Document ID: SP-1109 ERD-!"-09# '(l(n) *e+: ,-1
SP 1109 Spec((cat(on or Eart%(n) an/ on/(n)
This document is the property of Petroleum De Development velopment Oman, LLC. Neither the whole nor any part of this document may be disclosed to others or reproduced, stored in a retrieval system system,, or transmitted in any form by any means (electronic, mechanical, reproraphic recordin or otherwise! without prior written consent of the owner owner..
Specification for Earthing and Bonding
Version 4.0
Authorised for issue March 2004
"ined #............................................................ C$D%, &lectrical &nineerin
The followin followin is a brief summary summary of the ' most recent revisions revisions to this docum document. ent. Deta Details ils of all revisions prior to these are held on file by the issuin department.
er2(on No. ersion ) ersion 1.) ersion 4.)
Date Oct *+ Oct *2 5une **
ersion +.)
5une 4))1
ersion '.)
SP-1109
,ut%or &-' &-' "aif 6l "umry, O7&-+ %um umai aid d 6l %arth rthy
Scope 3 Remar*2 Oriinal issued as &D/0'/)* $ormat revised and te3t updated Converted to "pecification as per PDO Policy Cascade 8 minor chanes to the te3t 7ntro ntrodu duce ced d 9arc 9arcon onit itee as aarrti tifi fici ciaal me meth thod od o of f reducin earth resistivity
9arch
%umaid 6l %arthy
outi outine ne thre threee yearl yearly y revis revision ion and cap capture ture
4))'
TT&-'1
e3perience throuh several parties 7nclude 7nc ludess re: re:uir uireme ements nts for for &le &lectr ctroma omanet netic ic Compatibility (&9C!
Page 1
March 2004
Version 4.0
Specification for Earthing and Bonding
Contents 1
Intr Introduction. oduction........................ .............................................. .............................................. .............................................. ....................................... ................ 5
1.1
PURPOSE. PURPOSE........ .............. ............... ............... .............. .............. ............... ............... .............. ............... ............... .............. ................................ .........................4 4
1.&
,PPLIC, ,PPLIC,LE LE ST,ND ST,ND,RD ,RDS5 S5 SPECI SPECI'IC, 'IC,TION TION ,ND CODES........ CODES................ ............... ......... ..4 4
1.4.1 1.4.4 1.4.+
1.6
CO$PLI,N CO$PLI,NCE CE 7IT8 ST,ND ST,ND,RD ,RDS....... S............... ............... .............. ............... ............... .............................. .......................! !
1."
SSTE$ SSTE$ REPRESEN REPRESENT T,TION.......... TION................. ............... ............... .............. ............... ............... ............................... ........................! !
1.+.1
1.+.4 1.+.4 1.+.+
2
PDO "tandards...... "tandards............ ............ ............ ............ ............ ............ ........... ........... ............ ........... ........... ............ ............ ........... ........... .................... .................... .......; .; "7O "7OP-"7 P-"7&P &P "tandards....... "tandards............ ........... ............ ........... ........... ............ ............ ........... ........... ............ ........... ........... ............ ..................... ...................... ........; .; 7nterna 7nternational tional "tandar "tandards...... ds............ ............ ............ ........... ........... ............ ........... ........... ............ ............ ........... ........... ............ ................... ................... .......0 .0 Lanua Lanuae e and .>
Scope................................ Scope....................................................... .............................................. .............................................. ........................................ ...................8 &.1
ELECTR ELECTRIC, IC,L L PO7ER PO7ER SSTE$ SSTE$ E,R E,RT8IN.. T8IN..... ....... ........ ....... ....... ........ ....... ....... ........ ......... ........... .......... ....; ;
4.1.1 ?en ?eneral..... eral.......... ........... ............ ............ ........... ........... ............ ........... ........... ............ ............ ........... ........... ............ ........... ........... ............ ............ ........... ........... ............ .........2 4.1.4 % ?enerators. ?enerators....... ............ ........... ........... ............ ............ ............ ............ ............ ........... ........... ............ ........... ........... ............ ............ ........... .................. ..............1) .1) 4.1.+ L ?enerator ?eneratorss ('1;!... ('1;!......... ............ ........... ........... ............ ............ ............ ............ ............ ........... ........... ............ ........... ........... ...................... .................1) .1) 4.1.' Pow Power er Tra Transfor nsformers... mers........ ........... ............ ........... ........... ............ ............ ........... ........... ............ ........... ........... ............ ............ ........... ........... ................. ...........11 11 4.1.'.1 % ?enera ?enerator tor .4>
