Tablet Coater System

Page 1 of 26 Doc ID: Tablet Coater System URS Rev.0 June 2004

USER REQUIREMENTS TEMPLATE FOR A TABLET COATER SYSTEM

JOINT EQUIPMENT TRANSITION TEAM

JETT

USER REQUIREMENTS SPECIFICATION

Tablet Coater System

Page 2 of 26 Doc ID: Tablet Coater System URS Rev.0 June 2004

REVISION HISTORY Rev.

Date

Approval

0

06-Jun-2004

Vince Miller (JETT)

Revision Summary Initial issuance of the URS for industry use.

JOINT EQUIPMENT TRANSITION TEAM

JETT

USER REQUIREMENTS SPECIFICATION

Tablet Coater System

Page 3 of 26 Doc ID: Tablet Coater System URS Rev.0 June 2004

TABLE OF CONTENTS 1.0

INTRODUCTION..............................................................................................4

2.0 OVERVIEW........................................................................................................5 2.1 USE....................................................................................................................5 2.2 PRODUCT CLASSIFICATION.............................................................................5 2.3 INTENDED USE..................................................................................................5 2.4 CAPACITY.........................................................................................................6 2.5 PRODUCTION....................................................................................................6 3.0 OPERATIONAL REQUIREMENTS...............................................................6 3.1 CAPACITY.........................................................................................................6 3.2 PROCESS REQUIREMENTS...............................................................................6 3.3 PROCESS CONTROL.........................................................................................6 3.4 FUNCTIONS.......................................................................................................7 3.5 DATA AND SECURITY.......................................................................................9 3.6 ENVIRONMENT...............................................................................................12 4.0 CONSTRAINTS...............................................................................................15 4.1 MILESTONES AND TIMELINES.......................................................................15 4.2 EQUIPMENT CONSTRAINTS...........................................................................16 4.3 COMPATIBILITY AND SUPPORT.....................................................................16 4.4 AVAILABILITY................................................................................................18 4.5 PROCEDURAL CONSTRAINTS.........................................................................18 4.6 MAINTENANCE...............................................................................................20 5.0 LIFE-CYCLE....................................................................................................20 5.1 DEVELOPMENT...............................................................................................20 5.2 TESTING..........................................................................................................20 5.3 DELIVERY.......................................................................................................21 5.4 SUPPORT.........................................................................................................22 6.0

GLOSSARY......................................................................................................23

7.0

REFERENCES.................................................................................................25

8.0

APPROVAL.......................................................................................................26

JOINT EQUIPMENT TRANSITION TEAM

USER REQUIREMENTS SPECIFICATION

JETT

Tablet Coater System

Page 4 of 26 Doc ID: Tablet Coater System URS Rev.0 June 2004

Project No.: Insert the unique project number associated with this particular URS. Document No.: Insert the Document Identification Number and Revision. Document Description: Insert description of document, e.g. PURE STEAM GENERATOR, JETT Example User Requirements Specification.

1.0 INTRODUCTION Tablet coating systems vary in function and purpose. There are several uses of coaters:       

Strengthening coat De-dust/flavor mask Color and elegance Active drug coats Protective Timed Release Sugar coat

These systems range from a simple aqueous (water based) coat, to drug layers, and solvent based coating systems. Aqueous systems typically have less complexity, whereas active drug coating layers have a need for more instrumentation and controls, and lastly solvent based systems employ even more instrumentation and controls required primarily for safety reasons (explosion protection). Also, the product itself may pose environmental and exposure hazards that need to be dealt with to implement the installation of the coating system. Lastly, the utilities and space involved needs to be discussed prior to purchasing the equipment. Obviously, the actual equipment size is but a small part of the entire scope of work necessary to implement a larger coating operation. Small coaters can be self-contained, depending upon the application. The unit and its support equipment must be able to be installed in current building facilities. This document encompasses the normal range of coater operations. Technology improvements and new applications may require deviation from this template. This is to be utilized as a guide for the user to answer the majority of questions involved in specifying and using the equipment. Addendums may be used to round out the requirements. A typical Aqueous Process involves the following steps:

