J AC E K M . C Z A P L I C K I
Many areas of mining engineering gather and use statistical information, provided by observing the actual operation of equipment, their systems, the development of mining works, surface subsidence that accompanies underground mining, displacement of rocks surrounding surface pits and underground drives and longwalls, amongst others. In addition, the actual modern machines used in surface mining are equipped with diagnostic systems that automatically trace all important machine parameters and send this information to the main producer’s computer. Such data not only provide information on the technical properties of the machine but they also have a statistical character. Furthermore, all information gathered during stand and lab investigations where parts, assemblies and whole devices are tested in order to prove their usefulness, have a stochastic character. All of these materials need to be developed statistically and, more importantly, based on these results mining engineers must make decisions whether to undertake actions, connected with the further operation of the machines, the further development of the works, etc. For these reasons, knowledge of modern statistics is necessary for mining engineers; not only as to how statistical analysis of data should be conducted and statistical synthesis should be done, but also as to understanding the results obtained and how to use them to make appropriate decisions in relation to the mining operation. This book on statistical analysis and synthesis starts with a short repetition of probability theory and also includes a special section on statistical prediction. The text is illustrated with many examples taken from mining practice; moreover the tables required to conduct statistical inference are included.
STATISTICS FOR MINING ENGINEERING
STATISTICS FOR MINING ENGINEERING
J AC E K M . C Z A P L I C K I
an informa business
STATISTICS FOR MINING ENGINEERING
Book.indb i
12/9/2013 12:21:47 PM
This page intentionally left blank
Statistics for Mining Engineering
Jacek M. Czaplicki Mining Mechanization Institute, Silesian University of Technology, Gliwice, Poland
Book.indb iii
12/9/2013 12:21:48 PM
CRC Press/Balkema is an imprint of the Taylor & Francis Group, an informa business, London, UK © 2014 Taylor & Francis Group, London, UK Typeset by Vikatan Publishing Solutions (P) Ltd., Chennai, India Printed and Bound by CPI Group (UK) Ltd, Croydon, CR0 4YY All rights reserved. No part of this publication or the information contained herein may be reproduced, stored in a retrieval system, or transmitted in any form or by any means, electronic, mechanical, by photocopying, recording or otherwise, without written prior permission from the publisher. Although all care is taken to ensure integrity and the quality of this publication and the information herein, no responsibility is assumed by the publishers nor the author for any damage to the property or persons as a result of operation or use of this publication and/or the information contained herein. Published by: CRC Press/Balkema P.O. Box 11320, 2301 EH Leiden, The Netherlands e-mail:
[email protected] www.crcpress.com—www.taylorandfrancis.com Library of Congress Cataloging-in-Publication Data Czaplicki, Jacek M. Statistics for mining engineering / Jacek M. Czaplicki, Mining Mechanization Institute, Silesian University of Technology, Giliwice, Poland. p. cm. Includes bibliographical references and index. ISBN 978-1-138-00113-8 (hardback) -- ISBN 978-1-315-81503-9 (eBook PDF) 1. Mining engineering--Statistical methods. I. Title. TN272.7.C93 2014 519.5–dc23 2013043750 ISBN: 978-1-138-00113-8 (Hbk) ISBN: 978-1-315-81503-9 (eBook PDF)
Book.indb iv
12/9/2013 12:21:49 PM
Contents
Preface and acknowledgements
ix
About the author
xi
List of major notations
xiii
1. Fundamentals
1
1.1. Goal and task of statistics
1
1.2. Basic terms of probability theory
3
1.2.1. Random events and some definitions of probability
3
1.2.2. Random variables, distribution function and probability density function
7
1.2.3. Descriptive parameters of a random variable
8
1.2.4. Relationships between parameters of random variables
13
1.2.5. Probability distributions of discrete random variables
16
1.2.6. Probability distributions of continuous random variables
19
1.2.7. Two-dimensional random variable and its moments
30
1.2.8. Stochastic process
34
1.3. Basic terms of statistical inference
35
1.3.1. Estimator
36
1.3.2. Properties of estimators and methods of their construction
36
1.3.3. Statistical hypotheses and their types
39
1.3.4. Statistical tests and critical region
40
1.3.5. Probability distributions for the verification of statistical tests
43
2. Some areas of the application of mathematical statistics in mining
49
3. Analysis of data
55
3.1. Testing of sample randomness
55
3.1.1. The test procedure
55
3.1.2. Results of a randomness investigation 3.2. An outlier in a sample
57 58
3.2.1. Exponential distribution
60
3.2.2. Erlang distribution
63
3.2.3. Other distributions
65
3.2.4. Result of an outlier analysis
69
v
Book.indb v
12/9/2013 12:21:49 PM
vi Contents 3.3. Stationarity testing of sequences 3.3.1. The test procedure 3.4. Outcome dispersion testing
78
3.5. Cyclic component tracing
83
3.5.1. The period of cycle is known
84
3.5.2. The period of the cycle is unknown
87
3.6. Autocorrelation analysis
94
3.7. Homogeneity of data
98
3.7.1. The test procedure 4. Synthesis of data
102 111
4.1. Estimation of the parameters of a random variable
112
4.2. Probability distribution description
124
4.3. An example of empirical–theoretical inference about the distribution of a random variable
135
5. Relationships between random variables
141
5.1. The chi-square test of independence
141
5.2. The Pearson’s linear correlation coefficient
145
5.3. Partial correlation coefficient and multiple correlation coefficient
149
5.4. Non-linear correlation measures
152
6. Synthesis of data—regression analysis
157
6.1. Preliminary remarks
157
6.2. Linear regression
159
6.3. Linear transformations and multidimensional models
167
6.4. Autocorrelation and autoregression models
174
6.5. Classical linear regression for many variables
183
6.6. Regression with errors in values of random variables
187
6.7. Linear regression with additional information
198
7. Special topic: Prediction
Book.indb vi
69 70
207
7.1. Introduction and basic terms
207
7.2. Subject of prediction
210
7.3. Examples
212
8. Explanations of some important terms
231
9. Statistical tables
235
9.1. Distribution function Φ(z) of standardised normal distribution N(0, 1).
235
9.2. Quantiles of the standardised normal distribution N(0, 1)
236
9.3. Critical values of the Student’s t-distribution
238
9.4. Critical values of the Chi-squared distribution
239
9.5. Critical values of the Snedecor’s F distribution for α = 0.10
241
12/9/2013 12:21:49 PM
Contents 9.6. Critical values of the Snedecor’s F distribution for α = 0.05
243
9.7. Critical values of the Snedecor’s F distribution for α = 0.025
245
9.8. Critical values of the series distribution
247
9.9. Critical values of the Cochran statistic for α = 0.05
249
9.10. Critical values of the Hartley statistic for α = 0.05
250
9.11. Quantiles of the Poisson distribution
250
9.12. Critical values in Kolmogorov test of goodness-of-fit
252
9.13. Critical values of a linear correlation coefficient and a partial correlation coefficient
254
9.14. Critical values of the Spearman’s rank correlation coefficient
255
9.15. Critical values of a multiple correlation coefficient
255
9.16a.Critical values Dn,m(α) in the Smirnov test of goodness-of-fit for two empirical distributions
257
9.16b.Distribution of the Smirnov statistic Dn,m P{Dn,m ≤ k/n}
261
9.17. Critical values
Book.indb vii
vii
(2n, 2m) of the α
distribution
264
References
265
Subject index
273
12/9/2013 12:21:49 PM
This page intentionally left blank
Preface and acknowledgements
The variety of technical devices that is available on the market is quite rich. The items offered have, in the majority of cases, the broad possibility of realizing their targets. Very often the devices that are selected are set up together, creating systems to execute predetermined functions. In mining engineering, mechanized systems are formed in order to excavate rocks, to haul broken material, to dump waste, to store excavated ore or to carry out ore treatment by mechanical, chemical or thermal means. The technical objects being used nowadays are complicated constructions. In order to apply them in an appropriate manner, we should follow the recommendations formulated by their producers and we should frequently observe the realization of their operation (exploitation)1 process, which is understood here as the process of changes in their properties during the use of the object. Running changes are interesting first of all for the constructor and producer of the object. They are also interesting for the user of the equipment, who is concerned in its application to attain the best performance of the item purchased over the long term. Information gathered during the operation of the object creates statistical data. Actually, the more complicated machines used in mining (and pieces of equipment from other engineering areas) are furnished with special systems which diagnose a continuously running machine, collect information on its exploitation events and send it to the main producer’s computer. In many cases the information that is transmitted is very rich comprising a few tens of units of information. Again, this trio: the constructor, producer and user are interested in the accumulated material. And once again, this information has statistical character. The information that is generated through the realization of the operation of a machine has a twofold meaning. It provides information on the technical parameters that are of interest at a given moment of time directly, e.g. power consumption, force applied during retardation, mass accumulated in the shovel etc. But very often there is concern about the average characteristics of the observed data, i.e. there is concern about the statistical characteristics of collected material. It is easy to enumerate at least several further areas of mining engineering interest in which the important information that is gathered has a statistical character; investigations made during research on a stand in a lab generating records, collected data from an instrument with a new device installed and operating in real working conditions, sensors continuously tracing excessive shocks in a rock mass near mining production areas, information taken from an ore processing plant and connected with a given stage of ore treatment etc. All of these examples show areas that generate information of a statistical character. Information that should be analysed carefully; its synthesis should be conducted and statistical inference should be carried out. The main goal of this book is to acquaint readers with a basic knowledge of mathematical statistics; knowledge that should be known by contemporary mining engineers. For this reason this book is addressed—first of all—to students of mining faculties and schools. The majority of the cases considered here are taken from the field of mine mechanization. However, there
1 These two terms will be used here interchangeably, i.e. they are synonyms. Grounds for such an approach can be found in Chapter 1, Czaplicki 2010.
ix
Book.indb ix
12/9/2013 12:21:49 PM
x
Preface and acknowledgements
are also practical examples taken from different areas such as ore treatment, blasting, rock mechanics and some econometric problems associated with mining engineering. Some parts of this book that deal with the reliability and exploitation problems of a variety of equipment will be interesting for reliability engineers. Similarly, some examples may be of interest for earthmoving engineers. Because of the universal character of the models and methods presented here, some parts may also be attractive for civil engineers, engineers involved in production as well as for engineers working at industrial institutes, especially mining ones. Students learning mathematical statistics and searching for practical applications of it will find some chapters interesting as well. Additionally, I hope that my academic colleagues working at mining universities will also find this book interesting, and perhaps useful in their educational work. It is presumed that readers of the book have knowledge of the basics of probability theory. Nevertheless, in order to ensure a better understanding of the text, a short repetition from this field is presented in Chapter 1. It is also recommended that readers have some idea of the theory of reliability and the theory of exploitation. There are actually many books related to both probability and reliability theories and therefore no specific book is suggested here. There is a different situation related to the theory of exploitation (terotechnology, to a certain extent). One suggested book is “Mining equipment and systems. Theory and practice of exploitation and reliability” (2010) and also written by the author of this book. In order to make the considerations conducted here more communicative, several basic probabilistic terms are defined. The author has made a special effort to present definitions in such a form so as to be immediately understandable for even those readers with less knowledge of probability theory. Where terms of mathematical statistics are concerned, a special chapter at the end has been added where the majority of the essential terms are defined. In the entire text terms and notations taken from the field of engineering that interlace with statistical terminology are commonly applied. In order to make the text more understandable examples are given; in many cases taken from author’s practice. Data have been collected from different mines, different equipment producers and from several different countries. However, in several cases, data and results are taken from books and dissertations of colleagues; and the author is very grateful for their acceptance of the use of their great works in this book. The construction of the examples is similar: the goal of the investigation is formulated, an examination is conducted and there is a need to work with the outcomes to get proper interpretation of the properties of the reality observed. It is necessary to apply the appropriate mathematical tools from mathematical statistics in order to obtain suitable results from the investigation. The next step is very sensitive: how to properly interpret the outcomes? This means that the information acquired must be translated into engineering language. Often, during statistical inference, attention is paid to the nuances of the methods applied, to subtleties contained in the observations and to sensitive points of interference. This enriches the information that is the result of the investigation. I would like to express my very warm thanks to Prof. Leon Dziembała, who passed away just recently, for support, Ms Michele Simmons for proofreading and Janjaap Blom, Senior Publisher CRC Press / Balkema—Taylor & Francis Group and his open and extremely professional team for their reliable and efficient cooperation. Jacek M. Czaplicki Mining Mechanization Institute Silesian University of Technology, Gliwice, Poland
Book.indb x
12/9/2013 12:21:49 PM
About the author
Jacek M. Czaplicki has been an academic lecturer for forty years and is continuously associated with his home University. He did, however, leave his school for a couple of years’ lecturing in African universities. He worked for three years at the School of Mines of the Kwara State College of Technology, Ilorin, Nigeria on a UNESCO project. A few years later, he was appointed to Zambia Consolidated Copper Mines Ltd for three years and worked as a lecturer at the School of Mines of the University of Zambia, Lusaka as part of a World Bank project. Jacek Czaplicki received a Master of Science in Mine Mechanization from the Silesian University of Technology, Gliwice, Poland. He also obtained a Doctorate degree in Technical Sciences. Later, he submitted a dissertation and passed all of the requirements and was awarded a D.Sc. degree in Mining and Geological Engineering with a specialization in Mine Machinery at the same home University. Currently, he is a Professor (emeritus) of Mining Engineering. He has published about a hundred and forty papers and more than ten books in Poland and abroad. His specialisation comprises mine transport, the reliability and computation of mine machinery systems and the reliability of hoist head ropes. In his research, he appliesmethods and models from mathematical statistics. He is an internationally recognised specialist in mine mechanisation.
xi
Book.indb xi
12/9/2013 12:21:49 PM
This page intentionally left blank
List of major notations
E(X) F(n, m) H0, H1 n N(m, σ) N(0, 1) rS, r′S R R t(n) u uα z α φN(x) ΦN(x) χ 2(n) σ 2(X) ρ
– expected value, mean value, mathematical hope of the random variable X – F Snedecor distribution with F(n, m) degrees of freedom – statistical hypotheses: basic and alternative – sample size – normal distribution with parameters m and σ – standardised normal distribution with parameters m = 0 and σ = 1 – Spearman correlation coefficient – linear Pearson correlation coefficient – non-linear correlation coefficient – Student’s t probability distribution with n degrees of freedom – residual – quantile of order α standardised normal distribution N(0, 1) – Fisher’s distribution – level of significance – probability density function of standardised normal distribution N(0, 1) – probability cumulative function of standardised normal distribution N(0, 1) – χ 2 (chi-squared) distribution with n degrees of freedom – variance of the random variable X – correlation coefficient in general population – has distribution
Each example considered has following signs: ■ – beginning of example ◀ – end of example – end of a phase of consideration in the example; considerations will be continued Random variables are usually marked in bold. Sets are usually marked by Frankenstein letters.
xiii
Book.indb xiii
12/9/2013 12:21:49 PM
This page intentionally left blank
CHAPTER 1 Fundamentals 1.1
GOAL AND TASK OF STATISTICS
Originally, i.e. until the first half of the 19th century, the term statistics—a word taken from the Latin language: status—meant a set of data or numbers describing the state of a political body. The first notations in this regard were used in ancient China and Egypt and later in the Roman Empire. Such data were very useful and this was confirmed once again in the Middle Ages. Later on, the scope of the term was enlarged to include all sets of data. In the 20th century, methods for the analysis of the collected information were incorporated. There is a difference in meaning in the English language as to whether the word statistics is used as a singular or plural noun.1 Statistics means: a. A discipline of science, the branch of mathematics that deals with quantitative methods to investigate mass phenomena b. A set of data that is a picture of the running changes of some phenomena (processes) in a certain space. Statistics relates to status. Statistic means a characteristic describing the determined properties of a set of numbers. This characteristic is in fact an estimator (function) of an unknown parameter of the general population being investigated through taking a sample. Statistics, as a science dealing with the methods used to gain, to present and to analyse data, has the main goal of obtaining generalised useful information about some phenomenon or property. Such a phenomenon must have a mass character, i.e. it should be connected with a large number of cases. In such a situation, some regularity can be traced. In every case, this regularity is the result of the action of some causes; causes that create a set. Regularities of such a nature are called statistical regularities, i.e. they cannot usually be found by observing only one, singular event. The reasons that generate statistical regularity can be divided into the: • main ones or • random ones. The main reasons create a systematic component whereas the random reasons create a stochastic component. The mass character of a phenomenon does not give a ground to apply statistical methods. These methods can only be used when the set is composed of similar elements that have nonidentical properties. The first stage of a statistical investigation consists of the construction of an investigation plan. It is composed of the goal and subject of the examination planned. The elements of the statistical population have to be identified together with their properties, which are
1
There is no such difference in some other languages.
1
Book.indb 1
12/9/2013 12:21:50 PM
2
Statistics for mining engineering
slightly different for each element. These are called statistical properties. These features can be: • measurable (such as: mass, power, the number of hoists per day, the time of repair) • immeasurable (e.g. the machine type, the type of conveyance applied, the existence or nonexistence of a certain furnishing item in a given system). Measurable properties can be: • discrete (the number of cycles of a machine per unit of time, the number of device failures per tonne of mass transported etc.) • continuous (for example: the time of renewal, the age of a piece of equipment) • quasi-measurable (making order). Quasi-measurable properties determine the intensity of the investigated feature in the population. Examples of quasi-measurable properties can be incomes or wages, which to a certain limit have continuous character, but later on become discrete in nature. Each statistical unit can be described by one feature or many features, depending on the investigation goal formulated. In this context, we have one-dimensional populations or multidimensional ones. Another division of statistical properties distinguishes: • constant features • variable features. Constant features are described as answering the questions: What? When? Where? These features are common for all elements of the population of interest. They are not the subject of the investigation; they decide whether these elements belong to the population. The features that are the subject of investigation are variable ones. When the subject of an investigation is fixed and the method of gathering data is decided, the next step is data collection and later—their control and ordering in a convenient way, grouping together, segregating etc. Such material is the input for the analysis of information accumulated. To summarise—every statistical investigation consists of the following phases: 1. 2. 3. 4. 5.
preparation observation (data collection) work with the gathered information analysis inference.
The main task of mathematical statistics is the analysis and interpretation of the results that arise from the application of appropriate methods. The population whose elements are observed is called a sample, i.e. it is a subpopulation (subset) of the general population. Commonly, a sample is understood as a small part of anything or one of a number, which is intended to show the quality, style or nature of the whole; the specimen. However, the set observed is not always a trail in the statistical sense. The decision to take only a sample has different grounds, e.g.: − the general population is infinite in number (or almost infinite) and there is no possibility of testing all of the elements − the investigation has a destructive character; to test all of the elements would to destroy the whole population; it makes no sense − the cost of the testing of a large number of elements is very high − we are interested in only a rough estimation of a certain property of the population; it makes no sense to test many elements.
Book.indb 2
12/9/2013 12:21:50 PM
Fundamentals
3
The conclusions on the general population—formulated on a sample taken—will be correct if the sample is similar to the general population. This similarity means that the sample is representative. Errors due to the observation of a certain part of the population only are subject to the probability calculus law. It allows the value of an inaccuracy that is made to be estimated. However, one condition must be fulfilled here—the sample has to be random. This means that which elements will be in a sample depends on a purely chance event. From a statistical point of view, this is an element selection in which two conditions are fulfilled: 1. every elementary element of the population has an equal chance of being selected; a chance that has a positive probability 2. the possibility exists of estimating the probability of every subpopulation as a sample. Mathematical statistics deals with the construction of rules to determine the properties of the general population based on the sample taken. Taking into account the type of topic considered, the tasks of mathematical statistics can described as: • the estimation of unknown parameters of the investigated feature of a statistical unit; this feature is treated as a random variable • the verification of statistical hypotheses • the identification of random processes • decision-making in the case of uncertainty. For proper understanding and for the appropriate usage of methods of statistical inference later on, it is necessary to have elementary information from probability calculus and the theory of random variables. Let us make a short review in this regard. 1.2
BASIC TERMS OF PROBABILITY THEORY
1.2.1 Random events and some definitions of probability The foundation of mathematical statistics is the theory of probability which explains the ‘mechanisms’ that disclose statistical properties—the regularities occurring in mass phenomena. In mining engineering we deal with results of some magnitude measurements or observations based on some experiments. Usually these experiments have a random character. A set that contains the effects of these experiments is called a sample space and every subset of it is called a random event. If a particular subset comprises indivisible elements we call it a set of elementary events. A set of subsets of elementary events is called a Borel field of sets whose elements are random events. A Borel field consists of: • • • •
Elementary events Sum, product and difference of events Sure event Impossible event.
Due to the fact that events can be treated as elements of a set—let us recall briefly a few basic terms from event calculus. The sum of events A1, A2, ..., Ak is such event A k
A
∪A , i
(1.1)
i =1
which consists of all of the elementary events belonging to at least one of the sets A1, A2, ..., Ak.
Book.indb 3
12/9/2013 12:21:50 PM
4
Statistics for mining engineering The sum of events is generalised for an infinite sequence of events. The product of events A1, A2, ..., Ak is such event A k
A
∩A ,
(1.2)
i
i =1
whose elements are common (joint) for all events A1, A2, ..., Ak. The product of events is generalised for an infinite sequence of events.2 The difference between two events A1 and A2 is the event A A = A1 – A2
(1.3)
that consists of the elementary events belonging to A1 but not to A2. It follows from the symmetrical character of these definitions of the sum and the product that the operations of addition and multiplication are commutative, i.e. we have A1 ∪ A2 = A2 ∪ A1 and
A1 ∩ A2 = A2 ∩ A1
An important and particular case arises when A1 coincides with the whole space difference
. The
A*1 =
(1.4)
− A1
is the set of all of the elements of a space which do not belong to A1 and this event is called a complementary event or simply a complement of A1. The operations of addition and multiplication may be brought into relation with one another by means of the idea of complementary sets. If there is a given finite or numerable sequence A1, A2, ... the following relations hold:
( A1
A2 ∪
) * = A1*
( A1
A2* ∩ ...
A2 ∩
) * = A1*
A2* ∪ ...
A sure event is an event comprising the whole space of the elementary events, and for this reason for any event A the following relation holds: A* ∪ A =
(1.5)
An impossible event is an event that cannot occur under given circumstances. Therefore, the following relation holds: =
*
(1.6)
Two events having a joint part but with no elements are called separate (disjoint) events. One of the cardinal terms of this theory is probability. It has been defined differently. The development of the theory of probability can be traced to the second half of the 19th century. Its beginnings were like those of an illegitimate child. One famous gambling addict— Chevalier de Meré—wanted to increase his chances in gambling and asked a well-known
2 Notice, that here (operating on sets or events) we have different notations when symbols of multiplication and summation are concerned. This is necessary to differentiate from acting on numbers (in algebra).
Book.indb 4
12/9/2013 12:21:50 PM
Fundamentals
5
contemporary mathematician, Pascal, what to do to be successful in games of hazard. Pascal was positively astonished by the problem formulated. He gave no answer but he started to study the problem. In addition to Pascal, Fermat, Bernoulli and Laplace also considered the problem of games of chance. In 1812 Pierre Simon de Laplace formulated the so-called classical definition of the probability of the occurrence of a random event as a measure of the chance of the appearance of this event. He determined this measure as the ratio of the number of events that were favourable for the occurrence of this given event (events mutually excluding themselves) and the number of all possible events identically possible. For example, when tossing a dice, the probability of the occurrence of an even number is 3/6 provided that the dice is made properly (honestly), i.e. all of the walls of the dice have the same chance of occurrence. This classic definition has several defects because it can only be applied when the sets of events considered are finite and the structure of these sets is known. Moreover, this definition is a tautological one. It defines the probability of a random event taking into account a set of identically possible events, which means that they have the same probability.3 Along with the classic definition, some other definitions were formulated afterwards. Finally, in 1933 Andrey Kolmogorov formulated the axiomatic definition and this definition has become the ground for the modern theory of probability. Originally, this definition read as follows: ‘Let be a collection of elements which we shall call elementary events and be a set of subsets of ; the elements of set will be called random events. Axioms: 1. is a field of sets. 2. contains the set . 3. A non-negative real number P(A) is assigned to each set A in . This number is called the probability of event A. 4. P( ) = 1. 5. If A and B have no element in common, then P(A∪B) = P(A) + P(B).’ In the above set of axioms only a finite number of events were taken into account; however, in the same publication, Kolmogorov extended his reasoning to an infinite number of events.4 Based on the theory of sets, it can easily be concluded that event is a sure event and P(Φ) = 0, if Φ denotes an impossible event. The primitive notion (not definable) in the axiomatic approach to probability theory is the whole space of elementary events—this is the set of all of the possible elementary, indivisible results of experiments or observations. The subsets of the space of elementary events that belong to the enumerable additive field of subsets are called random events or events—for short. All subsets of the set of elementary events are events if this set is finite or enumerable.5 The probability is a non-negative real number supported at a [0, 1] interval. Some mathematicians, however, (Kopociński 1973, Grabski and Jaźwiński 2001 for instance), are of the opinion that probability is a function in which the arguments are random events and
3
A more comprehensive consideration in this regard was presented, for instance, by Papoulis (1965). In modern mathematics: is a sample space, is an event space. 5 More on the additive classes of sets can be found for instance in Cramer (1999, Chapter 1.6). 4
Book.indb 5
12/9/2013 12:21:52 PM
6
Statistics for mining engineering
the values are real numbers and this function fulfils the above axioms. The probability is a number for a fixed event. This approach is more general than the original one. It is worth adding here that where the definitions of probability are concerned, there are also some other theories dealing with probability, i.e. the theory of subjective probability and Bayesian theory. The first theory formalises the personal assessment of the chances of the occurrence of a given random event. In practical applications individuals assessing the chances of this appearance are selected purposely by presuming that their estimation will be significant, which is important because they have substantial knowledge in the case being considered. The second theory applies two terms – a priori probability for the description of knowledge about the investigated phenomenon before the investigation is done and a posteriori probability for the description of enriched knowledge because the results of investigation are known. The conditional probability denoted by P(A|B) is the probability of the occurrence of event A provided that event B has appeared (i.e. P(B) > 0). It is calculated as the quotient of the joint probability of A and B and the probability of B6,7 P(A | B ) =
P(A B ) P(B )
(1.7)
The probability of the sum of two events A and B P(A ∪ B) = P(A) + P(B) – P(A ∩ B)
(1.8)
We say that the random variable A is stochastically independent8 of an event B if P(A|B) = P(A)
(1.9)
This means that the occurrence of one does not affect the probability of the other. The concept of independence extends to any dealing with collections of more than two events or random variables. Considering the above, we can easily see that for two independent events the following equation holds: P(A ∩ B) = P(A) P(B)
(1.10)
Remark. Events can be pairwise independent but simultaneously jointly dependent. Consider a set {A1, A2, …, Ak} of pairwise disjoint events whose union is the entire space. For any event B of the same probability space, the following relation holds: k
P ( B ) = ∑ P ( Ai ) P ( B | Ai )
(1.11)
i =1
This is the formula for the total probability.
6
This is the so-called classical Kolmogorov definition. A different approach was presented by Bruno de Finetti who preferred to introduce conditional probability as an axiom of probability. 7 Notice, that if for a certain event B, the corresponding P(B) = 0, the expression P(A|B) is undefined. Nevertheless, it is possible to define a conditional probability with respect to a σ-algebra of such events (such as those arising from a continuous random variable). 8 The following terms can be found in the literature: statistically independent, marginally independent or absolutely independent.
Book.indb 6
12/9/2013 12:21:52 PM
Fundamentals
7
The summation can be interpreted as a weighted average and consequently the marginal probability. Probability P(B) is sometimes called ‘average probability’ or ‘overall probability’.9 This law usually has one common application where the events coincide with a discrete random variable taking each value in its range. Consider a set {A1, A2, …, Ak} of pairwise disjoint events whose union is the entire space. If P(Ai) are known and also the conditional probabilities P(B | Ai) then the conditional probability P ( Ai | B ) =
P ( B | Ai )P ( Ai )
∑
k i =1
(1.12)
P ( Ai )P ( B | Ai )
This is the so-called the Bayes’ Theorem. Probability P(Ai | B) is called a posteriori whereas probabilities P(Ai) are called a priori. 1.2.2
Random variables, distribution function and probability density function
In our previous considerations, there was no specific meaning given to the event being observed. Actually, to every result of an experiment ξ a number will be ascribed which means a function is to be constructed x(ξ). Notice, that the independent variable ξ will not be a number but an element of set . A real random variable X is a function supported on the space of random events if: a. the set {X ≤ x} is an event for any real number x, b. the following equations holds: P{X = ∞} = P{X = −∞} = 0
(1.13)
In other words, a measurable function assigning real numbers to every outcome of the experiment is called a random variable. Random variables will be marked in bold. A random variable is a discrete one if it is supported by a finite or enumerable set of numbers. Examples of probability distributions for discrete variables will be given in Chapter 1.2.5. In order to characterise a random variable, it is necessary to determine a set of its possible values and the corresponding probabilities. A function F(x), which is defined as the probability of an event {X ≤ x}, is called a distribution (distribution function, cumulative function) of the random variable X, i.e. FX(x) = P{X ≤ x}
(1.14)
The distribution is a non-decreasing monotonic function, continuous on the left and—as a probability—supported by a [0, 1] set. If a distribution FX(x) of random variable X can be defined as x
FX ( x ) =
∫
−∞
fX u ) du
(1.15)
then the random variable X is continuous, its distribution is continuous and the function fX(x) is called a probability density function. Function fX(x) can be treated as a density mass on the 9
Book.indb 7
Pfeiffer (1978), Rumsey (2006).
12/9/2013 12:21:54 PM
8
Statistics for mining engineering
x axis. If function fX(x) is finite, it has a simple interpretation of a linear mass density, i.e. a mass on (x, x + Δx) interval equals fX(x)dx. The probability that random variable X takes a value from a certain interval equals a mass located on this interval. The distribution FX(x) equals the mass over (−∞, x) interval if the random variable is determined over the whole x axis. Notice that ∞
fX x ) ≥ 0
d
∫
fX uu)) du d =1
(1.16)
−∞
if the variable is determined over the whole x axis. There are two types of random variables being commonly applied, namely: • continuous random variables • discrete random variables. Having defined the term of random variable, we can return to the Bayes’ Theorem considering random variables rather than random events. This problem is significant for instance, for strength of materials. If the probability distribution of the load or strength of a given object is known and we get new information in this regard then—based on an equivalent of formula (1.12)—we can find a new, more likely probability distribution of the load (or strength) of the object. Melchers (1999) illustrates the relations between these distributions as is shown in Figure 1.1. Notice that if additional information is of a low likelihood, i.e. its corresponding distribution is of a high spreading, then this information is given no significant input. In Fig. 1.1 the information is substantial and our knowledge is increased; the mean value shifted to the right (the first significant change) and the dispersion decreased (the second significant change). Our knowledge about the random variable of interest is more important, and thus more reliable than before the investigation. It is obvious that for discrete random variables the integrals in patterns (1.15) and (1.16) must be replaced by a summation symbol and the formula for the probability function is different because it is now of a discrete type. Following forthcoming changes—if the considered random variable is continuous we have probability density function. If a random variable is discrete, we have a probability mass function. The most comprehensive information on a random variable is given by its probability mass/density function. 1.2.3
Descriptive parameters of a random variable
Some constants connected with the probability mass/density function in a univocal way play very important roles in probability theory, in reliability theory and some other disciplines of science. These are the parameters of a random variable. Here are the most essential ones. Distribution a posteriori
f(x) Additional information Distribution a priori
x
Figure 1.1. Relation between information a priori, additional information and information a posteriori; information expressed by probability density functions.
Book.indb 8
12/9/2013 12:21:55 PM
Fundamentals
9
The expected value of a random variable X is a number ascribed to the integral10 (1.17) where is the domain of determinacy of X. Several other terms are used to describe this parameter, which include mathematical expectation, mean and mathematical hope. The expected value of a random variable is, in fact, the weighted average of all possible values that this variable can take on. However, from a rigorous theoretical point of view, the expected value is the integral of the random variable with respect to its probability measure. For a discrete random variable that takes the values xi with probabilities pi we have E( )
∑x p i
(1.18)
i
i
For engineers, it is important to say that the expected value is the centre of gravity of its probability density. Some essential properties can be formulated for this mean directly from the definition, namely: • The expected value of a constant is simply the value of this constant E(a) = a
(1.19)
E[(aX)k] = ak E(Xk)
(1.20)
• The following relationship holds
• The expected value of the linear function of a random variable equals the linear function of the expected value of this random variable, i.e. E(aX + b) = aE(X) + b
(1.21)
• For a random variable defined as: Y = X − E(X)
we have
E(Y) = 0
(1.22)
In the theory of probability and in many of its diverse applications, the expected value is the most important parameter of a random variable. In engineering practice, the majority of the so-called nominal parameters of technical objects are just mean values. The expected value may be intuitively understood by the law of large numbers: the expected value, when it exists, is almost surely the limit of the sample mean as the sample size increases to infinity. Nevertheless, the value cannot be expected in the everyday meaning—the expected value itself may be unlikely or even impossible. The expected value when throwing a dice is 3.5. By knowing the properties of integrals, we can easily come to the conclusion that not all random variables have a finite expected value, since the integral may not converge absolutely.
10 This definition differs from the definition usually presented in statistical books. Most commonly, there is a statement that an expected value is an integral or a sum. However, we obtain a number as the result of integration (or summation when a random variable is a discrete one) because the integral is a definite one (Riemann’s integral). By the way, do not try to say to a mining engineer that the average number of—for instance—shearer knives worn at the mine is an integral.
Book.indb 9
12/9/2013 12:21:57 PM
10
Statistics for mining engineering
And what is more, some random variables have no expected values. Usually, the Cauchy’s distribution is given as an example. Its example probability density function is defined by the formula: f x) =
1 t π t2 x2
−∞ < x < ∞
as shown in Figure 1.2. Moments If for a given integer number k (k > 0) the function xk is integrable with regard to the function F(x), then the mean value (1.23) where is the domain of the determinacy of X, is called a raw (crude) moment of the order k of the random variable X. Obviously, m0 = 1
m1 = E(X) = m.
When the term ‘moment’ is mentioned, an engineer usually associates it with the corresponding idea which plays a major role in mechanics.11 Formula (1.23) is defined as the moment of the probability density distribution. If a denotes a certain constant then the formula: ∞
E{( X a) a )k }
∫(
a )k dF d (x )
(1.24)
−∞
is called a moment of k-th order about a value of the random variable X. For a = 0 we have raw moments. For a = m we have central moments.
0.1
f(x)
0.05
0 −10
Figure 1.2.
−5
0 x
5
10
Probability density function for Cauchy’s distribution.
11 Generally, in physics, the term moment can refer to many different concepts such as the moment of force, the magnetic moment, the electric dipole moment etc.
Book.indb 10
12/9/2013 12:21:58 PM
Fundamentals
11
Of great particular usage in the engineering world is the second central moment called variance that is determined by the pattern: E{(X – m)2} = σ2(X) = E(X2) – [E(X)]2
(1.25)
The positive square root of variance is called the standard deviation. Standard deviation is a measure12 of the average dispersion of the values of the random variable around its expected value. A low standard deviation indicates that the data points tend to be very close to the mean, whereas a high standard deviation indicates that the data points are spread out over a large range of values. Considering the definition of variance, some important properties can be formulated. The standard deviation is invariant under changes in location and scales directly with the scale of the random variable. Thus, for a constant a and random variables X and Y we have: • The variance of constant a is zero σ2(a) = 0
(1.26)
• Adding a constant to the random variable does not change the variance: σ2(X + a) = σ2(X)
(1.27)
σ2(aX) = a2σ2(X)
(1.28)
• The following equation holds:
• For a linear function of a random variable we have: σ2(aX + b) = a2σ2(X)
(1.29)
• For a random variable Y defined as: Y = X/σ(X)
we have σ2(Y) = 1
(1.30)
• For any constant a ≠ E(X) the following inequality holds: σ2(X) < E(X – a)2
(1.31)
• If the investigated population is divided into k groups, then the variance of the whole population is the sum of two components: − the arithmetic mean of the variance within groups − the variance of the means of the groups, i.e. the variance between the groups.
The role of standard deviation as a parameter describing the distribution of random variables is proven by the Chebyshev’s inequality (also spelled the Tchebysheff’s inequality). This will be given in Chapter 3, formula (3.14). Using formulas (1.22) and (1.30), we can make a standardisation of a random variable. In this book the term ‘measure’ appears very often. Let us recall its definition. If denotes any σ-algebra then every real function μ of any space X and if μ is a real function of the space X as determined in is called a measurable with is called a measure in the σ-algebra. Moreover, every subset belonging to regard to measure μ. If μ takes values not greater than 1, this measure is called a probabilistic one.
12
Book.indb 11
12/9/2013 12:22:01 PM
12
Statistics for mining engineering
If a random variable of the expected value E(X) is given and the corresponding standard deviation σ(X), then the random variable: U=
X
(X ) σ( X )
(1.32)
is called the standardised random variable. Its expected value is zero and its standard deviation is 1. Generally, the standardisation of a random variable is a transformation aimed at bringing different distributions of random variables of different means and degrees of differentiation to comparability. The difference between a certain probability density function before and after standardisation is shown in Figure 1.3. In some cases, the standardisation of random variables is applied in the structural reliability analyses conducted in connection with the uncertainties related to the resistance and load of technical objects. Both resistance and load are generally treated as random variables that have known distribution functions, although in some practical cases these functions are unidentified. However, there is still a possibility of carrying out a reliability analysis by applying the third-order polynomial normal transformation technique engaging the first four central statistical moments and the explicit fourth-moment standardisation function (Yan-Gang Zhao and Zhao-Hui Lu 2007). The root of equation F(xα) = α
0 E(X).
0.04 f(x)
0.03
f1(x) 0.02 0.01 0
0
50
100
150
x
Figure 1.7.
Book.indb 15
Two probability density functions with different values of the location parameter only.
12/9/2013 12:22:05 PM
16
Statistics for mining engineering f(x) 0.8 0.6 0.4 0.2 0 0
Figure 1.8.
2
4
6
x
8
10
Probability density functions with different values of the shape parameter only.
f(x)
2
1
0 0
1
2
3
4
5
x
Figure 1.9.
1.2.5
Probability density functions with different values of the scale parameter only.
Probability distributions of discrete random variables
Bernoulli distributions A random variable X that takes an x1 value with the probability p, 0 < p < 1 and an x2 value with the probability 1 – p is called a double-point Bernoulli random variable. Its probability distribution is given by the formula: ⎧0 ⎪ F (x) = ⎨ p ⎪⎩1
x ≤ x1 x1 < x ≤ x2 x > x2
(1.37)
Usually an alternative formula is given stating: P(X = x1) = p
and
P(X = x2) = 1 − p
(1.37a)
An example of the probability mass function and corresponding cumulative function for the double-point Bernoulli distribution are shown in Figure 1.10. In probability theory and statistics, the Bernoulli distribution, named after the Swiss scientist Jacob Bernoulli, is a discrete probability distribution, which takes value 1 with success probability p and value 0 with probability 1 – p. Thus
Book.indb 16
12/9/2013 12:22:06 PM
Fundamentals
17
F(X)
f(X) 1 1−p
p
p 0 x1
x2
x
x1
x2
x
Figure 1.10. The probability mass function f(x) and the corresponding cumulative function F(x) for a double-point Bernoulli distribution.
P(X = 1) = 1 − P(X = 0) = p This is the particular case of the double-point Bernoulli distribution. The expected value and the variance for both distributions are the same: E(X) = p σ2(X) = p(1 – p)
(1.38)
If a point of interest is the certain state in which a given technical object can be in given moment and there are only two possibilities (e.g. two alternative states: work and repair), this means that this point of interest is the random variable of the double-point Bernoulli distribution. We may ascribe the notation 1 to the work state and the notation 0 for the repair state. Binomial distribution Let X1, X2, …, Xn be independent random variables of the identical double-point Bernoulli probability distribution with the parameter p. Such a defined sequence of random variables is called a sequence of independent Bernoulli experiments (trials). It is presumed that if the random variable Xi takes the value 1 then it is classified as a success. If in the i-th Bernoulli trial the random variable takes the value 0, it is classified as a failure. The probability that in n independent Bernoulli trials success occurs exactly k times is given by the formula: ( where
( )= n k
n! k !( n− k )!
⎛ n⎞ k ) = ⎜ ⎟ pk ( ⎝ k⎠
p )n − k
(1.39)
is the binomial coefficient.
Formula (1.39) defines the Bernoulli probability function. An example of the Bernoulli probability density function is shown in Figure 1.11. The main parameters—the expected value and the variance—of the random variable are determined as follows: E(X) = np
σ2(X) = np(1 – p)
(1.40)
Presume that there is a given mechanised system applied in an underground coal mine and that this system consists of a shearer, two scraper chain conveyors and a certain number of belt conveyors that deliver broken coal from the wall to the shaft. The system is observed over n production shifts and the point of interest is the work state of the system in a given moment of time in a shift. The probability that the system will be k times (k ≤ n) in the work state in a given moment is determined by formula (1.39).
Book.indb 17
12/9/2013 12:22:07 PM
18
Statistics for mining engineering
Figure 1.11.
The Bernoulli probability density function.
Geometric distribution This distribution is defined in a twofold manner: a. as the probability distribution of the number X of independent Bernoulli trials needed to get one success; this distribution is supported on the set {1, 2, …} b. as the probability distribution of the number Y = X – 1 of failures before the first success; this distribution is supported on the set {0, 1, 2, …} If the probability of success in every trial is p, then the probability that in k-th trial will be success is determined by the pattern: P(X = k) = (1 – p)k−1p
for k = 1, 2, …
(1.41a)
Similarly, if the probability of success in every trial is p, then the probability that there will be k-th failures preceding the first success is determined by the pattern: P(Y = k) = (1 – p)kp
for k = 0, 1, 2, …
(1.41b)
Often, the name shifted geometric distribution is adopted for the distribution of the number X. This ‘displacement’ is visible looking at the mode because for X the random variable is 1 whereas for the second random variable it equals 0. The expected value and the variance in these probability distributions are the following: E(X) = 1/p E(Y) = (1 – p)/p
σ2(X) = σ2(Y) = (1 – p)/p2
(1.42)
The geometric probability distribution is the discrete equivalent of the exponential distribution18 and it has no memory as does its exponential counterpart.19 An example of the probability mass distribution for geometric distribution is given in Figure 1.12. Considering the number of hoist winds up to the moment of the over-winding at an extreme level, it is easy to see that this number is a random variable that is geometrically distributed in which p denotes the probability of over-winding in a single hoist work cycle.
18
This distribution is given by formula (1.52). The idea of a lack of memory is extended into the area of stochastic processes, e.g. the Poisson process in which the time from the occurrence of one event to the next one is an exponential one that is characterised only by lack of memory. This lack of memory means that the probability of the appearance of k events in the interval (T, T + t) does not depend on how many events and in which manner they have occurred up to the moment T (Gnyedenko and Kovalenko 1966). 19
Book.indb 18
12/9/2013 12:22:08 PM
Fundamentals
Figure 1.12.
19
An example of the probability mass distribution for a geometric distribution.
Poisson distribution This distribution was first introduced by Siméon Denis Poisson and published together with his probability theory (1837). A practical application of this distribution was made by Władysław Bortkiewicz in 1898 when he was given the task of investigating the number of soldiers in the Prussian army who were accidentally killed by horse kicks. This investigation led to the Poisson distribution and according to some researchers to the field of reliability engineering.20 If the random variable X takes values at points k = 0, 1, 2, … with the probability P(
k) =
λk −λ e k!
λ>0
(1.43)
then we say that this random variable has a Poisson distribution (Figure 1.13). The expected value and the variance are identical and E(X) = λ σ2(X) = λ
(1.44)
If we are interested in the probability distribution of the number of failures of a given type in a given time interval and the events that occur create a memoryless stream of arrivals, then the probability distribution of this random variable is given by formula (1.43). By observing the process of the operation of belt conveyors in mining, we can easily determine that the mean time between two neighbouring failures is long compared to the mean time of repair. Thus, it is usually presumed that the operation process from a reliability point of view is described by the Poisson process of which the probability of the occurrence of k failures in time t is given by formula (1.43) where the parameter is λt (t – time). The Poisson distribution can also be applied to systems with a large number of possible events, each of which is rare and the process of occurring events can usually be described by the Poisson process. The Poisson distribution is sometimes called a ‘Poissonian’. 1.2.6
Probability distributions of continuous random variables
Uniform distribution The uniform distribution, sometimes also known as the rectangular distribution, is a distribution that has a constant probability.
20
Book.indb 19
Vide: http://en.wikipedia.org/wiki/Poisson_distribution#cite_note-4.
12/9/2013 12:22:09 PM
20
Statistics for mining engineering
Figure 1.13. An example of the probability mass function and the cumulative function for the Poisson distribution.
Figure 1.14.
The probability density function of the uniform distribution.
A continuous random variable X which has the probability density function given by the pattern: ⎧ ( b a ) −1 for x ∈ [ a, b ] f x) = ⎨ otherwise ⎩0
( i
.14 ).
(1.45)
A frequently used notation is X: U(a, b). The expected value and the mean are the same: E(X) = Me(X) = ½ (a + b)
(1.46)
Depending on definition of mode some researchers are of the opinion that the mode is any value in the interval [a, b]; some that the mode does not exist. The variance is determined by the formula σ2(X) = (b − a)2/12
(1.47)
The uniform distribution is applied to estimate the parameters for probability distributions, making use of additional information (a priori) on estimating the parameters of a random variable. If all of the values that are taken into account are equally probable, the uniform distribution is used. This additional information is described by the probability distribution that is chosen and then the Bayesian approach is applied. The Bayesian inference can still be used when one or
Book.indb 20
12/9/2013 12:22:10 PM
Fundamentals
21
even two limited values a and b are −∞ and ∞. It was proved (see de Groot 1970, for example) that even presuming an improper distribution, there is still a possibility of conducting the Bayesian procedure and the distribution a posteriori will be the proper one. The uniform distribution has several interesting properties, among other things: • If the random variable X has the a uniform distribution supported on the (0, b) interval, then the random variable Z = ln(b/X) has the exponential distribution of the expected value equals 1. • If random variables X1, X2, …, Xn are stochastically independent and have the same uniform distribution supported on the (0, 1) interval and if n tends to infinity, then the probability distribution of their sum tends to the normal distribution N of their mean tends to the normal distribution N
(
1 2
,
1 12 n
).
(
n 2
n 12
) and the distribution
Gamma distribution If the probability density function of the random variable X is given by the formula νξ ξ 1 x e Γ( ξ )
f x) =
νx
x ≥ 0, ν > 0, ξ > 0
(1.48)
then we say that this random variable has a gamma distribution with the shape parameter ξ and the scale parameter ν. A frequently used notation is X: Ga(ξ, ν). The expected value and the variance are as follows: σ2(X) = ξ /ν2
E(X) = ξ /ν
(1.49)
The gamma function, being a component of the function (1.48), is determined by the pattern: ∞
Γ (ξ ) =
∫
x ξ − 1e− x dx
(1.50)
0
The gamma function is an extension of the factorial function and it has the following property: Γ(ξ) = (ξ – 1) Γ(ξ – 1)
(1.50a)
Γ(ξ) = (ξ – 1)!
(1.50b)
For ξ being an integral number
For large values of ξ , the gamma function can be calculated using Stirling’s formula and then Γ(ξ
⎛ ξ⎞ )≈⎜ ⎟ ⎝ e⎠
ξ
⎛ 1 ⎞ 2 πξ ⎜1 + ⎝ 12ξ ⎟⎠
(1.51)
If a scale parameter is a multiple of ½, then the distribution is named the chi-squared or χ2-distribution21. This distribution is extremely significant in mathematical statistics. 21
Book.indb 21
See formula (1.109).
12/9/2013 12:22:12 PM
22
Statistics for mining engineering
0.5
f(x) ξ≤1
0.4 0.3 0.2
ξ>1
0.1 x
0 0
Figure 1.15.
2
4
6
8
10
12
14
16
18
20
Gamma probability density functions.
If the scale parameter is not larger than 1, the distribution is extremely asymmetric. Different shapes of the gamma probability distribution are shown in Figure 1.15. The gamma distribution is applied to describe the load and strength of some machine elements (Warszyński 1988). It is also employed for the modelling of the lifetime of items that are subject to cumulating agents. It is suitable for modelling the processes of the wearing of the elements of machines and devices (Gertzbah and Kordonsky 1966). In mining, winders have probability distributions of times of work and repair states that can be satisfactorily described by the gamma distribution. The repair time of dumpers used in open pit mines as well as of power shovels can be described by this distribution. The gamma distribution is frequently applied in the mathematical description of the processes of the wearing of tyres. This probability distribution was also applied in the study of the processes of the separation of grains in pulsators. It was assumed that the length of a single jump of a particle during water pulsation is a random variable of the gamma distribution (Smirnow 1979). The application of a generalised gamma distribution for the approximation of the composition functions for grains was presented by Nipl (1979). Some particular cases of the gamma distribution have been used in the description of certain material characteristics during ore enrichment processes (vide: Tumidajski and Saramak 2009 p. 63). If the shape parameter is 1 in the gamma distribution, then the probability density function is given by the formula f ( x ) = νe − νx
ν>0
(1.52)
and this distribution is called an exponential distribution (Figure 1.16). This probability distribution has many applications in engineering practice because it is easy to use. Many electric and electronic parts have a lifetime probability distribution of an exponential character. When the first models of the processes of the changes of states for technical objects occurred in literature, they were almost exclusively composed of exponential random variables. The processes of changes of states in which the times of the states are mutually independent and described by exponential distributions are called Markov processes. Their parameters and characteristics are shown in an explicit form, which is easy to use. For this reason, exponential distribution was widely applied during the early days of reliability development as well as in the theory of the exploitation of premature growth. This distribution was abused in those days, but excuses can be found in the poor development of advanced modelling by applying other, more complicated distributions. In those days,
Book.indb 22
12/9/2013 12:22:15 PM
Fundamentals 1.5
23
f(x)
x 0
Figure 1.16.
1
2
3
4
5
Probability density functions of an exponential distribution.
engineers working with the data gathered applied this distribution even when the goodness of the description was evidently poor (e.g. Barbaro and Rosenshine 1986 analysing the operation22 of a shovel-truck system). Unfortunately, engineers who are engaged in research have fallen into the habit of applying exponential distribution and they still use it, even in cases where it should not be applied. One can get the impression that engineers have not noticed that the actual models are much more advanced using different probability distributions. Some modern models allow any probability distribution to be employed, i.e. such a distribution can be exponential as well as another different model (e.g. Sivazlian and Wang 1989). However, it should be clearly stated that these modern models are more advanced and more difficult to use in analyses and application. Nevertheless, many pieces of equipment, also in mining (e.g. conveyors of different types, excavating machines, stackers), have probability distributions of work times that can be satisfactorily described by exponential distribution. Similarly, many machines used in earthmoving engineering have probability distributions of a work time exponential. The probability distribution of work time is also described by exponential distribution in many modern sophisticated electronics systems. In some cases, the repair time has a probability distribution of exponential character as well. Erlang distribution The sum of k independent random variables distributed exponentially has a gamma probability distribution with the parameter ξ = k. This distribution is called the Erlang distribution of the order k. Its cumulative function is given by the formula: k −1
(λ )i − λx e i! i =1
( ) = 1− ∑
x ≥ 0, λ > 0
(1.53)
It is easy to notice that the gamma distribution of the scale parameter taking a natural number is in fact the Erlang distribution.
22 The terms ‘exploitation’ and ‘operation’ are used interchangeably. Recall, according to the classical definition used in the theory of exploitation that the exploitation process is the process of changes in the properties of an object. This process does not concern either the design/construction or production phases.
Book.indb 23
12/9/2013 12:22:16 PM
24
Statistics for mining engineering
The Erlang distribution was developed by A.K. Erlang, a Danish mathematician, statistician and engineer who invented and developed the fields of traffic engineering and queuing theory. In the early years of the 20th century, he examined the number of telephone calls which could be made at the same time to the operators of switching stations. This work on telephone traffic engineering has been expanded to consider waiting times in queuing systems in general. The distribution is now also used in the fields of stochastic processes, telecommunication and biomathematics. When the scale parameter of the Erlang distribution is 2, then the distribution simplifies to the chi-squared distribution with 2k degrees of freedom. It can therefore be regarded as a generalised chi-squared distribution. The term ‘degrees of freedom’ was used here and therefore needs explanation. In statistics, the number of degrees of freedom is the number of values in the final calculation of a statistic that are free to vary. The degrees of freedom of an estimate of a statistical parameter is equal to the number of independent outcomes that go into the estimate minus the number of parameters used as the intermediate steps in the estimation of the parameter itself. The Erlang distribution is extremely significant in the queuing theory that is called the mass servicing theory in Central Europe. More than half a century ago the so-called Erlangian systems, which can be analysed based on the decomposition of the Erlang random variable into the sum of independent random variables exponentially distributed, came into existence. An example of an analysis of such a machinery system—the system applied in surface mining— was presented in Czaplicki’s book (2004 and 2010). Weibull distribution If the probability density function of the random variable X is determined by the formula: f x ) = αλ x α e
λx α
x ≥ 0,, α > , λ > 0
(1.54)
then we say that this random variable has the Weibull probability distribution. The notation that is sometimes used for this random variable is X: W(α, λ). This function has two structural parameters. The parameter α is the shape parameter whereas the parameter λ is the scale parameter. The picture showing the probability density functions for the Weibull distribution is quite similar to the gamma distribution. Both distributions are particular cases of the generalised gamma distribution. The expected value and the variance for the Weibull distribution are determined as follows: E( )
(
α 1 )λ
−1
⎡ ⎛ 2⎞ σ 2 ( ) = ⎢Γ 1 + ⎟ − Γ 2 ( ⎣ ⎝ α⎠
1
⎤ 2 ) ⎥ /λ α ⎦
(1.55)
The name of this distribution came from Waloddi Weibull, who described and applied this distribution to the strength of materials (Weibull 1939), although some researchers used it earlier. It is said that it was identified by Fréchet who published it in a Polish mathematical journal (1927) and was first applied by Rosin and Rammler (1933) to describe the size distribution of particles. However, a comprehensive mathematical analysis was done by Gnyedenko (1941). This distribution was generalised by Weibull, who added the parameter of the displacement of the origin of the coordinate system, in 1956. The probability distributions of the lifetime of many mechanical parts can be described by the Weibull distribution.
Book.indb 24
12/9/2013 12:22:18 PM
Fundamentals
25
It was proved (Gercbach and Kordonsky 1968) that if the elements of a system have work times of a gamma distribution of slightly different values of the parameters, then the probability distribution of the work time of the system is the Weibull distribution when the number of elements is large. Internal combustion engines have several cylinders, gas turbines have many vanes and many electronic systems have many identical parts. All systems having the same elements are characterised by the fact that the work time probability distribution tends to be the Weibull distribution if the number of these elements is increased. In some cases, the Weibull distribution is obtained from a theoretical analysis that is associated with an empirical situation. Consider a system consisting of a certain number of elements connected in a sequence with each element consisting of a pair of items working in a parallel way. A failure of the system occurs when both elements in any pair fail. If the reliability of an element is described by the exponential distribution then it was proved (Gnyedenko et al. 1969, Chapter 2.2) that when two simple mathematical conditions are fulfilled, the reliability (survival) function has a limit and this boundary is the Weibull distribution. An analysis of the process of operation of powered support of operating in underground coal mines is presented in Czaplicki’s book of 2010 (Chapter 7.6) and, based on empirical data, the probability distributions of the times of states are described by the Weibull family of functions. An analysis of the system of power shovel-crusher-conveyors is also presented in the same chapter. The author took into account that the empirical distributions of the random variables of work and repair times are often different to the exponential and for this reason he applied the Weibull function. He stated that the process of changes of states is a semi-Markov one. This probability function was used to describe the distribution of the instantaneous productivity of bucket wheel excavators (Jurdziak 2006, Dworczyńska et al. 2012). The Weibull distribution is extremely significant in the reliability of objects working until the first failure occurrence. The hazard function23 (a function of the conditional intensity of failure) of an item for which the lifetime is a random variable described by the Weibull distribution has a variety of different shapes (Figure 1.17) and because of this property, the Weibull distribution can be applied in many empirical cases24. For α = 1 the Weibull distribution becomes an exponential one. Normal (Gaussian) distribution If the probability density function of the random variable X is determined by the pattern: f (x) =
⎡ ( x m )2 ⎤ 1 exp ⎢ − ⎥ 2σ 2 ⎦ σ 2π ⎣
x ∈(
) , m ∈( −∞ ∞) , σ > 0
(1.56)
then we say that the random variable has a normal distribution. A frequently used notation is X: N(m, σ). This function has two structural parameters: m and σ. The first one is the location parameter and the second is the scale parameter. 23 A hazard function is associated with items working until the occurrence of the first failure. It is the probability that an item will fail in the near future (a brief time interval) provided that the item has been functioning well until now. Mathematically, it is the conditional intensity of the failure of an item and is determined by the formula: λ(t) = f(t)/R(t), where R(t) is the reliability function. 24 The Weibull distribution has had a tremendous career amongst practitioners, especially engineers. In 1977 Weibull himself collected 1019 references (articles) and 36 titles of books in which his model is mentioned in a technical report of Förvarets Teletekniska Laboratorium (in Stockholm, Sweden) (all these titles are only in English). Due to the enthusiasm related to this distribution, Giorski (1968) draws the attention of what he calls ‘Weibull euphoria’ arguing that the model is very useful but it is not ‘universal’ (one year later, Ravenis (1969) proclaimed that Weibull’s model is a ‘potentially universal p.d.f. for scientists and engineers’…).
Book.indb 25
12/9/2013 12:22:21 PM
26
Statistics for mining engineering λ(t) α 0, d > 0
(1.61)
where: 1
B (c, d )
∫
x c (1 − x )d 1 ddx =
0
Γ (c (c ) ( d ) is the beta function Γ (c d )
(1.62)
then we say that the random variable has a beta distribution. Plots of the probability density functions of the beta distribution of different parameters are shown in Figure 1.20. A frequently used notation is X: Be(c, d). The expected value and the variance in this probability distribution are E( )
Book.indb 28
c c d
σ2 ( ) =
cd (c d )2 (c (c d
)
(1.63)
12/9/2013 12:22:25 PM
Fundamentals
29
f(x) 5
4
3
2
1
0 0
0.2
0.4
0.6
0.8
1.0
x
Figure 1.20.
The probability density functions of a beta distribution.
The probability distribution of steady-state availability—treated as a random variable— for identical pieces of equipment are described by the beta distribution. Similarly, as a rule the probability distribution of the utilisation of equipment is described by this type of probability distribution. There are several further probability distributions that are applied in mining engineering (e.g. the Pareto distribution, logistic distribution, M1 and M2 distributions that are based on the hyperbolic cosine and used in the pulverisation of coal (Mianowski 1988, Tumidajski 1992)). However, their applications are not very frequent and for this reason they are not considered in this text. be the Borel set26 on the x axis that 0 < P(X ∈ ) < 1. Let X be a random variable and The conditional distribution determined for a real number x by the expression P(X ≤ x, X ∈ ) is called the truncated distribution of the random variable X. Example. If the probability density function is determined as f x) ⎧ ⎪ f1 u ) = ⎨ F (b ) − F (a ) ⎪⎩ 0
for a
u
b
(1.64)
elsewhere x
where function f(x) is determined by formula (1.56) and F ( x ) = ∫ f v )dv (the integrand −∞ − is the density function before truncation), then we say that the random variable U has a truncated normal distribution supported on interval [a, b]. The expected value and the variance of the random variable above can be defined as follows: E (U ) = μ = m + σ
I1 I0
(1.65)
26
A Borel set is any set in a topological space that can be formed from open sets (or, equivalently, from closed sets) through the operations of a countable union, countable intersection and relative complement.
Book.indb 29
12/9/2013 12:22:28 PM
30
Statistics for mining engineering σ2(U) = (I2 I02 – I12) (σ/I0)2
(1.66)
⎛ b− μ ⎞ ⎛ −μ ⎞ I0 = ΦN ⎜ − ΦN ⎜ ⎝ σ ⎟⎠ ⎝ σ ⎟⎠
(1.67)
⎛ μ⎞ ⎛ b− μ ⎞ I1 = φN ⎜ ⎟ − φN ⎜ ⎝ σ⎠ ⎝ σ ⎟⎠
(1.68)
where:
I2
I0 −
μ ⎛ μ⎞ b μ ⎛ b − μ⎞ φN ⎜ ⎟ − φN ⎜ ⎝ σ ⎟⎠ σ ⎝ σ⎠ σ
(1.69)
ΦN(y)—the distribution function of a normal standardised random variable N(0, 1); see Table 9.1 at the end of this book, φN(y)—the probability density function of the normal standardised random variable N(0, 1). The distribution of a stream of excavated rock which flows over a belt conveyor system in a unit of time can be described by the truncated normal distribution. The left side boundary is zero (x ≥ 0) whereas the right side boundary is defined by the inequality: x ≤ xmax, where xmax is the maximum conveyor output (the maximum mass of excavated rock that can physically be located on the conveyor, in unit of time). 1.2.7 Two-dimensional random variable and its moments The considerations examined up to now have concerned a one-dimensional random variable. However, in some empirical cases, we may have two or more random variables. It is necessary to consider the statistical measures that allow these variables to be described. Let us confine our attention to a two-dimensional case. The probability distribution F(x, y) of a two-dimensional random variable is defined as: x
F ( x, y )
y) ∫
P ( X ≤ x,
y
∫
f u, v )dudv.
(1.70)
−∞ −∞
if the random variable is a continuous one. We frequently interpret the probability distribution by means of the distribution of a unit of mass over the (x, y) plane. By projecting the mass in a two-dimensional distribution on one of the coordinate axes, we obtain the marginal distribution of the corresponding variable. Thus, we have: FX(x) = P(X ≤ x)
and
FY(y) = P(Y ≤ y)
(1.71)
It is easy to enlarge these considerations to include discrete random variables. If a two-dimensional random variable (X, Y) is given, then the raw statistical moment of the order k + l; k, l = 0, 1, … of this variable is given by the pattern:
mkl
Book.indb 30
E(
k
⎧∑ ∑ xik ylj pij for both discrete random variables X a d Y ⎪⎪ i j l )= ⎨∞ ∞ d dy for both continuous random variables X and Y ⎪ ∫ ∫ x k yl f x, y dxd ⎪⎩ −∞ − −∞ (1.72)
12/9/2013 12:22:30 PM
Fundamentals
31
Therefore: m10 = E(X) m01 = E(Y) m20 = E(X2)
m02 = E(Y2)
m11 = E(XY)
(1.73)
The last moment above, m11 is called the second order product moment or more concisely, the mixed moment. Similarly, we can define the central moments for a two-dimensional random variable (X, Y). The central moment of the order k, l is given by the formula: νkl = E{[X – E(X)]k [Y – E(Y)]l}
(1.74)
ν11 = E{[X – E(X)] [Y – E(Y)]} = Cov(X, Y)
(1.74a)
If k = l = 1, then
is called the covariance of (X, Y). This statistical parameter has some interesting properties, namely: ⎧Cov(X,Y ) = Cov(Y, X ) ⎪Cov(X, a)) = 0 ⎨Cov(X, X ) = σ 2 ( ) ⎪ ) (X ) E ( ) ⎩Cov(X,Y ) = (
any constant
(1.75)
If the random variable X is independent of the random variable Y, then their covariance is zero. The converse theorem does not hold. If the random variables X and Y have Cov(X, Y) = 0, then we say that they are uncorrelated linearly. Further covariance properties are: −σ(X) σ(Y) ≤ Cov(X, Y) ≤ σ(X) σ(Y)
(1.76)
σ2(X ± Y) = σ2(X) + σ2(Y) ± 2 Cov(X, Y)
(1.77)
A generalisation of the concept of variance is the variance matrix or the variance-covariance matrix.27 Such a matrix for the random vector X1 X 2 ,…, X n has the form: ⎡ σ12 cov ( X1, X 2 ) ⎢ cov X , X σ 22 ( ) 2 1 ⎢ ⎢ ... ... ⎢ cov X , X cov X ( n 1) ( n, X2 ) ⎢⎣
... cov ( X1, X ... cov ( X 2 , X . ... ... ... σ 2n
)⎤ )⎥⎥ ⎥ ⎥ ⎥⎦
(1.78)
This matrix is symmetric and its determinant is non-negative. A very important parameter called the linear correlation coefficient (ρ) is related to the covariance. It is defined in the following way: ρ = Cov(X, Y)/σ(X) σ(Y)
(1.79)
27
Some statisticians call this matrix the variance of the random vector because it is a natural generalisation to the higher dimensions of the one-dimensional variance (see for instance Feller 1957). Others call it the covariance matrix because it is the matrix of covariances between the scalar components of the random vector. The term cross-covariance is also sometimes used. Finally, very often the matrix is called the variance-covariance matrix since the diagonal terms are in fact variances.
Book.indb 31
12/9/2013 12:22:34 PM
32
Statistics for mining engineering This coefficient has several important properties, namely:
• it is supported on [−1, 1] interval; • if two random variables are stochastically independent linearly, then their correlation coefficient is zero; • the necessary and sufficient condition for ρ2 = 1 is that the following relationship holds: P(Y = aX + b) = 1
for a > 0
(1.80)
Because of the last relation, the coefficient is called a linear correlation coefficient. A particular case of a two-dimensional random variable is the Gaussian random variable which is characterised by the probability density function: f x, y )
1 2(( e 2 πσ x σ y
⎡ ( x m )2 ( x m10 )( y m10 ) ( y m01 )2 ⎤ 10 ⎢ ⎥ − 2ρ + σx σ y ⎥⎦ ρ2 ) ⎢⎣ σ 2x σ 2y
−1
(Figure 1.21)
(1.81)
where x, y, m10, m01 are supported on an infinite set of numbers, σx and σy takes only positive values and ρ ∈ [−1, 1]. The expected values m are determined by (1.73). The expected value of a conditional two-dimensional probability distribution (the conditional expected value) of the random variable X provided that Y = y is determined by the pattern:
E(
|Y
pij ⎧ for a discrete random variable ⎪∑ xi p ⎪ i .j yj ) = ⎨ ∞ ⎪ x f x, y ) dx ∫ f2 y) d for a continuous random variable ⎪⎩ −∞
(1.82)
f (x , y)
pij
where p. j and f2 ( y) are the probability mass functions and the probability density function in the conditional distribution of the random variable X, respectively. There are some two-dimensional random variables that are used in mining engineering problems but their applications are rare; perhaps they will be more useful in the future. Two of these distributions are as follows.
3 2 3
1 2
0
1 −1
0 −2 −3
Figure 1.21.
Book.indb 32
−2
−1
−3
The probability density function of a two-dimensional normal random variable.
12/9/2013 12:22:36 PM
Fundamentals
33
a. The two-dimensional composition of a gamma distribution and a standardised normal distribution; this probability density function is given by the formula: ⎛ ⎛ x2 ⎞ y2 ⎞ ⎧ ⎡ − βy y+ ⎟ − γx x+ ⎟⎤ 2⎠ 2⎠⎥ ⎪ ⎢ a −1 ⎝ b −1 ⎝ ⎪α y e +x e ⎥ for ( x, y ) ∈ A f x, y ) = ⎨ ⎢ ⎢ ⎥⎦ ⎪ ⎣ ⎪⎩0 elsewhere (Figure 1.22)
(1.83)
where: a > 0, b > 0, α > 0, γ > 0, A ∈ {(x, y): x > 0, y > 0} α=
2 π γb
βa γ b βa Γ( b )
(1.83a)
The random variables X and Y that are components of the above function are stochastically dependent because: f(x, y) ≠ f(x) f(y) It is interesting that the function (1.83) has a constant regression function of the first type equals m = 4[1 + 2ϕ(0 )] ≅ 7.2 This function was applied in a study concerning reliability (Czaplicki 1981). b. The Morgenstern distribution (Morgenstern 1956, Butkiewicz 1997, Butkiewicz and Hys 1977) for which the probability density function is given by the formula: f x, y
f1 ( x f2 ( y )[
(
F ( x ))(
F ( y ))]
(1.84)
where: μ ∈ [−1, 1] ⎡ ⎛ x ⎞ b1 ⎤ F1( x ) = 1 − exp ⎢ − ⎜ ⎟ ⎥ ⎢⎣ ⎝ a1 ⎠ ⎥⎦ ⎡ ⎛ y ⎞ b2 ⎤ F2 ( y ) = 1 − exp ⎢ − ⎜ ⎟ ⎥ ⎢⎣ ⎝ a2 ⎠ ⎥⎦
(1.84a)
This probability distribution is significant in investigations related to grain size, their magnetic susceptibility and perhaps some further physical-and-chemical properties of grains (Tumidajski and Saramak 2009).
Figure 1.22.
Book.indb 33
An example of the probability density function (1.83).
12/9/2013 12:22:39 PM
34
Statistics for mining engineering
1.2.8
Stochastic process
Generalisation of the concept of a random variable is a stochastic (random) process. A stochastic process X(t) is a set of random variables depending on the parameter t that belong to a certain set of real numbers. Very often it is presumed that this parameter is time. However, in engineering practice it is much better to analyse many stochastic processes that are dependent on different parameters28 such as: the total mass of transported material, the work executed by a given machine, the number of work cycles of a piece of equipment, the productivity of a system etc. When parameter t is fixed, the stochastic process is a random variable. When an elementary event is fixed, a random process is the function of time x(t) that is called the realisation of the stochastic process. In order to avoid any misunderstandings that may arise when using the word value (the value of parameter and the value of process), the values that take the random variable X(t) will be called process states. During empirical investigations we observe the realisation of a certain stochastic process only. When the investigation of the process is repeated, we observe stochastic copies of it. A set of such realisations and conditions of the choice of the observation is the statistical information based on which a statistical inference is being made. We say that a stochastic process X(t) is completely described when for every set of moments t1, t2, …, tn the joint distribution of the random variables X(t1), X(t2), …, X(tn) is known. Knowing this distribution, we are able to find the basic characteristics of the process such as: the expected value, its variance, the limited probability distribution of the process states and so on. An important property of a stochastic process is its stationarity. Two types of stationarity are distinguished in theory. We say that a stochastic process has strict (strong) stationarity if its joint probability distribution does not change when shifted in time or space. Accordingly, parameters such as the average value and variance, if they exist, also do not change over time or position. If the first moment and covariance do not vary with respect to the time of a certain stochastic process, we say that such a process has a wide-sense (weak-sense) stationarity. Two types of stochastic processes are widely applied in engineering analyses. These are processes that depend on the continuous parameter t and processes that are determined on the set of nonnegative integer numbers. The latter ones are called stochastic chains. The stochastic processes with the broadest applications in engineering practice are the Markov processes. A stochastic process X(t) of the continuous parameter t, t ≥ 0 (or a stochastic chain X(t), t = 0, 1, …) is called a Markov process (Markov chain) when for every system of moments t1< t2< … < tn< t and any set of real numbers x0, x1, …, xn, x the following equality holds; P(X(t) < x | X(ti) = xi, i = 0, 1, …, n) = P(X(t) < x | X(tn) = xn)
(1.85)
In other words, if the state of the Markov process in moment tn is known, then any additional information on the states of the process before tn does not have any influence on the distribution of the process values in later moments. The Markov process can be thought of as ‘memoryless’. It is the characteristic property that the process of the changes of the states of a continuous parameter of the Markov type has all of the states of the exponential distribution. The idea of the Markov chain can be described as follows. A set of states = { 1, 2, …, n} is given. The process starts in one of these states and moves successively from one state to another. Each move is called a step or jump. If the process is 28
Some researchers are of the opinion that time does not exist; it is only a very convenient measure that was invented and introduced by people. Notice that devices measuring time in fact show the progress of a certain physical process only.
