Standard Installation Procedure for BTS GSM - WCDMA 3900 Project
HUAWEI Confidential
Standard Installation Confirmation for Excelcomindo BTS GSM Revision Declaration
This document is prepared and explained by the Site Business Dept of Global Technical Service Dept. Specifications or documents related to this document: Related international specifications or document consistency: Specifications or documents that are replaced or expire: Correlation of specifications and documents:
Version v1.0
Prepared by
Reviewed by
Yanuar Wahyudi
Approved by
Revision Record
XL Representative
11/11/2011
Huawei Technologies Co., Ltd. All rights reserved
HUAWEI Confidential
Page2
Standard Installation Procedure of BTS GSM-WDCMA 3900 1.1.1 Unpack cases & check material 0:00 Operator
0:20
AB
1.2.1
1.4.1 Install Grounding Cable & Power Cable
Install BTS Cabinet 0:20 Operator
1:00
1:00 Operator
A
1:50
1.4.1 Install Grounding Cable & Power Cable 1:00 Operator
BTS Standard Installation Procedure 安装螺栓、弹垫、平垫在绝缘垫片上. 安装绝缘垫片.
SN
Task Description
Operator
Duration
1.1.1
Unpack Cases and Check Material
AB
20min
Procedure 1
Check whether the cases have the same number and types of items as are mentioned in the packing list.
2
Check whether the packing cases are intact.
3
Sign the Packing List along with the customer and sub-con.
4 5
Note 1
When moving the equipment, prevent the equipment from colliding with doors, walls, shelves, or other objects.
2
Do not touch the unpainted metal surface of the equipment or its components with sweat-soaked or dirty gloves
3 4
Tools 1 4
Flat-head screwdriver
2
Claw hammer
5
3
Paper knife
6
Materials 1
2
3
4
5
6
安装螺栓、弹垫、平垫在绝缘垫片上. 安装绝缘垫片.
HUAWEI Confidential
Page5
BTS Standard Installation Procedure 安装螺栓、弹垫、平垫在绝缘垫片上. 安装绝缘垫片.
SN
Task Description
Operator
Duration
1.1.2
Installation Preparation
CD
20 min
Procedure 1
Check the Installation Environment according to Engineering Design and Construction Drawings. Make sure there's enough space to install antenna system;
2
Prepare the tools and Instruments
3
Aware with safety
4
正面
5
Note 1
installation team make sure installation according design plan.
2
Prepare proper tools.
3 4
Tools 1
2
3
4
5
6 Materials
1
2
3
4
安装螺栓、弹垫、平垫在绝缘垫片上. 安装绝缘垫片.
HUAWEI Confidential
Page6
安装绝缘垫片.
SN
Task Description
Operator
Duration
安装绝缘垫片.
1.2.1-A
Install BTS Cabinet
A
40 min
BTS Standard Installation Procedure 安装螺栓、弹垫、平垫在绝缘垫片上.
Procedure 1
Use Isolation Plate and Assistant Plate to make sure the position of installation holes.
2
Mark the points of the holes and drill holes at the marked points .
3
Use the Coach Bolt and Isolation Washer to fix the Base Connector and Isolation Plate.
4
Use the level bar and adjusting pads to adjust the Isolation Plate levelness.
5
Note 1
Keep the new cabinet in the same line with the existing
2
The deepth of the hole should be 52mm ~ 60mm
3
Tools 1
Tape measure
2
Marking pen
3
4
Solid wrench
4
Level bar
6
Percussion drill
Materials 1
Isolation plate
2
2pcs coach bolts
3
Adjusting pads
4
Base Connector
5
HUAWEI Confidential
6
Page7
安装绝缘垫片.
SN
Task Description
Operator
Duration
安装绝缘垫片.
1.2.1-B
Install BTS Cabinet 3900L
A
40 min
BTS Standard Installation Procedure 安装螺栓、弹垫、平垫在绝缘垫片上.
Procedure 1
Put dinabolt on pondation holes which already measure.
2
Put cabinet on top of holes and pull the 4 bolt and make sure all tight and firmly.
3
Use the level bar to measure the levelness of the cabinet, if the cabinet is not level, lossen the coach bolts and adjust the levelness of the cabinet by adding or removing the adjusting pads.
4 5
Note 1
All bolt must be connect corectly and firmly.
2 3
Tools 1
Solid Wrench
2
Multimeter
Level bar
5
4
Materials 1
Cabinet
2
3
Adjusting pads
4
HUAWEI Confidential
4 bolts
Page8
安装绝缘垫片.
SN
Task Description
Operator
Duration
安装绝缘垫片.