JOINT EQUIPMENT TRANSITION TEAM

USER REQUIREMENTS SPECIFICATION

JETT

Tablet Coater System

Page 5 of 26 Doc ID: Tablet Coater System URS Rev.0 June 2004

 Dedust/Preheat (blowers on, pan in jog mode, heat applied, solution recirculating)  After reaching a preset exhaust temperature indicating tablet bed is warm:  Spray Solution to Tablets (Pan in run mode)  After reaching desired weight gain on tablets:  Cooldown (Heat off, Pan in jog mode)  Unload Tablets

2.0 OVERVIEW This document encompasses the normal range of equipment operations. 2.1 Use The coater shall be used primarily for:       

Strengthening coat De-dust/flavor mask Color and elegance Active drug coats Protective Timed Release Sugar coat

2.2 Product Classification The products being used on the machine are of:    

Low active (vitamins, supplements) Medium active (eg. Asprin) Highly active (eg. Morphine) Exclusive (eg. Penicillin)

2.3 Intended use The coater will be used for (Check all that apply):    

Aqueous Low LEL (Lower Explosion Limit) Solvents High LEL Solvents Sugar coat

JOINT EQUIPMENT TRANSITION TEAM

USER REQUIREMENTS SPECIFICATION

JETT

Tablet Coater System

Page 6 of 26 Doc ID: Tablet Coater System URS Rev.0 June 2004

2.4 Capacity The capacity of the machine is to be:      

Extremely small (1 liter to 6 liters) Small (7 liters to 30 liters) Medium (30 liters to 60 liters) Large (60 to 100 liters) Larger (100 to 150 liters) Largest (150, 170, and above)

2.5 Production The coater shall be capable of producing per 8-hour shift.

(unit)of coated tablets

3.0 OPERATIONAL REQUIREMENTS 3.1 Capacity    

Range of products Commodities to be used (i.e., tablets, etc.) Processed Materials to be used or involved Production rates

3.2 Process Requirements  

Quality of products and concentrations Product limitations (i.e. temperature, humidity, pH, etc.)

3.3 Process Control 

Measurement Range (Accuracy of instrumentation desired) Temperature: 

+/- 2C (Standard)



+/- 1C (Special)



+/- 0.5C (Custom)

Airflow: 

+/- 5% of Full Scale (Standard)

JOINT EQUIPMENT TRANSITION TEAM

USER REQUIREMENTS SPECIFICATION

JETT

Tablet Coater System 

Page 7 of 26 Doc ID: Tablet Coater System URS Rev.0 June 2004

+/- 2.5% Of Full Scale (Special)

Pan Pressure: 

+/- 10% of Full Scale (Standard – Negative pan pressure maintained)

Solution Flowrate: 

+/- 5% of Full Scale no feedback (Standard Peristaltic)



+/- 5% of Full Scale with feedback (Peristaltic with flowmeter) +/- 2% of Full Scale no feedback (Standard Gear Pump)

  

+/- 2% of Full Scale with feedback (Gear pump with flowmeter) +/- 1% of Full Scale with feedback (Gear pump with weigh scale)

Inlet Air Humidity: 

Not critical



Dry at least to



Within

C Dew point

C to C Dew point

3.4 Functions 3.4.1

Operation

The system shall operate with a minimum of operator involvement (loading, unloading, gun calibration, monitoring of conditions). Operation shall be safe both from an operator and environmental standpoint. The system shall be operated locally at the Coater machine itself. Control system requirements 

Manual only



Manual/automatic

Cleaning requirements

JOINT EQUIPMENT TRANSITION TEAM

USER REQUIREMENTS SPECIFICATION

JETT

Tablet Coater System 

Hand-Wash



Auto-Wash

Page 8 of 26 Doc ID: Tablet Coater System URS Rev.0 June 2004

 Special Requirements: 3.4.2 Power failure/Recovery In the event of a power failure, the system shall protect product against damage. The system will stop automatically upon loss of electricity, air, or other major utility and will require operator intervention to re-start. Depending upon the options chosen in the overview section, the system will:  



