Standard Installation on RRU_XL Axiata Project v 1 3
Short Description
TELECOM...
Description
Standard Installation on RRU
XL Axiata Project www.huawei.com By : QC team
HUAWEI TECHNOLOGIES CO., LTD.
content 1. Installation on top Antenna RRU CPRI , Power and grounding cable on top
2. Installation on bottom CPRI, power and grounding cable on bottom
HUAWEI TECHNOLOGIES CO., LTD.
Page 2
Installation on top Antenna 1. Water Proof Installation
Metode 1. 3x electrical tape 2. 3x rubber 3. 3x electrical Tape 4. Tie wrap with black ties
HUAWEI TECHNOLOGIES CO., LTD.
Page 3
Installation on top Antenna 2. Coloring label Installation
HUAWEI TECHNOLOGIES CO., LTD.
Page 4
Installation on top Antenna 2. Coloring label Installation
Add white color label near connector
HUAWEI TECHNOLOGIES CO., LTD.
Page 5
Installation on top 1. RRU placement
RRU
a. RRU on new mounting bellow antenna
Add new 3 mounting bellow antenna
HUAWEI TECHNOLOGIES CO., LTD.
Page 6
Installation on top 1. RRU placement
RRU
b. RRU On the mounting antenna installation
HUAWEI TECHNOLOGIES CO., LTD.
Page 7
Installation on top 1. RRU placement
RRU
c. RRU On the leg tower Installation
HUAWEI TECHNOLOGIES CO., LTD.
Page 8
Installation on top 1. RRU placement
RRU
d. RRU On the Bracing tower Installation (Guide mash type)
HUAWEI TECHNOLOGIES CO., LTD.
Page 9
Installation on top 2. RRU position
RRU
a. Installing the RRU on a Pole one or more RRUs can be installed on a pole.
HUAWEI TECHNOLOGIES CO., LTD.
Page 10
Installation on top 2. RRU position
RRU
b. Installing the RRU on a Pole one or more RRUs can be installed on a pole.
HUAWEI TECHNOLOGIES CO., LTD.
Page 11
Installation on top 2. RRU position
RRU
c. Installing the RRU on U-steel and Angle Steel This section describes the procedure and precautions for installing the RRU on U-steel and angel steel. U-steel and Angle Steel can be installed either on the ground or a tower and only one RRU can be installed on a piece of U-steel and Angle Steel. An RRU on U-steel and Angle Steel is installed in standard mode by default.
HUAWEI TECHNOLOGIES CO., LTD.
Page 12
Installation on top 2. RRU position
RRU
d. Installing the RRU on a Wall This section describes the procedure and precautions for installing the RRU on a wall. An RRU on a wall is installed in standard mode by default.
HUAWEI TECHNOLOGIES CO., LTD.
Page 13
Installation on top 2. RRU position
RRU
e. Installing RRU on an IFS06 This section describes the procedure and precautions for installing an RRU on an IFS06.
HUAWEI TECHNOLOGIES CO., LTD.
Page 14
Installation on top 2. RRU position
RRU
f. Installing the RRU on a Wall This section describes the procedure and precautions for installing the RRU on a wall. An RRU on a wall is installed in standard mode by default.
HUAWEI TECHNOLOGIES CO., LTD.
Page 15
Installation on top RRU 3. RRU installation with filter
Installation filter On
Use iron clamp
Leg Tower
HUAWEI TECHNOLOGIES CO., LTD.
Page 16
Installation on top RRU 3. RRU installation with filter Tx Rx Label on Jumper
FILTER
HUAWEI TECHNOLOGIES CO., LTD.
Page 17
Installation on top CPRI , Power and grounding cable on top 1. CPRI cable
CPRI cable connect to CPRI port 0
HUAWEI TECHNOLOGIES CO., LTD.
Page 18
Installation on top CPRI , Power and grounding cable on top 2. Power cable
To make shield layer power cable RRU measure from reverse RRU cover
HUAWEI TECHNOLOGIES CO., LTD.
Page 19
Installation on top CPRI , Power and grounding cable on top 3. Grounding cable
Grounding cable Install on RRU connect to grounding bar existing
HUAWEI TECHNOLOGIES CO., LTD.
Page 20
Installation on top CPRI , Power and grounding cable on top 4. label
Color ring & Print label standard for jumper cable & CPRI
HUAWEI TECHNOLOGIES CO., LTD.