1.2.1-B
Install BTS Cabinet 3900A
A
40 min
BTS Standard Installation Procedure 安装螺栓、弹垫、平垫在绝缘垫片上.
Procedure 1
Put dinabolt on pondation holes which already measure.
2
Put cabinet on top of holes and pull the 4 bolt and make sure all tight and firmly.
3
Use the level bar to measure the levelness of the cabinet, if the cabinet is not level, lossen the coach bolts and adjust the levelness of the cabinet by adding or removing the adjusting pads.
4
Combine between base frame-rf cabinet and APM 30. make sure all tight fimrly with bolt
Note 1
Make sure all bolt connection between rack connected firmly.
2 3
Tools 1
Solid Wrench
2
Multimeter
5
4
3 Level bar 6
Materials 1
Cabinet
2
3
Adjusting pads
4
5
HUAWEI Confidential
2pcs coach bolts
6
Page9
SN
安装绝缘垫片.
BTS Standard Installation Procedure 安装螺栓、弹垫、平垫在绝缘垫片上. 安装绝缘垫片.
1.4.1
Task Description
Operator
Duration
A
50 Min
Install Grounding Cable & Power Cable 3900L Procedure
1
Remove the prtection covers from the power input wiring terminal block. And make OT terminal of power cables
2
Insert the cord end terminal of the -48V DC power cable into the port labeled -48V.And insert the cord end erminal of the GND cable into the port labeled GND.
3
Add the cord end terminal to the other end of the -48V DC power cable , Add the cord end terminal to the other end of the GND power cable.
4
Connect the cord end terminal of the -48V DC power cable to the negative output MCB & chord end of the GND power cable to the positive output copper bar of the DC power distribution equipment.
RTN (+) to busbar Neg (-) to MCB
5
Note
A. Cold-pressed terminal B. Power cable insulator C. power cable conductor
A. Heat-shrink tube C. Power cable insulator
1
Make sure that the related equipments of the power cables have been powered off before installation.
2
Make sure power cable conneted corectly and firmly
3
Make sure for power cable 3900L must be conect using 2 DCDU
B. Bare Pressure Welding Termina D. power cable conductor
Tools 1
Philips screwdriver
2
4
Hydraulic pliers
5
Wire stripping
3
Pipefish clamp
6 Materials
1 3
HUAWEI Confidential
Heat shrink white cable ties
OT terminal/ Scun
2 4
Cable blue black 16mm2
Page10
安装绝缘垫片.
Power Supply
SN
BTS Standard Installation Procedure 安装螺栓、弹垫、平垫在绝缘垫片上. 安装绝缘垫片.
1.4.1
Task Description
Duration
Operator
Install Grounding Cable & Power Cable 3900L Procedure
1 2
Route the PGND cable from BTS to indoor's grounding bar. Then fix it on the ground in order to make it look well. Cut the proper length of the PGND cable according to the distance between Cabinetand indoor Grounding Bar. Then make the OT terminals of PGND cable,and
4
Connect the PGND cable to the cabinet's grounding bar and indoor grounding bar.
5
connect all grounding cable at all module and BTS door
Note 1
PGND cable should be cut as short as possible. Don't remain any dundancy.
2
Make sure conneted corectly and firmly
3
Tools 1
Philips screwdriver
2
4
Hydraulic pliers
5
Wire stripping
3
Pipefish clamp
6 Materials
1
Grounding cable yellow green
2
3
Heat shrink/isolation
4
HUAWEI Confidential
OT terminal/ Scun
Page11
SN
安装绝缘垫片.
BTS Standard Installation Procedure 安装螺栓、弹垫、平垫在绝缘垫片上. 安装绝缘垫片.
1.4.1
Task Description
Operator
Duration
A
50 Min
Install Grounding Cable & Power Cable 3900A Procedure
1
Remove the prtection covers from the power input wiring terminal block. And make OT terminal of power cables
2
Insert the cord end terminal of the -48V DC power cable into the port labeled -48V.And insert the cord end erminal of the GND cable into the port labeled GND.
3
Add the cord end terminal to the other end of the -48V DC power cable , Add the cord end terminal to the other end of the GND power cable.
4
Connect the cord end terminal of the -48V DC power cable to the negative output MCB & chord end of the GND power cable to the positive output copper bar of the DC power distribution equipment.
RTN (+) to busbar A. Heat-shrink tube C. Power cable insulator
B. Bare Pressure Welding Termina D. power cable conductor
A. Cold-pressed terminal B. Power cable insulator C. power cable conductor
Neg (-) to MCB
5
Note 1
Make sure that the related equipments of the power cables have been powered off before installation.