3.4.3

Manually re-start based on operator inputs. (Operator initiates power recovery sequence) Re-start based on last state before loss of power. (System runs through power recovery sequence when operator start signal is given) If there is an automatic batch reporting system, the information shall be retained in the event of a power failure (A UPS is required for automatic batch reporting systems). Emergency Stop

The system shall have an emergency stop (E-Stop) function designed to stop all physical movement of the machinery immediately. The E-Stop buttons shall be located in easily accessible areas around the machine as required by local safety standards. 3.4.4

Alarms and Warnings

“Critical alarms” shall take action via interlock(s) and/or operator procedural response to shut the equipment down and notify the operator of the condition(s). The operator shall be required to acknowledge the alarm before the alarm can be reset and the system restarted. Once the alarm is reset, the operator may restart the system. “Informational Messages” shall notify the operator and take no further action. The Equipment shall have the following critical alarms, warnings and informational messages:

JOINT EQUIPMENT TRANSITION TEAM

Page 9 of 26

USER REQUIREMENTS SPECIFICATION

JETT

Doc ID: Tablet Coater System URS Rev.0 June 2004

Tablet Coater System

Alarm or Informational Message Emergency Stop

Critical Alarm

NonCritical Alarm

Information al Message

Response Operator Interlock Procedur (s) al

X

X

(“Programmable Logic ControllerOperatorInterface Terminal”)

X

X

Control Power Fault

X

X

Main Air Fault

X

X

Inlet Air Temperature High Fault

X

X

Inlet Air Temperature Low Fault

X

X

Inlet Airflow Low Fault

X

X

Plugged Gun (low flow or solution pressure high)

X

X

Nozzle Airflow Low Fault

X

X

Inlet Dewpoint High Fault

X

X

PLCOIT Communication Watchdog

Inlet Dewpoint Low Warning Motor Faults

X

X

X

X

Pan Pressure High Warning

X

X

Pan Pressure Low Warning

X

X

PLC Battery Low Warning

X

The list of critical alarms in the table is not intended to be a comprehensive list of all alarms for the system. A complete alarm list will be developed and included in the Functional Specification document. For a standard equipment type application, request the supplier to submit the complete alarm list and differentiate between critical and non-critical alarms. Note: Consider documenting how “critical and non-critical” criteria were determined. 3.5 Data and Security Controls provided with Data Collection systems intended for use in the manufacture of pharmaceutical products shall be required to comply with

JOINT EQUIPMENT TRANSITION TEAM

X

USER REQUIREMENTS SPECIFICATION

JETT

Tablet Coater System

Page 10 of 26 Doc ID: Tablet Coater System URS Rev.0 June 2004

21 CFR Part 11 . The supplier shall stipulate the methods by which this criterion is met. 3.5.1

User Interfaces

Access to all Input/Output values and system status bits shall be provided through a data-communication link. Security for data and operator access is provided by (User ID/Password, Card Reader, Biometric (Fingerprint, eye scan, voice recognition, etc.), etc.). List the application that provides security functions to the system, either internal via the local OIP or external via a SCADA system, etc. 3.5.2

User Interface with Supervisors and Operators

The CONTROL PLATFORM system shall include interfaces with the Operator and Supervisor that ensure easy, safe, and reliable operation. An operator-interface panel shall be provided and mounted near the equipment or on the equipment. This panel shall provide the necessary switches, indicators, and devices to operate the equipment. 3.5.2.1

Language requirements Specify language in which information will be displayed (i.e. English, Spanish, German, Bilingual, etc.)

3.5.2.2

Display Requirements: State the system of measurement that will be used (English or Metric (S.I.)).

