Short Circuit
Short Description
Download Short Circuit...
Description
Project:
ETAP
Example
7.0.0T
Page:
1
Location:
Irvine, California
Date:
08-28-2009
Contract:
OTI-12345678
SN:
ETAPTRAING
Engineer:
Operation Technology, Inc.
Revision:
Base
Filename:
EXAMPLE-ANSI
Config.:
Normal
Study Case: ANSI - LG
This info is printed on every output report, 1st remark line. (120 characters) Second line of remarks for "ANSI - LG" study case.
Electrical Transient Analyzer Program Short-Circuit Analysis ANSI Standard 3-Phase Fault Currents
Number of Buses:
Number of Branches:
Number of Machines:
Swing
V-Control
Load
Total
1
1
14
16
XFMR2
XFMR3
Reactor
Line/Cable
Impedance
Tie PD
Total
7
1
0
5
0
0
13
Synchronous Generator
Power Grid
Synchronous Motor
Induction Machines
Lumped Load
Total
1
1
2
7
4
15
System Frequency:
60 Hz
Unit System:
English
Project Filename:
EXAMPLE-ANSI
Output Filename:
C:\ETAP 700\Example-ANSI\Untitled.SA1
Project:
ETAP
Example
7.0.0T
Page:
2
Location:
Irvine, California
Date:
08-28-2009
Contract:
OTI-12345678
SN:
ETAPTRAING
Engineer:
Operation Technology, Inc.
Revision:
Base
Filename:
EXAMPLE-ANSI
Config.:
Normal
Study Case: ANSI - LG
This info is printed on every output report, 1st remark line. (120 characters) Second line of remarks for "ANSI - LG" study case.
Adjustments Apply Tolerance
Individual
Adjustments
/Global
Transformer Impedance:
Yes
Individual
Reactor Impedance:
Yes
Individual
Overload Heater Resistance:
No
Transmission Line Length:
No
Cable Length:
No
Apply
Individual
Adjustments
/Global
Transmission Line Resistance:
Yes
Individual
Cable Resistance:
Yes
Individual
Temperature Correction
Percent
Degree C
Project:
ETAP
Example
7.0.0T
Page:
3
Location:
Irvine, California
Date:
08-28-2009
Contract:
OTI-12345678
SN:
ETAPTRAING
Engineer:
Operation Technology, Inc.
Revision:
Base
Filename:
EXAMPLE-ANSI
Config.:
Normal
Study Case: ANSI - LG
This info is printed on every output report, 1st remark line. (120 characters) Second line of remarks for "ANSI - LG" study case.
Bus Input Data
Bus ID
Type
Initial Voltage Nom. kV
Base kV
0.480
0.480
Sub-sys
%Mag.
Ang.
1
100.00
0.00
Bus1
Load
Bus2
Load
0.480
0.480
1
100.00
0.00
Bus6
Load
13.800
13.800
1
100.00
0.00
Bus7
Load
13.800
13.800
1
100.00
0.00
Bus9
Load
4.160
4.160
1
100.00
0.00
Bus23A
Load
0.480
0.492
1
101.45
-1.23
LVBus
Load
-3.49
Main Bus
SWNG
MCC1
0.480
0.480
1
97.09
34.500
34.500
1
100.00
0.00
Load
0.480
0.492
1
97.94
-3.10
Sub2A
Load
13.800
13.800
1
101.52
-1.20
Sub2B
Gen.
13.800
13.800
1
100.00
1.40
Sub 3
Load
4.160
4.160
1
99.81
-0.50
Sub3 Swgr
Load
4.160
4.160
1
99.59
-0.50
Sub22
Load
3.450
3.450
1
100.00
0.00
Sub23
Load
3.450
3.450
1
100.00
0.00
T1~
Load
34.500
34.500
0
100.00
0.00
16 Buses Total All voltages reported by ETAP are in % of bus Nominal kV. Base kV values of buses are calculated and used internally by ETAP.
Project:
ETAP
Example
7.0.0T
Page:
4
Location:
Irvine, California
Date:
08-28-2009
Contract:
OTI-12345678
SN:
ETAPTRAING
Engineer:
Operation Technology, Inc.
Revision:
Base
Filename:
EXAMPLE-ANSI
Config.:
Normal
Study Case: ANSI - LG
This info is printed on every output report, 1st remark line. (120 characters) Second line of remarks for "ANSI - LG" study case.
