Norsk Ståldag 2008 Oslo 29 October 2008
Danish Engnieers behind the World's largest Cable Stayed Bridges: Sutong and Stonecutters Bridge Tina VEJRUM Senior Project Manager, Bridges - COWI A/S
#
1
3 November 2008
Cable Stayed Bridges
#
Span
Year
Location
y
Sutong
1088 m
2008
China
y
Stonecutters
1018 m
2009
Hong Kong, China
y
Tatara
890 m
1999
Japan
y
Pont de Normandie
856 m
1995
France
y
2nd Incheon
800 m
2009
South Korea
y
Chongming
730 m
2008
China
y
MinPu
708 m
y
3rd Nanjing
648 m
2005
China
y
2nd Nanjing
628 m
2001
China
y
Jintang
620 m
2008
China
y
Baishazhou
618 m
2000
China
y
Qingzhou
605 m
2003
China
y
Yangpu
602 m
1993
China
2
3 November 2008
China
The Sutong bridge is - at present - the world's largest cable-stayed bridge
#
3
3 November 2008
Sutong Bridge, 2008 y
Total Bridge length 8146m
y
Main Bridge (Cable Stayed Bridge) 100 + 100 + 300 + 1088 + 300 + 100 + 100m spans
Special Fairway Bridge (Rigid Frame balanced cantilever bridge)
y
140+ 268 +140m spans
Approach Bridge
y
Spans 30m, 50m or 75 m concrete girders
#
4
3 November 2008
Sutong Bridge - Involved Parties Client: Jiangsu Province Sutong Bridge Construction Commanding Department
y
Designer: y
HPDI
y
Various sub-consultants incl. TongJi University
Chinese Design Checker: BRDI
y
International Consultant and Design Checker: COWI A/S
y
#
5
3 November 2008
Sutong Bridge - Key Issues
#
y
Significant Ship traffic
y
High Design Wind (typhoon area)
y
Strong Currents
y
Poor Soil Conditions
y
306 m High Concrete Pylons
y
Record Main Span
6
3 November 2008
Sutong Bridge Ship traffic on the Yangtze River
2000 ships crosses the bridge alignment every day
#
7
3 November 2008
Sutong Bridge Main Bridge - Elevation
Concrete Pylons Closed Steel Box Girder Parallel wire cable stays
#
8
3 November 2008
Sutong Bridge Pylons
#
9
3 November 2008
Sutong Bridge Main Bridge Cross Section
Typical steel weight = 24 t/m Maximum weight of a segment = 450t
#
10
3 November 2008
Sutong Bridge Aerodynamic Investigations
#
y
Numerical Studies, incl DVMFlow
y
Section Model - Tongji
y
Large Scale Section Model (High Re) – Tongji /Force Technology
y
Free standing Pylon - Tongji
y
Cable Stay – drag coefficient – Tongji/CARDC
y
Rain-wind induced vibrations of cable stays – Tongji/CARDC
y
Full Bridge Model - Tongji
11
3 November 2008
Sutong Bridge Pylon Foundations
Pile group dimension: 48 x 114 m 131nos Ø2.8m 120m long in-situ cast bored piles Capacity of each pile 100 MN (with full scour) Max UR= 0.88 (Safety factor = 2.0) #
12
3 November 2008
Sutong Bridge - Construction August 2006
#
13
3 November 2008
Sutong Bridge - Main Span Construction
#
14
3 November 2008
#
15
Sutong Bridge - Main Span Closure, June 2007
3 November 2008
Sutong Bridge - Finishing Works
Surfacing Stay Cable Dampers #
16
3 November 2008
Sutong Bridge - Load Test
#
17
3 November 2008
Sutong Bridge - Opened for Traffic 2008
#
18
3 November 2008
Stonecutters Bridge, Hong Kong S.A.R. NEW TERRITORIES
SHA TIN
KOWLOON AIRPORT
HONG KONG ISLAND
#
19
3 November 2008
Stonecutters Bridge - Location
#
20
3 November 2008
STONECUTTERS BRIDGE Design Competition
#
21
3 November 2008
January 2000
Stonecutters Bridge - Involved Parties
Client: y
Highways Department, Hong Kong S.A.R.
Designer: y
Ove Arup & Partners, Ltd.
