SLB Tools Golden Rules

December 1, 2017 | Author: JohnSmith | Category: Casing (Borehole), Nature
Share Embed Donate


Short Description

SLB Tools...

Description

10 Golden Rules for setting Down Hole Tools

for setting Down Hole Tools

Schlumberger Private

10 Golden Rules

10 Golden Rules for setting Down Hole Tools 1-Job Preparation

      

Find out Casing Size and weight (Tool Dressing) Depth and Temperature (Rubbers & O-rings) Tubing Size, Weight & Thread type (X-over & Drill Collars) Type of Job Fishing Diagram Back up (Spare elements, O-rings, Slips, …) – Best is to have a second tool ready to go Function Test Pop Joints (Avoid long stick ups) Physical Check (X-over) Scraper run, Perforations blur will damage the elements

Schlumberger Private

  

10 Golden Rules for setting Down Hole Tools

2- Never hang a String with a loose connection

Schlumberger Private

 Specially while hanging a heavy string downhole (Hurricane/ DLT jobs)

10 Golden Rules for setting Down Hole Tools

3- Minimum Left Hand Turns

Schlumberger Private

 Never exceed 3 left hand turns  While unlatching RBP start with 1 turn and proceed with 1/4 turns  If failed after 3 left hand turns do 5 right hand turns and repeat  Exception: Storm Valve

10 Golden Rules for setting Down Hole Tools

4- Surface Handling

Schlumberger Private

 Never put slips around packer body  Connect a 5’ Pop Joint on top of the tool

10 Golden Rules for setting Down Hole Tools

5- Signals At The Tool

Schlumberger Private

 Signals at surface may differ from signals the tool receives down-hole  Send Big Signals specially in deep/ deviated wells  To make sure Positrieve safety position pick up as much as derrick lets

10 Golden Rules for setting Down Hole Tools

6- Up Weight & Down Weight

Schlumberger Private

 Record and mark up weight and down weight of the string and the distance between them before trying to set the tool

10 Golden Rules for setting Down Hole Tools

7- Don’t Rely On Your Memory

Schlumberger Private

 Write down all steps of the job in a tally book and take it during the job  Mark setting depth and other important points on the tubing  record all job data

10 Golden Rules for setting Down Hole Tools

8- Have Your Eyes On the Weight Indicator

Schlumberger Private

 M/D is the only indicator in setting a tool  Notice and record all changes on M/D during the job

10 Golden Rules for setting Down Hole Tools

9- Tight Top To Down

Schlumberger Private

 Tightening a connection on the rig floor may unscrew upper connections  While tightening a string mark and have your eyes on upper joints

10 Golden Rules for setting Down Hole Tools

10- Let the elements relax

Schlumberger Private

 As soon as the tool is unset before pulling up let the rubber elements relax for 5 to 10 minutes.

View more...

Comments

Copyright ©2017 KUPDF Inc.
SUPPORT KUPDF