Line/Cable Input Data Ohms or Siemens/1000 ft per Conductor (Cable) or per Phase (Line) Length
Line/Cable ID
Library
Size
Adj. (ft)
% Tol.
#/Phase
T (°C)
R
X
Y
Cable2
5.0MCUS3
750
222.0
0
1
75
0.02230
0.03640
0.0000000
Cable14
1.0MCUN3
250
430.0
0
2
75
0.05520
0.03790
0.0000000
Cable22
15MCUS3
350
410.1
0
1
75
0.03815
0.04500
0.0000000
Cable23
15MCUS3
350
410.1
0
1
75
0.03815
0.03600
0.0000000
210
5280.0
0
1
75
0.05125
0.12758
0.0000012
Line4
Line / Cable resistances are listed at the specified temperatures.
Project:
ETAP
Example
7.0.0T
Page:
5
Location:
Irvine, California
Date:
08-28-2009
Contract:
OTI-12345678
SN:
ETAPTRAING
Engineer:
Operation Technology, Inc.
Revision:
Base
Filename:
EXAMPLE-ANSI
Config.:
Normal
Study Case: ANSI - LG
This info is printed on every output report, 1st remark line. (120 characters) Second line of remarks for "ANSI - LG" study case.
2-Winding Transformer Input Data
Transformer ID
Rating MVA
Prim. kV
Sec. kV
Z Variation %Z
X/R
+ 5%
- 5%
% Tap Setting % Tol.
Prim.
Sec.
Adjusted %Z
T2
10.000
34.500
13.800
6.90
23.00
-1.50
2.10
0
0
0
6.9000
T3
0.750
4.160
0.480
5.75
18.00
0
0
0
0
0
5.7500
T4
1.500
4.160
0.480
5.75
7.10
0
0
0
0
0
5.7500
T5
0.750
3.450
0.480
5.75
5.79
0
0
0
-2.500
0
5.7500
T22
5.000
13.800
3.450
6.50
12.14
0
0
0
0
0
6.5000
T23
5.000
13.800
3.450
6.50
12.14
0
0
0
0
0
6.5000
XFMR 3
1.000
4.160
0.480
7.20
28.00
0
0
0
-2.500
0
7.2000
3-Winding Transformer Input Data Transformer ID T1
Rating Winding
MVA
Tap kV
Impedance
%
%Z
MVAb
% Tol.
+ 5%
- 5%
39.00
15.000
0
0
0
Primary:
15.000
34.500
0
Zps =
Secondary:
10.000
13.800
0
Zpt =
7.20
40.00
15.000
0
5.000
4.160
0
Zst =
14.10
38.00
15.000
0
Tertiary:
7.10
Z Variation
X/R
Project:
ETAP
Example
7.0.0T
Page:
6
Location:
Irvine, California
Date:
08-28-2009
Contract:
OTI-12345678
SN:
ETAPTRAING
Engineer:
Operation Technology, Inc.
Revision:
Base
Filename:
EXAMPLE-ANSI
Config.:
Normal
Study Case: ANSI - LG
This info is printed on every output report, 1st remark line. (120 characters) Second line of remarks for "ANSI - LG" study case.
Branch Connections CKT/Branch
Connected Bus ID
ID
Type
From Bus
% Impedance, Pos. Seq., 100 MVAb To Bus
R
X
Z
T2
2W XFMR
Main Bus
Sub2A
3.00
68.93
69.00
T3
2W XFMR
Sub3 Swgr
LVBus
42.53
765.49
766.67
T4
2W XFMR
Sub 3
Bus1
53.46
379.59
383.33
T5
2W XFMR
Sub23
Bus23A
124.04
718.18
728.81
T22
2W XFMR
Bus7
Sub22
10.67
129.56
130.00
T23
2W XFMR
Bus6
Sub23
10.67
129.56
130.00
XFMR 3
2W XFMR
Sub3 Swgr
MCC1
24.43
684.01
684.45
T1
3W Xfmr
Main Bus
T1~
-0.03
0.67
0.67
3W Xfmr
Sub2B
T1~
1.24
46.65
46.67
3W Xfmr
Sub 3
T1~
1.23
47.32
47.33
Cable2
Cable
Sub 3
Sub3 Swgr
2.86
4.67
5.48
Cable14
Cable
Bus1
Bus2
515.10
353.67
624.83
Cable22
Cable
Sub2A
Bus7
0.82
0.97
1.27
Cable23
Cable
Sub2B
Bus6
0.82
0.78
1.13
Line4
Line
Sub3 Swgr
Bus9
156.36
389.25
419.48
Y
Project:
ETAP
Example
7.0.0T
Page:
7
Location:
Irvine, California
Date:
08-28-2009
Contract:
OTI-12345678
SN:
ETAPTRAING
Engineer:
Operation Technology, Inc.