March 2004
Page 2
SP-1109
Specification for Earthing and Bonding 4.4.1) 4.4.11 4.4.11 4.4.14 4.4.1+ 4.4.1' 4.4.1; 4.4.10 4.4.1> 4.4.12 4.4.1* 4.4.4)
Version 4.0
9iscellane 9iscellaneous ous 9etalwor 9etalwor@..... @........... ............ ........... ........... ............ ........... ........... ............ ............ ........... ........... ............ ........... ........... ............ ........... .....4> 4> =ell Pad &arthin............ &arthin................. ........... ............ ............ ............ ............ ............ ........... ........... ............ ........... ........... ............ ............ ........... ........... .......... ....42 42 5etties.. 5etties........ ............ ............ ........... ........... ............ ........... ........... ............ ............ ........... ........... ............ ........... ........... ............ ............ ............... ......................... .................. ..4* 4* oad oad T Tan@er an@er Lo Loadin adin $acilitie $acilities..... s........... ............ ........... ........... ............ ............ ............ ............ ............ ............. ....................... ..................... .....4* 4* oad oad T Tan@er an@er $iure 44. # 0.0-).'1; @, Nyn Three Phase &arthin Transformer.............................................12 Transformer.............................................12 $iure 4+. # ++-).'1; @, Nyn Three Phase &arthin Transformer..............................................12 Transformer............................................. .12 $iure 4'. # Low oltae oltae 7T "ystem.............................................................. "ystem................................................................................................ ...................................1* .1* $iure 4;. # Low oltae oltae 7T "ystem.............................................................. "ystem................................................................................................ ...................................4) .4) $iure 40. # Low oltae oltae TN "ystem...............................................................................................41 "ystem.............................................................................................. .41 $iure 4>. # ecommended alue alue of &arth esistance......................................................... esistance................................................................... ...........+4 .+4 $iure 42. # CT 7nstalled on sinle core armoured cable................................................................+2 cable................................................................+2 $iure 4*. # &arth Conductor "iEe...................................................................................................+* "iEe................................................................................................... +*
March 2004
Page 4
SP-1109
Specification for Earthing and Bonding
1
Version 4.0
Introduction 6 "pecification ("P! is a document that Petroleum Development Oman (PDO! issue to specify their re:uirements, procedures and standards. The prefi3 for these these documents shall be "P. "P.
1.1
PURPOSE This "P specifies the earthin 8 bondin arranements for both permanent and temporary installations in PDO sites and covers the followin# &lectrical "ystem ?roundin.
1.2
&:uipment ?roundin &:uipment ?roundin for electrical electrical e:uipment e:uipment and non/ele non/electric ctrical al metal metallic lic e:uipment e:uipment li@e tan@s, vessels, etc. "tatic and Lihtnin Protection ?roundin.
AP APPL PLICA ICABL BLE E S SA!" A!"AR AR"S# "S# SP SPEC ECI$I I$ICA CAIO IO! ! A! A!" " CO" CO"ES ES The followin "tandards, specifications and codes should be consulted when applyin the re:uir re: uireme ement nt of this "tandar "tandard. d. 6ll listed listed docume documents nts shall be lates latestt issue issue e3ce e3cept pt thos thosee documents prescribed by date.
1.2.1 .2.1
1. 1.2. 2.2 2
P"O Stand tanda ard rds s "P/1)**
/
"pecification for &lectrical 7nstallation Practice
"P/11)+
/
&lectrical &n &nineerin ? ?u uidelines (6mendment to to D&P ++.0'.1).1)!
"P/114)
/
"pecification fo for %ih oltae " "w witchear an and C Co ontrol ? ?eear (6mendment to D&P ++.0>.;1.+1!
