Travel & Tourism Services
970250
Security & Surveillance Services
9.7 – OTHER GENERAL SERVICES 970260
Boats : General Services/Maintenance
970270
Hotels: Accommodation, Banqueting etc.
970280
Recreational Services (Hotels, Clubs etc.)
970290
Indoor/Outdoor Plants, Garden - Maintenance
Page 40 of 154
CC01A-0-00000-PS-PRO-0004 Rev3 DSN : 848
PROJECT PROCEDURE CRITERIA FOR SELECTION OF SUBCONTRACTORS AND VENDORS
ATTACHMENT 5: PRE-QUALIFICATION REQUIREMENT FOR SUBCONTRACTORS
Method A: Approved List by ADNOC and its Operating Companies (OPCOs) Received Registration/Qualification number of Sub-Contractors holding current positive qualification with ADNOC and its Operating Companies, specifying with which Company they are qualified/registered for each relevant work group experience. a. b.
c.
Subcontractors qualified with Takreer/Gasco/Borouge will be assumed as prequalified (code Q) for the project for the same commodity code; Subcontractors holding current valid qualification with ADNOC or other OPCOs (different from the above) will need to be prequalified during the EPC execution by the awarded Contractor but exempted from the commercial section of the prequalification and subject to Company approval; Subcontractors without current qualification will all be classified as TBQ in full by the Contractor during execution and subject to Company review and approval.
Method B: Evaluating Technical and Commercial Information Technical - Experience and Capability Requirements Brief description of the organisation structure (both global and local) and resources (offices, manpower and equipment); Details of direct experience of similar jobs in the last five years, tabulating the following:
Name of the project
Project scope
Project value
Ultimate client
SUBCONTRACTOR’s scope and value
Completion date.
Current workload and availability of resources to comply with schedule requirements; Copy of Quality Assurance Certification; Evidence of documented Health, Safety and Environmental Systems and Procedures, such as copy of ISO 14001, an index of the HSE manual, etc. Evidence of Safety Record. Page 41 of 154
CC01A-0-00000-PS-PRO-0004 Rev3 DSN : 848
PROJECT PROCEDURE CRITERIA FOR SELECTION OF SUBCONTRACTORS AND VENDORS
Commercial Copies of Balance Sheets for the last three years; Details of outstanding litigations, if any; Typical Insurance Coverage values related to workmen compensation, employer’s liability, third party liability, plant and equipment, etc; Copy of valid Registration Certificate from Abu Dhabi Chamber of Commerce & Industry covering the services to be provided; Copy of Oil and Gas Classification for above; Copy of valid CONTRACTOR Classification from Abu Dhabi Planning Department, if available; Copy of valid Consultant Registration Certificate from Abu Dhabi Planning Department (for Consultant only), if available; Copy of Registration with COMPANY.
Page 42 of 154
CC01A-0-00000-PS-PRO-0004 Rev3 DSN : 848
PROJECT PROCEDURE CRITERIA FOR SELECTION OF SUBCONTRACTORS AND VENDORS
ATTACHMENT 6:
NOMINATED/RESTRICTED VENDOR LIST
ATTACHMENT 6.1 Vendor List for Standardised Equipment Please refer to Attachment 11 for Vendor List for Standardised Equipment.
ATTACHMENT 6.2 Vendor List for Licensor Equipment (a) Where a LICENSOR specifies mandatory VENDORS, CONTRACTOR shall utilise those VENDORS, and the VENDORS listed in this Attachment 6.2 are classified by COMPANY as Class “Q” (refer to Section 8.2.3 above). Nominated/Restricted Vendor List for Licensor Equipment
SL. Item Description
Vendor Name
1 Platforming Unit Catalyst Regeneration Control System 2 Parex Unit Rotary Valve and peripheral equipment 3 Parex Unit Adsorbent Chamber Control System 4 Parex Unit Adsorbent Chamber internals 5 Packinox 6 High Capacity MD trays (UOP MD and Slotted Sieve tray decks, downcomers, installation hardware and distributors; Raschig SuperRings, distributors, bed limiters, bed supports and installation hardware) 7 Hi Flux tubing
UOP UOP UOP UOP Alfa Laval
UOP
UOP
(b) Where a Licensor recommends VENDORS, but those VENDORS are not mandatory, CONTRACTOR shall proceed in accordance with Section 8 above including checking if VENDOR is pre-approved for the GOODS (listed in Attachment 7 below) and if necessary, seeking APPROVAL for non-approved VENDORS in accordance with this Procedure.
Page 43 of 154
CC01A-0-00000-PS-PRO-0004 Rev3 DSN : 848
PROJECT PROCEDURE CRITERIA FOR SELECTION OF SUBCONTRACTORS AND VENDORS
ATTACHMENT 6.3
Nominated/Restricted Vendor List Other Goods
SL. Item Description
1
ICS GOODS
Product Group No.
318510
Vendor Name
Location
Honeywell Middle East LtdAbu Dhabi Abu Dhabi
Page 44 of 154
Local Agent Not applicable
CC01A-0-00000-PS-PRO-0004 Rev3 DSN : 848
PROJECT PROCEDURE CRITERIA FOR SELECTION OF SUBCONTRACTORS AND VENDORS
ATTACHMENT 7:
VENDOR LIST FOR MAJOR GOODS VENDOR LIST FOR MAJOR GOODS
S/NO
1
2
Material Group Description
Vendor Name
Country
Comments
Vendor Name
Country
Comments
Structural steel frame
Gas/liquid incineration plant
Al Zamil
KSA
Ak&P_Factory Abdulla B. AlKhalita
KSA
Geyad For Commerce
KSA
Energya Steel
KSA
Contech
UAE
Icom Engineering
ITALY
Anors
ITALY
Cleveland Bridge
UAE
NPCC
UAE
Tiger Steel
UAE
William Hare
UK
Severfield Reeve International
UK
AIC - Arabian International Co.
KSA
John Zinc
USA
Zeeco
USA
Hidada Hanmaek Heavy Industry Kook Jae Metal Younghwa Engineering Thai Herrick Co. Ltd. Emirates Building System Icom S.R.L.
Han Yang Industry Co., Ltd. Hwaseong Plant Flare Industry Callidus Hamworthy Technip KTI
Page 45 of 154
KSA KOREA KOREA KOREA THAILAND UAE ITALY
KOREA KOREA USA USA ITALY ITALY
CC01A-0-00000-PS-PRO-0004 Rev 3 DSN : 848
PROJECT PROCEDURE CRITERIA FOR SELECTION OF SUBCONTRACTORS AND VENDORS
3
Thermal Oxidizer Hamworthy Callidus Durr Zohn Zink
GERMANY USA ITALY
Itas
ITALY
Nao Alstom Hitachi
Carbon steel columns dia