Page 21
Installation on top CPRI , Power and grounding cable on top 4. label
Max 1 m
Label CPRI and power cable RRU max 1 M before bending cable on horizontal cable tray Label must be installed as close as possible to the connector
HUAWEI TECHNOLOGIES CO., LTD.
Page 22
Installation on top CPRI , Power and grounding cable on top 5. Grounding clip Install grounding clip on power cable RRU before bending between vertical tray and horizontal tray
HUAWEI TECHNOLOGIES CO., LTD.
Page 23
Installation on top CPRI , Power and grounding cable on top 5. Grounding clip Install grounding clip on power cable RRU before bending between vertical tray and horizontal tray
HUAWEI TECHNOLOGIES CO., LTD.
Page 24
Installation on top CPRI , Power and grounding cable on top 6. Routing cable
Vertical Clamp
Horizontal Clamp
Power and CPRI cable install with clam 150 cm or each cable tray step, at horizontal and vertical tray. Power Cable Type : 300V, UL2464, 3.31mm^2,2x12AWG, Black Jacket (2 Cores: Blue, Black), 30A, Shielded Outdoor Cable
HUAWEI TECHNOLOGIES CO., LTD.
Optical Cable Type : DLC/UPC, DLC/UPC, Single-mode, GYFJH 2B1.3 (LSZH), 60m, 7.0mm, 2 Cores, 0.03m/0.34m, 2mm, Outdoor Protected Branch Cable
Page 25
Installation on top CPRI , Power and grounding cable on top 6. Routing cable
Vertical Clam
Horizontal Clam
Power and CPRI cable install with clam 150 cm or each cable tray step, at horizontal and vertical tray. Cable Fastener : Antenna Feeder Accessories, One Fastener for Fixing Six 3.3 mm^2,4 mm^2, and 8.2 mm^2 Power Cable and Optical Fibers, Stainless Steel, RRU
HUAWEI TECHNOLOGIES CO., LTD.
Page 26
Installation on bottom CPRI , Power and grounding cable on bottom 1. Routing cable outdoor BTS 3900A and DBS 3900
HUAWEI TECHNOLOGIES CO., LTD.
Page 27
Installation on bottom CPRI , Power and grounding cable on bottom 1. Routing cable outdoor BTS 3900A and DBS 3900
1 1. -
2 Power cable rectifier to BTS grounding cable BTS to main busbar signal cable E1/T1, FE/GE, optical alarm cable
2. - Jumper cable - CPRI cable - RRU power cable
HUAWEI TECHNOLOGIES CO., LTD.
Page 28
Installation on bottom CPRI , Power and grounding cable on bottom 2. RRU Power cable out door BTS 3900A and DBS 3900
Must be use MCB with capacity minimum 32A each RRU
Must be used cable 25mm if need additional MCB on Rectifier outdoor
*Note: power cable RRU direct to rectifier if not DCDU 12B yet HUAWEI TECHNOLOGIES CO., LTD.
Page 29
Installation on bottom CPRI , Power and grounding cable on bottom 2. RRU Power cable outdoor BTS 3900A add new DCDU 12B
Must be connected to Load0, Load1 & Load2
HUAWEI TECHNOLOGIES CO., LTD.
Page 30
Installation on bottom CPRI , Power and grounding cable on bottom 2. RRU Power cable outdoor BTS 3900A add new DCDU 12B 1. MCB on Rectifier must be 125A or 1x 80A or 2X80A for connected to DCDU-12B depend on design customer
1 2
2. Power connection to DCDU 12B use 1 port or 2 port
4
3 BTS 3900A cabinet
Rectifier outdoor cabinet
HUAWEI TECHNOLOGIES CO., LTD.
Page 31
Installation on bottom CPRI , Power and grounding cable on bottom 2. RRU Power cable outdoor BTS 3900A add new DCDU 12B 3. Routing power cable from right or left side BTS use anaconda conduit
1 2
4. Sticking a cable claw onto the right side of the DCDU-12B and grounding cable
4
3 BTS 3900A cabinet
Rectifier outdoor cabinet
HUAWEI TECHNOLOGIES CO., LTD.
Page 32
Installation on bottom CPRI , Power and grounding cable on bottom 2. RRU Power cable outdoor BTS 3900A DBS 3900 add new DCDU 12B
Please install ground clip RRU power cable and routing in BTS cabinet as picture above
HUAWEI TECHNOLOGIES CO., LTD.
