COSTO DE MATERIALES:

NOTAS: 1 ESTA TABLA TABLA ES ÚTIL ÚTIL PA 2 LLENAR SÓLO LOS CAM  3 LOS COSTOS OBTENIDO 4 CADA QUIEN DEBERÁ A 5 ESTA TABLA DE COSTO 6 LAS PROPORCIONES DE  "COSTO Y TI CARLOS SU LIMUSA - NO TERCERA E

CEMENTO

ARENA

GRAVA

AGUA

PRECIO x TON:

20 Bultos de 50 Kg.

PRECIO x CAMIÓN DE 7M3

PRECIO x CAMIÓN DE 7M3

PRECIO x PIPA DE 4000 LTS

$ 1, 8 0 0. 0 0

$ 8 0 0. 0 0

$950.00

$0.00

PRECIO x BULTO: DE 50 KG

PRECIO x M3:

PRECIO x M3:

PRECIO x M3:

$90.00

$ 1 1 4. 2 9

$ 1 3 5. 7 1

$0.00

DESPERDICIO:

DESPERDICIO:

DESPERDICIO:

DESPERDICIO:

3% 1. 0 3

8% 1.08

8% 1. 0 8

3 0% 1.30

COST COSTO O CON CON DESP DESP..

COST COSTO O CON CON DESP DESP..

COST COSTO O CON CON DESP DESP..

COST COSTO O CON CON DESP DESP..

$ 1, 8 5 4. 0 0

$ 1 2 3. 4 3

$146.57

$0.00

AGREGADO MÁXIMO

CEMENTO TONELADA

BULTOS DE 50 KG

ARENA M3

GRAVA M3

3/4" 1 1/2" 3/4" 1 1/2"

0.260 0.254 0.286 0.280

5.20  5.08  5.72  5.60 

0.500 0.470 0.500 0.470

0.680 0.700 0.680 0.700

3/4" 1 1/2" 3/4" 1 1/2"

0.323 0.308 0.354 0.338

6.46  6.16  7.08  6.76 

0.480 0.450 0.480 0.450

0.670 0.700 0.670 0.700

3/4" 1 1/2" 3/4" 1 1/2"

0.355 0.337 0.391 0.373

7.10  6.74 7.82  7.46 

0.470 0.440 0.470 0.440

0.650 0.680 0.650 0.680

3/4" 1 1/2" 3/4" 1 1/2"

0.423 0.400 0.467 0.445

8.46  8.00  9.34 8.90 

0.465 0.435 0.465 0.435

0.640 0.670 0.640 0.670

CLASIFICACIÓN F´C= REVENIMIENTO 100 kg/cm2

8 A 10 CM

FIRMES Y PLANTILLAS

12 A 15 CM

150 kg/cm2

8 A 10 CM

FIRMES, DALAS Y CASTILLOS

12 A 15 CM

200 kg/cm2

8 A 10 CM

LOSAS DE ENTREPISO

12 A 15 CM

250 kg/cm2

8 A 10 CM

PISOS ESTRUCTURALES, COLUMNAS, DADOS, ZAPATAS Y TRABES

12 A 15 CM

ELABORÓ: Arq. Alfonso

A OBRAS PEQUEÑAS DONDE HAY QUE EL ABORAR EL CONCRETO EN OBRA OS EN COLOR AMARILLO S SON SÓLO DE MATERIALES REGAR SUS COSTOS DE OPERACIÓN E INDIRECTOS PUEDE USARSE PARA FINES DE PLANEACIÓN DE COMPRA DE MATERIALES Y ANÁLISIS LA TABLA FUERON TOMADAS DE: EMPO EN EDIFICACIÓN" REZ SALAZAR RIEGA EDITORES MÉXICO 1997 2.21 ml de guarnicion por bulto ICIÓN

1.62 ml de banqueta de 1.20 mts ancho laceres Y Aguirre [email protected]

AGUA M3

$$$ x M3 CON M3 CONCRETO DESPERDICIO REQUERIDOS:

COSTO AL CONSTRUCTOR

CANTIDAD DE CANTIDAD DE CEM CEMENTO TON. BULTOS DE 50 KG

CANTIDAD DE ARENA EN M3

0.195 0.190 0.215 0.210

$643.42 $631.53 $691.63 $679.73

0.00 0.00 0.00 0.00

$0.00 $0.00 $0.00 $0.00

0.00 0.00 0.00 0.00

0.00  0.00  0.00  0.00 

0.00 0.00 0.00 0.00

0.210 0.200 0.230 0.220

$756.29 $729.17 $813.76

0.17

$784.79

0.00 0.00

$125.54 $0.00 $0.00 $0.00

0.05 0.00 0.00 0.00

1.07  0.00  0.00  0.00 

0.08 0.00 0.00 0.00

0.195 0.185 0.215 0.205

$811.45 $778.78 $878.20 $845.52

0.15 0.00 9.00 0.00

$121.72 $0.00 $7,903.77 $0.00

0.05 0.00 3.52 0.00

1.07  0.00  70.38  0.00 

0.07 0.00 4.23 0.00

0.190 0.180 0.210 0.200

$935.44 $893.49 $1,017.02 $976.92

1.44 0.00 0.00 0.00

$1,347.04 $0.00 $0.00 $0.00

0.61 0.00 0.00 0.00

12.18  0.00  0.00  0.00 

0.67 0.00 0.00 0.00

CANTIDAD DE GRAVA EN M3

CANTIDAD DE AGUA EN M3

0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00

0.11 0.00 0.00 0.00

0.03 0.00 0.00 0.00

0.10 0.00 5.85 0.00

0.03 0.00 1.94 0.00

0.92 0.00 0.00 0.00

0.27 0.00 0.00 0.00