Finished Floor Level In The Swimming Pool Area Is Assumed To Be The Same As The Main Building
+6.272
R6 - UC152x152x23
+3.005
FFL Is 150 above Slab
1
F E
3D View
F
E
FFL 0.0
340
1
G B
340
FFL 0.0
C2 - UC152x152x30
8 0X5
35°
S HS
C2 - UC152x152x30
D
SHS50X4
8 0X5
C2 - UC152x152x30
2 A
8 0X5
C1 - UC152x152x30
C
S HS
22
S HS
+3.005
B
0X5
38
2983
S HS 8
Detail B
57
52 x1 52 x2 3
C1 - UC152x152x30
A
C1
35°
1
-U
35°
Detail A
R5
38
SHS 80X5
57
2
9400
Section on Gridline F
C
Section on Gridline B F
G
R5
+2.945
B
C1 - UC152x152x30
1
C
B5 - IPE160
C1 - UC152x152x30
C1 - UC152x152x30
C1 - UC152x152x30
B2 - IPE160
1
B2 - IPE160
CB
3-
B UC152x152x30 125
369 0
D
C
+3.005
C1 - UC152x152x30
A
+2.983
-U
23 2x 15 2x 5 1
C2 - UC152x152x30 IPE 160
Truss to Stanchion Connection 10mm Plate & 4no M20 Bolts
15 2x 15 2x 23 C -U 4 R
2
B
Detail B Section on Scale 1:10
Eaves Connection
Detail B Half Trusses on Gridlines E & G connected using 10mm Fin plates and two M16 bolts each. Half Truss on Gridline F connected using bracing type connection all from 10mm plate with 2no M16 Bolts.
Base Plate Detail
CB
160 IPE
B1 - UC152x152x23
2
0 369
IPE 160
1-
B1 - UC152x152x23
B1 - UC152x152x23
2-
CB
CB
350x350x15 Plate 4 - M20x450 Long Gr 8.8 - HD Bolts
Eaves Beam Connection 10mm Plate & 2no M16 Bolts
E
Fin Plates This Side Of Beam
125
125
2
125
D
2S ide
1-
G 2
B2 - IPE160
B5 - IPE160 C1 - UC152x152x30
C1 - UC152x152x30
2
B6 - IPE160
CB
1
57
Ridge Connection
C2 - UC152x152x30
0 E16 - IP
C1 - UC152x152x30
B 3710
Roof Plan
C 3710
D 3710
Ridge Beam Connection 10mm Fin Plate With 2no M16 Bolts
Purlin Connection 10mm Fin Plate With 2no M16 Bolts
Purlin Connection
3D View Scale 1:10 Detail A (Note Truss on Gridline G Omitted For Clarity) Detail A 10mm Plate welded to top of truss. Half Trusses on Gridlines E,G & F are connected with 10mm Fin plates and 2no M20 Bolts.
C2 - UC152x152x30
A
B1 - UC152x152x23
CB
160 IPE
23 2x 15 2x 15
2-
C
CB
B1 - UC152x152x23
369 0
IPE 160
-U
B1 - UC152x152x23
B1 - UC152x152x23 Fin Plates This Side Of Beam
R5 - UC152x152x23
5F CB
B3 - SHS50X4
R6 - UC152x152x23
E
B4 - UC152x152x23
F
IinPEP 1la 60te s T h is
F
2
B1 - UC152x152x23
B4 - UC152x152x23
R1 - UC152x152x23
R
R5 - UC152x152x23
B4 - UC152x152x23
R5 - UC152x152x23
B4 - UC152x152x23 Fin Plates This Side Of Beam
R3 - UC152x152x23
B4 - UC152x152x23
C2 - UC152x152x30
Of B e am
160 IPE
G
0 369
Notes All welds 6mm Continuous except truss end plates which are 8mm. All material Galvanised after manufacture.