Book.indb 34
12/9/2013 12:22:42 PM
Fundamentals
35
currently in state i, then it moves to state j at the next step with a probability denoted by pij and this probability does not depend on which state the process was in before the current state (memoryless property). The probabilities pij are called transition probabilities. The process can remain in state i with the probability pii. An initial probability distribution, defined on , specifies the starting state. In a continuous space, the probability distribution that has a memoryless property is an exponential distribution whereas in a discrete space, it has a geometric distribution. The process is called a ‘chain’ because not only are the states discrete but the moments when the jumps occur are also discrete ones. The processes of operation (exploitation), which are understood as processes of changes of states of mechanised systems in mining and also in earthmoving engineering, can be described by the Markov processes in many cases (Sajkiewicz 1982, Czaplicki 2010a for instance). The process of the fluctuation of a mass in bins can be modelled by the Markov process in some cases (Benjamin and Cornell 1970) as can the process of road surface degradation (ibidem). Nowadays, a growing interest in the application of semi-Markov processes can be observed in engineering practice (Brodi and Pogosjan 1973, Barlow and Proschan 1975, Bousfiha et al. 1996, Bousfiha and Limnios 1997, Limnios and Oprişan 2001, Grabski and Jaźwiński 2001). This trend also concerns the mining engineering field (Czaplicki 2010a and 2010b, Czaplicki and Kulczycka 2012). A semi-Markov process is a random process X(t) with a finite or countable set of states that have stepwise trajectories with jumps at times 0 < τ1 < τ 2 < ... such that • the values X(τ) at its jump times form a Markov chain with transition probabilities: pij = P{X(τn) = j | X(τn−1) = i}
(1.86)
• the distributions of the jumps τn are described in terms of the distribution functions Fij(t) as follows: P{τn − τn−1 ≤ t, X(τn) = j | X(τn−1) = i} = pij Fij(t)
(1.87)
This process is called a semi-Markov process (see Korolyuk and Turbin 1976, Limnios and Oprişan 2001, Harlamov 2008)29. It is of practical importance to emphasise that states in this type of process are mutually independent. If Fij(t) are exponential then the semi-Markov process is a continuous-time Markov chain or simply a Markov process. If all of the distributions degenerate to a certain point, the result is a discrete-time Markov chain. In analytic terms, an investigation of semi-Markov processes can be reduced to a system of integral equations (Korolyuk and Turbin 1976).
1.3
BASIC TERMS OF STATISTICAL INFERENCE
An essential task of mathematical statistics is statistical inference. It can only be applied in relation to the outcomes of random experiments. Two cardinal parts of this field of science are the theory of estimation and the theory of the verification of statistical hypotheses.
29
Semi-Markov processes were introduced by Levy (1954) and Smith (1955). Takács (1954, 1955) investigated similar processes. The foundations of the theory of semi-Markov processes were mainly laid by Pyke (1961a, b), Pyke and Schaufele (1964), and Korolyuk and Turbin (1976).
Book.indb 35
12/9/2013 12:22:43 PM
36
Statistics for mining engineering
The theory of estimation deals with the assessment of unknown parameters of the general population that are based on a random experiment. 1.3.1
Estimator
A basic term of the theory of estimation is an estimator. This is understood as a clearly defined function of the outcomes of a random trial implied by an unknown parameter θ of the general population. If so, the estimator is a random variable. Notice that if the point of interest is an unknown parameter θ of the general population and that a random sample of size n is taken to estimate its value, then by applying the estimator Tn we have the following situation: Tn = f (X1, X2, …, Xn | θ)
(1.88)
because every element of the sample can be treated as a random variable. A value calculated based on a random sample taken tn of the estimator is called an estimate of the unknown parameter θ. This estimate is given by the equation: tn
f ( x , x2 , ..., xn )
(1.89)
It is a number, the deterministic value. 1.3.2
Properties of estimators and methods of their construction
Theoretically, an infinite number of estimators can be constructed. Some of them will give a worse assessment of the unknown parameter, some—better. Thus, we must have the possibility of making an evaluation of which estimator is better and which is worse. Or, to be more precise, which estimator has better properties that will usually yield better estimates because the estimator is a function. This gives us a tool with which to select a good estimator. There are two important items connected with each estimator, namely: • the error of estimation • the properties that characterise the selected estimator. It is obvious that one can be almost certain that when making an estimation an error will occur because a statistical inference is made based on a trial only. This error is called the error of estimation. It can be defined as: d = Tn – tn
(1.90)
The right side of the equation determines a certain random variable because the function of a random variable is also a random variable. Therefore, the left side of the equation is also a random variable. Therefore, the estimation error is a random variable. It has its own probability distribution and we are able analyse its basic parameters. To achieve a precise estimation, i.e. to ensure a small error of estimation, it is necessary to pay attention to both the correct sampling and the selection of an estimator with good statistical properties. A good estimator should be, among the other things, characterised by following properties: • • • •
Book.indb 36
unbiasedness consistency efficiency sufficiency.
12/9/2013 12:22:44 PM
Fundamentals
37
It is said that an estimator Tn of parameter θ is unbiased if its expected value is the same as the value of the estimated parameter30, i.e. E(Tn) = θ
(1.91)
Notice that the expected value of a random variable is a deterministic value31. An unbiased estimator allows the unknown parameter to be estimated without systematic errors. The difference: Δ = E(Tn) – θ
(1.92)
is called a bias of the estimator Tn. Obviously, the bias of an unbiased estimator is zero. Let us consider the estimation of an unknown expected value m in a certain general population . Let us use the arithmetic mean formula: x=
1 n ∑ xi . n i=1
(1.93)
This estimator is an unbiased one since: ⎛ 1 n E (x ) = E ⎜ ∑ ⎝ n i=1
i
⎞ 1 n ⎟⎠ = n ∑ E(( i=1
i
)=
1 nm = m n
The second statistical parameter used most frequently, besides the expected value, is the standard deviation σ or its square—the variance. Presume now that for the estimation of the unknown variance σ2 of the general population, the following estimator was applied: s2 ( ) =
1 n ( xi ∑ (x n i =1
x )2
(1.94)
Let us test the bias of the estimator above. Here we have: ⎡1 n ⎤ ⎧1 n ⎫ E [ s 2 ( X )] = E ⎢ ∑ (x ( xi x )2 ⎥ = E ⎨ ∑ [( xi m ) ( x m )]2 ⎬ ⎣ n i =11 ⎦ ⎩ n i =1 ⎭ n ⎡1 n ⎤ 1 = E ⎢ ∑ ( xi − m )2 − 2( x − m ) ∑ ( xi − m ) + ( x − m )2 ⎥ n n i =1 ⎣ i =1 ⎦ 1 n 1 n 2 1 2 n −1 2 = ∑ E[(x xi m − E x − m = ∑ σ − σ = σ ≠ σ2 n i =1 n i =1 n n Thus, the above estimator is a biased one. Its bias is: E [ s 2 ( X )] − σ 2 =
n −1 2 1 σ − σ2 = − σ2 n n
30 There are more general notions of bias and unbiasedness. Here ‘bias’ is de facto ‘mean-bias’ in order to distinguish mean-bias from the other notions with the most noteworthy ones being ‘median-unbiased’ estimators. See for example Rojo (2012). 31 In some statistical investigations, a randomisation of the expected value is made, i.e. we treat that value as a random variable although this is a targeted exception from the rule.
Book.indb 37
12/9/2013 12:22:44 PM
38
Statistics for mining engineering Notice, that when the sample size taken is large, its bias is: ⎛ 1 ⎞ lim ⎜ − σ 2 ⎟ = 0 n→∞ ⎝ n ⎠
Therefore, this estimator is asymptotically unbiased for this reason. It can be applied when the sample size is large; practically n > 30. By analysing the bias of the investigated estimator, a conclusion can be formulated that it gives estimates of the variance that are too low. It is easy to prove that an estimator: sˆ2 ( )
1 n ∑( n − 1 i =1
i
)2
(1.95)
of the unknown variance of the general population is an unbiased one. It can be applied in any sample size. If a sample of N elements is given and it consists of k groups of size ni; i = 1, 2, …, k, the following equation holds:
2 x
s
si
2
∑ + s (x ) = 2
i
k 2 i =1 i i
sn
N
∑ +
k i =1
( xi
x )2 ni
N
(1.96)
2 where: si —the estimate of variance within the i-th group x—the arithmetic mean of the whole sample xi —the arithmetic mean of the i-th group s 2 ( xi ) —the variance between groups.
By looking more carefully at pattern (1.96), a simple conclusion can be drawn—the more differentiated the population, the greater the value of its variance. The relationship (1.96) is called the ‘variation identity’ (Sobczyk 1996 p. 46). This pattern is useful in the calculation of some combined machinery systems (Czaplicki 2010a p. 230) as well as in calculations connected with the homogeneity of shovel-truck systems (ibidem p. 266). The second important property that must be investigated before the application of a given estimator is its consistency. It is said that estimator Tn of the parameter θ is consistent if it converges in probability (stochastic convergence) to the true value of the parameter, i.e. the following equation holds: lim P{| Tn − θ | < } = 1 ε > 0 n→∞
(1.97)
Looking at this relationship, one may easily come to the conclusion that enlarging the sample size leads to a situation in which the estimates that are obtained will be closer and closer to the real value of the unknown parameter θ. Suppose one has a sequence of observations {x1, x2, …} from a normal N(μ, σ) distribution. In order to estimate the unknown expected value μ, one uses the sample mean determined by formula (1.93). Now assume that every element of the sample is a random variable. If so, the estimator (1.93) becomes a random variable. Denote it by Tn. From the properties of the normal distribution, we know that Tn is itself normally distributed with the mean μ and the variance σ2/n. Equivalently, the random variable (Tn − μ)/(σ/ n ) has a standard normal distribution. Therefore, the following relationship holds: P(|Tn − μ | ≥ ε ) = P[(|Tn − μ | n / σ ≥ (ε n /σ)] = 2 [1 − ΦN(ε n /σ)] → 0
Book.indb 38
12/9/2013 12:22:48 PM
Fundamentals
39
as n tends to infinity for any fixed ε > 0. Thus, the estimator Tn of the sample mean is consistent for the population mean μ. An estimator can be unbiased but not consistent. For example, for independent and identically distributed32 random variables that are components of a sample {X1, ..., Xn}, one can use Tn = x1 as the estimator of the mean E(X). Alternatively, an estimator can be biased but consistent. For example, if the mean is estimated by the formula [(1/n) + (Σxi /n)], this estimator is biased, but as sample size n tends to infinity, it approaches the correct value and so it is consistent. A significant property of estimator is its efficiency. A given estimator is the most efficient if it is unbiased and of the lowest variance among all of the possible the unbiased estimators constructed on samples. A small value of the variance of a given estimator ensures a small dispersion of the estimates of the unknown value of the parameter that we can obtain from it. When investigating the efficiency of a given estimator, we compare at least the variances between two estimators of the same parameter. The estimator with a lower variance is more efficient than the other. Compare, for instance, an efficiency of the estimators of variances basing on the mean and the median. We have: σ2 D (x ) 2 Ef = 2 = n = ≅ 0.64 D (M Me ) πσ 2 π 2n 2
The final property of estimators to consider is sufficiency. An estimator of an unknown parameter is sufficient if it contains all of the information comprised in a sample taken and there is no other estimator that gives more information on the parameter being estimated. Consider, for example, two unbiased estimators of the expected value E(X). One defined by formula (1.93) and the second determined by the pattern: x
1 ( xmin + xmax ), 2
where xmin and xmax are the lowest and the highest value in the sample taken, respectively. The estimator x is insufficient because it takes only two values from the sample. The arithmetic mean takes all of the sample elements into account. Further considerations concerning the theory and practice of estimation will be conducted in Chapter 4 where a synthesis of the information obtained from a statistical investigation is analysed. 1.3.3 Statistical hypotheses and their types The basic terms in the theory of verification of statistical hypotheses are: statistical hypothesis33 and statistical test. A statistical hypothesis is any conjecture (supposition) concerning the general population. In practice, we almost always have some information on the population of interest, e.g. the investigated random variable is a continuous one and we know its physical limits, what values the random variable takes and so on. This information determines a certain set of admissible 32
Sometimes the abbreviation ‘i.i.d.’ is used for the term ‘independent and identically distributed’. A hypothesis (from Greek ποτιθ ναι—hypotithenai, Latin hypothesis meaning both ‘to put under’ or ‘to suppose’) is a proposed explanation for a phenomenon; a statement requiring verification. 33
Book.indb 39
12/9/2013 12:22:53 PM
40
Statistics for mining engineering
(possible) hypotheses. Denote this set by . This set determines a set of probability distributions and we know that these distributions may characterise the population. These distributions can be different in both, in formulas that indicate a class of distribution and the values of the parameters can be different (differences in a given class). Each formulated statistical hypothesis separates a certain subset from the set . It can be written as:
If the subset contains only one element (i.e. determines one distribution only), then such a hypothesis is called a simple hypothesis. Otherwise, the hypothesis is a composite (complex) one. Let us divide the statistical hypotheses remaining in a given class of distribution. A supposition that is formulated can concern: • the parameter of the population • the class of the population. If a hypothesis is formulated in relation to a parameter of the random variable, we say that the hypothesis is a parametric one provided that the distribution is known. If a hypothesis is formulated and there is no information on the population, we say that the hypothesis is a nonparametric one. Let us presume that the random variable of our interest is a discrete one (e.g. the number of failed machines, the number of occupied service stands, the number of spare parts) etc. Therefore, the set of admissible hypotheses comprises all of the possible distributions of discrete random variables that are nonnegative. If we have a ground to guess that the random variables of interest may be described by a binomial distribution, our hypothesis is both a parametric one and a complex one. A subset contains all of the binomial distributions with different values of parameters. If, in turn, a hypothesis was formulated that the binomial distribution has the parameter p = 0.1, then the hypothesis is simple. The formulation of a statistical hypothesis is a very important part of statistical analysis; however, it sets the challenge of verifying this supposition. 1.3.4
Statistical tests and critical region
A statistical test is any rule of conduct used to predicate whether the verified statistical hypothesis should be rejected or whether there is no basis to do this. The statement that there is no ground to reject the hypothesis is not the same as stating that the hypothesis is a true one. It may happen that based on the result of a different sample taken for the verification of this supposition, an inference may be altered—in which case the hypothesis should be rejected. The division of statistical hypotheses into parametric and nonparametric ones means that all tests in statistics are divided into parametric tests and nonparametric tests. A statistical test is constructed according to some rules. Firstly, a hypothesis is formulated that will be the subject of verification. This hypothesis is called a null one and is noted as:
In addition, an alternative hypothesis is also formulated which is different to the null one. Often, it is a denial statement compared to the verified hypothesis. It can be noted as:
and this hypothesis is accepted as the true one when the null hypothesis is rejected.
Book.indb 40
12/9/2013 12:22:55 PM
Fundamentals
41
Notice that a sample Wn ( x , x xn ) can be treated as a certain point in the n-dimensional space of trials. Denote a set of all possible results of trials by . A statistical test relies on the determination of such a region that if Wn ∈ , then the verified hypothesis should be rejected. This region is a critical one. If Wn ∈ – , then the verified null hypothesis can be accepted. The region is the area of the rejection of the verified hypothesis and also the critical region of the test. The area of the acceptance of the hypothesis is obviously determined by: − . Because inference about the properties of the investigated population is conducted based on a sample, there is a real possibility that the deduction will produce an incorrect result. The information contained in the sample may be such that we recognise the verified hypothesis as false and we reject it, although the hypothesis is a true one. Similarly, we may make a mistake by accepting a hypothesis which an untrue one. This means that two possible errors can be made during statistical inference. The relationship between the property of the hypothesis— true or false—and the decisions made during statistical inference is presented in the table below.
Hypothesis H0 Decision
True
False
Reject
I type error
√
Accept
√
II type error
The probability that an error of the first type will be made is given by the pattern: P(Wn ∈
|H0) = α( )
(1.98)
whereas the probability that an error of the second type will be made is given by the pattern: P(Wn ∈ ( − ) |H1) = β( )
(1.99)
The best test would be one which ensures a minimum of both errors. Unfortunately, there is no way to attain the simultaneous minimisation of both probabilities. If the probability of making an error of the first type is zero, then the rejection region is an empty set. Thus, the acceptance region overlaps with set , and for this reason, the probability is that relation Wn ∈ will be 1 for all of the hypotheses. This also means that β( ) = 1 for hypothesis H1. In the theory of the verification of statistical hypotheses, tests are constructed in such a way as to minimise the probability of making a type II error presuming that the probability of making a type I error is constant and appropriately low. Such tests are called the most powerful ones. A certain probabilistic measure is associated with these tests—the probability that a false hypothesis will be rejected and the alternative hypothesis which states the truth will be accepted. This measure is called the power of a statistical test. Therefore it can be written as: P(Wn ∈
|H1) = M( )
(1.100)
where M( ) is the power of the test. The relationship between the power of the test and the probability that a type II error will be made is given by the relationship: β( ) = 1 − M( )
Book.indb 41
(1.101)
12/9/2013 12:22:56 PM
42
Statistics for mining engineering
The task of the general theory of testing statistical hypotheses is to formulate methods for the construction of the best tests, i.e. the most powerful tests. However, in some cases such tests do not exist. Thus, the further task of the theory is to indicate what to do when there is no most powerful test. Look more carefully at formula (1.98), which provides information about the probability of making a type I error. If the verified hypothesis is rejected due to the information contained in the sample, then it can be assessed that a rare event occurred because the probability α is small. Moreover, if the event was Wn ∈ , then the assumption on the truthfulness of the null hypothesis was wrong. In a case when the event will not happen, we can say that we have no ground to discard the hypothesis. Notice, that we have no basis for evaluating the hypothesis as a true one because true hypothesis can be different. Such a property of statistical tests characterises tests of significance. These tests allow the verified hypothesis to be rejected with a high probability when it is false. However, they do not allow the problem of whether the null hypothesis is a true one to be resolved. The probability α is called the level of significance. Thus, if this level is assumed to be 0.05 (this is the most frequently presumed level of significance in engineering investigations), it means that taking 5 out of 100 cases on average, the verified hypothesis will be rejected—based on the sample taken—despite the fact that the hypothesis is a true one. The reason for the rejection is connected with the information contained in samples and is not associated with the statistical procedure conducted. Tests of significance are most frequently used in practice not only in the engineering field and they are very simple in application. Nonetheless, it should be noted that there is a certain freedom in the construction of tests of significance and this freedom is not only connected with the arbitrary presumed level of significance. Basically, there is independence in the selection of the statistic (estimator) which will be used to estimate the unknown parameter of the general population in parametric tests or in a different type of inference (in nonparametric tests of significance). Practically, the method of the selection of the level of significance and the selection of the statistic alone is usually imposed by what would be found in the literature on the subject. As was stated, the level of significance is usually assumed to be α = 0.05 and it is a rare event when this level is higher or lower than that. There is also a rule that is only one hypothesis is articulated presuming silently that the alternative hypothesis is its negation in tests of significance. In addition, nothing is stated about the level of the probability of a type II error. When a parametric test of significance is applied, its procedure is as follows. 1. Formulate the basic hypothesis (null one) H0 stating that parameter q = q0, which means it is suspected that the population of interest has a parameter q of q0 value 2. Take a sample of size n from the general population 3. Construct the statistic Q, which is a gauge (tester) of the verified hypothesis 4. Determine the probability distribution of the tester and find the critical region for the presumed level α of significance; a condition to fulfil is: P{Q ∈
| H0} = P {|Q – q0| > k } = α k > 0,
(Figure 1.23)
(1.102)
5. Make a decision based on the result of the investigation: reject the verified hypothesis or there is no basis to discard it. A different case can also be considered. If an estimation of the unknown parameter is obtained using the information contained in the sample taken and its value is qˆ , then the corresponding probability can be calculated from the formula: P{| {|
Book.indb 42
−
0
| > qˆ} = p
(1.103)
12/9/2013 12:22:56 PM
Fundamentals
Figure 1.23.
Graphical illustration of the critical region determined by formula (1.102).
Figure 1.24.
Graphical illustration of the critical region determined by the pattern (1.103).
43
If the following inequality holds: p>α
(1.104)
then there is no basis to reject the verified hypothesis H0 (Figure 1.24). 1.3.5 Probability distributions for the verification of statistical tests Coming to the end of the consideration of the basic terms used in mathematical statistics, let us briefly review the most important probability distributions that are applied in the verification of the statistical hypotheses that are frequently used in engineering practice, not only in mining. Many tests are based on the normal distribution when the hypotheses concern the parameters of random variables, especially in cases when some parameters are known or when the sample taken is large. However, when conditions of application of the normal distribution are not fulfilled then several different probability distributions can be applied. These are: • the Student’s t probability distribution • the χ2 (chi-squared) probability distribution • the F Snedecor’s (Fisher-Snedecor) probability distribution. In some cases (see for instance in the chapter concerning prediction), the Fisher’s z distribution is useful.
Book.indb 43
12/9/2013 12:22:57 PM
44
Statistics for mining engineering
We say that the random variable tr has a Student’s probability distribution with r degrees of freedom (this is a parameter of the random variable) when its pr obability distribution is given by the formula: t
Sr (t ) = P{ r
t} =
2 ∫ rB ( / 2, r / 2 ) −∞ (
dt , t ( −∞, ∞ ) t 2 / r )(r + ) / 2
(1.105)
Notice that there is a function beta defined by the pattern (1.62) in the denominator here. Example plots of the probability density function of the Student’s distribution are shown in Figure 1.25. The mode and median are zero and the expected value provided that r > 1, otherwise is undefined. The density of this random variable is symmetric with regard to point t = 0 and for this reason: Sr ( t ) = 1 − Sr (t ) Let there be n independent measurements of a random variable X. Let x denote the mean from the sample and is the unbiased estimator of the standard deviation (1.95) in the sample. A random variable defined by the formula: (1.106) where m is the expected value of the random variable of interest is the Student’s random variable with r = n – 1 degrees of freedom34. The random variable which probability distribution function is given by formula (1.105) is the same as the random variable determined by the formula: tr
Figure 1.25.
34
Book.indb 44
( ( X ))−1 ( x − m ) n − 1
(1.106a)
Student’s probability density functions.
The Student’s t-distribution is a special case of the generalised hyperbolic distribution.
12/9/2013 12:22:59 PM
Fundamentals
45
where s(X) is the biased estimator of the standard deviation. A number t(α, r) which fulfils the equation: P{|tr| > t(α, r)} = α
(1.107)
is called a critical value of the distribution tr. For a large r the Student’s random variable has approximately the normal standardised probability distribution N(0, 1)35. Tables of the critical values t(α, r) are given at the end of this book—Table 9.3. Random variables defined by patterns (1.105) and (1.105a) are applied in the interval estimation of the mean and in the verification of some statistitical hypotheses. This will be a point of interest in a further part of the book. A random variable defined as the sum of squares of n independent random variables Xi, i = 1, 2, …, r having the identical normal distribution N(0, 1) is the random variable of the chi-squared distribution with r degrees of freedom. Thus, it can be written as: χ2r = X12 + X22 + … + X2r
(1.108)
The random variable χ2r has the chi-squared probability distribution with r degrees of freedom if its cumulative function is given by: _
Fr (
2
)
P{ P{
2 r
2
}
2
1 u (r( r / 2)) e 2r / 2 '(r / 2 ) ¯0
u/2
ddu,, _2 0 du
(1.109)
Typical charts of the probability density function of the chi-squared random variable are shown in Figure 1.26. The expected value and the variance are determined by the patterns: ªE ( _ 2r ) r « 2 ¬S ( _ r ) 2 r
(1.110)
For large values of r, the random variable (2χ2r )1/2 – 2 ardised normal distribution N(0, 1). A number _ A2 ( ) that satisfies the equation:
[
P _2r
1 has approximately the stand-
]
_ A2 (r ) A
(1.111)
is called a critical value of the chi-squared distribution; _ A2 ( ) is the quantile of the order (1 − α) of the chi-square distribution with r degrees of freedom. If r is large, the critical values can be calculated using the following approximation: ¤ 2 _ ( ) r ¥1 u1 ¦ 9r 2 A
A
2³ 9r ´µ
3
(1.112)
35
The Student’s t-distribution, especially in its three-parameter (with a location-scale) version, arises frequently in Bayesian statistics as a result of its connection with the normal distribution. Whenever the variance of the normally distributed random variable is unknown and a conjugate prior placed over it that follows the inverse gamma distribution, the resulting marginal distribution of the variable will follow the Student’s t-distribution.
Book.indb 45
12/9/2013 12:23:03 PM
46
Statistics for mining engineering
Figure 1.26.
The Chi-squared probability density functions.
or χα2 ( ) ≅
1 2
(
2 1 + u1− α 2r
)
2
(1.112a)
where uα is the quantile of the order α of the standardised normal distribution (see Table 9.2). Notice that the random variable: tr
U r(
2 1 / 2 r
)
(1.113)
where U is the standardised normal random variable is the Student’s random variable with r degrees of freedom. 2 Tables of the critical values χα (r ) are given in Table 9.4. The chi-squared distribution is one of the most widely applied probability distributions in inferential statistics, e.g., in hypothesis testing or in the construction of confidence intervals. The chi-squared distribution is used in the common chi-squared tests for the goodnessof-fit of an observed distribution to a theoretical one (Chapter 4.2), the independence of two criteria of the classification of qualitative data (Chapter 5.1) and in the estimation of the confidence interval for a population standard deviation of a normal distribution from a sample standard deviation. Many other statistical tests also use this distribution, like the Friedman’s analysis of variance by ranks. We say that a random variable Fr1 r2 has the Snedecor’s F distribution (or F-distribution or the Fisher-Snedecor distribution, after R.A. Fisher and G.W. Snedecor) with (r1, r2) degrees of freedom if its distribution function is determined by the pattern: ⎛ r1 + r2 ⎞ ⎝ 2 ⎠ r / r2 / 2 x ( 1/2 ) x} = r1 r2 ∫ y (2 ⎛ r1 ⎞ ⎛ r2 ⎞ 0 Γ Γ ⎝ 2⎠ ⎝ 2 ⎠ Γ
P{
Book.indb 46
r1 , r2
1
y)
(r +r ) / 2
dy, x > 0
(1.114)
12/9/2013 12:23:05 PM
Fundamentals
Figure 1.27.
47
The Snedecor’s F probability density functions.
A few probability density functions of the Snedecor’s distribution are shown in Figure 1.27. The number Fα(r1, r2) that satisfies the equation {
r1 , r2
Fα (r1, r2 ))}} = α
(1.115)
is called a critical value of the F distribution; this is the quantile of the order (1 – α) of this distribution. The critical values satisfy the equation: Fα (
)F
α
(r1, 2 ) = 1
(1.116)
and also Fr1 r2 Fr2 r1 = 1
(1.117)
If the random variables χ2r and χ2s are of the chi-sqaured distribuiton with r and s degrees of freedom, respectively, then the random variable: Fr,s = (χ2r /r) : (χ2s /s)
(1.118)
has the Snedecor’s F distribution of (r, s) degrees of freedom36. Let Sr(t) be the cumulative function of the Student’s distribution with r degrees of freedom and let t(α, r) be the critical value in this distribution. Then r
()
1 2
(i
) {F , n
t 2 }]
Fα ( , ) t 2 ( , r ) Fα ( . r ) = 1 +
⎤ 2t 2 ( α , r ) ⎡ r α) 1 + 2 ⎢1 + sign( .5 − α) ⎥ r t ( α , r ) ⎣ ⎦
(1.119) (1.120) (1.121)
where sign x = −1 for x < 0, 0 for x = 0 and + 1 for x > 0. 36 Because the chi-squared distribution is a particular case of the gamma distribution then the random variable of the F Snedecor distribution can be treated as the quotient of two independent random variables of gamma distribution.
Book.indb 47
12/9/2013 12:23:09 PM
48
Statistics for mining engineering
Figure 1.28.
The Fisher’s z probability density function.
Tables 9.5–9.7 contain the critical values Fα (r1, r2 ). We say that a random variable has a z Fisher’s distribution with (r1, r1) degrees of freedom if its distribution function is given by the formula: P{
r1 , r1
x} =
2r1r / r2r2 / 2 B (r1 / 2, 2, r2 / 2 )
x
∫ (rre ∞
2z
1
e ddz + r2 )( r1 + r2 ) / 2
(1.122)
An example of the probability density function of the Fisher’s z distribution is sown in Figure 1.28. The number z(α, r1, r2) that satisfies the equation P{
r1 , r1
z (α,, r1, r2 )} = α
(1.123)
is called a critical value of the z distribution. If the random variable Fr,s has the distribution F with (r, s) degrees of freedom then the random variable: Z r,s
1 2
(1.124)
ln Fr , s
has the z Fisher’s distribution with (r, s) degrees of freedom. When the degrees of freedom become large (r, s → ∞), the Fisher’s distribution approaches normality with the mean and variance determined by the formulas: E(
r ,ss
)
s −1 r −1 2
σ2 (
r,s
)=
s −1 + r −1 2
(1.125)
This book is primarily intended to present the relationships between mathematical statistics and mining engineering practice and for this reason, the next chapter presents a description of an exploitation (operation) process of a technical object and the problems of a statistical nature that are associated with it.
Book.indb 48
12/9/2013 12:23:14 PM
CHAPTER 2 Some areas of the application of mathematical statistics in mining In English the term ‘mining’ usually means1: a. The act b. A kind of process c. A branch of industry all of which are connected with the extraction of useful mineral2. Here, we neglect its association with the military. Mining engineering is an engineering discipline that involves the practice, the theory, the science, the technology and the application of extracting, hauling (sometimes dumping) and processing minerals from a naturally occurring environment. Mining engineering also comprises the processing of minerals for additional value. Thus, in mining engineering the points of interest are the identified processes and their properties and also the properties of objects, understood here in a broad sense. These processes are of different natures. They are connected with methods of winning rocks and the identification of mineral deposits, their extraction, haulage and ore dressing, dumping of overburden etc. Different processes are connected with the operation of the equipment involved in mining development and the point of interest here is the exploitation process of pieces of equipment, their parts and assemblies and also entire machinery systems. In mining, the interesting processes are those that accompany mining development, i.e. the displacement of rocks due to rock extraction and all of the repercussions connected with this process. The objects of interest are mainly of two kinds: • Pieces of equipment that are a part of mine development and • Surrounding rocks near a mine. Changes in the properties of these two kinds of objects during a mining operation require the greatest attention of mining engineers. Many problems considered in this book concern technical objects, and whether this object means a single item or a system does not matter. For this reason, it seems worth considering some aspects of the properties and life course. Each technical object basically has three characteristic phases of its life. It is presumed that the source of the birth of any technical object is ‘a need’3. There is a certain technological process and there is a need to design an object that will be able to realize this process or that will be of service in order to realize some phases of the process. In some cases ‘a need’ may be different. There is a piece of equipment which properly fulfils its duties but its parameters are not so advantageous compared to modern standards. This may concern the output that is usually attained by this item, its low effectiveness, the average level of its reliability and so on. All of these indicate that there is ‘a need’ to create a new item 1
In English books, one may find slightly different definitions, e.g. SME Mining Engineering Handbook (1973, 2011). 2 In some other languages the term ‘mining’ only means (b) and (c) (e.g. in Polish). 3 A need here is a concept of primary (primitive notion) as in economics. One can find a definition of a need in psychology, e.g. it is such a state of an individual that is a deviation from an optimal state.
49
Book.indb 49
12/9/2013 12:23:19 PM
50
Statistics for mining engineering
with better parameters. Sometimes, a competitive company has just presented a new piece of equipment with better characteristics than our product. Finally, pressure sometimes appears to get better achievements. Our factory has modern machines, well-trained personnel with the knowledge and experience to produce a given piece of equipment cheaper. There is ‘a need’ to create a new item. In the first stage the object does not exist physically. It comes into being. It commences its existence in concepts, models, drafts, notes and in virtual notations. Later on it becomes more concretized; it appears as a list of parts and assemblies, a description of their mechanical and electrical connections and comes into being in a calculation procedure. This stage is ended when the design and construction documentation is completed. Actually, this is a virtual version. The non-existent object has got its properties—forecasted properties. The second stage of an object’s life is its production. The item is formed physically. Its final properties are created during the production process, i.e. the features of the object which will characterize it in the third phase of its life. Properties—these real ones—are usually rather different than those given in the first stage of its life by designers and constructors; the production process is not an ideal realisation of their intentions. This stage is finished when the object exists physically and is ready to be transferred to the user. When the object is purchased by its user, the third phase of its life usually begins4 and its usage commences. This is a process that continues over time and for the majority of objects is accompanied by the process of its maintenance5. These two processes interlace each other. The object realizes the purpose of its existence. Also, the process of changes in its properties commences. Elements of the object begin to show wear and tear. Some of these occur in a significant way and failures occur. The object becomes more and more degraded. However, for objects that can be renewed periods of maintenance occur (repairs, prophylactic actions, adjustments) and the process of degradation is reduced. Periods of maintenance happen in either a random way or in a deterministic way if planned. The process of changes in an object’s properties used to be termed the exploitation process6. There are two essential terms of exploitation theory associated with the term ‘exploitation process’. These are: the state of the object and the exploitation events. During the object’s exploitation, i.e. during the process of the object’s utilisation and maintenance, the properties of the object change. For some features these changes will be of a continuous type, sometimes slow, sometimes transitional and sometimes drastic. Therefore, an object at a given moment in time is not identical to the object at a different moment in terms of its properties. In order to describe the process of these changes the term state is applied. When defining a set of an object’s essential properties , = {c1, c2, …, cm}, we can say that the state of the object at time t is determined by a certain function: (t) = f [ (t)] = f [c1(t), c2(t), …, cm(t)]. Kaźmierczak (2000, p. 119) gave a similar assessment of the term ‘state’: under the term state of object we are going to understand here a ‘photograph’ of values of object properties in a given moment of time. In practical applications this function is not considered to be a continuous one. Discretisation occurs regularly and states are named. These names are usually associated with the
4
In some considerations more than three phases of an object’s life are taken into account, e.g. storage or montage in the final operation place. 5 There is a class of technical objects that cannot be renewed, e.g. hoist head ropes or balance ropes. 6 Some researchers are of the opinion that ‘the exploitation process of an object’ is everything that happens with the object from the moment of the end of its production until the moment of its final withdrawal from utilisation (Kaźmierczak 2000, p. 156).
Book.indb 50
12/9/2013 12:23:19 PM
Some areas of the application of mathematical statistics in mining 51 physical nature of the state, e.g. repair state, work state, stand-still state and so on. Notice that a simple conclusion can be made here: The exploitation process of an object can be understood as the sequence of the states of the object or—the usual formulation—as the process of the changes of states. As a result of this discretisation, at each moment when a change of state occurs, an exploitation event takes place. Sometimes, such events are visible and to some extent perceptible, e.g. a certain element of the object fails and the machine ceases its operation. Sometimes events are conventional ones—nothing physically happens apart from the fact that a certain object parameter exceeded its assumed limited value, e.g. a brake lining worn excessively. At this moment, it is assumed that the object is in a different state. Based on the consideration above, different theoretical models of the exploitation processes of technical objects can be constructed. The simplest model is the one that describes the process of impulses (Figure 2.1). An object operates and as a parameter of the process a time is taken into account. At moments t1, t2, t3, ... interesting exploitation events occur, e.g. failures. In the process considered, only one state is distinguished and the process has one type of exploitation events. At first glance, this model looks very simple. However, when considering it more carefully, many significant problems arise. Many essential questions connected with this process can be formulated; essential for the object’s user and for the object’s constructor and producer. Some of these questions are as follow: – What kind of statistical properties does the observed sequence of times {ti+1 – ti}, i = 1, 2, 3, … have? – If this sequence is a stationary one and it has no peculiar properties, then what kind of probability distribution can be used to associate it with the random variable: ‘time between neighbouring impulses’? – If there is a possibility of two or more failures occurring at the same moment of time, then is this possibility stable or not? – If the probability of the occurrence of failures is independent of time, then what is the probability distribution that describes the number of failures that can occur at a given moment in time? – Until what moment the analysis of the course of this process makes sense? To obtain answers to the above questions it is necessary to have a knowledge of the physical nature of the object as well as to have the knowledge and skills to conduct a proper mathematical analysis. It is necessary to use the appropriate mathematical tools from the probabilistic area as well as from the field of mathematical statistics. All of these should be undertaken in order to identify the properties of the object exploitation process that is described by the theoretical model just presented. Secondly, the most frequently used theoretical model is the model of the process of changes of states that is illustrated in Figure 2.2. The object is used and in moments t1, t2, t3, ... interesting exploitation events occur— changes of states. This model is more complicated than the previous one. The exploitation
0 Figure 2.1.
Book.indb 51
t1
t2
t3
t4
t5
t
Exploitation process as a process of impulses.
12/9/2013 12:23:19 PM
52
Statistics for mining engineering 9(t) 3 2 1
0
Figure 2.2.
t1
t2
t3
t4
t5
t6
t
Model of an exploitation process as the process of changes of states.
repertoire is associated with this model. It is determined by the set of states of the object that can happen during the operation of the object: = < 1, 2, ..., The set
> = < i ; i = 1, 2, ..., m >
m
of possible transitions between states is associated with this set: =
where λij are the intensities of the transitions between states. For some stochastic processes the probabilities are considered instead of the intensities. The determination of both sets can be achieved by logical analysis bearing in mind the operational reality. Notice that a special case of the above process is the process of changes in states: work-repair type, which is very well known in reliability theory (e.g. Gnyedenko et al. 1969, Kopociński 1973). The estimation of measures associated with the individual nonzero elements of the sets requires an extensive analytical procedure and here again one may formulate a list of questions that are worth answering. – What kind of statistical properties does each sequence of times of states have? – If a given sequence is stationary and has no peculiar properties, then what kind of probability distribution may be used to describe well, in a statistical sense, the random variable ‘time of given state’? – Are times of states independent of each other? – If some states are stochastically dependent, then what kind of random dependence is it? – Until what moment the analysis of the course of this process makes sense? The above list is similar to the previous one. Nevertheless, the necessary analysis connected with a trial to get answers to these questions is more complicated and more comprehensive. In both lists of questions is the presumption stating ‘if this sequence is a stationary one and it has no peculiar properties then …’. Let us explain what this means. When a statistical observation has been made and a sample has been taken, one obtains a sequence of the times of a given state {t1, t2, ..., tn}. And here a fundamental question should be formulated: What kind of stochastic properties characterize the sequence? These properties contain rich information about the running physical processes in the object being investigated and about the repercussions of these processes. An exploitation reality is determined by the particular realisation of a given sequence. It is worth remembering that three elements determine the course of the exploitation process of a technical object, namely: • Properties of the object given by the designer, the constructor and set up by the producer • Properties of the surroundings of the object (recall: surroundings of an object includes everything that is around it and that remains in a certain interaction with it) • Executed policy of use and maintenance of the object.
Book.indb 52
12/9/2013 12:23:19 PM
Some areas of the application of mathematical statistics in mining 53 Each sequence observed contains encoded information. By performing an adequate analysis and using suitable statistical tools in an appropriate sequence, we are able to decode it and translate it into engineering language. Usually, we are looking for answers, among other things, to the following questions: – Is the observed sequence homogeneous or does it perhaps have untypical elements that distinctly differ from the others? – Is the observed sequence stationary or is there a trend in it? – Is there a stable dispersion of values in the sequence or does it depend on time? Obviously, the above list can be extended according to our needs. A trial to answer the above listed questions is the subject of consideration in the next chapter, which is the first part of an analysis conducted in the book. The next step will be the statistical synthesis: The estimation of the parameters of random variables that are being investigated as well as finding the theoretical probability distributions that describe the empirical distributions well 7. A further part of the considerations will concern a case in which two or more random variables are observed. Two problems are important here—the investigation of whether random variables are independent of each other and—if not—an examination of the interdependence (in the shape of a correlation) between the variables. The second problem comprises a much broader scope of analysis than the first one. The next part, in turn, comprises the second stage of the statistical analysis. If there is information that random variables are stochastically dependent, the problem is: What kind of relationship exists between them? This part will present a description in the form of a function illustrating this stochastic interdependence. Consideration commences from a simple linear regression analysis and linear transformations up to multidimensional models. Next, more advanced models will be presented starting from autocorrelation and autoregression models, through classical linear regression for many variables and regressions when errors in the values of random variables are traced. This part of the consideration concludes by taking into account that in some cases there is additional information on the random variables examined and this information should be included in the study in order to improve statistical inference conducted. Chapter 7 contains a special topic—statistical prediction. There are many problems connected with any inference about the future. They concern terminology, definitions in use, the areas of study and so on. In this chapter some order is presented in this regard and a few examples are presented based on data taken from practice. The penultimate chapter is a supplement where basic statistical terms are defined in order to better understand the considerations presented in the book. The book concludes with Chapter 9 in which a set of tables to carry out statistical inference is included.
7 In this book the phrase ‘…describe well …’ will be found in many places. This term ‘well’ does not have the commonly understood meaning in this context but it is the use of ‘well’ in a statistical sense. This means further that the statistical investigation was conducted and a positive result was obtained. Thus, we are authorized to state that, for example: ‘This model describes well the empirical data.’
Book.indb 53
12/9/2013 12:23:20 PM
This page intentionally left blank
CHAPTER 3 Analysis of data The subject of consideration in this chapter is the study of the properties of the observation outcomes noted during the realisation of a statistical investigation. It is presumed that the recorded data has the form of a sequence of numbers. In order to translate this into statistical language—a sample is taken and it is necessary to make a primary analysis; this is the primary because a further part of the analysis depends on the information obtained from it. This information can be of different natures and this will determine the direction of the later investigations into different areas of the statistical consideration.
3.1
TESTING OF SAMPLE RANDOMNESS
When the decision is made to observe only a certain part of the population that was the point of interest, we must be sure that this separated representation will have all significant properties of the population. Practically, a point of interest is one feature or a few features, and it is expected that this separated part in the form of a sample will characterise the whole population well, i.e. the sample will be representative. A long time ago, it was stated that a sample is representative when it is taken in a random way1. And that this is a necessary condition. Therefore, the subject under consideration here will be a certain property of a sample—its randomness. Neglect here the problem of the definition of randomness. By studying some papers concerning randomness (starting from Kendall and Smith 1938 up to Wolfram 2002 p. 1067), some subtle differences can be noticed. It is also dependent on whether the consideration is in the area of mathematical statistics or whether attention is being paid to engineering problems. Our approach to randomness is a typical engineering one—a sample was taken and we want to know whether it is random. In order to resolve this problem it is necessary to choose the appropriate statistical tool—a test. This problem can be solved in the area of the theory of statistical hypotheses. It is said that there are not many tests that can be used in this case2. Here our analysis will be based on a number of series (runs) in a sample taken using the median of the variable that is being investigated3. The procedure of the test is as follows. 3.1.1 The test procedure The sample is in the form of a sequence of numbers that are successively noted according to their occurrence. One should order the sequence monotonically in order to estimate the median. The number in the middle is the estimation of the unknown median from the 1
If all of the samples of the same size have an equal chance of being selected from the general population, we say that the samples have a random character. 2 By the way, some tests for the randomness of a sample—for example ‘the rank correlation test for the randomness of a sample’ presented by Gopal (2006, test 71)—do not test the randomness of a sample. Gopal’s test is, in fact, a test for the stationarity of a sequence. Similar examples of improper statements can be found in the literature related to the subject. 3 Recall, the median was defined by formula (1.34).
55
Book.indb 55
12/9/2013 12:23:20 PM
56
Statistics for mining engineering
population. When the sample has an even number of items, then the arithmetic mean of the two middle numbers is an estimate of the median. Now, the original sequence of numbers translates into a sequence of plus and minus signs; each number will have a sign. A plus sign will be given to all numbers greater than the median and a minus sign will be associated with all numbers lower than the median. Any numbers equal to the median should be rejected. The next step in the test is the calculation of the number of series, i.e. the number of monomial signs. Denote the number of + signs by n+ and the number of − signs by n−. Now, the statistical hypothesis H0 is formulated, which proclaims that the elements of the sample were selected in a random manner, whereas the alternative hypothesis H1 rejects H0. In order to verify the premise H0, one compares the number of series in the sample with the critical value that is taken from the statistical table for the given number of signs and a presumed level of significance α. The critical region consists of two sub-regions: the left side and the right side, which means that there are two limited values: the minimum number of series (the critical region for α/2) and the maximum number of series (the critical region for 1 − α2 ). If the number of series falls between these two critical values, we have no ground to reject the null hypothesis. Otherwise, the alternative hypothesis H1 is the true one. This means that the rejection of the verified supposition is a consequence of the fact that there are either too many series in the sample or too few series. Consider an example. ■ Example 3.1 A reliability investigation of selected machines was carried out in an underground copper mine. The sequence of the repair times of one LHD machine was noted: 2.5; 1.4; 4.3; 0.8; 3.2; 0.4; 2.2; 3.4; 5.4; 7.2; 0.9; 2.8; 2.9; 1.8 h. Verify the hypothesis that the observed sequence is random.
By arranging the sequence monotonically we have: 0.4; 0.8; 0.9; 1.4; 1.8; 2.2; 2.5; 2.8; 2.9; 3.2; 3.4; 4.3; 5.4; 7.2 The sample contains 14 elements. Calculate the median of the sample: Me =
2.5 + 2.8 = 2.65 2
Convert the original sample into a sequence of signs. We have: ––+–+––+++–++– The number of the series is 9, the number of signs n+ = n+ = 7. Presuming a level of significance α = 0.05 and using Table 9.8, we have: Kα/2(7, 7) = 3
Book.indb 56
and
K1−α/2(7, 7) = 12
12/9/2013 12:23:20 PM
Analysis of data
57
The empirical number of the series fulfils the inequality 3 < 9 < 12, thus we have no ground to reject the verified hypothesis H0. We can now agree with the statement that the sample has a random property. ◀ The statistic that is the number of series also has an application in the verification of the hypothesis that proclaims that the two samples are from the same population. As a rule, tables of the critical values for a series comprise up to 20 signs so the problem arises of what to do when a sample size is greater than 20. For large n+ and n− the series number distribution can be satisfactorily described by the normal distribution N(m, σ) of the parameters determined by the formulas: m=
2 n+ n− +1 n+ + n−
(3.1)
and σ=
2 n+
(
−
(
+
−
)( 2
+
− −
). )
(3.2)
The above relationships can be used for approximate calculations.
3.1.2
Results of a randomness investigation
The finding that a given sample is non-random in mining practice does not occur frequently. This regularity is undoubtedly associated with the fact that studies are usually prepared with certain insight and diligence bearing in mind observations of the conditions for proper investigations. Nevertheless, there are some realisations of random variables in mining engineering that are non-stationary ones, e.g. the total number of wire breaks versus the time in the hoist head ropes (or better—versus the number of hoist cycles executed). In this case, one observes the realisation of a non-stationary random process and randomness testing makes no sense. If—as the result of statistical testing, the non-randomness of the sample was stated—we cannot make any further statistical inference concerning the random variable except to trace why this regularity has been noticed. There are many reasons for such a set of circumstances. One possibility is the existence of a cyclic component in the realisation of the observed random variable. The operation of many pieces of equipment in mining has a cyclic character and this periodicity can generate a cyclic component in the process of their exploitation. A stream of rock that is being excavated—it does not matter whether it is continuous or discrete—has a periodic character because of the cyclic character of a mining operation. And again, this can have an influence on processes that are running in mining. Another possibility is that during the repair of a technical object, a certain assembly has been replaced by an assembly from a different machine. As a rule, this new item is much more sensitive to failures than the original one. It can be much more susceptible to the periodic character of the operation. Generally, all these ‘abnormal’ events can generate non-randomness in the data observed. For a researcher carrying out an investigation, information about the non-randomness of the sample should be a clear signal that something untypical was noticed. Finding the reasons for this untypical regularity is by all means recommended. It may be the source of significant information on the object being investigated and it does not matter whether it is a technical item, a process or a property of the surrounding rocks. Sometimes, the reason can be prosaic—an informatics error in the system that is collecting the data.
Book.indb 57
12/9/2013 12:23:22 PM
58
Statistics for mining engineering
3.2
AN OUTLIER IN A SAMPLE
This problem can be included in the category of homogeneity investigations. Homogeneity alone can be defined in different ways depending on the subject of the research and in what sense it is understood. An example in this regard are studies on the homogeneity of a shoveltruck system that were presented in Czaplicki’s book (2010, Chapter 10). The basic statistical measure of the homogeneity of the machinery system was the standard deviation and also the probability distribution that was the result of the calculation scheme. Homogeneity, which is the point of interest here, is understood as a property of a random variable being investigated. This property relies on the possibility of describing data by using a model that is the probability distribution function. When a sample is taken, there is sometimes one outcome, very rarely two, that does not fit the sample at first glance due to the fact that this observed value clearly differs from the others. The outcome either has a very high or a very low value compared to the other data. In mathematical statistics such an outcome is termed an outlier4. Immediately the question arises as to whether this number belongs to the sample or whether it has been put into the data due to a wrong decision, a mis-recording or an error in the measurement. Outliers are often easy to spot in histograms. A histogram is an important tool in statistics and is a graphical representation that shows a visual impression of the distribution of data. It is an estimate of the probability distribution of a continuous variable and was first introduced by Karl Pearson (1895). A histogram consists of tabular frequencies, which are shown as adjacent rectangles that are erected over discrete intervals (called bins) with an area equal to the frequency of the observations in the interval. The height of a rectangle is also equal to the frequency density of the interval, i.e. the frequency divided by the width of the interval. The total area of the histogram is equal to the number of the items of data. A histogram may also be normalised in order to display relative frequencies. It then shows the proportion of cases that fall into each bin/category with the total area equalling 1. The categories are usually specified as successive, non-overlapping intervals of a variable. The bins must be adjacent, and often are chosen to be of the same size. The rectangles of a histogram are drawn so that they touch each other to indicate that the original variable is continuous. An example of a histogram with an outlier being far to the right is shown in Figure 3.1. An outlier is also easy to trace in a conventional x–y diagram when the data gathered concern the relationship between these two variables. A set of collected data shown in the coordinate system and an outlier visible far beyond main course of the rest of data are presented in Figure 3.2. The main problem that arises when an outlier is noticed in a sample is whether this extraordinary number belongs to the probability distribution that describes data observed well or whether it does not. Ignoring the problem that authors have given different definitions of an outlier (see, for example, Grubbs 1969, Zeliaś 1996, Moore and McCabe 1999, Czekała 2004, www.mathwords.com/o/outlier.htm), it is worth noting that mathematical statistics has a variety of tests that allow the hypothesis that states that such an outcome belongs to a given sample to be verified. Literature from this field is rich (cf. Barret and Lewis 1994) and particular problems of untypical observations have been considered by many authors for years (see, for example, Fisher 1929, Gnyedenko et al. 1965, Czaplicki 2006). Let us look at the problem of outliers from a practical point of view. Sometimes in the reliability investigations of pieces of equipment, a repair occurs which has evidently taken a
4
One can find some further definitions that are not entirely statistical ones: a person whose residence and place of business are at a distance or something (such as a geological feature) that is situated away from or classed differently from a main or related body.
Book.indb 58
12/9/2013 12:23:24 PM
Analysis of data
59
h(x)
x
Figure 3.1.
Histogram with an outlier. h(x)
x
Figure 3.2.
Empirical relationship between two variables and an outlier.
longer time to clear than the other data. Ignoring the problem of what are the causes of such observation, we can quickly come to the conclusion that the mean time of repair becomes significantly longer than before the outlier appeared and especially the corresponding standard deviation. In such a case, the first reaction should be to perform a penetrating analysis of the reasons for the occurrence of such an event—an out-of-statistics analysis. Before one commences this type of analysis, it is worth being aware of a certain regularity. There is a large class of technical objects that can be seriously damaged during their operation. The environment of the objects can also be devastated and the threat to the lives and health of personnel can be observed as well. For example, when a hoist conveyance over-winds beyond its capacity (a catastrophic type event), it can strike the crush beams and a rupture can occur in the hoist head rope. The intensity of failures of this type is completely different than other regular failures of the object. In addition, the time required to clear the failure is significantly longer. This means that these two types of exploitation events cannot be analysed together. The intensity of failures and the times of repair (if repair is possible) are completely different, but repair time, for instance, is not an outlier in a statistical sense. The exploitation process of an object of this type is a superposition of two processes; regular failures occur in one process whereas in the second one, rare events occur. A similar approach to events that occur can be repeated in different areas. When registering the shocks that appear in the rocks around underground excavations a sudden great earth tremor can sometimes be observed. In reality, it is obvious that these unusual events should be analysed separately and they are not outliers compared to the tremors that are registered day-to-day in a mine5.
5
Often, it is additionally presumed that extraordinary shocks and regular ones are independent of each other. Fortunately, in some cases this assumption does not hold; closely followed events in this regard allowed such an event that is a precursor of a coming great shock to be registered (Sokoła-Szewioła 2011). This information is important for the safety of mining operations.
Book.indb 59
12/9/2013 12:23:24 PM
60
Statistics for mining engineering
Thus, let us presume at the very beginning of our consideration that we are able to recognise and exclude events which are untypical and are caused by the nature of a complex phenomenon from further study. However, if there is no indication as to why an outlier has occurred in the sample, we have to make use of statistical tools. Consider the following statistical scheme. Presume there is a sample that was gathered from the elements of two different populations. The variables connected with these populations differ from each other considerably in regard to the mean value. Moreover, one population is very large in number in relation to the second one. In such a situation, we can expect that a number may occur in the sample taken that is significantly different from the other elements of the sample. The occurrence of such an item allows a hypothesis to be formulated stating inhomogeneity with regard to the feature that is the objective of the investigation. In order to formalise it, one can write it down. There is a given sample: {X1, X2, …, Xk, …, Xn} There is a supposition that the k-th element of the sample is untypical—an outlier. Assume the mean value of the rest of the elements is: E(Xi, i≠k) = μi = μ. Formulate a null hypothesis H0:E(Xi) = μ. This supposition says that all of the elements are taken from one population. An alternative hypothesis is: H1: μk ≠ μ ∧ μi, i≠k = μ which means that the k-th element has a significantly different mean value. A further part of the analysis depends on the kind of information that is available. In mining practice two probability distributions are applied most frequently, namely, exponential distribution and Erlang distribution. (Gaussian distribution is also applied often, especially when the times of the work cycle of machines operating periodically is concerned.) Let us also discuss a case when there is no information on the distribution of the random variable being investigated. Commence consideration when the random variable being investigated can be described by an exponential distribution. 3.2.1
Exponential distribution
Note at the very beginning that when an exponential distribution is concerned, we are in a peculiar situation. The intensive development of reliability theory in the sixties and seventies of the previous century as well as exploitation theory later on initiated the development of mathematical tools from the field of statistics in order to investigate the properties of technical objects that are manifested during the operation of an object. For this reason, there are several tests on the homogeneity of a sample and the tracing of outliers. Presume that the exponential distribution is of the parameter λ. It is a well-known fact that the product 2λΣ in 1,1 i = k X i has the probability distribution χ2 with (2n − 1) degrees of freedom because the sum of the random variables that are exponentially distributed has the Erlang distribution of (n − 1) degrees of freedom and multiplying it by the product 2λ, one obtains the Chi-square random variable with (2n − 1) degrees of freedom. Denote it conventionally: 2λ
n
∑
i 1, i ≠ k
Book.indb 60
n
i
2λ ∑ X i : χ2 (2( n 1)) 2λ
(3.3)
i 1
12/9/2013 12:23:25 PM
Analysis of data
61
By introducing the estimator of the expected value: mn 1 =
n 1 ∑ Xi n − 1 i =1,i ≠ k
(3.4)
one can rearrange pattern (3.3) into 2λ
1
n 1
χ 2 ( 2(
1))
Presuming that the null hypothesis is a true one and considering the ratio of quotients, it is easy to perceive that mn
2λ( n 1) 2λn : mn −1 : F (2nn, 2( n − 1)) 2n 2( n 1)
where mn is the estimator of the mean taking into account the outlier and the symbol F(2n, 2(n − 1)) denotes the F-Snedecor’s random variable with 2n, 2(n − 1) degrees of freedom. By simplifying one can get (mn : mn−1) : F(2n, 2(n − 1))
(3.5)
Now we are able to verify the null hypothesis. It should be rejected if—for the presumed level of significance α—the quotient of the left-hand side of this relationship is greater than the quantile of the order α of the distribution F, that is (mn : mn−1) > Fα(2n, 2(n − 1))
(3.6)
A slightly different approach for the verification of an outlier was presented by Fisher in 1929 (the problem of outliers in those days was almost non-existent in the formal sense). He presented a test for the simultaneous verification of the hypothesis of the exponential distribution of the random variable being tested together with the existence of an outlier that was significantly greater than the rest of the elements in the sample in his paper. Fisher proposed that the following formula be considered: η=
Xk
∑
n i= =1, i ≠ k
(3.7) Xi
If the random variables Xi ; i = 1, 2, …, n are stochastically independent and have the same exponential distribution, then the probability distribution of statistic η does not depend on λ. The critical values for this function were given in the paper cited, thus allowing for the verification of the formulated hypothesis (see also Gnyedenko et al. 1965 or Gnyedenko 1969). ■ Example 3.2 During a reliability investigation carried out in an underground coal mine, the following sequence of work times of a belt conveyor was observed: 290, 880, 670, 1420, 590, 380, 6220, 110, 280, 410, 770, 480, 60, 1330, 2070, 860, 1190, 1610, 820, 180 h The seventh element of the sample looked strange at first glance. A suspicion was formulated that possibly a gap in recording took place.
Book.indb 61
12/9/2013 12:23:27 PM
62
Statistics for mining engineering
Perhaps, a failure occurred at that time and was not recorded6. Begin from a randomness testing of the sample. Presume that the outlier belongs to the sample. If during a further part of the research it will be proved that this does not hold, our analysis will be repeated. The sample consists of n = 20 elements. If so, the median of sample is: Me =
670 + 770 = 720 h 2
The sequence of signs that depend on the fact that the given value is greater or lower than the median is as follows: –+–+––+–––+––++++++– The number of series in the sequence is 11. The number of plus and minus signs is identical and equals 10. Presume a basic hypothesis H0 that proclaims the randomness of the sample versus the alternative supposition that it does not hold. One can read the critical values 6 and 15 from Table 9.8. Because the number of series in the sample is 11, there is no basis to reject the basic hypothesis. We can assume that the sample has a randomness character. Let us calculate two mean values: one for all of the elements but without the outlier and the second one including it. We have: X n −1
1031 03 h, X n = 1335 335 h
The difference between them is significant. (A greater difference is visible in the corresponding standard deviations: 552 h and 758 h for this obvious reason). As many empirical investigations have proven, in the majority of cases the probability distributions of the work time for belt conveyors can be satisfactorily described by an exponential distribution. Calculate the ratio of the mean values: Xn ≅ 1.3 X n−1 Formulate a null hypothesis stating that the data are homogeneous and the quotient of means is not significantly different from the alternative hypothesis that proclaims that the ratio of the average values is significantly different from unity.
6
There are many such cases in mine practice and it is not a mining ‘specialisation’. In their book Gnyedenko et al. (1969) described a case where a member of staff who was responsible for registering failures took a break and nothing was recorded during this period.
Book.indb 62
12/9/2013 12:23:30 PM
Analysis of data
63
The critical value is taken from the F-Snedecor’s tables for degrees of freedom for this example (Table 9.6) and it is presumed that α = 0.05 is: Fα=0,05(40, 38) = 2.12 Because the empirical value does not exceed the critical one, there is no basis to reject the hypothesis, i.e. there is no ground to remove the outlier from the sample. ◀ 3.2.2
Erlang distribution
The above consideration can be expanded for a case where the values of the sample can be satisfactorily described by the Erlang probability distribution. It is enough to notice that the product 2λΣ in=1,1 i ≠ k X i has a Chi-squared distribution with 2k(n − 1) degrees of freedom. It can be noted conventionally as 2λ
n
∑
i =1,i ≠ k
i
1⎞ ⎛ : Ga G k ( n 1), ⎟ ⎝ 2⎠
(3.8)
Applying analogical reasoning one obtains: (mn : mn−1) > Fα(2kn, 2k(n − 1))
(3.9)
which means that the null hypothesis should be rejected when for the presumed level of significance α the quotient visible on the left side of the inequality (3.9) is greater than the quantile of the order α of the F probability distribution. ■ Example 3.3 The operation of a suspended loco used in an underground coal mine to refurnish longwall faces was investigated. A sequence of repair times was recorded giving the following data: 160, 60, 175, 320, 100, 360, 120, 70, 210, 45, 590, 250 120, 230, 30, 140, 55, 510, 60, 95, 180, 310, 190, 150, 2220, 200 min.
Attention was paid to element number 25, which was significantly greater than the other times. There was no description of what had happened and why this time was so long. There was also a suspicion that something had broken and there was no spare part in the mine’s warehouse. But in such a case there should be proof that a special order was submitted to the producer of the loco on that date. There was no such proof. Investigate whether the sample has randomness character.
Book.indb 63
12/9/2013 12:23:32 PM
64
Statistics for mining engineering The median of the sample is: Me =
150 + 160 = 155 min 2
and the sequence of signs is as follows: +–++–+––+–++–+–––+––+++–++ The series number is 17. The number of plus and minus signs is the same and equals 13. The critical numbers for the presumed level of significance α = 0.05 are: 8 and 19 (see Table 9.8). Conclusion: there is no basis to reject the null hypothesis that proclaims the randomness of the sample that has the outlier in it. Discuss now the existence of the outlier in the sample from a statistical point of view. An earlier reliability investigation gave grounds to conclude that the probability distribution of repair times could be satisfactorily described by the gamma distribution with the shape parameter just below two, and it was assumed that k ≅ 2. Thus, it was assumed that the Erlang distribution described the statistical data well. Two average times were calculated for the loco based on the sample; one presuming that all of the elements come from one homogeneous population and that the second one excludes the outlier. Results are mn = 267.3 min
and mn−1 = 189.2 min;
(the standard deviations are 428.8 and 140.5 min, respectively). The ratio is: mn = 1.41 mn−1 Formulate a hypothesis H0: the data are homogeneous and the quotient of the average values is non-significantly different than the one against the hypothesis H1, which states that the ratio of the average values is considerably greater than one, which means that the outlier does not belong to the sample. The quantile of the order (2kn, 2k(n − 1)) taken from the appropriate table (F Snedecor, Table 9.6) for the presumed level of significance α = 0.05 is: F0.05(104, 100) ≈ 1.39 The empirical value is greater than the critical one and for this reason we have ground to reject hypothesis H0. The sample is not homogeneous and the outlier should be excluded from further analysis. The above result indicates that our previous inference on the randomness of the sample has to be repeated. If so, calculate the median of the sample which is now 160 min. The sequence of signs is as follows: –++–+––+–++–+–––+––++–+ (The number of signs was reduced by 2 because there is no outlier and the element that equals the median was also rejected). The number of series is now 16. The number of – signs is 12. The critical values for the same level of significance are: 7 and 18 (Table 9.8). Corollary: there is no basis to reject the hypothesis that proclaims the randomness of the sample.
Book.indb 64
12/9/2013 12:23:34 PM
Analysis of data
65
Note. Further inquiry in this regard permits information about what happened to be obtained. Two bolts fixing the rail to the roof had been slackening due to the displacement of the surrounding rocks. The displacement was small but was strong enough to weaken the bolts. When the heavy unit arrived at the loosened rail part, the bolts slipped out and the loco went off the rail. Some parts of the loco were broken. We can assess this event as a rare one, and it can be counted among catastrophic ones. Observations of the operation of several similar locos at that mine indicated that there was no evidence of any comparable event. ◀ 3.2.3 Other distributions Consider now when the data contained in a sample can be satisfactorily described by a Gaussian distribution. As we know, the domain of determinacy for a random variable described by this distribution is the whole axis of real numbers. This is not accepted in engineering applications. All physical magnitudes used in the field of engineering have their own limits. However, such an approach in which the values of a random variable are supported over the whole real axis should be treated as a margin model. Very often the left-side natural limit for physical magnitude is zero. Not many physical magnitudes are supported over a certain part of a negative value axis. These are, first of all, load, stress, braking force, deceleration or the dynamic moment. Magnitudes that are considered in reliability analyses are determined over a nonnegative set of values as a rule. This set contains real number values when times of states are concerned. The effect of the existence of a machine work state is the specific job executed by this machine and in mining engineering may have the form of an excavated, hauled, dressed, dumped or stored mass of rock that has been won. This set can also contain natural numbers only if the point of interest is the number of pieces of equipment that are in a particular state at a given moment of time, the number of repair stands, spare parts etc. Where transport means are concerned, the proper determination of the right-side limit for random variable values determines whether the results of the calculation of their basic parameters will be adequate to the reality. Many practical examples testify that in the world of engineering and especially in mining the Gaussian distribution should have both side limits, which means that the probability distribution is truncated. In a case where the distribution has only one boundary or it has no limits, it is necessary to evaluate any error generated by such an assumption. If its value is small, it may be approved. Consider a homogeneity analysis. A hypothesis H0 that is verified is a statement that all of the elements of the sample are taken from one population in spite of the fact that one element differs considerably from the others. This formula can be used to check whether the supposition H0 is true: Tk =
n X k − mn −1 n − 1 Sn−2
(3.10)
where: Sn
2
=
n 1 (X i ∑ n − 2 i 1,i ≠ k
X nn−1 )2
(3.11)
is the estimator of the standard deviation of the variable being observed without the outlier. If the verified hypothesis is true, the random variable Tk has a Student’s t-distribution with (n – 2) degrees of freedom. If the alternative hypothesis H1 is true, the random variable Tk has
Book.indb 65
12/9/2013 12:23:35 PM
66
Statistics for mining engineering
a non-central Student’s t-distribution7. The hypothesis that is verified should be rejected for the presumed level of significance α if the following inequality holds: Tk ≥ tα(n − 2)
(3.12)
where tα(n − 2) is the quintile of the order α of the Student’s t-distribution with (n – 2) degrees of freedom. ■ Example 3.4 The unloading times of hauling trucks were recorded in a certain open pit mine. The following sequence was noted: 1.02; 1.10; 1.12; 0.98; 1.21; 1.09; 0.94; 1.05; 0.93; 1.66; 1.22; 1.08; 1.02; 0.88; 1.03; 1.09; 1.00; 0.86 min. The 10-th time looks strange (1.66 min) so it is excluded from further analysis. Verify whether this decision was a proper one.
Commence from testing whether the sample has a randomness property. The sample consists of 18 elements. If the outlier is rejected, the sample has an odd number of items and for this reason—after arranging the sequence monotonically—the element that is in the middle is the estimate of the unknown median. This means that the time of dumping, which equals 1.03 min, is the estimate of the median. There is such an element in the sample,
7
In probability and statistics, the non-central t-distribution generalises the Student’s t-distribution using a non-centrality parameter. Like the central t-distribution, the non-central t-distribution is primarily used in statistical inference, although it may also be used in robust modelling for data. In particular, the non-central t-distribution arises in power analysis. The cumulative distribution function with v degrees of freedom and non-centrality parameter μ can be expressed as: ⎧ ⎛ j − 1⎞ μ2 Γ ⎪1 ∞ 1 j − ⎝ 2 ⎠ ⎛ ν ν j + 1⎞ ⎪ ∑ −μ 2 e 2 B⎜ ; , ⎟ (1// ) ⎝ ν + x 2 2 2 ⎠ ⎪ 2 j =0 j ! Fν μ ( x ) = ⎨ ⎛ j − 1⎞ ⎪ μ2 Γ j − ⎪ 1 ∞ 1 ⎝ 2 ⎠ ⎛ ν ν j + 1⎞ 2 −μ 2 e B⎜ ; , ⎪1 − ∑ ⎟ 2 ⎝ 2 j ! ( 1 / 2 ) ν + x 2 2 ⎠ j =0 ⎩
(
)
(
for x ≥ 0
)
for x < 0 x
where B(x;a,b) is the regularised incomplete beta function, i.e. B ( x; a, b) = ∫ u a−1 ( 0
Book.indb 66
u )b−1 du
12/9/2013 12:23:37 PM
Analysis of data
67
so if one rejects it, the sequence of plus and minus signs (elements greater than the median and elements lower than the median) is as follows: −++−++−+−++−−+−− The number of series is 11 and the number of plus signs is equal to the number of minus signs, which is 8. The critical values for the level of significance α = 0.05 are: 4 and 13 (Table 9.8). Corollary: because the empirical value falls between the critical boundaries there is no basis to reject the hypothesis that states the randomness of the sample. Now evaluate whether the decision to reject the outlier was a correct one. Calculate the average values for the sample with the outlier and without it. Here we have: mn−1 = 1.04 min
and mn = 1.07 min
The corresponding standard deviations are: Sn−2 = 0.10 min
and Sn−1 = 0.18 min.
Now calculate the value of the statistic Tk—patterns (3.10) and (3.11): Tk = 6.36. Presume the level of significance α = 0.05. The critical value for this level is tα(n − 2) = 2.12 (Table 9.3). The empirical value significantly exceeds the critical value. The outlier has to be rejected from further considerations. Note. This extraordinary dumping time was caused by a malfunction of the hydraulic system that lifted and lowered the loading box. It is time to consider a case in which there is no information on the random variable being investigated, and thus we are not able to formulate a statistical hypothesis in this regard in addition to the fact that we know the sample that has just been taken. This may be the case when the sample is small or when the test that permits the probability distribution to be identified gives ambiguous information. In such a case, the oldest principle that is used is the rule of 3σ. According to this principle, the rejection region is determined by the inequality given by formula: X > X n − + 3Sn − 2
(3.13)
where the first component of the right side of the equation is the mean based on the (n − 1) sample whereas the second is the product of three times the standard deviation of the sample. By the way, let us evaluate how this principle holds for the case just discussed—example 3.4. Applying the estimates that were found during the analysis, one obtains X > 1.04 + 3 × 0.10 = 1.34 min The outlier (1.66 min) is above this value. Notice that the dispersion of the random vari◀ able being investigated is comparatively low8.
8
A basic measure of the relative dispersion of a random variable is the Coefficient of Variation (CV). It is a measure of the differentiation of the distribution of a random variable. It is the ratio of the standard deviation to the expected value of the random variable provided that the mean is different than zero. Its estimator—both parameters assessed based on the sample—is consistent but biased in a general case. CV is usually given in percentages.
Book.indb 67
12/9/2013 12:23:39 PM
68
Statistics for mining engineering
Although it is difficult to determine unequivocally what is the probability that the above inequality holds (it depends on the type of probability distribution that we are dealing with), we can be sure that this probability is very small, assessed as a few per cent (in the case of an exponential distribution for instance, it does not exceed 2%). A rather stronger statement in this regard is the limited estimation that is determined by Cheybyshev’s inequality theorem, which is as follows. Let X be a random variable with a finite expected value and a finite non-zero variance. Then, for any real number k > 0, the following inequality holds: P {|
E (X ) | ≤ k
1
x
} ≥ 1− k2
(3.14)
However, only the case k > 1 provides useful information. When k < 1, the right side of the inequality is greater than one, so it becomes vacuous because the probability of any event cannot be greater than one. When k = 1, it simply means that the probability is less than or equal to one, which is always true. If for instance k = 3 then, keeping in mind pattern (3.14), the lower estimation is approximately 0.9. Several further tests concerning outliers are applied in statistics. One of them is the socalled Q test. For verification of the statistical hypothesis H0 that proclaims that an outlier is necessary in a sample to order the sample monotonically, presume that the elements of the sample were presented in a non-decreasing way, i.e. {y1 ≤ y2 ≤ ... ≤ yn < Xk}
(3.15)
Xk Xk
(3.16)
Define the statistic: Q=
yn y1
The formula (3.16) determines the empirical value of the statistic Q. It should be compared with its counterpart Qα(n), which is a critical value. The critical values are given in Szepke’s paper (1967). If the following inequality holds: Q ≥ Qα(n) then the verified hypothesis H0 should be rejected at the level of significance α. It is obviously understood that the alternative supposition is accepted; the hypothesis that proclaims that the outlier belongs to the sample. At the conclusion of the considerations on outliers, note the following regularity. There are many probability distributions that are used in mathematical statistics and they have various properties. One such property is robustness on the outliers’ appearance. Although the problem of robustness in statistics is much wider9, we are discussing the possibility of the occurrence of untypical outcomes in a sample here. Literature on the subject of robustness appeared mainly in the late seventies and eighties of the previous century (e.g. Huber 1981, Rousseeuw and Leroy 1987), and many probability distributions were tested in this regard. The Gaussian distribution
9
There is a term ‘robust statistics’ which provides an alternative approach to standard statistical methods, such as those for estimating some parameters of a random variable. The main point is to make such estimators which are not unduly affected by outliers or small departures from model assumptions.