Parameter

Unit(s) of measurement

Format

Inlet Temperature

(###.#) units

Define the units

Exhaust Temperature

(###.#) units

Define the units

Inlet Airflow

(###.#) units

Define the units

Pan Pressure

(###.#) units

Define the units

Solution Flowrate

(###.#) units

Define the units

Total/Setpoint Spray Amount

(###.#) units

Define the units

Nozzle Airflow

(###.#) units

Define the units

Alarms and Warnings

N/A

N/A

JOINT EQUIPMENT TRANSITION TEAM

Page 11 of 26

USER REQUIREMENTS SPECIFICATION

JETT

Doc ID: Tablet Coater System URS Rev.0 June 2004

Tablet Coater System Parameter

Unit(s) of measurement

Format

System Status

N/A

N/A

Product Temperature

(###.#) units

Define the units

Inlet Dewpoint

(###.#) units

Define the units

Other (Specify)

(###.#) units

Define the units

3.5.3

Interface with Other Equipment

The control system shall include the interfaces necessary to facilitate operation and configuration. For example:  shall be provided.

An RS-232 communications port

 shall be provided.

A Modem communications port

 A high-speed configuration/monitoring connection shall be provided. The port shall be capable of being configured to communicate the following data to a supervisory control and data acquisition (SCADA) node (Note: the SCADA system shall be supplied and installed by the User): 

All process variables



Alarms and Warnings.

 System Status (e.g. “off,” “ on,” “standby” states, etc.).  3.5.4

Other

(specify)

Security Levels

List the total number of different access levels that will be required. Provide a general description of the access rights for each level (screen navigation, operational control, control loop variable manipulation, alarm setpoint manipulation, etc.). 3.5.5

Data Collection

Consider any archiving and reporting requirements here. 

None



Recorder

JOINT EQUIPMENT TRANSITION TEAM

Page 12 of 26

USER REQUIREMENTS SPECIFICATION

JETT

Doc ID: Tablet Coater System URS Rev.0 June 2004

Tablet Coater System 

Process Printout

 Historical Trending

Electronic process printout,

 Electronic process printout, Historical Trending and interface to company network The following shall be recorded:

3.6



Inlet Temperature



Exhaust Temperature



Inlet Airflow



Pan Pressure



Solution Flowrate



Total/Setpoint Spray amount



Nozzle Airflow



Alarms and warnings

 etc.)

System Status (ready, running,



Product Temperature



Inlet Dewpoint



Other:

(Specify)

Environment Provide details of the physical environment in which the Tablet Coater System will be operated. 3.6.1

Layout

Allocated floor space for the equipment is _____ inches by ________ inches with at least a _______inch corridor around the periphery for the equipment. Vertical clearance is _________ inches. See attached drawing #________________________ (if applicable). Layout is specific to the size equipment being used and system requirements of the equipment.

JOINT EQUIPMENT TRANSITION TEAM

USER REQUIREMENTS SPECIFICATION

JETT

Tablet Coater System 3.6.2 

Page 13 of 26 Doc ID: Tablet Coater System URS Rev.0 June 2004

Physical Conditions Room Explosion Classification List the critical explosion requirements for the room. 

Room will be non-hazardous

 Room will be Class I Div II (Zone 2) (explosive atmosphere present at known times)  Room will be Class I Div I (Zone 1) (explosive atmosphere present at all times) 

Environmental Classification List the critical air quality requirements for the environment.  Class 100, 10,000, or 100,000 (Federal Standard 209E)  ISO Class 5, 7, or 8 (ISO 14644-1 and ISO 14644-2)  Class A, B, C, or D (The Rules Governing Medicinal Products in the European Union – Annex 1)







Directional airflow



Airflow velocity



Number of air changes



Particle Ingress

Biohazard Level List the critical biohazard level requirements for the environment. 

BL-1



BL-2

Rating of enclosures List the rating requirements for enclosures in the environment. 