"P/1141
/
"pecification ffo or Low oltae "witchear aan nd Co Control ? ?eear (6mendment to D&P ++.0>.)1.+1!
"P/11);
/
"pecification fo for &lectrical " "ttandard D Drrawins
"P/11)2
/
"pecification for &lectrical Procedures (&"OP0 8 41!
"P/111+
/
"pecification for 1+4 @ "ubstation
"P/1142
/
Cathodic Protection Desin
P/14+'
/
"afe =or@in Procedures on Cathodically Protected "tructures
"afety
rules
Operational
SIOP SIOP%S %SIE IEP P St Stan anda dard rds s
SP-1109
D&P D& P ++.0'.1 ++.0'.1).1) ).1)/?e /?en n/
&lectr &lectrical ical &ni &ninee neerin rin ?ui ?uidel delines ines
D&P ++.0 ++.0>. >.;1 ;1.+ .+1 1
/
% "wit itch che ear ar 8 Contr ontrol ol ?ear 6ssem sembl blie iess
D&P ++.0 ++.0>. >.)1 )1.+ .+1 1
/
L "wit itcche hear 8 Contr ontrol ol ?ear 6ss ssem embl blie iess
D&P +4.+>.4).1)
/
7nstrument "i "inal Li Lines
D&P D& P ++.0' ++.0'.1 .1).+ ).++ + ?en.
&l &lec ectr trom oma anet netic ic Comp Compat atib ibili ility ty &9 &9C C
"hell "afety Committee
"tatic &lectricity
/
Page 5
March 2004
Version 4.0
1.2.& 1.2.&
Specification for Earthing and Bonding
Inte Intern rnat atio iona na'' S Sta tand ndar ards ds 6N"7 6N "7-7& -7&&& && " "td/ td/2)/ 2)/4)) 4))) ) /
7&& 7&&& & ?u ?uide ide for for "af "afety ety in 6C "ubsta "ubstation tion ?round ?roundin in
7&&
/
eulations for &lectrical 7nstallations
7&C 0));)
/
7nternational &lectrotechinical ocabulary
7&C >*/1'
/
&lectrical 77n nstallations in in & &3 3plosive ?as 6tmospheres (o (other than mines!
7&C 0)+0'
/
&lectrical 7nstallations in uildins
7&C '>*/1
/
&ffects of Current Passin Throuh the %uman ody
7&&& "td 1'4
7&&& e ecommended Practice for roundin o off 7ndustrial an and commercial power systems
The above D&Ps and "Ps are available from Live Lin@ 8 "hell =eb.
1.& 1.&
CO COMP MPLI LIA! A!CE CE (I (I) ) S S A! A!"A "AR" R"S S 6ll re:uirements of this "pecification shall apply e3cept where e:uipment 9anufacturerFs standards are more strinent, then the latter shall apply. $or $or any deviat deviations ions from from this "pecif "pecifica ication tion,, the Con Contrac tractor tor sha shall ll obtain obtain the writte written n areement of PDO prior to e3ecution of the related enineerin wor@. 7n all cases Company shall determine thethis ade:uacy of desin carried out and =or@s e3ecuted by the the Contractor in accordance with "pecification.
1.&.1 1.& .1
Lan*ua Lan*ua*e *e and and Unit Units s of Measur Measure+ e+ent ent &nlish lanuae and the 7nternational "ystem ("7! units of measurement in all documents and drawin drawinss shall be use usedG dG refer refer to 7"O +1 and 7"O 1) 1))). )). =h =here ere the "7 unit is a conversion of a manufactured dimension, the oriinal dimension can be put in brac@ets, after the "7 units. $or e3am e3ample, ple, ;) mm (4 in! pipe.
