INTRODUCTION TO THE SIMATIC MANAGER • The four phases for creating an automation solution • Runtime environment of the SIMATIC Manager • Integrated tools in STEP 7 Professional
University of Ruse
1
SIMATIC MANAGER
The four phases for creating an automation solution Planning and Configuring
Testing and Commissioning
Implementation and Module Test
Operation and Maintenance
SIMATIC software
University of Ruse
2
SIMATIC MANAGER
Runtime environment of the SIMATIC Manager SIMATIC software
University of Ruse
3
SIMATIC MANAGER
Integrated tools in STEP 7 Professional
University of Ruse
4
SIMATIC MANAGER
Block diagram of the SIMATIC Manager Tasks of the SIMATIC Manager Project structure of an automation plant in the SIMATIC Manager
University of Ruse
5
SIMATIC MANAGER
Tasks of the SIMATIC Manager
University of Ruse
6
SIMATIC MANAGER
Project structure of an automation plant in the SIMATIC Manager
University of Ruse
7
SIMATIC MANAGER
Demonstration of a typical project creation with the SIMATIC Manager Planning and Configuring
Testing and Commissioning
Implementation and Module Test
Operation and Maintenance
•Laying out project with station •Configuring hardware •Projecting connection •Create the symbols •Develop the control program •Program test module by module •Configure the visualization •Loading program •Test in the regular operation •Archiving and backup •Teleservice
University of Ruse
8
SIMATIC MANAGER
Planning and Configuring Laying out project with Station 1 generate a new project
2 Insert Station project name storage location
3 starting the hardware configuration tool
University of Ruse
9
SIMATIC MANAGER
Planning and Configuring Configuring Hardware – HW Config
Update Hardware catalog
Non SIEMENS Hardware Install Manufacturer GSD file Hardware catalog
University of Ruse
10
SIMATIC MANAGER
Planning and Configuring Configuring Hardware – HW Config
Slot No Module Address and parameters
University of Ruse
11
SIMATIC MANAGER
Planning and Configuring Configuring Hardware – HW Config
Manual tuning
Negative result of the check
University of Ruse
12
SIMATIC MANAGER
Planning and Configuring Configure network
University of Ruse
13
SIMATIC MANAGER
Implementation and Module Test Create the symbols
University of Ruse
14
SIMATIC MANAGER
Implementation and Module Test Develop the control program
University of Ruse
15
SIMATIC MANAGER
Implementation and Module Test Develop the control program
SCL Editor
Ladder Editor
University of Ruse
16
SIMATIC MANAGER
Implementation and Module Test Program test module by module – S7 PLCSIM
PLCSIM Start Button
Simulated inputs
Resulted Outputs
University of Ruse
17
SIMATIC MANAGER
Implementation and Module Test Configure the visualization – WinCC Flexible
University of Ruse
18
SIMATIC MANAGER
Testing and Commissioning Loading program
Program Download Start Button
Program Download
Show program Online
University of Ruse
19
SIMATIC MANAGER
Testing and Commissioning Test in the regular operation
Forcing of variables
Monitoring and control of variables
Program status
Single-step mode with stop points
University of Ruse
20
SIMATIC MANAGER
Testing and Commissioning Archiving and backup
University of Ruse
21
SIMATIC MANAGER
Operation and Maintenance Teleservice
Ruse
0359/82824273
Ruse
University of Ruse
22
SIMATIC MANAGER
Literature
Berger Hans, Automating with Simatic, Controllers, Software, Programming, Data communication, Operator Control and Process Monitoring 2. SIMATIC Configuring Hardware and Communication Connections with STEP 7, Manual, A5E00706939-01, SIEMENS Edition 03/2006. 1.