Page 33
Installation on bottom CPRI , Power and grounding cable on bottom 3. CPRI cable routing outdoor BTS 3900A
CPRI cable from RRU
HUAWEI TECHNOLOGIES CO., LTD.
CPRI cable from RRU
Page 34
Installation on bottom CPRI , Power and grounding cable on bottom 3. CPRI cable routing DBS 3900
CPRI cable from RRU
HUAWEI TECHNOLOGIES CO., LTD.
CPRI cable from RRU
Page 35
Installation on bottom CPRI , Power and grounding cable on bottom 3. CPRI cable routing outdoor BTS 3900A and DBS 3900 spare CPRI cable 1. Redundant optic cable place to inside BTS
2. Redundant optic cable place on vertical bottom tray
*note= split each redundant optic cable per sector with ties cable and color label
HUAWEI TECHNOLOGIES CO., LTD.
Page 36
Installation on bottom CPRI , Power and grounding cable on bottom 4. Routing cable indoor BTS 3900L, BTS 3900 and DBS 3900
When Power and CPRI cable insert to the room must install with rubber boot (3 hole) in/outlet, block closely and with good bending for water drift.
HUAWEI TECHNOLOGIES CO., LTD.
Page 37
Installation on bottom CPRI , Power and grounding cable on bottom 4. Routing cable indoor BTS 3900L, BTS 3900 and DBS 3900
HUAWEI TECHNOLOGIES CO., LTD.
Power, CPRI and grounding cable no need white conduit.
Cable lay at tray with tie wrap or clamp
Page 38
Installation on bottom CPRI , Power and grounding cable on bottom 4. Routing cable indoor BTS 3900L, BTS 3900 and DBS 3900 1. Grounding cable, Power cable DCDU and RRU in duct cable
1
2. CPRI, signal and alarm cable in duct cable.
2 1
2
HUAWEI TECHNOLOGIES CO., LTD.
Page 39
Installation on bottom CPRI , Power and grounding cable on bottom 5. Power cable RRU outdoor BTS 3900 L add new DCDU 12B
Must be connected to Load0, Load1 & Load2
HUAWEI TECHNOLOGIES CO., LTD.
Page 40
Installation on bottom CPRI , Power and grounding cable on bottom 5. Power cable RRU indoor BTS 3900L add new DCDU 12B 1. MCB on Rectifier must be 125A or 1x 80A or 2X80A for connected to DCDU-12B depend on design customer
3
1 2. Power connection to DCDU use 1 port or 2 port
2 4
Rectifier indoor cabinet
BTS 3900L cabinet
HUAWEI TECHNOLOGIES CO., LTD.
Page 41
Installation on bottom CPRI , Power and grounding cable on bottom 5. Power cable RRU indoor BTS 3900L add new DCDU 12B 3. Routing power cable from left side BTS use duct cable and ties cable on horizontal tray
3
1 4. Sticking a cable claw onto the right side of the DCDU-12B and grounding cable
2 4
Rectifier indoor cabinet
BTS 3900L cabinet
HUAWEI TECHNOLOGIES CO., LTD.
Page 42
Installation on bottom CPRI , Power and grounding cable on bottom 5. Power cable RRU indoor BTS 3900L add new DCDU 12B
RRU power cable routing from left side in duct cable and rout to right side to DCDU 12B
HUAWEI TECHNOLOGIES CO., LTD.
Page 43
Installation on bottom CPRI , Power and grounding cable on bottom 6. CPRI cable routing indoor BTS 3900L CPRI cable from RRU
CPRI cable routing from right side in duct cable to BBU
HUAWEI TECHNOLOGIES CO., LTD.
Page 44
Installation on bottom CPRI , Power and grounding cable on bottom 6. CPRI cable routing outdoor BTS 3900L and DBS 3900 spare CPRI cable
1. Redundant optic cable place to inside BTS
3. Redundant optic cable place on vertical bottom tray
2. Redundant optic cable place to horizontal tray (indoor type)
HUAWEI TECHNOLOGIES CO., LTD.
*note= split each redundant optic cable per sector with ties cable and color label
Page 45
Installation on bottom CPRI , Power and grounding cable on bottom 7. label Label must be installed as close as possible to the connector use print label: CPRI cable, RRU Power cable, MCB, grounding cable
HUAWEI TECHNOLOGIES CO., LTD.
Page 46
THANKS www.huawei.com
View more...
Comments