KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
ISWMP
DI R E K T O R A T J E N D E R A L C I P TA K A R YA D I R E K T O R A T S A N I T A S I
The improvement of Solid Waste Management to Support Regional and Metropolitan Cities Program
PROGRES PELAKSANAAN KONTRUKSI ISWMP TAHUN 2021
http://iswmp.id/
[email protected]
http://iswmp.id/
sekretariat@npmc iswmp.com
PROGRESS
Pelaksanaan Pembangunan Infrastruktur
TPST KONVENSIONAL – (M.27) 2 LOKASI KAB. KARAWANG 2 LOKASI LO KASI KAB. PURW PURWAKART AKARTA A
Improvement Improvem ent of Solid Waste Management Management to Support Support Regional Regional Area and and Metropolitan Metropolitan Cities Cities
2
ISWMP ISWMP
The improvement of Solid Waste Management to Support Regional and Metropolitan Cities Program
STA ST ATUS PELAKSANAAN PELAKSANA AN K KONSTRUKSI ONSTRUKSI
ISWMP ISWMP
The improvement of Solid Waste Management to Support Regional and Metropolitan Cities Program
STA ST ATUS PELAKSANAAN PELAKSANA AN K KONSTRUKSI ONSTRUKSI
PROGRESS TPST KAWASAN KABUPATEN KARAWANG DAN KABUPATEN PURWAKARTA
PROGRESS
Pelaksanaan Pembangunan Infrastruktur
TPST RDF (M.14) 1 LOKASI KAB. KARAWANG 1 LOKASI LO KASI KAB. PURW PURWAKART AKARTA A
Improvement Improvem ent of Solid Waste Management Management to Support Support Regional Regional Area and and Metropolitan Metropolitan Cities Cities
5
ISWMP ISWMP
The improvement of Solid Waste Management to Support Regional and Metropolitan Cities Program
STA ST ATUS PELAKSANAAN PELAKSANA AN K KONSTRUKSI ONSTRUKSI
PEMBANGUNAN TPST RDF SKALA KAWASAN Kategori / Paket
Keterangan ( etail Status Progres Progres Pelaksanaan Kegiatan)
Noomor Kontrak dan tanggal N
Jangka Waktu Pelaksanaan
Keterangan a. TPST TPST RD RDF F Jayam Jayamak akmu mur r • Realisasi 13.32%
Pembangunan TPST RDF • TPST RDF Jaya Makmur, Karawang • TPST RDF Tegalsari, Purwakarta
HK.02.03-Cb12.4.2/834 Tanggal 23 Agustus 2021s/d 22 Maret 2022
210 Hari Kalender
OVERALL PROGRES M14 25,02.% SISA WAKTU PELAKSANAAN 94 HARI SISA PROGRES 74,98 %
Target Rencana 20.78% Deviasi – 7.46 % b. TPST TPST R RDF DF Tega Tegasa sari ri • Realisasi 11.69% • Target Rencana 24.42% • Deviasi – 12.73 % • •
ISWMP
The improvement of Solid Waste Management to Support Regional and Metropolitan Cities Program
KURVA-S KURV A-S TPST RDF SKALA SKA LA KAW KAWASAN (MINGGU (MI NGGU KE 14)
7
PROGRESS
Pelaksanaan
Penyusunan Rencana Induk Pengelolaan Sampah Skala Regional Metro Bandung
8
Improvement Improvem ent of Solid Waste Management Management to Support Support Regional Regional Area and and Metropolitan Metropolitan Cities Cities
ISWMP ISWMP
The improvement of Solid Waste Management to Support Regional and Metropolitan Cities Program
STATUS PELAKSANAAN November
Tahapan
Kegiatan
M4
Kesiapan Perencanaan
1
Persiapan Pengadaan
1
Keterangan Progres: Telah menyelesaikan progress laporan akhir
Tahap Pra Kontrak Proses Pemilihan Penyedia
1
Jasa
Tahap Penandatanganan Kontrak
Tahap Pelaksanaan Kontrak Pekerjaan
Penyusunan Dokumen Kontrak
1
Penandatanganan Kontrak
1
Persiapan Pelaksanaan Pekerjaan
1
Pelaksanaan Pekerjaan
1
Penyelesaian Pekerjaan
1
TOTAL
8
% Capaian Pelaksanaan
100%
Kendala: Koordinasi strategi dan program dengan stakeholder provinsi dan pusat Rencana Tindak Lanjut: -
Status
Selesai Dalam Progress Belum Ada