2
Make sure power cable conneted corectly and firmly
3
Tools 1
Philips screwdriver
2
4
Hydraulic pliers
5
Wire stripping
3
Pipefish clamp
6 Materials
1
Heat srink/isolation
2
OT terminal / scun
3
power cable blue and black
4
Anaconda conduit
HUAWEI Confidential
Page12
安装绝缘垫片.
Power Supply
SN
BTS Standard Installation Procedure 安装螺栓、弹垫、平垫在绝缘垫片上. 安装绝缘垫片.
1.4.1
Task Description
Duration
Operator
Install Grounding Cable & Power Cable 3900A Procedure
5
Route the PGND cable from cabinet to outdoor's grounding bar. Then fix it on the ground in order to make it look well. Cut the proper length of the PGND cable according to the distance between Cabinetand outdoor Grounding Bar. Then make the OT terminals of PGND cable,and wrap them in insulating adhesive tape. Insert cable's yellow green on to ananconda conduit to protect cable outdoor. Conduit covering cable from entering BTS cabinet until entering Rectifier cabinet/selther windows. Connect the PGND cable to the cabinet's grounding bar and outdoor grouding bar.
6
Connect all grounding cable at all module and BTS door
1 2
4
Note 1
PGND cable should be cut as short as possible. Don't remain any dundancy.
2
Make sure conneted corectly and firmly
3
Tools 1
Philips screwdriver
2
4
Hydraulic pliers
5
Wire stripping
3
Pipefish clamp
6 Materials
1
Grounding cable yellow green
2
3
Heat shrink/isolation
4
HUAWEI Confidential
OT terminal/ Scun
Page13
安装绝缘垫片.
BTS Standard Installation Procedure 安装螺栓、弹垫、平垫在绝缘垫片上. 安装绝缘垫片.
SN
Task Description
Operator
Duration
1.8.1
Install E1 Cable WCDMA
A
30 min
Procedure 1
Route the E1 cable along the cable rack.
2
Insert the DB26 male connector of the E1 cable into E1/T1 port at WMPT
3
In the other side punch the E1 cable to the XL DDF
4
CPRI - Route from RFU Board to BBU at WBBP
5
Insert CPRI Connector at WRFU CPRI 0 and others side at CPRI port WBBP
Note 1
cable must arrange net and tidy
2
Label must attach
3
For outdoor BTS E1 cable must conect from E1/T1 to UELP inside and from UELP outside to XL DDF
4
Connection CPRI must refers to board configuration manual BTS
Tools 1
Philips screwdriver
2
Punchdown Tool
5
4
3
Cutter
6 Materials
1
120ohm E1 cable
2
Cable tie
3
CPRI cable
4
label
5
HUAWEI Confidential
6
Page14
安装绝缘垫片.
BTS Standard Installation Procedure 安装螺栓、弹垫、平垫在绝缘垫片上. 安装绝缘垫片.
SN
Task Description
Operator
Duration
1.8.1
Install E1 Cable GSM -DCS
A
30 min
Procedure 1
Route the E1 cable along the cable rack.
2
Insert the DB26 male connector of the E1 cable into E1/T1 port at GTMU
3
In the other side punch the E1 cable to the XL DDF
4
Route from RFU Board to BBU at GTMU.
5
Insert CPRI Connector at GRFU CPRI 0 and others side at CPRI port GTMU
Note 1
cable must arrange net and tidy
2
Label must attach
3
For outdoor BTS E1 cable must conect from E1/T1 to UELP inside and from UELP outside to XL DDF
4
Connection CPRI must refers to board configuration
Tools 1
Philips screwdriver
2
Punchdown Tool
5
4
3
Cutter
6 Materials
1
120ohm E1 cable
2
Cable tie
3
CPRI cable
4
label
5
HUAWEI Confidential
6
Page15
安装绝缘垫片.
BTS Standard Installation Procedure 安装螺栓、弹垫、平垫在绝缘垫片上. 安装绝缘垫片.
SN
Task Description
Operator
Duration
1.8.1
Install E1 Cable cobine GSM-WCDMA
A
30 min
Procedure 1
Route the E1 cable along the cable rack.
2
Insert the DB26 male connector of the E1 cable into E1/T1 port at GTMU or WMPT
3
In the other side punch the E1 cable to the XL DDF
4
Route from RFU Board to BBU at GTMU.
5
6
Insert CPRI Connector at GRFUCPRI 0 and others side at CPRI port GTMU For conection CRPI cable from CPRI port at GRFU to CPRI port at GTMU depend on board configuration Insert CPRI Connector at WRFU CPRI 0 and others side at CPRI port WBBP For conection CRPI cable from CPRI port at WRFU to CPRI port at WBBP refer on board configuration
7
Note 1
You should route the E1 cable in the cabinet before cutting the cable to an appropriate length as required.