Revision:
Base
Filename:
EXAMPLE-ANSI
Config.:
Normal
Study Case: ANSI - LG
This info is printed on every output report, 1st remark line. (120 characters) Second line of remarks for "ANSI - LG" study case.
Power Grid Input Data
Power Grid
Connected Bus
ID
ID
Utility
Main Bus
% Impedance 100 MVA Base
Rating MVASC
kV
1200.000
X/R
34.500
R
45.00
X
0.18514
8.33128
Total Connected Power Grids (= 1 ): 1200.000 MVA
Synchronous Generator Input Data % Impedance in Machine Base Synchronous Generator ID Gen1
Connected Bus Type
Turbo
ID Sub2B
Total Connected Synchronous Generators ( = 1 ): 8.824 MVA
Rating MVA 8.824
Xd"
X/R Ratio
kV
RPM
X"/R
X'/R
13.800
1800
48.00
48.00
R 0.250
Adj. 12.00
Tol. 0.0
Xd' 23.00
Project:
ETAP
Example
7.0.0T
Page:
8
Location:
Irvine, California
Date:
08-28-2009
Contract:
OTI-12345678
SN:
ETAPTRAING
Engineer:
Operation Technology, Inc.
Revision:
Base
Filename:
EXAMPLE-ANSI
Config.:
Normal
Study Case: ANSI - LG
This info is printed on every output report, 1st remark line. (120 characters) Second line of remarks for "ANSI - LG" study case.
Synchronous Motor Input Data % Impedance in Machine Base Synchronous Motor ID
Connected Bus
Type
Qty
Rating
ID
kVA
Xd"
X/R Ratio
kV
RPM
X"/R
X'/R
Syn1
Motor
1
Sub2A
1170.4
13.200
1800
27.00
27.00
0.570
R
Adj. 15.38
Tol. 0.0
23.08
Syn2
Motor
1
LVBus
134.2
0.460
1800
11.00
11.00
1.818
20.00
0.0
30.00
Total Connected Synchronous Machines ( = 2 ): 1304.6 kVA
Induction Machine Input Data
Induction Machine ID
Connected Bus Qty
ID
Rating
% Impedance Machine Base
X/R Ratio
HP/kW
kVA
kV
RPM
X"/R
X'/R
R
X"
2500.00
2060.05
13.200
1800
24.99
24.99
0.83
20.79
X'
Motors Mtr2
1
Sub2B
31.19
Pump 1
1
Sub3 Swgr
500.00
446.99
4.000
1800
4.82
4.82
3.88
18.68
28.02
Mtr1
1
Bus23A
100.00
118.05
0.380
1800
9.02
9.02
2.22
20.00
50.00
Mtr6
2
MCC1
60.00
53.74
0.460
1800
6.03
6.03
3.32
20.00
50.00
Mtr4
1
MCC1
125.00
110.12
0.460
1800
8.71
8.71
2.30
20.00
50.00
Mtr3
1
MCC1
75.00
66.20
0.460
1800
6.74
6.74
2.97
20.00
50.00
Mtr5
1
MCC1
50.00
45.32
0.460
1800
5.51
5.51
3.63
20.00
50.00
Total Connected Induction Motors ( = 8 ): 2954.2 kVA
Xd'
Project:
ETAP
Example
7.0.0T
Page:
9
Location:
Irvine, California
Date:
08-28-2009
Contract:
OTI-12345678
SN:
ETAPTRAING
Engineer:
Operation Technology, Inc.
Revision:
Base
Filename:
EXAMPLE-ANSI
Config.:
Normal
Study Case: ANSI - LG
This info is printed on every output report, 1st remark line. (120 characters) Second line of remarks for "ANSI - LG" study case.