Book.indb 68
12/9/2013 12:23:40 PM
Analysis of data
69
proved to be robust on the appearance of outliers while gamma and Weibull did not. This means that an extraordinary outcome may appear and the sample will be homogeneous. Generally, it is worth remembering that if an untypical outcome is in a sample, it is necessary to verify the source of information in order to check the possible physical reasons for its appearance etc. And, if all of these non-statistical potential reasons are attested and no motive is found then it is time to apply statistical tools. As has been shown, the presence of an outlier in the sample generates a problem. If further analysis is carried out and some statistical measures are estimated—or, when for example, performing least squares fitting to the data—it is often the best solution to discard the outlier before computing. This should even be done when the appropriate statistical test gives no grounds to reject the hypothesis that the outlier belongs to the given sample characterised by a certain probability distribution. It is worth noting that if a sample is large, the rejection of one element does not cause a great loss. If, however, a sample is small, the value of the outlier has an enormous influence on the values of the calculated parameters. Estimates will be distorted and therefore it is better to reject it. 3.2.4
Result of an outlier analysis
This provides unequivocal information about which part of the gathered data should be taken into further investigations. In a case where an untypical element belongs to the sample, it is noteworthy information that during the operation of the object such event can sometimes occur.
3.3
STATIONARITY TESTING OF SEQUENCES
In our analysis, two steps were done first—we checked the randomness of the sample taken and rejected the outlier (if there was one). The next step should be an examination of whether the observed sequence of outcomes is stationary or not. The result of this examination has a significant influence on further parts of the statistical analysis. This is because if a sequence is a non-stationary one (which means that the values of the sample are increasing or decreasing, on average), it indicates that we have observed the realisation of a certain stochastic process of the monotonically expected value of the variable. If so, our further analysis should be done in the area of the theory of stochastic processes. However, if the sequence is stationary, we can presume that our sample was the realisation of a certain random variable and the scope of further consideration should be on the analysis of the field of the random variables. Such analysis is much simpler than an analysis of stochastic processes. Generally, stationarity means that something is fixed in a position or mode that is immobile or unchanging in condition or character. Stationarity in connection with the exploitation process of a technical object is associated with the way in which the process is realised. Therefore, it is a kind of property of a random process. Let us ignore the subtleties connected with the different kinds of stationarity that are considered in the theory of stochastic processes (see, for example, Feller 1957, Kovalenko et al. 1983, Ross 1995). Instead, we will approach the problem of stationarity from a practical engineering point of view. Each sequence of the times of a given state should be tested to see whether the observations increase or decrease on average over time. Because the parameter of the process is a time, this verification concerns stationarity. Nevertheless, in engineering practice there are some operations for which the most important process parameter is not time. For a mine hoist installation, the number of winds to be executed is much more important. Similarly, for a transportation system, the number of tons of mass to be displaced is critical. For many machines the number of work cycles to be performed is vital. For these reasons, the point of interest is a defined
Book.indb 69
12/9/2013 12:23:41 PM
70
Statistics for mining engineering
stochastic property of the sequence of values being observed. However, in order to make further considerations more communicative, it will be presumed that the process parameter is time. There are several statistical tests that allow this property to be checked for a given sequence, but the one that is most frequently used in econometrics and technometrics is the test that applies the Spearman’s rank correlation coefficient (see, for example, Hollander and Wolfe 1973). Correlation is a kind of stochastic relationship between random variables. It is the statistical proportionality of the results of the measurements of different phenomena. It is sometimes stated that it refers to the departure of variables from independence10. A basic measure of correlation is a correlation coefficient, however several other correlation coefficients are used in different investigative situations. The procedure for the Spearman rank correlation test is as follows. 3.3.1
The test procedure
A natural number that follows the sequence of the occurrence of the elements in time is assigned to each element of the sample. These natural numbers are called ranks11. Next, the sample is ordered monotonically. Natural numbers going up or down are assigned to all of the elements of the new sequence. (For general purposes, it does not matter if these numbers are assigned going up or down, as this only generates a change in the sign of the coefficient.) If a situation occurs in which a few values are identical, a rank that is the arithmetic mean of their ranks should be assigned. In such a way, a second set of ranks, vi, i = 1, 2, …, n is obtained. These two sets of ranks create a matrix: ⎡v1 v2 ... vn ⎤ ⎢1 2 n ⎥⎦ ⎣ To assess the Spearman’s rank correlation coefficient, the following statistic is applied: rS
1
1 6 Rn n( n2 −1)
(3.18)
where: n
Rn = ∑ ( i − i )2
(3.19)
i =1
This correlation coefficient is a normalised measure that is determined over [−1, 1] interval and it is created based on the Pearson’s linear correlation coefficient. If the investigated sequences are independent of each other, the rank Spearman’s correlation coefficient equals zero. However, if these sequences are functionally dependent, then this coefficient equals 1 in the modulus. A value near zero indicates that these sequences are not correlated; there is no interrelationship between the value that appears in the sequence and its order in the sequence, i.e. it testifies to the stationarity of the sequence being investigated. Formally, the procedure of statistical investigation is as follows. A statistical hypothesis is formulated H0: ρ = 0 (where ρ is the correlation coefficient in the entire population), which states that there is no dependence between the values with respect to time. This hypothesis is
10
For more on correlation see Chapter 6. Rank refers to the relative position, value, worth, complexity, power, importance, authority, level etc. of a person or object. 11
Book.indb 70
12/9/2013 12:23:41 PM
Analysis of data
71
set against the hypothesis H1 : ρ ≠ 0, which states that the values of a variable depend on time. If the following inequality holds: |rS | ≥ rS (α, n)
(3.20)
where rS (α, n) is the critical value (taken from Table 9.14) for the given level of significance α and the sample size n, the hypothesis H0 must be rejected. Paying attention to the sign of the coefficient and confronting it with the way of assigning ranks, we can conclude what kind of tendency is in the sequence: increasing when the sign is plus or decreasing when it is minus. The estimator (3.18) had been applied in statistical investigations for a long period of time up to a moment when the problem of the influence of the ranks associated with the same values (called tied ranks) was taken into consideration. Due to the fact that in mathematical statistics there are many tests that apply ranks (e.g. Mann-Whitney test or Kruskal-Wallis test), the problem was crucial. Researchers easily came to the conclusion that such ranks have an effect on the statistical inference being conducted and that this effect is negative. Generally, the greater the number of tied ranks, the greater their effect is. In the test just presented, they decrease the value of the sum of squares of the deviations of natural numbers from their mean. Thus, it is necessary to introduce a correcting sum: g
TΣ
∑ (w
3 j
− wj )
(3.21)
j =1
where g is the number of groups of tied ranks, while wj is the number of tied ranks in the j-th group. The final pattern of the estimator for the rank correlation coefficient is: 1 ( n3 − n ) − 6Rn − TΣ 2 rS′ = ( n3 − n )2 − TΣ ( n3 − n )
(3.22a)
or rS′ =
12vi i − 3n( n + 1)2 ( n3 − n − TΣ )( n3 − n )
.
(3.22b)
Generally, the application of the test for an investigation of the rank correlation coefficient is possible when n ≥ 4 for the presumed level of significance α = 0.05. If α = 0.01, the sample size n ≥ 5. For a larger n, in practice for n > 10, this correlation coefficient has approximately the normal distribution N( , (n ( n )−1 ), while statistic Rn has approximately the normal distribution: ⎛ n( n2 N⎜ 6 ⎝
⎞ ) n(n (n ) , n − 1⎟ 6 ⎠
For this reason if n is large (practically, already if n > 10), the critical value can be calculated from the pattern: rS ( , n )
u1 , n −1
(3.23)
where u1−α is the quantile of the order (1 – α) of the standardised normal distribution N(0, 1).
Book.indb 71
12/9/2013 12:23:43 PM
72
Statistics for mining engineering
■ Example 3.5 Reliability investigations concerned armoured flight conveyors operating in underground coal mines where the longwall method was being used. For one conveyor the sequence of repair times was as follows: 110, 40, 60, 10, 100, 70, 30, 50, 155, 65, 170, 35, 90, 85, 230, 40, 35, 95, 65, 100, 45, 180, 80, 60, 30, 140, 170, 120, 25, 80, 130, 105, 70, 20, 15 min. A question to answer is whether this sequence is stationary.
Firstly, investigate the randomness of the sample. The size of the sample is 35. Arranging the sequence monotonically, one can find that 18-th element is 70 min. This is the median of the sample. By transforming the sequence into the sequence of signs, one has: +–––+––+–+–+++––+–+–++––+++–+++–– The number of series of signs is 20. The sequence now has 33 elements because two elements were rejected (they were identical to the median). The number of plus signs is 17 whereas the number of minuses is 16. We next verify the basic hypothesis that states the randomness of the sample versus the alternative supposition that rejects it. Presuming the level of significance α = 0.05 and bearing in mind parameters of the sample, the critical values are: 11 and 23 (see Table 9.8). Therefore, we have no ground to reject the null hypothesis—we assume that the sample has a randomness character. Because the sample has no outlier, let us check whether the sequence observed is stationary. Making all of the necessary calculations (Table 3.1), one gets: rS = 1 −
6 × 6957.5 6 × 6957.5 = 1− = 0.026 n( n2 −11) 35(352 − 1)
Immediately a conclusion can be formulated that such a small value should not be significant. Formally, a null hypothesis is stated that proclaims the stationarity of the sequence given by the sample versus an alternative supposition rejecting it. The critical value can be calculated by applying the formula (3.23). Here we have: rS ( , n ) =
1, 645 = 0.282 n −1
Looking at this result one can state that there is no basis to reject the null hypothesis that proclaims the stationarity of the sample. Some readers have probably noticed that there are several values in the table that are repeated and obviously their ranks also. Let us investigate the influence of these ranks on our
Book.indb 72
12/9/2013 12:23:47 PM
Analysis of data
73
statistical inference—on the value of the correlation coefficient. Calculate the correcting sum as determined by formula (3.21). In the case being considered, g = 9 (the number of groups) and the sum is: TΣ = 132 By applying pattern (3.22a), one calculates the corrected value of the rank correlation coefficient, which is now: r′S = – 0.037. As you can see the difference is small, negligible. Table 3.1.
CH03.indd 73
Auxiliary calculations.
Value
Rank vi
110 40 60 10 100 70 30 50 155 65 170 35 90 85 230 40 35 95 65 100 45 180 80 60 30 140 170 120 25 80 130 105 70 20 15
27 9.5 13.5 1 24.5 17.5 5.5 12 31 15.5 32.5 7.5 22 21 35 9.5 7.5 23 15.5 24.5 11 34 19.5 13.5 5.5 30 32.5 28 4 19.5 29 26 17.5 3 2
# group III IV VIII VI I
V IX II
III II V VIII
VII IV I IX
VII
VI
Number i
(vi – i)2
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35
676 56.25 110.25 9 380.25 132.25 2.25 16 484 30.25 462.25 20.25 81 49 400 42.25 90.25 25 12.25 20.25 100 144 12.25 110.25 380.25 16 30.25 0 625 110.25 4 36 240.25 961 1089
Σ
6957.5
12/12/2013 3:08:07 PM
74
Statistics for mining engineering
It is worth noting that the non-stationarity of the sequence examined here is not frequently observed. However, there are some processes in mining engineering that have a dependence on time or another process parameter. There are three basic areas in which the non-stationarity of data can be perceived in mine mechanisation. When a piece of equipment commences to fulfil its duties, a period of running-in (grinding-in) often begins. Some structural elements that work together begin to fit better. The cooperation becomes smoother over time. If this is so, any potential failures should occur less frequently. For this reason, the mean work time between failures increases. This process has a fading character. At the very beginning, the intensity of failures, which is relatively high, decreases toward its characteristic appropriate level that is associated with the properties of the object. When this level is reached, the regular exploitation process of the object begins. Producers of high-quality machines eliminate this period by performing the running-in period when the production of the machine is finished in their factory. The purchaser of the machine obtains an object in which the elements already work together smoothly. Some other machine manufacturers whose products have a running-in period during regular operations guarantee the replacement of failed elements through this special period free of charge or guarantee a low price on the items necessary to replace those that have failed. This period is warranted by the producer. A second special period in which the intensity of failures increases is the period during which a piece of equipment becomes worn—aging. Some signs of wear and tear are clearly visible in some machine elements. Elements begin to work together less efficiently over time. The number and intensity of failures increases. The exploitation process of the machine shifts from the regular period (II) to a third period—a period of significantly increasing degradation. The end of the working life of this object is approaching. Users of the machine are interested in getting rid of it in order to avoid operational problems and economic losses. However, nowadays, the economic end of a machine occurs rather than its mechanical death. A problem that sometimes faces users of machines is the appearance on the market of a new machine that has better parameters and better properties. This problem raises the question of whether it may be more profitable to withdraw the machine from use, sell it and purchase a new machine. There is also a different source generating non-stationarity in data. Mining practice has shown that sometimes unusual situations arise. The process of the generation of a stream of rock that is being excavated is running with a high degree of intensity when suddenly a failure occurs in a machine that is important for production. There is time pressure—this machine should be repaired as quickly as possible. And, unfortunately, there is no spare element to replace the one that has failed. Miners sometimes try to solve this problem by making use of a similar element (as a direct replacement or after some modification) during the repair. The machine operates again but the intensity of failures changes. The modified element (sometimes it is an entire assembly) fulfils its duties but not entirely in the way that is expected. This period when the machine begins to perform its duties and the intensity of failure increases is a non-stationary one, and this means that the work time between two neighbouring failures is shortened and the intensity of the failures increases. This type of repair practice is obviously not recommended but unfortunately it can sometimes be observed in mining reality. Be aware that phases of operation of machines described above concern objects that can be repaired. However, there are some other technical items that are non-repairable and that fail during their usage and that some periods of non-stationarity occur when this happens. A hoist head rope in a hoist can be given as an example. Its process of wearing, which is usually understood as the process of breaks in the wires, results in breaks after a period without showing any signs of fatigue (stationary period) thus entering into a non-stationary phase with an accelerating accumulation of breaks.
Book.indb 74
12/9/2013 12:23:49 PM
Analysis of data
75
■ Example 3.6 The use of an underground suspended loco was investigated. The times of its work were noted as well as any failures that occurred. Next, the total work time between two neighbouring failures was calculated. In such way a sequence of 13 times of the use of the loco was obtained: 241.1; 205.4; 26.1; 25.0; 68.1; 41.0; 9.2; 17.1; 5.2; 69.1; 1.0; 4.9; 0.5 h Looking at this sequence it is easy to see that the total work time from failure to failure decreases stochastically. Let us verify this supposition. Apply a test based on the Spearman’s rank correlation coefficient.
By assigning ranks and making all of the necessary calculations, one gets the data shown in Table 3.2. Calculate the coefficient. Here we have: rS = 1 −
6 × 662 = −0.82 n( n2 −1)
Formulate a null hypothesis stating that the sequence is a stationary one. Compare this value with the corresponding critical one taken from Table 9.14:
CH03.indd 75
Table 3.2.
Auxiliary calculations.
Value
Rank vi
Number i
(vi – i)2
241.1 205.4 26.1 25 68.1 41 9.2 17.1 5.2 69.1 1 4.9 0.5
13 12 9 8 10 7 5 6 4 11 2 3 1
1 2 3 4 5 6 7 8 9 10 11 12 13 Σ
144 100 36 16 25 1 4 4 25 1 81 81 144 662
12/12/2013 2:45:47 PM
76
Statistics for mining engineering rS(α = 0.05; n =13) = 0.53.
The empirical value is significantly greater in modulo than the critical one. This gives the ground to reject the null hypothesis. Taking into consideration how the ranks were ascribed and the sign of rS, we can conclude that the total work times from failure to failure decreases and not incidentally, significantly in a statistical sense. Remark. There was no way to obtain information about what the physical reason for such a phenomenon was but when the last failure occurred the loco went under a general repair that lasted for quite some time. ◀ There are some further different areas of mining engineering where the data indicate nonstationarity. Figures 3.3–3.6 illustrate the statistical relationships between: • The number of tonnes of hard coal sold in Poland on a monthly basis in 1995–2007 • The lost time incident rate for the mining industry in the USA • Vertical displacements of rocks over the time interval connected with tremor recorded in the ‘Rydułtowy-Anna’ coal mine, Poland • The theoretically determined subsidence w(t) of point S and the observed vertical displacement wp(t) in an area of the ‘Halemba’ underground coal mine, Poland. All of these plots contain important and useful information although in some cases further statistical analysis is difficult and requires the application of sophisticated statistical tools. Make some comments on the problem of stationarity. Let us repeat at the very beginning, due to importance of this material, that information on non-stationarity has great repercussions for any further statistical analysis that is conducted. This information is also vital if the analysis concerns the problems of mine mechanisation for instance. If the data collected refers to the realisation of the exploitation process of a technical object (and it does not matter whether it is a single item or the entire system), the information on non-stationarity should be a clear signal to observe the object carefully. The main point of interest should be the answer to two questions:
Number of thousands of tonnes of hard coal sold [103 Mg]
• What is the physical source of such regularity? • What will probably happen to the object in the near future?
January
February
March
April
May
June
July
August
September
October
November
December
Figure 3.3. The number of tonnes of hard coal sold on a monthly basis in 1995–2007 (Manowska, 2010).
Book.indb 76
12/9/2013 12:23:50 PM
Analysis of data 24,000 Rate
8 7
18,000
6
15,000
5 12,000 4 9,000
3
6,000
2
07
05
06
20
20
04
20
02
01
03
20
20
20
00
20
98
97
99
20
19
19
96
19
94
93
95
19
19
19
92
19
19
19
19
19
19
91
0
90
1
0
89
3,000
88
Number of nonfatal lost-time injuries
21,000
Nonfatal lost-time injury rate (per 100 full-time equivalent employees)
9 Number
Figure 3.4.
77
The lost time incident rate for the mining industry in the USA (Saporito and Self, 2012).
Figure 3.5. Vertical displacements of rocks over the time interval connected with tremor recorded in the ‘Rydułtowy-Anna’ coal mine (Szewioła-Sokoła, 2011).
Time h 27-10-2005 Energy: 8.00E+04 J
Figure 3.6. The theoretically determined subsidence w(t) of point S and the observed vertical displacement wp(t) in an area of the ‘Halemba’ underground coal mine during the period 24-10-2005 to 31-10-2005 (Sokoła-Szewioła 2011).
Book.indb 77
12/9/2013 12:23:52 PM
78
Statistics for mining engineering
Sometimes this information is alarming. By analysing it more carefully and in more depth one may get information that the existence of the object will very likely be jeopardised or even that its existence will be seriously threatened in the near future. The responsibility falls on the person performing the analysis if he/she does not generate running events. In the regular operation of technical objects, non-stationarity seldom occurs unless the periods of running-in and intensive aging are neglected. However, there are some technical objects that have a non-stationary process of wear nearly from the beginning of their use (vide: hoist head ropes). There are also some objects for which the operation process can change drastically because of significant changes in their surroundings. It concerns powered support systems, for example. When a longwall is being constructed in an area where another longwall is in operation (this second excavation can be below or above the longwall), the stresses that exist in the rocks change and soon have a considerably different dispersion than in an intact rock. Drastically changed stresses in rocks can also be observed when the excavation comes into contact with geological faults. All of these situations cause a higher number of failures of powered support elements. Look now at Figures 3.3–3.6. Information about the non-stationarity of the sequences noted in these figures ‘gives’ an analyser the ground to make some important decisions. Generally, in Figure 3.3 one can detect the process of changes in coal production in Poland. This occurred during the period of the restructuration of the Polish mining industry after the collapse of the previous political system. One can guess that the situation on the market stabilised over time and a certain sales level was reached. This information is useful for planning the further production of hard coal in Poland. Figure 3.4 in turn ‘carries’ different information. There is a positive tendency in mining in the USA that the lost time incident rate decreases over time. This is a clear indication that its policy in this regard is a correct one that should be maintained. However, it can be predicted that the general tendency tends to a certain asymptote if there are no significant changes in the mining methods being applied. Figures 3.5 and 3.6 contain essential information, which is a precursor of a coming tremor caused by running mining operations. If such an event is observed in a mine monitoring station, an appropriate action should be undertaken immediately. This problem will be discussed in the chapter on prediction. Non-stationarity testing of sequences in mining engineering is of immense importance in some areas. Let us conduct our consideration presuming, so far, that the sequence observed and later analysed is a stationary one in a sense of the mean value.
3.4
OUTCOME DISPERSION TESTING
If during the analysis being conducted there is no basis to reject the hypothesis that proclaims the stationarity of the sequence noted, i.e. that the values in the sequence do not change over time on average, then this does not mean that this sequence is free from any dependence on time. This relationship can be subtler, e.g. the dispersion of the sequence values is not constant but changes with time on average. As a rule, in mining practice, if a value is not constant, it increases over time. A problem of this type can occur, for instance, when an examination of the data is being carried out and the point of interest is to find a good function that can satisfactorily describe the information that has been obtained. Such a situation can be observed when analysing records concerning the fatigue-wearing processes of a head rope of a hoist. Usually, a default presumption is that this function should describe the data that are in hand well and this goodness should be approximately constant over time. Unfortunately, very often the opposite
Book.indb 78
12/9/2013 12:23:53 PM
Analysis of data
79
regularity is noticed—the goodness of the description worsens with the amount of work executed by the rope. This goodness worsens because of the increasing dispersion of the values noted (total number of breaks of wires) around the expected value function. ■ Example 3.7 A plot of the function is shown in Figure 3.7: the total number of cracks in the wires of a hoist head rope versus the number q of winds executed by this hoist12. More than a half century ago, it was proposed (Kowalczyk 1957) that the empirical data in such case be approximated by a power function determined by the formula: Θt = δt χcζt
(3.24)
where: δ, χ—structural parameters of the function Θt—total number of cracks of rope wires t—time (or number q of winds) c—constant ζt—random component of the function. Usually, linearisation of function (3.24) is being done by applying the natural logarithm and for this reason c = e which makes that the random component ζt is in an additive way connected with the regression function. It was presumed that the random component of the model comprises the whole stochastic nature of the process of the accumulation of cracks during the rope’s utilization. It exclusively explains the fact that the theoretical function does not precisely cover the
300
200 Θi θi 100
0 30
40
50
60
qi × 103
Figure 3.7. Total number of cracks in the wires of a hoist head rope vs. the number q of winds executed; θi empirical plot, Θi theoretical plot.
12
Notice, that this plot begins at a certain distance from the inception point (0, 0) because after its installation the rope in the hoist works for a certain period of time without any break. It makes no sense to consider any approximation function to fit the data during this period.
Book.indb 79
12/9/2013 12:23:53 PM
80
Statistics for mining engineering
empirical values. The total number of breaks at a given moment is a random variable (the left side of the equation). This means that the right-hand side of equation is also a random variable. The only stochastic element of this side is the random component. It is unobservable directly; however, it can be estimated by determining the sequence of residuals which measure how different the theoretical and empirical values are. The series of empirical values of θt are usually noted following the utilisation of a rope and create statistical data. Considering function (3.24) the random component can be defined in two ways: a. As a sequence of the differences between the empirical values of θi and its theoretical counterparts; it is the sequence for formula (3.24): ui
θi
atib
i = 1, 2, …,
(3.25)
where a and b are estimates of the unknown structural parameters δ, χ b. As the sequence of residuals defined by pattern: uˆi
ln
θi atib
1, 2,
,
(3.26)
which is the result of the appropriate conversion of formula (3.24). Notice, that the residual here is the index of power and c = e. Both measures are correctly defined and they are two different measures of the random component for function (3.24). The structural parameters are estimated by making a linearsation of the power function, that is: lnΘt = χ ln l t + ln δ + ζ t lnt
(3.27)
and applying the method of least squares. The appropriateness of this method is ignored here (see Chapter 6 for more on this topic). Presuming that the process parameter is the number of winds executed, the results of the estimation of the function given in Figure 3.7 are: Θi = 5 28 × 10 −5 qi3.78e ui This function is shown as a continuous one in Figure 3.7. Incidentally, many engineers use this way of reasoning and they are usually convinced that everything is correct. But this is not true. For more on this topic, see Czaplicki 2010, Chapter 5.3.2. Now observe what the course of the residuals looks like. Figure 3.8 illustrates the residuals ui determined by function (3.25) for the sequence of the data observed and Figure 3.9 shows the residuals determined by function (3.26) against the number of winds executed by the rope. In both figures, the points of the residuals are connected by straight lines. Both plots are different from a typical realisation of a pure stochastic process with a zero mean and a finite variance, as could be expected because of the least squares method that was applied. If this is so, this supposition should be verified. A suggestion can be formulated that there has to be a certain factor that generates this difference. Looking at both figures, a hypothesis can be postulated that the dispersion of the values is not uniformly distributed over time in a stochastic sense.
Book.indb 80
12/9/2013 12:23:54 PM
Analysis of data
81
10
0 ui –10 10
–20 20 30
40
50
60
qi × 10
3
Figure 3.8.
Residuals determined by function (3.25) for the sequence of data noted.
0.1
0.05 uˆi
0
–0.05 –0.1
30
40
50
60
qi × 103
Figure 3.9.
Residuals determined by function (3.26) vs. the number of winds executed by a rope.
To verify this supposition the data were divided in half and the standard error of estimation was calculated for both sequences giving S1 = 3.32 for the first half and S2 = 6,75 for the second. The problem now is to verify whether this difference is statistically significant or only random. An appropriate statistical test must be applied to clear up these doubts. At least two tests can be considered: a. The test applying the F-Snedecor’s distribution b. The Kruskal-Wallis one-way analysis of variance. The reasoning based on (a) assumes a Gaussian distribution of the random variable being tested. This is the most frequently used method; however, this assumption must be verified before further analysis. The reasoning based on (b) is a non-parametric method for testing the equality of the population medians among groups. It is identical to the one-way analysis of variance with the data being replaced by their ranks. Since it is a non-parametric method, this test does not assume the normal population (Kruskal and Wallis 1952, Siegel and Castellan 1988);
Book.indb 81
12/9/2013 12:23:56 PM
82
Statistics for mining engineering
therefore, this approach is more general (more general than the test based on the F-Snedecor’s random variable). There is a presumption in the test that the probability distribution describes a continuous random variable13. In the case being considered, an assumption can be made that the calculated sequence of differences has a normal probability distribution. Therefore, case (a) can be analysed. Formulate a null hypothesis H0 : σ12 = σ22 that the variance in the first half of the data does not differ significantly from the variance in the second half of the data. Looking at the data, an alternative hypothesis can be: H1 : σ12 > σ22. In order to verify the basic hypothesis, calculate the ratio of the empirical variances. This should be done in such way that the variance in the numerator must be not greater than the variance in the denominator. In our case we have the ratio S22 /S12, which is the random variable that has the F-Snedecor’s distribution with (n1 – 1, n2 – 1) degrees of freedom if the hypothesis H0 is the true one. If the ratio is greater than the critical value Fα(n1 − 1, n2 − 1), which is taken from the appropriate statistical table presuming a level of significance α, the hypothesis H0 must be rejected in favour of the alternative supposition. This means that the variances of residuals are statistically different, which is identical to the statement that the standard deviations are significantly different from each other. In the case being analysed we have: F = Sˆ22 Sˆ12 = 44.14 14 whereas
0,05 0
(14,15) = 2.42
for the presumed level of significance α = 0.05 (Table 9.6). The critical value should be determined in such way that the number of degrees of freedom associated with the greater variance is in the upper row of the table. The number of degrees of freedom associated with the smaller variance is placed in the side column of the table. Due to the fact that the calculated F value is greater than that taken from Table 9.6: F0,05 (14, 15) = 2.42, we have the ground to reject the null hypothesis. Thus, it can be assumed that the dispersion of the residuals of the random variable being investigated increases with the number of winds that are executed by the hoist. ◀ By the way, when looking at Figure 3.3, we may suspect that the dispersion of the number of tonnes of hard coal sold on a monthly basis between the years 1995–1999 is significantly greater than in the next eight years. Let us make some comments on an analysis of the outcomes of dispersion testing The first piece of crucial information is that the data that are at hand is in fact the realisation of a certain stochastic process, and what is more, the dispersion of its values around the mean increases. If so, a further part of the analysis being conducted should be placed on an analysis of random processes. Secondly, there must be a physical factor which generates the variability of the dispersion. Usually, this will be a certain process running in time. This process and its properties should be identified because much important information is associated with it. Thirdly, the expected value function for the process is often estimated using a mathematical model that can be linearised and the least squares method is applied to estimate its unknown parameters. However, if the dispersion is not constant, one of the 13
It is true that this test is more universal than Snedecor’s F test but it is weaker in its power than the F test.
Book.indb 82
12/9/2013 12:23:56 PM
Analysis of data
83
basic assumptions that must be fulfilled in order to allow the least squares method to be applied is not satisfied. Thus, if the least squares method is still applied, the estimates obtained can be less credible and in some cases false conclusions can be drawn based on them. If the analysis concerns the wear process of a hoist head rope, this false inference can affect the assessment of the level of safety of the rope and this can be dangerous. Moreover, when an inference on the degree of rope wear in the future is conducted periodically, the formulated prognoses will be of a diminishing likelihood over time because of the increasing dispersion. This means that uncertainty increases with time where the accuracy of the prediction is concerned. Because it is impossible to renew a rope that is in operation in a shaft, the only solution to keep safety at an appropriate level is to execute more precise and more comprehensive rope diagnostics and obviously to perform them more often. When analysing the regular exploitation processes of pieces of equipment or processes of changing states, the variability of dispersion over time is rarely noted. Sometimes such a regularity can be observed when the object is in operation for a long time without any maintenance or planned prophylactic actions which should have been made.
3.5
CYCLIC COMPONENT TRACING
Many processes in mining have a cyclic character. The cyclic character of processes is generated by the periodic character of the organisation of work. The cycle of a process can be connected with the calendar—season, day or production progression per day or shift. By looking more carefully at the operation of many machines, it is easy to notice that their exploitation process has a periodic nature, and that it can be understood in a different sense. Periods alone can have a more or less stochastic character. Many years ago, a hypothesis was formulated that proved that this cyclic nature of operation can periodically distort the processes of changes of states (Czaplicki 1974, 1975). The hypothesis proclaimed that in some periods of operation time—during the exploitation of a technical object (a single machine or a system of machines), the occurrence of some states are more probable than that of others. If this is so, the probability of the appearance of a given state is not constant in time but is rather a function of time and this function is a cyclic one. In addition, a stream of rock being extracted or hauled by transport means very often also has a periodic character. These two functions are frequently correlated with each other. In some cases, a stronger statement can be formulated: if a stream of rock being transported increases, and usually has greater dispersion in value, it means that the probability of the occurrence of a failure in the transporting units increases. Therefore, the output of a hauling unit that is calculated as the product of the probability of the work of the unit and the mean mass of the rock being transported gives an incorrect estimation because the higher the mass being transported, the lower the probability of its displacement. Thus, this estimation gives higher values than it should. Consider the problem of the existence of a cyclic component from a formal point of view. There are two cases to consider: a. the period of cycle is known b. the period of cycle is unidentified. Consider these cases in a sequence.
Book.indb 83
12/9/2013 12:23:57 PM
84
Statistics for mining engineering
3.5.1
The period of cycle is known
If the period of a cycle is known, we can presume that during the cycle one observes consecutive stochastic copies of the same phenomenon. Denote this cycle by [0, T]. Presume that the object14 can be in any of k mutually excluding states, j = 1, 2, …, k. The object is observed N times—that is, records of what was going on with the object during N cycles are given. If we pay attention to one unit of cycle time (it can be any), we notice one out of the k events. If so, the construction of the probability distribution of a random variable that a given state is observed k times in N independent trials (N ≥ k) is now possible. This distribution is multinomial and is given by the formula: P{
1
b1 X 2 = b2
bk } =
k
N! p1b p2b2 ... pkbk 1 , b1 b2 !...bk !
(3.28)
where: k
∑p
k
∑b
j
j =1
j
=N
j =1
and bj is the multiplicity of the occurrence of the j-th state. Consider one state of an object. Its realisation in time consists of the realisations in N periods of time. If all of these realisations are put together, the frequency of the occurrence of this state versus the time cycle will be obtained for N independent trials. The relative frequency, in turn, is the j-th estimator that is unbiased, consistent and most efficient for parameter p of the distribution (formula 3.28). The following hypothesis can be formulated: the method of the exploitation of an object can generate a significant irregularity in the process of the changes of the states of the object. In other words, some states can occur more frequently in some periods of time during the cycle and some states will be observed less often. If we have the diagrams of the relative frequency against time in the cycle for all states, the above hypothesis can be verified. It is obvious that a certain irregularity of the process of the appearance of a given state will be visible due to the stochastic character of the process. However, the problem arises of whether the changes that are observed are connected exclusively with the stochastic nature. By reversing the problem, a question can be formulated: how many times can a given state occur in a moment of cycle time in N trials that such an event can be assessed as very rare—so rare that a certain exploitation factor probably generated this irregularity? Let us simplify our consideration and study only one state. Denote it by s. If it is the only one of interest, it can be specified in the following way: P{
s
bs } =
N! bs
psbs ∏ p j j b
∏b ! j
j s
j s
However
∏ bj j s
(N N bs
i
∏ pj
bj
(
ps )N
bs
,
j s
14
In some cases the term ‘technical object’ stands for a system of pieces of equipment. If this system is observed during a longer period of time, it may happen that some pieces are withdrawn or added. A cardinal feature of mine systems is their changeability because the lengths of the hauling distances change almost continuously. If only one piece of equipment is added or withdrawn from the system, the system is not the same. Its characteristics change.
Book.indb 84
12/9/2013 12:23:57 PM
Analysis of data
85
thus P{
s
bs } =
⎛ N ⎞ bs p ( ⎝ bs ⎠ s
ps )N bs .
(3.29)
The multinomial distribution is reduced to a binomial one. The problem of a significant irregularity in the occurrence of state s is reduced to finding the number bs, which has a probability of appearance lower than that presumed, a small level of probability, say υ (where υ αAE2 = e −α
(3.41)
which—after rearrangement—gives: ⎧⎪⎛ P ⎨⎜ ⎪⎩⎝
⎞ ⎟ >− ⎠
⎪⎫ α⎬ = α ⎭⎪
(3.42)
If the level of significance presumed equals α, one can verify a null hypothesis stating that the i-th jump that is the value of the quotient ⎛ ⎜ ⎝
( ) is significant. If the inequality holds Âj AE
2
2
⎞ ⎟ > −l α ⎠
then the verified null hypothesis should be rejected. This means that we can presume that the time series shows important oscillations with the period that equals n/i. This regularity holds with the probability 1 – α. In some cases, information that some periodic oscillations are significant is enough to take the proper decision in relation to the source of the observed data. But in some other cases it is not enough; for instance, we need to predict what the probable course of the process observed in the near future will be. Let us ignore for the time being what the prognosis means and let us conduct our consideration on a decomposition of a time series a little further. Here a more advanced approach will be presented that makes use of the fundamental monograph written by Box and Jenkins (1976). If all of the significant fluctuations are identified, we are able to construct the cyclic component function C(t)19. Then, having specified two deterministic components, we are able to identify the third element, a purely stochastic one. Consider the following sequence:
19
CH03.indd 89
A cyclic component can consist of a few functions.
12/9/2013 3:32:35 PM
90
Statistics for mining engineering u(ti) = x(ti) – S(ti) – C(ti); i = 1, 2, …, n
(3.43)
The above relationship determines the time series of the residuals generated by the differences. It can be presumed that this sequence is a realisation of the unknown purely stochastic component ξt. Usually, it is also presumed that the sequence u(ti) has a zero expected value and the finite and constant standard deviation σξ. In the majority of cases, a stronger presumption is formulated namely: Nξ(0, σξ). Ignoring how strong the presumptions are, it is necessary to verify—by applying the appropriate statistical tests— whether all of these assumptions hold when confronted with the properties of data in hand. ■ Example 3.8 (Based on Manowska’s Ph.D. dissertation, 2010, Chapter 14) In Figure 3.12 is a graph of a mass of hard coal sold in Poland versus time counted in months. The data comprise the period of the turn of the century: the late nineties—beginning of 21st century. A great restructuring of the mining industry (mainly coal) took place in Poland during this period. It is easy to notice that the time series is a non-stationary one and that it decreases with time. Therefore, a linear function20 was applied as the first approximation of the trend in the data, i.e. yˆS (t ) = αt + β + ut The classical method of least squares was applied in order to estimate the unknown parameters a and b (see Chapter 6.2) obtaining the following equation: yˆ S ( ) = −25.56 + 10947 + ζt where ζt is a random component. The linear regression function is visible in this Figure.
Mass of hard coal sold (thousand tonnes)
14000
y(t)
13000 12000 11000 10000 9000 8000 7000 6000 0
20
40
60
80 Months
Figure 3.12.
100
120
140
160 t
Mass of hard coal sold versus time.
20
This function makes sense in the interval observed and perhaps, for only a few months ahead. The more proper one should be a decreasing function that tends to a certain horizontal asymptote.
Book.indb 90
12/9/2013 12:24:07 PM
Analysis of data
91
It was suspected that there was a cyclic component in the sequence, thus ζt consisted of the constituent and the purely random one. As the next step, the differences were calculated: y( ) − yˆ S ( ) for all of the months of the sample. All of these differences are shown in Figure 3.13. The sequence visible in this figure was the income data for the Fourier analysis with its transform applied. The Matlab 5.3 program was used and the result of the Fourier study is presented in Figure 3.14. It is important whether a dominating frequency is observed in terms of the module of the spectrum in such a graph. If so, a cyclic component very likely exists. It was presumed that the general form of a cyclic function is described by the following pattern:
3000 y(t) –yˆS(t) 2000 1000 0 –1000 –2000 –3000 –4000
Figure 3.13.
Time series of the differences y( )
yˆ s ( ) (Manowska 2010).
70000
Module of spectrum
60000 50000 40000 30000 20000 10000
0.4808
0.4231
0.3654
0.3077
0.25
0.1932
0.1346
0.0769
0
0.0192
0
Frequency
Figure 3.14.
Book.indb 91
Result of the application of the Fourier transform (Manowska 2010).
12/9/2013 12:24:09 PM
92
Statistics for mining engineering ⎛ π ⎞ yC (t ) = sin si 2 t ϕ A Τ ⎝ 0 ⎠
(3.44)
where: T0—period, number of months in one cycle, ϕ—the phase displacement, A—the amplitude. Next, the harmonic analysis was applied that relies on a description of the residuals as the sum of the sinus functions for whatever period, amplitude and phase were selected using the appropriate algorithm. This algorithm relies on the analysis of the mean square error that is the result of the application of the sinus functions. The minimum of this error was a point of interest. In order to search for this minimum, the period was changed from 1 to 156 (sample size), the amplitude varied from 0 to 1000 tonnes and the phase displacement varied from 0 to 2π. The minimum of the mean square error was 10,400 tonnes for the period equal to 12 and the phase displacement was 2.17. The amplitude was 820 tonnes. Therefore, the formula for the cyclic function was: ⎛ π ⎞ yC1 (t ) = sin 2 t + 2.17⎟ 820 ⎝ 12 ⎠ If so, a further point of interest was the next time series, the second residuals. They were obviously determined by the general formula: y(t ) − yˆS (t ) − yC 1 (t ) . This sequence is shown in Figure 3.15. This way of further reasoning was repeated and the Fourier analysis applied. The result of its application is presented in Figure 3.16. The minimum of the mean square error was 8,272 tonnes for the period equal to 114 and the phase displacement 0.72. The amplitude was 506 tonnes. Therefore, the formula for the cyclic function was: ⎛ π ⎞ yC 2 (t ) = sin 2 t + 0.72⎟ 506 ⎝ 114 ⎠ 3000 2000
Second residuals
1000 0 –1000 –2000 –3000 –4000
Figure 3.15.
Book.indb 92
Time series of the differences: y(t ) − yˆS (t ) − yC 1 (t ) (Manowska 2010).
12/9/2013 12:24:14 PM
Analysis of data
93
40000
Module of spectrum
35000 30000 25000 20000 15000 10000 5000
0.4808
0.4231
0.3654
0.3077
0.25
0.1932
0.1346
0.0769
0 0.0192
0
Frequency
Figure 3.16. Result of the application of the Fourier transform for the second residuals of the time series (Manowska 2010).
2000
Third residuals
1000
0
–1000
–2000
–3000
–4000
Figure 3.17.
Time series of the differences: y(t ) − yˆS (t ) − yC1 C 1 (t ) − yC 2 (t ) (Manowska 2010).
A further point of interest was the next time series, the third residuals, given as the difference: y(t ) − yˆS (t ) − yC1 C 1 (t ) − yC 2 (t ), for all points noted. This sequence is shown in Figure 3.17. Based on this data, a third plot was constructed that showed the result of the application of the Fourier analysis. Figure 3.18 illustrates again the relationship between the modules of spectrum against time.
Book.indb 93
12/9/2013 12:24:17 PM
94
Statistics for mining engineering 25000
Module of spectrum
20000
15000
10000
5000
2.08
2.36
2.74
3.25
4.00
5.20
7.43
13.00
52.00
0
Frequency
Figure 3.18. Result of the application of the Fourier transform for the third residuals of the time series (Manowska 2010).
By analysing Figure 3.18 more carefully it is easy to conclude that there is no dominating frequency that is clearly greater than the others. Therefore, it can be suspected that no other cyclic functions should be constructed. However, this way of reasoning was repeated as in the previous cases and the mean square error was greater than before. It is obvious that the construction of the next cyclic function is not needed; a model with such a function will be worse than without it. Thus, the final model to generate the observed time series is: y( ) = yˆS ( ) +
3.6
C1
( )+
C2
( ) + ξt
AUTOCORRELATION ANALYSIS
There are some processes in mining engineering that depend on many factors that can be grouped together to create two specific sets: the properties of the object that is the point of the investigation and the main characteristic features of its operational process. They can comprise many elementary components such as: material fatigue, corrosion, friction wear, local weight loss, pitting and so on, all of which concern technical objects. However, there are some other processes running in the rocks surrounding a mine that also depend on many features and it is difficult to take all of them into account. In such cases, the course of an interesting variable can be described by the values of it that were noted in the past. This leads to the application of an autoregression model, which can be used if the values of the variable that were noted in sequent moments of time depend on each other. There are also some other cases when the dependence of the actual values of the variable being investigated, for which the values were recorded in the past, are significant. This can concern a purely random component in time series. Let us consider two examples.
Book.indb 94
12/9/2013 12:24:20 PM
Analysis of data
95
■ Example 3.9 The object of consideration was a hoist head rope with a triangular shape of strands working in the main shaft of an underground mine. The point of interest was the course of the wear of the rope. Observations were made every ν = 103 hoist cycles and the number of breaks in the wires were noted. The empirical data are shown in Figure 3.19. The plot of the theoretical function is also visible in this figure: Ni
a ν ib
for which the estimates of the unknown structural parameters were: a = 6.48 × 10−5 and b = 3.22. These estimates were obtained after the linearisation of this power function and after the application of the least squares method. The goodness of the estimation using this power function was investigated by analysing the residuals that were determined by the formula: εi = ni – Ni The graph of these differences is presented in Figure 3.20.
240 200
Ni ni
100
10 40
60
80
100
110
νi × 103
Figure 3.19. Plot of the total number of cracks in the wires of the hoist head rope vs. the number of winds executed by the hoist; ni empirical plot, Ni theoretical plot. 30 20 10 εi
0 –10 –20
0
10
20
30
40
i
Figure 3.20.
Book.indb 95
Graph of sequent residuals εi.
12/9/2013 12:24:22 PM
96
Statistics for mining engineering
This graph is not a typical realisation of a purely random process with a zero mean and a constant variance, which is what might be expected. Let us investigate the residuals by searching for internal stochastic relationships. One of assumptions of the classical method of least squares says that the residuals should not be correlated with each other, i.e. E(
i
j
)=0 i≠ j
(3.45)
The term correlation was introduced here in relation to the stationary testing of the realisation of the random variable that was observed. Recall that correlation is a certain type of stochastic relationship. It relies on such regularity that when the values of one variable increase (or decrease), on average the values of the second variable decrease or increase. Thus, it is a statistical relationship. If the consideration concerns only one variable, we say it is an autocorrelation. Calculate the correlation coefficients of first, second and third order: r1(a), r2(a), r3(a). This means that we investigate the interdependence between the two sequences that are noted; the original sequence and the sequence derived by the first, second and third beginning elements, respectively. Note, that the number of elements taken under consideration decreases one by one when one calculates the sequent autocorrelation coefficients. As the measure of correlation, the classic Pearson’s linear correlation coefficient can be applied if a sample is given in the form (xi, yi; i = 1, 2, …, N). The coefficient can be expressed as:
∑
RXY =
∑
N i =1
( xi
N
( xi i =1
x )( yi
x)
2
∑
y)
N
( yi i =1
(3.46) y )2
In the case when the autocorrelation coefficient of the first order is being calculated, pattern (3.46) takes the form: =
(a) 1
r
∑ ∑
N −1 i =1
N −1 i =1
( xi
( xi
x1 )(x ( xi
1
x2 )
N −1
x1 )2 ∑ i =1 (x ( xi +1 x2 )2
(3.47)
where: x1 =
1 N −1 ∑ xi N − 1 i =1
x2 =
1 N ∑ xi N − 1 i =2
(3.47a)
Notice, that for an increasing sample size, the difference in the mean values becomes negligible. One can construct further autocorrelation coefficient formulas in a similar way. The results of the calculation of the autocorrelation of the residuals in the sample were as follows: r1( a )
r2( a )
0.866 r3( a ) = 0.884
The values obtained are high, but we have no idea whether they are significant in a statistical sense. In order to answer this question, the Durbin-Watson test is usually the one that comes to mind (Durbin 1953, Durbin and Watson 1950, 1951). However, the Durbin-Watson statistic is only valid for stochastic regressors and first order autoregressive schemes (such as AR(1)). Furthermore, it is not relevant in many cases; for example, if the error distribution is not normal, or if it concerns the dependent variable in a lagged form as an independent variable. In these cases, it is not an appropriate test for autocorrelation. The tests that are
Book.indb 96
12/9/2013 12:24:23 PM
Analysis of data
97
suggested and which do not have these limitations are the Breusch-Godfrey test (Breusch 1979, Godfrey 1978, 1988) as well as the Pawłowski J test (Pawłowski 1973). Because the first of these tests is well-known and much simpler to apply when compared to the latter test, further reasoning will be performed using this kind of examination. The Breusch-Godfrey statistic is determined by the following formula: χ2 ( ) (
( )
) rc(
) 2
(3.48)
where c is the autocorrelation order. A verified hypothesis is H0 : ρc = 0, i.e. there is no autocorrelation of the order c in the random variable being tested. If the following inequality holds: χ2 ( ) (
( )
) rc(
) 2
then there is no ground to reject the null hypothesis. Otherwise, one can presume that the autocorrelation of the order c is significant. Making all of the necessary calculations and reading the critical values from the table of χ2 distribution for a presumed level of significance α = 0.05 (Table 9.4), we have: 37.35 (3.84)
32.97 (5.99)
32.04 (7.82)
where the first number is the empirical value and the corresponding critical one is in the brackets. The Breusch-Godfrey test can also be supported by the F-Snedecor’s statistic by making use of the well-known relationship between the χ2 statistic and the F-Snedecor’s statistic. It has been proven using a simulation technique for small samples that such an approach is better than that one based on the χ2 statistic. In the case being analysed, it does not matter which statistic is applied (either χ2 or F-Snedecor’s), the result of verification is identical: all empirical values are significant. By translating this result into engineering language, one can say that there is a significant dependence between the degree of rope wear in a given moment of time and the degree of rope wear a while ago and two whiles before. It also means that the wear process of the rope has a memory and—as investigations showed (Czaplicki 2010, Chapter 5)—this memory can be constant with time in a stochastic sense but it can also be variable depending on the number of winds that have been executed by the rope. ◀ Some important remarks can be formulated in connection with autocorrelation testing when random variables are the objects of engineering interest. • If during a statistical investigation, the autocorrelation of the random variable being tested was traced, then one can be almost certain that there is a physical reason generating this statistical regularity. • Autocorrelation means that there is a ‘memory’ in the process that is observed and the future state depends—as a rule—on the state just before, sometimes on some states that happened earlier. • If the autocorrelation was traced, it gives ground to formulate the supposition that the adequate model describing the course of the random variable being tested is an autoregression function and vice versa. • If autocorrelation was found, the further investigation should be focused on recognising the physical grounds that are the source of this autocorrelation. This can provide important knowledge on the nature of the process that is being observed which can allow for some
Book.indb 97
12/9/2013 12:24:26 PM
Statistics for mining engineering
98
counteraction if this phenomenon is disadvantageous (if possible) or can allow engineers to make use of it if it is useful.
3.7
HOMOGENEITY OF DATA
The statement that something is homogeneous means that it is alike, similar or uniform from a certain point of view. In the statistical sense, homogeneity is a property of a data set and relates to the validity of the very advantageous assumption that the statistical properties of the samples that were taken are identical to the whole population. There are some areas of analysis in mining engineering in which we cannot complain that the data are poor or small in number. This often concerns analyses from ore dressing areas. A similar situation applies to gathering data on the regular vibrations of surrounding rocks of a mine. Moreover, there are also some different fields of mining engineering interest where the information that is collected is usually poor. In reality, the machines that are in operation are often of a high quality and reliability and failures do not occur very often. Therefore, in order to gather an appropriately large enough sample of information on how a given machine fulfils its duties from a reliability point of view is difficult; such a technical object should operate for a long time—frequently too long in comparison to mining reality. In some other cases, when research concerns destructive tests, we cannot permit so many items to be destroyed. However, in many cases, it is possible to examine a certain number of similar objects operating in similar conditions and it can be expected that data that are obtained will be homogeneous; all of the observations can be gathered together in order to create a large sample so that statistical inference will have a strong foundation. In other words—we have observed a certain number of stochastic copies of the same phenomenon and these data create the entirety. The homogeneity of random variables is also of interest in comparative studies. One has two slightly different technical objects or slightly different processes and the point of interest is to answer the question of whether the difference that exists is significant or not. In engineering studies of a probabilistic nature, homogeneity is usually understood in two ways, namely: a. As the equality of distributions, i.e. the probability distributions of random variables that are the subject of interest are identical ones b. As the equality of parameters; the parameters of a statistical nature characterising the selected properties of the object of investigation, e.g. average values, standard deviations, probabilities of occurrence of determined events or states etc., differ from each other only negligibly from a statistical point of view. Consider case (a). There are a number of statistical tests that allow the hypothesis that the data are homogeneous to be verified from the distribution point of view. Divide this problem into two separate cases: i. There are two samples ii. There are three or more samples and we are interested whether we can assume that they come from the same population. This division is connected with the properties of the tests that are applied. When the data in hand comprise two samples, using the Smirnov test is recommended21. The variable tested should be a continuous one. A model considered for this test is as follows.
21
Book.indb 98
There is also the Smirnov test, which allows three samples to be compared (Birnbaum and Hall 1960).
12/9/2013 12:24:27 PM
Analysis of data
99
Let (X1, X2, …, Xn) and (Y1, Y2, …, Yn) be two simple samples. A verified null hypothesis states that both samples come from the same population. Construct two empirical distribution functions for both random variables according to the following patterns: ⎧ 0 ⎪ Fn ( x ) = ⎨i /n ⎪ 1 ⎩
for
⎧0 ⎪ Gm ( y ) = ⎨ j/m ⎪1 ⎩
for
x( i ) for
x ≤ x( ) x x( i x > x( n )
)
i
, 2,
j
,2
, n −1
(3.49)
and y ≤ y( ) y j ) y y( j y > y( m )
for
)
m −1
(3.50)
where (x(1), x(2), …, x(n)) and (y(1), y(2), …, y(m)) are the samples arranged monotonically into non-decreasing sequences. The statistic that measures the distance between distributions Fn(x) and Gm(y) is determined in one of the following ways: Dn+, m p x Gm (x ( x ) Fmn ( x )] Dn, m i f x [Gm ( x ) Fmn ( x )] Dn, m = sup x [ m ( x ) mn ( x )]
(3.51)
which means that the point of interest is the maximum of the mismatch. In other words, if you plot the sorted values of sample x against the sorted values of sample y as a series of increasing steps then the test statistic is the maximum vertical gap between these two plots. Obviously, Dn,m = Dm,n. Both statistics Dn+,m and Dn−, m have the same distribution. Let us devote our attention to only one of them. Denote by Dn+,m ( ) and Dn,m(α) the critical values for both statistics if the level of significance in the test is α. Due to the discontinuity of the statistic distribution Dn,m, the corresponding critical value is determined by the formula: Dn, m ( )
inf{d : P ( Dn, m ≥ d )
}
The critical value Dn+, m ( ) is determined analogically. In practice statistics are calculated by applying one of the formulas: i − 1⎞ ⎛ j ⎞ ⎛ − Fn ( y( j ) )⎟ = max i n Gm ( x( i ) ) − ⎟ ⎝m ⎠ ⎝ n ⎠ j − 1⎞ ⎛ ⎛i ⎞ x ≤ j ≤ m Fn ( y( j ) ) − ⎟ = max ≤ i ≤ n ⎝ − Gm ( x( i ) )⎟⎠ ⎝ m ⎠ n ax Dn+, m , Dn−, m
Dn+, m = max Dn−, m = Dn, m =
j m
(
(3.51a)
)
To apply the above test it is necessary to make use of Table 9.16a, which gives the critical values Dn,m(α). These values are valid for n = 3(1)20, m = 2(1)n and α = 0.01; 0.02; 0.05; 0.10. The intersection of the line that corresponds with data n and m and the column that corresponds with the probability α determines two numbers: the integer dn,m(α) and the fractional
Book.indb 99
12/9/2013 12:24:27 PM
100
Statistics for mining engineering
number α*. At the same intersection of the line with the column denoted by k read the integer kn,m. The critical value is given by the formula: Dn,m ( ) =
d n ,m ( ) kn,m
(3.52)
The number α* is the real level of significance of the test, in which α* ≤ α. The differences between α* and α come from the discontinuity of the distribution of statistic Dn,m. The distribution of statistic Dn,m for n = m = 1(1)40 is presented in Table 9.16b. For a given n and k = 1(1)12, the probability P{Dn,n ≤ k/n} can be read off. Due to the fact that for α ≤ 0.10, the following approximate equality holds: Dn+,m ( )
Dn,m (
)
There is no table for the statistic Dn+,m ( ). ■ Example 3.10 A durability investigation of a certain mechanical part of an articulated dump truck was carried out. The point of interest was the number of load cycles but not as related to the failure occurrence but the number of load cycles that were the difference between the assumed level and the number achieved. Two parts were tested and for this reason two samples were obtained. They were as follows:
(0.46
0.14
(0.06
−2.53
2.45
−0.32 −0.07
−0.53
−0.19
0.30) × 103 cycles
0.54
−1.56
0.19
−1.19
0.02) × 103 cycles
A hypothesis was formulated stating that these two samples came from the same population. The alternative supposition rejects this. The calculation procedure is as follows. 1. Construction of the empirical distribution Fn(x) for the first sample:
Book.indb 100
i
X
Fn(x)
1 2 3 4 5 6
−0.32 −0.07 0.14 0.30 0.46 2.45
0 1/6 2/6 3/6 4/6 5/6
12/9/2013 12:24:34 PM
Analysis of data
101
2. Construction of the empirical distribution Gm(y) for the second sample: j
y
Gm(y)
1 2 3 4 5 6 7 8 9
−2.53 −1.56 −1.19 −0.53 −0.19 0.02 0.06 0.19 0.54
0 1/9 2/9 3/9 4/9 5/9 6/9 7/9 8/9
3. Sort values of both samples to get distribution functions Fn(x) and Gm(y) as k/r where r is the minimum common multiple for numbers n and m 4. Further calculation procedures are as follows: u
Fn(u)
Gm(u)
Fn(u) − Gm(u)
−2.53 −1.56 −1.19 −0.53 −0.32 −0.19 −0.07 0.02 0.06 0.14 0.19 0.30 0.46 0.54 2.45
0 0 0 0 0 3/18 3/18 6/18 6/18 6/18 9/18 9/18 12/18 15/18 15/18
0 2/18 3/18 4/18 8/18 8/18 10/18 10/18 12/18 14/18 14/18 16/18 16/18 16/18 1
0 −2/18 −3/18 −4/18 −8/18 −5/18 −7/18 −4/18 −6/18 −8/18 −5/18 −7/18 −4/18 −1/18 −3/18
5. Look for the maximum inconsistency in the last column. Here we have: D6,9
a ||F F6 (u ) G9 (u ) | = 8 / 18
From Table 9.16a one gets the critical value: D6,9 (0.05) 13 / 18 By looking at both values, it is easy to conclude that there is no ground to reject the verified hypothesis proclaiming that both samples come from the same population. ◀ Remark. If n, m → ∞ then the statistic: Dn+, m
nm n+m
has χ2 distribution with 2 degrees of freedom.
Book.indb 101
12/9/2013 12:24:36 PM
102
Statistics for mining engineering
The statistic: Dn, m
nm n+m
has a Kolmogorov K(y) distribution22. We continue to consider case (a) but the number of samples is two, three or more. In statistics there are a few tests that can be applied in such a case but the most popular in engineering practice seems to be the Kruskal-Wallis test based on the sum of ranks (KruskalWallis 1952). It is a non-parametric test and is used to compare more than two samples that are independent, or not related. The model considered for this test is as follows. Presume that k objects are observed with regard to a certain feature and therefore k samples are obtained. A convenient feature of the test is that the samples can have different sizes. Denote them by ni; i = 1, 2, …, k. Assume that the random values of a measure of the feature can be described by a certain probability distribution F(x) and a statistical hypothesis H0 is formulated that all probability distributions are identical, which is: H 0 : F1 ( x )
F2 ( x )
Fk ( x )
The alternative hypothesis H1 rejects the null supposition. 3.7.1
The test procedure
All elements of all of the samples are gathered together and ranks are assigned for the monotonically ordered set—from 1 to N, where N is the total number of elements in all samples, ∑ ik=1 i = N . If tied values exist, the average of ranks must be assigned to tied values. Next, the value of the following statistic is calculated: KN =
k 12 Ti 2 − 3( N 1) ∑ N ( N 1) i =1 ni
(3.53)
where Ti is the sum of ranks in i-th sample. Looking at formula (3.53), it is easy to notice that if there are more differences between the average sample ranks and the general mean rank, statistic KN is larger. A low dispersion in this regard, in turn, will be favourable for the hypothesis H0—providing that there is no ground to reject it. Kruskal and Wallis observed that if k grows and if the sizes ni increase, the random variable KN has the asymptotic probability distribution of χ2 with k − 1 degrees of freedom. Therefore, if the following inequality holds: N
≥ χα2 ( k − 1)
(3.54)
where χα2 ( 1) is the critical value for the assumed level of significance α, the verified null hypothesis should be rejected. 2( 2(k k − 1) 1 has approximately the standardFor a large k, the random variable 2 χ2k−1 ised normal distribution N(0, 1). Accordingly, for a large k, the following approximations can be applied:
22
Book.indb 102
The Kolmogorov distribution has a cumulative function: P (
y) =
2π ∞ exp− ⎡ ( i )2 π2 ⎤ . y ∑ ⎣⎢ 8 y2 ⎦⎥ i =1
12/9/2013 12:24:38 PM
Analysis of data
χα2 (
1) (
⎛ 2 2 ⎞ 1) ⎜1 − + u1− α 9( 1) ⎟⎠ ⎝ 9( 1)
103
3
(3.55a)
or χα2 (
1)
1 2
(
2(
1) + u1− α
)
2
(3.55b)
Large amounts of computing resources are required to calculate the exact probabilities for the Kruskal-Wallis test. Existing software only provides exact probabilities for sample sizes of less than about 30 participants. These software programs rely on asymptotic approximation for larger sample sizes. Exact probability values for larger sample sizes are actually available. Spurrier (2003) published exact probability tables for samples with as many as 45 participants. Meyer and Seaman (2006) made precise probability distributions for samples as large as 105 participants. If some of ni values are small (that is, less than 5), the probability distribution of KN can be quite different from this Chi-square distribution. In order to obtain a more precise reasoning when tied ranks are in samples, a correction should be done by first calculating the following measure: ⎛ ∑ g ( S − )⎞ j j =1 j ⎟ υ = ⎜1 − S N −N ⎟ ⎜⎝ ⎠
−1
(3.56)
where g is the number of groups of tied ranks, and tj is the number of tied ranks in j-th group. Then multiply number υ by the estimate KN. It can be proved that υ > 1 always and for this reason the new value of statistic (3.53) will be greater than the one calculated without correction. This means that by taking the correction into account the chance of the rejection of the verified null hypothesis increases. ■ Example 3.11 The investigation concerned four scrapers with the same parameters, made by the same producer. Repair times were noted and the following data were gathered:
Machine I: 85, 150, 430, 30, 170, 600, 210 Machine II: 50, 80, 750, 140, 320, 260, 360, 180 Machine III: 135, 90, 490, 110, 145, 190 Machine IV: 580, 120, 330, 100, 160, 240. All times are given in minutes. Here, we have small size samples. In order to create a large sample, a hypothesis was formulated that all of these data are homogeneous.
Book.indb 103
12/9/2013 12:24:43 PM
104
Statistics for mining engineering
The Kruskal-Wallis was applied to verify this supposition. The calculation procedure was as follows. Sample I No. 1 2 3 4 5 6 7 8
Sample II
Time min
Rank
85 150 430 30 170 600 210
4 12 23 1 14 26 17
Σ
97
Sample III
Time min
Rank
50 80 750 140 320 260 360 180 Σ
2 3 27 10 20 19 22 15 118
Sample IV
Time min
Rank
Time min
Rank
135 90 490 110 145 190
9 5 24 7 11 16
580 120 330 100 160 240
25 8 21 6 13 18
Σ
72
Σ
91
Calculate the estimate for KN statistic. We have: KN =
12 ⎛ 972 1182 722 912 ⎞ + + + − 3 × 28 = 0.6 27 × 28 ⎝ 7 8 6 6 ⎟⎠
Compare this value with the critical one. From the table of χ2 critical values (Table 9.4), we have χα2 (3) = 7.8 for the presumed level of significance α = 0.05. Because the critical value is greater than the empirical value, there is no ground to reject the verified hypothesis. This means that all of the data can be treated as one sample. If so, this new sample has 27 elements. Now, we can try to find a theoretical probability distribution that will satisfactorily describe the empirical data. ◀ Our previous considerations on homogeneity of data are important for two reasons at least. • If there is no ground to reject the hypothesis that the investigated data are homogeneous, there is a possibility to gather all of the data and to create a large sample. This is important because the unit samples in some cases can be small. Working with a large sample, there is a greater likelihood that stronger statistical inferences can be made. • If there is a basis to reject the hypothesis on homogeneity in the data, a further investigation should be done to find the reason why the data are inhomogeneous and which object has ‘made’ it so. Discovering the reason that is generating this ‘unfitness’ can give valuable information from an operational point of view. Let us now consider the second of the cases listed—(b); some parameters are the points of our interest. It was stated that our interest in homogeneity is not always as strong as the equality of distributions. One can be interested in the identity of certain parameters of a statistical nature that characterise specific features of the object of interest. In reliability investigations of mine equipment, we can be interested, for instance, in whether some probabilities of failure occurrence are identical from a stochastic point of view. Let us study the following probabilistic model. We investigate k technical objects and we are interested in the number of work cycles that are executed by these objects. Let n1, n2, …, nk denote these numbers till the moment of the occurrence of m-th failure. Denote by Q the probability of the appearance of one failure in one work cycle. We would like to check whether the following hypothesis holds: H0 : Q1 = Q2 = ... = Qk
Book.indb 104
12/9/2013 12:24:45 PM
Analysis of data
105
which states that the probability of the occurrence of a failure in a work cycle for all of the objects is the same. An alternative hypothesis rejects this. To verify the basic supposition, one can apply the Cochran’s test23. A measure in this test is the statistic: Θ=
max( n1, n2 , …, k ) − 1 n1 + n2 + nk − m
(3.57)
The verified hypothesis should be rejected if the following inequality holds: Θ ≥ qk , m ( − )
(3.58)
where qk,2m(1 – α) is the quantile of order (1 – α) of the Cochran’s statistic (Table 9.9). In the literature on the subject it is recommended (see for instance Migdalski 1992) that the Hartley’s test should be applied when the number of objects being observed is small (k ≤ 12). A measure in this study is: Λ=
max( 1, n2 , , nk ) − 1 min( 1, n2 , , nk ) − 1
(3.59)
The verified hypothesis should be discarded if the following inequality: Λ ≥ ηk , m ( − α )
(3.60)
where ηk,2m(1 – α) is the quantile of order (1 – α) of the Hartley’s statistic is the true one. ■ Example 3.12 In a certain quarry seven wheel loaders operated that loaded blasted rock into the crushers and onto dumpers; they were also used in some auxiliary works. The operating machines came from two different producers. However, their reliability was similar. In a different quarry, owned by the same contractor, it was planned to replace some machines of this type but the problem was which producer has better machines.
Let us ignore a problem of negotiations, the possible discounts offered by producers, conditions of payment, realisation of the purveyance and assurance of spare parts—all of which are connected with the potential transaction, and let us devote our attention to the reliability of the equipment that will be purchased.
23
Book.indb 105
There are a few tests in mathematical statistics that are connected with the name of William Cochran.
12/9/2013 12:24:46 PM
106
Statistics for mining engineering
A reliability study of machines comprising maintenance problems and especially repairs was done. The applied statistical test has no ground to reject the hypothesis stating that all of the repair times could be satisfactorily described by one probability distribution. It was presumed that a satisfactory deciding criterion would be satisfactory frequency of satisfactory occurrence of failures. A new reliability investigation was performed with this criterion in mind and a day was presumed as a basic elementary period of operation. A decision was made to observe machines up to the moment of the 10-th failure occurrence. For machines from the first producers, the following sequence was noted: 22.6
18.0
26.0
19.8 days
and 10.9
18.6
16.7 days
was noted for machines from the second producer. At first glance, the reliability of the machines of the first producer looks better than those of the second one. However, formulating the problem from a statistical point of view, we should answer the question of whether this ‘difference’ is significant statistically or not. Because there are only seven machines in operation, we should apply the Hartley’s test. Calculate an estimate of the statistic: max( 1, n2 , , nk ) − 1 25 = = 2.52 .9 min( 1, n2 , , nk ) This value should be compared with the critical value. Presume a level of significance α = 0.05 as usual. The corresponding critical value (Table 9.10) is: ηk, m (
α) α)
η ,20 (
α ) = 3.94
Comparing these two values, we have no doubts that we have no basis to reject the verified hypothesis. The observed differences in values are not statistically significant. ◀ Let us notice that the above test rather carelessly used the information that was in hand. It only takes into consideration the maximum and minimum values. The rest of the information is ‘useless’. It looks more proper if the hypothesis will be formulated stating that the times of repair can be described by one probability distribution and to apply an appropriate statistical procedure to verify this supposition. Another approach can be used to check whether our guess that the data can be treated as homogeneous one is correct. We can also investigate, using the Wilcoxon-Mann-Whitney’s test (see for instance Lehmann & D’Abrera 2006), whether the supposition stating that the data come from two different populations having the same expected values is a true one. The condition of the application of the test is in the form of a probability distribution that should be similar to the probability distribution of the random variables tested. ■ Example 3.13 In the seismic station of a certain underground coal mine, tremors of the rock surrounding the mine were noted. A point of interest was the rock vibrations whose energy exceeded 105 J. In the selected period of observation, 33 events were recorded:
Book.indb 106
12/9/2013 12:24:49 PM
Analysis of data
107
(7, 15, 280, 190, 900, 8, 8, 100, 10, 2, 800, 2000, 1000, 900, 850, 95, 25, 100, 950, 9, 320, 210, 20, 20, 40, 6, 600, 40, 5, 7, 105, 2, 80) × 105 J The randomness of the sample was tested first. The sample has 33 elements and for this reason the 17-th element is the sample median for the sample arranged monotonically. This element is recorded as the last one: 80 × 105 J. Converting the sample into a sequence of signs we have: −−+++−−+−−++++++−++−++−−−−+−−−+− The number of series in this sequence is 15. The number of n+ signs = n+ = 16. Presuming a level of significance α = 0.05 and using Table 9.8, we have two critical values: Kα/2(16, 16) = 11
and K1−α/2(16, 16) = 22
The empirical number of the series is above the critical numbers and for this reason we have no ground to reject the hypothesis stating randomness. We can presume that the sample has a random property. Figure 3.21 is an illustration of the sequence of tremors noted taking into account their energy. Let us now investigate whether this sequence is a stationary one. Apply the test based on the Spearman’s rank correlation coefficient. Using the procedure described in Chapter 3.3, we can construct a table which facilitates further reasoning (Table 3.3). It contains the sum of squares of differences that equal 6975.5, the number that is important for further analysis. Calculate the Spearman’s rank correlation coefficient—formula (3.18) supported by (3.19). We have rS = 1 −
6 × 6975.5 = −0.166 33(332 − 1)
Formulate hypothesis H0 stating there is no dependence between the values with respect to time. This hypothesis is set against a hypothesis H1 : ρ ≠ 0, stating that the values of the variable depend on time. 2000 1800
105 J
1600 1400 1200 1000 800 600 400 200 0 1
Figure 3.21.
Book.indb 107
3
5
7
9
11 13 15 17 19 21 23 25 27 29 31 33
The sequence of the energy of several seismic tremors (×105 J).
12/9/2013 12:24:50 PM
108
Statistics for mining engineering Table 3.3.
Auxiliary calculations.
No.
Value
Rank
(vi − i)2
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33
7 15 280 190 900 8 8 100 10 2 800 2000 1000 900 850 95 25 100 950 9 320 210 20 20 40 6 600 40 5 7 105 2 80
5,5 11 24 22 29,5 7,5 7,5 19,5 10 1,5 27 33 32 29,5 28 18 14 19,5 31 9 25 23 12,5 12,5 15,5 4 26 15,5 3 5,5 21 1,5 17 Σ
20,25 81 441 324 600,25 2,25 0,25 132,25 1 72,25 256 441 361 240,25 169 4 9 2,25 144 121 16 1 110,25 132,25 90,25 484 1 156,25 676 600,25 100 930,25 256 6975,5
To verify the null supposition the critical value rα(n) should be taken from Table 9.14 for a given level of significance α, and the sample size n = 33. However, the sample size is large and in such case the approximation can be applied, i.e. rS ( , n ) ≈
u1− α n −1
where u1−α is the quantile of order (1 – α) of the standardized normal distribution N(0, 1). In our case we have: rS ( , n ) ≈
1.96 = 0.346 32
Looking at the empirical value and the corresponding critical one we have no ground to reject the null hypothesis. We can assume that the sequence noted is free from dependence of time.
