OPGS POWER GUJARAT PVT LTD 2 X 150 MW TPP Doc title

STANDARD OPERATING PROCEDURE

Doc No: OPGS/-/-/-/-/Re v No

0

Re v Dt.

STANDARD OPERATING PROCEDURE FOR LIGHT OIL UNLODING.

SYSTEM NAME: 

Light oil Unloading System.

OBJECTIVE: 

To ensure smooth, safe and conscious operating procedure for Light fuel oil unloading and storage.

SYSTEM DESCRIPTION: 

HSD is imported to the site by means of tankers. A truck unloading station consists of flexible hoses, suction strainers, unloading pumps and manifolds to transfer the truck contents into the HSD tank. One unloading pump with the capacity of 500 litres per min. The truck unloading operation is totally manual.



The volume of the HSD storage tanks is of 100 m3, which corresponds to the fuel requirement for seven, considering one false start in each start up attempt.

SAFETY CHECKS:        

Ensure all Kind of permit to works are closed. Ensure proper earthling is done for all the electrical equipment’s. All the pipelines & equipment’s are properly fixed & supported. Provision of Jumpers in all the flange joints is available. Ensure coupling guard is fixed properly for all rotating equipment’s. Ensure that the dyke, surrounding area is clean and free of any combustible materials. Ensure the use of appropriate Personal Protective Equipment’s. Ensure availability of appropriate type of portable fire extinguishers at designated locations.

19/8/201 6

OPGS POWER GUJARAT PVT LTD 2 X 150 MW TPP Doc title

STANDARD OPERATING PROCEDURE

Doc No: OPGS/-/-/-/-/Re v No

0

Re v Dt.

ENVIRONMENTAL CHECKS   

Check the surroundings for Oil leakage or Spillage before starting the unloading. Check for unwanted fire hazard material near by the surroundings. Make sure vehicle tyres are arrested and engines are switched off.

Make Sure the Following Valves Position before start unloading.

       

All drain valves are closed in pump suction side Pump suction valve is in open condition. Open root valves of DP Switch Close Suction strainer drain valve Open root valve of suction pressure indicator Close pump casing drain valve Open root valve of discharge pressure indicator Open pump discharge valve

Following activities to be carried out and ensured, receiving of light oil Tanker       

The truck will be first Gross weighted and from Weigh Bridge Information will be sent to Control room The truck will be positioned outside the Unloading Point and Ensure that the individual compartment of the tanker is sealed. Key number from Invoice will be verified and corresponding key (provided by BP) will be taken from control room for Opening tanker Manifold lock. The truck will be parked in flat surface and allowed to settle for 10-15 min. Meanwhile, the calibration certificate with dip level will be checked and validity along with seal at the bottom of the dip rod will be checked. The o/l marking and p/l marking on the dip scale corresponding to each compartment is checked along with the calibration certificate and Invoice. Each compartment level will be checked with Dip scale along with Water paste for detection of water.

19/8/201 6

OPGS POWER GUJARAT PVT LTD 2 X 150 MW TPP Doc title

STANDARD OPERATING PROCEDURE            

Doc No: OPGS/-/-/-/-/Re v No

0

Re v Dt.

19/8/201 6

After position the taker in the unloading point Truck’s engine will be switched off and key will be taken under engineer’s custody. Oil sample from each compartment will be collected for checking the density If any discrepancy found in Dip level, the same will be escalated to Shift Incharge and then the same will be escalated to BP thru HO Purchase. Tank level has to be recorded with value by finishing of each compartment in unloading log sheet. Once a low pressure indication comes on the suction side of the unloading pump, stop the pump Record final level of the storage tank, and Close the truck manifold valve All the compartments will be checked visually after completion and the truck will be moved back and forth twice to remove the bottom settled oil. After Unloading, the Truck will be tare weighed at Weigh Bridge. After completion of tare weight Final weighment slip will submitted to shift Incharge thru filed operator. After verification of the corresponding valves by shift Incharge invoice copy will send to store for further process. Store will make sure and cross check all related documents of Quality and Quantity before sending the vehicle out and in case of any deviation in the vehicle will be hold until the clarification or instruction from superiors. Store Incharge will be only authorised person to send the out the vehicle.

Note:



Checklist on “HSD unloading from tank trucks” has to be filled and all the activities to be ensured



As per Oil marketing companies, the Difference in Dip level can be contended along with density measurement and the Density difference between loading and receipt shall be less than 0.003.

OPGS POWER GUJARAT PVT LTD 2 X 150 MW TPP Doc title

Re v No

STANDARD OPERATING PROCEDURE

LIGHT OIL UNLOADING LOG & CHECK SHEET Date

Name of the Driver :

Vehicle No

Name of the Agency :

Log Sheet Vehicle In Time Vehicle Out Time Gross weight Tare Weight Net weight Density in invoice Tan Initi k al lev el

Le vel

In Invoic e

In Dip Scale

Water check

After C4

Final

Remarks

C1 C2 C3 C4

Aft er C1

Density as per lab Aft After er C3 C2

Check Sheet S.N o

Description

Doc No: OPGS/-/-/-/-/-

Status

0

Re v Dt.

19/8/201 6

OPGS POWER GUJARAT PVT LTD 2 X 150 MW TPP Doc title

1 2 3 4 5 6 7 8 9 10 11

STANDARD OPERATING PROCEDURE

Truck seal to be checked before entering to the unloading point by store. Invoice to be collected and Vehicle Number to be cross checked Each compartment level will be checked and recorded in Unloading log sheet with Dip scale along with Water paste for detection of water. After position the taker in the unloading point Truck’s engine will be switched off and key will be taken under engineer’s custody Sample to be collected and value has to obtain from lab be fort starting of unloading. Healthiness of power supply to be ensured before starting. Closed condition all drain valve to be ensured before start the unloading pump. Tank level to be recorded before start the unloading and after completion of each compartment. All the compartments will be checked visually after completion unloading Truck to be moved back and forth to remove the bottom settled oil Bottom settled oil to be collected and all compartment valve o be ensured for wide opening.

Name & Signature of the Engineer Name & Signature of the Shift Incharge

Doc No: OPGS/-/-/-/-/Re v No

0

Re v Dt.

19/8/201 6