Lumped Load Input Data Lumped Load Lumped Load
Connected Bus
ID
ID
Motor Loads Rating kVA
% Load kV
MTR
STAT
Loading kW
X/R Ratio
kvar
X"/R
X'/R
Static Loads
% Imp. (Machine Base) R
X"
X'
Loading kW
kvar
LUMP1
LVBus
220.0
0.460
70
30
134.0
75.9
2.38
2.38
8.403
20.00
50.00
62.52
35.43
LUMP2
Sub22
3500.0
3.300
60
40
1785.0
1106.2
10.00
10.00
1.538
15.38
23.08
1300.64
806.06
LUMP4
Bus23A
500.0
0.400
70
30
297.5
184.4
2.38
2.38
10.050
23.92
9999.00
183.60
113.79
LUMP6
Bus9
500.0
4.160
60
40
255.0
158.0
6.67
6.67
2.307
15.38
23.08
170.00
105.36
Total Connected Lumped Loads ( = 4 ): 4720.0 kVA
Project:
ETAP
Example
7.0.0T
Page:
10
Location:
Irvine, California
Date:
08-28-2009
Contract:
OTI-12345678
SN:
ETAPTRAING
Engineer:
Operation Technology, Inc.
Revision:
Base
Filename:
EXAMPLE-ANSI
Config.:
Normal
Study Case: ANSI - LG
This info is printed on every output report, 1st remark line. (120 characters) Second line of remarks for "ANSI - LG" study case.
SHORT-CIRCUIT REPORT
3-phase fault at bus: Prefault voltage
LVBus = 0.490
= =
102.00 % of nominal bus kV ( 0.480 kV) 102.00 % of base ( 0.480 kV)
Contribution From Bus ID
1/2 Cycle To Bus ID
LVBus
Total
Sub3 Swgr
%V From Bus
kA Real
kA Imaginary
Imag. /Real
kA Symm. Magnitude
0.00
1.292
-16.609
12.9
16.659
LVBus
94.78
0.844
-14.845
17.6
14.869
Syn2
LVBus
106.43
0.081
-0.889
11.0
0.893
LUMP1
LVBus
106.43
0.367
-0.874
2.4
0.948
Sub 3
Sub3 Swgr
95.35
0.088
-1.654
18.8
1.656
Bus9
Sub3 Swgr
95.30
0.003
-0.018
6.7
0.018
MCC1
Sub3 Swgr
98.04
0.002
-0.016
8.5
0.017
Pump 1
Sub3 Swgr
106.08
0.005
-0.025
5.3
0.025
Bus1
Sub 3
95.35
0.000
0.000
999.9
0.000
# T1~
Sub 3
101.00
0.088
-1.654
18.8
1.656
LUMP6
Bus9
102.00
0.003
-0.018
6.7
0.018
Mtr6
MCC1
109.16
0.006
-0.045
7.4
0.046
Mtr4
MCC1
109.16
0.004
-0.047
11.8
0.047
Mtr3
MCC1
109.16
0.003
-0.028
8.5
0.028
Mtr5
MCC1
109.16
0.003
-0.019
6.6
0.019
NACD Ratio = 1.00 # Indicates a fault current contribution from a three-winding transformer * Indicates a fault current through a tie circuit breaker If faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these PDs will not be reported.
Project:
ETAP
Example
7.0.0T
Page:
11
Location:
Irvine, California
Date:
08-28-2009
Contract:
OTI-12345678
SN:
ETAPTRAING
Engineer:
Operation Technology, Inc.
Revision:
Base
Filename:
EXAMPLE-ANSI
Config.:
Normal
Study Case: ANSI - LG
This info is printed on every output report, 1st remark line. (120 characters) Second line of remarks for "ANSI - LG" study case.