CH03.indd 108
12/12/2013 2:46:04 PM
Analysis of data
109
Let us conduct our consideration further. Check whether a memory exists in the realisation of the random variable. Thus, we formulate a hypothesis stating that the mutual correlation between the values of the random variable does not exist versus an alternative supposition which rejects this. Let us check the autocorrelation of the first order. Firstly, using formula (3.47), we have estimations of the means: 300.8 105 J x2 = 303 × 105 J
x1
which allow the correlation coefficient to be calculated
∑
r1( a ) =
n −1 i =1
n −1
∑ i =1 ( xi
( xi
x1 ) (x ( xi
1
x2 )
n −1
x1 )2 ∑ i =1 (x ( xi +1 x2 )2
= 0.434
In order to check whether this value is significant or not, calculate the Breusch-Godfrey statistic: χ2 (
1)( 1( ) )2 = 5.842
1) (
Now, we can compare this value with the one from theory. Let us read the critical value from the Table of χ2 distribution for the presumed level of significance α = 0.05 (Table 9.4). Here we have: χ α2 =0.05 ( = 1) = 3.841 The empirical value clearly exceeds the critical one. We have the ground to discard the null hypothesis. There is a memory in the realisation of the random variable of interest. It concerns the neighbouring values. This is important information for the researcher. Let us now check whether the memory can be extended into the next step. Formally, verify the hypothesis stating that there is no autocorrelation of the second order. We calculate the appropriate average values: x3
310.4 105 J x4 = 312.2 105 J
and we calculate the linear correlation coefficient for every second value. Here we have: (a) 2
r
=
∑ ∑
n−2 i =1
n−2 i =1
( xi
( xi
x1 ) (x ( xi
x1 )
2
∑
n−2 i =1
x2 ) ( xi + 2 (x
x2 )2
= 0.186
Using this estimate, calculate the Breusch-Godfrey statistic: χ2 (
2) (
2 )( 2( ) )2 = 5.654
Compare this value with the one from theory. Read the critical value from the table of χ2 distribution for presumed level of significance α = 0.05 (Table 9.4). Here we have: 2 α =0.05
( = 2 ) = 5.991
The empirical value does not exceed the critical one. We have no ground to discard the null hypothesis. There is no memory of the second type in the realisation of random variable tested. ◀
Book.indb 109
12/9/2013 12:24:52 PM
110
Statistics for mining engineering
There is no doubt that the problem of sudden rock displacement of great energy is extremely important in underground mining. This problem is a multi-dimensional one. One dimension is time; more precisely, a random variable which is the time from one tremor to the next tremor. Notice that in example 3.10, time was excluded from the analysis; the data comprised only the sequence of events. The second dimension is the energy that is connected with a given tremor. Again, it is a random variable. The dispersion of this variable is sometimes very high and the range of values is very broad. For these reasons, probability distributions serving as theoretical models often use logarithms (log-normal, log-gamma or log-Weibull). There is also a subtle problem connected with the effect of a given tremor. Some tremors produce displacement of rock masses that are not serious for mining production even when the energy level is very high. In some other cases, the energy involved in a given tremor is not so great but the result is very serious—e.g. a roof collapse in some underground openings. Thus, one considers two random variables: a. The energy of a rock tremor with ‘safe’ repercussions—the variable characterised by a certain density function f(x) b. The energy of a rock tremor with serious repercussions—the variable characterised by a certain density function g(x). The probability density functions of these two random variables overlap (see Figure 3.22). Generally, the location of these probability distributions is as follows. The density function f(x) is located on the left because the values that take the random variable X, which express energy are low, on average. In Figure 3.22 the level of energy x0 is such that mine detectors record tremors only above a certain value. The density function g(x) in turn is on the right compared to the location of the density f(x). Therefore, the range of the variation of energy is divided into three intervals. In the first interval (I) the energy involved in the occurring tremor is low and the repercussion is not serious. The second is interval (II) in which there is an increasing probability of serious repercussions—the probability that the tremor from this interval will cause severe damage increases. The last interval (III) is characterised by a certain event. A tremor from this interval has drastically serious consequences.
0.4
0.3 f(x) g(x) 0.2
I
II
III
0.1
0
Figure 3.22.
Book.indb 110
0 x0 Safe repercussions
x
Energy Serious repercussions
The probability density functions of the energy of rock tremors and their repercussions.
12/9/2013 12:24:57 PM
CHAPTER 4 Synthesis of data Having behind us all of the investigations that are connected with statistical diagnostics (previous chapter), we now presume that the data in hand are a classical random sample. If so, we can make an evaluation of this information in the sense of an estimation of the selected numerical characteristics as well as in the sense of certain functions which will describe the data that were obtained well. The parameters of first choice in the engineering world are: the expected value and the standard deviation. These parameters are well-known, communicative and contain significant, useful information. Some further parameters can be enumerated, but what will be taken into account depends on the scope of the consideration. If the points of interest are econometrics problems (mineral sales in time, market demand for a given mineral commodity, the prognosis of its price and so on), these supplementary parameters are usually taken from descriptive statistics, e.g. quantiles (especially—median) and typical functions connected with the description of random variables. In a reliability investigation, parameters such as the intensity of the failures for an object that can be repaired and the mean times of the states are commonly applied. But the most important and most frequently used parameter is the steady-state availability, which is a function of the repair rate. Where functions are concerned, the probability density function is very important. In addition, the survival function, the hazard function and the renewal function can be joined to the list but they are concerned with objects that cannot be repaired. We neglect here functions that are of less importance. In safety studies, the basic parameters are mainly probabilities such as: the probability of correct performance of a technical object during a given period of time and the probability that a load will exceed the strength of the machine. Some further parameters are: the factor of safety1, the confidence factor and the mass of the probability common to the distribution of the load and strength. Functions are first of all the probability distributions of the operation load and operation strength. All of these parameters are well defined on the basis of their theories. However, a problem comes into play here, how to adequately estimate these characteristics when the data (sample) are in our hands. Therefore, a further consideration that will be conducted here concerns the theory and practice of estimation. A concept of the function that permits estimating an unknown value of a parameter was introduced in Chapter 1.3 and the desired properties of a good estimator were described. Let us now enlarge the scope of our consideration of estimation. If we would like to estimate an unknown value of one or more parameters of the distribution of a random variable, we say it is a parametric estimation. If our inference does not concern the parameters and if information about the distribution function is not available, which means that we have no idea about the class of the distribution, we say that it is a non-parametric estimation. Let us now consider the problem of the estimation of the unknown parameters of random variables.
1 Remember, the factor of safety has a loose connection with safety. Probabilistic measures of safety are much better.
111
Book.indb 111
12/9/2013 12:24:57 PM
112
Statistics for mining engineering
4.1
ESTIMATION OF THE PARAMETERS OF A RANDOM VARIABLE
There is a scope of consideration in the theory of estimation in which the point of interest is to obtain an estimate of an unknown parameter in the form of a number. This is point estimation. It involves the use of a sample in order to calculate a single value that is to serve as the ‘best guess’ or ‘best estimate’ of an unknown (fixed or random) population parameter. It is the application of a point estimator to the data. Consider a problem of the methods of the construction of functions that allow estimates of the unknown values of parameters to be obtained. There are a number of methods of construction of estimators that have desirable properties. The oldest general method proposed for this purpose is the method of moments introduced by K. Pearson (1894, 1898). This method consists in equating a convenient number of the sample moments to the corresponding moments of the distribution, which are functions of the unknown parameters. By considering as many as there are parameters to be estimated, and solving the resulting equations with respect to the parameters, estimates of the latter are obtained. This method usually leads to comparatively simple calculations. Estimators obtained by this method are consistent but frequently biased and of a low efficiency. Consider, for instance, the application of this method to get estimators of the unknown structural parameters of gamma distribution given by formula (1.48). The relationships between the expected value and the variance and these structural parameters were defined by patterns (1.49). Having a sample, we replace the expected value with its estimate (x —the mean of the sample) and the variance by its estimate (S Sx2—the variance of the sample). At this moment, we have to replace the structural parameters with their evaluating functions. Therefore, a new pair of patterns is as follows: ξˆ =x νˆ
ξˆ νˆ 2
Sx2
(4.1)
x2 and d ξˆ = 2 Sx
(4.2)
and d
By rearranging them, we have: νˆ =
x Sx2
Notice the difference by comparing them to the formula (1.49). The above patterns are estimators and these functions are random variables because one can get different estimates for different samples that are taken. Similarly, one can obtain, for example, the estimators for the structural parameters of the beta distribution that is determined by formula (1.61). Using patterns for the expected values and the variance (1.63), we can construct the following set of equations: x=
cˆ cˆ + dˆ
and d Sx2 =
ˆˆ cd ( ˆ + ˆ ) ( ˆ + ˆ + 1) 2
(4.3)
Finding estimators for the unknown structural parameters for this distribution is now not a problem. A different method that is used to obtain estimators is the method of quantiles. There are several methods for estimating the quantiles (Serfling 1980). The idea is to compare a theoretical quantile to the corresponding one that is constructed from the sample, similar to that in the method of moments. If several parameters are evaluated, then several equations should be made using the appropriate number of quantiles based on the sample taken.
Book.indb 112
12/9/2013 12:24:57 PM
Synthesis of data
113
It can be proved (Gnyedenko et al. 1968) that if some general assumptions are fulfilled, the quantile of order p based on a sample (recall, Fn(zp) = p) has an asymptotically Gaussian distribution with the expected value being the quantile of order p of the theoretical distribution (F(ζ) = p) and the variance as determined by the pattern: [ p((1 − p )] nffn2 (ζ ). This method does not give estimators with good statistical properties and has actually almost been abandoned. The method that is recommended is the method of maximum likelihood. From a theoretical point of view it is the most important general method. In specific cases, this method was already applied by Gauss (1880), although it was introduced as a general method of estimation by R.A. Fisher (1912) and later was developed in a series of works by the same author. A cardinal term of this method is the sample likelihood that is expressed by the likelihood function. The sample likelihood is the joint density of the continuous probability distribution of the outcomes (x1, x2, …, xn) given by the sample where this likelihood depends on the real value of the estimated parameter. For discrete distribution, one can say on the joint probability that corresponds with the density. Denote by f (x, ξ) the probability density function. The function: , xn ; ξ )
L( x1, x2 ,
n
∏f
xi ; ξ )
i =1
(4.4)
is called a likelihood function. When the values of a sample are given, the likelihood function L becomes the function of the single variable ξ. The method of maximum likelihood relies on the selection of such an estimator of ξ that assures the maximum of the likelihood function. It is known that a function attains its maximum at a certain point if the first derivative of the function equals zero and the second derivative in this point is less than zero. Thus, it is necessary to solve the equation: ∂L ( ∂ξ
)=0
(4.5)
with respect to ξ. It is very often much more useful to use the equation: ∂ ln L ( ∂ξ
)=0
(4.5a)
instead of (4.5) because its logarithmic function is more convenient for differentiation. Both functions L(xi ; ξ) and lnL(xi ; ξ) have the extreme at the same point. A significant limitation of this method is the necessity to have information on the probability distribution function. Remark. Estimators obtained by this method are sometimes biased. Consider, as an example, a population that is characterised by the exponential distribution with parameter θ. A sample was taken of elements xi ; i = 1, 2, …, n and the point of interest is the construction of an estimator of the distribution using the method of likelihood. The likelihood function in this case is as follows: n
L
Book.indb 113
θe
θx
θe
θx2
... θe
θxn
=θ e n
−θ
∑ xi i =1
12/9/2013 12:24:58 PM
114
Statistics for mining engineering
Calculate the logarithm of both sides of the equation n
n lnθ − θ ∑ xi
ln L
i=1
Therefore d
n
L 1 =n dθ θ
∑x
i
i =1
and n
n
1 θ
∑x
i
=0
i =1
Now, the estimator that takes the following form can be constructed: θˆ =
n
∑
n i =1
xi
=
1 x
(4.6)
The investigation plan has significant influence on the final form of the estimator in reliability investigations of technical objects as well as in investigations of their operation processes. A plan of investigation in reliability should include this trio: < n, ,
>
where: n—sample size, number of items investigated, —sampling principle, —criterion for the termination of the investigation. The most common sample principles are: • Sampling without return ( ); a failed element is not replaced with a new one • Sampling with return ( ); a failed element is replaced with new one. The criteria of an investigation of a termination can be different. Those most frequently applied are: • • • •
Moment of the r-th failure occurrence Amount of work executed Research is carried out over time T Research is carried out either over time T or up to the r-th failure occurrence depending on which criterion will be achieved earlier.
Graphical illustrations of the realisations of a reliability investigation are presented in Figure 4.1 are shown. Let us illustrate, for instance, formulas that are used to determine the estimators of the parameter of the exponential probability distribution in relation to the tests performed. − For plan [n, , T] d( ) λˆ = nT
Book.indb 114
(4.7)
12/9/2013 12:25:01 PM
Synthesis of data Plan [n,
, T]
Plan [n,
115
, r] 2
1
1
2 . . .
2 . . .
n
n
1
4 ...
tr
T Plan [n,
r
3
, T]
Plan [n,
, r] 2
1
1
2 . . .
2 . . .
n
n
1 ... r
tr
T
Figure 4.1. Graphical illustration of the mode of reliability investigations for a given criterion of their termination.
where d(T) is the number of failures noted during the investigation − For plan [n, , r] r −1 λˆ = ntr
(4.8)
where tr is time up to the r-th failure occurrence − For plan [n,
, T] d( ) λˆ = S(( )
(4.9)
where: S (T ) = ∑ id=1(T ) ti + [n [
(T )] T
(4.9a)
ti—the i-th time to failure occurrence − For plan [n,
, r] r −1 λˆ = S( r )
Book.indb 115
(4.10)
12/9/2013 12:25:03 PM
116
Statistics for mining engineering
where: S( r )
∑ ir=1
i
n r ] tr
(4.10a)
Remark. Estimator (4.9) is a biased one. Our previous considerations were devoted to the construction of estimators in order to assess the unknown values of the structural parameters of probability distribution functions; ‘structural’ means that they are in formulas of these distribution functions. However, there is also an area in mathematical statistics in which estimation is oriented on a different problem. We are still interested in building formulas that will permit unknown structural parameters of functions to be estimated but these relationships are not connected with the distribution functions. These multi-element relations express a variety of dependences between random variables. In order to estimate the structural parameters in this case, the least squares method is applied as a rule. This method originated in the fields of astronomy and geodesy as scientists and mathematicians sought to provide solutions to the challenges of navigating the Earth’s oceans during the Age of Exploration. It was created by Carl Gauss in 1795 (vide: Bretscher 1995). The most important application of the least squares method is in datafitting. The best fit in the least squares sense minimises the sum of squared residuals; residual here is understood as the difference between the observed value and the corresponding value that is provided by the model. A description of this method along with applications will be given in Chapter 6. When data have been obtained and the estimator selected one calculates an appraisal in the form of a number that is a point estimation. However, it is easy to perceive the probability that the estimate will be identical to the unknown value of the parameter, which is practically zero, when the population is a continuous one. This means that we made an error during such estimation with the probability that is near one. Bearing this in mind, statisticians developed a different method of estimation—interval estimation. Its idea is to construct an interval instead of calculating a single value. For the time being, we will presume that this is an interval of possible or probable values of the unknown population parameter. SpławaNeyman (Neyman 1937), who introduced this idea, identified interval estimation as distinct from point estimation. In doing so, he recognised that the then-recent work quoting results in the form of an estimate plus-or-minus a standard deviation indicated that interval estimation was actually the problem that statisticians really had in mind. The most widespread forms of interval estimation are: • Confidence intervals • Credible intervals applied using the Bayesian method. Other common approaches to interval estimation that are included in statistical theory are: • Tolerance intervals • Prediction intervals • Likelihood intervals2. For our further analyses, we will presume that the constructed numerical interval covers the unknown value of population parameter being estimated with a certain presumed probability. The idea of a confidence interval is as follows. Presume that the random variable X has in its population the distribution function determined by the unknown parameter θ. Presume also that a sample was taken xi; i = 1, 2, …, n 2
Book.indb 116
Non-statistical methods that can lead to interval estimates include fuzzy logic.
12/9/2013 12:25:05 PM
Synthesis of data
117
from this population and the estimator θˆ n of the parameter was constructed. The estimator, as a random variable has its own probability density function h( ˆ n ; θ). Define two such functions c1(θ) and c2(θ) that fulfil two equations: P{θˆ n < c1 (θ)} =
c1 ( θ )
1 h(θˆ n ; θ) dθˆ n = α 2
(4.11a)
1 h( ˆ n ; θ) d θˆ n = α 2 c2 ( θ )
(4.11b)
∫
−∞
P{ ˆ n > c2 (θ)} =
∞
∫
where α is any number from (0, 1) interval. Bearing the above relationships in mind and making any necessary transformations, the following equation can be obtained: c2 ( θ )
P{ 1 ( ˆ n ) < θ <
ˆ 2 ( n )} =
∫
( ˆ n ; θ) ˆ n = 1 − α = γ
(4.12)
c1 ( θ )
) 2 ( ˆ n )] is called a confidence interval and its The interval obtained in this way [ 1 ( ˆ n ), boundary values lower and upper confidence limits, respectively. The number γ is called the confidence coefficient or level of confidence. Observe the following regularities and pay attention to their correct interpretation: a. An interval obtained in this way is random b. For a given γ an infinite number of intervals can be found that fulfil relationship (4.12) and depending on sample size the point of interest will be those intervals with the narrowest range c. The statement that for a given parameter θ the confidence interval was found, keeping the confidence coefficient γ in mind, means that in 100 γ % of the cases the interval covers the unknown value of parameter θ. Figure below is an illustration of the above statement. The lengths of intervals are random, many of them cover the unknown value of parameter θ but sometimes constructed interval does not cover it.
The construction of a confidence interval can concern an inference on the one side (either (4.11a) or (4.11b)) and here we have one side interval where attention should be paid to the limits of the determination of the variable. In practice, one is obviously confined to one sample and to the determination of only one confidence interval. It is worth noticing that presuming a confidence interval near one is not
Book.indb 117
12/9/2013 12:25:06 PM
118
Statistics for mining engineering
very convenient. The greater the value of γ; the wider the confidence interval and for this reason the accuracy of the estimation lower. In the majority of statistics books, many examples of a Gaussian distribution are given. In engineering analyses, the application of this distribution is not so wide. Moreover, the frequently set up presumption (in many statistics books) that one parameter of this distribution is known does not hold in practice. Therefore, consider the construction of a confidence interval for the mean of a random variable of an unknown distribution. In such a case, we are in an inconvenient situation. If we would like to make a credible study, we should have a large sample size. It is a well-known fact in mathematical statistics that the arithmetic mean based on a sample of size n taken from any distribution has the following limited distribution: σ ⎞ ⎛ N m, ⎟ ⎝ n⎠
for n → ∞
where m is the expected value and σ is the variance. Observe that if the distribution is normal the above pattern holds for any sample size n. It can be assumed that for a large n (greater than 30) the mean has such a distribution in which the statistic: U=
x m n : N (0,, ) s
Thus, we can construct the following equation: P
x m ⎛ ⎞ u < n < uγ ⎟ = γ ⎝ γ ⎠ s
(4.13)
where uγ is the multiplication factor of the estimation error of the unknown average value. This factor can be taken from the table of standardised normal distributions for the level of confidence γ and for the value (1 + γ)/2. This factor is in fact the quantile of the standardised distribution N(0, 1). Transforming equation (4.13) correctly, we get: s s ⎞ ⎛ P x − uγ < m < x + uγ ⎟=γ ⎝ n n⎠
(4.14)
Remark. The confidence interval for the unknown expected value m that is defined by the above equation is the same as the confidence interval for the mean in the normal distribution when the standard deviation is σ except that in the formula (4.14) is presumed that σ ≅ s. In engineering practice, we often use exponential distribution. Therefore, let us look at the confidence intervals for a structural parameter of this distribution in cases of different investigation plans being used (the estimators for this parameter were determined by formulas (4.7)–(4.10)). − For plan [n, , T] the interval is: ⎡ Δ1− α ( ) 1 2 ⎢ , nT ⎢⎣
Book.indb 118
Δ α [ (T )] ⎤ 2 ⎥ nT ⎥⎦
(4.15a)
12/9/2013 12:25:07 PM
Synthesis of data
119
where: Δβ[d(T)] is the quantile of order β of the Poisson distribution for the number of failures noted d(T) − For plan [n, , r] the interval is: 1 Δ α [ 1] ⎤ ⎡ Δ1−α 2 ⎢ ⎥ , 2 ntr ntr ⎢⎣ ⎥⎦ − For plan [n,
(4.15b)
, T] the interval is: ⎡1 ⎤ 1 1 1 , ln ⎢ ln ⎥ p[ (T )] T 1 − p[ (T )] ⎥⎦ ⎢⎣T 1 p[
(4.15c)
where p[ (T )] and p[ (T )] are the lower and upper limits of the confidence interval for parameter p in the binomial distribution. − For plan [n,
, r] the interval is: 1 ⎡ Δ1− α 2 ⎢ , ⎢⎣ S ( r )
Δα [
1] ⎤ ⎥ S(( r ) ⎥ S ⎦ 2
(4.15d)
where α is the presumed probability near one. The quantiles of the Poisson distribution are in the construction of confidence intervals (4.15a), (4.15b) and (4.15d). This is connected with the fact that the most important information of a statistical nature that is obtained from the investigation is statistic d(T)—the number of failures noted and the distribution of its random variable is simply the Poisson distribution. The exception to this rule is pattern (5.15c) because the value of the statistic d(T) in this plan of investigation does not depend on the parameter λ for technical objects of high reliability in practice (more on this topic see Gnyedenko et al. 1969, Chapter 3.4). Hence, the transformation was made by replacing the Poisson distribution with the binomial one. Now, let us make some generalisations about the consideration being conducted by looking at interval estimations for a technical object whose operational process is of the workrepair type and both distributions of states are exponential. Consider the process cycle twi + tni; i = 1, 2, …; tw—work time, tr—repair time. Let us devote our attention firstly on the work state. A sequence of times is associated with this state. Consider the sum Σ in=1 twi. This sum is a random variable and it can be presumed that the component variables are independent and obviously exponentially distributed. If so, this sum has the Erlang distribution of order n or, what is the same thing, the product 2λΣ in 1 twi has χ2 distribution with 2n degrees of freedom (vide formula (3.3)). This statement allows the interval estimation for the unknown parameter λ to be obtained because the following equation holds: ⎧ 2 ⎨χ1 n ⎩
n
λ ∑ twi i =1
⎫ χ22 (2nn ) ⎬ 1 α ⎭
which yields ⎧ χ2 (2n) χ2 (2 n ) ⎫⎪ ⎪ P⎨ 1 n , ξ > 0
Estimate the unknown structural parameters for this function. Let us apply the method of moments—patterns (4.2). The estimates of the expected value and the standard deviation are as follows: x
83 0
i
Sx = 53.1 min
which give these estimations of the structural parameters: ξˆ = 2.44
νˆ = 0.03
Making use of the formulas taken from the method of maximum likelihood, we calculate the logarithm of the function L for a sample of size n ln L
nξ ln ν − n ln Γ(ξ ) + (ξ
n
)∑ ln xi − i =1
n
∑x
i
(4.31)
i 1 i=
Now, it is necessary to solve the set of equations that allow the estimates of structural parameters to be found, namely ∂ ln L =0 ∂ξ
∂ ln l L =0 ∂ν
Combining the above equations we get: n ∂ ln Γ(ξ ) ⎛ ξ⎞ 1 − ln ⎜ ⎟ = ∑ ln xi ⎝ x ⎠ n i =1 ∂ξ
Book.indb 126
ν=
ξ x
12/9/2013 12:25:35 PM
Synthesis of data
127
This set can only be solved applying an appropriate computer program. It turns out that the estimates obtained in this way differ insignificantly from the estimates obtained using the method of moments. Now, we have the theoretical model that should describe the distribution of data well. The next step is to verify this supposition, which has the following statistical form: the theoretical function describing the distribution of the empirical data differs insignificantly from the corresponding empirical function. The alternative hypothesis rejects this. The research situation that has been just described touches the sphere of consideration in mathematical statistics that belongs to non-parametric4 tests of significance and especially tests of the goodness-of-fit. Non-parametric tests can generally be divided into three groups: • Tests of the goodness-of-fit • Randomness tests • Independence tests. These tests characterise a lower power than parametric tests; however, they have the advantage of simple construction and uncomplicated calculations. An example of an application of randomness analysis was presented in Chapter 3.1. Now the point of interest will be the application of tests of the goodness-of-fit. Independence tests will be considered in the next chapter. Tests of the goodness-of-fit investigate the compatibility (accordance) of the empirical distribution with the theoretical one. It is also possible to verify the hypothesis that few distributions are consistent using some of these tests, which means that they can be described well by means of one probability function. In the case just considered the point of interest is a problem of whether the theoretical model that has just been selected describes the data well. In order to answer this question, a test of the goodness-of-fit should be applied. Two tests are used most frequently—the Pearson’s Chi-squared test and the Kolmogorov test. They are based on two different approaches to the issue of compatibility. In the Pearson’s test attention is paid to a comparison of the frequencies; empirical and theoretical. In the Kolmogorov test attention is focused on the maximum of the inconsistency between the distributions, again, a theoretical one with an empirical distribution5. Pearson’s Chi-squared test. The test has one disadvantage—the data to be analysed should be large. This is due to a requirement that is part of the test procedure. The range of the variation of the variables is divided into a certain number of separate intervals that are in contact with a neighbouring interval. It is suggested that approximately 8 to 10 sample outcomes, on average, should belong to each interval. The test procedure is as follows. Presume that the population of interest is characterised by some distribution. A sample is taken of size n. The outcomes are divided into r separate bins. Denote the number of outcomes in a given bin by ni; i = 1, 2, …, r. Obviously r
∑n
i
n
i =1
The empirical probability density function is obtained in this way.
4 There is a large amount of information in mathematical statistics dealing with non-parametric problems (see for instance Corder and Foreman (2009), Gibson et al. (2003) or Wasserman (2007)). 5 There are also some tests that are focused on one family of probability distributions, e.g. the ShapiroWilk test deals exclusively with the normal distribution.
Book.indb 127
12/9/2013 12:25:38 PM
128
Statistics for mining engineering
A verified hypothesis states that the population can be characterised by a certain specified probability function F(x). Using the information contained in the empirical distribution, one can calculate the probability pi; the probability that the random variable tested will take a value from the bin. Multiplying these probabilities by the sample size, one gets a theoretical number that should occur in a given bin if the verified hypothesis is a true one. Using all of the data, the following statistic should be calculated: ( i − i )2 npi i =1 r
χ2 = ∑
(4.32)
which has—if the verified hypothesis is the true one—the asymptotical χ2 distribution with r − k − 1 degrees of freedom where k denotes the number of parameters of the distribution F(x). The critical region in this test is the right-side one. The critical value χα2 ( 1) should be read from the Table (9.4) of χ2 distribution for r − k − 1 degrees of freedom and a presumed level of significance α. If the following inequality holds P
[
]
then the verified hypothesis should be rejected, i.e. the difference between the empirical distribution and the theoretical one is statistically significant. Otherwise, there is no basis to reject the null hypothesis. It is said that if the value given by formula (4.32) is closer to zero, then the verified hypothesis is more reliable. ■ Example 4.2 (Tumidajski 1993; Example 9.2) In a mine dressing plant 263 portions of the material that was fed mechanically for dressing were collected. The data were used to verify a hypothesis that states that the useful component (copper) in this material can be described by a Gaussian distribution. The samples had an identical mass and a chemical analysis was carried out. Outcomes were grouped in bins, the necessary calculations done and a table to facilitate further calculations was constructed.
Table 4.1.
Auxiliary calculations. (
Bin intervals Cu content
ni
ui
Φ(ui)
pi
npi
2.44
30 28 35 44 42 29 26 29
−1.063 −0.719 −0.375 −0.031 0.312 0.656 1.000 –
0.144572 0.235762 0.351973 0.488034 0.621720 0.745373 0.841345 1.000000
0.144572 0.091190 0.116211 0.136061 0.133686 0.123653 0.095972 0.158655
38.02 23.98 30.56 35.78 35.16 32.52 15.24 41.73
i
i
)2
npi 1.6918 0.6739 0.6451 1.8884 1.3306 0.3810 0.2290 3.8834
where pi = Φi+1 − Φi for i ≠ 1.
CH04.indd 128
12/12/2013 2:49:07 PM
Synthesis of data
129
Information was obtained from a previous investigation that the distribution of the data could be satisfactorily described by a Gaussian distribution. Therefore, a null hypothesis was constructed repeating that way of reasoning. The arithmetic mean from the samples that had just been taken was calculated obtaining x = 2.1181, and the standard deviation s = 0.3228. x x Upper limits of bins were standardised as ui = i s , whereas values Φ(ui) were read from the Table of the standardised normal distribution N(0, 1). By calculating the Chi-squared statistic, the following result was obtained χ2 = 10.72. Presume a level of significance α = 0.05. The number of degrees of freedom is r − 2 − 1 = 5. From Table 9.4, we have the critical value: 11.07. The empirical value is below the critical one—conclusion: there is no ground to reject the verified hypothesis. We can assume that the distribution N(2.12; 0.32) describes the distribution of copper in the broken rock delivered to the dressing plant well. ◀ ■ Example 4.3 In the seismic station of a certain underground coal mine tremors of rock surrounding the mine were noted between 14-09-2001 and 21-10-2010. The point of interest was the time (counted in days) between two neighbouring tremors whose energy was above the defined level. Within the selected period of observation, 32 events were recorded, namely: 10, 131, 81, 116, 17, 196, 29, 178, 20, 147, 23, 134, 20, 222, 129, 207, 95, 89, 80, 75, 145, 112, 15, 85, 219, 53, 99, 49, 71, 318, 381, 211 days Figure 4.3. Let us perform a statistical analysis of the sample. First of all, the randomness of the sample should be tested. The sample has 32 elements and for this reason the median is the arithmetic mean of two neighbouring elements— number 16 and 17—for the sample ordered monotonically. Thus, the median is 12 (95 99) = 97 days. The original sample is now converted into a sequence of signs: all of the observations in the sample larger than the median value are given a + sign and those below the median are given a – sign. Thus, the sequence is as follows: –+–+–+–+–+–+–+++––––++––+–+––+++
400 350
Time (days)
300 250 200 150 100 50 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32
Figure 4.3.
Book.indb 129
Time between two neighbouring tremors for the period 14-09-2001 and 21-10-2010.
12/9/2013 12:25:41 PM
130
Statistics for mining engineering
The number of series in this sequence is 22. The number of signs n− = n+ = 16. Presuming a level of significance α = 0.05 and using Table 9.8, we have two critical values for our case: Kα/2(16, 16) = 11
K1−α/2(16, 16) = 22
and
The empirical number of the series touches the right side critical value. The outcome is ambiguous. Formally we can reject the hypothesis proclaiming randomness. But we may try to conduct our analysis a bit further. Usually, in such a case, there are two ways to conduct further analysis. One way is to collect a new sample, but in the case being considered this was not possible. A second way is to apply a different test. Unfortunately, the author of this book is not familiar with any different test for the randomness of a sample than that presented in Chapter 3.1. Thus, let us conduct a further study assuming with a certain carefulness that the sample has a randomness property. There is no outlier in the sample. Let us check whether the sample is a stationary one by applying the test based on the Spearman’s rank correlation coefficient. Calculations connected with this test are as follows: Order i
1
2
3
4
5
6
7
Value Rank vi
10 1
131 81 21 13
Order i
18
19
20
21
Value 89 Rank vi 15
80 12
75 11
145 23
8
9
10
11
12
13
14
23 6
134 20 222 22 4, 5 30
15
16
17
116 19
17 3
196 26
29 178 7 25
20 147 4, 5 24
129 20
207 27
95 16
22
23
24
25
26
27
28
29
30
31
32
112 18
15 2
85 14
219 28
53 9
99 17
49 8
71 10
318 31
381 32
221 29
Calculate the coefficient (formula 3.18). We have: 6∑ i =1 (vi i )2 n
rS = 1 −
n( n2 −1)
= 0.255
Let us check whether this value is significant. The null hypothesis states that the stationarity of the sequence versus an alternative supposition rejecting it. The critical value can be calculated by applying formula (3.23). Here we have: rS ( , n ) =
1.645 = 0.295 n −1
Comparing these two values, we can state that there is no basis to reject the null hypothesis that states the stationarity of the sample. If so, we can try to find a theoretical model which will describe the distribution of the data well. Let us divide the range of observations into five 80-day-long intervals. By ascribing to each interval the corresponding values, a histogram is obtained which is presented in Figure 4.4. The theoretical models that could be considered here are: exponential, gamma or Weibull distributions. Let us reject the exponential model because this is a particular case for gamma distribution as well as for the Weibull distribution.
Book.indb 130
12/9/2013 12:25:43 PM
Synthesis of data
131
Figure 4.4. The histogram and the theoretical probability density function for the times from Example 5.3.
Let us try to use the Weibull distribution. It was defined by pattern (1.54). Recall f x ) = αλx α e
λx α
x ≥ 0,, α > , λ > 0
In order to estimate unknown values of the structural parameters, we can apply the method of moments first. This means that we need to solve the following set of equations: Γ(1+ ( αˆ −1 ) λˆ −1/ αˆ = x ⎛ 2⎞ Γ ⎜1+ 1 ⎝ ˆ ⎟⎠
2
⎛ 1⎞ 1 ⎟ ⎜⎝1+ ˆ⎠
2
(4.33) =S
2 x
λˆ αˆ where x is the average value of the observations and Sx2 is the corresponding variance. This set can easily be solved using an appropriate computer program. For the data in hand x 11
d y
d Sx2 = 7995 days 2
and therefore λˆ =
αˆ =
× 10 −3
The probability density function with these parameters is depicted in Figure 4.4. Notice that two pieces of information here indicate that the exponential distribution has no validity. Firstly, the standard deviation of the random variable investigated is distinctly different than the mean. Secondly, the shape parameter α is clearly different than unity. Apply now the method of most likelihood. We have the set of equations: λˆ =
n
∑
n i =1
( i )αˆ
⎡ n αˆ ⎢λˆ ( i )α lln ⎣ i1
Book.indb 131
⎤ lln xi ⎥ = n 1 ⎦
n
i − i
(4.34)
12/9/2013 12:25:44 PM
132
Statistics for mining engineering
Inserting the estimates of parameters that were obtained using the method of moments, we come to the conclusion that the estimates are good enough. Changes in the values of the parameters because of the application of the method of most likelihood are negligible. Now we have the theoretical model that describes the distribution of data. Let us check whether this model describes the distribution of data well in a statistical sense. It is necessary to apply the test of the goodness-of-fit. Our data are not so rich and for this reason, it seems advisable to use the Kolmogorov test. In the Kolmogorov test two distribution functions are compared—the empirical one with the theoretical one. A null hypothesis H0 that is verified states that these distribution functions are identical, i.e. H0:F(e)(x) = F(t)(x), where F(e)(x) is an empirical function and F(t)(x) is the corresponding theoretical one. If the population has a distribution that is in accordance with the theoretical one—this means that the null hypothesis is true—then the values of both distribution functions should be close to one another. In the Kolmogorov test, the absolute differences between these functions are investigated and attention is paid to the largest gap between these values. This difference is the basis for the construction of the Kolmogorov statistic whose distribution is independent of the theoretical distribution function. The critical values were calculated based on this statistic and they are given in Table 9.12. If the maximum difference between the theoretical and empirical functions is greater than the critical value, the verified hypothesis should be rejected. The test procedure is as follows. Observations are ordered monotonically and they are grouped in separate intervals (bins). In this way information on a number nj; j = 1, 2, …, k, …, r of the outcomes belonging to each interval is obtained. Obviously, Σ rj =1 n j n. The empirical distribution function is determined as: F (e ) (x ) =
1 ∑ nj nj k
(4.35)
where Σj ≤ k nj is the total number of observations up to the k-th interval, inclusively. Next, based on the theoretical distribution function for each sample value (if the size of the sample is small) or for each interval (bin), one calculates the value of the function. Thus, we have two sequences of values of these distribution functions. Afterward, one calculates the absolute difference between the two value functions and the greatest difference is noted. This value is compared with the corresponding critical value for a given number of observations and a presumed level of significance. If the largest gap is below the critical value, we have no ground to discard the verified hypothesis. Example 4.3 (cont.) Following the reasoning presented above, calculate the values of the distribution functions— empirical and theoretical—in the points that correspond with the empirical values. The results of the calculation are presented in Table 4.2. Presume a level of significance α = 0.05. For such a level of significance and the sample size n = 32, the critical value in the Kolmogorov test is 0.234 (see Table 9.12). The maximum difference between these functions is 0.090. Thus, there is no ground to reject the verified hypothesis. This means that there will be no objection to the statement that the Weibull distribution with the parameters (1.33; 1.58 × 10−3) describes the empirical distribution of data well.
Book.indb 132
12/9/2013 12:25:47 PM
Synthesis of data
133
Table 4.2. The empirical and theoretical distribution functions for Example 4.3. xj j
days
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32
10 15 17 20 20 23 29 49 53 71 75 80 81 85 89 95 99 112 116 129 131 134 145 147 178 196 207 219 221 222 318 381
F(e)(x)
F(t)(x)
0.031 0.062 0.094 0.125 0.156 0.187 0.219 0.250 0.281 0.313 0.344 0.375 0.406 0.438 0.469 0.5 0.531 0.563 0.594 0.625 0.656 0.688 0.719 0.750 0.781 0.813 0.844 0.875 0.906 0.937 0.969 1
0.033 0.056 0.066 0.081 0.097 0.097 0.13 0.244 0.267 0.367 0.389 0.415 0.421 0.441 0.461 0.491 0.51 0.568 0.585 0.637 0.645 0.656 0.694 0.7 0.789 0.829 0.851 0.871 0.874 0.876 0.965 0.986
max|F(e)(x) − F(t)(x)|
0.090
F (e ) (x ) =
j n xj
F (t ) ( x ) =
∫f
x )dx
0
◀ Example 3.5 (cont.) As a result of the preliminary analysis and bearing in mind the histogram shown in Figure 4.2, we came to the conclusion that the distribution of data could be described by the gamma function (1.49) with parameters (2.44; 0.03). Now it is time to check whether this description is good in a statistical sense. The sample is not so rich, and therefore the Kolmogorov test can be applied. Therefore, formulate the hypothesis H0:F(e)(x) = F(t)(x) versus the hypothesis H1 which denies it. In order to check whether the basic supposition is not false, the sample was ordered monotonically in an increasing way. Both distribution functions were calculated at the points
Book.indb 133
12/9/2013 12:25:48 PM
134
Statistics for mining engineering
that corresponded to the empirical values. The results of the calculation are presented in Table 4.3.
Presume a level of significance α = 0.05. For such a level of significance and the sample size n = 35, the critical value in the Kolmogorov test is 0.224 (see Table 9.12). The maximum difference between these functions is 0.064. Thus, there is no ground to reject the verified
Table 4.3.
The empirical and theoretical distribution functions for example 3.5. xj
j
[min]
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28
10 15 20 25 30 30 35 35 40 40 45 50 60 60 65 65 70 70 80 80 85 90 95 100 100 105 110 120
F(e)(xj)
0.029 0.057 0.086 0.114 0.143 0.171 0.200 0.229 0.257 0.286 0.314 0.343 0.371 0.400 0.429 0.457 0.485 0.514 0.543 0.571 0.600 0.629 0.657 0.686 0.714 0.743 0.771 0.800
F(t)(xj)
max|F(e)(xj) − F0(xj)|
F(t)(xj)
gamma
Weibull
0.014 0.033 0.061 0.095 0.134 0.134 0.177 0.177 0.222 0.222 0.268 0.315 0.408 0.408 0.453 0.453 0.496 0.496 0.575 0.575 0.612 0.646 0.678 0.707 0.707 0.735 0.76 0.804
0.028 0.053 0.083 0.116 0.152 0.152 0.191 0.191 0.230 0.230 0.271 0.312 0.394 0.394 0.434 0.434 0.473 0.473 0.548 0.548 0.583 0.616 0.648 0.678 0.678 0.706 0.733 0.781
0.064
(Continued)
Book.indb 134
12/9/2013 12:25:49 PM
Synthesis of data Table 4.3.
135
(Continued). xj
j
[min]
29 30 31 32 33 34 35
130 140 155 170 170 180 230
F(e)(xj)
0.829 0.857 0.886 0.914 0.943 0.971 1
F(t)(xj)
max|F(e)(xj) − F0(xj)|
F(t)(xj)
gamma
Weibull
0.842 0.872 0.908 0.935 0.935 0.948 0.984
0.822 0.857 0.898 0.929 0.929 0.945 0.986
hypothesis. This means that there will be no objection to the statement that the gamma distribution with the parameters (2.44; 0.03) describes the empirical distribution of data well. ◀ If there is no indication of what kind of distribution should be applied, one can choose any of them provided that the selected distribution describes—in a statistical sense—the distribution of empirical data well. In the case just considered, the Weibull function has a similar shape as the distribution. By repeating the calculation for the Weibull distribution, one obtains the theoretical distribution function values, which are shown in the last column of this Table. It is easy to notice that the Weibull distribution of the calculated structural parameters can also be used because the maximum difference between the cumulative functions does not exceed the critical value in the Kolmogorov test.
4.3
AN EXAMPLE OF EMPIRICAL–THEORETICAL INFERENCE ABOUT THE DISTRIBUTION OF A RANDOM VARIABLE
Many systems in mining are of the series type in a reliability sense, especially the mechanised ones, e.g., BWE—belt conveyors—stacker in surface mining; shearer—AFC—belt conveyors in underground coal longwall mining; crusher (sizer, Australian)—belt conveyor—dumping machine; screen—receiving conveyor. These systems consist of pieces of equipment that can be repaired (are renewable). There are also series systems in mining that consist of nonrenewable objects. In reliability theory, a system has a series structure if, and only if, the failure of any element of the system means the failure of the system. This type of structure is the worst of all of those that are possible, i.e. such a system has the most inconvenient reliability parameters and characteristics. If, for instance, any piece of equipment that is engaged in the excavation and haulage of the coal won in an underground mine fails, then the whole system will not have any stream of coal quite soon. An exception to this rule is when such a system has a bin in its structure and a certain amount of the mineral can be stored in it. The reliability parameters of renewable series systems are calculated by applying the Markov processes theory if the times of the states (work and repair) can be satisfactorily described by exponential distributions. If, however, the probability distributions of the times of the states are not exponential but are still stochastically independent, then the theory of semi-Markov processes should be applied. If a system is of a series structure and its components work to the first failure occurrence, which means that the whole system works to the first failure occurrence, then order statistics should be applied. A system of this type can be found, for instance, in electronics.
Book.indb 135
12/9/2013 12:25:49 PM
136
Statistics for mining engineering
Before a definition of order statistics is given, let us consider a random variable that describes the time of work of such a system that consists of identical elements. It is defined by the equation: in( X (1) , X (2) ,
X1,n
, X (n ) )
(4.36)
where: X(i); i = 1, 2, …, n denote the work times of the elements X1,n denotes the first (shortest) time amongst n possible. Denote by F(i)(x) the probability distribution of the random variables X(i). Assuming that the work times of the elements are stochastically independent, the probability distribution of the work time for a series system is determined by the formula: n
∏ (1 − F
F1,n ( x ) = 1
(i )
(x )
i =1
)
(4.37)
which means that the reliability (survival) function is given by the pattern: n
R1,n ( x ) = ∏ R ( i ) ( x )
(4.38)
R(i ) ( x ) = 1− F (i ) ( x )
(4.38a)
i =1
Recall
If the probability distributions of the work time of the elements are exponential, i.e. F ( i ) ( x ) = 1 − exp( e p( −λ ( i ) x )
x≥0
λ(i ) > 0
(4.39)
where λ(i) is the intensity of the failures of the i-th element then the probability distribution of the work time of the system is also exponential and given by the formula: F1,n ( x ) = 1 e p
n ⎛ ⎞ x∑ λ(i ) ⎝ i =1 ⎠
x
0
(4.40)
The formula above contains information that the intensity of the failures of the system is the sum of all of the intensities of the failures of all of its elements. The mean time of work of the system is determined by the equation:
E(
⎡ n 1 ⎤ 1,n ) = ⎢ ∑ (i ) ⎥ )⎦ ⎣ i =1 E (
−1
(4.41)
Particularly, if all of the elements are the same in a reliability sense then R1,n ( x ) = [ R( x )]n and for the exponential law λ
Book.indb 136
λ( )
E(
1,n
)=
1 E( n
( )
)
12/9/2013 12:25:49 PM
Synthesis of data
137
■ Example 4.4 Often, durability tests of chains, which are not used only in mining, rely on the following scheme. In testing a device, a three-link or five-link segment of the chain is fixed and an alternating load is applied periodically. Such tests are usually normalised. The test is finished the moment that any link breaks off. The number of load cycles until the moment of the occurrence of the break is noted6.
When the data collected from strength tests are gathered, it is usually presumed that the number of cycles noted contains information about the durability of the links in the chain and because this number is a random variable, the probability distribution is usually estimated and—as a rule—a log-normal distribution is applied. The presented reasoning is flawed. The random variable that is observed in testing—the number of load cycles until the moment of the failure of one out of three chain links or one out of five chain links—is the first order statistic X1,n, n = 3 or 5. From a reliability point of view, a chain segment is a system consisting of three or five identical elements, stochastically taking. All of the elements work until the moment of the first failure occurrence. Thus, these systems are non-repairable ones. Recall now the definition of an order statistic. Let X1, X2, …, Xn be a random vector of size n and let x1, x2, …, xn be the realisation of this vector. An order statistic Xk,n is a function of the random variables X1, X2, …, Xn taking k-th largest value in every sequence x1, x2, …, xn. If f(x) denotes the probability density function of the random variable x and F(x) is the cumulative function, then the probability density function fk,n(x) is determined by the pattern: fk , n x ) =
(k
n! f x )[ F ( x )]k [ )!( n − k )!
F ( x )]n− k
(4.42)
As you can see the probability distribution functions of order statistics are different. If the estimation of the probability distribution of the random variable—the number of load cycles until the moment of the failure occurrence—is done, this distribution is F1,n(x). Therefore, if there is interest in the probability distribution of the durability of the links in a chain F(x) then, bearing in mind formula (4.37) and rearranging it appropriately, we have: F (x ) = 1− (
F1, n ( x ))n
(4.43)
6
Some other investigations use a slightly different scheme. A given segment of a chain is tested for a given number of load cycles. If there is no failure during this test, the investigation is finished and it is assumed that the chain fulfils the stipulated requirements.
Book.indb 137
12/9/2013 12:25:55 PM
138
Statistics for mining engineering
As the investigations show, the data gathered during durability tests can be satisfactorily described by a log-normal distribution and this distribution is F1,n(x). Now, the problem is what can be stated about the probability distribution F(x). Let us analyse this problem in more depth. Presume that as a result of testing, a sequence of numbers was obtained that created a sample of size n; x1, x2, …, xn. Knowing a priori that the theoretical model is log-normal, it is necessary to convert the sample into a sequence of logarithms log x1, log x2, …, log xn. The next step is the estimation of the structural parameters, i.e. the estimation of the average value and the standard deviation. Presume that the estimation gives the following result: − The estimate of the average value of the number of load cycles until the moment of the first failure occurrence out of n links tested, equals 3 × 104 (μ = log 3 × 104 = 4.477) − The estimate of the standard deviation equals 1.5 × 104 (σ = log 1.5 × 104 = 4.176). Having the estimations of these parameters of the probability function, a test of the goodness-of-fit should now be applied in order to verify the hypothesis which states that the empirical and the theoretical functions are identical statistically. It should be possible to describe the distribution of logarithms by the Gaussian distribution. Presume that the test that was used gave no ground to reject the verified supposition. If so, the probability density function is given by the pattern: f1,n x ) =
⎛ (log x − μ )2 ⎞ exp ⎜ − ⎟⎠ 2σ 2 ⎝ xσ 2 π c
x>0
c
0.4343
and this is shown in Figure 4.5. Let us now start a statistical inference about the probability density function f(x) that already has the probability density function f1,n(x) determined. Unfortunately, it is easy to come to the conclusion—looking at formula (4.43)—that there is no way to present the function that is being searched for in an explicit form. We can only: − state that the distribution that is being searched for is not a log-normal one − find a plot of the probability density function f(x) by applying an appropriate computer program.
1 . 10–5
f1,n(x) 5 . 10–6
0 0
2 . 104
4 . 104
6 . 104
8 . 104
1 . 105
x
Figure 4.5. The probability density function of a log-normal distribution of the first order statistic of a chain link.
Book.indb 138
12/9/2013 12:25:57 PM
Synthesis of data
139
0.006
0.004 f(x) 0.002
0
Figure 4.6.
0
10
20
x
30
40
50
The probability density function of chain link durability for n = 3.
A graph of the probability density function of the number of load cycles of a chain link until the moment it fails for the data being considered and only the three chain links that created the segment (i.e. the diameter of the links of the chain is large) is presented in Figure 4.6. Although the course of the function is similar to the function from Figure 4.5, it does not have a log-normal distribution. You can only try to find the theoretical distribution that will describe this function satisfactorily from a statistical point of view. Obviously the expected values and the standard deviations should be the same. ◀
Book.indb 139
12/9/2013 12:25:58 PM
This page intentionally left blank
CHAPTER 5 Relationships between random variables We have reached the point in our considerations at which we have the statistical diagnostics (a preliminary analysis of data) and the sample that is characterised by synthetic numerical characteristics—the parameters of the random variable being investigated. Moreover, a theoretical distribution was found that describes the data collected well. However, this is obviously not enough. Often there is such a situation in which we suspect that the random variable that is being investigated has an influence on a certain different random variable or even several random variables. It is therefore necessary to check this supposition. A similar problem can arise from different reasoning. We would like to theoretically describe the functioning of a certain technical object. A theoretical model was found but every model has some assumptions that have to be fulfilled in order to validate its application. Often the requirements of the model are such that some random variables have to be independent (often). And again, the problem of verifying whether this requirement has been fulfilled comes into play—the independence or dependence of some random variables. Sometimes, the following situation appears during the research that is being carried out: the independence of some random variables was expected but—as the result of statistical testing—something opposite has been found. Such a situation is very interesting from a research point of view. We should find the reason why such an irregularity exists. The points of interest in this chapter are such problems. We start our study from an investigation of the independence of random variables.
5.1
THE CHI-SQUARE TEST OF INDEPENDENCE
We will presume for the time being that our investigation concerns only two random variables and that they are of a categorical nature. Generally, variables can be classified as categorical (qualitative) or quantitative (numerical). • Categorical variables take on values that are names or labels. The colour of a ball (e.g., red, green, blue) or the type of hoist conveyance (e.g., skip, cage, bucket) would be examples of categorical variables. • Quantitative variables are numerical. They represent a measurable quantity. For example, when we speak about the population of a country, we are talking about the number of people in the country—a measurable attribute of the country. Therefore, population would be a quantitative variable. Let us formulate a question as to whether changes in the values of one variable are accompanied by changes in the values of another variable. The simplest case is when the investigation concerns independence and when this freedom is confirmed by an appropriate statistical investigation, the investigation is finished. But, when information is obtained during investigation that the random variables are dependent, some questions immediately arise such as: how dependent—strongly or weakly? What is the character of this dependence—linear? Nonlinear? Etc. A basic test for an investigation into the independence of two categorical random variables is the Pearson’s Chi-squared test of independence. The idea behind the test is as follows.
141
Book.indb 141
12/9/2013 12:25:58 PM
142
Statistics for mining engineering
A sample of size n from the population that is being investigated is taken; remark: the sample should be large. The outcomes are classified to create a so-called contingency table (independence table) with w rows and k columns. The interior of the table creates the matrix nij and nij, which means how many times the i-th realisation of the category (feature) X occurs and simultaneously the j-th realisation of the category Y. It is recommended that Λi,j nij ≥ 5. By summing up in rows and columns, we obtain the marginal numbers ni· and n·j that is: k
w
∑n
ni
∑n
nj
ij
(5.1)
ij
j =1
i 1 i=
but w
n
k
w
k
∑ ∑ nij = ∑ ni⋅ i =1 j =1
∑n
i =1
j =1
(5.2)
⋅j
Table 5.1 shows the concept of an independence table. A hypothesis that proclaims the independence of the categories being investigated as expressed by the random variables is formulated as:
{
H 0: P X
}
{
y j = P {X = xi } P Y
xi ,Y
yj
}
(5.3)
in accordance with the formula (1.10). In the test the statistic criterion that is being considered is determined as: w
k
i =1
j =1
χ =∑∑ 2
(n
ij
− nij*
)
2
(5.4)
nij*
where nij* =
ni n j
(5.5)
n
The statistic (5.4) has the asymptotic Chi-squared distribution with (w − 1) (k − 1) degrees of freedom if the verified hypothesis is a true one. The critical region in this test is the rightside test. Presuming the level of significance α and knowing the number of degrees of freedom, the critical value should be taken from Table 9.4. If the empirical value given by the Table 5.1.
Contingency table.
Feature X
Feature Y
Book.indb 142
x1 x2 … xi … xw n·j
y1 n11 n21
y2 n12 n22
ni1
ni2
nw1 n·1
nw2 n·2
…
yj n1j n2j
…
yk n1k n2k
ni· n1· n2·
nij
nik
ni·
nwj n·j
nwk n·k
nw· n
12/9/2013 12:25:58 PM
Relationships between random variables 143 formula (5.4) is greater than the critical one, the null hypothesis should be rejected. Otherwise, there is no ground to reject the verified hypothesis. Analysing the merits and demerits of this test more carefully, it is worth noticing that the numbers in the table have a discrete character. This suggests that the probability of the first type of error is underestimated—it is easier to reject the verified hypothesis. Therefore, this is a certain bias of the test. This takes on a special meaning if there is a case when the features have only two categories. Removal of the bias can be done by the introduction of a corrective amendment1, the so-called Yates amendment and the formula (5.4) is: 2
2
i =1
j =1
χ =∑∑ 2
(n
ij
− nij* − 0.5 nij*
)
2
(5.6)
At the beginning of the description of the test, the statement was given that the sample should be large. Generally, in mathematical statistics a truism is the statement that it is advantageous if a sample is large. In some national standards, there are recommendations that sample size should have at least 100 elements and marginal numbers—8 elements at least. Martin (1972) suggested that the Yates amendment should be applied to a four-fold table and also when the sample size does not exceed 60 elements. Siegel and Castellan (1988) made a different suggestion. They recommended not using the test when the sample size is below 20. They also made more suggestions related to the conditions of the application of the test. In some areas of study in mining engineering, we have no possibility to gather a large sample. In such a case, a different approach should be used. We will now consider the outlook for tables of sizes 2 × 2 and 2 × 3 that are based on Bennet and Nakamura (1963) and Bolshev and Smirnov (1965). The tables that are the point of interest are presented as: m2
m1
m
n1 – m1 n2 – m2 n – m
(A)
n1
n2
n
or m1 (B)
m2
m3
m
n1 – m1 n2 – m2 n3 – m3 n – m n1
n2
n3
n
Table (A) is constructed in the following way: a sample of size n is taken from the population being investigated. A property of the sample is that m (m < n) elements of the sample possess a certain feature while the others do not. The sample is divided into two parts of size n1 and n2; n1 + n2 = n in a random way. Among the items in the first part (n1), m1 elements have the feature that is of interest. Similarly, among the items of the second part (n2), m2 elements have the feature that is of interest. Table (B) is constructed based on a similar experiment, where it is necessary to separate the features into three groups. In order to fulfil the requirements of the test, a 2 × 2 table was constructed in such way that: n1 ≥ n2 and (m1/n1) ≥ (m2/n2). A 2 × 3 table was constructed in such a manner that: m1 ≤ m2 ≤ m3 and m ≤ n − m. A limitation of this test is the requirement: n1 = n2 = n3. 1
Book.indb 143
This amendment is recommended for smaller samples.
12/9/2013 12:26:01 PM
144
Statistics for mining engineering
Denote by Mi; i = 1, 2, 3 the random variables whose realisations are observed in the form of the numbers mi and denote them by: pi
⎧M ⎫ E⎨ i⎬ ⎩ ni ⎭
the corresponding probability. If the probability of the classification of an element into the i-th part does not depend on whether this element has the feature of interest, then p1 = p2 in case (A) and p1 = p2 = p3 in case (B). The hypothesis that is verified—considering the 2 × 2 table—proclaims the identity of the probabilities, H0: p1 = p2 versus an alternative supposition H1: p1 ≠ p2. There is also the possibility to verify the null hypothesis when the alternative hypothesis is: H1: p1 > p2. If the table is 2 × 3, the verified hypothesis proclaims: H0: p1 = p2 = p3 versus the alternative hypothesis that rejects it. The set of tables with the critical values for the test comprise almost 60 pages and for this reason it is not included in this book. Besides, many books that consist of sets of statistical tables include this set. ■ Example 5.1
The durability of the pinions used in some mine machinery was investigated. To improve the reliability of toothed gear transition in which the pinions operate a high level of performance was established, which expressed by the number of hours of work that the pinions should operate without any failure. During the reliability investigation 21 pinions from the first producer and 19 pinions produced by a second producer were tested. As a result of the investigation, it was observed that 11 pinions from the first producer and only 3 pinions from the second producer fulfilled the requirement. However, a statistical hypothesis was formulated, which stated that the durability of pinions manufactured by the second producer was the same as the durability of pinions manufactured by the first producer. The outcomes of the investigation are presented in the table below. Producer first Result
second
Σ
positive
11
3
14
negative
10
16
26
Σ
21
19
40
Presume the level of significance α = 0.025. Using the appropriate statistical table (see for instance Zieliński 1972), we get the critical value m2(21; 19; 11; 0.025) = 3. Due to the fact that
Book.indb 144
12/9/2013 12:26:02 PM
Relationships between random variables 145 the empirical value m2 = 3 is not greater than the critical value, there is the ground to reject the verified hypothesis provided that the random variables are arranged monotonically in the same way. However, both values are the same, and this fact may generate some doubts where the reasoning is concerned. Note some further problems connected with this investigation: 1. By presuming a slightly different level of significance, a different result of the statistical reasoning can be obtained; e.g. for α = 0.05 the critical value is m2 = 4 2. The alternative hypothesis can be formulated otherwise suspecting that the durability of the pinions from the second producer is worse. Readers can check such an approach for themselves. ◀
5.2
THE PEARSON’S LINEAR CORRELATION COEFFICIENT
If information is obtained that some random variables are mutually statistically dependent during an investigation, further research should be directed towards the analysis of this interdependence. Generally, the first area of consideration as to whether statistical interdependence was stated is correlation analysis. Correlation is the certain stochastic relation between two or more random variables. It relies on such a regularity that changes in the values of one variable are accompanied by systematic stochastic changes in the values of the second variable or variables. Sometimes, correlation is described as a certain degree of stochastic ‘brotherhood’ of the changes in random variables. There are a few different methods that can be used to check whether or not there is a correlation between variables. One of most commonly applied methods is the construction of a statistical table like the one that was presented in the previous chapter (table of independence). If the numbers lie principally on the main diagonal or the largest numbers lie on the main diagonal, then it can be expected that the random variables are correlated linearly. If the numbers are located in a certain characteristic way in the table but not linearly, a supposition can be formulated that a nonlinear correlation exists between random variables. A different method, which is often applied in practice, is the construction of a diagram of the dispersion of the random variables in a rectangular coordinate system X, Y in which pairs of observations (xi, yi) are used. If these points are accumulated in such a way that they can be closed by an ellipse, then we can suspect that a linear correlation exists between random variables. If the points are closer to each other, a stronger relationship can be expected. If the points are scattered, one can expect a lack of correlation. Example diagrams are shown in Figure 6.2. A precise statement about whether the correlation between random variables exists can be obtained by analytical reasoning. There are many correlation measures in mathematical statistics, such as: linear correlation coefficients, rank correlation coefficients, nonlinear correlation coefficients, partial correlation coefficients, multiple correlation coefficients and so on. Many of these measures have found applications in mining engineering and they have been used for years. Let us discuss the problem of correlation between two random variables. There is no doubt that the measure of correlation that has been most commonly applied for years is the Pearson’s linear correlation coefficient. It is defined by formula (1.79). Recall that this is a normalised measure and is determined over a [−1, +1] interval. In the case of functional relationship between variables X and Y, this coefficient becomes 1 when the increment in the values of one variable is accompanied by an increment in the values of a second
Book.indb 145
12/9/2013 12:26:02 PM
146
Statistics for mining engineering
variable. If the relationship is reversed but is still strict, then the coefficient reaches –1. Generally, the greater the value in the modulus of the correlation coefficient, the stronger the interdependence between the random variables. Remember, we are only considering the linear relationship between the variables. If the random variables are mutually independent, then the value of the correlation coefficient is zero. Let us now turn from theory to practice. Having some information about the general population, we can use estimator (3.46); however, some varieties of this measure can be found in statistical books. Similarly, as in many previous research situations, the point of interest is whether the estimate that is obtained is statistically significant or not. Obviously, a test is needed to resolve the problem. Usually, the procedure is as follows. A statistical hypothesis H0 is formulated that proclaims that there is no correlation between the random variables that are being investigated which is noted as: H0: ρ = 0; ρ means the correlation coefficient in the whole population. An alternative hypothesis rejects it. There are at least two ways to verify the null hypothesis. One way is to apply the Student’s statistic, namely: if n ≥ 3 and the verified hypothesis is true one then the statistic t=
RX ,Y 1 − RX2 ,Y
n−2
(5.7)
has the Student’s distribution with n − 2 degrees of freedom2. From the table with the critical values of the Student’s distribution, we read off the value t (α, n − 2) for the presumed level of significance α and the number n − 2 degrees of freedom. If the estimate (5.7) is not lower in the modulus than the critical value, then the verified hypothesis should be rejected. Otherwise, there is no basis to reject the null hypothesis. The second way is to use the critical values table for the Pearson’s correlation coefficient. They are given in Table 9.13; parameter ν here is n − k and k is the number of random variables (k = 2) that are being investigated. ■ Example 5.2
At the beginning of seventies of the 20th century a reliability investigation of mine hoist head ropes comprising 35 mines was carried out in Poland. The information that was gathered contained: the technical data of the hoists and operational parameters such as, for instance, the average number I of winds per day. The speed of the increment of wire breaks was assumed as the measure of rope wear. The number of days T of work was calculated until the moment at which the speed attained a certain value presuming that this value was the maximum for all of the ropes that were investigated. All of the ropes had the same construction (triangle shape of strands) and for this reason it was presumed that the wear measure was selected well. 2
Book.indb 146
The number two is connected with the fact that two random variables are considered.
12/9/2013 12:26:03 PM
Relationships between random variables 147 After having defined these two parameters, an interesting problem was whether these two values were correlated, i.e. when the increment in the intensity of the hoist work was noticed, it should have been accompanied by a decrement in the rope durability. The empirical pairs (T, I) are shown in Figure 5.1. A statistical hypothesis was formulated which stated that there was no correlation between random variables, i.e. H0: ρ = 0 versus an alternative hypothesis that rejected it. The level of significance was presumed α = 0.05. The Pearson’s correlation coefficient was calculated obtaining RT,I = −0.333. For the given sample size and the presumed level of significance the critical value was calculated by interpolating values because the critical values are given for n = 30 and for 35 in Table 9.13. In the case that was considered ν = 33. The formula (5.7) that gives can also be applied:
Table 5.2.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35
CH05.indd 147
Auxiliary calculations. T Days
I Av number of winds/day
316 205 960 440 331 693 782 360 331 472 305 522 146 226 321 525 409 239 479 333 363 525 414 405 345 290 462 554 643 560 276 729 617 913 940
680 720 640 680 680 680 640 640 640 640 680 400 620 560 520 480 520 560 520 880 880 840 880 840 880 880 880 680 680 520 520 400 480 480 460
12/12/2013 2:51:01 PM
148
Statistics for mining engineering 1000 900
Durability (days)
800 700 600 500 400 300 200 100 350
450
550
650 Winds/day
750
850
Figure 5.1. Empirical points for the hoist head ropes: durability of the rope versus the average number of winds that were executed.
t=
−0.333 1− ( −
)2
33 = −2.03
Making use of Table 9.3 we get the critical value: t(α = 0.05, n – 2 = 33) ≅ 2.04 The critical value is greater than the empirical value and thus we have no ground to reject the null hypothesis. Nevertheless, both values are very close to each other and this fact creates a sensitive point. If the level of significance is presumed to be slightly higher, the result of the reasoning is different and the final conclusion as well. As there are some doubts about the result of inference, let us check it using the critical values for the Pearson’s correlation coefficient. For the presumed level of significance and the known sample size (Table 9.13), we have the critical value 0.334, which is also obtained from the interpolation. Thus, because this way of reasoning gives the same result, there is no ground to reject the verified hypothesis, but—again—both values, the empirical and critical ones, are very close to each other. Notice that from an engineering point of view we suspect the existence of a certain relationship between the random variables that are being investigated. This was the reason that we paid attention to the very small difference between the critical and the empirical values. At this that stage of our analysis, we accept the outcome of that part of the statistical inference, although it looks as though further research should be conducted. Our conclusion stating that there is no correlation between variables being investigated can be strengthened by analysing Figure 5.1 and Figure 6.2. It is easy to notice that the empirical points scattering in Figure 5.1 does not correspond with any sketch visible in Figure 6.2. Our previous considerations comprised problems related to the stochastic interdependence between two random variables. Now it is time to enlarge the scope of interest for a greater number of random variables. If the number of random variables of interest is k and the relationship between them is linear, we can then estimate the linear correlation coefficients for the whole set of pairs of variables. These coefficients can be arranged in matrix R, which is called a correlation matrix:
Book.indb 148
12/9/2013 12:26:04 PM
Relationships between random variables 149 ... R1k ⎤ ⎡ 1 R12 1 ⎢R 1 ... R2 k ⎥⎥ 2 21 R=⎢ , ⎢ ... ⎥ ⎢ ⎥ 1 ⎦ ⎣Rk1 Rk 2
(5.8)
where Rij = Rji. Formally, if X1, X2, …, Xk are random variables with the non-zero variances σ21 > 0, 2 σ2 > 0, … σ2k > 0 then the entries Rij ; i ≠ j are equal to the correlation coefficients; for i = j the element is defined as 1. The properties of the correlation matrix R are determined by the properties of the covariance matrix ∑, according tothe relation: Σ=DRD where D is the diagonal matrix with entries σ1, σ2, … σk. 5.3
PARTIAL CORRELATION COEFFICIENT AND MULTIPLE CORRELATION COEFFICIENT
We are often interested in the stochastic interdependence between two random variables ignoring the influence of a third variable or other variables. A measure that allows such a relationship to be investigated is the partial correlation coefficient. In a general case, it is defined as: Kij = − Rij /(Rii Rjj)1/2,
(5.9)
where Rij, Rii and Rjj are the algebraic components that correspond to the elements of the matrix R. In the case of three random variables that are marked by the numbers 1, 2 and 3, we have: K12; 3 =
(
R12 R13R23
)(
1 R132 1 R232
)
(5.10)
Let us return to Example 5.2. Example 5.2 (cont.)
As a part of the research, a calculation of the maximum stress σ2 daN/mm2 (daN stands for 0.1 × Newton) for each rope was done3. An interesting problem that had been formulated during the investigation was to get the answer to the question of whether a statistical
3 In engineering nomenclature, the symbol σ denotes stress and it has nothing to do with standard deviation as in the mathematical statistics that were just noted. Similarly, the symbol E in statistics means the expected value while in mechanics it is the Young’s modulus.
Book.indb 149
12/9/2013 12:26:05 PM
150
Statistics for mining engineering
relationship existed between the intensity of the hoist work and the durability of the rope ignoring the influence of the total rope stress. These data are presented in Table 5.3. The following correlation coefficients were calculated: RTσ = −0.224
RIσ = −0.061
The partial correlation coefficient between the random variables T and I was calculated using the formula (see pattern 5.10) ignoring the influence of the random variable σ: KTI ; σ =
RTI
RT σ RI σ
(1 − R )(1 2 Tσ
Table 5.3.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35
CH05.indd 150
2 Iσ
R
)
=
−0.
( −0.
)(
.061)
(1 − ( − .224 ))(11− ((− .061)2 ) 2
= −0.356
Auxiliary calculations. T Days
I Av number of winds/day
σ daN/mm2
316 205 960 440 331 693 782 360 331 472 305 522 146 226 321 525 409 239 479 333 363 525 414 405 345 290 462 554 643 560 276 729 617 913 940
680 720 640 680 680 680 640 640 640 640 680 400 620 560 520 480 520 560 520 880 880 840 880 840 880 880 880 680 680 520 520 400 480 480 460
30.0 30.0 30. 30.0 30.0 30.0 30.0 25.7 25.7 25.7 25.7 37.1 37.1 37.1 37.1 37.1 37.1 37.1 37.1 34.4 34.4 34.4 34.4 34.4 34.4 34.4 34.4 27.3 27.3 37.1 31.6 31.6 31.6 31.6 31.6
12/12/2013 2:50:41 PM
Relationships between random variables 151 A statistical hypothesis was formulated stating that there is no correlation between the random variables of interest ignoring the influence related to the total rope stress. An alternative hypothesis rejected this. The level of significance was presumed α = 0.05. The critical value for the given sample size and the degrees of freedom equal to (35 – 3) is 0.340 (Table 9.13). Taking into account that |−0.356| > 0.340, the null hypothesis should be rejected at the presumed level of significance. This means that there is a statistically significant negative relationship between the average number of winds that are executed by the rope and its durability if the influence of the total rope stress is ignored. However, this dependence is rather weak. Notice that the sign before the coefficient value is very important. The outcome that was obtained meets engineering expectations. ◀ Three significant remarks in connection with the correlation coefficient analysis are worth noting, namely: a. If the correlation coefficient from the sample is near 1, it does not mean that a cause-effect relation exists: between the random variables; we can say on a strong stochastic dependence (it may be totally random similarity of two samples). b. The small correlation coefficient does not mean that a statistical dependence exists between the random variables being investigated; there may be a dependence but it can have a character that is different than a linear one (more precisely, rectilinear). c. The correlation coefficient can be underestimated due to measurement errors that may be connected with one or more variables; however, there are statistical measures that take such faults into account. Let us make some generalisations about our considerations. The subject of interest will now be an investigation on correlation in a case where several random variables are concerned. Presume that there is given a random variable Y in the population and the point of interest is the influence of the set of different variables (X1, X2, …, Xk) on that variable. In econometrics, variable Y is treated as the variable that is being explained and variables Xi are treated as the variables that provide the explanation4. The measure Rm determines the degree of dependence of the correlation relationship between variables Xi; i = 1, 2, …, k and the variable Y is the multiple correlation coefficient that is determined by the formula: Rm = [1 – (|R|/RYY)]1/2,
(5.11)
where: |R|—determinant of the matrix R of correlation coefficients, RYY—algebraic component of the element YY of this matrix. A multiple correlation coefficient is a normalised measure supported on the closed interval [0, 1]. The higher its value and the closer to unity, the stronger the correlation dependence is. There is a possibility to verify its significance by applying the appropriate statistical test. The critical values of the multiple correlation coefficient are given in Table 9.15. Often several additional significant problems occur during correlation analysis especially those connected with the proper interpretation of results obtained. Every so often some supplementary statistical measures must be applied in order to obtain a final result. An example of such an extensive analysis was given in Czaplicki’s book (2010, Chapter 3.9, which was entitled ‘Mutual dependence of random variables’). The example concerned the results of the reliability investigations of the main hoists that were operating in the Polish mining industry in the late seventies of the 20th century. 4
In many countries students are taught ‘mathematical determinism’, i.e. if x increases two times y increases four times strictly because y = 2x2 and x is the independent variable and y is the dependent variable. In practice a strict relationship seldom exists. Moreover, in some research works x is the variable giving explanation and in some different analyses x is explained.