y
COWI A/S
Contractor: y
#
22
3 November 2008
MHYH JV (Maeda - Hitachi - Yokogawa - Hsin Chong Joint Venture)
Stonecutters Bridge Key Issues - in Relation to Bridge Site
#
y
Prominent Location
y
Typhoon Winds
y
Spanning the Entrance to Kwai Chung Container Port
y
Record Main Span
23
3 November 2008
Stonecutters Bridge - Typhoons
#
24
3 November 2008
Stonecutters Bridge - the Container Terminals
#
25
3 November 2008
#
26
3 November 2008
Winning Design - upper part of tower in steel
- two cable planes in a curvilinear array - central circular tower
#
27
3 November 2008
- twin deck with curved soffit
Design Competition Winner (September 2000) Design Competition #
28
3 November 2008
Reference Scheme
Design & Construction Consultancy
Stonecutters Bridge Key Issues - in Relation to Reference Scheme
#
y
Articulation
y
Tower Design
y
Deck Design
y
Aerodynamic Response
y
Navigation during Construction
29
3 November 2008
Stonecutters Bridge - Supports at Tower
#
30
3 November 2008
All-concrete Tower
RS Tower
Wind Tunnel Test Results - Peak Responses
#
31
3 November 2008
Condition
Deflection (Max)
In-service, smooth flow
0.46 m
In-service, turbulent flow
0.45 m
Free, smooth flow
0.32 m
Free, turbulent flow
0.43 m
In-service, smooth flow
0.07 m
In-service, turbulent flow
0.05 m
Free, smooth flow
0.16 m
Free, turbulent flow
0.09 m
Stonecutters Bridge - Tower Options Tower response, DMI WT tests + deskstudy
1 0.9 0.8
Peak tower amplitude [m]
0.7
All Steel
0.6
0.5 0.4
Comp 1
0.3
0.2
Comp 2
0.1
0 0
10
20
30
40
50
60
Scruton no., Sc
DMI wind tunnel test results, turbulent flow DMI test results, October 2001, turbulent flow GVPO fit to DMI test results, 1. procedure, Desk study report GVPO fit to DMI test results, 2. procedure, Desk study report DMI Test results, October 2001, Smooth flow #
32
3 November 2008
70
80
Stonecutters Bridge - Tower/Cable Interaction
#
33
3 November 2008
Displacement [m]
Stonecutters Bridge Linear Resonance/Parametric Excitation 10 Displacement of Stay 20 8
Displacement of tower top
6 4 2 0 -2 -4 -6 -8 Time [sec] -10 0
#
34
3 November 2008
25
50
75
100
125
150
175
200
225
250
275
300
325
350
375
400
Stonecutters Bridge Composite Upper Tower
#
35
3 November 2008
Stonecutters Bridge - Deck Section
Reference Scheme deck section
Modified deck section
#
36
3 November 2008
Stonecutters Bridge - Wind Studies 40
V i 20 Vm
Typhoon York, North Wind 0 0
#
37
3 November 2008
600
1200
1800 t i
2400
3000
3600
Stonecutters Bridge - Wind Tunnel Testing
#
38
3 November 2008
Stonecutters Bridge ULS Bending Moment Envelopes, Live Load
ULS Bending Moment Envelopes (MNm)
150 Hogging moment
100 50 0 -600
-400
-200
0
200
-100 Sagging moment
Highway Loading Distance from centre of bridge (m)
#
39
600
-50
-150
3 November 2008
400
Mean Wind Mean Wind & Buffeting
Stonecutters Bridge Stay Cables, Effect of Type
#
40
3 November 2008
Stonecutters Bridge - Navigation Simulations
#
41
3 November 2008
Stonecutters Bridge - General Arrangement
#
42
3 November 2008
Stonecutters Bridge Cross Section, General Arrangement
#
43
3 November 2008
Deck Fabrication in Shanhaiguan
Stay Cable Manufacture in Jiangyin
Steel Supply from Japan (and elsewhere)
Deck Assembly in Shatian
Tower Steelwork Fabrication in Zhongshan
Site Erection in Hong Kong
#
44
3 November 2008
Stainless Steel Supply from Sweden
Stonecutters Bridge Towers - Stainless Steel Reinforcement
#
45
3 November 2008
Stonecutters Bridge Tower Construction - Lower Tower
#
46
3 November 2008
Stonecutters Bridge Tower Steelwork Fabrication
Stainless Steel 1.4462 (Duplex)
#
47
3 November 2008
Stonecutters Bridge Tower Steelwork Fabrication - Trial Assembly
#
48
3 November 2008
Stonecutters Bridge Tower Steelwork Installation
#
49
3 November 2008
Stonecutters Bridge Deck Panel Fabrication, Shanhaiguan
Structural Steel S420M/ML #
50
3 November 2008
Stonecutters Bridge Trial Mock-up, Shanhaiguan
#
51
3 November 2008
Stonecutters Bridge Deck Assembly, Shatian
#
52
3 November 2008
Stonecutters Bridge Completed Deck Segment, Shatian
#
53
3 November 2008
Stonecutters Bridge Heavy Lift of Back Span Steel Deck
#
54
3 November 2008
Stonecutters Bridge Heavy Lift of Back Span Steel Deck
#
55
3 November 2008
Stonecutters Bridge Heavy Lift of Back Span Steel Deck: 2 x 2000t
2m
2m
78.5 mPD
+
78.5 mPD
+
4m
4m
+50.0 mPD +50.0 mPD
#
56
3 November 2008
2m
Stonecutters Bridge Lifting of Main Span Deck Segment, Hong Kong
#
57
3 November 2008
#
58
3 November 2008
Stonecutters Bridge Main Span Construction, Sept. 2008
Maximum Weight:
#
59
3 November 2008
570t
Stonecutters Bridge Stay Cable Manufacture, Jiangyin
#
60
3 November 2008
Stonecutters Bridge Stay Cable Testing, CTL (USA)
#
61
3 November 2008
Stonecutters Bridge Stay Cable Delivery, Hong Kong
#
62
3 November 2008
Stonecutters Bridge - Stay Cable Installation
#
63
3 November 2008
Lateral Bearings Testing, FIP (Italy)
#
64
3 November 2008
Stonecutters Bridge - Lateral Bearings, Installation
#
65
3 November 2008
Hydraulic Buffers - Testing, FIP (Italy)
#
66
3 November 2008
Stonecutters Bridge Hydraulic Buffers - Installation
#
67
3 November 2008
Stonecutters Bridge - Predicted Main Span Closure: Beginning of 2009
Key Figures Structural Steel: Deck Segments
#
Stay Cables: 33,500t
Weight
7,200t
Anchor Boxes
1,000t
Longest Stay Cable, Length
540m
SS Skins
1,600t
Longest Stay Cable, Weight
75t
68
3 November 2008
View more...