3-phase fault at bus: Prefault voltage
Main Bus = 35.190
= =
102.00 % of nominal bus kV ( 34.500 kV) 102.00 % of base ( 34.500 kV)
Contribution From Bus ID
To Bus ID
Main Bus
Total
Sub2A
Main Bus
# T1~
1/2 Cycle %V From Bus
kA Real
kA Imaginary
1.5 to 4 Cycle Imag. /Real
kA Symm. Magnitude
%V From Bus
kA Real
kA Imaginary
Imag. /Real
kA Symm. Magnitude
0.00
0.528
-21.953
41.6
21.959
0.00
0.508
-21.771
42.9
21.777
12.76
0.022
-0.309
14.3
0.310
9.16
0.016
-0.222
13.9
0.222
Main Bus
0.47
0.051
-1.166
22.7
1.167
0.43
0.037
-1.071
29.3
1.072
Utility
Main Bus
102.00
0.455
-20.478
45.0
20.483
102.00
0.455
-20.478
45.0
20.483
Bus7
Sub2A
12.88
0.044
-0.462
10.6
0.464
9.24
0.032
-0.339
10.4
0.340
Syn1
Sub2A
106.64
0.010
-0.310
30.0
0.310
106.64
0.007
-0.215
29.2
0.215
# Sub2B
T1~
29.70
0.030
-1.048
34.8
1.048
28.32
0.024
-1.000
42.3
1.000
# Sub 3
T1~
3.85
0.021
-0.118
5.5
0.120
2.48
0.013
-0.071
5.5
0.072
Sub22
Bus7
27.29
0.044
-0.462
10.6
0.464
19.81
0.032
-0.339
10.4
0.340
Bus6
Sub2B
29.72
0.020
-0.070
3.6
0.072
28.32
0.001
-0.012
8.6
0.012
Gen1
Sub2B
102.00
0.043
-2.223
51.5
2.224
102.00
0.049
-2.266
46.5
2.266
Mtr2
Sub2B
106.64
0.013
-0.327
25.9
0.327
106.64
0.009
-0.222
24.6
0.222
Sub3 Swgr
Sub 3
4.19
0.177
-0.976
5.5
0.992
2.69
0.107
-0.592
5.5
0.601
Bus1
Sub 3
3.85
0.000
0.000
999.9
0.000
2.48
0.000
0.000
999.9
0.000
NACD Ratio = 0.96 # Indicates a fault current contribution from a three-winding transformer * Indicates a fault current through a tie circuit breaker If faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these PDs will not be reported.
Project:
ETAP
Example
7.0.0T
Page:
12
Location:
Irvine, California
Date:
08-28-2009
Contract:
OTI-12345678
SN:
ETAPTRAING
Engineer:
Operation Technology, Inc.
Revision:
Base
Filename:
EXAMPLE-ANSI
Config.:
Normal
Study Case: ANSI - LG
This info is printed on every output report, 1st remark line. (120 characters) Second line of remarks for "ANSI - LG" study case.
3-phase fault at bus: Prefault voltage
MCC1 = 0.490
= =
102.00 % of nominal bus kV ( 0.480 kV) 99.45 % of base ( 0.492 kV)
Contribution From Bus ID
1/2 Cycle To Bus ID
MCC1
Total
Sub3 Swgr
%V From Bus
kA Real
kA Imaginary
Imag. /Real
kA Symm. Magnitude
0.00
0.925
-17.836
19.3
17.860
MCC1
91.62
0.608
-15.686
25.8
15.698
Mtr6
MCC1
106.43
0.116
-0.699
6.0
0.708
Mtr4
MCC1
106.43
0.083
-0.726
8.7
0.731
Mtr3
MCC1
106.43
0.064
-0.433
6.7
0.437
Mtr5
MCC1
106.43
0.053
-0.293
5.5
0.298
Sub 3
Sub3 Swgr
92.23
0.062
-1.796
29.0
1.797
Bus9
Sub3 Swgr
92.19
0.003
-0.019
7.6
0.019
LVBus
Sub3 Swgr
92.41
0.003
-0.014
5.1
0.015
Pump 1
Sub3 Swgr
103.43
0.005
-0.027
5.9
0.028
Bus1
Sub 3
92.23
0.000
0.000
999.9
0.000
# T1~
Sub 3
98.36
0.062
-1.796
29.0
1.797
LUMP6
Bus9
99.45
0.003
-0.019
7.6
0.019
Syn2
LVBus
103.77
0.002
-0.062
28.3
0.062
LUMP1
LVBus
103.77
0.022
-0.062
2.8
0.066
NACD Ratio = 1.00 # Indicates a fault current contribution from a three-winding transformer * Indicates a fault current through a tie circuit breaker If faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these PDs will not be reported.
Project:
ETAP
Example
7.0.0T
Page:
13
Location:
Irvine, California
Date:
08-28-2009
Contract:
OTI-12345678
SN:
ETAPTRAING
Engineer:
Operation Technology, Inc.
Revision:
Base
Filename:
EXAMPLE-ANSI
Config.:
Normal
Study Case: ANSI - LG
This info is printed on every output report, 1st remark line. (120 characters) Second line of remarks for "ANSI - LG" study case.