Skor
1 0.5 0
ISWMP ISWMP
The improvement of Solid Waste Management to Support Regional and Metropolitan Cities Program
STATUS PELAKSANAAN November
% Per Nilai Tahapan
Kegiatan
Tahap Persiapan Pelaksanaan Pekerjaan
20.00%
30.00%
4.0%
4.0%
1
1
b
Peny Penyusu usunan nan p pro rogr gram am k kerj erja a
4.0%
4.0%
1
1
c
Pendataan hasil studi terdahulu dan regulasi terkait
4.0%
4.0%
1
d
Su Surv rve ey lapa lapang ngan an
4.0%
4.0%
1
1
e
Diskus Diskusii Lapora Laporan n Penda Pendahul huluan uan
4.0%
4.0%
1
1
1
a
Kompi Kompilas lasii dan anali analisis sis data data awal awal
10.0%
10.0%
1
1
b
FGD 1
10.0%
10.0%
1
1
10.0%
10.0%
1
1 1
a
50.00%
M4
Koo Koordin rdinasi asi awal awal dengan dengan pihak pihak terk terkait ait
c Diskus Diskusii lapora laporan n ant antar ara a Tahap Penyelesaian Pekerjaan
Bobot
Status Saat Ini
a
Tahap Pelaksanaan Pekerjaan
Nilai Total (Bobot x Status)
Kompi Kompilas lasii dan analisi analisiss data lanju lanjutan tan
8.3%
8.3%
1
b
FGD 2
8.3%
8.3%
1
1
c
Diskusi Diskusi draf draf la lapora poran n akhir akhir (Worksho (Workshop) p)
8.3%
8.3%
1
1
d
Peny Penyusu usunan nan d dra raf f lapora laporan n akhir akhir
8.3%
8.3%
1
1
e
Di Disk skus usii la lapo pora ran n akhi akhirr Fi Fina nali lisa sasi si lapo lapora ran n akhir akhir
8.3% 8.3%
8.3% 8.3%
1 1
1 1
Selesai Dalam Progress
100.0%
100.0%
14
14
Belum Ada
TOTAL KUMULATIF
Status
Skor
1 0.5 0
Pelaksanaan PROGRESS Optimalisasi Sistem Pengelolaan Sampah di Kawasan Pembangunan Infrastruktur
Improvement Improvem ent of Solid Waste Management Management to Support Support Regional Regional Area and and Metropolitan Metropolitan Cities Cities
ISWMP ISWMP
The improvement of Solid Waste Management to Support Regional and Metropolitan Cities Program
STATUS PELAKSANAAN November
Tahapan
Kegiatan
M4
Kesiapan Perencanaan
1
Persiapan Pengadaan
1
Keterangan Progres: Telah menyelesaikan proses penyusunan laporan akhir
Tahap Pra Kontrak Proses Pemilihan Penyedia
1
Jasa
Tahap Penandatanganan Kontrak
Tahap Pelaksanaan Kontrak Pekerjaan
Penyusunan Dokumen Kontrak
1
Penandatanganan Kontrak
1
Persiapan Pelaksanaan Pekerjaan
1
Pelaksanaan Pekerjaan
1
Penyelesaian Pekerjaan
1
TOTAL % Capaian Pelaksanaan
8 100%
Kendala: Melakukan koordinasi dengan IP untuk menghitung biaya OP Rencana Tindak Lanjut: -
11
ISWMP ISWMP
The improvement of Solid Waste Management to Support Regional and Metropolitan Cities Program
% Nilai Per Tahapan
20.00%
Nilai Total (Bobot x Status)
Kegiatan Tahap Persiapan Pelaksanaan Pekerjaan
STATUS PELAKSANAAN November Bobot
Status
M4
a
Koordinasi awal dengan pihak terkait
4.0%
4.0%
1
1
b
Penyusunan program kerja
4.0%
4.0%
1
1
4.0%
4.0%
1
1
c
Pendataan hasil studi terdahulu dan regulasi terkait
d
Survey lapangan
4.0%
4.0%
1
1
e
Diskusi Laporan Pendahuluan
4.0%
4.0%
1
1
Tahap Pelaksanaan Pekerjaan
30.00%
a
Kompilasi dan analisis data awal
10.0%
10.0%
1
1
b
FGD 1
10.0%
10.0%
1
1
c
Diskusi laporan antara
10.0%
10.0%
1
1
Tahap Penyelesaian Pekerjaan
50.00%
a
Kompilasi dan analisis data lanjutan
10.0%
10.0%
1
1
b
FGD 2
10.0%
10.0%
1
1
c
Penyusunan draf laporan akhir
10.0%
10.0%
1
1
d
Diskusi laporan akhir
10.0%
10.0%
1
1
e
Finalisasi laporan akhir
10.0%
10.0%
1
1
Selesai Dalam Progress
100.0%
100.0%
13
13
Belum Ada
TOTAL KUMULATIF
Status
Skor
1 0.5 0