NEMA 1 (Open)



NEMA 12 (Oil tight)



NEMA 4 (Wash down)



NEMA 4X (Wash down and non-Corrosive)

JOINT EQUIPMENT TRANSITION TEAM

USER REQUIREMENTS SPECIFICATION

JETT

Tablet Coater System 3.6.3

Page 14 of 26 Doc ID: Tablet Coater System URS Rev.0 June 2004

Cleaning Requirements



Hand-Wash



Auto-Wash

 Steam Clean 3.6.4 Sterilization Requirements Describe the type of sterilization that will be performed on or within the Tablet Coater System and the duration the Tablet Coater System will be exposed. 3.6.5

Intended Operating Environment:

Describe the type of operating environment that the Tablet Coater System will be exposed to following installation. For example: The Tablet Coater System shall be located in a GMP environment with a temperature range of 15 to 25 °C, non-condensing humidity. Vibration levels in operating environment are The Seismic Zone in the operating environment is . (Remainder of Page Intentionally Left Blank)

JOINT EQUIPMENT TRANSITION TEAM

JETT

USER REQUIREMENTS SPECIFICATION

Tablet Coater System

Page 15 of 26 Doc ID: Tablet Coater System URS Rev.0 June 2004

4.0 CONSTRAINTS 4.1 Milestones and Timelines Based on the model outlined below, establish the project milestones with a timeline:

“BASELINE” EQUIPMENT ACQUISITION MODEL SUPPLIER

USER/(CONSULTANT if applicable)

User Audit of Supplier

Master Validation Plan Equipment Validation Plan • Explanation to Supplier (Living Document)

User Requirements Specification (URS) (Living Document)

Proposal Analysis

• User Initiates

RFQ

Proposal

RFQ

• Quality Plan • Project Plan

l o sa p o Pr

P.O.

Approval Review Functional Specification

Functional Specification (Traceable to URS)

Detailed Design Documentation (traceable to Functional Specification)

Review Detailed Design Review System Acceptance Test Specifications Integrate with Validation Documentation (as appropriate)

Approval

System Acceptance Test Specifications (IQ/OQ) • Hardware • Software

Approva l

System Acceptance Testing and Results (User Witness Optional) Maintenance & Support Documentation

JOINT EQUIPMENT TRANSITION TEAM

Page 16 of 26

USER REQUIREMENTS SPECIFICATION

JETT

Doc ID: Tablet Coater System URS Rev.0 June 2004

Tablet Coater System

4.2 Equipment Constraints Describe the operating constraints that the [equipment/system] will be required to meet. For example: 4.2.1

Environmental Conditions

The Tablet Coater System is to be used at the following environmental conditions: Altitude ________ ft above sea level 4.2.2

Process air enters in from… C

Indoor Temperature: Outdoor Temperature: Minimum:

C

Maximum:

C

Climatic conditions:

4.2.3

Winter dry bulb

C

Winter wet bulb

C

Summer dry bulb

C

Summer wet bulb

C

Equipment Generated Vibration

The maximum allowable equipment vibration generated during operation is . 4.3 Compatibility and Support Include any requirements for compatibility with other User systems. In the examples provided below, fill in blanks with the appropriate information. Delete areas that are not applicable to this application. 4.3.1

CONTROL PLATFORM Controllers

The Supplier shall utilize Control Platform Controllers that shall include a communications port. The Supplier shall provide documentation that the program (embedded software) was developed and coded utilizing program development and documentation software.

JOINT EQUIPMENT TRANSITION TEAM

USER REQUIREMENTS SPECIFICATION

JETT

Tablet Coater System

Page 17 of 26 Doc ID: Tablet Coater System URS Rev.0 June 2004

The supplier shall indicate the use of custom or “bespoke” code within the equipment, and shall supply licensing of the custom code for the life of the equipment. An escrow agreement shall be required in the event the supplier cannot support the supplied custom software any longer. In such instances, the source code and all information regarding the source code shall be given to the user in a timely fashion to prevent downtime of the equipment. 4.3.2

Preferred Vendor List

If necessary attach any critical preferred vendors. Refrain from driving the supplier into customizing his equipment package. If the vendor wishes to deviate from the Preferred Instrumentation List, a listing of the proposed components and instrumentation sub-vendors indicating type and model numbers shall be submitted with the quotation, along with an explanation of why the deviation is recommended. 4.3.3