3-phase fault at bus: Prefault voltage
Sub 3 = 4.243
= =
102.00 % of nominal bus kV ( 4.160 kV) 102.00 % of base ( 4.160 kV)
Contribution From Bus ID
1/2 Cycle To Bus ID
%V From Bus
kA Real
kA Imaginary
1.5 to 4 Cycle Imag. /Real
kA Symm. Magnitude
%V From Bus
kA Real
kA Imaginary
Imag. /Real
kA Symm. Magnitude
Sub 3
Total
0.00
0.820
-26.398
32.2
26.411
0.00
0.740
-25.967
35.1
25.978
Sub3 Swgr
Sub 3
0.41
0.190
-1.013
5.3
1.030
0.24
0.112
-0.606
5.4
0.616
Bus1
Sub 3
0.00
0.000
0.000
999.9
0.000
0.00
0.000
0.000
999.9
0.000
Sub 3
86.60
0.631
-25.385
40.3
25.393
86.52
0.628
-25.362
40.4
25.369
# T1~ Bus9
Sub3 Swgr
8.02
0.042
-0.249
5.9
0.252
5.46
0.028
-0.170
6.1
0.173
LVBus
Sub3 Swgr
10.74
0.043
-0.183
4.3
0.188
6.00
0.021
-0.103
4.9
0.105
MCC1
Sub3 Swgr
12.17
0.031
-0.231
7.4
0.233
5.29
0.014
-0.099
7.0
0.100
Pump 1
Sub3 Swgr
106.08
0.073
-0.350
4.8
0.357
106.08
0.049
-0.234
4.8
0.239
Bus2
Bus1
0.00
0.000
0.000
999.9
0.000
0.00
0.000
0.000
999.9
0.000
# Main Bus
T1~
87.76
0.070
-2.902
41.2
2.903
87.68
0.071
-2.906
40.9
2.907
# Sub2B
T1~
91.04
0.006
-0.159
28.1
0.159
90.77
0.005
-0.152
32.5
0.152
LUMP6
Bus9
102.00
0.042
-0.249
5.9
0.252
102.00
0.028
-0.170
6.1
0.173
Syn2
LVBus
106.43
0.058
-0.798
13.8
0.800
106.43
0.046
-0.559
12.1
0.561
LUMP1
LVBus
106.43
0.315
-0.789
2.5
0.850
106.43
0.136
-0.330
2.4
0.357
Mtr6
MCC1
109.16
0.098
-0.635
6.5
0.642
109.16
0.044
-0.272
6.2
0.276
Mtr4
MCC1
109.16
0.068
-0.659
9.6
0.663
109.16
0.031
-0.283
9.1
0.285
Mtr3
MCC1
109.16
0.054
-0.393
7.3
0.397
109.16
0.024
-0.169
7.0
0.170
Mtr5
MCC1
109.16
0.045
-0.266
5.9
0.270
109.16
0.020
-0.114
5.7
0.116
Sub2A
Main Bus
89.54
0.003
-0.043
14.1
0.043
88.97
0.002
-0.031
13.6
0.031
Utility
Main Bus
102.00
0.067
-2.859
42.5
2.860
102.00
0.069
-2.875
41.8
2.876
Bus6
Sub2B
91.04
0.003
-0.011
3.5
0.011
90.77
0.000
-0.002
8.1
0.002
Gen1
Sub2B
102.00
0.009
-0.337
38.1
0.337
102.00
0.010
-0.345
34.9
0.345
Mtr2
Sub2B
106.64
0.002
-0.050
22.0
0.050
106.64
0.002
-0.034
20.9
0.034
NACD Ratio = 1.00 # Indicates a fault current contribution from a three-winding transformer * Indicates a fault current through a tie circuit breaker If faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these PDs will not be reported.
Project:
ETAP
Example
7.0.0T
Page:
14
Location:
Irvine, California
Date:
08-28-2009
Contract:
OTI-12345678
SN:
ETAPTRAING
Engineer:
Operation Technology, Inc.
Revision:
Base
Filename:
EXAMPLE-ANSI
Config.:
Normal
Study Case: ANSI - LG
This info is printed on every output report, 1st remark line. (120 characters) Second line of remarks for "ANSI - LG" study case.