2
Label must attach
3
Arrange cable neat and tidy
Tools 1
Philips screwdriver
2
Punchdown Tool
3
Cutter
Materials 1
WRFU
GRFU
3
HUAWEI Confidential
120o hm E1 CPRI
2
Cable tie
4
label
Page16
安装绝缘垫片.
BTS Standard Installation Procedure 安装螺栓、弹垫、平垫在绝缘垫片上. 安装绝缘垫片.
SN
Task Description
Operator
Duration
1.9.1
Install Alarm Cable EMU GSM 3900L
A
30 min
Procedure 1
Route the alarm cable along the cable rack.
2
Insert the DB9 male connector of th alarm cable into the COM port on the top of th cabinet.
3
Connect from RS485 from alarm box to BTS BBU board UPU Mon 1
4 5
Note 1
For detail please refer to manual alarm installation
2 3 4
Tools 1
Philips screwdriver
2
Cutter
3
5
4
6 Materials
1
Alarm cable
2
3
label
4
5
HUAWEI Confidential
Cable tie
6
Page17
安装绝缘垫片.
BTS Standard Installation Procedure 安装螺栓、弹垫、平垫在绝缘垫片上. 安装绝缘垫片.
SN
Task Description
Operator
Duration
1.9.1
Install Alarm CableEMUA GSM 3900A
A
30 min
Procedure 1
Route the alarm cable along the cable rack.
2
Insert the DB9 male connector connect to COM out BTS outdoor
3
Insert the DB9 male connector at the other end of the alarm cable into the RS485 port on the EMU.
4 5
Note 1
For external alarm which will connected depend on customer request refers to site condition
2
For detail please refer to manual alarm installation
3 4
Tools 1
Philips screwdriver
2
Cutter
3
5
4
6 Materials
1
Alarm cable
2
3
label
4
5
HUAWEI Confidential
Cable tie
6
Page18
SN
安装绝缘垫片.
BTS Standard Installation Procedure 安装螺栓、弹垫、平垫在绝缘垫片上. 安装绝缘垫片.
1.11.2
Task Description
Operator
Duration
CD
20 min
Install Internal cable & RF jumpers at RFU Board Procedure
1
Using solid wrench to tighten 1/2 inch jumper connectors to 7/8 inch feeder connectors
2
For other side connect 1/2 inch jumper to RFU board.
3
Make sure connection tight and no cross feeder.
4 5
Note 1
Be carefully when bend the RF jumpers to avoid broken
2
Tighten the DIN connectors with spanner at the strength of 27N.m
3
The curve radius for Jumpers should satisfy:1/2 inch jumper(soft)>50mm, 1/2 inch jumper(common)>127mm
4
Tools 1
Phillips screwdriver
2
Solid wrench
5
4
3 6
Materials
NO JUMPER COILING
HUAWEI Confidential
1
6 (soft) 1/2 inch jumpers
2
White cable ties
3
Black Cable Ties
4
Lighting protection
5
6
Page19
SN
Task Description
Operator
Duration
1.12.1
Power on check
AB
20 min
安装绝缘垫片.
BTS Standard Installation Procedure 安装螺栓、弹垫、平垫在绝缘垫片上. 安装绝缘垫片.
Procedure 1
Measure the resistance between each wiring post on the top of the cabinet and each ground wiring post to check whether there is a short circuit.
2
Setting all switches on the busbar to OFF and then turn on power input MCB on the power distriution cabinet.And test the imput voltage. The permitted voltage is between 40V and -60V.
3
Set the power switch of the FAN to ON, and check whether the fans run normally.
4
Set the power switch of the common subrack to ON, and check whether the RUN LED on the RFU-BBU etc run normally
5 6
Note 1
Make sure all the BTS DCDU switch are off before power on
2
Before power on the BTS,the power supply aready off
3
Tools 1 4
Multimeter
2
Anti-static wrist
5
3 6
Materials 1
2
3
4
HUAWEI Confidential
Page20
SN
Task Description
Operator
Duration
1.13.1
Stick the labels
CD
20 min
安装绝缘垫片.
BTS Standard Installation Procedure 安装螺栓、弹垫、平垫在绝缘垫片上. 安装绝缘垫片.
Procedure 1
The power and PGND cable should use the cable tie label. Both cabinet side and power side need to stick the labels.
2
The L-shaped label should be sticked on the signal cables. Both sides of the cable need to stick the labels.
3
The label of feeder cable must corect and complete
4
The label for signal cable , alarm, must be complete
5
Note 1
The lable should follow Huawei template if the costomer no speical requirement
Thank you for interesting in our services. We are a non-profit group that run this website to share documents. We need your help to maintenance this website.