Book.indb 151
12/9/2013 12:26:08 PM
152
Statistics for mining engineering
5.4
NON-LINEAR CORRELATION MEASURES
Let us make some generalisations about the concept of the linear correlation coefficient. Assume that a sample (xi, yi); i = 1, 2, …, n was taken and a model in the form of the function y = f(x) was found. Consider the following measure:
∑ [ y − f ( x )] ∑ (y − y) n
ϕ2 =
i
i =1 n
2
i
2
(5.12)
i
i =1
The above measure, which is called the goodness-of-fit factor here, is normalised and it takes its values from closed interval [0, 1]. When the value of this measure is known, the multiple correlation coefficient Rm can be calculated because: Rm = 1 − ϕ 2
(5.13)
This measure determines the conformity between the function that was found (called the regression function) and the empirical values that are contained in the sample. Accordance is greater if the correlation coefficient is closer to unity and obviously ϕ2 is closer to zero. There is a certain inconvenience in the application of the correlation coefficient. It can be estimated provided that the regression function is known. If this model is unidentified, a different measure must be applied instead of the correlation coefficient R (5.13)—correlation ratio. This ratio can be used if the dependence between the variables is non-linear. It can be calculated if: a. the sample that was taken is rich b. values of the variables are divided into categories. Categories have a physical validation in an independent analysis. Categories can be constructed without being in touch with the physical background and can be based on a purely mathematical treatment. Note that such a sample allows for the construction of a table of correlation similar to what was done in the case of the contingency table. An example of a correlation table is given below. For the data given in the correlation table, the goodness-of-fit factor is determined by the formula:
∑ ∑ = ∑ w
ϕ
2
i =1
k
j =1 w
[ y j − f ( xi )]2 nij
( y j − y )2 n⋅ j i =1
(5.14)
where w and k denote the number of categories of the features X and Y. The correlation ratio of feature Y with respect to feature X is the statistic:
∑ ∑
w
ηY |X =
i =1 w
(Θi Ys )2 ni⋅
j =1
(5.15)
( y j Ys )n⋅ j
where: Ys =
1 ∑ y j n⋅ j n j
(5.16)
is the arithmetic mean in the marginal distribution of variable Y Θi
Book.indb 152
∑ =
k
n y j | xi
j =1 ij k
∑
n
(5.17)
j =1 ij
12/9/2013 12:26:08 PM
Relationships between random variables 153 is the average value in the marginal distribution of variable X = xi; i = 1, 2, …, w. When the positions of both variables are replaced, the correlation ratio ηX|Y of the feature X with respect to the feature Y will be obtained. ■ Example 5.3 Calculate both correlation ratios for data given in Table 5.4. Look at pattern (5.15). It can be expressed as:
∑ ∑
w
ηY |X =
i =1 k
(
j =1
i
Y )2 ni⋅
( y j Y )n j
=
S 2 ( | ) S (Y | ) = S2 (Y ) S(Y )
where: S2(Y|X) and S(Y|X) are the conditional variance and the conditional standard deviation among the categories for random variable Y S2(X|Y) and S(X|Y) are the conditional variance and the conditional standard deviation among the categories for random variable X S2(Y) S2(X) and S(Y) S(X) are the variances and the standard deviations for random variables Y and X respectively in the marginal distributions. Similarly, the formula for ηX|Y can be developed. Now, calculation is needed to obtain evaluation of correlation ratios of interest. It is presented in Table 5.5.
Table 5.4.
An example of a correlation table. X
No of category k 1 2 3 4 5 6 7
Table 5.5. Xi ni· 32 3 34 8 36 14 38 15 40 12 42 6 44 2
Y No of category i
1
2
3
4
5
6
7
31–33
33–35
35–37
37–39
39–41
41–43
43–45
n·j
3.25–3.75 3.75–4.25 4.25–4.75 4.75–5.25 5.25–5.75 5.75–6.25 6.25–6.75 ni·
1
1 2 3 2
1 1 2
2 10 17 15 10 4 2 60
3
8
4 3 5 3
14
15
1 3 2 4 2 12
1 1 2 1 1 6
Supplementary calculations—the characteristics of the marginal distribution.
Xi ni· (Xi – Xs)2ni· Ys|xi (Ys|xi – Ys)2ni· Yj 96 97.47 272 109.52 504 40.46 570 1.35 480 63.48 252 110.94 88 79.38
60 2262 502.6
Book.indb 153
1 1
3 6 4 1
4.33 0.78 4.37 1.77 4.61 0.74 3.87 14.11 5.12 0.94 5.5 2.61 6.25 3.98 24.93
3.5 4.0 4.5 5.0 5.5 6.0 6.5
n·j
Yj n·j
2 10 17 15 10 4 2
7 40 76.5 75 55 24 13
(Yj – Ys)2n·j Xs|yj 3.59 7.06 1.96 0.38 4.36 6.73 5.51
60 290.5 29.59
33 36.8 36.82 37.07 39.4 41.5 43
(Xs|yj – Xs)2n·j 44.18 8.1 13.16 5.95 28.9 57.76 56.18 214.24
12/9/2013 12:26:11 PM
154
Statistics for mining engineering
where: Xs =
2262 = 37.7 60
Ys =
290.5 = 4.84 60
Calculate now the unconditional and conditional standard deviations: S (X ) =
S (X s | y)
502.6 = 2.. 60 214.24 60
S (Y ) =
S (Ys | x ) =
1.
29.59 = 0.70 60 24.93 = 0.645 60
Thus, the correlation ratios are as follows: ηX |Y
0.645 0.70
0 921
ηY |X =
1.89 = 0.654 2.89
Let us make some short comments. Because both values are significantly different so the relationship between investigated random variables is nonlinear. ◀ Greater cognitive sense has correlation ratio ηX|Y than ηY|X. The correlation ratio is a unitless measure, normalised and takes values between 0 and 1. Theoretically, the limit η = 0 represents the special case of no dispersion among the means of the different categories. The limit η = 1 refers to no dispersion within the respective categories. There is also a third special case when all of the data take the same value; in this case the correlation ratio is undefined. All of these cases are interesting from a theoretical point of view only. If the value of the correlation ratio increases, the relationship between the random variables will be assessed as becoming stronger. This measure does not allow the direction of changes to be stated but it is obvious taking into account that we have a non-linear relationship here. This measure is unsymmetrical, thus ηY |X ≠ ηX |Y
(5.18)
However, in the special case in which the relationship is rectilinear, the following formula holds: ηY2 |X
2 η2X |Y = RXXY
(5.18a)
In other cases the above relationship does not hold and the following relationships are true: ηY2 |X
Book.indb 154
2 RXY
η2X |Y
2 RXXY
(5.18b)
12/9/2013 12:26:13 PM
Relationships between random variables 155 Thus, if at least one of the correlation ratios is zero then RXY = 0. No relationship exists between the correlation coefficients ηY2 |X and η 2X |Y and they may radically differ from each other. There is the possibility to test the significance of the correlation ratio. Assume that the investigated random variables X and Y have a certain two-dimensional distribution with unknown correlation ratios: E{E (Y | X ) − E (Y )}2 σ 2 (Y )
(5.19a)
E{E (X |Y ) − E (YX Y )}2 σ 2 (X )
(5.19b)
HY2 |X =
H X2 |Y =
and a null hypothesis is formulated that proclaims a lack of the correlation H 0: HY2 |X = 0 against an alternative hypothesis H1: HY2 |X ≠ 0. If the null hypothesis is true then the statistic: F=
ηY2 |X
n −1 1 − ηY2 |X k − 1
(5.20)
has the Snedecor’s F distribution with (w – 1, k – 1) degrees of freedom. Presuming the level of significance α, the critical region is above the interval (F1–α(w – 1, n – 1), + ∞). If the empirical value falls into that region, the verified hypothesis should be rejected. Otherwise, there is no basis for rejection. Presume now that the point of interest is the verification of the hypothesis H 0: H X2 |Y = 0 . If so, the following statistic should be considered: F=
η2X |Y 1− η
2 X |Y
n−w w −1
(5.21)
It has the Snedecor’s F distribution with (w – 1, n – w) degrees of freedom. The further part of statistical inference is well known.
Book.indb 155
12/9/2013 12:26:17 PM
This page intentionally left blank
CHAPTER 6 Synthesis of data—regression analysis 6.1
PRELIMINARY REMARKS
If two or more random variables in a general population are of interest, they are interdependent stochastically and if an appropriately rich sample is taken, we can try to find an analytical formula of a functional nature that describes this interdependence well. This problem is extremely important in many engineering areas and mining engineering is no exception to this rule. This problem has had a very rich literature for many years and is still under development. In this chapter some elementary information as well as some connections with mine practice will be provided. Presume for the time being, that only two random variables are of interest. Usually, a research situation is of such a nature that the values of one variable Y are obtained by being read off at some regular intervals of time or after the execution of given piece of work (counted in the amount of the mass of extracted, hauled or dumped rock etc.) A second variable X is more or less determined on the values of the first variable. Let us call variable X an explanatory variable and variable Y the variable being explained1. The relation between variables can be of different nature, namely: i. Variables are connected by a cause-and-effect relationship, i.e. because the explanatory variable took a certain value, the variable being explained took a corresponding value, e.g. for a greater intensity of machine usage, its durability is reduced by a certain number of work cycles, on average; a. A mathematical model has a physical sense and compatible dimensions. ii. Variables are connected by a symptomatic relationship, i.e. we do not have the possibility to observe the variable that directly causes the value that will be taken by variable Y but we have the possibility to observe a different variable, which is significantly and strongly correlated with the causal variable; a. A mathematical model constructed in this case has no physical relationship, but there is often the possibility to make the dimensions compatible by assigning the appropriate dimensions to some model parameters. b. The possibility to apply symptomatic model seldom occurs in engineering practice. iii. Variables are connected by neither a cause-and-effect relationship nor by a symptomatic relationship; the model describes only the process of how the values of variable Y are formed as a function of a certain parameter, e.g. the compressive strength of the soil as a function of the depth of the soil layer being investigated;
1 The terms ‘independent variable’ and ‘dependent’ variable’ are commonly used. However, in econometrics or technometrics these terms are not well-suited. In some cases the variables that are treated as independent—during a statistical analysis—are dependent on each other. The terms proposed here seem to be more appropriate ones and they are in common use in some European languages.
157
Book.indb 157
12/9/2013 12:26:24 PM
158
Statistics for mining engineering
a. The constructed model has no compatible dimensions and is a model of the tendency of the development of the trend2. iv. The explanatory variable and the variable being explained are the same variables but values of the explanatory variable are displaced over a certain parameter; the model is of an autoregressive character and is usually applied when the future values of the variable depends on the previous values. a. The model has compatible dimensions and contains information on a memory in the process that is being investigated. v. Variables are not connected by any physical relationship; the model has an adaptive character and is only constructed in such a way that will describe the evolution of the values of variable Y well. a. Such a model has no physical logic and its only sense is to describe how the values of the variable being described change following certain parameter well. Let us assume that a model whose analytical formula is being investigated is described by the formula: Y = f X)+ξ
(6.1)
where: X—the explanatory variable, ξ—the stochastic component of the model, the random variable. The explanatory variable X can have a different nature. It can be a deterministic variable; in some cases it can be treated as random variable. Notice (this is important) that the variable being explained is a random variable. In the case when the explanatory variable is not a random one, then the only variable that ensures the compliance of both sides of equation (6.1) is the stochastic component. It comprises the whole stochastic nature of the right side of equation (6.1). Before the construction of a trial model, i.e. before the construction of the function f, a researcher involved in the investigation tries to become familiar with the literature concerning the subject under consideration and tries to find any model that has already been established. If such a model exists, then basically the problem of the identification of the model is resolved. However, there is a problem as to whether the data that have just been gathered conform to the model from the literature. The term that was just used—basically—makes sense. It does not matter how serious an investigation has been made and how magnificent the researcher who was involved in it is, validation of the model must be performed. However, if there is a lack of publications in this regard, then it is necessary to choose an analytical model that will describe the data. In some cases, the results of the investigation can ‘suggest’ what kind of model should be applied. If there is an autocorrelation in the data gathered, it means that there is a memory in the process that is being investigated. For this reason, the first choice of a model should be an autoregressive one. Sometimes, there is such a situation in which there is no hint as to what character the model being searched should have or what kind of function should be applied. In such a case, the first step is usually the construction of a plot in the rectangular coordinate system X, Y. 2 Econometricians are usually of the opinion that a model of the tendency of development is connected with time. In the engineering world the model parameter is frequently different, e.g. the number of tonnes of rock extracted or the number of cycles executed by a machine. These measures are more adequate because the reasons that generate the course of the process are physical phenomena, not time. Recently, in cosmology, a more and more popular opinion is that time does not exist. Time is a convenient measure but it was created by people. When measuring time, we compare only two courses of physical processes.
Book.indb 158
12/9/2013 12:26:24 PM
Synthesis of data—regression analysis 159 Y
X
Figure 6.1. variable.
Empirical distribution of points that is probably a picture of a two-dimensional random
In such a way, a diagram illustrating the distribution of the empirical points on the plane can be obtained. If the scattering of points creates a ‘cloud’ such as is visible in Figure 6.1, then the further investigation can be conducted presuming that this distribution is a picture of a certain twodimensional random variable. Often the arrangement of empirical points on a plane ‘suggests’ which hypothetical function should be taken into consideration in the further part of the investigation (Figure 6.2a–6.2f). Let us discuss what the procedure of estimation of the unknown structural parameters for hypothetical model actually looks like.
6.2
LINEAR REGRESSION
Let us start from the simplest case when the proposed regression3 line is a simple straight line function: y = β1 + β0 + ξ
(6.2)
This function also has a very wide application in mining engineering, e.g. the speed of the corrosion of a shaft furnishing versus time can be described by a linear function (Carbogno et al. 2001); the resistance to the compression of soil samples depending on the depth of the sample location can also be modelled by this function (Bejamin and Cornell 1977), the utilisation rate for the means of transport in relation to its productivity can be designed using pattern (7.2) (Lin Zaikang et al. 1997), the unit energy of an excavation as a function of the rock compressive strength can be modelled using the linear function (Ceylanoğlu and Görgülü 1997) and the relationship between the peak cutting force and the cutting depth is also linear (Brown and Frimpong 2012). The point of our interest will be an estimation of structural parameters β0 and β1 in order to obtain the analytical recipe of the right side of equation (7.2) that will give the best fit to the empirical data. Notice a certain subtleness. Due to the fact that the information in hand 3
The term ‘regression’ is used in several different sciences such as: biology, economics, geography, psychology, geology and so on. In statistics, it is usually understood as the analysis or measure of the association between random variables.
Book.indb 159
12/9/2013 12:26:25 PM
160
Statistics for mining engineering Y
Y
b)
a)
Consider y = ax + b + ξ
Consider y = a + bx + cx2 + ξ
X
X Y
Y
d) c)
Consider y = baxcξ or y = bxacξ or y = a + bx + cx2 + ξ
Consider y = b + a log x + ξ or y = bxacξ lub y = axξ/(x + b)
X
X Y
Y
f)
e)
Consider y = (a + bx + ξ)−1 or y = x[a + (b + ξ)x]−1 or y = a/x + ξ
X Figure 6.2. functions.
Book.indb 160
Consider y = k(a + be−cx + ξ)−1 or y = a + bx + cx2 + dx3 + ξ
X
Examples of the distribution of empirical points and the proposed analytical regression
12/9/2013 12:26:26 PM
Synthesis of data—regression analysis 161 is in the form of a sample, we have no possibility of finding the real values of the model parameters; we can only estimate these parameters. Denote these estimates by b0 and b1 appropriately and estimate the random component; the so-called residuals, by u. These residuals are defined as the differences: yi − (b1xi + b0 )
i
(6.3)
and they take both negative and positive values. If an assumption is made that it does not matter whether the difference value is negative or positive, then the best estimates of the unknown parameters of equation (6.3) will be such assessments for which the following sum n
S
∑u
2 i
(6.4)
i =1
attains the minimum. Therefore, the following set of equations should be solved: ⎧ ∂S ⎪ ∂b = 0 ⎪ 0 ⎨ ⎪ ∂S = 0 ⎪⎩ ∂b1
(6.5)
which gives the following set of equations: n n ⎧ n 2 b x b x = yi xi ∑ ∑ ∑ i 0 i ⎪⎪ 1 i =11 i =1 i 1 ⎨ n n ⎪b1 ∑ xi b0 n ∑ yi ⎪⎩ i =1 i =1
(6.6)
The above set is called the set of normal equations of the least squares method. Move this consideration onto a theoretical ground. There is a statistical population in which the values of the categories create a certain twodimensional distribution. Let the relationship between these variables be given by formula (6.2). Thus, the following relationships hold: ⎧ ⎪ β1 ⎪ ⎨ ⎪β ⎪⎩ 0
ρ
σY σX ρ
σY E ( ), σX
(6.7)
where: ρ is the linear correlation coefficient between variables X and Y. E(X), E(Y) are the expected values of the random variables X and Y, respectively. σX, σY are the standard deviations of the random variables X and Y, respectively. Because the only information is the sample taken, the estimators of the unknown structural parameters are obtained by solving the set of equations (6.6), namely: SY ⎧ ⎪b1 R S ⎨ X ⎪b y − b x , 1 ⎩ 0
Book.indb 161
(6.8)
12/9/2013 12:26:26 PM
162
Statistics for mining engineering
where the symbols here are already well known. Having such estimators the question arises as to what kind of properties do these relationships have? Look at the stochastic ‘mechanism’ that generates the observations. Assumptions of the classical least squares method are as follows (Goldberger 1966, Draper and Smith 1998): a. Equation (6.2) means that each observation of yi; i = 1, 2, …, n is the linear function of the observation xi and the random component b. The random component ξ is a random variable with a zero expected value and an unknown constant variance σ 2ξ , i.e. E(ξ) = 0 and σ 2ξ = const as well as σ 2ξ > 0 c. The random variables ξi and ξj are uncorrelated for i ≠ j, thus cov (ξi, ξj) = 0 d. The variable xi is non-random, thus xi and ξi are independent for every i. If the assumptions above are fulfilled, then the estimators just obtained are the best unbiased estimators with the minimum variance. If these assumptions are not satisfied, then the estimators have worse statistical properties and their application can mean that the estimates obtained will be of a low likelihood. If, for instance, these estimators are applied to safety problems, it may happen that a safety risk will be underestimated. Often, an additional assumption (e) is made, which states that the random component distribution is normal, and then we decide on the classical model of normal linear regression (Goldberger 1966). After the estimation of the structural parameters, an assessment of the random component should be made. The applied method of the least squares ensures that the mean value equals zero or the mean value that is assessed using the sample will be negligibly different than zero. The important information will be a measure of its dispersion. The unbiased estimator of the unknown variance σ 2ξ of the random component in the model of the linear regression is determined by the function: su2 =
1 n 2 ∑ ui n − 2 i =1
(6.9)
Having the estimates (b0, b1) of the structural parameters (β0, β1) of the regression function that describes how these variables are mutually dependent and knowing the estimate of the unknown variance of the random component, the question can be formulated as to whether these estimates are significant. If assumption (e) is a rational one, the significance can be easily verified. Formulate a hypothesis that states that there is no linear relationship, H0: β1 = 0 between the variables that are being investigated; an alternative hypothesis rejects it. It can be proved (Goldberger 1966) that the statistic:
t=
b1
∑
n i =1
( xi − x )2
(6.10)
su
has the Student’s distribution with n − 2 degrees of freedom. Therefore, if |t| (6.10) is above the critical value taken from Table 9.3 for a presumed level of significance α, then the null hypothesis should be rejected. Otherwise, there is no basis to discard the verified conjecture. The reasoning that is performed here can easily be generalised. Maintaining assumption (e), the confidence interval for the parameter β1 can be determined by applying the following formula:
Book.indb 162
12/9/2013 12:26:30 PM
Synthesis of data—regression analysis 163
b1 +
t1
∑
n i =1
2
n 2
xi
x
2
su
β1
b1 −
t1
∑
n
2, n
( xi i =1
2
x )2
su
(6.11)
presuming the level of probability 100(1 − α). By calculating expression (6.11) and presuming the plus sign, one obtains the right-side boundary; presuming the minus sign the left-side boundary is obtained. Testing the significance of the regression can be conducted by making use of the statistic F Snedecor’s if the relationship between the random variables t and F is known (see the end of Chapter 1). If positive information is obtained, i.e. there is a statistically significant linear relationship between the variables tested, then the standard deviations of the random variables of estimated parameters will be very useful information. They give information about how good the estimates are. The standard deviation of parameter b1 is given by formula: Sb1 =
su
∑
n i =1
(6.12)
x )2
( xi
where as the standard deviation of parameter b0 is:
∑ x n∑ ( x − x ) n
Sb0
su
i =1
n
i =1
2 i
2
(6.13)
i
The greater the standard deviation, the smaller the accuracy of the estimates. The standard deviation of the estimator is called its mean error. Very important information for the researcher carrying out the investigation is in the sequence of the residuals: ui yi − yi(t ) yi − (b1xi + b0 ), which is in fact the sequence of the differences between the empirical values of the variable being explained and its theoretical values. This sequence is a representation of the random component that is not directly observable. The sum of these residuals should be zero or insignificantly different from zero. The sequence should be stationary, should have constant dispersion and a lack of autocorrelation in accordance with the assumptions that were made. It is recommended that it be checked whether these conditions are fulfilled in all of the cases that are being considered. ■ Example 6.1 A tribology investigation was carried out to analyse the wear process of the linings used in the disc brakes of a winder. The linings were made from different materials and some changes in the production process had been introduced. One of the investigation results was the course of the wear process of the lining for the disc that was fluorescently nitrided versus the number of brakes that were executed by the tester. The results of the investigation are presented in Figure 6.3. The results of the investigation clearly indicated that the relationship between the number of brakes that were executed x and the linear loss of linings (measured in mm) is linear, which was expected based on the literature on the subject.
Book.indb 163
12/9/2013 12:26:34 PM
Linear wear of lining y mm
164
Statistics for mining engineering
1.60
0.00
0
200
400
600
800
1000
1200
Number of brakes executed x
Figure 6.3. The linear wear of the lining for the disc that was fluorescently nitrided versus the number of brakes that were executed by the tester.
Firstly, the linear correlation coefficient was calculated that gives: RXY = 0.990 This value is high, which ‘suggests’ that there is really a significant linear relationship between the variables that were investigated. Formally, a hypothesis was formulated that stated that there is no linear correlation between the variables versus an alternative hypothesis that rejects the statement of a null hypothesis. For a presumed level of significance α = 0.05 and a sample size n = 21, the critical value, which is 0.433, was taken from Table 9.13. Thus, the null hypothesis should be rejected in a favour of the alternative supposition. It can be stated that there is a strong linear relationship between the number of brakes that were executed and the linear loss of the lining. The next step was the estimation of the structural parameters of the linear function. Using the set of questions (6.6), the following estimates were obtained: b1
.
3
b0 = −0.132
Thus, the relationship between the variables that were of interest can be expressed as: y 1 342 × 10 −3
Book.indb 164
0 132 + u
12/9/2013 12:26:37 PM
Synthesis of data—regression analysis 165 The accuracy of the estimation was determined by two standard deviations: Sb0
0 029
Sb1 = 4 10 −5
The residuals are presented in Figure 6.4. The mean loss and the corresponding standard deviation were as follows: u
4.7 × 10 −4
su = 0.06 mm
The mean loss was not precisely zero because of the rounding up of some values. The small value of the standard deviation indicates that the theoretical function was properly selected and fit the empirical values well. A sequence of the residuals was calculated and is presented in the Table below. This series was the object of further investigations. Firstly, the stationarity of the sequence was tested using the Spearman’s correlation coefficient. The coefficient was calculated and the result was: rS = 0.056 This is very low value and it was suspected that this sequence was uncorrelated with the number of brakes executed. A null hypothesis was formulated stating that there was no linear correlation between the number of brakes and the goodness of fit of the theoretical function to the empirical values, H0: ρ = 0 versus an alternative hypothesis rejecting it. A level of significance was maintained as previously. For the known sample size and α = 0.05, the critical value was 0.368 (Table 9.14). The empirical value was significantly lower than the critical one; there was no ground to reject the verified hypothesis. Let us conduct this investigation further by orientating it on dispersion testing, first of all. i 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
Book.indb 165
ui 0.048 0.051 0.063 0.026 0.029 −8.05 ⋅ 10−3 −5.2 ⋅ 10−3 −0.032 −0.039 −0.047 −0.074 −0.081 −0.058 −0.055 7.6 ⋅ 10−3 −0.02 −0.027 −0.064 0.039 0.132 0.105
12/9/2013 12:26:39 PM
166
Statistics for mining engineering 0.2 0.1 uj
0 −0.1
0
5
10
15
20
j
Figure 6.4.
The residuals of the function of the linear mass loss of disc brake lining.
By dividing the sequence of residuals in half and calculating the standard deviation for each sub-sequence (subsample), we have: S1
S2 = 0.052 mm
0 028
These figures differ significantly at first glance. It is necessary to verify whether this difference is statistically important. The test that can be applied in this case is that one based on a comparison of the variances of random variables. By calculating the variances, a null hypothesis was formulated that stated that these variances differ non-significantly, H 0: σ12 σ 22 . Looking at Figure 6.4, we can suspect that the dispersion increases. Thus, an alternative hypothesis can be formulated as: H 0: σ12 < σ 22 . The test is based on the F Snedecor’s statistic because: S22 = F (nn1 1 n2 1) S12 where n1, n2 are the size of the first and the second subsample, respectively4. Calculating, we have S22 /S12 3.45. Compare this value with the corresponding critical one for a level of significance α = 0.05 and the subsamples sizes (9, 9) which is: F0.05(9, 9) = 3.18
(Table 9.6)
The empirical value is distinctly above the critical one5. The null hypothesis should be rejected on the presumed level of significance. The dispersion in the second half of the observation is significantly greater than in the first half. It looks as though we are right to suggest that the dispersion increases with an increase in the number of brakes that were executed. The last step in the investigations of the residuals can be autocorrelation testing. Calculate the correlation coefficient between the values that are distant from each other by one, two and three steps. The results of calculations are as follows: r1( a )
r2( a ) = 0.374
r3( a ) = 0.042
4
To be more precise, it is assumed that the subsamples are taken from a Gaussian distribution. It looks as though this assumption holds in the case of the residuals in this case. 5 Remember that if the alternative hypothesis rejects only what the null hypothesis says, the critical value is the quantile F0.025(9, 9).
Book.indb 166
12/9/2013 12:26:40 PM
Synthesis of data—regression analysis 167 Let us check the null hypothesis that states a lack of autocorrelation of the order c of the investigated random variable, H0: ρc = 0 versus an alternative hypothesis H1: ρc > 0. A measure that allows the null hypothesis to be tested—as we already know—is the statistic: χ2 ( ) (
( )
) rc(
) 2
By making all of the necessary calculations and taking the critical values from the Chisquared distribution for a presumed level of significance α = 0.05, we have the following results: 11.283 (3.841)
2.658 (5.991)
0.761 (7.815)
where the numbers in brackets are the critical values. Only an autocorrelation of the first order is statistically significant. This is important information because in the majority of cases the existence of the autocorrelation is connected with physical reasons. Rarely is the autocorrelation connected with a purely random arrangement of numbers. In the case being considered, it would be worthwhile to undertake an investigation to identify these reasons, i.e. the physical process that is generating the autocorrelation and very likely causing that the increases in the dispersion. We can only state that when the lining is successively worn, important information for short-term prediction will be information on the wear at the current moment of time. The existence of the autocorrelation of residuals makes the statistical properties of the applied estimators to deteriorate but improves the process of inferences about the future. The problem of forecasting the degree of the wear of a lining can be significant for the functional reliability of the brake. However, what is more important is the vital information from the point of view of safety. ◀ 6.3
LINEAR TRANSFORMATIONS AND MULTIDIMENSIONAL MODELS
Our previous considerations can be generalised. The generalisation itself can be of a different nature. Let us list some of these. The generalisation can rely on: a. A consideration of a function that is different than linear but that describes the course of the random variable being explained well b. A consideration of a linear function with component variables that have errors in their values c. A consideration of a linear function of one or more variables for which there is some additional information about these variables. In this chapter our consideration will be orientated on the problem of the estimation of the function parameter based on a sample that is non-linear; however, it is of such a property that it can be transformed into a linear one. In such a case, we call it the linearisation of regression function (linear transformation). There is a certain class of functions for which the structural parameters can be easily estimated because of the possibility of transforming them into a linear function. Let us consider some examples. Let the model being analysed be expressed by an exponential function of two variables for instance: y = αa b z c ξ
Book.indb 167
(6.14)
12/9/2013 12:26:44 PM
168
Statistics for mining engineering
where α, a and b are the structural model parameters, x and z are the explanatory variables and ξ is the random component. In this case, the symbol c denotes a constant that is dependent on the assumed logarithm during linearisation. The logarithms of both sides give: log α + x log
log
llog og b + ξ
(6.15)
which allows it to be stated that the function is a linear one of the form: v = a0 + a1x + a2 z +ξξ
(6.16)
where: v
log y
0
= log α a1 = log
2
= log b
(6.16a)
Similarly, the power model: y = βx b z c d ξ
(6.17)
after taking the logarithms gives a linear model. Such functions were applied in modelling the processes of the wear of hoist head ropes and for modelling the effective intensity of the wear of brake lining materials (Broś et al. 1976). Another function, which after some transformations, gives a linear model is the function: yξξ =
ax x+b
(6.18)
where a and b are the structural function parameters, x is the explanatory variable and ξ is the random component of the model. By making the substitution: ( yξξ )−1
(6.19)
x+b 1 b = + ax a ax
(6.20)
z we have z= and further v
x −1 λ = a −1
δ=
b a
z1 = zξ
(6.20a)
which gives the linear function: z1 = (λ + δ )ξ
(6.21)
In some cases the following function can also be taken into consideration: yξξ =
Book.indb 168
x a0 + a1x + a2w
(6.22)
12/9/2013 12:26:45 PM
Synthesis of data—regression analysis 169 that linearisation gives: ( ξ )−1 =
a0 + 1x + a2w a0 w = + a1 + a2 x x x
(6.23)
which yields m1
( 0v +
1
+
2
)ξ
(6.24)
where: 1 m = =v y x
w x
h
m1 = mξ
(6.24a)
It is assumed that after the linearisation of a given model, the appropriate conversion of the values of the observed variables occurs, and later the estimation of the structural parameters of a new (linearised) model is done. After these estimates are found, a return conversion is made in order to get the estimates of the structural parameters of the primary function. There are two noteworthy problems associated with the above procedure. Firstly, the method of least squares minimises the sum of squares of the deviations of the empirical values from the theoretical ones but only for the linearised function, not the primary one. Nonetheless, the solutions found are quite near to the real unknown solutions and for this reason, this procedure is widely applied; especially due to the simplicity of its calculation. Secondly, there is more subtle and difficult problem that is connected with the random component. Notice that it is variously integrated into its model. Because this component is a random variable any transformation of it means that one achieves a different random variable and that its probability density function can be obtained by an appropriate transformation. However, this density function is often complicated. The problem of finding a probability distribution that can be commonly applied in statistics that the density function describes well arises—the function obtained on the way to linearisation. In some cases this problem causes serious difficulties. Linearisation has found applications in the graphical methods of statistical inference that are connected with distribution functions by using probability papers. By using such a paper, we can: a. Verify a statistical hypothesis in the form of a probability distribution function; however, without introducing the concept of level of significance b. Estimate the unknown value of one or two of the structural parameters of the distribution function that is of interest. Therefore, these methods concern one- or two-parameter distribution functions exclusively. A probability paper of a given distribution of the random variable X that is characterised by the probability distribution function F(x) is an appropriately selected orthogonal coordinate system with the abscissa ϖ = ψ1(x) and the ordinate η = ψ2[F(x)] in which the distribution function (or its complement—important in reliability analyses) is linearly determined by the formula: η
Book.indb 169
bϖ
12/9/2013 12:26:52 PM
170
Statistics for mining engineering
The most frequently applied probability papers are for the: a. b. c. d. e. f. g. h.
Gaussian function Lognormal function Exponential function Weibull function Gumbel function6 Logistic function7 Rosin-Rammler distribution8 Power distribution9.
If the distribution of the variable X that is being investigated has the assumed form, then the empirical points that are projected onto the probability paper should concentrate approximately on the straight line of the pattern: ˆ = a * + b* ϖ η where a* and b* are estimates of the unknown values of the structural parameters a and b. These estimates can be obtained using, for instance, the method of least squares. If, for example, the investigation concerns the Gaussian distribution, the following equations are applied: ˆ = ψ 2 [ ( )] = ϖ = ψ1 ( ) = ; η
x−m ϖ m ˆ= − ; η σ σ σ
It is also possible to construct a confidence region for the cumulative function F(x) by using the quantiles of the Snedecor’s statistic (see for instance Firkowicz 1970). The use of probability papers was popular in the sixties and seventies of the 20th century, especially in reliability analyses. However, their popularity declined with the growing application of computers and advanced statistical programs. Sometimes, a multinomial model is applied to get a statistically good description of data. It is necessary to remember that the higher the degree of the multinomial, it is necessary to have more structural parameters to assess and a larger sample size. If for example the model is: y = α2
2
+ α1x + α 0 + ξ
(6.25)
the set of normal equations obtained from the application of the least squares method is:
The cumulative distribution function of the Gumbel distribution is expressed by the formula: exp(−e−(x–μ)/β). This distribution is used to model the distribution of the maximum or the minimum of a number of samples of various distributions. The Gumbel distribution (1954) is a particular case of the generalised extreme value distribution (also known as the Fisher-Tippett distribution). It is also known as the logWeibull distribution and the double exponential distribution (which is sometimes used to refer to the Laplace distribution). 7 The cumulative distribution function of the logistic distribution is expressed by the formula: ( )−1. In some cases this distribution is applied in ore dressing to approximate the particle size distribution curve (Saramak and Tumidajski 2006). 8 This distribution is sometimes applied in particle size analysis of comminution processes. 9 This distribution is connected with the generalised gamma distribution proposed by Stacy (1962); however, a similar distribution had already been considered by Amoroso (1925). Amoroso-Stacy’s distribution was intensively studied by two Polish engineers: Firkowicz (1969) and Ciechanowicz (1972) in connection with quality control and reliability. 6
x −μ
Book.indb 170
12/9/2013 12:26:54 PM
Synthesis of data—regression analysis 171 n
n
n
a2 ∑ xi4 a1 ∑ xi3 + a0 ∑ xi2 i =1 n
i =1 n
a2 ∑ x + a1 ∑ x 3 i
2 i
i =1 n
i =1 n
i =1
i =1
i =1 n
n
∑x y
2 i i
i =1 n
a0 ∑ xi = ∑ xi yi i =1
(6.26)
i 1
n
a2 ∑ xi2 a1 ∑ xi + a0 n = ∑ yi i =1
for the estimation of the unknown structural parameters. The generalisation of the method for a case in which variable y is described by a multinomial of order k of the variable x does not cause any problems. ■ Example 6.2 The wear process of a hoist head rope was observed and the total number, nt, of cracks in the wires was noted depending on time from the 86th day of its usage until the 468th day when the decision was made to withdraw the rope from further operation. Empirical points were inserted into the diagram and these points were connected by continuous lines—see Figure 6.5. A power model was applied the first approximation function for the empirical data N t = δt γ c ξ Note, that this model is a model that only describes the trend and has no physical sense. Its exclusive task is to describe the course of empirical data well. A linearisation was made by applying a common logarithm and for this reason c = 10. The least squares method was applied and the following estimates were obtained: • The estimate g of the exponent γ; g = 2.46 • log d = −4.079, which gives d = 8.33 × 10−5 and is the estimate of the proportional coefficient δ. A plot of the function: Nt = dtg was inserted into Figure 6.5.
340
300
200
nt Nt
100
0
0
200 120
300 t
400 470
Figure 6.5. The total number of cracks in the wires of the rope versus the number t of days the rope was in operation; nt—the empirical data, Nt—the theoretical data (the power function).
Book.indb 171
12/9/2013 12:26:56 PM
172
Statistics for mining engineering
Looking at this Figure, it is easy to state that the goodness of fit is rather poor, especially where larger numbers of data are concerned.
Study the diagram of the residuals ut = Nt − nt for this theoretical function. It is given in Figure 6.6. Looking more carefully at this Figure, it is easy to perceive that there are long intervals in which the residuals have the same sign. This proves that the empirical model was not selected properly; the signs of the residuals should be mixed. Moreover, the investigation concerning the dispersion stability with time gives information that it is not fulfilled. For these reasons, a different theoretical model should be applied. Let us check the exponential function of the pattern: Nt = α
βt 2
γtt + ζ )
(6.27)
where: α, β and γ are the structural function parameters and ζ is the random component. Making the linearization, we have: lnNt
l α βt 2 + γtt + ζ ln
30 20 10 ut
0 −10 −20 −30
200 126
Figure 6.6.
Book.indb 172
300 t
400 468
The residuals ut = Nt − nt chart for the power function as the theoretical model.
12/9/2013 12:26:58 PM
Synthesis of data—regression analysis 173 The second degree of polynomial is obtained in such a way. The set of equations (6.26) can be used to estimate the unknown structural parameters. By making all of the necessary calculations, the following theoretical function is obtained: N t = 0.7478 exp(1.976 × 10 −5 t 2 0.022t + ζ )
(6.27a)
Let us check whether this model describes the data well. This function and the empirical figures are visible in Figure 6.7. Looking at this figure, we are inclined to say that the description does not satisfy our needs. Let us make sure by analysing the residuals τt = Nt − nt for exponential function (6.27a). They are shown in Figure 6.8. Both of the proposed approximation functions should be rejected due to their poor description of the data. Moreover, when the analysis of the residuals for both theoretical functions is conducted a little further, it turns out that these sequences have an autocorrelation up to the third order, which means that memories exist in both sequences.
340 300
200
nt Nt
100
0 0
200 120
300
400 470
t
Figure 6.7. The total number of cracks in the wires of the rope versus the number t of days of the rope’s operation; nt—empirical data, Nt—theoretical data (the power function).
20 0 φt
–20 –40 –60 100
200
300
400
500
t
Figure 6.8.
Book.indb 173
The residuals τt = Nt − nt; chart for the exponential function as the theoretical model.
12/9/2013 12:27:00 PM
174
Statistics for mining engineering
The results of the autocorrelation testing provide important information, namely: • There is a memory in the wear process of the rope—the state of the rope at a given moment of time strongly depends on the state of the rope a while before • The autoregression function should be considered as an approximation function. ◀ 6.4
AUTOCORRELATION AND AUTOREGRESSION MODELS
In theory, autoregressive models occur when the reversibility of stochastic stationary processes is analysed (e.g. Box and Jenkins 1976). In this chapter these models will be considered from an engineering point of view. Presume that there is given laboratory data or data gathered during an investigation or information collected during operation research. The best situation is when data are in the form of a large sample. The point of interest is to find such a function that will describe the collected data well. The usual procedure is as follows. We select a function that has a certain number of structural parameters. These parameters are usually estimated using the least squares method. The next step is the calculation of the residuals—very often as a sequence of the differences between the empirical values and the corresponding theoretical ones. An examination of the residuals allows an assessment of how good the selected model is. Consider the set of assumptions for the least squares method given at the beginning of this chapter. In engineering practice assumption (a) is usually fulfilled. Assumption (b) is fulfilled when the investigation concerns stationary processes. If the investigated process is non-stationary, assumption (b) is fulfiled in some cases, while in other cases it is not. There is also an area of engineering consideration in which the postulate of a lack of autocorrelation (assumption (c)) does not hold. In such a situation the problem of interdependence between variables arises. Consider a model in which E(ξ) = 0 and the variance σ 2ξ = const but there is an autocorrelation in the realisation of the random component. Presume that the structural parameters were assessed using method that gave biased estimators and the sequence of the residuals is evaluated. Suppose further that the autocorrelation of the random component was traced and that the following relationship holds: ξt
L
∑
ξ
i t i
χt
(6.28)
i =1
where {χt} is the pure random process and L is the natural number. In practical applications the problem of how large the number L should be arises. Or to put it differently, how far back to go? Here it is worth referring to theoretical publications in this regard as well as to look at the practice of the application of such models that have a confirmed autocorrelation of a random variable in econometrics and technometrics. In practice the deciding factor in how many elements of the right side of the equation (7.28) should be taken into account is information that the autocorrelation coefficients are significant. However, a situation can occur in practice in which many autocorrelation coefficients are significant, sometimes up to fifth or even eighth order, inclusively (Czaplicki 2000). In such a situation a decision should be taken as to how many components of the sum the model should have (6.28). Let us look at this problem from a theoretical point of view. In 1925 Fisher suggested that in the autoregressive model, the coefficients for subsequent variables that are delayed in time decrease systematically with movement to more distant periods. This idea was revisited and developed by Koyck (1954) and Nerlove (1958). Koyck presumed that the coefficients decrease geometrically for elements connected with receding elements. Thus, model (6.28) should have two or three components and should neglect the random component.
Book.indb 174
12/9/2013 12:27:01 PM
Synthesis of data—regression analysis 175 It is worth noticing that each the process element, i.e. the value of the process at a given moment of time, depends on the values from previous moments and it does not matter how far back our inference is done. Thus, in the coefficients that are one or more steps back, there is information about the history. Therefore, a model that takes into account many steps back will have a weak rationale. Usually, in practice, applications have models with L = 1, L = 2 or L = 3, rarely more. A practical approach to the selection of the number of components of the autoregression model was presented in example 3.8 and will also be presented in example 6.4. The unknown parameters δi are estimated by applying the method of least squares taking into consideration the residuals. Presume now that model (6.28) is replaced by the model with the estimates of the unknown structural parameters and that this model will be used for forecasting. If the prediction is unbiased, we neglect the pure random component χt, which is the integral constituent of the model. This is the reason that errors are generated. Taking into account that these errors can accumulate, any inference too far into the future is inadvisable, especially if the variance of the component is high. However, if the prognosis will concern only one or two steps ahead, model (6.28) should be useful. If the autocorrelation of the random component in the model being analysed was stated, and especially if the variance of this component is not constant with time, then the autoregressive model as a regression function: U
Yt
∑
Y
k t k
+ ζt
(6.29)
k =1
where νk is the structural parameter of the model and ζt is the pure random component of the model should be considered. Having the sample taken, we can estimate the unknown structural parameters, which is a minor task because the model considered is a linear one. The model has a physical sense and compatible dimensions. It is easy to construct a set of normal equations. If, for example, the model concerns two steps back: Yt
Ytt−1 + ν2Yt 2 + ζt
(6.30)
then we have the following set of equations: ⎧ νˆ 1 ∑ yt2 1 + νˆ 2 ∑ yt 1 yt 2 = ∑ yt yt 1 ⎪ t t t ⎨ˆ 2 ⎪ ν1 ∑ yt 1 yt 2 + νˆ 2 ∑ yt 2 = ∑ yt yt 2 t t ⎩ t
(6.31)
It is not a problem to find the estimators for the above structural parameters. ■ Example 6.3 The wear process of a hoist head rope was observed and the total number ni of cracks in the wires was noted depending on the number of winds v that were executed. The data that were gathered are presented in a graphical form in Figure 6.9. Two functions were taken into consideration in order to describe the data: • The power function N i = dvig c ε where: d and g are the structural function parameters and ε is the random component
Book.indb 175
12/9/2013 12:27:02 PM
176
Statistics for mining engineering
500
400
300 ni 200
100
0
100
200 νi × 10
3
20
Figure 6.9. The number ni of total cracks in the wires for a hoist head rope versus the number νi of winds that were executed.
• The exponential function Mi =
β
2 i
+ γ νi + χ )
where: α, β and γ are the structural function parameters and χ is the random component. The method for estimating the structural parameters is well known so let us look at the results of estimation, which are presented in a graphical form—Figure 6.10. It is easy to see that both of the proposed theoretical functions describe the empirical data poorly. Knowing that very often the autoregression function describes the empirical data well, the following function was considered Ai
ni = ν1ni +
ni − 2 + ζi
An estimation of structural parameters ν1 and ν2 was done and the result in a shape of the plot Ai was inserted into Figure 6.10. There is no doubt that the autoregression function describes the data well.
Book.indb 176
12/9/2013 12:27:04 PM
Synthesis of data—regression analysis 177 500
400 ni Ni
300
Mi Ai
200
100
0
50
100
150
200
νi × 103
20
220
Figure 6.10. Diagram of the total number of cracks in the wires of a hoist head rope versus the number νi of winds that were executed: ni—the empirical data, Ni—the power function, Mi—the exponential function, Ai—the autoregression function.
15
ui
–15
10
0
–10 50
100
Figure 6.11.
150 νi × 10
20
3
200 220
Residuals ui generated using the autoregressive function.
Perform an investigation of the residuals ui ni − ( 1ni + ni − 2 ), where ι1 and ι2 are the estimates of the parameters ν1 and ν2 that were obtained from the application of the least squares method. A sequence of these residuals is presented in Figure 6.11. Looking at this figure it can be seen that: 1. The positive values are well mixed with the negative values 2. The values of the residuals probably increase when the total number of winds that are executed increases. Calculate the two basic parameters for the sequence {ui}, namely: the expected value and the corresponding standard deviation. Here we have: u
0.62
k
su = 5.16 cracks
Remember the theory that the average value should be zero. It is different than that in this case. We can presume that this is due to rounding up and imperfect calculations. Therefore,
Book.indb 177
12/9/2013 12:27:07 PM
178
Statistics for mining engineering
formulate a hypothesis that states that the average value u is insignificantly different from zero, H0: m = 0 (m is the average value in the population) versus an alternative hypothesis that rejects it. The following statistic can be applied to verify the null hypothesis: t=
u n su
which—if the null hypothesis is the true one—has the Student’s distribution with n − 1 degrees of freedom. After the calculation we have t = 0.82. Presume a level of significance α = 0.05. From Table 9.3 the critical value for a sample size of n = 47 is 2.01. Because the empirical value is below the critical value, there is no ground to reject the verified hypothesis. Our supposition was right. Check supposition (2). Divide the sample in half and calculate the corresponding standard deviations for both subsamples. We have: s1 = 3.05 cracks s2 = 6.76 cracks The numbers differ distinctly. A hypothesis H0 is formulated that states that there is no significant difference between these parameters. If this is true, then the ratio of the variances has the F Snedecor’s statistic. By calculating one obtains: s22 /s12 4.93. Formulate an alternative hypothesis H1 that states that the dispersion in values for the second half of the observation is greater, H1: σ 22 > σ12 . If so, the critical value taken from Table 9.6 for a presumed level of significance α = 0.05 is F0.05(22, 23) = 2.03. The empirical value is definitely greater than the critical one. The alternative hypothesis is the true one. The dispersion in the second half of the data is significantly greater than in the first half. We are right to suspect that the dispersion of the random variable increases with an increase in the number of winds that are executed. A more precise analysis of the diagram presented in Figure 6.9 allows one to notice that the nature of the course of the increasing number of cracks in wires up to (160 ÷ 170) × 103 work cycles is gentle; the increment in the number of cracks is slow. However, the number of cycles grows as the speed of increment increases. Thus, a supposition can be formulated that something physically happened in the rope wear process that generated this increment. Ignoring the presumed essence of the event here10, we can formulate a hypothesis that the nature of the wear process up to this figure is different than the one above this figure. If so, two different regression functions should be applied to describe the data. Following this path of reasoning, we should get two sequences of residuals and the test of the significance of the dispersion should be repeated separately for each case. As the investigations show (Czaplicki 2010, p. 111 and more), this supposition was justified and resulted in a different evaluation of the reliability of the rope. ◀ Consider the problem of the number of elements in the equation (6.28) in greater depth. This problem is important in time series analysis. It was found (see for instance Box and Jenkins 1976) that a function that can be useful to identify the trend of the lag in an autoregressive model is the Partial Autocorrelation Function (PACF). Once can determine the appropriate number of lags by plotting the partial autocorrelative function. This allows the stochastic ‘mechanism’ of the autoregression in the data analysed and the order of the autoregression
10
A model of the fatigue wear of a wire rope used in hoisting installations in mines was presented in Czaplicki’s book 2010.
Book.indb 178
12/9/2013 12:27:08 PM
Synthesis of data—regression analysis 179 model to be identified. This order, say p, is identified based on changes in the values of the partial autocorrelation ϕll that is calculated by solving the Yule-Walker matrix equation: ρ1 ρ2 ⎡ 1 ⎢ρ 1 ρ1 ⎢ 1 ⎢… … 1 ⎢ ⎢⎣ρλ 1 ρλ 2 ρλ − 3
… ρλ −1 ⎤ ⎡ ϕ l 1 ⎤ ⎡ ρ1 ⎤ … ρλ − 2 ⎥⎥ ⎢ϕ l 2 ⎥ ⎢ρ2 ⎥ ⎢ ⎥=⎢ ⎥ … … ⎥ ⎢ … ⎥ ⎢…⎥ ⎥⎢ ⎥ ⎢ ⎥ … 1 ⎥⎦ ⎣ ϕ ll ⎦ ⎣ ρl ⎦
(6.32)
where ρi is the autocorrelation function determined by the pattern: ρl =
E [ X (t l ) − m ][ X (t ) m ] E [ X (t ) m ]2
(6.33)
If ϕll ≠ 0 for l ≤ p and ϕll = 0 for l > p, then the order of the autoregression function should be p. ■ Example 6.4 (based on Sokoła-Szewioła’s dissertation 2011) The process of the vertical displacement of a selected point located on the surface in the area that was under the direct influence of mining operations was noted in one of the underground coal mines in the Silesian Coal Basin. The point of interest was the increment of the displacement at a point in successive two-hour-long time intervals. The increment, which was denoted as Δw, was calculated from the formula: Δwi
Zi +1 − Zi
i = 1, 2,…, n
where Zi was the observed height of the point in i-th measurement. There are many factors that have an influence on rock displacement around drives and longwalls that are associated with the extraction of rock (the physical proximity of these openings, the speed of mining operation, the properties of the rocks surrounding the openings etc.). This rock movement finally reaches the surface and as a rule causes the subsidence of this surface. The significance of these factors can vary over time. It is very hard to find any analytical model that takes into account all of these issues and that weighs their significance appropriately. Therefore, it was presumed that a good model to describe the vertical displacement of rock masses on the surface would be an autoregressive one described as: p
wi
Δw ∑ d Δw j
i j
+ εi
j =1
where: dj ; j = 1, 2, …, p are the structural function parameters ε—the random component; Nε(0, σε) p—the order of the autocorrelation. Data were gathered, and an example of the daily distribution of the vertical displacement increments of the rock masses at the observed point in the period involved in the research is presented in Figure 6.12. Simultaneously, any seismic activity of tremors with an energy E ≥ 7 × 103 J was recorded11. The results of the observation are presented in Figure 6.13. 11
Book.indb 179
This figure was obtained from a separate study. This limited value is different for different mines.
12/9/2013 12:27:10 PM
Statistics for mining engineering 0.05 0.04 0.03 0.02 Δw 0.01 0 i –0.01 m –0.02 –0.03 –0.04 –0.05
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 74
180
i
8.00E+004 7.50E+004 7.00E+004 6.50E+004 6.00E+004 5.50E+004 5.00E+004 4.50E+004 4.00E+004 3.50E+004 3.00E+004 2.50E+004 2.00E+004 1.50E+004 1.00E+004 5.00E+003 0.00E+000
Tremor
5.00E+05
0 3 6 9 12 15 18 21 24 27 30 33 36 39 42 45 48 51 54 57 60 63 66 69 72 75
E [J]
Figure 6.12. Daily distribution of vertical displacement increments of the rock masses at the observed point in the period involved in the research (Sokoła-Szewioła 2011).
i
Figure 6.13. Daily distribution of analysed tremors expressed in energy units within the period involved in the research (Sokoła-Szewioła 2011).
The author of the research presumed that the sequence that was observed was a realisation of a certain random process. Based on a previous investigation, she suspected that this process was a stationary one but it was necessary to verify this. Recall here that the stochastic process X(t) is stationary if: 1. E{X(t)} = m = const 2. E{[X(t) − m][X(s) − m]} depends on the difference (t − s) only. Thus, as the first step, the stationarity of the sequence was analysed bearing the expected value in mind. Instead of the classical approach that applies a test based on the rank correlation coefficient, the author decided to solve the problem in a different way. She calculated the expected value of the random variable for subsamples of size l, l < n. Three sizes were presumed: l = 5, 25, 50. The following function was used as the estimator for the expected value: mk =
1 k l ∑ Δwi l i k +1
l+k
n i 1, 2, …, n = 132
The values of the parameter k varied: k = 0, 1, 2, …, 75. An example result of the estimation on the average value for l = 50 is shown in Figure 6.14. Further analysis of the estimations showed that the average value did not depend on k for the presumed value of l. This indicated that the sequence could be treated as a stationary one as far as the expected value was concerned.
Book.indb 180
12/9/2013 12:27:13 PM
75
70
65
60
55
50
45
40
35
30
25
20
10
15
50
45
40
35
30
25
20
15
10
Cov[25, k]
5
Estimation of the average value for k = 0, 1, 2, …, 75 and l = 50 (Sokoła-Szewioła 2011).
2E-005 1.5E-005 1E-005 5E-006 0 –5E-006 –1E-005 –1.5E-005 –2E-005
Figure 6.15.
k
5
Figure 6.14.
0
0.002 0.0015 0.001 0.0005 0 –0.0005 –0.001 –0.0015 –0.002
0
mk [m]
Synthesis of data—regression analysis 181
k
The covariance diagram for l = 25 and k = 0, 1, 2, …, 50 (Sokoła-Szewioła 2011).
The next point of the investigation was the calculation of the covariance according to the pattern: Cov(l,, ) =
1 n
n −1
∑( l −k
)(
i l
i
)
i k
where Δw is the average value. The estimation was done for the time interval [k, n − l] and [k + l, n]. An example plot of the covariance for l = 25 and k = 0, 1, 2,…, 50 is presented in Figure 6.15. Afterwards, the following values were found: max1 max1 max1
(5,, ) min i 1≤ x ≤50 (5, ) = 6.3553 × 10 −6 (5 v( , k ) i 1 50 Cov( Cov( , k ) .7897 × 10 −6 Cov 50 Cov m n1 50 (50, ) = 5.7082 × 10 −6 50 Cov(50, ) − mi
x 50
When looking at these numbers, a simple conclusion can be drawn that the covariance is constant over time. The next characteristic that was taken into consideration was the process autocorrelation function. The following function was applied as its estimator: ρˆl =
∑
n l i =1
(
∑
)(
i 1 n k i =1
(
i
)
i
)
2
The results of the calculation for l = 1, 2, …, 12 are shown in Figure 6.16.
Book.indb 181
12/9/2013 12:27:14 PM
12
11
10
9
8
7
6
5
4
3
2
1 0.8 0.6 0.4 0.2 0 –0.2 –0.4 –0.6 –0.8 –1
0
Statistics for mining engineering
ρl
182
l
Figure 6.16.
The autocorrelation diagram for l = 1, 2, …, 12 (Sokoła-Szewioła 2011).
Figure 6.17.
Values of the partial autocorrelation ϕll for l = 1, 2, …, 12 (Sokoła-Szewioła 2011).
The author of the research perceived that because the correlogram12 became extinct when l increased; it indicated that the process was stationary one13. The subsequent step at this stage of the investigation was the identification of the autoregression order, i.e. it was necessary to recognise how many elements the autoregression formula should have. Based on the changes in the values of the partial autoregression function ϕll that were calculated by solving equation (6.32) for l = 1, 2, …, 12, it was found that the order of the autocorrelation should be: p = 4. A juxtaposition of the values of the partial autoregression function is presented in the table below and the data is presented graphically in Figure 6.17. l
1
2
3
4
5
6
ϕll
−0.3812
−0.1658
−0.1958
−0.2869
−0.0839
−0.1710
l ϕll
7 −0.0627
8 −0.0589
9 −0.0654
10 −0.0328
11 −0.0697
12 −0.0574
After the investigations of the statistical properties of the data, an estimation of the structural function parameters was performed, which gave the model: Δwi
0 532990wi −1 − 0 3252678wi
0 3325874wi − 3 − 0.2868859wi − 4 + ε i
12
A correlogram is a plot of the sample autocorrelation function. Its counterpart, which is important in geology, is the variogram, which is connected with spatial statistics. 13 The value of the first autocorrelation coefficient is high and very likely is statistically significant.
Book.indb 182
12/9/2013 12:27:16 PM
Synthesis of data—regression analysis 183 The sequence of residuals εi was calculated and tested to determine whether they could be described by the Gaussian distribution N(0, σε). The Shapiro-Wilk test gave no ground to reject this hypothesis14. Generally, the autoregression function has information about the stochastic interdependence of the random variable. What is more, it carries important information. It is very likely that there is a physical background that generates such interdependence. The process that was analysed has a memory. Additionally, by analysing the magnitude of the particular parameters, we are able to assess how great the influence of the value of the process one or two or more steps back on the current state of the process is. Where hoist head ropes are concerned, investigations have shown (Dłubała 2009) that the magnitude of rope wear at a given moment of time depends on the magnitude of the rope wear in the previous rope survey in almost 80% of the cases and in almost 20% of the cases on the rope wear two steps back. Moreover, an investigation can be made to test the strength of this memory. A question can be formulated as to whether the dependence that is found is steady in time. As investigations have proven (Czaplicki 2010), this memory strength is often constant in the processes of hoist rope wear. However, there are sometimes processes in which the importance of the most recent notations increases. Here once again, this can be an indication that a certain physical factor commences its action. It seems that a recommendation can be formulated stating that the constant tracking and investigation of some physical processes is highly suggested because much important information is encoded in the realisations that are observed. And a task for the researcher is to catch, to identify and to explain their physical sense. Such information can be significant for the further inspection of some technical objects. Such information can also be beneficial to object’s producer as it can indicate in which ways it can be improved. 6.5
CLASSICAL LINEAR REGRESSION FOR MANY VARIABLES
Consider a certain generalisation of the classical model of regression connecting two random variables. Instead of two variables, a certain number of random variables will be considered. Here we take into account one variable Y, which will be explained, and K variables xi, i = 0, 1, …, K will be explanatory. The model has the form: K
= ∑ βi
i
+ ζ x0 = 1
(6.34)
i =0
Because this model is not so broadly applied in mining practice as the one considered in Chapter 6.2, the analysis presented here will be confined to some basic information. An example from an ore dressing area will be used to illustrate the study that is presented. In a case with many variables and with a random sample of size n (thus we have n × K elements in the data), it is advisable to apply the matrix notation due to its simplicity. Thus, relationship (6.34) can be expressed as: ⎡ 1 ⎤ ⎡ x10 ⎢⋅ ⎥ ⎢ ⋅ ⎢ ⎥ ⎢ ⎢ ⋅ ⎥=⎢ ⋅ ⎢ ⎥ ⎢ ⎢⋅ ⎥ ⎢ ⋅ ⎢⎣ yn ⎥⎦ ⎢⎣ xn 0
x1K ⎤ ⎡ β0 ⎤ ⎡ ζ1 ⎤ ⋅ ⎥⎥ ⎢⎢ ⋅ ⎥⎥ ⎢⎢ ⋅ ⎥⎥ ⋅ ⎥⎢ ⋅ ⎥ + ⎢ ⋅ ⎥ ⎥⎢ ⎥ ⎢ ⎥ ⋅ ⎥⎢ ⋅ ⎥ ⎢ ⋅ ⎥ xnK ⎥⎦ ⎢⎣β K ⎥⎦ ⎢⎣ζ n ⎥⎦
(6.35)
14
Incidentally, due to the fact that the process is stationary in a weak-sense and is normal, it means that it is of a strict stationarity. This is because the distribution of a normal process is specifically determined by means of the average value and the autocorrelation.
Book.indb 183
12/9/2013 12:27:18 PM
184
Statistics for mining engineering
or in short Y = XB + Z
(6.36)
where: Y—the vector of the observations of the variable being explained X—the matrix of the observations of the explanatory variables B—the vector of the structural function parameters Z—the random component vector. Traditionally, the basis for selecting the best fit hyperplane to the empirical data is the method of least squares. A vector of the estimates of the structural parameters can be obtained from the equation15: b = (X′X)−1X′ Y
(6.37)
Therefore, one can obtain the vector of the theoretical values of the variable being explained Y(t) from the formula: Y(t) = Xb
(6.38)
whereas the residual vector is determined by the difference: u = Y − Y(t)
(6.39)
The assumptions of the model are as follows: a. b. c. d. e.
Y = XB + Z EZ=O E Z Z′ = σ2I X is the matrix of fixed elements in repeated attempts r(X) = 1 + K < n,
(6.40) (6.41) (6.42)
where: I is the unit matrix and r(X) means the rank of the matrix X. According to assumption (a), each observation of the variable y is the linear function of the observations of variables x and the random component. Assumption (b) says that each random component has an expected value of zero. The next assumption (c) gives two pieces of information. Firstly, that the variance σ2 is constant. Secondly, that the random components are not correlated. Assumption (d) says that the explanatory variables are not random, which means that X and Z are independent. Moreover, this statement informs us that there is no linear relationship between variables x, which is a necessary condition for estimation. In the linear regression model, the best unbiased linear estimator of the structural vector parameters is the vector obtained by applying the least squares method. It has the minimum variance and the variance-covariance matrix is given by: V = s2(X′X)−1
(6.43)
where s2 is the estimate of the unknown variance of the random component. If an in-depth analysis is not conducted, at least three measures of the stochastic structure are calculated, namely:
15
Book.indb 184
Notice that during the calculation, a column of ones appears in matrix X because of the free term.
12/9/2013 12:27:19 PM
Synthesis of data—regression analysis 185 • the residual variance: Su2 =
1 U′ U n K −1
(6.44)
• the goodness of fit factor:
∑ (y − y ) ∑ (y − y) n
ϕ
2
j =1
2
n
j =1
2
(t ) j
j
⎯the arithmetic mean
(6.45)
j
• the multiple correlation coefficient: Rm = 1 − ϕ 2
(compare (5.12) and (5.13))
The interpretation of these measures and their properties has already been discussed16. ■ Example 6.5 (based on Gawenda 2004) In Gawenda’s Ph.D. dissertation (2004), the problem of the analysis and proper description of the process of the comminuition of porphyry in a jaw crusher was studied. Based on the paper of Cardou (Cardou et al. 1993), it was stated that the grain composition during crushing in jaw crushers can be described well by the modified Weibull distribution given by the formula: ϖ ⎡ ⎛ z ⎞ ⎤ ⎥ G ( z ) = 1 − exp e p⎢ c ⎢⎣ ⎝ d max z ⎠ ⎥⎦
z
;c
, d max > 0, ϖ > 0
where c, ϖ, dmax are the structural parameters estimated based on the empirical data.
Many issues connected with such a description were considered. Among other things was the problem of the selection of a model to describe the relationship between parameter ϖ and two basic technical parameters of a jaw crusher, namely: x1 the input slot width to the crusher and x1 the jaw pitch. The experiment was carried out and its results are shown in the table below.
16
Book.indb 185
For more on this topic see for instance Draper and Smith (1998) or Goldberger (1966).
12/9/2013 12:27:20 PM
186
Statistics for mining engineering
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
x1
x2
ϖ
25 25 25 25 25 25 20 20 20 15 15 15 25 25 25 20 20 20 20 20 20 15 15 15 15 15 15
13.4 13.4 13.4 8 8 8 8 8 10.7 10.7 10.7 10.7 10.7 10.7 10.7 10.7 10.7 10.7 5.3 5.3 5.3 5.3 5.3 5.3 2.7 2.7 2.7
0.810 0.860 0.771 0.899 0.864 0.855 0.916 0.869 0.899 1.028 0.957 0.842 0.850 0.904 0.840 0.835 0.915 0.893 0.981 0.919 0.898 1.025 1.068 0.973 0.965 1.158 0.965
Gawenda (2004).
Ignoring the method of reasoning made by the author of the research here, let us find a model to describe the relationship between these variables. It was known from previous investigations that the relationship should be linear one. Thus, the proposed model was as follows: ϖ
1 1
2
2
0
ζ
Using equation (6.37), the following estimates are obtained: b0 = 1.17873; b1 = −0.00817;
b2 = −0.001226
which means that the model is: ϖ = −0.00817x1 – 0.01226x2 + 1.17873 + ζ Now assess the residuals. Their average value is 0 and the standard deviation is 0.0553. Looking at these figures we are inclined to say that the model describes the data well. Calculate the goodness of fit factor. By applying formula (6.45), we get ϕ2 = 0.374. Having this parameter, the multiple correlation coefficient is: R = 1 − ϕ 2 = 0.791 This value looks high; however, it is necessary to check whether it is significant.
Book.indb 186
12/9/2013 12:27:22 PM
Synthesis of data—regression analysis 187 Formulate a null hypothesis that states that there is no significant correlation between the investigated variables versus an alternative hypothesis rejecting it. Presume a level of significance α = 0.05 The sample size is 27 and the total number of variables 3. Thus, the critical value taken from Table 9.15 is 0.470. The empirical value is clearly above the critical one. Thus, there is a reason to reject the verified hypothesis. The model gets its substantiation. The variance-covariance matrix is as follows: ⎡ 3.007 × 10 −3 ⎢ V = ⎢ 6.423 × 10 −5 ⎢ −1.704 × 10 −44 ⎣
6.423 × 10 −5 2.359 × 10 −5 −1.266 × 10 5
−1.704 × 10 −4 ⎤ ⎥ −1.266 2 6 10 −5 ⎥ 1.359 × 10 −5 ⎥⎦
Readers may comment on these parameters themselves.
6.6
◀
REGRESSION WITH ERRORS IN VALUES OF RANDOM VARIABLES
A few generalisations were made in the consideration that was conducted starting from the traditional model of regression. In this chapter a new important generalisation will be made—one that is important from an engineering point of view. Return for a moment to the simplest linear model that can be determined by formula (6.2). Assumptions (a)–(d), which were listed on p. 174, were associated with this model. Let us make a break in these assumptions that comes closer to engineering reality. Presume that the observations of the explanatory variable are not accurate, but were made with a certain error. For an engineer, it is obvious that when looking at the digits given by a measuring device or when looking at a gauge pointer, the information is read with some preciseness. In many econometric problems the issue of the accuracy of some variables is very difficult to formalise. In mathematical statistics there is an extensive chapter that deals with total least squares in which data modelling takes into consideration observational errors for both types of variables. The method deals with both linear and non-linear models17. Because the level of considerations here is a basic one, we confine our study to a simple case in which only two variables are taken into account and the errors are exclusively connected with the explanatory variable. Readers who are interested in this topic should become familiar with Gillard’s elaboration (2006) and Fuller’s monograph (2006); for non-linear models, the book by Carroll et al. (2006) is recommended. Presume now that instead of the observation of variable x a different variable is perceived that is the sum of two variables: X=x+u
(6.46)
where u is a certain random variable. It can be presumed that no systematic errors are being made and therefore u: N(0, σu)
(6.47)
17
In statistics there is a special chapter that is dedicated to the errors-in-variables model, which tries to find the line of the best fit for a two-dimensional set of data only. This is the so-called Deming regression, although the model was considered much earlier by Adcock (1878) and Kummell (1879). These ideas were almost entirely unknown until the appearance of Koopmans’ work (1937). Later, only Deming (1943) propagated this idea.
Book.indb 187
12/9/2013 12:27:24 PM
188
Statistics for mining engineering
The observed variable X is sometimes called the manifest variable or the indicator variable. The unobservable variable x is called a latent variable. Models with a fixed x are called functional models18. Models with a random x are called structural models. Now, it is necessary to determine the mutual relationship between the variables that are the components of the model. Assume that the error in measurement of variable X is independent from: a. The real value of this variable and b. Independent from the random variable that is a component of the model. Let us analyse what kind of repercussions are connected with such a research situation. Construct the variance–covariance matrix, similar to the one made in formula (6.43). We have: ⎡ σ 2yy ⎢ 2 ⎣σ Xy
2 ⎤ ⎡β12 2x σ 2ξ σ Xy =⎢ 2 ⎥ σ XX ⎦ ⎣ β1σ 2x
β σ 2x ⎤ ⎥ σ 2x +σ 2u ⎦
(6.48)
Let us define the regression coefficient based on the information contained in the sample taken: Rˆ =
∑
n j =1
(
∑
)( y j
j n j =1
y) 2
(
j
(6.49)
)
where all of the variables with a straight accent above the mean are the average values. Calculate its expected value. Having in mind that the random variables are normal, we have: E(( ˆ ) = β1
σ 2x σ 2x +σ u2
(6.50)
Looking more carefully at the formula above, it is easy to see that the regression coefficient has been attenuated (its value is reduced) by the presence of a measurement error. It is assumed (see for instance Fuller 2006) that the basic measure of this attenuation is the quotient: κ xX =
σ 2x σ 2X
(6.51)
i.e. the ratio of the variances of the variable x and X. This measure is called the reliability ratio. However, it is not a reliability measure of a technical item that could be expected by an engineer. It is a determined statistical measure that is associated with the theory and practice of measurement19.
18
There is again some inconsistency in understanding terms. The term ‘functional’ as presented here comes from econometrics; engineers will have a different association with it. 19 In genetics this ratio is a measure of heritability. An observed characteristic of a plant or an animal, the X value, is called the phenotype and the unobserved true genetic makeup of the individual, the x value, is called the genotype. The phenotype is the sum of the genotype and the environmental effect, where the environmental effect is the measurement error.
Book.indb 188
12/9/2013 12:27:24 PM
Synthesis of data—regression analysis 189 If this measure can be estimated, then the estimator of the structural parameter standing with the explanatory variable is given by the formula: (6.52) The second parameter can be estimated using the pattern: (6.53) Now define the variance–covariance matrix connected with the defined estimators. It is determined as the following:
(6.54)
where: (6.55) and it is the residual variance of the model
(6.56) and it is the unbiased estimator of the conditional variance of βˆ 1 (6.57) Unfortunately, it is seldom the case when the reliability ratio is known in engineering practice. At most, you can meet with cases in which we are able to determine its approximate value, but we are not able to assess the error that results from this approximation. Consider now a different case. Examination often allows it to be realised that the values of the variable that are read off or calculated are flawed. This means that the data are imprecise. Concern arises that the model that is created will be less accurate. In engineering practice in some areas of consideration, e.g. in issues that are associated with safety problems, we cannot afford to commit significant errors. Thus, by all means, it is advisable to assess the scale of the error of a given model. Often an engineer who is conducting research is able to assess the accuracy that is connected with reading off the values of physical magnitude. But, he/she has no idea about repercussions that will be generated if the regression model that is selected is applied. What is more, he/she does not know how the accuracy of the estimation of the variable being explained will change because of the model that is applied. Therefore, presume that the standard deviation of the measurement error is known. Note that even if this parameter is unknown, the measurement can usually be repeated many times and then the estimation of this parameter can be achieved.