3-phase fault at bus: Prefault voltage
Sub3 Swgr = 4.243
= =
102.00 % of nominal bus kV ( 4.160 kV) 102.00 % of base ( 4.160 kV)
Contribution From Bus ID
1/2 Cycle To Bus ID
%V From Bus
kA Real
kA Imaginary
1.5 to 4 Cycle Imag. /Real
kA Symm. Magnitude
%V From Bus
kA Real
kA Imaginary
Imag. /Real
kA Symm. Magnitude
Sub3 Swgr
Total
0.00
1.828
-24.339
13.3
24.407
0.00
1.747
-23.909
13.7
23.973
Sub 3
Sub3 Swgr
9.22
1.639
-23.322
14.2
23.379
9.22
1.635
-23.302
14.2
23.360
Bus9
Sub3 Swgr
7.65
0.042
-0.250
6.0
0.253
5.23
0.028
-0.171
6.2
0.173
LVBus
Sub3 Swgr
10.43
0.043
-0.184
4.3
0.189
5.80
0.021
-0.103
4.9
0.105
MCC1
Sub3 Swgr
11.84
0.031
-0.232
7.4
0.234
5.08
0.014
-0.099
7.1
0.100
Pump 1
Sub3 Swgr
106.08
0.073
-0.351
4.8
0.359
106.08
0.049
-0.234
4.8
0.239
Bus1
Sub 3
9.22
0.000
0.000
999.9
0.000
9.22
0.000
0.000
999.9
0.000
# T1~
Sub 3
87.85
1.639
-23.322
14.2
23.379
87.77
1.635
-23.302
14.2
23.360
LUMP6
Bus9
102.00
0.042
-0.250
6.0
0.253
102.00
0.028
-0.171
6.2
0.173
Syn2
LVBus
106.43
0.057
-0.801
14.1
0.803
106.43
0.046
-0.560
12.2
0.562
LUMP1
LVBus
106.43
0.315
-0.793
2.5
0.853
106.43
0.136
-0.331
2.4
0.358
Mtr6
MCC1
109.16
0.097
-0.637
6.5
0.645
109.16
0.044
-0.273
6.2
0.277
Mtr4
MCC1
109.16
0.068
-0.662
9.8
0.665
109.16
0.031
-0.284
9.1
0.285
Mtr3
MCC1
109.16
0.053
-0.394
7.4
0.398
109.16
0.024
-0.169
7.0
0.171
Mtr5
MCC1
109.16
0.045
-0.267
5.9
0.271
109.16
0.020
-0.115
5.7
0.116
Bus2
Bus1
9.22
0.000
0.000
999.9
0.000
9.22
0.000
0.000
999.9
0.000
# Main Bus
T1~
88.91
0.186
-2.666
14.3
2.673
88.83
0.187
-2.670
14.3
2.676
# Sub2B
T1~
91.92
0.012
-0.146
12.3
0.146
91.68
0.011
-0.140
13.1
0.140
NACD Ratio = 1.00 # Indicates a fault current contribution from a three-winding transformer * Indicates a fault current through a tie circuit breaker If faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these PDs will not be reported.
Project:
ETAP
Example
7.0.0T
Page:
15
Location:
Irvine, California
Date:
08-28-2009
Contract:
OTI-12345678
SN:
ETAPTRAING
Engineer:
Operation Technology, Inc.
Revision:
Base
Filename:
EXAMPLE-ANSI
Config.:
Normal
Study Case: ANSI - LG
This info is printed on every output report, 1st remark line. (120 characters) Second line of remarks for "ANSI - LG" study case.
Momentary Duty Summary Report 3-Phase Fault Currents:
(Prefault Voltage = 102 % of the Bus Nominal Voltage)
Bus ID LVBus Main Bus
Device kV 0.480
ID
Momentary Duty Type
Symm. kA rms
X/R Ratio
M.F.
