Slings and Rigging Equipments

September 19, 2022 | Author: Anonymous | Category: N/A
Share Embed Donate


Short Description

Download Slings and Rigging Equipments...

Description

 

Document Title:

Slings and Rigging Equipments

COPI Doc No.:

ID-G-BU-YH0-PRO-GN-00-0043

Originator: COPI Group Owner: Area: Location: System: Document Type: Discipline / Subdiscipline: Old COPI Document No.:

1

Rev

IFU

Status

28.02.2010

Issue Date

COPI Project - HSE General General General Procedure/Work Instruction/Job Note Project / HSE -

Issued for Use

Reason for Issue

Didik Swaradi

Prepared

Fred McFadden

Checked

Don Sample

Tony Evers

Not Reqd

Unit Owner

Snr. Manager

VP Projects

 Approvals

Printed initials in the approval boxes confirm that the document has been signed. The originals are held within Document Management.  

 

Procedure/Work Instruction/Job Note: Slings and Rigging Equipments ConocoPhillips Indonesia

ID-G-BU-YH0-PRO-GN-00-0043 Rev. 2 Page 2 of 5

Revision Sheet ConocoPhillips Indonesia Inc. Ltd

REVISION

DATE

DESCRIPTION OF CHANGE

0A

31.01.2010

Issued for Comment

1

28.02.2010

Issued for Use

Additional Approvers (If Applicable) Name

Designation

Signature

Date

 

Procedure/Work Instruction/Job Note: Slings and Rigging Equipments ConocoPhillips Indonesia

ID-G-BU-YH0-PRO-GN-00-0043 Rev. 2 Page 3 of 5

Contents 1.0 

SCOPE ..................................................................................................................................... ..................................................................................................................................... 4 

2.0 

DEFINITIONS ........................................................ ........................................................................................................................... ................................................................... 4 

3.0 

INSPECTIONS.............................................................................. INSPECTIONS.......................................................................................................................... ............................................ 4 

4.0 

SAFETY FACTOR ................................................................................... .................................................................................................................... ................................. 4 

5.0 

APPROVAL APPROVA L AND STAMPS...................................................................................................... ...................................................................................................... 5 

6.0 

GENERAL GENERA L REQUIREMENTS REQUIREMENTS ........................................................................................... ................................................................................................... ........ 5  

 

Procedure/Work Instruction/Job Note: Slings and Rigging Equipments ConocoPhillips Indonesia

1.0

ID-G-BU-YH0-PRO-GN-00-0043 Rev. 2 Page 4 of 5

SCOPE This procedure provides minimum requirements for slings and rigging equipment used for hoisting and material handling.

2.0

DEFINITIONS COPI  – ConocoPhilli ConocoPhillips ps Indonesia Qualified Inspector -  -  an experienced CONTRACTOR craftsperson or engineer, acceptable to the COMPANY, who has a MIGAS certification.

3.0

INSPECTIONS 3.1

Periodic   - Slings and rigging equipment shall require quarterly and annual Periodic inspections by a Qualified Inspector. 3.1.1

This quarterly inspection shall be indicated indicated by the following following color-coded color-coded tape system or its equivalent refer to COPI document number ID-G-BU00000-00000-00315 00000-00000-00 315 - “Lifting Equipment Certification”  Certification” 

3.1.2

Employees using slings slings and and rigging equipment must ensure ensure the marking system remains legible between inspections.

3.1.3

Slings or rigging rigging equipment equipment with illegible illegible marking systems shall be considered unsafe and shall be removed from f rom service.

3.1.4

Annual inspections for slings slings (wire (wire rope, rope, sy synthetic nthetic web, web, wire wire mesh, mesh, chain, chain, etc) to include but not limited to performance load test.

3.2 

Daily Daily  - Slings and rigging equipment shall be inspected daily (when in use) and prior to each use by the user to ensure that they are in proper working order. 3.2.1

Damaged or defective slings, slings, as determined determined by a competent person, must be destroyed.

3.2.2

Damaged or defective rigging equipment equipment must be tagged (do not not use) and returned to the tool room immediately.

3.2.3

Under no no circumstances may slin slings gs and rigging equipment equipment in need of of inspection or repair remain in service.

4.0

SAFETY FACTOR 4.1

Slings and manufactured rigging equipment shall not be loaded in excess of their rated capacities.

 

Procedure/Work Instruction/Job Note: Slings and Rigging Equipments ConocoPhillips Indonesia

4.2

ID-G-BU-YH0-PRO-GN-00-0043 Rev. 2 Page 5 of 5

Slings, shackles, and other similar equipment must have a safety factor of five (5). 4.2.1

4.3

Safety Factor = “Nominal failure load” / “Rated working load”  load” 

Only quenched-dipped and forged lifting equipment attachments will be purchased for use. use. (Without this manu manufactured factured process, the a attachment ttachment will not not show deformation under heavy loads)

5.0

APPROVAL AND STAMPS  All spreader spreader bars, eye pads, and other custom lifting dev devices ices must be engineere engineered d and the design stamped by a Registered Professional Engineer.

6.0

5.1

No makeshift devices are to be used.

5.2

CONTRACTOR shall control the issue of all lifting and hoisting equipment.

GENERAL REQUIREMENTS 6.1

Slings shall not be shortened with knots, bolts or other makeshift devices.

6.2

Sling legs shall not be kinked.

6.3

Wire rope slings must be 1/2" minimum diameter.

6.4

Slings used in a basket hitch shall have the loads balanced to prevent slippage.

6.5

Slings shall be securely attached to their loads.

6.6

Slings shall be padded or protected from the sharp edges of their loads.

6.7

Suspended loads shall be kept clear of all obstruction.

6.8

All employees shall be kept clear clear of loads about to be be lifted and clear of suspended loads.

6.9

Hands or fingers shall not be placed between the sling and its load while while the sling is being tightened around the load.

6.10

Shock loading is prohibited.

6.11

A sling sling shall not be pulled from under a load load when when the load is is resting on the sling.

6.12

The use of si single ngle leg slings with hand tucked eye splices is prohibited. Hand tucked types used in pairs will be acceptable. Slings with Flemish Flemish eye splices with pressed on fittings are preferred.

6.13

Slings that are damaged or defective shall not be used.

6.14

Both slings and rigging certifications can be seen on COPI document document number IDG-BU-00000-00000-00315 G-BU-00000-00000 -00315 - “Lifting Equipment Certification”

6.15

Slings and other rigging rigging equipment shall be assessed, determined, determined, applied and utilized by qualified or trained riggers in rigging of lifts greater then 100 kg.

View more...

Comments

Copyright ©2017 KUPDF Inc.
SUPPORT KUPDF