Book.indb 189
12/9/2013 12:27:26 PM
190
Statistics for mining engineering
Thus, we can assume that the value of σu is known. Let us make an estimation of the empirical product moments that apply the formulas: mXy =
1 n ∑ Xi n − 1 i =1
X ( yi
)
y)
(6.58a)
myy =
1 n ∑ ( yi n − 1 i =1
y ) ( yi
y)
(6.58b)
1 n ∑ Xi n − 1 i =1
X Xi
)(
X
mXX =
(
(
)
(6.58c)
Now, we are able to construct the estimators of the most important regression parameters. They are as follows (compare Fuller 2006): σˆ 2x = mXX − σ u2 βˆ 1 =
mXy mxx − σ u2
(6.59) (6.60)
σˆ 2ξ = myy − βˆ 12σ 2x
(6.61)
βˆ 0 = y − βˆ 1X
(6.62)
Look at the two relationships (6.59) and (6.61) that determine the variances. It is the same element in both of these formulas—the variance of the measurement error. It is known that the variance is almost always positive. This condition allows the upper limit of this error to be determined. This problem is important in engineering practice. By analysing formula (6.59), we come to the conclusion that σ 2u ≤ mXX X whereas by appropriately transforming pattern (6.61). it can be stated that: σ 2u ≤ mXX X −
2 mXy
myy
which is a stronger restriction than the previous one. And further σ u ≤ mXX X −
2 mXy
myy
(6.63)
The right side of inequality (6.63) determines the maximum of the allowable average measurement error that can be taken into consideration when examining this regression analysis. Express this limit as the percentage of the average value of the variable x that yields: 2 ⎞ mXy σu 100 ⎛ 100 = m − ⎜ XX ⎟ X X ⎝ myy ⎠
Book.indb 190
(6.64)
12/9/2013 12:27:27 PM
Synthesis of data—regression analysis 191 Pattern (6.64) determines the upper limit of the measurement error which cannot be exceeded in this regression analysis as a percentage. The matrix of the variance–covariance of the structural parameter estimators (6.60) and (6.62) is given by the formula: ⎡1 2 2 ˆ ˆ ⎢ n Sv X V (β1 ) ⎢ ⎢⎣ XVˆ (βˆ 1 )
ˆ ( ˆ )⎤ 1 ⎥ ⎥ ˆ(ˆ ) ⎥ 1 ⎦
(6.65)
where now: Sv2
(
1 n ∑ yi n − 2 i =1
y βˆ 1 (X i
) 2
)
(6.66)
1 mXX Sv2 + βˆ 12σ u4 Vˆ (βˆ 1 ) = n −1 σˆ 4x
(6.67)
v r B1u
(6.68)
and the random variable
■ Example 6.6 In the article by Pyra et al. (2009), the discussion was related to selected problems of blasting and the impact of shock waves that are generated by setting off explosives. This problem was studied in connection with a surface mining operation. Some statistical data were analysed, the relationship between the speed of propagation read off from a measuring device and the air pressure shock wave, among other things. This pressure was also taken from the gauge. Let us use the data which are in this article. This information is presented in Figure 6.18. We made only one correction here assuming that the point (0, 0) belongs to the data.
Book.indb 191
12/9/2013 12:27:31 PM
192
Statistics for mining engineering
Speedometer readings, mm/s
3 2.5 2 1.5 1 0.5 0
0
200
100
300
400
Pressure, Pa
Figure 6.18. Relationship between the speed of propagation read off from a measurement device and the air pressure shock wave (Pyra et al. 2009).
For the information presented in Figure 6.18, we have: • The pressure characterised by two parameters: X
Sx = 104.9 Pa
1 11
• The speed also characterised by two parameters: y 1 03
Sy = 0.73 .73
/
/s
Presume now, for the time being, that both variables are given precisely, i.e. without errors. If so, the regression function of these variables can be found by applying the classical regression model. This path of reasoning gives the following estimates of the unknown values of the structural parameters: b1
3
.8
b0
1.7 10 −3
A graph of the function: y(x) = b1x + b0 is shown by a continuous line in Figure 6.18. Let us make an estimation of the standard deviation of the random component ξ of the model: Sξ =
Book.indb 192
n 1 ∑ ( yi n − 2 i =1
y xi
)2 = 0.14
/ /s
12/9/2013 12:27:32 PM
Synthesis of data—regression analysis 193 Presume now that the variable x—the pressure—is estimated imprecisely and that the standard error of estimation is known, is stable and equals σu. Make an estimation of the limit in the accuracy of the measurement. The estimation of the empirical product moments is as follows: Xy
75.288
myy = 0.53
mXX = 1.101 × 10 4
and we are able to estimate the matrix of the product moments: ⎡ myy ⎢m ⎣ Xy
myX ⎤ mXX ⎥⎦
Taking into account relationship (6.63), we have σ u ≤ 20.18 Pa which represents 13.4% of the average value of the variable X. Assume for the purposes of our analysis that the standard deviation that determines the accuracy of the measurement of the variable x equals: 4; 8 and 12% of the average value of X. The results of estimations of the structural parameters of the regression function and the standard deviations are presented in the table below where: b11—The estimation of the structural parameter standing by the variable X b00—The estimation of the free term Sx—The estimation of the standard deviation of the variable x Sξ—The estimation of the standard deviation of the random component ξ Sv—The estimation of the standard deviation of the random variable v. σu
b11
b00
Sx
Sξ
Sv
formula
(6.60)
(6.62)
(6.59)
(6.61)
(6.66)
Pa
10−3 mm/s Pa
mm/s
Pa
mm/s
mm/s
6.86
−0.002
104.76
0.13
0.14
6.93
−0.01
104.23
0.11
0.15
7.05
−0.03
103.35
0.06
0.15
– 0.04 X – 0.08 X – 0.12 X
The plots of the function for three analysed cases are shown Figure 6.19. Let us analyse the most important information contained in this figure. Firstly, the value of parameter b11 changes; its value increases with an increment in the measurement error, which causes the second parameter to decrease. Secondly, when the accuracy of the measurement worsens, the regression function performs a rotation around a certain point. This point is determined by the average values of both variables. It follows that any analysis or prediction of the variable values that are being explained that are not much different than the mean value will be correct even when the measurement error is larger. For values that are far from the average, the likelihood of statistical inference gets worse.
Book.indb 193
12/9/2013 12:27:35 PM
194
Statistics for mining engineering 2.6
σu
Speedometer readings, mm/s
2
y.1(x) y.2(x) y.3(x)
1
0
0
100
200
300
x Pressure, Pa
Figure 6.19. Regression function: the speed y of propagation vs. the pressure x with measurement errors for three levels of accuracy; y1(x) for σ u = 0.04X , y2(x) for σ u = 0.08X and y3(x) for σ u = 0.12X .
A slight decrease of the standard deviation Sx that increases the measurement error is obvious taking into account equation (6.59). Along with an increase in the size of the error there is a decrease in the importance of the explanatory variable. Similarly, as in the classical regression analysis, an investigation can be made to check the significance of the regression that has been done, i.e. verification of the hypothesis that states that parameter β1 is zero, H0 : β1 = 0. However, the verification procedure is more subtle than the previous one. It can be proved (Fuller 2006) that the statistic t=
βˆ 1 − β1 Vˆ (βˆ )
(6.69)
1
has approximately the standardised normal distribution N(0,1). However, it is recommended that this variable be treated as a variable of the Student’s distribution with n − 2 degrees of freedom. This approximation is fully justified (ibidem) when the following condition is fulfilled: σ u4 < 0.001 ( n 1) mXX − σ 2u
(
Book.indb 194
)
(6.70)
12/9/2013 12:27:36 PM
Synthesis of data—regression analysis 195 This means that it is preferred when the sample size is large and the variance of the random variable u small. If this does not hold, any interference based on statistic (6.69) should be treated as one with a reduced likelihood. Notice that so far the consideration does not deal with the issue of the latent variable x. A case often occurs in which we are interested in finding this variable. And here two cases should be considered. Looking at equation (6.48), it can be assumed that: a. The latent variable is deterministic b. The latent variable is random. Analysis of both cases will lead to the construction of two different procedures. Consider case (a). Let us change our notation a little. The model can be described as: ⎡ yi − β0 ⎤ ⎡β1 ⎤ ⎡ξi ⎤ ⎢ X ⎥ = ⎢ 1 ⎥ xi + ⎢ u ⎥ i ⎣ ⎦ ⎣ ⎦ ⎣ i⎦
(6.71)
Note, that the values β0, β1, σξ and σu are known. Equation (6.71) is the classical linear regression model in which it can be assumed that xi is the unknown parameter that is being estimated. Using the formulas that were developed on the basis of regression theory, we can state that the best unbiased estimator for the latent variable in a general case is given by the expression: i = βˆ 1 x
′
∑ −ε 1 βˆ 1
−
βˆ 1
∑ −ε
i
− βˆ 0 ,
i
)′
(6.72)
where ∑ε is the variance-covariance matrix of the two-dimensional random variable ε i ξi , ui ). If the matrix ∑ε is a diagonal20 one Σ ε = diag σ ′ξ2 , σ 2u , then equation (6.72) is reduced:
(
i = x
βˆ 1
i
)
− βˆ 0 σ u2 + βˆ 2σ 2 + σ 2 1
u
i
σ ξ2
(6.72a)
ξ
The variance of estimator (6.72) is determined by the formula: V ( i −
i
) = [(βˆ 1,1) ∑ −ε 1 (βˆ 1,1)′ ]−1
(6.73)
whereas estimator (6.72a) has a variance that is given by: V ( i −
⎡β ⎤ + ⎥ i) = ⎢ ⎢⎣ σ ξ σ ⎥⎦
−1
(67.3a)
Consider case (b)—the latent variable has a stochastic character. The number of random variables of the model increased. The variance-covariance matrix now has the form:
20
Recall, a diagonal matrix is a matrix in which the entries outside the main diagonal are all zero. The diagonal entries themselves may or may not be zero.
Book.indb 195
12/9/2013 12:27:39 PM
196
Statistics for mining engineering ⎡ β12σ 2x σ 2ξ ⎢ 2 2 ⎢β1σ x + σ ξu 2 ⎢ β1σ x ⎣
β1σ 2x σ ξ2u σ 2x + σ 2u σ 2x
β1σ 2x ⎤ ⎥ σ 2x ⎥ σ 2x ⎥⎦
(6.74)
The unbiased estimator of the latent random variable is the statistic: X i
yi + γ 2X i
(6.75)
γ 0
(1 γ 2 )X − γ 1 y
(6.76)
where:
(6.77) m zz
1 n ∑ (Zi − Zssrr)(Zi − Zsrr) n − 1 i =1
(6.78) (6.79)
Let us write the equation so that the estimations of the parameters γ 1 and γ 2 are achieved in the following form: ⎡ γ 1 ⎤ ⎡ myy ⎢ γ ⎥ = ⎢ m ⎣ 2 ⎦ ⎣ Xy
−1
myX ⎤ ⎡ myX ⎤ mXX ⎥⎦ ⎢⎣ σ 2x ⎥⎦
(6.80)
Construction of estimator (6.75) in the explicit form can be achieved based on equations (6.76) and (6.80). The variance of the estimator (6.75) can be assessed by applying formula: (6.81)
Example 6.4 (cont.) Making use of the information obtained earlier during the analysis in example 6.4 let us find the estimator for the latent variable assuming σ u = 0.12X .
Book.indb 196
12/9/2013 12:27:42 PM
Synthesis of data—regression analysis 197 Presume that the latent variable is deterministic. Using formula (6.72a), we have: xi = 114 27 yi + 0.195X i + 3.428 Presume now that the latent variable is random. Making use of formula (6.80) and (6.76) we have: xi
147 13 yi − 0.036X i + 4.296
As you can see, the formulas are slightly different. Now look at how the values of the variable x look depending on whether the mine records are treated as: 1. Correct and without errors 2. Deterministic but with random errors with a known variance 3. Randomly inaccurate. In Figure 6.20 in which, in order to be more communicative, the values of each set are connected by straight lines so that all three sets of data are visible. The information contained in this figure comprises: 1. The results of measurements; these outcomes are treated as correct and without errors 2. The calculated values of the pressure that correspond with these outcomes assuming that the measurements have random errors that are normally distributed with a zero expected value and a finite constant variance 3. The calculated values of the pressure assuming that the measurements are randomly imperfect.
Pressure measured: Randomly inaccurate
without errors without random errors 400 350
Pressure, Pa
300 250 200 150 100 50 0
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
Measurements
Figure 6.20.
Book.indb 197
Pressure in consecutive measurements depending on how the data are treated.
12/9/2013 12:27:47 PM
198
Statistics for mining engineering
Some comments on the information contained in Figure 6.20: • All three courses of the pressure are similar • The data gathered at the mines represent a kind of point of reference although the statement that the data are correct and without errors raises objections • Both courses with random components are very similar • By analysing both sets of data with random components more comprehensively, it can be stated that greater dispersion is connected with the information when three random variables are considered (the greatest number of stochastic components amongst the models that were considered) • It should be taken into account that the limitation in measurement imperfection is rather sharp, thus the differences in the courses of the latent variable are small • By analysing which assumption on randomness is closer to the reality in the mine, it looks as though the postulation on the randomly imperfect measurement of the explanatory variable is closer to reality in the mine. ◀
6.7
LINEAR REGRESSION WITH ADDITIONAL INFORMATION
The idea of this regression relies on taking an advantage of any supplementary information that the researcher sometimes has—additional in the sense that it is information outside the sample. This information can be of a different nature and it can come from different sources. It can originate from: • Theoretical considerations • Information from earlier investigations and analyses • Previously taken samples. In engineering practice we often make use of information from research that had been conducted earlier. Therefore, we are able to formulate some conditions that have to be fulfilled by the structural parameters of the regression function. In some cases these conditions are determined by strict relationships; in other cases the conditions can have a different form, e.g. some of the parameters are defined only over certain intervals. The basic purpose of this type of regression is to find the increment in the efficiency of the statistical inference by using this a priori information. In some cases the Bayesian approach is applied; information from a sample is coupled with information that comes from outside the sample. We are not going to consider the Bayesian approach here; it goes rather beyond the basic level that is presented here. At this time, we will discuss a few methods that allow a priori information about the structural parameters of the model being analysed to be used during their estimation within the framework of classical statistical inference. Additional information—exact linear limits In this model one assumption is that the additional information has the form of linear relationships that link the structural parameters together—all of them or only some of them. The information in hand can be expressed in the following matrix form: g=GB
(6.82)
where: g—a known vector of size (J × 1), J ≤ K G—a known matrix of size (J × K) B—the vector of the structural function parameters.
Book.indb 198
12/9/2013 12:27:49 PM
Synthesis of data—regression analysis 199 The information that the number of additional conditions is J is contained in equation (6.82) and obviously this number does not exceed the number of structural parameters. These conditions can have different forms, e.g. a. Some values of the parameters are known, for instance β2
β*2
g = [β2*]
and then
(6.83)
G = [0 1 0 … 0],
(6.83a)
b. Some ratios of the parameters are known, for instance β1 = f1 β2
g
β3 = f2 β2
and then
⎡1 − f1 G=⎢ ⎣ 0 − f2
⎡0 ⎤ ⎢0 ⎥ ⎣ ⎦
0 0 … 0⎤ 1 0 … 0 ⎥⎦
(6.84)
(6.84a)
c. Some linear combinations of the parameters are known, for instance K
∑β
i
=1
and then
(6.85)
i =1
g = [1]
G = [1 1 1 … 1]
(6.85a)
Let us pay more attention to the condition above. In some cases not all outcomes contained in the sample are treated in the same way during the estimation; a case may occur in which some observations are more important or have a greater likelihood than the others. In such a case weights are usually assigned to each outcome according to some presumed principle. The sum of these weights is close to unity. Such an attitude is regularly applied when an estimation of the abundance of deposits, for example gold, is carried out. This method is called kriging and relies on assigning appropriate weights to particular measurement points located in the area being estimated in order to minimise the mean squares error of estimation. In this technique greater weights are allocated to the points that lie near the testing point. This method gives the best unbiased linear estimations of the variable being analysed21. It can be proved (Goldberger 1966) that estimator b1 of the unknown values of parameters B can be determined by the formula: b1 = b + (X′X)−1G′ [G (X′X)−1G′]−1(g – Gb)
(6.86)
The estimator is unbiased. It is easy to see that this statistic differs from estimator b that is obtained from the classical regression by the expression that is the linear function (g – Gb), which means that the estimator without additional information does not fulfil the defined conditions. 21
Book.indb 199
For more on this topic see Hustrulid and Kuchta (2006, Chapter 3.10).
12/9/2013 12:27:49 PM
200
Statistics for mining engineering
The matrix of variance–covariance is given by the pattern: V1 = V – VG′(GVG′)−1 GV
(6.87)
where V = σ2(X′ X)−1 and it is the variance–covariance matrix (6.43). It is worth noting that we have achieved a profit in effectiveness. Matrix V is the positively defined matrix. The second matrix on the right side of equation (6.87) is the non-negative defined matrix. This means that every diagonal element of matrix V1 is smaller or equal to the corresponding element of matrix V. Thus, the variance of each coordinate of vector b1 is not greater than the variance of the corresponding variance of the coordinate of b. Now define two vectors of the residuals: u1 = Y − X b1
(6.88)
u2 = X(b − b1)
(6.89)
The first vector is the vector of the differences between the observed values of the variable being explained and the corresponding theoretical values that are obtained from the estimation of the structural model parameters using the conditional method. The second vector is the vector of the differences between the theoretical values of the variable being explained that are obtained from the estimation of the structural model parameters using the unconditional method and the theoretical values obtained by applying the conditional method. It was proved (Dziembała 1972) that the residual variance of variable u1 is given by the formula: Su2 =
1 n (
)
u1′
1
1
=
(
)
(
2
2
(6.90)
)
The first component of the sum is known as the residual variance which is obtained from the estimation of the parameters using the unconditional least squares method, whereas the second component is the so-called differentiating variance. The root square of the variance gives information about how the theoretical values differ from each other on average; the theoretical values obtained from the unconditional method and the corresponding theoretical values obtained from the conditional method. The following sum should be considered as the second basic measure of the stochastic structure:
∑ (y − y ) + ∑ (y = ∑ ( − ) ∑ (y n
ϕ +ϕ 2
2 1
t =1 n
t =1
t
(t ) 2 t 2
n
t =1 n
t =1
(t ) t
( t
)
− yt(tw ) − y(
) )
2
) 2
(6.91)
where y (tw ) is the arithmetic mean of the theoretical values that are obtained from the conditional method. The first component of the sum is known as the goodness-of-fit factor (6.45), while the second component is the so-called inconsistency factor. This is supported on the [0, 1] interval and it informs which part of the variance of the variable is the differentiating variance. The closer the value ϕ12 to zero, the smaller the difference between estimators b and b1.
Book.indb 200
12/9/2013 12:27:53 PM
Synthesis of data—regression analysis 201 Dziembała proposed (ibidem) that the following factor be analysed additionally:
∑ ( y y )( y y ) ∑ (y y) ∑ (y y ) n
rd 1 =
(t ) t
t
t =1
n
t =1
( tw ) t
n
2
t
(t ) t
t =1
(6.92)
( tw ) t
It is a kind of factor to measure the goodness-of-fit of the proposed model. It is supported on the same interval [0, 1] and for rd1 = 1, we have the ideal compatibility between the empirical and theoretical values. When rd1 decreases, the goodness-of-fit also decreases. Sometimes, in some practical cases, a slightly different approach can be more advantageous. This relies on first using the conditions at hand to eliminate some structural parameters and second to applying the least squares method to the reduced model that is obtained. At the final stage of analysis, we should return to the conditions in order to estimate the rest of the parameters. For example, presume that the model of interest is: y = β1 1 + β2 x2 + ε provided that β1
β2
1
Substituting we have: y = ( − β2 )
1
+ β2
2
+ε
and further y − x1 = β2 x2 − 2 x1 + ε This equation can be written as y* = β 2
*
+ε
By applying the least squares method, one obtains an estimate b2* and next we make use of the condition to obtain b1*
b2*
Additional information—estimates of structural parameters Assume now that the additional information is in the form of the unbiased estimators of some structural parameters of the linear model. Such a situation occurs, for instance, when there is a continuation of a previous investigation. Consider the relationship as divided into blocks: y = X1 B1 + X2 B2 + E
(6.93)
Presume that vector b*1, which is the unbiased estimator of vector B1, is known, i.e. b*1 = B1 + h
Book.indb 201
(6.94)
12/9/2013 12:27:55 PM
202
Statistics for mining engineering
where h is the vector of size (p × 1); 1 ≤ p ≤ K and it is the vector of the random errors of the estimates components of vector b*1. Assume also that E(h) = O
E(h E′) = O
(6.95)
Information from the sample taken and the additional information can be connected and therefore the following equation can be written: ⎡ y ⎤ ⎡X ⎤ ⎡E ⎤ ⎢ b* ⎥ = ⎢ G ⎥ B + ⎢ h ⎥ ⎣ ⎦ ⎣ 1⎦ ⎣ ⎦
(6.96)
where G = [I O]. The variance-covariance matrix of the ‘enlarged’ random component is: ⎡E ⎤ ⎡ σ 2I O ⎤ ⎢ ⎥ ⎥ E ⎢ ⎥ [ E′ h ′ ] = ⎢ ⎢ ⎥ ⎢⎣h ⎥⎦ ⎢⎣ O W ⎥⎦
(6.97)
W = E(h h′ )
(6.97a)
where
Knowing vector W = E(h h′), it can be proved (Goldberger 1966) that the best unbiased estimator of vector B is the statistic: b** = (σ−2 X′X + G′W−1G)−1 (σ−2 X′y + G′W−1 b*1)
(6.98)
Consider the following example. Assume that vector B1 contains only one element, which means that G = [1 0 0 … 0] (compare formula (6.83a)). In such a case the matrix W is a scalar. Denote it as W = σ2w. Calculating we have: ⎡1 0 ... 0 ⎤ ⎢0 0 ... 0 ⎥ ⎥ 1 ⎢ −11 G ′W G = 2 ⎢ . . . . ⎥ σw ⎢. . . .⎥ ⎢⎣0 0 ... 0 ⎥⎦
and
⎡b1* ⎤ ⎢ ⎥ 0 1 ⎢ ⎥ G ′W 1b1* = 2 ⎢ . ⎥ σw ⎢ ⎥ ⎢.⎥ ⎢0⎥ ⎣ ⎦
(6.99)
The normal equations corresponding with this case can be shown as: ⎡ Σx12 ϕ Σx1x2 ... Σx1xK ⎤ ⎡b1** ⎤ ⎡ Σx1 y + ϕb1* ⎤ ⎢ ⎥⎢ ⎥ ⎢ ⎥ Σx22 ... Σx2 xK ⎥ ⎢b2** ⎥ ⎢ Σx2 y ⎥ ⎢ Σx2 x1 ⎢ . ⎥ . . . ⎥⎢ . ⎥ = ⎢ . ⎢ ⎥⎢ ⎥ ⎢ ⎥ . . . ⎥⎢ . ⎥ ⎢ . ⎢ . ⎥ ⎢ Σx x Σx ΣxK x2 ... ΣxK2 ⎥⎦ ⎢⎣bK** ⎥⎦ ⎢⎣ ΣxK y ⎥⎦ K 1 ⎣
Book.indb 202
(6.100)
12/9/2013 12:28:02 PM
Synthesis of data—regression analysis 203 whereas ϕ=
σ2 σ w2
(6.101)
The only difference between the above set of equations and the set of the normal equations that are obtained from the least squares method is: − The first entry upper left in the matrix X′X − The first upper entry in the vector X′y. The method just considered requires accurate knowledge about variance σ2 and the matrix W to the proportional coefficient. If these parameters are unknown, their estimation can be used, however the solutions obtained will only be approximate. For example, by applying the unbiased estimator of variance, σ2 can be obtained using the least squares method (without any conditions) and the unbiased estimator of W can be achieved from the regression in which b*1 was determined22. Intuitively, it can be stated that using conditional estimators makes sense only if their variances are small. If, however, their dispersions are high, then this a priori information is poor and it does not mean much in the interference. Therefore, it can be omitted. ■ Example 6.6 Data for this example are taken from Ścieszka’s investigation (1971) and his dissertation (1972). In order to identify factors that have a significant influence on the wear process running in the brake linings of winders, the following function was tested as the theoretical model: I g = kpav be ξ
where: Ig—the intensity of mass wear p—the unit pressure on brake lining v—the sliding speed k, a, b—the structural parameters of the model ξ—the random component. 22
Book.indb 203
For more on this topic see, for instance, Goldberger 1966.
12/9/2013 12:28:04 PM
204
Statistics for mining engineering
This function was linearised: ln I g
l k + a ln p + b ln ln l v+ξ
and becomes a recipe for a linear function of the form: Y
0
1
1
2
2
u
The investigation of the wear process was carried out in the stand at the Mining Faculty. The data were gathered and natural logarithms were calculated from which the following sets of outcomes were obtained: ⎡ 2.0669 ⎤ ⎢ 2.5096 ⎥ ⎢ ⎥ ⎢ 2.6927 ⎥ ⎢ ⎥ ⎢ 3.0421⎥ ⎢ 2.1747 ⎥ ⎢ ⎥ ⎢ 2.7973 ⎥ ⎢3.1046 ⎥ ⎢ ⎥ ⎢3.3656 ⎥ y=⎢ ⎥ ⎢ 2.4723 ⎥ ⎢3.0 0445 ⎥ ⎢ ⎥ ⎢3.6689 ⎥ ⎢ 4.0490 ⎥ ⎢ ⎥ ⎢ 3.2308 ⎥ ⎢ 3.7171⎥ ⎢ ⎥ ⎢ 4.3624 ⎥ ⎢ ⎥ ⎣ 4.7741⎦
⎡5.9130 ⎢6.6063 ⎢ ⎢7.0116 ⎢ ⎢7.2608 ⎢5.9130 ⎢ ⎢6.6063 ⎢7.0116 ⎢ ⎢7.2608 x=⎢ ⎢5.9130 ⎢6.6063 ⎢ ⎢7.0116 ⎢7.26008 ⎢ ⎢5.9130 ⎢6.6063 ⎢ ⎢7.0116 ⎢ ⎣7.2608
1.6094 ⎤ 1.6094 9 ⎥⎥ 1.6094 ⎥ ⎥ 1.6094 ⎥ 2.3026 ⎥ ⎥ 2.3026 ⎥ 2.3026 ⎥ 2. ⎥ 2.3026 ⎥ ⎥ 2.9957 ⎥ 2.9957 ⎥ ⎥ 2.9957 ⎥ 2.9957 ⎥ ⎥ 3.6889 ⎥ 3.6889 ⎥⎥ 3.6889 ⎥ ⎥ 3.6889 ⎦
By making an appraisal of the structural model parameters using the least squares method, the following estimates were achieved (pattern (6.37)): ⎡ a1 ⎤ ⎡ 0.9616 ⎤ a = ⎢⎢a2 ⎥⎥ = ⎢⎢ 0.6893 ⎥⎥ ⎢⎣a0 ⎥⎦ ⎢⎣ −5.0746 ⎥⎦ The residual variance (pattern (6.44)) is: Su2 = 0.0363 The variance-covariance matrix (pattern (6.43)) is: ⎡8.728 × 10 −3 0 ⎢ V=⎢ 0 3.778 × 10 −3 ⎢ −0.058 −0.01 ⎣
Book.indb 204
−0.058⎤ ⎥ −0.01 ⎥ 0.42 ⎥⎦
12/9/2013 12:28:06 PM
Synthesis of data—regression analysis 205 The goodness of fit factor (pattern (6.45)): ϕ2 = 0.0532 and the multiple correlation coefficient R = 1 − ϕ 2 = 0.973 This value is high and looks substantial. Let us check it statistically. A hypothesis is formulated that states that there is no significant correlation between the random variable being explained and the explanatory variables, H0: ρ = 0 against and alternative hypothesis is that rejects it. Presume a level of significance in our reasoning α = 0.05. We have the sample size n = 16 and the number of variable K = 3. Thus, the critical value for the multiple correlation coefficient is (Table 9.15) 0.608. The empirical value is high and is above the critical value. There is a ground to reject the basic hypothesis. The model can be accepted. Notice that the analysis presented here is carried out in the area of linearised function, not the original function. A year before this investigation a similar examination had been carried out (Ścieszka 1971) in which the main point of interest was sliding speed and the form of the function was also a power one. At the end of the investigation, the estimate of the power exponent obtained whose value was 0.6508 and the variance equalled 0.0615. Looking at both estimates of this power exponent, it looks as though they are similar. Let us check how our assessment will change if we include the information from the previous investigation into our procedure. Consider formula (6.99). Construction of both patterns takes into account information about the first structural parameter; in our case, it is the second parameter. So, rearranging both patterns appropriately and using formula (6.98), we have: ⎡a0* ⎤ ⎡ 0.9616 ⎤ ⎢ ⎥ a* = ⎢a1* ⎥ = ⎢⎢ 0.6871 ⎥⎥ ⎢a2* ⎥ ⎢⎣ −5.0687 ⎥⎦ ⎣ ⎦ By comparing both sets of estimates of the structural parameters, we observe that the differences are very small, as was expected. Let us make an assessment of the residual variance. By applying formula (6.90), we get: Su2 = 0.0337 The accuracy of our inference increases somewhat. However, this increment does not change the estimate in the multiple correlation coefficient (a change is observed for further decimal places). ◀
Book.indb 205
12/9/2013 12:28:11 PM
This page intentionally left blank
CHAPTER 7 Special topic: Prediction
7.1
INTRODUCTION AND BASIC TERMS
It is a good practice that the basic terms, together with their definitions, which are associated with this field are presented before any study of problems from a given area. Usually such an approach makes the considerations that are conducted unambiguous and communicative. But in some cases, although rare, this principle fails. Before we clarify such terms as prediction, prognosis, predictor and a few other expressions that are connected with forecasting, let us commence our consideration from the term ‘anticipation’. Anticipation (prescience) is an inference about unknown events that is based on events that have happened and that are known. These unknown events can be located in the future; they can also be located in past, but the main feature is that they are unknown (unidentified), e.g. evaluating the abundance of a mineral deposit through test drillings. An inference on events that will happen in the future that is based on information from the past is called predicting (forecasting) the future. This act of predicting can be rational or irrational. A rational forecast is when the inference is based on a logical process that runs from premises, i.e. from a set of facts that belong to the past along with their proper interpretation towards their conclusions. We call this a scientific prediction on future events when the process of the inference is based on the rules of science. Among the problems that are connected with a general prediction1 of the future is a subarea that is associated with the use of logical tools for forecasting, and this scope is called scientific forecasting or a scientific prediction. It is characterised by an approach that that is based on a research process that comprises learning about the past, i.e. gathering the data and diagnosing them by applying an appropriate method—appropriate in the sense that the model possesses the property of using the data concerning the past to infer future events. This property is usually expressed by a suitable mathematical component in the model being used that indicates that the inference concerns the future. Moreover, this component should change with time because usually the further into the future that we are discussing, the less precise is our inference2. However, in some engineering areas a degenerated approach to prediction is presented that relies on the assumption that what has happened in the past will be repeated unchanged in the future. And then it is not necessary to have any component that is associated with forecasting, and the term ‘prognosis’ is also not required. In such a case, it is hard to call it a prediction, and only modelling remains3. Such an approach can often be found, for instance in reliability books (see for instance Dovitch (1990), Smith (2007), O’Connor (2005)); however the term ‘prediction’ is there used. 1
Cramér said ‘prediction is the practical aim of any form of science’ (1999, p. 339). We ignore here the precision of displacement of—for example—planets; the prediction horizon can be extended very far and the precision of the inference will still be high. 3 O’Connor writes openly: ‘reliability prediction, i.e. modelling’ (2005, p. 75). 2
207
Book.indb 207
12/9/2013 12:28:13 PM
208
Statistics for mining engineering
An essential term that is associated with prediction is the word ‘prognosis’. Let us cite some of the scientific definitions of this term4. ‘Any judgement in which truthfulness is a random event of known and high enough probability’ (Hellwig 1963, Cieślak 2001, p. 20). ‘Future value of a stochastic process’ (Gichman and Skorochod 1965). ‘A function’ (Goldberger 1966). ‘Prognosis is a number’ (Benjamin and Cornell 1970). ‘It is a particular (numerical) result of an inference process of the future’ (Pawłowski 1973). ‘A random variable’ (Czaplicki 1976). ‘A judgment of unknown states of physical objects’ (Rybicki 1976). ‘A specific result of prediction’ (Greń 1978). ‘Prognosis is a state of the predicted variable belonging to the future’ (Cieślak 2001, p. 37). ‘Prognoses are made by means of models, judgements, and models and judgements, and they are final product of the forecasting process’ (Kasiewicz 2005). ‘Estimated future value of the sequence’ (Bielińska 2007). There is no doubt that a mining engineer may feel lost in this area; however, this diversity of definitions can be partly justified by the multiplicity of prognostic situations, the different goals of prediction and the variety of methods applied. A typical engineering situation in which problems of prediction have been considered in many specialised articles and conference papers since the early 1970s is reliability although here the situation is no better when a general approach is concerned. Melchers (1999) in his extensive book that had the word ‘prediction’ in the title used this term only twice in the whole book. In books concerning reliability in mining engineering (Dhillon 2008 and Czaplicki 2010a), the problem of prediction does not occur; in many reliability books, prediction in fact only means modelling. There is also a problem of how to understand a formula that allows a prognosis to be obtained. This ‘recipe’ is termed a ‘predictor’.5 ‘A quantity giving a prognosis is a stochastic process’ (Gichman and Skorochod 1965). ‘A quantity giving a prognosis is a random variable’ (ibid em). ‘It is a function’ (Benjamin and Cornell 1970). ‘Operator, function’ (Greń 1978). ‘Functional’ (Pawłowski 1973). ‘Stochastic functional’ (Czaplicki 1976). ‘Random variable, functional, element or transformation’ (Rybicki 1976). What a wealth of approaches, concepts and ideas. However, an engineer likes to move on the solid ground of exact sciences. Thus, let us now create some order in the material above. 1. Not wanting to formulate another definition of prognosis and prediction, let us presume the following statements for our further study: • Prediction is the process of inference on an unknown current state or future state of the external world • The result of this process of inference is prognosis • Prognosis can be a number, a function (in a particular random variable or stochastic process); it can also be a matrix (deterministic or stochastic) 4
On the Web the word ‘prognosis’ is frequently associated with medicine. Sometimes predictor means a formula for determining additional values or derivatives of a function from the relationship of its given values or is a term used for an independent variable.
5
Book.indb 208
12/9/2013 12:28:13 PM
Special topic: Prediction 209 2. A recipe that is used in prediction is every functional that ascribes a prognosis to each model that is applied to define the course of the variable being predicted 3. Each procedure in prognostic inference is based on some assumptions; two main ones are6: a. There is information on the course of the magnitude that will be predicted; this information concerns its past, or it can be current information and it is in fact a sample in a statistical sense b. The properties of this course are stable overtime 4. Each prognosis should be calculated together with the appropriate measure of the accuracy of the prediction (this is a so-called basic postulate). An analytical description of a predictor
can be expressed as:
= ΦT [G(Y )]
(7.1)
where: Φ—operation that should be performed to get a prognosis G—model describing the course of the variable that is being predicted Y—the variable that is being predicted T—the period for which the prediction is being done. Looking more carefully at formula (7.1), two additional terms should be determined. An approach to the construction of a prognosis that relies on selection of a form of operator Φ will be called the principle of prediction. The application of a particular principle of prediction to one class of the models that describe the course of the variable being forecasted will be called the method of prediction. In econometrics one method of prediction, which relies on determination of the expected value of the variable being predicted, is very often applied. This principle is based on the reasoning that errors in plus and errors in minus create a balance and no systematic error7 will be made. Consider, for example, a model that describes the course of variable Y that is given by the formula: k
Y( )
∑α X ( ) + ξ i
i
t
i =1
and we are interested in obtaining the prognosis for variable Y(t = T) presuming an unbiased principle of prediction. If so, expression (7.1) takes the form: ⎧k ⎫ k ΦT {G [ (T )]}} E ⎨∑ α i X i (T ) + ξt =T ⎬ = ∑ α i E [ ⎩ i =1 ⎭ i =1
i
(T )] + E (ξt T )
If the least squares method was applied to estimate the structural parameters, the random variable ξ will have the normal distribution of zero expected value. If, additionally, there is no autocorrelation in the random component, we have: k
∑α i =1
i
i
ξt T )
k
∑ α E[ i
i
(T )]
i =1
Notice a certain subtleness. Usually, we don’t know the exact values of the explanatory variables that will be taken by them in the future. Thus, we have to treat these variables as 6
In some particular cases, this list is longer, e.g. there is knowledge on values of explanatory variables for the period being predicted (see for instance Pawłowski 1973). 7 In prediction theory, we say an error of the predictor, error of the prediction procedure (sometimes called error of prediction for short) and error of prognosis. The first one has a theoretical meaning only, the second one is connected with the prediction method that is applied, and the last one is the difference between the prognosis and the real value of the variable being investigated.
Book.indb 209
12/9/2013 12:28:14 PM
210
Statistics for mining engineering
random and the above pattern is correct for this reason. Nevertheless, if these future values are known (from a theoretical consideration, for instance, or if we knowingly and intentionally presume these values), then the model used for prediction is simplified and the problem of forecasting becomes minor. However, in engineering considerations an approach that is based on expected values is correct in some cases but in some other cases it is not correct. An error of prognosis, for instance, that relies on underestimating the wear magnitude of a hoist head rope operating in a mine shaft can have serious repercussions compared to overestimating this rope wear. A long list of similar examples can be enumerated in mining engineering8. In prediction theory there is a well-known principle that if a prognosis can only be done once and will not be repeated, it is better to select a mode of the variable being forecasted because it has the greatest chances of occurring. In some cases weights are given to any result for which overestimating or underestimating the variable forecasted will probably occur and these weights are important components of the prediction procedure. In some other cases, it is better not to consider the point estimation (prediction) of the variable of interest but a prediction interval paying special attention to any area that is connected with a possible crossing over of the limited value by the forecasted variable. In a case in which the postulates associated with the prediction are concerned, often an additional postulate is formulated that concerns the desirability of the efforts necessary to achieve a high degree of effectiveness of the prediction (see for instance Pawłowski 1973); however, it is not entirely correct. It was proved that when an optimal decision is being taken, a prognosis that is less accurate can be more useful; one with a lower likelihood (Winters 1960). It was also proved that sometimes a situation can happen in which the use of the prognosis that was obtained is useless or can even be adverse (Sadowski 1977).
7.2
SUBJECT OF PREDICTION
Taking into account a meritum of the consideration of the problems of prediction in the engineering world, problems of prediction can be divided into two groups: • Forecasting of future realisations of random variables, stochastic processes and (rarely) random fields9,10 • Forecasting of future realisations of the parameters and characteristics of random variables, stochastic processes and random fields. Where mining engineering is concerned, the first group of problems are mainly connected with the diagnostic and operational issues of a technical object as well as with econometric issues. In mine practice, an engineer must make a decision of whether to allow the further use of a hoist head rope in the main mine shaft by predicting the state (degree of wear) of this rope in the near future (at least until the date of the next inspections). The process of rope wear has a stochastic character. When forecasting the future surface subsidence, an engineer must make a decision about whether to continue the current underground extraction process or to change it significantly. The process of surface deformation has a random character. When estimating the course of the commodity price of a mineral on the world market, a mining 8
Errors in prediction are generally divided into ex-ante and ex-post if the criterion for the division is time. 9 However, sometimes, we are interested in a single number only. 10 A method of prediction of non-stationary–stationary stochastic field was presented for example in Czaplicki’s article (1977a).
Book.indb 210
12/9/2013 12:28:17 PM
Special topic: Prediction 211 engineer must make a decision to continue the operation of a mine or to change its course significantly (to speedup or to slow down). These changes have a stochastic nature. When observing the development of a pit, an engineer may come to the conclusion that the removal of the overburden is too slow and that it threatens the level of production and that he must make a decision to accelerate removal of overburden in order to avoid economic losses; all based on a prediction. Thus, all of these problems can be considered on the ground of the extrapolation of stochastic processes; in some special cases—stochastic fields. Observe that in mining engineering prediction is usually directly associated with decision making, which as a rule has significant after-effects either in economics or in safety or both. Sometimes tracking changes in economic magnitudes that are connected with a mining time series are obtained and their analysis, decomposition and the identification of particular components are difficult, time consuming and require good knowledge and proficiency in the statistical area. An example of such a procedure will be given in Example 7.1, which is a continuation of Example 4.8. The second group of problems are mainly connected with reliability prediction. When observing the realisation of a given diagnostic parameter of a technical object, it is easy to come to the conclusion that its changes have a random character. Some parameters are so important that if they go above or below defined limits, they can have serious repercussions. Mining operations are often connected with safety problems and there is no way to ignore them. Depending on the character of the observed variable whose value will be forecasted, we say it is a prediction of: • • • • • •
Stochastic chains Time series Stochastic streams (fluxes) Processes of changes of states Continuous random processes Stochastic fields.
The prediction of stochastic chains is mainly used in forecasting any realisations of wear processes as well as in the renewal processes of technical objects and in predicting the occurrence of special events. A basic model here is the Markov chain. By predicting the processes of the wear and renewal of technical objects and having some a priori information, it is possible to construct a prognosis (Koźniewska and Włodarczyk 1978) of: − the predicted distribution of the number of technical objects of a given age interval at a given moment in time − the predicted number of a given subpopulation at a given moment in time − the predicted number of renewals at a given moment in time. This type of prediction is a passive one. The term ‘passive prognosis’ usually means such a prognosis for which the future realisation of a variable is a direct consequence of the actions of a certain stochastic ‘mechanism’ and this action is stable over a certain period of time. In some cases, the point of interest is a so-called active prognosis that is based on a random process that is the source of information and that is accompanied by decisions to change the course of the process in the proper direction. An active prognosis helps a suitable decision to be made. Such a forecast is not a prognosis in the common sense (Koźniewska and Włodarczyk 1978). When data are collected through discrete notations, then the information has the character of a time series. In such a case, the prediction is a procedure composed of several stages. The researcher who has the data selects the appropriate method of the extrapolation of the time series and then follows the steps that are associated with this method. Frequently, the core
Book.indb 211
12/9/2013 12:28:17 PM
212
Statistics for mining engineering
of consideration is either such a mathematical depiction of the course of the investigated variable that faithfully describes its path and that enables forecasting, or a decomposition of the time series is done before the forecast that gives the appropriate tool for prediction. An example of such decomposition was discussed in Example 3.8. Actually, there are many methods for the prediction of a time series, which are mainly applied in econometrics (see for instance: Holt (1957)11, Brown (1959), Hellwig (1963), Box and Jenkins (1976), Clements and Hendry (1998), Armstrong (2001), Chatfield (2001), Bowerman et al. (2005)). In some cases these methods are useful for mining engineering when the study concerns the future courses of the prices of mineral commodities on the world market, the demand for a given mineral commodity etc. The models that are applied in these cases are usually in the form of a classical mathematical description of trends that are accompanied by a conventional analysis of the statistical properties of the data. An example of such a way of prediction will be presented in the next subchapter. In some particular cases when there is no possibility to apply such models and for which there is also no way to apply a cause-and-effect pattern because of many stochastically dependent variables, a model of autoregression is used, often with success. Obviously, memory in sequence should be observed. Such an approach to inference in the future will be shown in Example 7.2. Problems with forecasting stochastic streams usually comprise issues such as: − the prediction of the parameters and characteristics of impulse processes (impulse frequently means failure) − the prediction of the parameters and characteristics of the times between impulses. The most commonly investigated topics in this class of prediction problems are: the prediction of the number of failures in a given time period and the prediction of the time to the nearest failure (e.g. Cunningham et al. (1973), Czaplicki (1976)). The basic information that is needed to study stochastic streams is the identification of: − the essential properties of the stream being investigated (singularity or not, stationarity or not, the existence of memory or not) − the distribution of the time between successive impulses − the stream parameter (in some cases this can be a function) − the distribution of the number of impulses that can appear at a given moment in time − the stochastic relationships that exist between the above-mentioned stream characteristics. In the theory of exploitation the term ‘operation process of a technical object’ is usually understood as the process of changes of states (Czaplicki 2010). Its past, current and future properties are of interest from the operational and reliability points of view. An interval prediction of parameters for the work-repair process of the Markov type will be given in Example 7.3 as an example of such an issue. The area of prediction also includes issues that are connected with forecasting in durability investigations. The most interesting problems are: the prediction of the length of the investigation, the problem of how many failures will be recorded during the investigation and the application of the prediction to shorten the length of the investigation12.
7.3
EXAMPLES
We will discuss three examples of prediction—three different models to describe the courses of the forecasted variables from three different areas of mining engineering. The first two 11 12
Book.indb 212
See Gelper et al. 2008. See for instance Czaplicki (1980) and (1981a).
12/9/2013 12:28:18 PM
Special topic: Prediction 213 cases are taken from practice, the third, which is theoretical, concerns the reliability problems of single items and their systems whose process of changes of states is of the Markov type. The first two studies were especially selected in order to show not a quick simple reasoning but a procedure in which many steps are needed and for which sophisticated statistical tools are sometimes required in order to achieve the final result. Such a scheme is closer to the reality of mining engineering and has a didactic nature. ■ Example 7.1 (Continuation of Example 3.8; based on Manowska’s dissertation 2010) Our consideration is connected with the mass of hard coal that was sold in Poland around the end of the 20th century for which the final formula that describes the time series that was observed after its decomposition will be presented. This pattern was as follows: y(t ) = yˆS (t ) + yC 1 (t ) + yC 2 (t ) + ξt Continuing the previous analysis, a study of the pure random component ξt should now be made. The properties of this component should be identified by analysing the time series of the residuals (here: differences) that are determined by general pattern: u(t ) = y(t ) − [ yˆS (t ) + yC 1 (t ) + yC 2 (t )] An analysis of the time series of residuals should comprise several points, namely: a. Verification hypothesis to determine whether the series is a stationary one by applying, for instance, a test based on the Spearman’s rank correlation coefficient b. If the series is stationary, calculating the average value of the residuals c. Verification of a hypothesis that states that this calculated mean is insignificantly different from zero13; e.g. by applying the test using the Student’s t statistic d. Calculation of the standard deviations of the residuals for the first and for the second half of the sample; verification of a hypothesis that states that the calculated values differ insignificantly from each other e. If both standard deviations differ insignificantly from each other, calculation of the standard deviation of the residuals for the whole sample f. Verification of the hypothesis that states that there is no autocorrelation between the sequences of the residual values. Let us briefly discuss the above-listed points. If the procedure of the decomposition of the time series was made properly, we can expect that the series of residuals is stationary. This gives meaning to point (b) and we can be certain that verification of the hypothesis that states that this calculated mean is not significantly different than zero gives a positive result, i.e. there is no systematic error in the deviations. Point (d) is a more subtle point of the analysis being conducted. However, taking into account that the cyclic component that was traced consisted of two pieces, we may suspect that the dispersion of the residuals should be stable over time; however, this is only a supposition. This gives meaning to the next point (e). The last but one point (f) concerning autocorrelation in the sequence of the residuals is free of any suggestion in this regard. The result of the investigation is unknown and the only solution is to apply the appropriate statistical test. The outcome of this study is important if a prediction of the time series is to be done. 13
As a rule the least squares method is applied to estimate the systematic component. It should ensure that the average value of the residuals equals zero. If this value is different, it is usually only slightly different, which is a result of rounding during calculation.
Book.indb 213
12/9/2013 12:28:18 PM
214
Statistics for mining engineering
Let us analyse these points one by one. The sequence of the residuals in relation to time is presented in Figure 7.1. Let us first check whether this sequence is independent of time. Formulate a hypothesis H0 that states that there is no dependence of time versus the alternative hypothesis that rejects it. By applying the test for stationarity based on the Spearman’s rank correlation coefficient, we have (pattern (3.18) and (3.19)): rS = 1 −
6 × 594052 = 0.1298 160(1602 − 1)
Let us compare this empirical value with the critical one. By applying formula (3.23) we have: rS (
.05; n
u1−α 1.645 = = 0.1305 n −1 159
)=
By comparing these two values, we see that the empirical one does not exceed the critical one, which means that there is no ground to reject the hypothesis H0. Thus, we can conclude that the sequence of residuals is a stationary one. However, because both values are quite close to each other, the result obtained should be treated cautiously. By calculating the average value of the residuals, we have: u = −41.5 tonnes Formulate a hypothesis H0 that states that this value differs insignificantly from zero versus the alternative hypothesis that rejects it. Presume the level of significance α = 0.05. If it is presumed that the residuals can be satisfactorily described by the normal distribution, then the statistic that can be applied is from the formula: t=
u −0 n su
where su is the estimate of the standard deviation of the residuals that has the Student’s distribution with n – 1 degrees of freedom provided that the basic hypothesis is true. By calculating, we obtain: t=
u −0 −41.5 n= 160 = −0.718 su 731
2000
Tonnes of hard coal
1000 0 1
5
9 13 17 21 25 29 33 37 41 45
49 53 57 61 65 69 73 77 81 85 89 93 97 101 105 109 113 117 121 125 129 133 137 141 145 149 153 157
−1000 −2000 Months −3000 −4000
Figure 7.1.
Book.indb 214
The sequence of residuals versus time.
12/9/2013 12:28:18 PM
Special topic: Prediction 215 In Table 9.3 we look for such a value for the presumed level of significance α that corresponds with the sample size n – 1 = 159. We have: t(α = 0.05; n – 1 = 159) = 1.98. The empirical value in modulo is distinctly lower than the critical one, thus there is no ground to reject the verified hypothesis, which means that the sequence of residuals can be treated as having a zero expected value. Analyse the dispersion of the residuals. Let us check whether it is constant over time. Divide the sequence in half and calculate the standard deviations for each half separately. We have: su( ) = 527.7 tonnes
su( )
The difference in the values between these parameters is substantial. If a hypothesis is formulated that states that this difference is insignificant and the ratio of the variances is used (as in Chapter 3.4) as the verifying statistic, we can immediately come to the conclusion that this ratio will have a large value. However, this ratio is the F Snedecor’s statistic and for a large sample size its critical value is quite close to unity; just a little above 1. Thus, a clear and immediate conclusion can be formulated that the dispersion of residuals decreases over time. Compare this outcome with the original data. The information that was gathered concerned the period of restructuring in the Polish hard coal mining industry and the total mass of coal sold decreased over time. The situation was due to the transition from the old system to a new one, which now has a clear economic background. Therefore, it can be expected that the trend should slowly go towards a certain stabilised level and the dispersion should decrease over time. For this reason the dispersion of the residuals should also decline, again, to a certain level. Continue the analysis of the dispersion. Divide the period of observation into four disjoint periods, each period forty elements in length. Calculate the standard deviations for each period. We have: 1028
1027.6
513.9
588.7 tonnes
It looks as though the standard deviation is stable for the first half of the sequence observed (2 × 40) as well as in the second half. The first two standard deviation values are almost identical. Check whether the second pair can be treated as the same values statistically. Calculate the ratio of the variances: 588.72 = 1.31 513.92 Compare this empirical value with the critical one presuming a level of significance α = 0.05 as usual. We have the critical value: Fα = 0.05(r1 = 40 – 1, r2 = 40 – 1) = 1.68 for the same sample sizes in both cases. The empirical value does not exceed the critical one, and therefore there is no foundation to reject the verified hypothesis that states that these two standard deviations differ in significantly from each other. Thus, we can actually state that the dispersion of the residuals was stabilised after approximately 80 months of observation. This result has serious repercussions. It seems reasonable to state that a further consideration should be conducted based on the last 80 notations only and that these data should be used to: 1. Conduct a preliminary analysis consisting of: a. the identification of the trend b. the identification of the cyclic components
Book.indb 215
12/9/2013 12:28:22 PM
216
Statistics for mining engineering c. the determination of the residuals together with an analysis of their properties d. the construction of a model of the time series that was investigated that can be used for prediction
2. Estimation of the distribution of the ex-post error of the prognosis based on data from the past a. b. c. d. e. f.
the selection of the size of a subsample from which forecasting will be commenced the identification of the model for prediction the selection of the range (reach) of prediction the calculation of the prognoses the calculation of the ex-post errors the repetition of calculations adding successive elements of the time series (up to the last but one notation) g. the identification of the statistic properties of the ex-post error versus the range of prediction 3. Prediction of the variable that is being investigated The way of reasoning is now extended and it looks as though there will be many phases to pass. Thus, a new sample size to be analysed should consist of approximately 80 elements—the most recent notations. However, taking into account that a possible cyclic component consists of a 12-month period (and probably 2 times 6), we should presume that the sample size should be a multiple of 12 elements. Therefore, our new sample size has 6 × 12 = 72 months and covers the months in the years 2002 to 2007. If the sample size is different in its length because it is not a multiple of the period, the sum of residuals very likely will not be zero. The outcomes taken into further analysis are presented in Figure 7.2. The linear trend that can be associated with the time series above can be expressed by the formula: yˆ S (t ) = −14.4 t + 8462 + ut for which the structural parameters were estimated by applying the least squares method.
Mass of hard coal [thousands of tonnes]
10000 9500 9000 8500 8000 7500 7000 6500 Months
6000 1
Figure 7.2.
Book.indb 216
7
13
19
25
31
37
43
49
55
61
67
Mass of hard coal sold versus time.
12/9/2013 12:28:23 PM
Special topic: Prediction 217 We can now verify whether the pattern found is significant from a statistical point of view. By calculating the linear correlation coefficient between random variables x and y, we have: Rx,y = −0.370 Compare this figure with the critical one assuming no stochastic dependence between the random variables being tested. The critical number taken from Table 9.13 is ≅ 0.217. Because the empirical value in modulo is clearly above the critical one, we are can assume that the trend can be depicted by the function yˆS (t ). However, the value of the coefficient is low. Relate this formula with the one that takes into account all of the data (160 elements; Example 3.8). The slope angle of the trend is now flatter than before, which means that the situation on the market is becoming stabilised. This result also gave the ground to conduct further reasoning and the residuals were calculated removing the trend from the data. The series of these residuals (first ones) are presented in Figure 7.3. The cyclic component, which was estimated applying the same method as previously, is also visible in this picture. The pattern that determined this component was: ⎛ π ⎞ yˆC 1 (t ) = sin ⎜ 2 t + ϕ⎟ A ⎝ T0 ⎠ where: T0 = 12
ϕ = 2.2
A = 721
The information contained in the formula above is important. The period of the component is twelve months, which means that the periodicity is connected with a calendar year. This information strengthens the previous conclusion that the situation is approaching stabilisation14. A further investigation was focused on tracing any second periodic component. The sequence that was tested was obtained from a calculation of the differences: y(t ) = yˆS (t ) − yˆC 1 (t ) 2000
Mass of hard coal [thousands of tonnes]
1500 1000 500 0 0
10
20
30
40
50
60
70
80
−500 −1000 −1500 Months Residuals
Figure 7.3.
14
Book.indb 217
Cyclic function
Time series of the first differences and the first cyclic function.
In many countries the amount of coal sold versus time has a cyclic component of a 12-month period.
12/9/2013 12:28:23 PM
218
Statistics for mining engineering
Again, a cyclic component was found by applying the same method of analysis as previously. A model of this component was: ⎛ π ⎞ yˆC 2 (t ) = sin ⎜ 2 t + ϕ⎟ A ⎝ T0 ⎠ where: T0 = 6
ϕ = 4.28
A = 338
And here again it is easy to read the outcome obtained—with the exception of one year, the period exists as a half year cycle. The second residuals and the second cyclic function are presented in Figure 7.4. The model of random process observed is now: y(t ) = yˆS (t ) + yˆC 1 (t ) + yˆC 2 (t ) + ξt The sequence of the third residuals was calculated removing both the trend and the cyclical constituents from the data. This sequence is shown in Figure 7.5. It is the realisation of the pure random component of the model. Let us examine its properties. Let us first check whether this sequence is independent of time. Formulate a hypothesis H0 that states that there is no dependence of time versus the alternative hypothesis that rejects it. By applying the test for stationarity based on the Spearman’s rank correlation coefficient, we have (patterns (3.18) and (3.19)): rS = 1 −
407748 = −0.093 72(72 − 1)
This figure is small and we can suspect that is not significant. Verify it formally. A statistical hypothesis that states that there is no dependence between the values of the variable occurring in time and time was formulated. The critical value for the test can be obtained using the formula: rS (
)=
.05;; n
u1− α 1.645 = = 0.185 n −1 79
2000
Mass of hard coal [thousands of tonnes]
1500
1000 500
0 0
10
20
30
40
50
60
70
80
−500 −1000 −1500 Months Residuals
Figure 7.4.
Book.indb 218
Cyclic function
Time series of the second differences and the second cyclic function.
12/9/2013 12:28:24 PM
Mass of hard coal [thousands of tonnes]
Special topic: Prediction 219
1400
900 Months
400
−100
1 4 7 10 13 1619 22 25 28 3134 37404346 49 52 55 58 61 64 67 70
−600
−1100
Figure 7.5.
Time series of the third differences.
The empirical value in modulo is below the critical one, therefore there is no basis to reject the verified hypothesis. We can assume that the sequence of the third residuals is independent of time. Calculate the average value of the residuals. We have: u = 0 tonnes Calculate the standard deviation of the residuals. Here we have: su = 502.4 tonnes Analyse the dispersion of the residuals. Let us check whether it is constant over time. Divide the sequence in half and calculate the standard deviations for each half separately. We have: su( )
su(
)
= 501.1 tonnes
We can assume that the dispersion is constant over time. The last but one property of the residuals to check is their autocorrelation. By applying formula (3.47), one gets an estimation of autocorrelation of the first order: (a) 1
r
=
∑ ∑
N −1 i =1
N −1 i =1
(ui
(ui
u1 )(u (ui
1
u2 )
N −1
u1 )2 ∑ i =1 (u (ui +1 u2 )2
= −0.031
Calculate the value of the Breusch-Godfrey statistic: χ2 ( ) (
Book.indb 219
)( c( ) )2 = 71( 71( 0.031)2
0.068
12/9/2013 12:28:26 PM
220
Statistics for mining engineering
The verified hypothesis is H0 : ρc = 0, i.e. there is no autocorrelation of the order c = 1 in the tested random variable. Read the critical value. For the given order c = 1 and presuming the level of significance α = 0.05 (Table 9.4). χα2 (
1) 3,84
The critical value is above the empirical one. We can assume that the null hypothesis is true—there is no autocorrelation in the sequence being analysed. The final property to be checked is whether the sequence of residuals can be satisfactorily described by the normal distribution. The sample size is large and for this reason the Chi-squared test of goodness of fit can be applied. An estimation of the basic statistical parameters—the average value and the standard deviation—was just done. Thus, the theoretical probability distribution is specified. Following all of the further steps described in Chapter 4.2, the Chi-squared statistic (4.32) is finally: χ2 = 10.21 The verified hypothesis states that the theoretical Gaussian probability distribution of the specified parameters describes the empirical distribution well. Presume a level of significance α = 0.05. For the number of degrees of freedom r − 2 − 1 = 5, the critical value taken from Table 9.4 is: 11.07. The empirical value is below the critical one—conclusion: there is no ground to reject the verified hypothesis. We may assume that the distribution N(0; 502.4) describes the distribution of residuals well. Now, we have the theoretical model fully defined. It is given by the formula: y(t ) = yˆS (t ) + yˆC 1 (t ) + yˆC 2 (t ) + ξt where: yˆS (t ) = −14.4 t + 8462 ⎛ π yˆC 1 (t ) = 721sin 721 i ⎜ + ⎝ ⎛ π yˆC 2 (t ) = 338 sin i ⎜ + ⎝ ξ
u
=
⎞ ⎟⎠ ⎞ ⎟⎠
(0; 502.4)
and there is no autocorrelation in the realisation of the residuals. The preliminary analysis (I) is now finished. The model specified above can be used for prediction. Now, there is no problem to forecast the further realisation of the random variable that is being discussed, say for one, two or three months in the future because the forecasted random variable is the normal one and therefore the unbiased prediction and the most likely prediction are identical. As an ex-ante accuracy measure of the prediction, the standard deviation su can be used. There is also a possibility to improve the prediction inference. The sample size, which is the main source of information, is large and for this reason we can use a certain part of it to learn about the accuracy of the prognoses. The idea in this regard is as follows.
Book.indb 220
12/9/2013 12:28:32 PM
Special topic: Prediction 221 Presume that we have information that the realisation of the random variable of interest is less, say, without the 12 last notations, which means that the sample size comprises 72 − 12 = 60 elements, which are associated with the first 60 months. Using the previous method, we are able to: − find the trend − find both cyclic components − identify the pure random component for this shorter sequence. The theoretical model for the random variable investigated is found in this way and by making use of it, we can predict the future realisation of the random variable. However, we are in possession of information about the real value that the variable has taken. Thus, the error of the prognosis can be calculated. This procedure can be repeated presuming that the sample size consists of 61, 62, … up to 72 elements. Twelve patterns for the trend will be found in this way. We can presume that the cyclic components are the same. Some important information can be obtained using this way of reasoning. Two of the most important pieces of information are: − the evolution of the trend − the error of the prognosis. Let us devote our attention to predicting only one month ahead. Having the twelve prognoses and twelve real values that were taken by the random variable, the twelve errors of the prognosis (prognosis, because it concerns still the same random variable) can be calculated. Each error is a number but we can treat this information as information about the realisation of a certain random variable. We make a randomisation of this parameter of prediction in this way. If so, the average value of the error can be estimated as well as the corresponding standard deviation. These parameters are ex-post measures of the accuracy of the prediction for the method of forecasting that was applied. What is important here is that the calculation of the error concerns the most recent notations. Let us do the calculation. Firstly, calculate twelve formulas for the trend. The proportional coefficient (slope of a straight line) increases in modulo, which means that the trend becomes more horizontal. The two trend functions that differ most in their formulas are presented in Figure 7.6. Such a change is obvious because the situation on the market developed to stability.
8500
−7.96 t + 8321.1
8400 yˆs(t)
−15.42 t + 8486 8300
8200 2
Figure 7.6.
Book.indb 221
4
6 t
8
10
12 Months
Trend functions.
12/9/2013 12:28:34 PM
222
Statistics for mining engineering
By presuming the same cyclic functions, one can calculate the prognoses. These are shown in the table below in the first column. In the next column are the real values that were taken by the random variable. The errors of prognosis are given in the last column. Prognosis t
Real values t
Error of prognosis t
7871.6 7744.3 7646.4 7364.7 6933.1 6738.3 6983.0 7578.9 8152.4 8334.3 8149.5 7760.0
7796.5 7169.7 7752.1 6699.3 6775.2 6464 6539.8 7018.4 7324.1 8606 7857.4 6688.2
−75.1 −574.6 105.7 −665.4 −157.9 −274.3 −443.2 −560.5 −828.3 271.7 −292.1 −1071.8
Look at Figure 7.7. Both realisations of the sequences—the prognosis and the real values are visible in it. Check the sequence of the errors of prognosis. This sequence has the following properties: a. There is no ground to reject the hypothesis that states its stationarity b. The growing dispersion in it is statistically insignificant c. There is no autocorrelation in it. If so, calculate the mean and the corresponding standard deviation. They are as follows:
Mass of hard coal [thousands of tonnes]
Δ = −380.5 t
d sΔ = 388.1 t
9000 8500 8000 Prognosis 7500 7000 Real values 6500 6000
Months 1
2
3
4
5
6
7
8
9
10
11
t 12
Figure 7.7. Real values of the total mass of hard coal sold in Poland and the corresponding prognosis.
Book.indb 222
12/9/2013 12:28:34 PM
Special topic: Prediction 223 Looking at these figures, we can state that: − Because the prognosis is below the real value taken by the random variable on average, we can suspect that our next prognosis will also underestimate the forecasted value; the mean error in this regard is 380 t − The ex-post error of the prognosis is 388 t and this is information about the predicted accuracy of our inference for the future15. Notice that this error is 23% smaller than the ex-ante one, which was 502 t. This means that this way of reasoning is more effective than the previous one statistically. Recall, our inference is based on the most recent (fresh) notations. ■ Example 7.2 (based on Sokoła-Szewioła’s dissertation 2011) In Example 6.4 the final model was presented that describes the vertical displacement of mining terrain situated in the area under the direct influence of a mining operation that was being conducted in one of the underground coal mines in the Silesian Coal Basin. This model was developed after the empirical and theoretical study and its ultimate form was: Δwi
0 5329900wi −1 − 0 3252678wi
0 3325874wi −3 − 0.2868859wi − 4 − ε i
Remember that Δwi is an increment in the height of the point that is being observed in i-th measurement16. This model was the basis for the prediction. It corresponds with notation G in formula (7.1). The point of interest was to forecast one step ahead. Because notations were done every two hours, the question was what the increment would be for two hours counting from the moment of last notation. It was presumed that measurements i − 1, i − 2, … were the history and for this reason the i-th measurement already belongs to the future. Such a formulated prediction problem has repercussions in relation to the model selected. All of the addends on the right side of the equation above are deterministic and known values except for the random component. So, the whole stochastic nature of this equation is connected with this component. Knowing that it has a zero expected value, we can be sure that there will be no systematic error connected with the prediction. Thus, the prediction will be unbiased. Moreover, because the Shapiro-Wilk test that was applied during the statistical analysis gave no ground to reject the hypothesis that the residuals can be described by the Gaussian distribution, then calculated prognoses will have the greatest chances of being realized; the mode equals the expected value. Hence the predictor is: = ΦT G ( ) = Δwi( P ) ⇒ = E ( − .5329900wi −1 − 0 3252678wi − 2 − 0.3325874wi 3 0.2868859wi − 4 + ) = −0.5329900wi 0 3252678wi − 2 − 0.3325874 8 wi 3 0 2868859 8 88 wi 4 = Δwi( P ) Notice the difference. The symbol = Δwi( P ) denotes the random variable which is predicted. The symbol = Δwi( P ) in this case means a prognosis concerning i-th measurement and this prognosis is a number. However, if the prediction is repeated, the model applied is identical and almost all of the data used in the prediction are the same, then the following prognoses that are calculated can be treated as the realisation of a certain random variable.
15
Often, errors of prognosis are expressed in percentages that relate to real values. Notice that all of the components of the sum are of the same signs; they are negative. This mathematical regularity has a physical background—the successive subsidence of rock masses. 16
Book.indb 223
12/9/2013 12:28:36 PM
224
Statistics for mining engineering
Moreover, an important conclusion can be formulated that the model that generates a decrement in the height of a point that is located on the surface—which is under the direct influence of the mining operation that is being conducted in the underground mine—is an autoregressive one that describes a stationary Gaussian process with memory and constant dispersion. This was proved in the cited dissertation by investigating different points in different mines. Now pay attention to the standard deviation. In the case being considered, it has an important role because this parameter is the same for the right side of the equation and for the left side, i.e. σ(Δw) = σ(ε) and this is a measure ex-ante of the accuracy of the prediction. Using the data gathered, the standard deviation was estimated obtaining: s(ε) = 0.00542969 ≅ σ(ε) Taking into account that a large sample was taken, it can be assumed that the real value is close to the calculated one17. But the main purpose of the study was to forecast sudden great tremors of high energy that would cause the sudden relatively significant displacement of rock masses and subsidence of the surface18. The author of the dissertation assumed that this should be a presage of a coming tremor of this type and she tried to trace it in the sequences of these very small values of ground subsidence. She knew that the appearance of such a precursor should have a stochastic nature. She did not expect that it would be possible to predict this great tremor using any analytical model but her attention was focused on the accuracy of the prognosis—an error value, i.e. the error of the prognosis. When making a prediction differences between prognoses and real values were regularly smaller or greater but sometimes, rarely, a great divergence was noted. And this divergence should be the precursor being searched for—it was assumed. Thus, having such rich data, successive prognoses were calculated and the difference between the real value and the projected one were also calculated. It was presumed that all of the errors of the prognoses lying in the area ±3σ(Δw) could be neglected. The successive errors of prognoses, the zone determined by boundaries ±3s(ε) and additionally, the tremors of high energy (E ≥ 7 × 103 J) are presented in Figure 7.8. Looking at this figure, we can come to the conclusion that Sokoła-Szewioła was right. During the period of observation, six tremors were noted and only one was unpredicted—the preceding error of prognosis remains in the zone. Similar results were obtained when data from a few different mines were analysed; however, the assumed level of energy was different. The specific conditions that exist in rock masses connected with geology parameters as well as with mining operations being conducted determine the level of energy that should be considered in a given mine. A separate set of problems is connected with the decisions about where to set a measurement point, how to detect rock displacements, what kind of devices should be applied, how often measurements should be done and how many etc. At the end of considerations connected with the above example, let us pay attention to some generalisation possibilities.
17
Such a large number of digits was needed because of the dimensions that were applied; this estimate was converted into the length dimension: σ(ε) ≈ 1.63 mm. 18 The term ‘relatively significant’ is specifically used here; ‘significant’ in relation to the prognosis that was made. In some cases no subsidence was noted, again, in contradiction to the forecast.
Book.indb 224
12/9/2013 12:28:43 PM
Special topic: Prediction 225
Tremors
Δwi(P) − Δwi
Tremors
Unpredicted
Successive observations
Figure 7.8. Errors in the prognoses, the zone determined by boundaries ±3s(ε) and tremors of high energy (Sokoła-Szewioła 2011).
Presume that interest is focused on a prognosis two steps ahead. Immediately, the inference is less certain because the model for prediction is: Δwi(+P )
0 5329900wi( P ) − 0 3252678wi 1 − 0 3325874wi − 2 − 0.2868859 8 wi−3 + ε
This means that the right side of the equation has two random variables, which results in an increment in the variance of the prognosis expressed by the left side of the equation. The value of the ex-ante measure of the accuracy of the prediction increases although the calculation itself is simple. This way of reasoning in forecasting uses the so-called chain principle of prediction19 at is connected with recursive equations. Let us extend the reasoning presented in the example above. Notice at first that the sequence that was the basis for the analysis and for further prediction was a sequence of differences. This means that the original components of these differences were in the primal information. However, the sequence of this primordial data Zi; i = 1, 2 …, n is nonstationary; subsidence almost always increases over time (sometimes it becomes zero and rarely does the ground rise). Instead of reasoning in the area of nonstationary processes, the author reduced the problem to a stationary process by calculating the sequence of the first differences. It is obvious that the analysis and prediction of a stationary process is much easier to conduct compared to a nonstationary one. The idea of converting data that comprise a description of a nonstationary process to a stationary one, especially when prediction is concerned, was popular in the late 1960s and 1970s. The usual way of reasoning was to simply calculate the differences in adjacent series of elements (those that were nonstationary) as was done in Example 6.4. A new sequence of first differences often occurred in the stationary one. However, sometimes the test that was applied for stationarity rejected the hypothesis that stated the stationarity of the sequence of differences. In such a case, a new sequence of differences was calculated; differences between differences. In most cases, this new sequence had a stationary character. Generally, it was recommended to make such a ‘differentiation’ until a stationary sequence was obtained. When this was achieved, prediction was 19
H. Wold seems to be the father of this principle (1964) but some researchers assign paternity to Tinbergen (1951).
Book.indb 225
12/9/2013 12:28:43 PM
226
Statistics for mining engineering
done and a prognosis was calculated in the area of stationary processes. The last but one step was to return to the original sequence with the prognosis attained, after any necessary mathematical transformations. A condition was formulated that the prognosis that was transferred to the original space should correspond with the properties of the nonstationary process. A final step was the calculation of the accuracy of the prognosis and an analysis of the result attained. It was obvious that such a way of reasoning was not suitable for all cases. This way of analysis is not adequate if the stochastic process that is being analysed has an explosive character. Thus, the terms ‘quasi-stationary stochastic process’ or ‘almost stationary stochastic process’ were formulated. A stochastic process Yt that has the following property: ∧t Yt < (1 + ω )t where: Yt means the length of the stochastic vector of Yt ϑ—constant ω—any positive number can be called a quasi-stationary stochastic process20. A characteristic feature of such a process is that any changes have an evolutionary character without a rapid pace of growth of the length of the vector Yt as time increases. Presume now that m random variables Yi ; i = 1, 2, …, m are observed that are stochastic copies of each other and that a sample of size N was taken. Presume additionally that all moments t < t0 belong to the past and all moments t ≥ t0 belong to the future. If so, the following matrix can be constructed with all of the known elements: ⎛ ⎜ y1 (t0 − N ) ⎜ Y = ⎜ y1 (t0 − N + 1) ⎜… ⎜⎝ y (t 1) 1 0
y2 (t0 − N ) y2 (t0 − N + 1) … y2 (t0 1)
⎞ … ym (t0 − N ) ⎟ ⎟ … ym (t0 − N + 1)⎟ ⎟ … … ⎟⎠ … ym (t0 1)
All of the row vectors of this stochastic matrix are stationary whereas the column vectors can be either stationary or nonstationary. Assume that the column vectors are realisations of quasi-stationary random processes. Now, if (t0 − s) denotes any quasi-stationary stochastic vector and if (t0 − s) denotes the stochastic vector of differences, then the formula that allows the stationary vector to be obtained is given by the pattern: ρ
X( 0
)
∑( k =0
ρ )k ⎛ ⎞ Y( 0 ⎝ k⎠
(7.2)
)
where: ρ is the multiplicity of calculation of the differences needed to obtain the stationary sequence: s = 1, 2, …, N − ρ. The number ρ also informs about the number of lost elements from the original sample of size N because of the calculation of the differences. If we are interested in a prognosis at a moment just at t0, then using formula (7.2), we can state that ρ
Y( 0 )(
)
X ( 0 )( ) − ∑ ( X( k =0
ρ )k ⎛ ⎞ Y( 0 ⎝ k⎠
)
(7.3)
where symbol (P) denotes the prognosis. 20
Book.indb 226
Compare Zadora (1974).