C
CB
2-
LP3
LP5
0 00x90x3 P FC 2 S G2 -
LP4
7-
PF C2 00x 90x 30
B2 - T70 B1 - T70
B5 - T70
B1 - T70
CP2 B8 - PFC150x90x24 PL8
0x30 200x9
B7 - PFC150x90x24
PF C2 00x 90x 30
CP4 -
-
PL4
3 .3x 48
SG3 - PFC200x90x30 HR 3
0 x3 90 0x 20
HS
FC
B9 - T70
B6
24 90x 50x C1 PF
-C
-P
B1 - T70 B8 - PFC150x90x24
HS
C2 - CHS219.1x10
-C
PL1
ST
3 .3x 48
1-
5
PL4 4-
B1 - T70
SG3 - PFC200x90x30
HR
CP2 SG
PL1
1-
PL1 SG 6
PL1
-P FC 0 x3 90 0x 20
ST
1-
ST
1-
3D View Without Handrails (NTS) 20
2290
450
2520
3D View Without Landing Plates (NTS) 1250 90
3D View With Handrails (NTS)
2970
2290
1820
2385
Plan View (1:20) Elevation (1:20)
20
1060
1230
430
430
20mm Pack to all baseplates. TOC -450mm
2970
1250
90
1000
Between Stringers
Between Handrails
945
1042
1250
900
500
320
1100
1590
1250
1000
1100
1250
CH
S4 8.3 x3
PL 5
PL9
PL3
2
5
C1 - CHS219.1x10
B6
4 0x2 0x9 15 FC P -
6-
4
HR
SG ST
HR
B2 - T70
B1 - T70
B7 - PFC150x90x24
PF C2 00x 90x 30
B7 - PFC150x90x24 B4 - T70
P FC S G2 -
4-
PL2
CP3 -
LP1 LP2
SG
H R1 -
B3 - T70 -
SG
8.3x3 C HS 4
PL 7
1
0x30 200x9
HR
P L3
P
P FC S G1 -
CP1 -
48.3x3
PL2 CP5 -
C
x30 90 0x 20 C PF
C HS H R1 -
x3 S48.3 - CH H R1
A3
6
5
Index
Date
Description REVISIONS
4
3
Example Client
B
Example Project 2
Example Drawing
C ST 3D View
D
CH
DATE
1 0000
EX - 01
NTS
6150 1621
2258
2271
LP4 3 HR
1100
1100
CH
-C
Landing Plate Hard to Wall.
HS
2-
5 HR
HR
3.2 .3x 48
LP6
HS
3.2 .3x 48
LP5
+3.315
SG
FC 20 0x7 5x2 3
-F
311
Landing Plate Hard to Wall.
All Landing and treads plates 8mm Durbar.
1910
50
1142
1100
0 X1 00 L2
B5
3 5x2 0x7 20 FC P -
1100
-P
1
B7
23 75x 00x
1142
-C
B1
P 0-
2 FC
2 x3. 8.3 S4
HR6 - CHS48.3x3.2
TR
1-
HR1 - CHS48.3x3.2
- LP3
1658
LP2
Handrails Fixed with 4no M12 Gr8.8 Bolts
1000
HR4 - CHS48.3x3.2
1650
900
LP3
LP1
SG 2
1 00X F L2
0
B8 - PFC200x75x23
B1
-P
B3
FC 20 0x7 5x2 3
3315
3315
+1.658
3 5x2 0x7 20 FC P -
50
1320
261
50
2269
3D View (NTS)
1200
435
1200
50
Elevation 2 (1:25)
Landing Plate Hard to Wall Around Landing 1910
50
1240
1180
Tread Width
1142
Between Handrails.
1240
50
2820
50
1370 Landing Hard to Wall Around Landing
Notes All steel S275
All connects as per Engineering drawing no PC 00006-2 (2)
1
2
3
4
5
6
7
8
9
10
All Steel Galvanised to BS 1461
The landing plates butt hard to the wall as shown in the Engineering drawings. 355
Thank you for interesting in our services. We are a non-profit group that run this website to share documents. We need your help to maintenance this website.