Utilities

The utilities and space involved needs to be discussed prior to purchasing the equipment. Obviously, the actual equipment size is but a small part of the entire scope of work necessary to implement a larger system. The unit and its support equipment must be able to be installed in current building facilities. The User shall ensure that the following utilities are available and that the utility supply lines and piping are terminated with fittings or connections, which are compatible with those described on the Customer Connection Drawings. The Supplier shall specify utility data, which is marked with a triangle. Utility data, which are not specified or marked with a triangle, shall be brought to the attention of the User. These data shall be specified (by the User or the Supplier) and shall be approved by both the User and the Supplier before system design begins. Base Utilities Worksheet

Related Discharges  Volume  pH  Temperature

JOINT EQUIPMENT TRANSITION TEAM

USER REQUIREMENTS SPECIFICATION

JETT

Tablet Coater System

Page 18 of 26 Doc ID: Tablet Coater System URS Rev.0 June 2004

 Materials

Electricity  ______ VAC ____ Hertz  Phases  Amperage  Uninterruptible Power Supply (Define Use)

Control Air  Pressure For example: _______ PSIG (must be clean, dry ISA instrument quality air, capacity to be determined by size of equipment). Recommend at least 90 PSIG constant air pressure for all equipment, unless specified.

Other Utility Requirements Provide details regarding any other utility systems that are required to support operation of the equipment/system. 4.4 Availability The Tablet Coater System is intended to be operated [Continuously, Regularly, __ hours per day, __ hours per week]. Operation of the Tablet Coater System shall be suspended, and the system shall be available for preventative maintenance or routine service [__ hours per week, __ continuous hours per week, __ days per month, __ weeks per year]. 4.5 Procedural Constraints 4.5.1

Product Contact Materials

Describe any local procedural requirements such as local standards, which must be adhered to if applicable. All piping welds and product contact welds shall meet ASME and 3A specification requirements. Product contact metal to be (316L Stainless Steel, 316 Stainless Steel, 304 Stainless Steel, etc.)

JOINT EQUIPMENT TRANSITION TEAM

USER REQUIREMENTS SPECIFICATION

JETT

Tablet Coater System

Page 19 of 26 Doc ID: Tablet Coater System URS Rev.0 June 2004

List critical requirements for surface finish, roughness, etc.. Other standards are attached. The Supplier shall adhere to the indicated sections only. 4.5.2

Product in Contact with Materials

All product contact parts should be considered. The Tablet Coater System will be used for (aqueous solutions, low LEL (lower explosion limit) solvents, high LEL solvents, etc.). 4.5.3

Noise Level Constraints

Insert your own noise level constraint requirements here. For example: The noise level generated during operation of the Tablet Coater System will not exceed 85 dB from 3 feet away. 4.5.4

EMI / RFI levels are:

Insert your own electrical and radio frequency noise immunity and emission requirements here. For example: The Tablet Coater System [will/will not] be used in an area where two-way radio communication devices are in operation. The Tablet Coater System shall meet CE requirements for electrical noise immunity and emissions. 4.5.5

Containment

4.5.5.1

Explosion Protection This section is only valid if the product being used is highly reactive. Insert containment guidelines here (i.e. Bar Construction with isolation and suppression, 10 Bar construction with isolation only, Closed-Loop Nitrogen System, etc.).

4.5.5.2

Product This section is only valid if the product being used is highly reactive. The system comes standard with inlet prefilters and HEPA prefilters. Insert containment of product guidelines here (i.e. HEPA filtration of exhaust, HEPA filtration with bag in-bag out isolation of exhaust, scrubber system, cyclone separator system, thermal oxidizer system, evaporator, etc.).

JOINT EQUIPMENT TRANSITION TEAM

USER REQUIREMENTS SPECIFICATION

JETT

Tablet Coater System 4.5.6

Page 20 of 26 Doc ID: Tablet Coater System URS Rev.0 June 2004

Labeling

All equipment and control wiring shall be labeled and identified. 4.6 Maintenance Describe the expected hardware and software maintenance support including: ease of maintenance, expansion capability (software only), likely enhancements (software only), expected lifetime and long-term support. System shall be maintained on a schedule as indicated by the supplier. Supplier is to provide (at minimum) the following maintenance instructions: 1. 2. 3.