12/9/2013 12:28:47 PM
Special topic: Prediction 227 By looking at formula (7.3), we can state that by having the prognosis of the stationary process for moment t0, we are able to get the prognosis for the quasi-stationary process for the same moment. This way of reasoning can be extended (Czaplicki, Ph.D. dissertation 1975) but it will not be presented here because it is significantly beyond the basic level of considerations which is presented here. ■ Example 7.3 In Chapter 4.1 the problem of interval estimation was considered and the set of formulas that allows the confidence intervals for the parameters of technical object which the process of changes of states is of work-repair type, to be obtained. The process was presumed to be the Markov process. This means that the times of both states are independent and exponentially distributed. The reason that these patterns are presented is the fact that many of the technical objects in mining have operational processes that can be satisfactorily described by such a model. By following this line of reasoning, it appears to be advantageous to present a similar set of formulas but which are orientated to the future. The process whose parameters are the subject of our interest is stationary, which means that these parameters are independent of time. If so, it can be assumed that the interval estimations (based on the sample taken) that are obtained remain valid for the future provided that neither the method of operation nor the exploitation conditions do not change significantly. This is very simplified approach to prediction. However, there is a possibility to improve this reasoning. Assume that we are interested in the prediction intervals of these parameters for m future process cycles and that we have information on the process comprising n process cycles. We know that the random variable λ ∑ in=1twi has a χ2 distribution with 2n degrees of freedom. Analogically, it can be stated that the random variable 2λ ∑ im=1twi( P ) has a χ2 distribution with 2m degrees of freedom and the upper script (P) denotes the future (predicted) value. Consider the equation: m ∑ i =1twi n
n∑ i =1twi( P ) m
= F (2nn, 2 m )
Because the formula: n
∑ i =1twi n
= λˆ ( n )
is the estimator of the intensity of the failures of a sample of size n, then the following equation can be constructed: ⎧⎪ ⎫⎪ λˆ ( P ) P ⎨F1 (2 n, 2 m ) < ( m ) < F2 (2 n, 2 m ) ⎬ = 1 − α λˆ ( n ) ⎪⎭ ⎩⎪ where λˆ (( )) concerns the future as before. Thus, the prediction interval for the intensity of failures for m future process cycles is determined by the pattern: P{λˆ ( n ) F1 (2 n, 2 m ) < λˆ (( Pm)) < λˆ ( n ) F2 (2 n, 2 m )} = 1 − α
Book.indb 227
(7.4)
12/9/2013 12:28:53 PM
228
Statistics for mining engineering
Analogically, the prediction interval for the intensity of repair for m future process cycles is determined by the pattern: P{βˆ ( n ) F1 (2 n, 2 m ) < βˆ (( mP )) < βˆ ( n ) F2 (2 n, 2 m )} = 1 − α
(7.5)
To construct the prediction intervals for the expected values of times of states is easy and—having equation (1.119) in mind—the following equations hold: P{Tw ( n ) F1 (2 m, 2 n ) < Tw((Pm) ) < Tw ( n ) F2 (2 m, 2 n )} = 1 − α
(7.6)
F (2m m, n ) Trr(((Pm)) < Tr ( n ) F2 ( m, 2 n )} = 1 − α
(7.7)
P{
r(n) 1
where obviously: Tw ( n )
1 n 1 n twi Tr ( n ) = ∑ tri ∑ n i =1 n i =1
Now consider the quotient of two F statistics: λˆ (( Pm)) λˆ (n)
:
βˆ (( Pm)) F (2 n, 2 m ) = βˆ ( n ) F (2 n, 2 m )
(7.8)
Denote this random variable by ϑ(2n, 2m). If so, equation (7.8) can be expressed as: κˆ (( Pm)) = κˆ ( n ) ϑ(2 n, 2 m )
(7.9)
Now, we can obtain the prediction interval for the repair rate from the expression: P{κˆ ( n ) ϑ1 (2 n, 2 m ) < κˆ (( mP )) < κˆ ( n ) ϑ 2 (2 n, 2 m )} = 1 − α
(7.10)
Similarly, the prediction interval for the steady-state availability can be achieved using the equation: Â( n ) Â( n ) ⎪⎧ ⎪⎫ < Â((mP)) < P⎨ ⎬ = 1− α + − ϑ + − ϑ Â ( Â 1) (2 n , 2 m ) Â ( Â 1) (2 n , 2 m ) (n) 2 (n) (n) 1 ⎩⎪ ( n ) ⎭⎪
(7.11)
Note, that ϑ1 (2 2 ) ϑ 2 (2 n,, 2 ) = 1
(7.12)
By constructing the prediction intervals for M future cycles of the process of the series system consisting of k identical elements, one obtains the following formulas, which allow these intervals to be found: • The prediction interval for the intensity of failures from the equation: P) ˆ P{λˆ ( N ) F1 (2 Nk , 2Mk ) < λˆ (( M ) < λ ( N ) F2 (2 Nk , 2Mk )} = 1 − α
Book.indb 228
(7.13)
12/9/2013 12:28:58 PM
Special topic: Prediction 229 • The prediction interval for the expected value of work time from the equation: F (2Mk Mk, k , Nk k ) Τww(((PM) ) Τw ( N ) F2 ( Mk Mk , N Nk )} = 1 − α
P{
w( N ) 1
(7.14)
• The prediction interval for the intensity of repair from the equation: P) ˆ P{βˆ ( N ) F1 (2 N , 2M ) < βˆ (( M ) < β( N ) F2 (2 N , 2M )} = 1 − α
(7.15)
• The prediction interval for the expected value of repair time from the equation: P{
P) F (2M M , N ) Τrr(((M Τr ( N ) F2 ( M , 2 N )} = 1 − α )
r(N ) 1
(7.16)
The prediction interval for the repair rate of the system can be determined using the ratio of two statistics F (not identical ones this time), namely: P) λˆ (( M ) λˆ (N )
:
P) βˆ (( M F (2 Nk , 2Mk ) ) = ˆβ F (2 N , 2M ) (N )
(7.17)
Denote this random variable by Ω(2Nk, 2Mk, 2N, 2M). If so, the following equation can be constructed: P) ˆ P{κˆ ( N )Ω1 (2 Nk , 2Mk ,2 N ,2M ) < κˆ (( M ) < κ ( N ) Ω 2 (2 Nk , 2Mk , 2 N, 2M )} = 1 − α
(7.18)
which allows the prediction interval for the repair rate of the system to be obtained. The prediction interval for the steady-state availability of the system can be obtainedfrom the pattern: ⎧⎪ ⎫⎪ Â( N ) Â( N ) < Â((MP )) < P⎨ ⎬ Â( N ) + ( Â( N ) − 1)Ω1 (2 Nk ,2Mk ,2 N,2M ) ⎭⎪ ⎪⎩ Â( N ) + ( Â( N ) − 1)Ω 2(2 Nk ,2Mk ,2 N,2M ) = 1− α (7.19) After certain modifications, the interval estimations can be obtained for a series system that is constructed from non-identical elements (Czaplicki 1977b). Constructing the prediction interval for the repair rate of a series system consisting of k of the same elements and for the steady-state availability of this type of system, it is necessary to know the values of the random variable Ω(δ1, δ2, δ3, δ4), which is the quotient of two F statistics F(δ1, δ2) and F(δ3, δ4) for the presumed level of probability21 α. A particular case of this random variable is the random variable ϑ that appears in formulas (7.10) and (7.11), and this variable is the quotient of two F statistics with the same degrees of freedom. For the two most frequently applied probability levels α = 0.95 and α = 0.99, the values ϑα are given in Table 9.17.
21
The probability density function of
f( )
Book.indb 229
δ1 δ 2 δ3 δ 4 δ2δ 2 δ 2δ 2
Γ
( )Γ( )Γ( )Γ( ) δ3 2
Γ
δ
δ
2
this random variable is given by the formula:
∞
( )Γ ( )Ω ∫ δ1 −1 2
0 ( δ1
F
δ2
δ1 δ 2 −1 2 dF
δ1 δ 2 ) 2
( δ3 (δ
δ4 )
δ3 δ 4 2
12/9/2013 12:29:01 PM
230
Statistics for mining engineering
If the critical values of the Ωα distribution are needed, the following approximation can be applied: ⎡ k +1 k +1 ⎤ Ωα ≅ exp ⎢uα + ⎥ Nk Mk ⎦ ⎣
(7.20)
where uα is the quantile of the order α of the standardised normal distribution. The above approximation is obtained from the following reasoning. By calculating the logarithms of both sides of the equation (7.15), one obtains: P) ˆ ˆ (P) ˆ ln Ω = ln(λˆ (( M ) / λ ( N ) ) − ln(β( M ) / β( N ) )
(7.21)
Both logarithms of the right side of the equation are the Fisher’s z transformation of the statistic F. For a large M, N and k become normal distributions with a zero expected value; where the first logarithm has the variance ((Nk)−1 + (Mk)−1) while the second one has the variance22 (N−1 + M−1). For his reason, the random variable lnΩ has an approximately normal distribution with a zero expected value and the variance ((Nk)−1 + (Mk)−1 + N−1 + M−1). When the variable is being analysed, the approximation has the form: ϑα ≅
⎡ ⎢ ⎣
α
2 2⎤ + ⎥ n m⎦
(7.22)
At the end of these considerations, it looks as though it is worth recalling the obvious stipulation that the information about the past should comprise a longer period than that concerning the future. The presented relationships fulfil the mathematical requirements but now it is necessary to refer to engineering practice. There is information about ‘when the number of process cycles becomes large …’. In some cases, this constraint is difficult to fulfil in practice. There are some pieces of equipment for which the exploitation process can be satisfactorily modelled by the Markov process but these are of very high reliability, e.g. many main belt conveyors. Failures are recorded only a few times per year on average and therefore, in order to get a large sample where the process cycles are concerned, it is necessary to observe a dozen years or more. However, very often such conveyors do not work in one place for such a long period. A cardinal feature of mine transport routes is their changeability, especially where their length is concerned. From time to time, new pieces are added or sometimes some pieces are withdrawn. This problem is connected with both a large sample size and with how far statistical inference should be conducted in cases for which prediction is being analysed. All researchers should keep these things in mind when undertaking a study in the field of forecasting.
22
Book.indb 230
See formula (1.125).
12/9/2013 12:29:05 PM
CHAPTER 8 Explanations of some important terms Correlation—a certain kind of stochastic relation between two or more random variables; it relies on such a regularity that any changes in the values of one variable are accompaniedby systematic stochastic changes in the values of the second variable or other variables. Correlation coefficient—a basic measure of the strength of the stochastic relationship between the random variables being investigated Critical region of test—a region of the rejection of the verified statistical hypothesis; the region is determined by the test that is applied. Degrees of freedom (the number)—the number of independent outcomes of the observation reduced by the number of relationships that connect these outcomes among themselves. When an estimation of the structural parameters of the regression function is done and their significance is tested, then the number of degrees of freedom equals the number of observations reduced by the number of parameters that are being estimated. Error of type I (error of the first kind)—an error that may be made during the verification of a statistical hypothesis; it relies on the rejection of the true hypothesis. Error of type II (error of the second kind)—an error that may be made during the verification of a statistical hypothesis; it relies on the approval of the false hypothesis. Estimation—the process of finding an estimate; an approximate calculation; in mathematical statistics a chapter on such a statistical inference that deals with the assessment of the unknown values of parameters in the general population based on a sample taken from it. Interval estimation—such a method of the assessment of the unknown value of the general population parameter that relies on the construction of a numerical interval of a random length that covers the unknown value of the parameter with a presumed a priori level of the probability. Point estimation—such a method of the assessment of the unknown value of the general population parameter that this value is assumed to be the value of its estimator based on data taken from the sample. Histogram—a graphical representation of a function that assigns a number of observations falling within it to each discrete interval (bin) of the investigated variable; a histogram may also be normalised in order to display the relative frequencies that show the proportion of cases that fall into each of several categories, with the total area equaling 1. Hypothesis (statistical)—any supposition concerning an unknown distribution or parameters of the general population for which this supposition is verified based on a random sample taken from this population. Null hypothesis—the basic statistical hypothesis that is being verified. Alternative hypothesis—any statistical hypothesis that is a competitive one to the null hypothesis.
231
Book.indb 231
12/9/2013 12:29:08 PM
232
Statistics for mining engineering
Intensity of failures 1. For nonrenewable technical objects (i.e. working to the first failure occurrence), it is the conditional probability that a failure will occur in time unit t + Δt provided that until time t no failure has occurred. 2. For renewable technical objects, it is the unconditional probability that a failure will occur; it is the reciprocal of the expected work time between two successive failures; dimension: failure per unit of time. Interval, confidence—a random interval determined by the estimator distribution; this interval has such a property that it covers, with a presumed a priori probability (level of confidence), the unknown value of the population parameter or parameters. Least squares method—a method for the estimation of the parameters of the regression function based on empirical data shown in the form of a sequence of numbers. The method relies on such a selection of the values of the parameters of the approximate function so as to achieve the minimum of the sum of squares of the deviations of the empirical points from the corresponding theoretical points as determined by the approximation function. The method of least squares is a standard approach to the approximate solution of over-determined systems, i.e. sets of equations in which there are more equations than unknowns. Level of confidence—the presumed, near to 1, probability that the confidence interval covers the unknown value of the general population. Most frequently, the presumed level of significance is 0.10; 0.05 or 0.01. Level of significance—the probability, presumed near zero, of making an error of type I; most frequently the level is presumed to be 0.1; 0.05 or 0.01. Parameters (of the general population)—parameters of the distribution of the random variable being tested from the general population; they characterise this distribution in a synthetic way. Usually parameters are divided into several groups: measures of an average level (e.g. mean, median), measures of dispersion (e.g. variance, standard deviation), measures of asymmetry, measures of concentration and other statistical measures (e.g. correlation); these measures are applied during the statistical study of a population. Population, general population—a set, any finite or infinite aggregation of elements (homogeneous, but not identical) from which samples are drawn. Regression—the analysis or measure of the association between random variables; the analysis that allows the mean value of the variable being explained by one or more explanatory variables to be described. Sample, random—an observed part of the general population; the sample that was taken in a random way and that will be used to make an inference on a determined regularity in the whole population. Sample, representative—a random sample for which the structure is not significantly different than the structure of the general population for the variable that is being investigated and which is taken into consideration. Sequence—a function from a subset of the natural numbers to a different set (numbers, points, functions etc.). Standard estimation error—the square root of the variance, i.e. the standard deviation in the estimator distribution; the estimator that is used to assess the unknown value of a parameter of the general population. Statistic—any function of outcomes of the sample, a random variable; theoretically, any function of a number of random variables, which are usually identically distributed, that may be used to estimate a population parameter.
Book.indb 232
12/9/2013 12:29:08 PM
Explanations of some important terms 233 Statistics— 1. formerly, knowledge on the state 2. the discipline of science that deals with the quantitative methods for investigating mass phenomena 3. the numerical facts or data themselves. Time series—a sequence of ordered observations of the variable of interest, which is connected with different or identical moments in time or time periods; a significant feature of a time series is its arrangement according to the occurrence of the observations in time. Test (statistical)—a rule of conduct that allows the decision to be made to reject the verified hypothesis or not, based on a sample taken. Test of significance—a test that allows, with a presumed high probability, for the rejection of the verified hypothesis if it is false; it does not allow it to be stated that the verified hypothesis is a true one. Variable (explanatory)—a variable that is used to explain the formation of another variable or variables that are being investigated and that are logically associated with it. Variable (being explained)—a dependent variable; a variable whose formation is explained by another variable or variables that are being investigated and that are logically associated with it.
Book.indb 233
12/9/2013 12:29:08 PM
This page intentionally left blank
CHAPTER 9 Statistical tables Table 9.1.
Distribution function Φ(z) of standardised normal distribution N(0, 1).
z
0.00
0.01
0.02
0.03
0.04
0.05
0.06
0.07
0.08
0.09
0.0 0.1 0.2 0.3 0.4
0.5000 0.5398 0.5793 0.6179 0.6554
0.5040 0.5438 0.5832 0.6217 0.6591
0.5080 0.5478 0.5871 0.6255 0.6628
0.5120 0.5517 0.5910 0.6293 0.6664
0.5160 0.5557 0.5948 0.6331 0.6700
0.5199 0.5596 0.5987 0.6368 0.6736
0.5239 0.5636 0.6026 0.6406 0.6772
0.5279 0.5675 0.6064 0.6443 0.6808
0.5319 0.5714 0.6103 0.6480 0.6844
0.5359 0.5753 0.6141 0.6517 0.6879
0.5 0.6 0.7 0.8 0.9
0.6915 0.7257 0.7580 0.7881 0.8159
0.6950 0.7291 0.7611 0.7910 0.8186
0.6985 0.7324 0.7642 0.7939 0.8212
0.7019 0.7357 0.7673 0.7967 0.8238
0.7054 0.7389 0.7704 0.7995 0.8264
0.7088 0.7422 0.7734 0.8023 0.8289
0.7123 0.7454 0.7764 0.8051 0.8315
0.7157 0.7486 0.7794 0.8078 0.8340
0.7190 0.7517 0.7823 0.8106 0.8365
0.7224 0.7549 0.7852 0.8133 0.8389
1.0 1.1 1.2 1.3 1.4
0.8413 0.8643 0.8849 0.9032 0.9192
0.8438 0.8665 0.8869 0.9049 0.9207
0.8461 0.8686 0.8888 0.9066 0.9222
0.8485 0.8708 0.8907 0.9082 0.9236
0.8508 0.8729 0.8925 0.9099 0.9251
0.8531 0.8749 0.8944 0.9115 0.9265
0.8554 0.8770 0.8962 0.9131 0.9278
0.8577 0.8790 0.8980 0.9147 0.9292
0.8599 0.8810 0.8997 0.9162 0.9306
0.8621 0.8830 0.9015 0.9177 0.9319
1.5 1.6 1.7 1.8 1.9
0.9332 0.9452 0.9554 0.9641 0.9713
0.9345 0.9463 0.9564 0.9649 0.9719
0.9357 0.9474 0.9573 0.9656 0.9726
0.9370 0.9484 0.9582 0.9664 0.9732
0.9382 0.9495 0.9591 0.9671 0.9738
0.9394 0.9505 0.9599 0.9678 0.9744
0.9406 0.9515 0.9608 0.9686 0.9750
0.9418 0.9525 0.9616 0.9693 0.9756
0.9429 0.9535 0.9625 0.9699 0.9761
0.9441 0.9545 0.9633 0.9706 0.9767
2.0 2.1 2.2 2.3 2.4
0.9772 0.9821 0.9861 0.9893 0.9918
0.9778 0.9826 0.9864 0.9896 0.9920
0.9783 0.9830 0.9868 0.9898 0.9922
0.9788 0.9834 0.9871 0.9901 0.9925
0.9793 0.9838 0.9875 0.9904 0.9927
0.9798 0.9842 0.9878 0.9906 0.9929
0.9803 0.9846 0.9881 0.9909 0.9931
0.9808 0.9850 0.9884 0.9911 0.9932
0.9812 0.9854 0.9887 0.9913 0.9934
0.9817 0.9857 0.9890 0.9916 0.9936
2.5 2.6 2.7 2.8 2.9
0.9938 0.9953 0.9965 0.9974 0.9981
0.9940 0.9955 0.9966 0.9975 0.9982
0.9941 0.9956 0.9967 0.9976 0.9982
0.9943 0.9957 0.9968 0.9977 0.9983
0.9945 0.9959 0.9969 0.9977 0.9984
0.9946 0.9960 0.9970 0.9978 0.9984
0.9948 0.9961 0.9971 0.9979 0.9985
0.9949 0.9962 0.9972 0.9979 0.9985
0.9951 0.9963 0.9973 0.9980 0.9986
0.9952 0.9964 0.9974 0.9981 0.9986
3.0 3.1 3.2 3.3 3.4
0.9987 0.9990 0.9993 0.9995 0.9997
0.9987 0.9991 0.9993 0.9995 0.9997
0.9987 0.9991 0.9994 0.9995 0.9997
0.9988 0.9991 0.9994 0.9996 0.9997
0.9988 0.9992 0.9994 0.9996 0.9997
0.9989 0.9992 0.9994 0.9996 0.9997
0.9989 0.9992 0.9994 0.9996 0.9997
0.9989 0.9992 0.9995 0.9996 0.9997
0.9990 0.9993 0.9995 0.9996 0.9997
0.9990 0.9993 0.9995 0.9997 0.9998
For z < 0 values Φ(z) are calculated applying formula Φ(z) = 1 − Φ(−z).
235
Book.indb 235
12/9/2013 12:29:08 PM
Book.indb 236
Table 9.2.
Quantiles of the standardised normal distribution N(0, 1).
12/9/2013 12:29:09 PM
p
0.000
0.001
0.002
0.003
0.004
0.005
0.006
0.007
0.008
0.009
p
0.50 0.51 0.52 0.53 0.54
0.000 000 0.025 069 0.050 154 0.075 270 0.100 434
0.002 507 0.027 576 0.052 664 0.077 784 0.102 953
0.005 013 0.030 084 0.055 174 0.080 298 0.105 474
0.007 520 0.032 592 0.057 684 0.082 813 0.107 995
0.010 027 0.035 100 0.060 195 0.085 329 0.110 516
0.012 533 0.037 608 0.062 707 0.087 845 0.113 039
0.015 040 0.040 117 0.065 219 0.090 361 0.115 562
0.017 547 0.042 626 0.067 731 0.092 879 0.118 085
0.020 054 0.045 135 0.070 243 0.095 396 0.120 610
0.022 562 0.047 644 0.072 756 0.097 915 0.123 135
0.50 0.51 0.52 0.53 0.54
0.55 0.56 0.57 0.58 0.59
0.125 661 0.150 969 0.176 374 0.201 893 0.227 545
0.128 188 0.153 505 0.178 921 0.204 452 0.230 118
0.130 716 0.156 042 0.181 468 0.207 013 0.232 693
0.133 245 0.158 580 0.184 017 0.209 574 0.235 269
0.135 774 0.161 119 0.186 567 0.212 137 0.237 847
0.138 304 0.163 658 0.189 118 0.214 702 0.240 426
0.140 835 0.166 199 0.191 671 0.217 267 0.243 007
0.143 367 0.168 741 0.194 225 0.219 835 0.245 590
0.145 900 0.171 285 0.196 780 0.222 403 0.248 174
0.148 434 0.173 829 0.199 336 0.224 973 0.250 760
0.55 0.56 0.57 0.58 0.59
0.60 0.61 0.62 0.63 0.64
0.253 347 0.279 319 0.305 481 0.331 853 0.358 459
0.255 936 0.281 926 0.308 108 0.334 503 0.361 133
0.258 527 0.284 536 0.310 738 0.337 155 0.363 810
0.261 120 0.287 147 0.313 369 0.339 809 0.366 489
0.263 714 0.289 760 0.316 003 0.342 466 0.369 171
0.266 311 0.292 375 0.318 639 0.345 126 0.371 856
0.268 909 0.294 992 0.321 278 0.347 787 0.374 544
0.271 508 0.297 611 0.323 918 0.350 451 0.377 234
0.274 110 0.300 232 0.326 561 0.353 118 0.379 926
0.276 714 0.302 855 0.329 206 0.355 787 0.382 622
0.60 0.61 0.62 0.63 0.64
0.65 0.66 0.67 0.68 0.69
0.385 320 0.412 463 0.439 913 0.467 699 0.495 850
0.388 022 0.415 194 0.442 676 0.470 497 0.498 687
0.390 726 0.417 928 0.445 443 0.473 299 0.501 527
0.393 433 0.420 665 0.448 212 0.476 104 0.504 372
0.396 142 0.423 405 0.450 986 0.478 914 0.507 221
0.398 855 0.426 148 0.453 762 0.481 727 0.510 073
0.401 571 0.428 894 0.456 542 0.484 544 0.512 930
0.404 289 0.431 644 0.459 326 0.487 365 0.515 792
0.407 011 0.434 397 0.462 113 0.490 189 0.518 657
0.409 735 0.437 154 0.464 904 0.493 018 0.521 527
0.65 0.66 0.67 0.68 0.69
0.70 0.71 0.72 0.73 0.74
0.524 401 0.553 385 0.582 842 0.612 813 0.643 345
0.527 279 0.556 308 0.585 815 0.615 840 0.646 431
0.530 161 0.559 237 0.588 793 0.618 873 0.649 524
0.533 049 0.562 170 0.591 777 0.621 912 0.652 622
0.535 940 0.565 108 0.594 766 0.624 956 0.655 727
0.538 836 0.568 052 0.597 760 0.628 006 0.658 838
0.541 737 0.570 999 0.600 760 0.631 062 0.661 955
0.544 642 0.573 952 0.603 765 0.634 124 0.665 079
0.547 551 0.576 910 0.606 775 0.637 192 0.668 209
0.550 466 0.579 873 0.609 791 0.640 266 0.671 346
0.70 0.71 0.72 0.73 0.74
Book.indb 237
0.75 0.76 0.77 0.78 0.79
0.674 490 0.706 303 0.738 847 0.772 193 0.806 421
0.677 640 0.709 523 0.742 144 0.775 575 0.809 896
0.680 797 0.712 751 0.745 450 0.778 966 0.813 380
0.683 961 0.715 986 0.748 763 0.782 365 0.816 875
0.687 131 0.719 229 0.752 085 0.785 774 0.820 379
0.690 309 0.722 479 0.755 415 0.789 192 0.823 894
0.693 493 0.725 737 0.758 754 0.792 619 0.827 418
0.696 685 0.729 003 0.762 101 0.796 055 0.830 953
0.699 884 0.732 276 0.765 456 0.799 501 0.834 499
0.703 089 0.735 558 0.768 820 0.802 956 0.838 055
0.75 0.76 0.77 0.78 0.79
0.80 0.81 0.82 0.83 0.84
0.841 621 0.877 896 0.915 365 0.954 165 0.994 458
0.845 199 0.881 587 0.919 183 0.958 124 0.998 576
0.848 787 0.885 290 0.923 014 0.962 099 1.002 712
0.852 386 0.889 006 0.926 859 0.966 088 1.006 964
0.855 996 0.892 733 0.930 717 0.970 093 1.011 034
0.859 617 0.896 473 0.934 589 0.974 114 1.015 222
0.863 250 0.900 226 0.938 476 0.978 150 1.019 428
0.866 894 0.903 991 0.942 376 0.982 203 1.023 651
0.870 550 0.907 770 0.946 291 0.986 271 1.027 893
0.874 217 0.911 561 0.950 221 0.990 356 1.032 154
0.80 0.81 0.82 0.83 0.84
0.85 0.86 0.87 0.88 0.89
1.036 433 0.080 319 0.126 391 0.174 987 0.226 528
1.040 732 0.084 823 0.131 131 0.180 001 0.231 864
1.045 050 0.089 349 0.135 896 0.185 044 0.237 235
1.049 387 0.093 897 0.140 687 0.190 118 0.242 641
1.053 744 0.098 468 0.145 505 0.195 223 0.248 085
1.058 122 0.103 063 0.150 349 0.200 359 0.253 565
1.062 519 0.107 680 0.155 221 0.205 527 0.259 084
1.066 938 0.112 321 0.160 120 0.210 727 0.264 641
1.071 377 0.116 987 0.165 047 0.215 960 0.270 238
1.075 837 0.121 677 0.170 002 0.221 227 0.275 874
0.85 0.86 0.87 0.88 0.89
0.90 0.91 0.92 0.93 0.94
1.281 552 0.340 755 0.405 072 0.475 791 0.554 774
1.287 271 0.346 939 0.411 830 0.483 280 0.563 224
1.293 032 0.353 174 0.418 654 0.490 853 0.571 787
1.298 837 0.359 463 0.425 544 0.498 513 0.580 467
1.304 685 0.365 806 0.432 503 0.506 262 0.589 268
1.310 579 0.372 204 0.439 531 0.514 102 0.598 193
1.316 519 0.378 659 0.446 632 0.522 036 0.607 248
1.322 505 0.385 172 0.453 806 0.530 068 0.616 436
1.328 539 0.391 744 0.461 056 0.538 199 0.625 763
1.334 622 0.398 377 0.468 384 0.546 433 0.635 234
0.90 0.91 0.92 0.93 0.94
0.95 0.96 0.97 0.98 0.99
1.644 854 0.750 686 0.880 794 2.053 749 0.326 348
1.654 628 0.762 410 0.895 698 2.074 855 0.365 618
1.664 563 0.774 382 0.911 036 2.096 927 0.408 916
1.674 665 0.786 613 0.926 837 2.120 072 0.457 263
1.684 941 0.799 118 0.943 134 2.144 411 0.512 144
1.695 398 0.811 911 0.959 964 2.170 090 0.575 829
1.706 043 0.825 007 0.977 368 2.197 286 0.652 070
1.716 886 0.838 424 0.995 393 2.226 212 0.747 781
1.727 934 0.852 180 2.014 091 0.257 129 0.878 162
1.739 198 0.866 296 2.033 520 0.290 368 3.090 232
0.95 0.96 0.97 0.98 0.99
12/9/2013 12:29:09 PM
Table 9.3. α
0.2
0.1
0.05
0.02
1 2 3 4 5
3.078 1.886 1.638 1.533 1.476
6.314 2.920 2.353 2.132 2.015
12.706 4.303 3.182 2.776 2.571
31.821 6.965 4.541 3.747 3.365
6 7 8 9 10
1.440 1.415 1.397 1.383 1.372
1.943 1.895 1.860 1.833 1.812
2.447 2.365 2.306 2.262 2.228
11 12 13 14 15
1.363 1.356 1.350 1.345 1.341
1.796 1.782 1.771 1.761 1.753
16 17 18 19 20
1.337 1.333 1.330 1.328 1.325
21 22 23 24 25
0.01
α
0.002
0.001
63.657 6.925 5.841 4.604 4.032
318.309 22.327 10.212 7.173 5.893
636.619 31.598 12.941 8.610 6.859
1 2 3 4 5
3.143 2.998 2.896 2.821 2.764
3.707 3.499 3.355 3.250 3.169
5.208 4.785 4.501 4.297 4.144
5.959 5.405 5.041 4.781 4.587
6 7 8 9 10
2.201 2.179 2.160 2.145 2.131
2.718 2.681 2.650 2.624 2.602
3.106 3.055 3.012 2.977 2.947
4.025 3.930 3.852 3.787 3.733
4.437 4.318 4.221 4.140 4.073
11 12 13 14 15
1.746 1.740 1.734 1.729 1.725
2.120 2.110 2.101 2.093 2.086
2.583 2.567 2.552 2.539 2.528
2.921 2.898 2.878 2.861 2.845
3.686 3.646 3.611 3.579 3.552
4.015 3.965 3.922 3.883 3.850
16 17 18 19 20
1.323 1.321 1.319 1.318 1.316
1.721 1.717 1.714 1.711 1.708
2.080 2.074 2.069 2.064 2.060
2.518 2.508 2.500 2.492 2.485
2.831 2.819 2.807 2.797 2.787
3.527 3.505 3.485 3.467 3.450
3.819 3.792 3.767 3.745 3.725
21 22 23 24 25
26 27 28 29 30
1.315 1.314 1.313 1.311 1.310
1.706 1.703 1.701 1.699 1.697
2.056 2.052 2.048 2.045 2.042
2.479 2.473 2.467 2.462 2.457
2.779 2.771 2.763 2.756 2.750
3.435 3.421 3.408 3.396 3.385
3.707 3.690 3.674 3.659 3.646
26 27 28 29 30
40 60 120 ∞
1.303 1.296 1.289 1.282
1.684 1.671 1.658 1.645
2.021 2.000 1.980 1.960
2.423 2.390 2.358 2.326
2.704 2.660 2.617 2.576
3.307 3.232 3.160 3.090
3.551 3.460 3.373 3.291
40 60 120 ∞
v
Book.indb 238
Critical values of the Student’s t-distribution. v
12/9/2013 12:29:10 PM
Book.indb 239
Table 9.4. α
Critical values of the Chi-squared distribution. 0.9995
0.999
0.995
0.99
0.975
0.06393 0.02100 0.0153 0.0639 0.158
0.05157 0.02200 0.0243 0.0908 0.210
0.04393 0.0100 0.0717 0.207 0.412
0.03157 0.0201 0.115 0.297 0.554
0.03982 0.0506 0.216 0.484 0.831
0.02393 0.103 0.352 0.711 1.145
0.0158 0.211 0.584 1.064 1.610
6 7 8 9 10
0.299 0.485 0.710 0.972 1.265
0.381 0.598 0.857 1.153 1.479
0.676 0.989 1.344 1.735 2.156
0.872 1.239 1.646 2.088 2.558
1.237 1.690 2.180 2.700 3.247
1.635 2.167 2.733 3.325 3.940
11 12 13 14 15
1.587 1.934 2.305 2.697 3.108
1.834 2.214 2.617 3.041 3.483
2.603 3.074 3.565 4.075 4.601
3.053 3.571 4.107 4.660 5.229
3.816 4.404 5.009 5.629 6.262
16 17 18 19 20
3.536 3.980 4.439 4.912 5.398
3.942 4.416 4.905 5.407 5.921
5.142 5.697 6.265 6.844 7.434
5.812 6.408 7.015 7.633 8.260
6.908 7.564 8.231 8.907 9.591
v 1 2 3 4 5
0.95
0.90
0.10
α
0.05
0.025
0.01
0.005
0.001
0.0005
2.706 4.605 6.251 7.779 9.236
3.841 5.991 7.815 9.488 11.070
5.024 7.378 9.348 11.143 12.832
6.635 9.210 11.345 13.277 15.086
7.879 10.597 12.838 14.860 16.750
10.828 13.816 16.266 18.467 20.515
12.116 15.202 17.730 19.997 22.105
1 2 3 4 5
2.204 2.833 3.490 4.168 4.865
10.645 12.017 13.362 14.684 15.987
12.592 14.067 15.507 16.919 18.307
14.449 16.013 17.535 19.023 20.483
16.812 18.475 20.090 21.666 23.209
18.548 20.278 21.955 23.589 25.188
22.458 24.322 26.125 27.877 29.588
24.103 26.018 27.868 29.666 31.420
6 7 8 9 10
4.575 5.226 5.892 6.571 7.261
5.578 6.304 7.042 7.790 8.547
17.275 18.549 19.812 21.064 22.307
19.675 21.026 22.362 23.685 24.996
21.920 23.336 24.735 26.119 27.488
24.725 26.217 27.688 29.141 30.578
26.757 28.300 29.819 31.319 32.801
31.264 32.909 34.528 36.123 37.697
33.136 34.821 36.478 38.109 39.719
11 12 13 14 15
7.962 8.672 9.390 10.117 10.851
9.312 10.085 10.865 11.651 12.443
23.542 24.769 25.989 27.204 28.412
26.296 27.587 28.869 30.144 31.410
28.845 30.191 31.526 32.852 34.170
32.000 33.409 34.805 36.191 37.566
34.267 35.718 37.156 38.582 39.997
39.252 40.790 42.312 43.820 45.315
41.308 42.879 44.434 45.973 47.498
16 17 18 19 20
v
(Continued)
12/9/2013 12:29:10 PM
Book.indb 240
Table 9.4. α
v
(Continued). 0.9995
0.999
0.995
0.99
0.975
0.95
0.90
0.10
0.05
0.025
0.01
0.005
0.001
0.0005
α
v
21 22 23 24 25
5.896 6.404 6.924 7.453 7.991
6.447 6.983 7.529 8.085 8.649
8.034 8.643 9.260 9.886 10.520
8.897 9.542 10.196 10.856 11.524
10.283 10.982 11.688 12.401 13.120
11.591 12.338 13.091 13.848 14.611
13.240 14.041 14.848 15.659 16.473
29.615 30.813 32.007 33.196 34.382
32.671 33.924 35.172 36.415 37.652
35.479 36.781 38.086 39.364 40.646
38.932 40.289 41.638 42.980 44.314
41.401 42.796 44.181 45.558 46.928
46.797 48.268 49.728 51.179 52.618
49.010 50.511 52.000 53.479 54.947
21 22 23 24 25
26 27 28 29 30
8.538 9.093 9.656 10.227 10.804
9.222 9.803 10.391 10.986 11.588
11.160 11.808 12.461 13.121 13.787
12.198 12.879 13.565 14.256 14.953
13.844 14.573 15.308 16.047 16.791
15.379 16.151 16.928 17.708 18.493
17.292 18.114 18.939 19.768 20.599
35.563 36.741 37.916 39.087 40.256
38.885 40.113 41.337 42.557 43.773
41.923 43.194 44.461 45.722 46.979
45.642 46.963 48.278 49.588 50.892
48.290 49.645 50.993 52.336 53.672
54.052 55.476 56.892 58.301 59.703
56.407 57.858 59.300 60.735 62.162
26 27 28 29 30
40 50 60 70 80 90 100
16.906 23.461 30.340 37.467 44.791 52.276 59.896
17.916 24.674 31.738 39.036 46.520 54.155 61.918
20.707 27.991 35.535 43.275 51.172 59.196 67.328
22.164 29.707 37.485 45.442 53.540 61.754 70.075
24.433 32.357 40.482 48.758 57.153 65.647 74.222
26.509 34.764 43.188 51.739 60.391 69.126 77.929
29.051 37.689 46.459 55.329 64.278 73.291 82.358
51.805 63.167 74.397 85.527 96.578 107.565 118.498
55.758 67.505 79.082 90.531 101.879 113.145 124.342
59.342 71.420 83.298 95.023 106.629 118.136 129.561
63.691 76.154 88.379 100.425 112.329 124.116 135.807
66.766 79.490 91.952 104.215 116.321 128.299 140.169
73.402 86.661 99.607 112.317 124.839 137.208 149.449
76.095 89.561 102.695 115.578 128.261 140.782 153.167
40 50 60 70 80 90 100
12/9/2013 12:29:10 PM
Book.indb 241
Table 9.5. Critical values of the Snedecor’s F distribution for α = 0.10. v1 1 2 3 4 5 6 7 8 9 v2 1 2 3 4 5
10
12
15
20
24
30
40
60
120
v1
∞
39.86 49.50 53.59 55.83 57.24 58.20 58.91 59.44 59.86 60.19 60.71 61.22 61.74 62.00 62.26 62.53 62.79 63.06 63.33 8.53 9.00 9.16 9.24 9.29 9.33 9.35 9.37 9.38 9.39 9.41 9.42 9.44 9.45 9.46 9.47 9.47 9.48 9.49 5.54 5.46 5.39 5.34 5.31 5.28 5.27 5.25 5.24 5.23 5.22 5.20 5.18 5.18 5.17 5.16 5.15 5.14 5.13 4.54 4.32 4.19 4.11 4.05 4.01 3.98 3.95 3.94 3.92 3.90 3.87 3.84 3.83 3.82 3.80 3.79 3.78 3.76 4.06 3.78 3.62 3.52 3.45 3.40 3.37 3.34 3.32 3.30 3.27 3.24 3.21 3.19 3.17 3.16 3.14 3.12 3.10
v2 1 2 3 4 5
6 7 8 9 10
3.78 3.59 3.46 3.36 3.29
3.46 3.26 3.11 3.01 2.92
3.29 3.07 2.92 2.81 2.73
3.18 2.96 2.81 2.69 2.61
3.11 2.88 2.73 2.61 2.52
3.05 2.83 2.67 2.55 2.46
3.01 2.78 2.62 2.51 2.41
2.98 2.75 2.59 2.47 2.38
2.96 2.72 2.56 2.44 2.35
2.94 2.70 2.54 2.42 2.32
2.90 2.67 2.50 2.38 2.28
2.87 2.63 2.46 2.34 2.24
2.84 2.59 2.42 2.30 2.20
2.82 2.58 2.40 2.28 2.18
2.80 2.56 2.38 2.25 2.16
2.78 2.54 2.36 2.23 2.13
2.76 2.51 2.34 2.21 2.11
2.74 2.49 2.32 2.18 2.08
2.72 2.47 2.29 2.16 2.06
6 7 8 9 10
11 12 13 14 15
3.23 3.18 3.14 3.10 3.07
2.86 2.81 2.76 2.73 2.70
2.66 2.61 2.56 2.52 2.49
2.54 2.48 2.43 2.39 2.36
2.45 2.39 2.35 2.31 2.27
2.39 2.33 2.28 2.24 2.21
2.34 2.28 2.23 2.19 2.16
2.30 2.24 2.20 2.15 2.12
2.27 2.21 2.16 2.12 2.09
2.25 2.19 2.14 2.10 2.06
2.21 2.15 2.10 2.05 2.02
2.17 2.10 2.05 2.01 1.97
2.12 2.06 2.01 1.96 1.92
2.10 2.04 1.98 1.94 1.90
2.08 2.01 1.96 1.91 1.87
2.05 1.99 1.93 1.89 1.85
2.03 1.96 1.90 1.86 1.82
2.00 1.93 1.88 1.83 1.79
1.97 1.90 1.85 1.80 1.76
11 12 13 14 15
16 17 18 19 20
3.05 3.03 3.01 2.99 2.97
2.67 2.64 2.62 2.61 2.59
2.46 2.44 2.42 2.40 2.38
2.33 2.31 2.29 2.27 2.25
2.24 2.22 2.20 2.18 2.16
2.18 2.15 2.13 2.11 2.09
2.13 2.10 2.08 2.06 2.04
2.09 2.06 2.04 2.02 2.00
2.09 2.03 2.00 1.98 1.96
2.03 2.00 1.98 1.96 1.94
1.99 1.96 1.93 1.91 1.89
1.94 1.91 1.89 1.86 1.84
1.89 1.86 1.84 1.81 1.79
1.87 1.84 1.81 1.79 1.77
1.84 1.81 1.78 1.76 1.74
1.81 1.78 1.75 1.73 1.71
1.78 1.75 1.72 1.70 1.68
1.75 1.72 1.69 1.67 1.64
1.72 1.69 1.66 1.63 1.61
16 17 18 19 20
(Continued)
12/9/2013 12:29:11 PM
Book.indb 242
Table 9.5. (Continued). v1 1 2 3 v 2
4
5
6
7
8
9
10
12
15
20
24
30
40
60
120
∞
v1
v2
21 22 23 24 25
2.96 2.95 2.94 2.93 2.92
2.57 2.56 2.55 2.54 2.53
2.36 2.35 2.34 2.33 2.32
2.23 2.22 2.21 2.19 2.18
2.14 2.13 2.11 2.10 2.09
2.08 2.06 2.05 2.04 2.02
2.02 2.01 1.99 1.98 1.97
1.98 1.97 1.95 1.94 1.93
1.95 1.93 1.92 1.91 1.89
1.92 1.90 1.89 1.88 1.87
1.87 1.86 1.84 1.83 1.82
1.83 1.81 1.80 1.78 1.77
1.78 1.76 1.74 1.73 1.72
1.75 1.73 1.72 1.70 1.69
1.72 1.70 1.69 1.67 1.66
1.69 1.67 1.66 1.64 1.63
1.66 1.64 1.62 1.61 1.59
1.62 1.60 1.59 1.57 1.56
1.59 1.57 1.55 1.53 1.52
21 22 23 24 25
26 27 28 29 30
2.91 2.90 2.89 2.89 2.88
2.52 2.51 2.50 2.50 2.49
2.31 2.30 2.29 2.28 2.28
2.17 2.17 2.16 2.15 2.14
2.08 2.07 2.06 2.06 2.05
2.01 2.00 2.00 1.99 1.98
1.96 1.95 1.94 1.93 1.93
1.92 1.91 1.90 1.89 1.88
1.88 1.87 1.87 1.86 1.85
1.86 1.85 1.84 1.83 1.82
1.81 1.80 1.79 1.78 1.77
1.76 1.75 1.74 1.73 1.72
1.71 1.70 1.69 1.68 1.67
1.68 1.67 1.66 1.65 1.64
1.65 1.64 1.63 1.62 1.61
1.61 1.60 1.59 1.58 1.57
1.58 1.57 1.56 1.55 1.54
1.54 1.53 1.52 1.51 1.50
1.50 1.49 1.48 1.47 1.46
26 27 28 29 30
40 60 120 ∞
2.84 2.79 2.75 2.71
2.44 2.39 2.35 2.30
2.23 2.18 2.13 2.08
2.09 2.04 1.99 1.94
2.00 1.95 1.90 1.85
1.93 1.87 1.82 1.77
1.87 1.82 1.77 1.72
1.83 1.77 1.72 1.67
1.79 1.74 1.68 1.63
1.76 1.71 1.65 1.60
1.71 1.66 1.60 1.55
1.66 1.60 1.55 1.49
1.61 1.54 1.48 1.42
1.57 1.51 1.45 1.38
1.54 1.48 1.41 1.34
1.51 1.44 1.37 1.30
1.47 1.40 1.32 1.24
1.42 1.35 1.26 1.17
1.38 1.29 1.19 1.00
40 60 120 ∞
12/9/2013 12:29:11 PM
Book.indb 243
Table 9.6. Critical values of the Snedecor’s F distribution for α = 0.05 v1 1 2 3 4 5 6 7 8 9 v2 1 2 3 4 5
10
12
15
20
24
30
40
60
120
v1
∞
161.4 199.5 215.7 224.6 230.2 234.0 236.8 238.9 240.5 241.9 243.9 245.9 248.0 249.1 250.1 251.1 252.2 253.3 254.3 18.51 19.00 19.16 19.25 19.30 19.33 19.35 19.37 19.38 19.39 19.41 19.43 19.45 19.45 19.46 19.47 19.48 19.49 19.50 10.13 9.55 9.28 9.12 9.01 8.94 8.89 8.85 8.81 8.79 8.74 8.70 8.66 8.64 8.62 8.59 8.57 8.55 8.53 7.71 6.94 6.59 6.39 6.26 6.16 6.09 6.04 6.00 5.96 5.91 5.86 5.80 5.77 5.75 5.72 5.69 5.66 5.63 6.61 5.79 5.41 5.19 5.05 4.95 4.88 4.82 4.77 4.74 4.68 4.62 4.56 4.53 4.50 4.46 4.43 4.40 4.36
v2 1 2 3 4 5
6 7 8 9 10
5.99 5.59 5.32 5.12 4.96
5.14 4.74 4.46 4.26 4.10
4.76 4.35 4.07 3.86 3.71
4.53 4.12 3.84 3.63 3.48
4.39 3.97 3.69 3.48 3.33
4.28 3.87 3.58 3.37 3.22
4.21 3.79 3.50 3.29 3.14
4.15 3.73 3.44 3.23 3.07
4.10 3.68 3.39 3.18 3.02
4.06 3.64 3.35 3.14 2.98
4.00 3.57 3.28 3.07 2.91
3.94 3.51 3.22 3.01 2.85
3.87 3.44 3.15 2.94 2.77
3.84 3.41 3.12 2.90 2.74
3.81 3.38 3.08 2.86 2.70
3.77 3.34 3.04 2.83 2.66
3.74 3.30 3.01 2.79 2.62
3.70 3.27 2.97 2.75 2.58
3.67 3.23 2.93 2.71 2.54
6 7 8 9 10
11 12 13 14 15
4.84 4.75 4.67 4.60 4.54
3.98 3.89 3.81 3.74 3.68
3.59 3.49 3.41 3.34 3.29
3.36 3.26 3.18 3.11 3.06
3.20 3.11 3.03 2.96 2.90
3.09 3.00 2.92 2.85 2.79
3.01 2.91 2.83 2.76 2.71
2.95 2.85 2.77 2.70 2.64
2.90 2.80 2.71 2.65 2.59
2.85 2.75 2.67 2.60 2.54
2.79 2.69 2.60 2.53 2.48
2.72 2.62 2.53 2.46 2.40
2.65 2.54 2.46 2.39 2.33
2.61 2.51 2.42 2.35 2.29
2.57 2.47 2.38 2.31 2.25
2.53 2.43 2.34 2.27 2.20
2.49 2.38 2.30 2.22 2.16
2.45 2.34 2.25 2.18 2.11
2.40 2.30 2.21 2.13 2.07
11 12 13 14 15
16 17 18 19 20
4.49 4.45 4.41 4.38 4.35
3.63 3.59 3.55 3.52 3.49
3.24 3.20 3.16 3.13 3.10
3.01 2.96 2.93 2.90 2.87
2.85 2.81 2.77 2.74 2.71
2.74 2.70 2.66 2.63 2.60
2.66 2.61 2.58 2.54 2.51
2.59 2.55 2.51 2.48 2.45
2.54 2.49 2.46 2.42 2.39
2.49 2.45 2.41 2.38 2.35
2.42 2.38 2.34 2.31 2.28
2.35 2.31 2.27 2.23 2.20
2.28 2.23 2.19 2.16 2.12
2.24 2.19 2.15 2.11 2.08
2.19 2.15 2.11 2.07 2.04
2.15 2.10 2.06 2.03 1.99
2.11 2.06 2.02 1.98 1.95
2.06 2.01 1.97 1.93 1.90
2.01 1.96 1.92 1.88 1.84
16 17 18 19 20
(Continued)
12/9/2013 12:29:11 PM
Book.indb 244
Table 9.6. (Continued). v1 1 2 3 v 2
4
5
6
7
8
9
10
12
15
20
24
30
40
60
120
∞
v1
v2
21 22 23 24 25
4.32 4.30 4.28 4.26 4.24
3.47 3.44 3.42 3.40 3.39
3.07 3.05 3.03 3.01 2.99
2.84 2.82 2.80 2.78 2.76
2.68 2.66 2.64 2.62 2.60
2.57 2.55 2.53 2.51 2.49
2.49 2.46 2.44 2.42 2.40
2.42 2.40 2.37 2.36 2.34
2.37 2.34 2.32 2.30 2.28
2.32 2.30 2.27 2.25 2.24
2.25 2.23 2.20 2.18 2.16
2.18 2.15 2.13 2.11 2.09
2.10 2.07 2.05 2.03 2.01
2.05 2.03 2.01 1.98 1.96
2.01 1.98 1.96 1.94 1.92
1.96 1.94 1.91 1.89 1.87
1.92 1.89 1.86 1.84 1.82
1.87 1.84 1.81 1.79 1.77
1.81 1.78 1.76 1.73 1.71
21 22 23 24 25
26 27 28 29 30
4.23 4.21 4.20 4.18 4.17
3.37 3.35 3.34 3.33 3.32
2.98 2.96 2.95 2.93 2.92
2.74 2.73 2.71 2.70 2.69
2.59 2.57 2.56 2.55 2.53
2.47 2.46 2.45 2.43 2.42
2.39 2.37 2.36 2.35 2.33
2.32 2.31 2.29 2.28 2.27
2.27 2.25 2.24 2.22 2.21
2.22 2.20 2.19 2.18 2.16
2.15 2.13 2.12 2.10 2.09
2.07 2.06 2.04 2.03 2.01
1.99 1.97 1.96 1.94 1.93
1.95 1.93 1.91 1.90 1.89
1.90 1.88 1.87 1.85 1.84
1.85 1.84 1.82 1.81 1.79
1.80 1.79 1.77 1.75 1.74
1.75 1.73 1.71 1.70 1.68
1.69 1.67 1.65 1.64 1.62
26 27 28 29 30
40 60 120 ∞
4.08 4.00 3.92 3.84
3.23 3.15 3.07 3.00
2.84 2.76 2.68 2.60
2.61 2.53 2.45 2.37
2.45 2.37 2.29 2.21
2.34 2.25 2.17 2.10
2.25 2.17 2.09 2.01
2.18 2.10 2.02 1.94
2.12 2.04 1.96 1.88
2.08 1.99 1.91 1.83
2.00 1.92 1.83 1.75
1.92 1.84 1.75 1.67
1.84 1.75 1.66 1.57
1.79 1.70 1.61 1.52
1.74 1.65 1.55 1.46
1.69 1.59 1.50 1.39
1.64 1.53 1.43 1.32
1.58 1.47 1.35 1.22
1.51 1.39 1.25 1.00
40 60 120 ∞
12/9/2013 12:29:12 PM
Book.indb 245
Table 9.7. Critical values of the Snedecor’s F distribution for α = 0.025. v1 1 2 3 4 5 6 7 8 9 10 v2 1 2 3 4 5
12
15
20
24
30
40
60
v1
∞
120
647.8 799.5 864.2 899.6 921.8 937.1 948.2 956.7 963.3 968.6 976.7 984.9 993.1 997.2 1001 1006 1010 1014 1018 38.51 39.00 39.17 39.25 39.30 39.33 39.35 39.37 39.39 39.40 39.41 39.43 39.45 39.46 39.46 39.47 39.48 39.49 39.50 17.44 16.04 15.44 15.10 14.88 14.73 14.62 14.54 14.47 14.42 14.34 14.25 14.17 14.12 14.08 14.04 13.99 13.95 13.90 12.22 10.65 9.98 9.60 9.36 9.20 9.07 8.98 8.90 8.84 8.75 8.66 8.56 8.51 8.46 8.41 8.36 8.31 8.26 10.01 8.43 7.76 7.39 7.15 6.98 6.85 6.76 6.68 6.62 6.52 6.43 6.33 6.28 6.23 6.18 6.12 6.07 6.02
v2 1 2 3 4 5
6 7 8 9 10
8.81 8.07 7.57 7.21 6.94
7.26 6.54 6.06 5.71 5.46
6.60 5.89 5.42 5.08 4.83
6.23 5.52 5.05 4.72 4.47
5.99 5.29 4.82 4.48 4.24
5.82 5.12 4.65 4.32 4.07
5.70 4.99 4.53 4.20 3.95
5.60 4.90 4.43 4.10 3.85
5.52 4.82 4.36 4.03 3.78
5.46 4.76 4.30 3.96 3.72
5.37 4.67 4.20 3.87 3.62
5.27 4.57 4.10 3.77 3.52
5.17 4.47 4.00 3.67 3.42
5.12 4.42 3.95 3.61 3.37
5.07 4.36 3.89 3.56 3.31
5.01 4.31 3.84 3.51 3.26
4.96 4.25 3.78 3.45 3.20
4.90 4.20 3.73 3.39 3.14
4.85 4.14 3.67 3.33 3.08
6 7 8 9 10
11 12 13 14 15
6.72 6.55 6.41 6.30 6.20
5.26 5.10 4.97 4.86 4.77
4.63 4.47 4.35 4.24 4.15
4.28 4.12 4.00 3.89 3.80
4.04 3.89 3.77 3.66 3.58
3.88 3.73 3.60 3.50 3.41
3.76 3.61 3.48 3.38 3.29
3.66 3.51 3.39 3.29 3.20
3.59 3.44 3.31 3.21 3.12
3.53 3.37 3.25 3.15 3.06
3.43 3.28 3.15 3.05 2.96
3.33 3.18 3.05 2.95 2.86
3.23 3.07 2.95 2.84 2.76
3.17 3.02 2.89 2.79 2.70
3.12 2.96 2.84 2.73 2.64
3.06 2.91 2.78 2.67 2.59
3.00 2.85 2.72 2.61 2.52
2.94 2.79 2.66 2.55 2.46
2.88 2.72 2.60 2.49 2.40
11 12 13 14 15
16 17 18 19 20
6.12 6.04 5.98 5.92 5.87
4.69 6.62 4.56 4.51 4.46
4.08 4.01 3.95 3.90 3.86
3.73 3.66 3.61 3.56 3.51
3.50 3.44 3.38 3.33 3.29
3.34 3.28 3.22 3.17 3.13
3.22 3.16 3.10 3.05 3.01
3.12 3.06 3.01 2.96 2.91
3.05 2.98 2.93 2.88 2.84
2.99 2.92 2.87 2.82 2.77
2.89 2.82 2.77 2.72 2.68
2.79 2.72 2.67 2.62 2.57
2.68 2.62 2.56 2.51 2.46
2.63 2.56 2.50 2.45 2.41
2.57 2.50 2.44 2.39 2.35
2.51 2.44 2.38 2.33 2.29
2.45 2.38 2.32 2.27 2.22
2.38 2.32 2.26 2.20 2.16
2.32 2.25 2.19 2.13 2.09
16 17 18 19 20
(Continued)
12/9/2013 12:29:12 PM
Book.indb 246
Table 9.7. (Continued). v1 1 2 3 v 2
4
5
6
7
8
9
10
12
15
20
24
30
40
60
120
∞
v1
v2
21 22 23 24 25
5.83 5.79 5.75 5.72 5.69
4.42 4.38 4.35 4.32 4.29
3.82 3.78 3.75 3.72 3.69
3.48 3.44 3.41 3.38 3.35
3.25 3.22 3.18 3.15 3.13
3.09 3.05 3.02 2.99 2.97
2.97 2.93 2.90 2.87 2.85
2.87 2.84 2.81 2.78 2.75
2.80 2.76 2.73 2.70 2.68
2.73 2.70 2.67 2.64 2.61
2.64 2.60 2.57 2.54 2.51
2.53 2.50 2.47 2.44 2.41
2.42 2.39 2.36 2.33 2.30
2.37 2.33 2.30 2.27 2.24
2.31 2.27 2.24 2.21 2.18
2.25 2.21 2.18 2.15 2.12
2.18 2.14 2.11 2.08 2.05
2.11 2.08 2.04 2.01 1.98
2.04 2.00 1.97 1.94 1.91
21 22 23 24 25
26 27 28 29 30
5.66 5.63 5.61 5.59 5.57
4.27 4.24 4.22 4.20 4.18
3.67 3.65 3.63 3.61 3.59
3.33 3.31 3.29 3.27 3.25
3.10 3.08 3.06 3.04 3.03
2.94 2.92 2.90 2.88 2.87
2.82 2.80 2.78 2.76 2.75
2.73 2.71 2.69 2.67 2.65
2.65 2.63 2.61 2.59 2.57
2.59 2.57 2.55 2.53 2.51
2.49 2.47 2.45 2.43 2.41
2.39 2.36 2.34 2.32 2.31
2.28 2.25 2.23 2.21 2.20
2.22 2.19 2.17 2.15 2.14
2.16 2.13 2.11 2.09 2.07
2.09 2.07 2.05 2.03 2.01
2.03 2.00 1.98 1.96 1.94
1.95 1.93 1.91 1.89 1.87
1.88 1.85 1.83 1.81 1.79
26 27 28 29 30
40 60 120 ∞
4.42 5.29 5.15 5.02
4.05 3.93 3.80 3.69
3.46 3.34 3.23 3.12
3.13 3.01 2.89 2.79
2.90 2.79 2.67 2.57
2.74 2.63 2.52 2.41
2.62 2.51 2.39 2.29
2.53 2.41 2.30 2.19
2.45 2.33 2.22 2.11
2.39 2.27 2.16 2.05
2.29 2.17 2.05 1.94
2.18 2.06 1.94 1.83
2.07 1.94 1.82 1.71
2.01 1.88 1.76 1.64
1.94 1.82 1.69 1.57
1.88 1.74 1.61 1.48
1.80 1.67 1.53 1.39
1.72 1.58 1.43 1.27
1.64 1.48 1.31 1.00
40 60 120 ∞
12/9/2013 12:29:12 PM
CH09.indd 247
Table 9.8.
Critical values of the series distribution.
α = 0.05 n1 n2
2
α = 0.95 n1 3
4
5
6
7
8
9
10 11 12 13 14 15 16 17 18 19 20
2
2 3
4
5
6
7
8
9
10 11 12 13 14 15 16 17 18 19 20
4
3
2
5 6
4
2
5
2
2
3
6
2
3
3
3
7
2
3
3
4
4
8
2
2
3
3
4
4
5
9
2
2
3
4
4
5
5
6
10
2
3
3
4
5
5
6
6
6
11
2
3
3
4
5
5
6
6
7
7
12
2
3
4
4
5
6
6
7
7
8
8
13
2
3
4
4
5
6
6
7
8
8
9
9
n2 3
5 6
7
4
5 7
8
8
5 7
8
9
10
6
5 7
8
9
10 11
7
5 7
9
10 11 12 12
8
5 7
9
10 11 12 13 13
9
5
5 7
9
10 11 12 13 14 15
10
5 7
9
11 12 13 14 14 15 16
11
5 7
9
11 12 13 14 15 16 16 17
12
5 7
9
11 12 13 14 15 16 17 17 18
13
14
2
3
4
5
5
6
7
7
8
8
9
9
10
5 7
9
11 12 13 15 16 16 17 18 19 19
14
15
2
3
4
5
6
6
7
8
8
9
9
10 10 11
5 7
9
11 13 14 15 16 17 18 18 19 20 20
15
16
2
3
4
5
6
6
7
8
8
9
10 10 11 11 11
5 7
9
11 13 14 15 16 17 18 19 20 20 21 22
16
17
2
3
4
5
6
7
7
8
9
9
10 10 11 11 12 12
5 7
9
11 13 14 15 16 17 18 19 20 21 21 22 23
17
18
2
3
4
5
6
7
8
8
9
10 10 11 11 12 12 13 13
5 7
9
11 13 14 15 17 18 19 20 20 21 22 23 23 24
18
19
2
3
4
5
6
7
8
8
9
10 10 11 12 12 13 13 14 14
5 7
9
11 13 14 15 17 18 19 20 21 22 22 23 24 24 25
19
20
2
3
4
5
6
7
8
9
9
10 11 11 12 12 13 13 14 14 15
5 7
9
11 13 14 16 17 18 19 20 21 22 23 24 24 25 26 26
20
(Continued) 12/9/2013 3:51:47 PM
Book.indb 248
Table 9.8.
(Continued).
α = 0.025 n1 n2
2
α = 0.975 n1 3
4
5
6
7
8
9
10 11 12 13 14 15 16 17 18 19 20
2 3
4
2
4
3
5 6
4
5 7
8
5 7
8
5
2
2
6
2
2
3
3
7
2
2
3
3
8
2
3
3
3
4
4
9
2
3
3
4
4
5
5
10
2
3
3
4
5
5
5
6
11
2
3
4
4
5
5
6
6
7
3
5
6
7
8
9
10 11 12 13 14 15 16 17 18 19 20
n2 2 3 4
9
5
5 7
8
9
10
6
5 7
9
10 11 12
7
5 7
9
10 11 12 13
8
5 7
9
11 12 13 13 14
9
5 7
9
11 12 13 14 15 15
10
5 7
9
11 12 13 14 15 16 16
11
5 7
9
11 12 13 15 15 16 17 18
12
5 7
9
11 13 14 15 16 17 18 18 19
13
12
2
2
3
4
4
5
6
6
7
7
7
13
2
2
3
4
5
5
6
6
7
7
8
8
14
2
2
3
4
5
5
6
7
7
8
8
9
9
15
2
3
3
4
5
6
6
7
7
8
8
9
9
16
2
3
4
4
5
6
6
7
8
8
9
9
10 10 11
5 7
9
11 13 15 16 17 18 19 20 20 21 22 22
16
17
2
3
4
4
5
6
7
7
8
9
9
10 10 11 11 11
5 7
9
11 13 15 16 17 18 19 20 21 22 22 23 24
17
18
2
3
4
5
5
6
7
8
8
9
9
10 10 11 11 12 12
5 7
9
11 13 15 16 17 18 19 20 21 22 23 24 24 25
18
19
2
3
4
5
6
6
7
8
8
9
10 10 11 11 12 12 13 13
5 7
9
11 13 15 16 17 19 20 21 22 22 23 24 25 25 26
19
20
2
3
4
5
6
6
7
8
9
9
10 10 12 12 13 13 13 13 14
5 7
9
11 13 15 16 17 19 20 21 22 23 24 24 25 26 26 27
20
10
5 7
9
11 13 14 15 16 17 18 19 19 20
14
5 7
9
11 13 14 15 17 17 18 19 20 21 21
15
12/9/2013 12:29:13 PM
Book.indb 249
Table 9.9. vx 1 K
Critical values of the Cochran statistic for α = 0.05. 2
3
4
5
6
7
8
9
10
16
36
144
∞
2 3 4 5
0.9985 0.9669 0.9065 0.8412
0.9750 0.8709 0.7679 0.6838
0.9392 0.7977 0.6841 0.5981
0.9057 0.7457 0.6287 0.5441
0.8772 0.7071 0.5895 0.5065
0.8534 0.6771 0.5598 0.4783
0.8332 0.6530 0.5365 0.4564
0.8159 0.6333 0.5175 0.4387
0.8010 0.6167 0.5017 0.4241
0.7880 0.6025 0.4884 0.4118
0.7341 0.5466 0.4366 0.3645
0.6602 0.4748 0.3720 0.3066
0.5813 0.4031 0.3093 0.2513
0.5000 0.3333 0.2500 0.2000
6 7 8 9 10
0.7808 0.7271 0.6798 0.6385 0.6020
0.6161 0.5612 0.5157 0.4775 0.4450
0.5321 0.4800 0.4377 0.4027 0.3733
0.4803 0.4307 0.3910 0.3584 0.3311
0.4447 0.3974 0.3595 0.3286 0.3029
0.4184 0.3726 0.3362 0.3067 0.2823
0.3980 0.3535 0.3185 0.2901 0.2666
0.3817 0.3384 0.3043 0.2768 0.2541
0.3682 0.3259 0.2926 0.2659 0.2439
0.3568 0.3154 0.2829 0.2568 0.2353
0.3135 0.2756 0.2462 0.2226 0.2032
0.2612 0.2278 0.2022 0.1820 0.1655
0.2119 0.1833 0.1616 0.1446 0.1308
0.1667 0.1429 0.1250 0.1111 0.1000
12 15 20 24 30
0.5410 0.4709 0.3894 0.3434 0.2929
0.3924 0.3346 0.2705 0.2354 0.1980
0.3264 0.2758 0.2205 0.1907 0.1593
0.2880 0.2419 0.1921 0.1656 0.1377
0.2624 0.2195 0.1735 0.1493 0.1237
0.2439 0.2034 0.1602 0.1374 0.1137
0.2299 0.1911 0.1501 0.1286 0.1061
0.2187 0.1815 0.1422 0.1216 0.1002
0.2098 0.1736 0.1357 0.1160 0.0958
0.2020 0.1671 0.1303 0.1113 0.0921
0.1737 0.1429 0.1108 0.0942 0.0771
0.1403 0.1144 0.0879 0.0743 0.0604
0.1100 0.0889 0.0675 0.0567 0.0457
0.0833 0.0667 0.0500 0.0417 0.0333
40 60 120 ∞
0.2370 0.1737 0.0998 0
0.1576 0.1131 0.0632 0
0.1259 0.0895 0.0495 0
0.1082 0.0765 0.0419 0
0.0968 0.0682 0.0371 0
0.0887 0.0623 0.0337 0
0.0827 0.0583 0.0312 0
0.0780 0.0552 0.0292 0
0.0745 0.0520 0.0279 0
0.0713 0.0497 0.0266 0
0.0595 0.0411 0.0218 0
0.0462 0.0316 0.0165 0
0.0347 0.0234 0.0120 0
0.0250 0.0167 0.0083 0
12/9/2013 12:29:14 PM
Statistics for mining engineering
250
Critical values of the Hartley statistic for α = 0.05.
