SAVEB Global investment
No.40, Bakori Road Kubwa F.C.T. Abuja Tel:08039788582,08038403268,08058170112 Email:
[email protected]
ESTIMATE FOR SWIMMING POOL s/n A B C D E
F
G
H I
J
Item Description Excavatio Excavation n of Bulk Area of Pool Blinding 50mm plane in-situ blinding to bed High yield bond reinforcement 12mm & 10mm 9mm Water membrane bar Concrete Works 250mm waterproof bed 200mm waterproof wall workmanship Nitro bond SPR Swan from wall to all sides of the pool Sum carried to summary
Unit M2
Qty 94
Rate 950
Amount 150,000
M2 Kg
60 190
3500 2000
210,000 380,000
lm
55
2950
162,250
M2 M2
60 60
7450 7950
Liters M2
40 192
3450 1650
447,000 477,000 150,000 138,000 316,800
2,431,050
Finishing’s
Approved mosaic tiles laid to bed & wall with white cement & adhesive Approved anti slippery tiles laid to pool deck with sketting workmanship Swimming pool continued Sum carried to summary Pool Equipments & Installations 24” Fiberglass sand filtration system & 1HP Pump
M2 M2 M2
50 55 100
1850 1850 4960
92,500 101,750 496,000
M2
40
4450
178,000 180,000 1,048,250
1
389,560
Sales And Servicing Of Lawn And Ridding Mower, Designs Landscaping Specialist Sales Designs Interior Decoration, Renovation Renovation , Construction And Maintenance Maintenance Of Swimming Swimming Pool , Interlocking Interlocking Laying And Building Building Construction