4.

All sub-systems provided (Maintenance and operation manuals of vendor equipment) A comprehensive lubrication list and recommended lubrication schedule A comprehensive recommended maintenance (regular recommended inspection intervals, wear points, recommended spare parts list) Supplier shall supply ______ Copies of Operation, Installation, Maintenance and de-commissioning manuals

5.0 LIFE-CYCLE 5.1 Development If S88 is to be applied to the equipment being acquired, it should be referenced in this section of the document. The Supplier shall provide a Quality and Project Plan as part of their proposal. The Supplier shall have a quality system in place. Internal quality procedures shall be available for the User’s review. The Supplier shall provide a Project Manager for the project to provide a single communication point with the User. The project shall utilize the GAMP methodology when developing the system and documentation. 5.2 Testing Describe the Supplier testing requirements. Reference the Validation Test Plan, Factory Acceptance Test, special tests, etc. This section should also include required amount of demonstrated run time, any special materials necessary to complete testing, integration testing, etc.

JOINT EQUIPMENT TRANSITION TEAM

USER REQUIREMENTS SPECIFICATION

JETT

Tablet Coater System

Page 21 of 26 Doc ID: Tablet Coater System URS Rev.0 June 2004

In order to verify system performance, the User shall witness the execution of the Factory Acceptance Test procedures. The Supplier shall notify the User _______ weeks in advance of the start of this test. The Factory Acceptance Test Specification shall be submitted to the User for review and approval prior to execution. A minimum of _______ weeks shall be allowed for the User to review and to comment and/or approve the Factory Acceptance Test Specification. Refer to the Equipment Validation Plan for applicable procedures. 5.3 Delivery The [equipment/system], with all options, equipment, and the documentation listed below, shall be delivered to the User’s receiving dock. 5.3.1

Documentation

Installation, operation, and maintenance instruction documentation for the system shall be developed to a level that is comprehensible to a high school graduate. The Supplier shall use the formats described in the GAMP Supplier Guide, Current Version, to produce the documentation. The Supplier shall provide the documentation for preliminary review. The Supplier shall provide documentation reflecting “asbuilt” condition with final delivery. All final documents shall be shipped with transmittals that identify them as contractually required documents. All final documents and drawings shall reflect “as-built” condition. All documents shall be written in the language of the destination country and supplied with hard copies and electronic versions in the format identified for each document: 

Project Plan

Microsoft Word 97 (*.doc)



User Requirements Specification

Microsoft Word 97 (*.doc)



Functional Specification/Requirement

Microsoft Word 97 (*.doc)



Design Specifications

Microsoft Word 97 (*.doc)



Controls Test

Microsoft Word 97 (*.doc)



Hardware Installation Test

Microsoft Word 97 (*.doc)



Operational Test

Microsoft Word 97 (*.doc)

JOINT EQUIPMENT TRANSITION TEAM

Page 22 of 26

USER REQUIREMENTS SPECIFICATION

JETT

Doc ID: Tablet Coater System URS Rev.0 June 2004

Tablet Coater System



Factory Acceptance Test

Microsoft Word 97 (*.doc)



Operator, Maintenance and Service Manuals

Microsoft Word 97 (*.doc)



Process and Instrumentation Diagram (P&ID)

AutoCAD version 12.0 (*.dxf)



Instrument Listing

Microsoft Word 97 (*.doc) or Excel 97 (*.xls)



Control Schematics

AutoCAD version 12.0 (*.dxf)



Control Panel Assembly Drawings

AutoCAD version 12.0 (*.dxf)



Equipment Assembly Drawings

AutoCAD version 12.0 (*.dxf)



Bill of Materials

Microsoft Word 97 (*.doc) or Excel 97 (*.xls)



Spare Parts List

Microsoft Word 97 (*.doc) or Excel 97 (*.xls)



Component Cut Sheets

Microsoft Word 97 (*.doc) or Excel 97 (*.xls)