Table 9.10. K
2
3
4
5
6
7
8
9
10
11
12
2 3 4 5 6
39.0 15.4 9.60 7.15 5.82
87.5 27.8 15.5 10.8 8.38
142 39.2 20.6 13.7 10.4
202 50.7 25.2 16.3 12.1
266 62.0 29.5 18.7 13.7
333 72.9 33.6 20.8 15.0
403 83.5 37.5 22.9 16.3
475 93.9 41.1 24.7 17.5
550 104 44.6 26.5 18.6
626 114 48.0 28.2 19.7
704 124 51.4 29.9 20.7
7 8 9 10 12
4.99 4.43 4.03 3.72 3.28
6.94 6.00 5.34 4.85 4.16
8.44 7.18 6.31 5.67 4.79
9.70 8.12 7.11 6.34 5.30
10.8 9.03 7.80 6.92 5.72
11.8 9.78 8.41 7.42 6.09
12.7 10.5 8.95 7.87 6.42
13.5 11.1 9.45 8.28 6.72
14.3 11.7 9.91 8.66 7.00
15.1 12.2 10.3 9.01 7.25
15.8 12.7 10.7 9.34 7.48
15 20 30 60 ∞
2.86 2.46 2.07 1.67 1.00
3.54 2.95 2.40 1.85 1.00
4.01 3.29 2.61 1.96 1.00
4.37 3.54 2.78 2.04 1.00
4.68 3.76 2.91 2.11 1.00
4.95 3.94 3.02 2.17 1.00
5.19 4.10 3.12 2.22 1.00
5.40 4.24 3.21 2.26 1.00
5.59 4.37 3.29 2.30 1.00
5.77 4.49 3.36 2.33 1.00
5.93 4.59 3.39 2.36 1.00
n −1
Table 9.11. d 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
α
Quantiles of the Poisson distribution. 0.99993
0.9999
0.9993
0.999
0.993
0.99
0.95
0.000070 0.01188 0.07633 0.21115 0.41162 0.66825 0.97222 1.31628 1.69465 2.10271 2.53672 2.99367 3.47103 3.96672 4.47896 5.00626 5.54732
0.000100 0.01421 0.08618 0.23180 0.44446 0.71375 1.03840 1.38697 1.77758 2.19758 2.64323 3.11150 3.59988 4.10632 4.62904 5.16657 5.71762
0.000700 0.03789 0.16824 0.38894 0.68204 1.03236 1.42874 1.86297 2.32894 2.82197 3.33840 3.87531 4.43033 5.00152 5.58725 6.18615 6.79705
0.00100 0.04540 0.19053 0.42855 0.73937 1.10710 1.52034 1.97041 2.45242 2.96052 3.49148 4.04244 4.61106 5.19544 5.79398 6.40533 7.02835
0.00702 0.12326 0.38209 0.74108 1.17032 1.65152 2.17293 2.72659 3.30682 3.90942 4.53113 5.16960 5.82265 6.48871 7.16642 7.85464 8.55241
0.01005 0.14855 0.43604 0.82325 1.27911 1.78528 2.33021 2.90611 3.50746 4.13020 4.77125 5.42818 6.09907 6.78235 7.47673 8.18111 8.89457
0.05129 0.35536 0.81769 1.36632 1.97013 2.61301 3.28532 3.98082 4.69523 5.42541 6.16901 6.92421 7.68958 8.46394 9.24633 10.03596 10.83214 (Continued)
Book.indb 250
12/9/2013 12:29:14 PM
Statistical tables 251 Table 9.11. d
α
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
d 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
Book.indb 251
α
(Continued). 0.93
0.90
0.80
0.70
0.60
0.50
0.40
0.07257 0.43081 0.94230 1.53414 2.17670 2.85488 3.53984 4.28584 5.02895 5.78633 6.55583 7.33581 8.12496 8.92222 9.72672 10.53773 11.35465
0.10536 0.53181 1.10206 1.74477 2.43259 3.15190 3.89477 4.65612 5.43247 6.22130 7.02075 7.82934 8.64594 9.46962 10.29962 11.13539 11.97613
0.22314 0.82439 1.53504 2.29679 3.08954 3.90366 4.73366 5.57606 6.42848 7.28922 8.15702 9.03090 9.91010 10.79398 11.68206 12.57389 13.46913
0.35667 1.09733 1.91379 2.76371 3.63361 4.51714 5.41074 6.31217 7.21993 8.13293 9.05036 9.97161 10.89620 11.82373 12.75388 13.68639 14.62103
0.51082 1.37642 2.28508 3.21132 4.14774 5.09098 6.03924 6.99137 7.94661 8.90441 9.86440 10.82624 11.78972 12.75462 13.72081 14.68814 15.65651
0.69315 1.67835 2.67406 3.67206 4.67091 5.67016 6.66966 7.66925 8.66895 9.66871 10.66852 11.66836 12.66823 13.66811 14.66802 15.66793 16.66785
0.91629 2.02231 3.10338 4.17526 5.23662 6.29192 7.34265 8.38977 9.43395 10.47568 11.51533 12.55317 13.58944 14.62431 15.65793 16.68043 17.72191
0.30
0.20
0.10
0.05
0.025
0.01
0.005
1.20397 2.43922 3.61557 4.76223 5.89036 7.00555 8.11105 9.20895 10.30068 11.38727 12.46951 13.54798 14.62316 15.69544 16.78512 17.83246 18.89769
l.60944 2.99431 4.27903 5.51504 6.72098 7.90599 9.07538 10.23254 11.37977 12.51875 13.65073 14.77666 15.89731 17.01328 18.12509 19.23316 20.93782
2.30258 3.88972 5.32232 6.68078 7.99359 9.27467 10.53207 11.77091 12.99471 14.20599 15.40664 16.59812 17.78158 18.95796 20.12801 21.29237 22.45158
2.99573 4.74386 6.29579 7.75366 9.15352 10.51303 11.84240 13.14811 14.43465 15.70522 16.96222 18.20751 19.44257 20.66857 21.88648 23.09713 24.30118
3.68888 5.57164 7.22469 8.76727 10.24159 11.66833 13.05947 14.42268 15.76319 17.08480 18.39036 19.68204 20.96158 22.23040 23.48962 24.74022 25.98300
4.60517 6.63835 8.40595 10.04512 11.60462 13.10848 14.57062 15.99996 17.40265 18.78312 20.14468 21.48991 22.82084 24.13912 25.44609 26.74289 28.03045
5.29832 7.43013 9.27379 10.97748 12.59409 14.14976 15.65968 17.13359 18.57822 19.99842 21.39783 22.77926 24.14494 25.49669 26.83398 28.16406 29.48198
12/9/2013 12:29:15 PM
Book.indb 252
Table 9.12. Critical values in Kolmogorov test of goodness-of-fit. α 0.20 0.10 0.05 0.02 n
0.01
a n
0.20
0.10
0.05
0.02
0.01
12/9/2013 12:29:15 PM
1 2 3 4 5
0.900 00 0.683 77 0.564 81 0.492 65 0.446 98
0.950 00 0.776 39 0.636 04 0.563 22 0.509 45
0.975 00 0.841 89 0.707 60 0.623 94 0.563 28
0.990 00 0.900 00 0.784 56 0.688 87 0.627 18
0.995 00 0.929 29 0.829 00 0.734 24 0.668 53
51 52 53 54 55
0.146 97 0.145 58 0.144 23 0.142 92 0.141 64
0.167 96 0.166 37 0.164 83 0.163 32 0.161 86
0.186 59 0.184 82 0.183 11 0.181 44 0.179 81
0.208 64 0.206 67 0.204 75 0.202 89 0.201 07
0.223 86 0.221 74 0.219 68 0.217 68 0.215 74
6 7 8 9 10
0.410 37 0.381 48 0.358 31 0.339 10 0.322 60
0.467 99 0.436 07 0.409 62 0.387 46 0.368 66
0.519 26 0.483 42 0.454 27 0.430 01 0.409 25
0.577 41 0.538 44 0.506 54 0.479 60 0.456 62
0.616 61 0.575 81 0.541 79 0.513 32 0.488 93
56 57 58 59 60
0.140 40 0.139 19 0.138 01 0.136 86 0.135 73
0.160 44 0.159 06 0.157 71 0.156 39 0.155 11
0.178 23 0.176 69 0.175 19 0.173 73 0.172 31
0.199 30 0.197 58 0.195 90 0.194 27 0.192 67
0.213 84 0.211 99 0.210 19 0.208 44 0.206 73
11 12 13 14 15
0.308 29 0.295 77 0.284 70 0.274 81 0.265 88
0.352 42 0.338 15 0.325 49 0.314 17 0.303 97
0.391 22 0.375 43 0.361 43 0.348 90 0.337 60
0.436 70 0.419 18 0.403 62 0.389 70 0.377 13
0.467 70 0.449 05 0.432 47 0.417 62 0.404 20
61 62 63 64 65
0.134 64 0.133 57 0.132 53 0.131 51 0.130 52
0.153 85 0.152 63 0.151 44 0.150 27 0.149 13
0.170 91 0.169 56 0.168 23 0.166 93 0.165 67
0.191 12 0.189 60 0.188 12 0.186 67 0.185 25
0.205 06 0.203 43 0.201 84 0.200 29 0.198 77
16 17 18 19 20
0.257 78 0.250 39 0.243 60 0.237 35 0.231 56
0.294 72 0.286 27 0.278 51 0.271 36 0.264 73
0.327 33 0.317 96 0.309 36 0.301 43 0.294 08
0.365 71 0.355 28 0.345 69 0.336 85 0.328 66
0.392 01 0.380 86 0.370 62 0.361 17 0.352 41
66 67 68 69 70
0.129 54 0.128 59 0.127 66 0.126 75 0.125 86
0.148 02 0.146 93 0.145 87 0.144 83 0.143 81
0.164 43 0.163 22 0.162 04 0.160 88 0.159 75
0.183 87 0.182 52 0.181 19 0.179 90 0.178 63
0.197 29 0.195 84 0.194 42 0.193 03 0.191 67
21 22 23 24 25
0.226 17 0.221 15 0.216 45 0.212 05 0.207 90
0.258 58 0.252 83 0.247 46 0.242 42 0.237 68
0.287 24 0.280 87 0.274 90 0.269 31 0.264 04
0.321 04 0.313 94 0.307 28 0.301 04 0.295 16
0.344 27 0.336 66 0.329 54 0.322 86 0.316 57
71 72 73 74 75
0.124 99 0.124 13 0.123 29 0.122 47 0.121 67
0.142 81 0.141 83 0.140 87 0.139 93 0.139 01
0.158 64 0.157 53 0.156 49 0.155 44 0.154 42
0.177 39 0.176 18 0.174 98 0.173 82 0.172 68
0.190 34 0.189 03 0.187 76 0.186 50 0.185 28
Book.indb 253
26 27 28 29 30
0.203 99 0.200 30 0.196 80 0.193 48 0.190 32
0.233 20 0.228 98 0.224 97 0.221 17 0.217 56
0.259 07 0.254 38 0.249 93 0.245 71 0.241 70
0.289 62 0.284 38 0.279 42 0.274 71 0.270 23
0.310 64 0.305 02 0.299 71 0.294 66 0.289 87
76 77 78 79 80
0.120 88 0.120 11 0.119 35 0.118 60 0.117 87
0.138 11 0.137 23 0.136 36 0.135 51 0.134 67
0.153 42 0.152 44 0.151 47 0.150 52 0.149 60
0.171 55 0.170 45 0.169 38 0.168 32 0.167 28
0.184 08 0.182 90 0.181 74 0.180 60 0.179 49
31 32 33 34 35
0.187 32 0.184 45 0.181 71 0.179 09 0.176 59
0.214 12 0.210 85 0.207 71 0.204 72 0.201 85
0.237 88 0.234 24 0.230 76 0.227 43 0.224 25
0.265 96 0.261 89 0.258 01 0.254 29 0.250 73
0.285 30 0.280 94 0.276 77 0.272 79 0.268 97
81 82 83 84 85
0.117 16 0.116 45 0.115 76 0.115 08 0.114 42
0.133 85 0.133 05 0.132 26 0.131 48 0.130 72
0.148 68 0.147 79 0.146 91 0.146 05 0.145 20
0.166 26 0.165 26 0.164 28 0.163 31 0.162 36
0.178 40 0.177 32 0.176 27 0.175 23 0.174 21
36 37 38 39 40
0.174 18 0.171 88 0.169 66 0.167 53 0.165 47
0.199 10 0.196 46 0.193 92 0.191 48 0.189 13
0.221 19 0.218 26 0.215 44 0.212 73 0.210 12
0.247 32 0.244 04 0.240 89 0.237 86 0.234 94
0.265 32 0.261 80 0.258 43 0.255 18 0.232 03
86 87 88 89 90
0.113 76 0.113 11 0.112 48 0.111 86 0.111 25
0.129 97 0.129 23 0.128 50 0.127 79 0.127 09
0.144 37 0.143 55 0.142 74 0.141 95 0.141 17
0.161 43 0.160 51 0.159 61 0.158 73 0.157 86
0.173 21 0.172 23 0.171 26 0.170 31 0.169 38
41 42 43 44 45
0.163 49 0.161 58 0.159 74 0.157 96 0.156 23
0.186 87 0.184 68 0.182 57 0.180 53 0.178 56
0.207 60 0.205 17 0.202 83 0.200 56 0.198 57
0.232 13 0.229 41 0.226 79 0.224 26 0.221 81
0.249 04 0.246 13 0.243 32 0.240 60 0.237 98
91 92 93 94 95
0.110 64 0.110 05 0.109 47 0.108 89 0.108 33
0.126 40 0.125 72 0.125 06 0.124 40 0.123 75
0.140 40 0.139 65 0.138 91 0.138 18 0.137 46
0.157 00 0.156 16 0.155 33 0.154 51 0.153 71
0.168 46 0.167 55 0.166 66 0.165 79 0.164 93
46 47 48 49 50
0.154 57 0.152 95 0.151 39 0.149 87 0.148 40
0.176 65 0.174 81 0.173 02 0.171 28 0.169 59
0.196 25 0.194 20 0.192 21 0.190 28 0.18 841
0.219 44 0.217 15 0.214 93 0.212 77 0.210 68
0.235 44 0.232 98 0.230 59 0.228 28 0.226 04
96 97 89 99 100
0.107 77 0.107 22 0.106 68 0.106 15 0.105 63
0.123 12 0.122 49 0.121 87 0.121 26 0.120 67
0.136 75 0.136 06 0.135 37 0.134 69 0.134 03
0.152 91 0.152 14 0.151 37 0.150 61 0.149 87
0.164 08 0.163 24 0.162 42 0.161 61 0.160 81
12/9/2013 12:29:16 PM
Table 9.13. Critical values of a linear correlation coefficient and a partial correlation coefficient. α 0.1 0.05 0.02 0.01 0.001 N
Book.indb 254
1 2 3 4 5
0.98769 0.90000 0.8054 0.7293 0.6694
0.99692 0.95000 0.8783 0.8114 0.7545
0.999507 0.980000 0.93433 0.8822 0.8329
0.999877 0.990000 0.95873 0.91720 0.8745
0.9999988 0.99900 0.99116 0.97406 0.95074
6 7 8 9 10
0.6215 0.5822 0.5494 0.5214 0.4973
0.7067 0.6664 0.6319 0.6021 0.5760
0.7887 0.7498 0.7155 0.6851 0.6581
0.8343 0.7977 0.7646 0.7348 0.7079
0.92493 0.8982 0.8721 0.8471 0.8233
11 12 13 14 15
0.4762 0.4575 0.4409 0.4259 0.4124
0.5529 0.5324 0.5139 0.4973 0.4821
0.6339 0.6120 0.5923 0.5742 0.5577
0.6835 0.6614 0.6411 0.6226 0.6055
0.8010 0.7800 0.7603 0.7420 0.7246
16 17 18 19 20
0.4000 0.3887 0.3783 0.3687 0.3598
0.4683 0.4555 0.4438 0.4329 0.4227
0.5425 0.5285 0.5155 0.5034 0.4921
0.5897 0.5751 0.5614 0.5487 0.5368
0.7084 0.6932 0.6787 0.6652 0.6524
25 30 35 40 45
0.3233 0.2960 0.2746 0.2573 0.2428
0.3809 0.3494 0.3246 0.3044 0.2475
0.4451 0.4093 0.3810 0.3578 0.3384
0.4869 0.4487 0.4182 0.3932 0.3721
0.5974 0.5541 0.5189 0.4896 0.4648
50 60 70 80 90
0.2306 0.2108 0.1954 0.1829 0.1726
0.2732 0.2500 0.2319 0.2172 0.2050
0.3218 0.2948 0.2737 0.2565 0.2422
0.3541 0.3248 0.3017 0.2830 0.2673
0.4433 0.4078 0.3799 0.3568 0.3375
100
0.1638
0.1946
0.2301
0.2540
0.3211
12/9/2013 12:29:17 PM
Table 9.14. Critical values of the Spearman’s rank correlation coefficient. α n
0.05
0.01
4 3 6 7 8 9 10 12 14 16 18 20 22 24 26 28 30
1.000 0.900 0.829 0.714 0.643 0.600 0.564 0.506 0.456 0.425 0.399 0.377 0.359 0.343 0.329 0.317 0.306
– 1.000 0.943 0.893 0.833 0.783 0.746 0.712 0.645 0.601 0.564 0.534 0.508 0.485 0.465 0.448 0.432
Table 9.15. coefficient. k
Critical values of a multiple correlation
3
4
5
6
1
0.999 1.000
0.999 1.000
0.999 1.000
0.999 1.000
2
0.975 0.995
0.983 0.997
0.987 0.997
0.990 0.998
3
0.930 0.977
0.950 0.983
0.961 0.987
0.968 0.990
4
0.881 0.949
0.912 0.962
0.930 0.970
0.942 0.975
5
0.836 0.917
0.874 0.937
0.898 0.949
0.914 0.957
6
0.795 0.886
0.839 0.911
0.867 0.927
0.886 0.938
7
0.758 0.855
0.807 0.885
0.838 0.904
0.860 0.918
8
0.726 0.827
0.777 0.860
0.811 0.882
0.835 0.898
9
0.697 0.800
0.750 0.837
0.786 0.861
0.812 0.878
10
0.671 0.776
0.726 0.814
0.763 0.840
0.790 0.859
N
(Continued)
Book.indb 255
12/9/2013 12:29:17 PM
Table 9.15. k
(Continued). 3
4
5
6
11
0.648 0.753
0.703 0.793
0.741 0.821
0.770 0.841
12
0.627 0.732
0.683 0.773
0.722 0.802
0.751 0.824
13
0.608 0.712
0.664 0.755
0.703 0.785
0.733 0.807
14
0.590 0.694
0.646 0.737
0.686 0.768
0.717 0.791
15
0.574 0.677
0.630 0.721
0.670 0.752
0.701 0.776
16
0.559 0.662
0.615 0.706
0.656 0.738
0.687 0.762
17
0.545 0.647
0.601 0.691
0.641 0.724
0.673 0.749
18
0.532 0.633
0.587 0.678
0.628 0.710
0.660 0.736
19
0.520 0.620
0.575 0.665
0.615 0.697
0.647 0.723
20
0.509 0.607
0.563 0.652
0.604 0.685
0.636 0.712
21
0.498 0.596
0.552 0.641
0.593 0.674
0.624 0.700
22
0.488 0.585
0.542 0.630
0.582 0.663
0.614 0.690
23
0.479 0.574
0.532 0.619
0.572 0.653
0.604 0.679
24
0.470 0.565
0.523 0.609
0.562 0.643
0.594 0.669
25
0.462 0.555
0.514 0.600
0.553 0.633
0.585 0.660
26
0.454 0.546
0.506 0.590
0.543 0.624
0.576 0.651
27
0.446 0.538
0.498 0.582
0.536 0.615
0.568 0.642
28
0.439 0.529
0.490 0.573
0.529 0.607
0.560 0.633
29
0.432 0.522
0.483 0.565
0.521 0.598
0.552 0.625
30
0.425 0.514
0.476 0.557
0.514 0.591
0.545 0.618
40
0.373 0.454
0.419 0.494
0.455 0.526
0.484 0.552
60
0.308 0.377
0.348 0.414
0.380 0.442
0.406 0.467
120
0.221 0.272
0.251 0.300
0.275 0.322
0.295 0.342
N
The upper row is for α = 0.05; the lower row for α = 0.01.
Book.indb 256
12/9/2013 12:29:17 PM
Table 9.16a. Critical values Dn,m(α) in the Smirnov test of goodness-of-fit for two empirical distributions. α 0.10
0.05
0.02
0.01
k
n
m
3
3
3
0.100
—
—
—
3
4
4 3
4 12
0.029 0.057
4
0.029 —
— —
— —
4 12
5
5 4 3 2
4 16 15 10
0.079 0.079 0.036 0.095
5 20 15
0.008 0.016 0.036 —
5 20
0.008 — —
5 20 15 10
6
6 5 4 3 2
5 24 9 5 6
0.026 0.048 0.095 0.095 0.071
5 24 10 6
0.0026 0.048 0.048 0.024 —
7
7 6 5 4 3 2
5 28 25 21 18 14
0.053 0.091 0.066 0.067 0.067 0.056
6 30 29 24 21
8
8 7 6 5 4 3 2
5 34 15 27 6 21 8
0.087 0.087 0.093 0.079 0.085 0.048 0.044
9
9 8 7 6 5 4 3 2
6 40 36 11 30 27 7 18
10
10 9 8 7 6 5 4 3 2
11
11 10 9 8
0.008 0.016 — —
5
6 30 12
0.002 0.004 0.010 — —
6 30 12
0.002 0.004 0.010 — —
6 30 12 6 6
0.008 0.038 0.030 0.030 0.017 —
6 35 30 28 21
0.008 0.015 0.015 0.006 0.017 —
6 36 35 28
0.008 0.009 0.003 0.006 — —
7 42 35 28 21 14
6 40 17 29 7 21 8
0.019 0.033 0.043 0.042 0.020 0.048 0.044
6 42 20 35 8 24
0.019 0.013 0.009 0.009 0.004 0.012 —
7 48 20 35 8
0.002 0.005 0.009 0.009 0.004 — —
8 56 24 40 8 24 8
0.034 0.079 0.098 0.095 0.086 0.062 0.091 0.036
6 46 42 13 35 28 8 18
0.034 0.047 0.034 0.028 0.028 0.042 0.036 0.036
7 54 47 14 36 32 9
0.006 0.011 0.015 0.014 0.014 0.014 0.009 —
7 55 49 15 40 36 9
0.006 0.008 0.008 0.006 0.006 0.003 0.009 —
9 72 63 18 45 36 9 18
6 50 22 40 18 7 14 24 9
0.052 0.084 0.095 0.087 0.092 0.061 0.084 0.070 0.091
7 53 24 46 20 8 15 27 10
0.012 0.045 0.050 0.036 0.042 0.019 0.046 0.028 0.030
7 61 28 50 22 8 18 30
0.012 0.018 0.012 0.016 0.019 0.019 0.010 0.007 —
8 63 30 56 24 9 18 30
0.002 0.007 0.007 0.006 0.009 0.004 0.010 0.007 —
10 90 40 70 30 10 20 30 10
6 57 52 48
0.075 0.092 0.089 0.081
7 60 59 53
0.021 0.043 0.039 0.047
8 69 63 61
0.004 0.017 0.019 0.013
8 77 70 64
0.004 0.008 0.007 0.007
11 110 99 88
(Continued)
Book.indb 257
12/9/2013 12:29:17 PM
Table 9.16a.
(Continued). α
n
m
0.10
0.05
0.02
0.01
k
7 6 5 4 3 2
44 38 35 29 27 20
0.083 0.092 0.074 0.098 0.055 0.077
48 43 39 33 30 22
0.049 0.048 0.044 0.035 0.022 0.026
55 49 44 40 33
0.014 0.013 0.014 0.007 0.005 —
59 54 45 40 33
0.006 0.006 0.010 0.007 0.005 —
77 66 55 44 33 22
12
12 11 10 9 8 7 6 5 4 3 2
6 64 30 19 13 46 8 36 9 9 11
0.100 0.091 0.093 0.078 0.091 0.098 0.046 0.096 0.048 0.088 0.066
7 72 33 21 15 53 8 43 9 10 12
0.031 0.050 0.049 0.041 0.032 0.034 0.046 0.033 0.048 0.044 0.022
8 77 37 23 16 58 9 48 10 11
0.008 0.017 0.020 0.018 0.018 0.017 0.015 0.010 0.016 0.018 —
8 86 40 25 17 60 10 50 11 12
0.008 0.009 0.007 0.007 0.009 0.010 0.004 0.007 0.005 0.004 —
12 132 60 36 24 84 12 60 12 12 12
13
13 12 11 10 9 8 7 6 5 4 3 2
7 71 67 64 59 54 50 46 40 35 30 24
0.044 0.091 0.100 0.094 0.098 0.099 0.094 0.086 0.087 0.089 0.071 0.057
7 81 75 70 65 62 56 52 45 39 33 26
0.044 0.049 0.048 0.049 0.042 0.039 0.046 0.034 0.040 0.038 0.036 0.019
8 92 86 78 73 67 63 54 50 44 36 26
0.013 0.019 0.015 0.018 0.018 0.019 0.017 0.019 0.015 0.013 0.014 0.019
9 95 91 84 78 72 65 59 52 48 39
0.003 0.009 0.009 0.010 0.008 0.009 0.007 0.007 0.007 0.004 0.004 —
13 156 143 130 117 104 91 78 65 52 39 26
14
14 13 12 11 10 9 8 7 6 5 4 3 2
7 78 39 73 34 63 29 8 24 42 19 33 12
0.059 0.097 0.087 0.090 0.091 0.082 0.091 0.083 0.086 0.079 0.072 0.050 0.100
8 89 43 82 37 70 32 9 27 46 21 36 13
0.019 0.049 0.044 0.041 0.049 0.046 0.046 0.033 0.037 0.047 0.030 0.029 0.050
8 102 47 90 42 80 36 10 30 51 24 39 14
0.019 0.017 0.020 0.017 0.016 0.015 0.018 0.012 0.014 0.019 0.010 0.012 0.017
9 104 52 96 45 84 38 11 32 56 24 42 —
0.005 0.010 0.008 0.009 0.008 0.008 0.009 0.003 0.008 0.006 0.010 0.003
14 182 84 154 70 126 56 14 42 70 28 42 14
15
15 14 13 12 11 10 9
7 92 87 28 76 15 38
0.075 0.100 0.088 0.078 0.099 0.077 0.073
8 98 96 31 84 16 25
0.026 0.044 0.047 0.040 0.048 0.050 0.042
9 111 107 34 95 18 28
0.008 0.017 0.019 0.017 0.018 0.018 0.015
9 123 115 36 102 20 30
0.008 0.009 0.008 0.010 0.009 0.006 0.007
15 210 195 60 165 30 45
(Continued)
Book.indb 258
12/9/2013 12:29:18 PM
Table 9.16a.
(Continued). α
n
m
0.10
0.05
0.02
0.01
k
8 7 6 5 4 3 2
60 56 17 10 40 11 26
0.086 0.079 0.087 0.052 0.086 0.086 0.088
67 62 19 11 44 12 28
0.042 0.047 0.040 0.023 0.042 0.049 0.044
75 70 21 12 48 14 30
0.014 0.014 0.016 0.009 0.018 0.010 0.015
81 75 23 12 52 14 —
0.010 0.009 0.006 0.009 0.008 0.010
120 105 30 15 60 15 30
16
16 15 14 13 12 11 10 9 8 7 6 5 4 3 2
7 101 48 91 22 80 38 69 9 59 27 48 11 36 14
0.093 0.093 0.093 0.089 0.084 0.086 0.088 0.100 0.058 0.094 0.086 0.088 0.070 0.072 0.078
8 114 53 101 24 89 42 78 10 64 30 54 12 39 15
0.035 0.048 0.048 0.047 0.047 0.049 0.044 0.043 0.024 0.048 0.042 0.041 0.034 0.041 0.039
9 120 60 112 27 100 47 87 11 73 33 59 13 45 16
0.011 0.019 0.017 0.018 0.017 0.019 0.017 0.016 0.009 0.018 0.019 0.018 0.014 0.008 0.013
10 133 63 121 29 106 50 94 11 77 36 64 14 45
0.003 0.009 0.009 0.009 0.008 0.009 0.009 0.007 0.009 0.010 0.008 0.007 0.006 0.008 —
16 240 112 208 48 176 80 144 16 112 48 80 16 48 16
17
17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2
8 109 105 100 96 90 85 79 74 68 61 56 50 44 36 30
0.045 0.096 0.094 0.096 0.091 0.093 0.092 0.097 0.091 0.097 0.099 0.084 0.094 0.085 0.098 0.070
8 124 116 111 105 100 93 89 82 77 68 62 55 48 42 32
0.045 0.045 0.049 0.048 0.050 0.046 0.046 0.044 0.049 0.044 0.046 0.040 0.048 0.046 0.035 0.035
9 139 131 125 118 112 104 99 92 85 77 68 63 56 45 34
0.016 0.020 0.018 0.018 0.019 0.017 0.018 0.017 0.016 0.018 0.019 0.016 0.015 0.012 0.018 0.012
10 143 142 134 127 119 110 106 99 88 84 73 68 60 48
0.005 0.009 0.009 0.009 0.008 0.009 0.010 0.008 0.009 0.009 0.007 0.010 0.005 0.005 0.007 —
17 272 255 238 221 204 187 170 153 136 119 102 85 68 51 34
18
18 17 16 15 14 13 12 11 10 9
8 118 58 37 52 99 16 88 41 9
0.056 0.091 0.093 0.096 0.100 0.098 0.094 0.097 0.099 0.088
9 133 64 41 58 110 18 97 46 10
0.021 0.047 0.048 0.046 0.048 0.050 0.042 0.048 0.047 0.041
10 150 71 46 65 123 20 108 52 11
0.007 0.018 0.019 0.017 0.018 0.020 0.016 0.019 0.016 0.017
10 164 77 49 70 131 21 118 54 12
0.007 0.009 0.009 0.010 0.008 0.010 0.010 0.009 0.010 0.007
18 306 144 90 126 234 36 198 90 18
(Continued)
Book.indb 259
12/9/2013 12:29:18 PM
Table 9.16a.
(Continued). α
n
Book.indb 260
m
0.10
0.05
0.02
0.01
k
8 7 6 5 4 3 2
36 65 11 52 23 13 16
0.088 0.095 0.053 0.099 0.090 0.084 0.063
40 72 12 60 25 15 17
0.040 0.046 0.025 0.038 0.049 0.030 0.032
44 83 13 65 28 16 18
0.017 0.014 0.011 0.019 0.019 0.015 0.011
47 87 14 70 30 17
0.010 0.008 0.004 0.008 0.010 0.006 —
72 126 18 90 36 18 18
19
19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2
8 133 126 120 114 110 104 99 92 85 80 74 69 64 56 49 42 32
0.068 0.097 0.095 0.096 0.100 0.095 0.097 0.090 0.094 0.089 0.092 0.097 0.088 0.082 0.082 0.077 0.073 0.095
9 142 141 133 127 121 114 108 102 94 89 82 76 70 61 53 45 36
0.027 0.049 0.046 0.048 0.048 0.047 0.046 0.050 0.049 0.047 0.046 0.049 0.044 0.043 0.043 0.041 0.045 0.029
10 160 158 151 142 135 130 121 114 104 99 93 86 77 70 57 51 38
0.009 0.019 0.018 0.018 0.020 0.019 0.018 0.019 0.018 0.019 0.016 0.018 0.016 0.019 0.015 0.019 0.013 0.010
10 176 166 160 152 148 138 130 122 113 107 98 91 83 71 64 54 38
0.009 0.009 0.010 0.009 0.010 0.008 0.009 0.010 0.009 0.009 0.009 0.010 0.009 0.009 0.009 0.008 0.005 0.010
19 342 323 304 285 266 247 228 209 190 171 152 133 114 95 76 57 38
20
20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2
8 144 68 130 32 25 57 108 26 96 10 84 20 72 33 12 13 42 17
0.081 0.098 0.098 0.099 0.089 0.079 0.095 0.099 0.091 0.096 0.062 0.095 0.087 0.085 0.082 0.085 0.087 0.095 0.087
9 160 76 146 35 27 63 120 29 107 11 93 22 79 36 13 15 48 19
0.034 0.049 0.048 0.048 0.049 0.046 0.049 0.049 0.043 0.046 0.029 0.049 0.44 0.043 0.035 0.047 0.027 0.040 0.026
10 171 85 163 39 30 71 135 32 118 12 104 25 91 40 15 16 54 20
0.012 0.019 0.019 0.019 0.020 0.019 0.019 0.018 0.018 0.020 0.012 0.020 0.014 0.016 0.016 0.012 0.013 0.011 0.009
11 187 91 175 42 32 76 143 35 127 12 111 26 93 44 16 17 57 20
0.004 0.010 0.009 0.009 0.009 0.010 0.009 0.009 0.007 0.010 0.005 0.010 0.009 0.008 0.007 0.005 0.007 0.005 0.009
20 380 180 340 80 60 140 260 60 220 20 180 40 140 60 20 20 60 20
12/9/2013 12:29:19 PM
Table 9.16b. n 1 k
Distribution of the Smirnov statistic Dn,m P{Dn,m ≤ k/n}. 2
3
4
5
6
7
1.000 000
0.666 666 1.000 000
0.400 000 0.900 000 1.000 000
0.228 571 0.771 428 0.971 428 1.000 000
0.126 984 0.642 857 0.920 634 0.992 063 1.000 000
0.069 264 0.525 974 0.857 142 0.974 025 0.997 835 1.000 00
0.037 296 0.424 825 0.787 878 0.946 969 0.991 841 0.999 417 1.000 000
k
8
9
10
11
12
13
14
1 2 3 4 5 6 7 8 9 10 11 12 13
0.019 891 0.339 860 0.717 327 0.912 975 0.981 351 0.997 513 0.999 844 1.000 000
0.010 530 0.269 888 0.648 292 0.874 125 0.966 433 0.993 706 0.999 259 0.999 958 1.000 000
0.005 542 0.213 070 0.582 476 0.832 178 0.947 552 0.987 659 0.997 943 0.999 783 0.999 989 1.000 000
0.002 903 0.167 412 0.520 849 0.788 523 0.925 339 0.979 260 0.995 633 0.999 345 0.999 937 0.999 997 1.000 000
0.001 514 0.131 018 0.463 902 0.744 224 0.900 453 0.968 563 0.992 140 0.998 503 0.999 795 0.999 982 0.999 999 1.000 000
0.000 787 0.102 194 0.411 803 0.700 079 0.873 512 0.955 727 0.987 350 0.997 125 0.999 500 0.999 937 0.999 995 0.999 999 1.000 000
0.000 408 0.079 484 0.364 515 0.656 679 0.845 065 0.940 970 0.981 217 0.995 100 0.998 979 0.999 836 0.999 981 0.999 998 1.000 000
k
15
16
17
18
19
20
21
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
0.000 211 0.061 668 0.321 861 0.614 453 0.815 583 0.924 535 0.973 751 0.992 344 0.998 162 0.999 646 0.999 947 0.999 994 0.999 999 1.000 000
0.000 109 0.047 743 0.283 588 0.573 706 0.785 465 0.906 673 0.965 002 0.988 800 0.996 984 0.999 329 0.999 880 0.999 983 0.999 998 0.999 999 1.000 000
0.000 056 0.036 892 0.249 392 0.534 647 0.755 040 0.887 622 0.955 047 0.984 439 0.995 389 0.998 847 0.999 761 0.999 960 0.999 994 0.999 999 1.000 000
0.000 028 0.028 460 0.218 952 0.497 409 0.724 581 0.867 606 0.943 981 0.979 252 0.993 331 0.998 160 0.999 570 0.999 916 0.999 987 0.999 998 0.999 999 1.000 000
0.000 014 0.021 922 0.191 938 0.462 071 0.694 310 0.846 826 0.931 910 0.973 250 0.990 776 0.997 232 0.999 285 0.999 843 0.999 971 0.999 995 0.999 999 0.999 999 1.000 000
0.000 007 0.016 863 0.168 030 0.428 664 0.664 409 0.825 466 0.918 942 0.966 458 0.987 701 0.996 032 0.998 884 0.999 729 0.999 944 0.999 990 0.999 998 0.999 999 1.000 000
0.000 003 0.012 955 0.146 921 0.397 187 0.635 020 0.803 687 0.905 183 0.958 911 0.984 094 0.994 532 0.998 343 0.999 561 0.999 899 0.999 980 0.999 996 0.999 999 1.000 000
1 2 3 4 5 6 7 n
n
(Continued)
Book.indb 261
12/9/2013 12:29:19 PM
Table 9.16b. n 22 k
(Continued). 23
24
25
26
27
28
0.000 001 0.009 942 0.128 321 0.367 613 0.606 260 0.781 631 0.890 738 0.950 653 0.979 952 0.992 710 0.997 641 0.999 326 0.999 831 0.999 963 0.999 993 0.999 998 0.999 999 1.000 000
0.000 001 0.007 622 0.111 963 0.339 899 0.578 218 0.759 421 0.875 705 0.941 731 0.975 279 0.990 548 0.996 759 0.999 009 0.999 732 0.999 936 0.999 986 0.999 997 0.999 999 1.000 000
0.000 000 0.005 838 0.097 599 0.313 982 0.550 963 0.737 166 0.860 177 0.932 196 0.970 086 0.988 034 0.995 679 0.998 598 0.999 594 0.999 895 0.999 976 0.999 995 0.999 999 0.999 999 1.000 000
0.000 000 0.004 468 0.085 006 0.289 796 0.524 546 0.714 957 0.844 239 0.922 101 0.964 388 0.985 162 0.994 385 0.998 079 0.999 409 0.999 837 0.999 960 0.999 991 0.999 998 0.999 999 0.999 999 1.000 000
0.000 000 0.003 417 0.073 980 0.267 262 0.499 004 0.692 876 0.827 971 0.911 498 0.958 206 0.981 927 0.992 865 0.997 439 0.999 167 0.999 756 0.999 936 0.999 985 0.999 996 0.999 999 0.999 999 1.000 000
0.000 000 0.002 611 0.064 337 0.246 302 0.474 362 0.670 992 0.811 443 0.900 437 0.951 561 0.978 330 0.991 109 0.996 666 0.998 861 0.999 647 0.999 901 0.999 975 0.999 994 0.999 998 0.999 999 0.999 999
0.000 000 0.001 993 0.055 914 0.226 833 0.450 633 0.649 361 0.794 721 0.888 969 0.944 480 0.974 375 0.989 109 0.995 750 0.998 482 0.999 505 0.999 853 0.999 961 0.999 990 0.999 998 0.999 999 0.999 999
k
29
30
31
32
33
34
35
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
0.000 000 0.001 521 0.048 563 0.208 772 0.427 822 0.628 305 0.777 865 0.877 140 0.936 988 0.970 069 0.986 859 0.994 681 0.998 020 0.999 325 0.999 790 0.999 940 0.999 984 0.999 996 0.999 999 0.999 999
0.000 000 0.001 160 0.042 153 0.192 036 0.405 929 0.607 054 0.760 926 0.864 996 0.929 112 0.965 419 0.984 356 0.993 451 0.997 469 0.999 100 0.999 706 0.999 912 0.999 976 0.999 994 0.999 998 0.999 999
0.000 000 0.000 884 0.036 570 0.176 546 0.384 946 0.584 454 0.743 954 0.852 579 0.920 879 0.960 438 0.981 599 0.992 054 0.996 821 0.998 825 0.999 600 0.999 875 0.999 964 0.999 990 0.999 997 0.999 999
0.000 000 0.000 674 0.031 710 0.162 222 0.364 860 0.566 263 0.726 991 0.839 930 0.912 317 0.955 137 0.978 588 0.990 483 0.996 069 0.998 494 0.999 466 0.999 825 0.999 947 0.999 985 0.999 996 0.999 999
0.000 000 0.000 513 0.027 482 0.148 989 0.345 656 0.546 505 0.710 076 0.827 085 0.903 453 0.949 530 0.975 325 0.988 735 0.995 206 0.998 102 0.999 302 0.999 762 0.999 925 0.999 978 0.999 994 0.999 998
0.000 000 0.000 390 0.023 808 0.136 773 0.327 315 0.527 197 0.693 241 0.814 080 0.894 313 0.943 629 0.971 814 0.986 806 0.994 228 0.997 644 0.999 104 0.999 683 0.999 896 0.999 968 0.999 991 0.999 997
0.000 000 0.000 297 0.020 615 0.125 505 0.309 815 0.508 355 0.676 518 0.800 946 0.884 922 0.937 451 0.968 060 0.984 695 0.993 128 0.997 113 0.998 868 0.999 586 0.999 859 0.999 955 0.999 987 0.999 996
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 n
(Continued)
Book.indb 262
12/9/2013 12:29:20 PM
Table 9.16b. n 36 k 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
CH09.indd 263
(Continued).
0.000 000 0.000 226 0.017 844 0.115 119 0.293 133 0.489 989 0.659 934 0.787 713 0.875 305 0.931 011 0.964 067 0.982 400 0.991 904 0.996 507 0.998 589 0.999 467 0.999 812 0.999 938 0.999 981 0.999 994
37
38
39
40
0.000 000 0.000 171 0.015 440 0.105 553 0.277 243 0.472 106 0.643 511 0.774 409 0.865 485 0.924 322 0.959 843 0.979 921 0.990 551 0.995 820 0.998 265 0.999 325 0.999 754 0.999 916 0.999 973 0.999 992
0.000 000 0.000 130 0.013 354 0.096 746 0.262 120 0.454 713 0.627 272 0.761 059 0.855 485 0.917 402 0.955 395 0.977 260 0.989 067 0.995 049 0.997 891 0.999 156 0.999 683 0.999 888 0.999 963 0.999 988
0.000 000 0.000 099 0.011 546 0.088 644 0.247 737 0.437 810 0.611 234 0.747 686 0.845 325 0.910 264 0.950 731 0.974 418 0.987 450 0.994 189 0.997 464 0.998 958 0.999 598 0.999 854 0.999 950 0.999 984
0.000 000 0.000 075 0.009 980 0.081 194 0.234 068 0.421 399 0.595 412 0.734 312 0.835 027 0.902 925 0.945 858 0.971 396 0.985 698 0.993 239 0.996 981 0.998 729 0.999 496 0.999 812 0.999 934 0.999 978
12/9/2013 3:40:47 PM
CH09.indd 264
Table 9.17.
Critical values
α
(2n, 2m) of the
distribution. α = 0.99
n
m 1
1
2
3
4
5
6
7
8
9
10
15
20
∞
1
66.12
539.35
188.89
146.30
130.89
123.02
118.26
115.07
112.79
111.07
109.74
105.9
104.1
99
2
32.76
13.91
46.36
31.16
25.94
23.37
21.84
20.84
20.12
19.59
19.18
18.0
17.4
16
3
26.76
10.62
7.86
19.60
15.71
13.76
12.69
11.96
11.44
11.07
10.78
9.9
9.5
8.5
4
24.37
9.32
6.77
5.75
12.32
10.66
9.69
9.04
8.57
9.24
7.98
7.2
6.9
6.0
5
23.10
8.62
6.18
5.21
4.70
9.14
8.25
7.56
7.23
6.92
6.86
6.0
5.7
4.8
6
22.31
8.19
5.78
4.88
4.37
4.05
7.38
6.82
6.42
6.13
5.91
5.2
4.9
4.2
7
21.77
7.90
5.54
4.65
4.14
3.84
3.63
6.28
5.89
5.61
5.39
4.8
4.5
3.7
8
21.39
7.69
5.37
4.48
3.98
3.68
3.47
3.32
5.52
5.24
5.03
4.4
4.1
3.4
9
21.10
7.54
5.52
4.35
3.86
3.56
3.36
3.20
3.09
4.97
4.77
4.2
3.9
3.1
10
20.87
7.41
5.13
4.24
3.76
3.46
3.26
3.11
3.00
2.91
4.56
4.0
3.7
2.9
15
20.21
7.06
4.82
3.94
3.48
3.18
2.98
2.83
2.72
2.63
2.36
3.4
3.1
2.4
20
19.9
6.9
4.7
3.8
3.4
3.1
2.9
2.7
2.6
2.5
2.2
2.1
2.8
2.1
∞
19.0
6.39
4.28
3.44
2.98
2.69
2.49
2.34
2.222
2.1
1.84
1.69
1.0
1.0
n
m 1
2
3
4
5
6
7
8 α = 0.95
9
10
15
20
∞
12/9/2013 4:06:21 PM
References
Adcock, R.J. 1878. A problem in least squares. The Analyst (Annals of Mathematics) 5 (2), pp. 53–54. Amoroso, L. 1925. Ricerche intorno alla curva dei redditi. Annali di Matematica Pura ed Applicata. 421, pp. 123–159. Amstrong, J.S. 2001. Principles of forecasting. A handbook for researchers and practitioners. Kluwer Academic Publishers, Norwell, Mass. Andersson, O. 2012. Experiment!: planning, implementing and interpreting. Wiley. Андрейев, С.Е., Товаров, В.В., Петров, В.А. 1959. Закономерности измелчения и усчисление характеристик гранулометрического состава. Недра, Москва. Antoniak, J., Brodziński, S., Czaplicki, J. 1976–1980. Reliability investigation of hoisting installations. Research work. Mining Mechanization Institute, Silesian University of Technology, Gliwice, (unpublished, in Polish). Barbaro, R.W., Rosenshine, M. 1986. Evaluating the productivity of shovel-truck materials haulage system using a cyclic queuing model. SME Fall Meeting, St. Luis, Missouri, Sept. 7–10. Barlow, R.E., Proschan, F. 1975. Statistical theory of reliability and life testing. Probability models. Holt, Rinehart & Winston. New York. Benjamin, J.R., Cornell, C.A. 1970. Probability, statistics and decision for civil engineers. Mc Graw-Hill, Inc. Bennet, B.M., Nakamura, E. 1963. Tables for testing significance in 2 × 3 contingency table. Technometrics 5, pp. 501–511. Bhaudury, B., Basu, S.K. 2003. Terotechnology: Reliability engineering and maintenance management. Asian Books. Bielińska, E. 2007. Forecasting of time sequences. Silesian University of Technology, Gliwice, Birnbaum, Z.W., Hall, R.A. 1960. Small sample distributions for multi-sample statistics of the Smirnov type. Annals of Mathematical Statistics 31, pp. 710–720. Болъшев, Л.Н., Смирнов, Н.В. 1965. Таблицы математической статистики. Наука, Москва. Bortkiewicz, W. 1898. Das Gesetz der kleinen Zahlen. Leipzing, Germany: B.G. Teubner. Bousfiha, A., Delaporte, B., Limnios, N. 1996. Evaluation numérique de la fiabilité des systèmes semi-markoviens. Journal Européen des Systémes Automatisés. 30, 4, (In French), pp. 557–571. Bousfiha, A., Limnios, N. 1996. Ph-distribution method for reliability evaluation of semi-Markov systems. Proceedings of ESREL-97. Lisbon, June: 2149–2154. 1997. Box, G.E.P., Jenkins, G.M. 1976. Time series analysis: forecasting and control. San Francisco HoldenDay, 2nd ed. Box, G.E.P., Jenkins, G.M., Reinsel, G.C. 2008. Time series analysis: forecasting and control. Wiley. Bowerman, B., O’Connell, R., Koehler, A. 2005. Forecasting, time series, and regression. Thomson Books Cole. Bretscher, O. 1995. Linear algebra with applications. 3rd ed. Upper Saddle River NJ: Prentice Hall. Breusch, T.S. 1979. Testing for Autocorrelation in Dynamic Linear Models. Australian Economic Papers, 17, pp. 334–355. Броди, С.М., Погосян, И.А. 1973. Вложенные стохастические процессы в теории массого обслуживания. Кийев. Broś, J., Czaplicki, J., Ścieszka, S. 1976. Investigations of abrasive-wear characteristics of braking materials in model conditions. Scientific Problems of Machines Operation and Maintenance, 4 (28), pp. 413–434 (In Polish). Brown, O.F., Frimpong, S. 2012. Nonlinear finite element analysis of blade-formation interactions in excavation. Mining Engineering, SME, November, pp. 60–67. Brown, R.G. 1959. Statistical forecasting for inventory control. Mc Graw-Hill Book, New York. Butkiewicz, J., Hys. 1977. Multi-dimensional generalization of Weibull distribution and exponential Gumbel distribution. Ossolineum. (In Polish).
265
Book.indb 265
12/9/2013 12:29:21 PM
266
Statistics for mining engineering
Butkiewicz, J. 1997. A review of multidimensional probability distributions. In: Statistical methods in quality control of production. Ossolineum. (In Polish). Carbogno, A., Sajdok, H., Herok, R. 2001. Durability of elements of hoist guide system in shafts of Pniówek Colliery. IX International Conference TEMAG’2001, Gliwice-Ustroń 24−26 Oct., pp. 57–64 (In Polish). Cardou, M., Clerici, C., Morandini, A., Ocella, E. 1993. An experimental research on the comminution law and work index in jaw. XVII IMPC, Sydney. Carroll, R.J., Ruppert, D., Stefański, L.A., Creiniceanu, C. 2006. Measurement Error in Nonlinear Models: A Modern Perspective. CRC. Ceylanoğlu, A., Görgülü, K. 1997. The performance measurement results of stone cutting machines and their relations with some material properties. Conference Mine Planning and Equipment Selection’97, Ostrava, 3−6 Oct., pp. 397. Chatfield, C. 2001. Time-series forecasting. Chapman & Hall/CRC. Church, H.K. 1981. Excavation Handbook. McGraw-Hill Book Co. Ciechanowicz, K. 1972. Generalized gamma distribution and power distribution as models for component durability. Archiwum Elektrotechniki, XXI, 3, pp. 489–512. (In Polish). Cieślak, M. (ed). 2001. Economic forecasting. Methods and applications. PWN, Warsaw. (In Polish). Çinclar, E. 1969. On semi-Markov processes on arbitrary spaces. Proc. Cambridge Philos. Soc., 66, pp. 381–392. Clements, M., Hendry, D. 1998. Forecasting economic time series. Cambridge Univ. Press. Corder, G.W., Foreman, D.I. 2009. Nonparametric Statistics for Non-Statisticians: A Step-by-Step Approach. Wiley. Counningham, L.A., Lwin, T., Singh, N. 1973. On prediction problems in reliability. Microelectronics & Reliability, 12. Cramer, H. 1999. Mathematical methods of statistics. Princeton Univ. Press. Czaplicki, J.M. 1974. On cyclic component in the process of changes of states. Scientific Problems of Machines Operation and Maintenance, 4 (20), pp. 545–555. Czaplicki, J.M. 1975. Prediction of reliability and exploitation indices and characteristics for mine continuous transport systems based on theoretical investigations. Ph.D. dissertation, Mining Faculty of Silesian Technical University, Gliwice. (In Polish). Czaplicki, J.M. 1975. Significant non-uniformity of the process of change of conditions of an element or system during working cycle. Scientific Problems of Machines Operation and Maintenance, 4 (24), pp. 525–531. Czaplicki, J.M. 1976. Certain model of a process of failures and the problem of its prediction. Scientific Problems of Machines Operation and Maintenance, 4, pp. 481–491. (In Polish). Czaplicki, J.M. 1977a. Complex indices prediction model of technical object. Scientific Problems of Machines Operation and Maintenance, 2, pp. 273–289. Czaplicki, J.M. 1977b. Interval estimation and prediction of some reliability indices of renewable technical objects and their systems. Statistical Review, R.XXIV, 4, pp. 507–520. (In Polish). Czaplicki, J.M. 1978. Estimation (with information a priori) of the density function of work time of object. Scientific Problems of Machines Operation and Maintenance, 3, 33, pp. 189–205. (In Polish). Czaplicki, J.M. 1980. Some problems of prediction of time of durability investigation. (Part I). Scientific Problems of Machines Operation and Maintenance, 4, 44, pp. 511–521. (In Polish). Czaplicki, J.M. 1981. On a certain two-dimensional population. IV Conference “Reliability and Quality Control”. Jabłonna, pp. 7–8. (In Polish). Czaplicki, J.M. 1981a. Some problems of prediction of time of durability investigation. (Part II). Scientific Problems of Machines Operation and Maintenance, 1, pp. 85–93. (In Polish). Czaplicki, J.M., Lutyński, A. 1982. Vertical transport. Reliability problems. Silesian Univ. of Tech., 1052, Gliwice (In Polish). Czaplicki, J.M., Lutyński, A. 1987. Horizontal transport. Reliability problems. Silesian Univ. of Tech., 1330, Gliwice (In Polish). Czaplicki, J.M. 1999. Random component autocorrelation in the process of cumulating wire breaks in hoisting ropes. Conference: Mining 2000, Gliwice, pp. 71–77. Czaplicki, J.M. 2000. Investigation of the random component autocorrelation in the process of cumulating wire breaks in hoisting ropes. Conference “Energy-saving and Reliable Mine Machinery”, Mining of equilibration development. Silesian Univ. of Tech., 246, Gliwice, pp. 123–130.
Book.indb 266
12/9/2013 12:29:21 PM
References
267
Czaplicki, J.M. 2004. Elements of theory and practice of cyclic systems in mining and earthmoving engineering. Silesian Univ. of Tech., Gliwice (In Polish). Czaplicki, J.M. 2006. Description of accumulation function for increasing number of wire cracks of hoist head ropes by means of modified autoregression function. X International Conference “Quality, Reliability and Safety of Ropes and Rope Transportation Devices”. Cracow 25–26 Sept., Papers AGH, 37, pp. 69–84 (In Polish). Czaplicki, J.M. 2009. Shovel-truck systems. Modelling, analysis and calculation. Francis & Taylor CRC/ Balkema. Czaplicki, J.M. 2009. Reliability of a system: loader—crusher—belt conveying for surface mining. Surface Mining, 4–5, pp. 35–39. Czaplicki, J.M. 2010a. Mining equipment and systems. Theory and practice of exploitation and reliability. Francis & Taylor CRC/Balkema. Czaplicki, J.M. 2010b. On a certain family of exploitation processes of series system in mining engineering. Mining Review, 11–12, pp. 26–30. (In Polish). Czaplicki, J.M. 2012. Reliability in mine mechanization and earthmoving engineering. Silesian University of Technology, Gliwice. (In Polish). Czaplicki, J.M., Kulczycka A.M. 2011. Steady-state availability of a multi-element symmetric pair. Scientific Problems of Machines Operation and Maintenance, 3 (167), vol. 46, pp. 15–26. Czaplicki, J.M., Ścieszka, S. 1974. On certain conditional method of analytical determination of operational characteristics of equipment. 3, (19), pp. 407–418. (In Polish). Czekała, M. 2004. Groups of untypical observations—a multidimensional test. In “Progress in Econometrics”. Barczak ed. Katowice, pp. 15–21. (In Polish). Deming, W.E. 1943. Statistical adjustment of data. Wiley, NY (Dover Publications edition, 1985). Dhillon, B.S. 2008. Mining equipment reliability, maintainability and safety. Springer. Dovitch, R.A. 1990. Relaibility statistics. ASQ Quality Press, Milwaukee, Wisconsin. Downarowicz, O. 1997. Operational system. Management of technical store. Exploitation Institute, Gdańsk-Radom. (In Polish). Draper, N.R., Smith, H. 1998. Applied regression analysis. Wiley. Durbin, J. 1953. A note on regression when there is extraneous information about one of the coefficients. Journal of the American Statistical Association, 48, December, pp. 799–808. Durbin, J., Watson, G.S. 1950. Testing for serial correlation in least squares regression. Biometrica, 37, December, pp. 409–428. Durbin, J., Watson, G.S. 1950. Testing for serial correlation in least squares regression II. Biometrica, 38, June, pp. 159–178. Dworczyńska, M., Gładysiewicz, L., Kawalec, W.A model of stream of rock excavated for main belt conveyors design. The School of Surface Mining, 27–28 March 2012, Cracow. (In Polish). Dziembała, L. 1967. Analysis of cyclic fluctuates of number of fires in month. Statistical Review, R. XIV, 2, pp. 203–208 (In Polish). Dziembała, L. 1972. On some parameters’ estimators of stochastic structure in conditional (single) least square method. Statistical Review, R. XIX, 4, (In Polish). Dziembała, L., Zadora, K. 1971. Application of spectral analysis for investigation of cyclic fluctuations. Statistical Review, R. XVIII, 3–4, (In Polish). Epstein, B. 1948. Logaritmico-normal distributions in breakage of solids. Ind. Eng. Chem., 40, pp. 2289–2291. Everitt, B.S. 2002. Cambridge dictionary of statistics. CUP. Feller, W. 1957. An introduction to probability theory and its applications. J. Wiley and Sons, Inc. Firkowicz, S. 1969. On the power distribution. Archiwum Elektrotechniki, XVIII, 1, pp. 29–40. Firkowicz, S. 1970. Statistical testing of products. WNT, Warsaw. (In Polish). Fisher, R.A. 1912. On an absolute criterion for fitting frequency curves. Mess. of Math. 41. P. 155. Fisher, R.A.: Test of significance in harmonic analysis. Proc. Roy. Soc. A 125, 1929, pp. 54–59. Fréchet, M. 1927. Sur la loi de probabilité de l’écart maximum. Annales de la Société Polonaise de Mathematique, Cracovie, 6, pp. 93–116. Fuller, W.A. 2006. Measurement error models. Wiley. Gelper, S., Fried, R., Croux, C. 2008. Robust forecasting with exponential and Holt-Winters smoothing. (http://www.econ.kuleuven.be/public/ndbae06/pdf-files/robust_holt_winters.pdf). Герцбах, И.Б., Кордонский, Х.Б., 1966. Модели отказов. Изд. Советское Радио. MockBa. Gauss, C.F. 1880. Werke. Vol. 4, Göttingen. (Reprint).
Book.indb 267
12/9/2013 12:29:21 PM
268
Statistics for mining engineering
Gawenda, T., 2004. An assessment of the influence of the physic-chemical properties of rock materials and technological parameters of jaw crushers on effects of crushing. Ph.D. dissertation, Mining and Geoengineering Faculty, AGH, Cracow (In Polish). Gibbons, J.D., Chakraborti S., 2003. Nonparametric Statistical Inference. 4th Ed. CRC. Гихман, И.И. and Скороход, А.В. 1965. Введение в теорию случайных просессов. Изд. Наука, Москва. Gillard, J.W. 2006. An historical overview of linear regression with errors in both variables. Cardiff University. Giorski, A.C. 1968. Beware of the Weibull euphoria. IEEE Transactions on Reliability, R-17, pp. 202–203. Гнeдeнкo, Б.В. 1941. Предельные теоремы дла максимального члена вариационного ряда. ДАН СССР, т. 32. Gnyedenko, B.V., Belayev, Yu.K., and Solovyev, A.D. 1969. Mathematical methods of reliability theory. Academic Press. New York. Гнeдeнкo, Б.В., and Koваленко, И.Н. 1966. Введение в теорию массового обслуживания. Изд. Наука. MockBa. Гнeдeнкo, Б.В., 1969. Резервирование с восставлением и суммирование случайново числа слагаемых. Colloquium on Reliability Theory. Supplement to preprint volume. pp. 1–9. Godfrey, L.G. 1978. Testing Against General Autoregressive and Moving Average Error Models when the Regressors Include Lagged Dependent Variables, Econometrica, 46, pp. 1293–1302. Godfrey, L.G.: Specification test in econometrics. Cambridge 1988. Goldberger, A.S. 1966. Econometric Theory. J. Wiley & Sons. Gopal, K. Kanji. 2006. 100 statistical tests. London: SAGE Publ. Ltd. Grabski, F., Jaźwiński, J. 2001. Bayesian methods in reliability and diagnostics. WKŁ, Warsaw (In Polish). Granger, C.W., Hatanaka, H. 1969. Analyse spectrale des séries temporelles en économie. Dunod, Paris. Greń, J. 1978. Methodological aspects of economical prediction. Statistical Survey, 1. (In Polish). Griffin, W. 1989. Perturbation theory applied to truck-shovel system simulation. Proceedings of the International Symposium on Off-Highway Haulage in Surface Mines, Edmonton 15–17 May, pp. 83–87. Grubbs, F.E. 1969. Procedures for detecting outlying observations in samples. Technometrics 11, pp. 1–21. Gumbel, E.J. Statistical theory of extremes and some practical applications. National Bureau of Standards, Applied Mathematics Series, 33. Харламов Б. 2008. Репрерывныйе полумарковские процессы. Петербург. Hartley, H.O. 1950. The maximum F-ratio as a short-cut test of heterogeneity of variance. Biometrika, 37, pp. 308−312. Hellwig, Z. 1963. Statistical prognoses and their significance in forecasting of future courses of economic phenomena and processes. Papers of High School of Economics, 16, Wrocław. (In Polish). Hogg, R.V., Craig, A.T. 1995. Introduction to mathematical statistics. 5th ed. Macmillan. Holt, C.C. 1957. Forecasting seasonals and trends by exponentially weighted moving averages. ONR Research Memorandum 52. http://en.wikipedia.org/wiki/Poisson_distribution#cite_note-4 Huber, P.J. 1981. Robust statistics. Wiley. Hufford, G., Griffin, W.H., Sturgul, J.R. 1981. An application of queuing theory to equipment selection for a large open pit copper mine. SME-AIME Meeting, Denver, Colorado, 18–20 November. Hustrulid, W, Kuchta, M. 2006. Open pit mine. Planning and design. Vol. 1. Fundamentals. Taylor & Francis. London. Jóźwiak, J., Podgórski, J. 1997. Foundations of statistics. 5th ed. PWE. Warsaw (In Polish). Jurdziak, L.: Application of extreme value theory for dimensioning of belt conveyors cooperating with BWE. Industrial Transport, 3, (25), 2006, pp. 38–43. (In Polish). Kasiewicz, S. 2005. Constructing the value of a company in operational management. SGH, Warsaw. Kaźmierczak, J. 2000. Exploitation of technical systems. Silesian Univ. of Tech., Gliwice (In Polish). Kendall M.G., Babington Smith. 1938. Randomness and random sampling numbers. Journal of the Royal Statistical Society, 101, 1, pp. 147–166.
Book.indb 268
12/9/2013 12:29:21 PM
References
269
Kokosz, Z. 2010. Advantages of isolinear map construction by kriging. Surface Mining, 2, pp. 91–95 (In Polish). Kolmogorov A.N. 1933. Grundbegriffe der Wahrscheinlichkeitsrechnung. Berlin: Julius Springer (In German). Translation: Kolmogorov, A.N. 1956. Foundations of the theory of probability. New York, Chelsea. Лщлмогоров, А.Н. 1941. Щ логарифмическг нормлном законе разпределеня размеров частиц при дроблений. АН СССР, 31, 99–101. Koopmans, T.C. 1937. Linear regression analysis of economic time series. DeErven F. Bohn, Haarlem, Netherlands. Kopociński, B. 1973. An outline of renewal and reliability theory. PWN, Warsaw. (In Polish). Кщролюук В.С., Турбин А.Ф. 1976. Полумарковские процессы и их приложения. Наук. Думка, Киев. Kowalczyk, J. 1957. The fatigue index for hoist head ropes. Central Mining Institute Bulletin 187. (In Polish). Коваленко И.Н., Кузнецов Н.Ю., Шуренков В.М. 1983. Случайнуе процессы. Справочник. Наукова Думка. Koyck, L. 1954. Distributed lags and investment analysis. North-Holland, Amsterdam. Koźniewska, I., and Włodarczyk, M. 1978. Models of renewal, reliability and mass servicing. PWN, Warsaw. (In Polish). Kummell, C.H. 1879. Reduction of observation equations which contain more than one observed quantity. The Analyst (Annals of Mathematics) 6 (4), pp. 97–105. Lehmann, E.L., D’Abrera, H.J.M. 2006. Nonparametrics: statistical methods based on ranks. Springer. Lévy, P. 1954. Processus semi-markoviens. Pro. Int. Cong. Math. Amsterdam, pp. 416–426. Limnios, N., Oprişan, G. 2001. Semi-Markov processes and reliability. Statistics for Industry and Technology. Birkhäuser. Lin Zaikang, Yang Jian & Nie Zhenggang. 1997.: Design capacity of belt and bunkers by computer simulators in Barakupuria Mine of Bangladesh. Conference Mine Planning and Equipment Selection’97, Ostrava, 3–6 Oct., p. 259. Lwin, T., Singh, N. 197 Makridakis, S., Wheelwright, S., Hyndman, R. 1998. Forecasting, methods and applications. Wiley. Maliński, M. 2004. Computer aided verification of statistical hypotheses. Silesian Univ. of Tech., Gliwice (In Polish). Manowska, A. 2010. Forecasting of hard coal sale for a group of mines. Ph. D. dissertation. Mining Faculty of Silesian University of Technology, Gliwice, Poland. (In Polish). Martin, J. 1972. Foundations of mathematics and statistics for biologists, physicians and chemists. PZWL, Warsaw. (In Polish). Melchers, R.E. 1999. Structural reliability analysis and prediction. J. Wiley & Sons. Meyer and Seaman, 2006. Expanded tables of critical values for the Kruskal-Wallis H statistic. Paper presented at the annual meeting of the American Educational Research Association, San Francisco. Mianowski, A. 1988. The characterization of size distribution as a reciprocal hyperbolical function. Int. Journal of Mining Proc. 24, pp. 11–26. Migdalski, J. (ed.) 1982. Reliability manual. Mathematical foundations. WEMA, Warsaw (In Polish). Migdalski, J. (ed.) 1992. Reliability engineering. Manual. ATR Bydgoszcz, ZETOM Warsaw (In Polish). Moore, D.S. McCabe, G.P. 1999. Introduction to the Practice of Statistics. New York: W.H. Freeman. Morgenstern, D. 1956. Einfache Beispiele zweidimensionaler Verteilungen. Mittel-Amtsblatt für Math., Stat. 8, pp. 234–235. Nagelkerke, N. 1991. A note on a general definition of the coefficient of determination. Biometrica, 78, 3, pp. 691–692. Nerlove, M. 1958. Distributed lags and demand analysis for agricultural and other commodities. U.S. Department of Agriculture, Washington. Neyman, J. 1937. Outline of a theory of statistical estimation based on the classical theory of probability. Philosophical Transactions of the royal Society of London A, 236, pp. 333–380. Nipl, R. 1979. On application of generalized gamma distribution to approximation of grain composition curves. Proc. of XII Cracow Conference on Ore Dressing. Cracow. O’Connor, P.D.T. 2005. Practical reliability engineering. John Wiley & Sons.
Book.indb 269
12/9/2013 12:29:21 PM
270
Statistics for mining engineering
Papoulis, A. 1984. Probability, random variables and stochastic processes. McGraw-Hill. Pawłowski, Z. 1973. Econometric prognoses. PWN, Warsaw (In Polish). Pearson, K. 1894. Contributions to the mathematical theory of evolution. Philosophical Transactions of the Royal Society A: Mathematical, Physical and Engineering Sciences, 185, p. 71. Pearson, K. 1895. Contributions to the Mathematical Theory of Evolution. II. Skew Variation in Homogeneous Material. Philosophical Transactions of the Royal Society A: Mathematical, Physical and Engineering Sciences, 186, pp. 343–326. Pearson, K. 1898. Contribution etc. IV: On the probable errors of frequency constants and on the influence of random selection on variation and correlation. Philosophical Transactions of the Royal Society A: Mathematical, Physical and Engineering Sciences, 191, p. 229. Pfeiffer, P.E. 1978. Concepts of probability theory. Courier Dover Publ. pp. 47–48. PN-82/N-04001. Exploitation of Technical Objects. General Terminology. (In Polish). Poisson, S.D. 1837. Probabilité des jugements en matière criminelle et en matière civile, précédées des règles générales du calcul des probabilitiés. Paris, France: Bachelier. Pyke, R. 1961a. Markov renewal processes: definitions and preliminary properties. Ann. of Math. Statist. 32, pp. 1231–1242. Pyke, R. 1961b. Markov renewal processes with finitely many states. Ann. of Math. Statist. 32, pp. 1243–1259. Pyke, R., Schaufele, R., 1964. Limit theorems fir Markov renewal processes. Ann. of Math. Statist. 35, pp. 1746–1764. Pyra, J., Sołtys, A., Winzer, J. 2009. Some remarks on estimation of reaction of shock wave in blasting. Mining Review, 11–12, pp. 94–102 (In Polish). Ravenis, J.V. II. 1969. A potentially universal probability density function for scientists and engineers. Proc. Intern. Conf. on Quality Control. Tokyo, Sept. pp. 523–526. Rojo, J. (ed). 2012. Selected works of E.L. Lehmann. Springer. Rosin, P., Rammler, E. 1933. The Laws Governing the Fineness of Powdered Coal, Journal of the Institute of Fuel, 7, pp. 29–36. Ross, S.M. 1995. Stochastic processes. J. Wiley & Sons. Rousseeuw, P.J., Leroy, A.M. 1987. Robust regression and outliers detection. Wiley. Rybicki, W. 1976. An optimal forecasting, predictors F-points and statistical games. Statistical Review, 4. (In Polish). Rumsey, D. 2006. Probability of dummies. Wiley, p. 58. Sadowski, W. 1977. Decisions and prognoses. PWE, Warsaw. (In Polish). Sajkiewicz, J.: Foundations of theory systems with continuous technological structures (applied in mining). Ossolineum 1982 (In Polish). Saporito, V., Self, F.M. 2012. Taking the mining industry to a higher level of excellence. Mining Engineering, SME, October, pp. 20–24. Saramak, D., Tumidajski, T. 2006. The role and meaning of the approximation particle size distribution curves for mineral resources. AGH Mining and Geoengineering, 3/1, pp. 301–314. (In Polish). Senatorski, J., Pasteruk, T. 2001. Technological methods to increase durability of tribological nodes of vehicles and mine machinery. IX International Conference TEMAG’2001, Gliwice-Ustroń 24−26 Oct., pp. 239–246 (In Polish). Serfling, R.J. 1980. Approximation theorems of mathematical statistics. J. Wiley & Sons. Siegel, S., Castellan, N.J. Jr. 1988. Nonparametric statistics fort the behavioural sciences. Mc Graw-Hill. Inc. Sivazlian, B.D., Wang, K.H. 1989. System characteristics and economic analysis of the G/G/R machine repair problem with warm standbys using diffusion approximation. Microelectronics & Reliability, 29, 5. pp. 829–848. Smirnow, S. 1979. Nutzanwendungen für erweiterte Korngroessenverteilungs-funktionen. Aufber. Technik, 6. Smith, D.J. 2007. Reliability, maintainability and risk. Practical methods for engineers including reliability centered maintenance and safety-related systems. Elseveir. Smith, W.L. 1955. Regenerative stochastic processes. Proc. Roy. Soc. London. Ser. A, 232, pp. 6–31. Sobczyk, M. 1996. Statistics. PWN, Warsaw (In Polish). Sokoła-Szewioła, V. 2011. Research studies and modelling of the changing in time vertical displacements of the mining area in time at the period of tremor occurrence inducted by longwall mining. D.Sc. Dissertation. Silesian Univ. of Technology, Gliwice, Poland. (In Polish).
Book.indb 270
12/9/2013 12:29:21 PM
References
271
Spurrier, J.D. 2003. On the null distribution of the Kruskal-Wallis statistic. Journal of Nonparametric Statistics 15, (6), pp. 685–691. Stacy, E.W. 1962. A generalization of the gamma distribution. Annals of Mathematical Statistics, 28, pp. 1187–1192. Steele, C. 2008. Use of the lognormal distribution for the coefficients of friction and wear. Reliability Engineering & System Safety, 93 (10), pp. 1574–2013. Szepke, R. 1967. Applied radiometry. WNT, Warsaw. (In Polish). Ścieszka, S. 1971. The hoist brakes wear process investigation. Silesian Univ. of Tech. Research work, unpublished, Gliwice. (In Polish). Ścieszka, S. 1972. Problems of dry friction in brakes in mine hoist. Ph.D. dissertation, Mining Faculty, Silesian Univ. of Tech., Gliwice. (In Polish). Takács, L. 1954. Some investigations concerning recurrent stochastic processes of a certain type. Magyar Tud. Akad. Mat. Kutato Int. Kzl., 3, pp. 115–128. Takács, L. 1955. On a sojourn time problem in the theory of stochastic processes. Trans. Amer. Math. Soc. 93, pp. 631–540. Timbergen, J. 1951. Business cycles in the United Kingdom 1870–1914. Amsterdam. Tumidajski, T. 1992. Selected problems of stochastic analysis of properties of granular materials and ore dressing processes. Papers of AGH, Mining 159, Cracow. (In Polish). Tumidajski, T. 1993. Application of statistical methods in analysis of ore dressing processes. Śląskie Wyd. Techniczne, Katowice. (In Polish). Tumidajski, T., Saramak, D. 2009. Methods and models of mathematical statistics in ore dressing. AGH, Cracow (In Polish). Walpole, R.E., Myers, R.H. 1989. Probability and statistics for engineers and scientists. 4th ed. Macmillan, New York. Warszyński, M. 1988. Reliability in construction computations. PWN, Warsaw. (In Polish). Wasserman, L. 2007. All of nonparametric statistics. Springer. Weibull, W. 1939. A statistical theory of strength of materials. Proc. Roy. Swed, Inst. Eng. V. 15. Weibull, W. 1956. Scatter of fatigue life and fatigue strength in aircraft structural materials and parts. Fatigue in Aircraft Structures, 4. Weisstein, Eric W. Pearson Mode Skewness. MathWorld. Winters, P.R. 1960. Forecasting sales by exponentially weighted mooring averages. Management Science 6, 1960. Wold, H. (ed.) 1964. Prediction by chain principle: essays on the casual chain approach, Amsterdam. Wu C.F.J., Hamada M.S. 2009. Experiments: planning, analysis, and optimization. Wiley. Yan-Gang Zhao, Zhao-Hui Lu. 2007. Fourth-moment standardization for structural reliability assessment. Journal of Structural Engineering, July, pp. 916–924. Zadora, K. 1974. Modelling and prediction of stochastic fields. Statistical Review, XXI, 3, pp. 435–449. (In Polish). Zeliaś, A. 1996. Methods of outliers tracing in economic research. Statistical News, 8. (In Polish). Zieliński, R. 1972. Statistical tables. PWN, Warsaw. (In Polish).
Book.indb 271
12/9/2013 12:29:21 PM
This page intentionally left blank
J AC E K M . C Z A P L I C K I
Many areas of mining engineering gather and use statistical information, provided by observing the actual operation of equipment, their systems, the development of mining works, surface subsidence that accompanies underground mining, displacement of rocks surrounding surface pits and underground drives and longwalls, amongst others. In addition, the actual modern machines used in surface mining are equipped with diagnostic systems that automatically trace all important machine parameters and send this information to the main producer’s computer. Such data not only provide information on the technical properties of the machine but they also have a statistical character. Furthermore, all information gathered during stand and lab investigations where parts, assemblies and whole devices are tested in order to prove their usefulness, have a stochastic character. All of these materials need to be developed statistically and, more importantly, based on these results mining engineers must make decisions whether to undertake actions, connected with the further operation of the machines, the further development of the works, etc. For these reasons, knowledge of modern statistics is necessary for mining engineers; not only as to how statistical analysis of data should be conducted and statistical synthesis should be done, but also as to understanding the results obtained and how to use them to make appropriate decisions in relation to the mining operation. This book on statistical analysis and synthesis starts with a short repetition of probability theory and also includes a special section on statistical prediction. The text is illustrated with many examples taken from mining practice; moreover the tables required to conduct statistical inference are included.