Asymm. kA rms
Device Capability Asymm. kA Peak
Symm. kA rms
Asymm. kA rms
Asymm. kA Peak
LVBus
MCC
16.659
16.4
1.537
25.602
43.000
34.500
Main Bus
MCC
21.959
44.3
1.654
36.318
59.982
64.000
108.000
34.500
CB2
5 cy Sym CB
21.959
44.3
1.654
36.318
59.982
64.000
108.000
34.500
CB10
5 cy Sym CB
21.959
44.3
1.654
36.318
59.982
64.000
108.000
34.500
CB1
5 cy Sym CB
21.959
44.3
1.654
36.318
59.982
64.000
108.000
MCC1
0.480
MCC1
MCC
17.860
23.6
1.592
28.425
47.371
Sub 3
4.160
Sub 3
MCC
26.411
39.1
1.644
43.421
71.815
4.160
CB8
5 cy Sym CB
26.411
39.1
1.644
43.421
71.815
78.000
132.300
4.160
CB9
5 cy Sym CB
26.411
39.1
1.644
43.421
71.815
58.000
97.000
4.160
CB18
5 cy Sym CB
26.411
39.1
1.644
43.421
71.815
58.000
97.200
4.160
CB19
5 cy Sym CB
26.411
39.1
1.644
43.421
71.815
78.000
132.300
4.160
Sub3 Swgr
Switchgear
24.407
13.9
1.508
36.794
62.051
39.000
65.810
4.160
CB14
5 cy Sym CB
24.407
13.9
1.508
36.794
62.051
78.400
132.300
4.160
CB13
5 cy Sym CB
24.407
13.9
1.508
36.794
62.051
78.400
132.300
4.160
CB3
5 cy Sym CB
24.407
13.9
1.508
36.794
62.051
66.000
110.700
Sub3 Swgr
Method: IEEE - X/R is calculated from separate R & X networks. Protective device duty is calculated based on total fault current. The multiplication factors for high voltage circuit-breaker and high voltage bus momentary duty (asymmetrical and crest values) are calculated based on system X/R. * Indicates a device with momentary duty exceeding the device capability
Project:
ETAP
Example
7.0.0T
Page:
16
Location:
Irvine, California
Date:
08-28-2009
Contract:
OTI-12345678
SN:
ETAPTRAING
Engineer:
Operation Technology, Inc.
Revision:
Base
Filename:
EXAMPLE-ANSI
Config.:
Normal
Study Case: ANSI - LG
This info is printed on every output report, 1st remark line. (120 characters) Second line of remarks for "ANSI - LG" study case.
Interrupting Duty Summary Report
3-Phase Fault Currents:
(Prefault Voltage = 102 % of the Bus Nominal Voltage)
Bus ID LVBus Main Bus
MCC1
Sub 3
Sub3 Swgr
Device kV
Interrupting Duty
ID
Type
CPT (Cy)
0.480 34.500 CB2
5 cy Sym CB
3.0
Symm. kA rms
X/R Ratio
M.F.
Device Capability Adj. Sym. kA rms
kV
16.659
16.4
21.777
44.5
1.230
26.790
38.000
21.959
44.3
1.087
23.866
38.000
Rated Int.
Adjusted Int.
40.000
40.000
10.000
10.000 *
38.000
40.000
40.000
38.000
40.000
40.000
6.70
50.000
50.000
0.600
20.00
25.000
25.000
0.600
20.00
22.000
22.000 *
22.797
0.480
20.00
30.000
30.000
21.359
0.600
15.00
200.000
200.000
Fuse1
Fuse
CB10
5 cy Sym CB
3.0
21.777
44.5
1.230
26.790
CB1
5 cy Sym CB
3.0
21.777
44.5
1.230
26.790
Fuse
17.860
23.6
1.047
18.696
5.500
CB17
Molded Case
17.860
23.6
1.276
22.797
CB15
Molded Case
17.860
23.6
1.276
22.797
CB7
Molded Case
17.860
23.6
1.276
Fuse2
Fuse
17.860
23.6
1.196
0.480 Fuse3
Test PF
6.65
4.160 CB8
5 cy Sym CB
3.0
25.978
39.6
1.207
31.357
4.800
41.000
47.308
CB9
5 cy Sym CB
3.0
25.978
39.6
1.207
31.357
4.800
29.000
33.462
CB18
5 cy Sym CB
3.0
25.978
39.6
1.207
31.357
4.800
29.000
33.462
CB19
5 cy Sym CB
3.0
25.978
39.6
1.207
31.357
4.800
41.000
47.308
4.160 CB14
5 cy Sym CB
3.0
23.973
14.0
1.000
23.973
4.800
41.000
47.308
CB13
5 cy Sym CB
3.0
23.973
14.0
1.000
23.973
4.800
41.000
47.308
CB3
5 cy Sym CB
3.0
23.973
14.0
1.000
23.973
8.300
33.000
41.000
Method: IEEE - X/R is calculated from separate R & X networks. HV CB interrupting capability is adjusted based on bus nominal voltage Short-circuit multiplying factor for LV Molded Case and Insulated Case Circuit Breakers is calculated based on asymmetrical current. Generator protective device duty is calculated based on maximum through fault current. Other protective device duty is calculated based on total fault current. * Indicates a device with interrupting duty exceeding the device capability ** Indicates that the circuit breaker has been flagged as a generator circuit breaker. However, ETAP could not detect a single path, without a transformer, to the specified generator. Therefore, this circuit breaker is treated as a regular circuit breaker in short-circuit calculations.