CONTROL PLATFORM Program Printout and Disk File

XXX Program Development format



OIP Configuration Printout and Disk File

XXX Program Development format

5.4 Support Describe what support activities are required after acceptance. The paragraphs outlined below provide some areas for consideration. 5.4.1

Start-up Support (list available options)

5.4.1.1 5.4.2

Training (list training options available) Post Start-up Support (list post-startup support available)

5.4.2.1

Technical Support Telephone (Voice or Modem) Replacement Parts Availability List (Normal lead times shall be listed)

5.4.2.2

User Site Support Preventative Maintenance (list maintenance contracts available) System Improvements (supplier shall notify user of any improvements available on a regular basis)

JOINT EQUIPMENT TRANSITION TEAM

Page 23 of 26

USER REQUIREMENTS SPECIFICATION

JETT

Doc ID: Tablet Coater System URS Rev.0 June 2004

Tablet Coater System

6.0 GLOSSARY If necessary, attach a glossary, which includes definitions of terms that may be unfamiliar to the Supplier or terminology that may have meanings specific to entries on this User Requirements Check sheet. For example (example list is not intended to be complete): Acronym SCADA S.I. NEMA RFQ

Definition Supervisory Control and Data Acquisition International System of Units (Metric) National Electric Manufacturers Association Request for Quote

PO

Purchase Order

IQ

Installation Qualification

OQ

Operational Qualification

ISA

International Society for Measurement and Control

PSIG

Pounds per square inch gauge

ASME

American Society of Mechanical Engineers

HEPA

High Efficiency Particle Arrestance HEPA filtered air is 99.97% free of all particulate down to 0.3 microns (including bacteria, fungal and other opportunistic microbiological).

C

Degrees Celsius

BL

Biohazard Level

CFR dB EMI ft

Code of Federal Regulations Decibels Electro-Magnetic Interference Feet

GUI

Graphic User Interface

HMI

Human – Machine Interface

HVAC ISO

Heating, Ventilation, and Air Conditioning International Organization for Standardization

JOINT EQUIPMENT TRANSITION TEAM

Page 24 of 26

USER REQUIREMENTS SPECIFICATION

JETT

Doc ID: Tablet Coater System URS Rev.0 June 2004

Tablet Coater System

Acronym

Definition

JETT

Joint Equipment Transition Team

LEL

Lower Explosion Limit

OIP

Operator Interface Panel

RFI

Radio Frequency Interference

URS

User Requirement Specification

VAC

Voltage Alternating Current

JOINT EQUIPMENT TRANSITION TEAM

USER REQUIREMENTS SPECIFICATION

JETT

Tablet Coater System

Page 25 of 26 Doc ID: Tablet Coater System URS Rev.0 June 2004

7.0 REFERENCES List references that were used in preparing this document or that provide additional details, such as: 

Equipment Validation Plan



Current revision of GAMP Guidelines



Vendor Piping Certification (if applicable)



Customer Connection Diagram



Approved Instrumentation List



Process Flow Diagram



21 CFR Part 11



National Electric Code



S88

JOINT EQUIPMENT TRANSITION TEAM

USER REQUIREMENTS SPECIFICATION

JETT

Tablet Coater System

Page 26 of 26 Doc ID: Tablet Coater System URS Rev.0 June 2004

8.0 APPROVAL Insert your company’s standard approval page at the appropriate position in the document or utilize the sample approvals listed below. The approval process/requirements should be outlined in the Equipment Validation Plan. This document has been reviewed by the User Project Manager and approved for use by the Supplier.

Printed/Typed Name

Signature

Date

This document has been reviewed by the User Quality Assurance Group and approved for use by the Supplier.

Printed/Typed Name

Signature

Date

This document has been reviewed by the Supplier Project Manager and approved for use by the Supplier Project Team.

Printed/Typed Name

Signature

Date

Other approvals as necessary may be included, such as the Technical Services Groups, User Groups, Engineering, etc. as required.

JOINT EQUIPMENT TRANSITION TEAM

View more...

Comments

Copyright ©2017 KUPDF Inc.
SUPPORT KUPDF