1.4 1.4 1.4.1
S, S,S SEM EM RE REPR PRES ESE! E! AI IO! O! Con-entio Con-entions ns for for rans ransfor+e for+err (indin* (indin* Arran*e Arran*e+ent +ents s 6n upper/case letter indicates the hiher voltae windin 6 lower/case lower/case letter indicates the th e lower voltae windin A or + indicates a star windin D or d indicates a delta windin or E indicates a EiEa windin N or n indicates that the star windin has h as an accessible neutral point
&3ampl &3a mple# e# Dyn Dyn is a transf transform ormer er with a de delta lta % windi windin n and a star L L win windin din wit with h accessible neutral point
March 2004
Page 6
SP-1109
Specification for Earthing and Bonding
1.4.2 1.4 .2
Version 4.0
Con-en Con-entio tions ns for Sste Sste+ + Ear Earthi thin* n* Power system earthin arranements are distinuished as follows#
The first letter denotes the earthin arranement at the source of enery# T H dire direct ct co conne nnecti ction on of one one or more more p poin oints ts to &ar &arth. th. 7 H al alll li live ve parts parts isola isolate ted d from from &arth &arth or one po point int co conne nnect cted ed to &ar &arth th throu throuh h an impedance.
The secon second d let letter ter den denote otess the rel relati ationsh onship ip of the e3p e3pose osed d con conduc ductiv tivee par parts ts of the installation to &arth# T H di dire recct ele lecctric trical al con onne nect ctio ion n of the the e3pos posed condu onduccti tiv ve part partss to &art &arth h independently of the earthin earth in of any point of the source of enery enery,, N H direct electrical connection of the e3posed conductive parts to the earthed points of the source of enery, enery, which for 6C, is usually the neutral point.
Note# e3posed e3posed conductive parts are always earthed.
$or low vo volta ltae e sy syste stems ms the desina desination tion FTNF FTNF is further further subdiv subdivide ided d depen dependin din on the arranement of neutral and protective arranement protective cond conductor uctors, s, the arranement bein denot denoted ed by a further letter or letters# " H neutral neutral and protecti protective ve functions functions provid provided ed by sepa separate rate con conducto ductors rs (N and P& P&!, !, C H neutral neutral and protec protective tive functio functions ns combined combined in a sinle sinle cconduct onductor or (P& (P&N!. N!.
D&D7C6T&D &6T% &L&CTOD&
$rame
N&)
$rame of L enerator
>)
P& for earth fault return of L enerator
>)
"ee Note +
Neutral connection of %-% %-% transformer P& for earth fault return of %-% transformer
14) >)
"ee Note 1 "ee Note +
Neutral connection of L L transformer (% (%-'1; -'1; !
>)
P& for earth fault return of L transformer
14)
Tan@ of transformer
>)
"ure arresters
>)
$rame of motors
4;
9ain % and L switchear
>)
"ub/switchboards and panels
>)
Lihtin installation (supports, control bo3es, etc.!
4;
9ain conductor in earth rid
>)
ranch connector in earth rid "ubstation earth mat
4; 1;)
"ubstation perimeter fence earthin
>)
&3traneous &3traneo us condu conducti ctive ve parts parts (of (of non non/el /elect ectric rical al e:uipment!
4;
"ee Note +
"ee Note +
"ee Note 4
'()ure &9 : Eart% Con/uctor S(Ae NOTE:
1. This applies applies to solidly solidly earthed earthed % enerators enerators and %-L %-L transform transformers. ers. 7n case o off res resistance istance ear earthin, thin, a sinle sinle core core % cable cable shall shall be used betwee between n the neutra neutrall poi point nt of the en enera erator tor or transformer and the neutral resistor (or the "inle Phase &arthin Transformer!. 4. "ubstation "ubstation earth mats shall be construct constructed ed from (;) (;) 3 +! mm bare hard drawn cop copper per bars bars.. +. This is the P& that shall be provided provided in case of ssinle inle core core cable cabless (ref (refer er 6ppendi3 6ppendi3 1G "ec "ection tion 4 of this "P!.
SP-1109
Page 39
March 2004
Version 4.0
Specification for Earthing and Bonding
6PP&ND7 6 # ?LO""6A ?LO""6A O$ D&$7N7T7ON", D&$7N 7T7ON", T&9" 6ND 6&76T7ON" 6&76T7ON" The followin terms and abbreviations used in this document, are defined below#
?eneral Terminoloy "hall
/
The word FshallF is to be understood as mandatory.
"hould
/
The word FshouldF is to be understood as stronly recommended.
9ay
/
The word FmayF is to be understood as indicatin a possible course of action.