Tim O’Rourke – MEA – ML Manager Fahd Ali - PAG Marketing Manager Anees Khokhar– CEO - ITS Pakistan
Karachi, Pakistan June 20th, 2012
Rapid Multilateral Solutions
Multilaterals – “a new approach?” Quick overview of TAML Levels Moving forward – MRC to ERC ARACMO – Level 3 SPE Presentation WEL TAML Presentation – Deep Water
Multilaterals – a new approach, emerging technology ?
Think again!!!
Information courtesy Hart E&P Mag Aug 07 & Julie Bonner, Chairperson TAML
•
1929 – Leo Ranney rudimentary attempts MLs. He drilled a 2.44 m vertical shaft in Ohio, Ohio put men and equipment in the bottom of the hole and they dug horizontal holes– he also drilled in a horizontal radial pattern “spokes pattern, spokes of a wheel wheel” perhaps creating the 1st ML ever.
•
In the 1940’s John Zublin drilled horizontal drain holes for operators in Calif.
•
In 1945 Mr. Zublin eventually reenters 250 wells in Calif., West Texas and Wy Wy. Averaging 2 laterals per well
ML’s are Not New 1939 – Alexander Grigoryan graduated from Azerbaijan Industrial Institute. 1941 – He drilled, drilled what is on record, record the world first directional well (Baku 135) using only Turbo Drills. This directional well led to him to develop a way to increase of production in the same way a “tree root extends to soil”. * * *
In 1953 he drilled (66/45) 9 branches, branches ea leg 80 to 300 m without whipstocks or cement plugs Increased exposure to the pay zone by 5.5 times Increased production by 17 times 110 wells followed from Eastern Siberia to the West Ukraine near the Black Sea.
Information courtesy Hart E&P Mag Aug 07 & Julie Bonner, Chairperson TAML
What are the TAML Classifications
Level 1
Level 6
Open hole O h l mainbore i b Open hole lateral
Pressure integrity within the junction Level 2 Mainbore cased Open hole lateral
Level 5 Hydraulic isolation at the junction, via completion
Level 3 Mainbore cased Mechanical support in the lateral
Level 4 Mainbore and lateral cemented
Saudi Aramco 1996
Saudi Aramco 2002
Why Does This Work?
The Future MRC’s to ERC’s “Extreme Reservoir Contact” 50K’ to 75K’ on the pay p y
Current MRC (Maximum
Future ERC (Extreme Reservoir Contact)
Reservoir Contact wells) Wells
Wells
Costs / Benefit Discussion Well cost:
4 M$
Time to Drill & Complete: 2.5 / 3.0 Months Average Production: 5000 bopd Additional cost: < 1 M$ Ti tto D Time Drill ill & Complete: C l t < 1 Month M th Incremental Production: +3000 bopd
Possible ML Design for Producers and Injectors 3-Leg ML Producer 2-Leg ML Injector
Nahr Umr Sandstone 12m
ML Concept p for PDO in Sandstone
ML Flow Chart
FEA of RapidExclude Junction verses the Washover Junction LLevell 4 Washover System p w/ 10 psi
3.51” of deflection into the mainbore at 10 psi of load to a standard level 4 wash-over junction j ti
RapidX w// 2500 ppsi
Negligible deflection with 2500 psi of load applied to the Connector and Template
Mechanical Integrity at a Junction 9-5/8” casing Full size window L= 15 ft , W= 8.5 in. P j t dA Projected Area= 1500 sq.in i . +/-/ Formation Contact Pressure: if p = 100 psi
er mberg Schlu
Radial Force Component on C Connection: ti
F
F = 150,000 Lb
Reliability issues and future workovers
Before
After
Schlumberger ML milestones since 2006 •
2006: Woodside Tender – Vincent Field, 7 systems – RapidX Level 5 – Sub Sea Vincent Field
•
2006: Development of 7” Level 5 RX*
•
2007: Woodside Vincent Field – 4 systems installed
•
2008: First Tri Lateral – Level 3 Aramco 2008: Woodside Vincent Field – 4 systems plus World world first TAML level 5 first Tri Lateral
•
2008: Woodside orders 17 systems
•
2008: First Tri Lateral – Level 3 Aramco
*Mark of Schlumberger
Rapid Products Strength •
High Mechanical strength at the junction
•
Junction has long term stability e.g. fragile shales, mobile salts,
Level 4 Mill-over Junction
p reservoirs depleted
•
Junction is assembled downhole not constructed
Junction Collapsed p
Saudi Aramco First
Phase 1- MRC Australia 3 well xxx
2 Well xxx
-1
1 Well xxx
-2
4
5 well xxx
Phase 1 & 2 MRC – each well > 6K m
Geological Considerations Formations Water depth 375 – 400m
Overburden Calcarenite & Marl
Claystone / Shale
Sandstone – Reservoir (top res ±1300m TVDSS)
Typical Well Plan
Oil Industries Highest Strength p System y Multilateral Junction – RapidX TAML Level 5 99-5/8 5/8” RapidX 2500 psi
SLB Level 5 Junction
Top View
Bottom View
RapidX, RapidExclude and RapidConnect Sizes B
A
•
Size
7”
9-5/8”
C
D
•
A
7.00”
9-5/8”
•
B
4.00”
4.75”
•
C
2.99”
4.00”
•
D
3-1/2”
5.00”
•
E
4 1/2 4-1/2
7 00” 7.00
E
RapidX Junction
Template Connector
Water Injector
Project’s Typical Multilateral Completions
Five x Level 5 Tri Lateral RapidX deployed March , 2012