Project:

ETAP

Example

7.0.0T

Page:

1

Location:

Irvine, California

Date:

08-28-2009

Contract:

OTI-12345678

SN:

ETAPTRAING

Engineer:

Operation Technology, Inc.

Revision:

Base

Filename:

EXAMPLE-ANSI

Config.:

Normal

Study Case: ANSI - LG

This info is printed on every output report, 1st remark line. (120 characters) Second line of remarks for "ANSI - LG" study case.

Electrical Transient Analyzer Program Short-Circuit Analysis ANSI Standard 3-Phase Fault Currents

Number of Buses:

Number of Branches:

Number of Machines:

Swing

V-Control

Load

Total

1

1

14

16

XFMR2

XFMR3

Reactor

Line/Cable

Impedance

Tie PD

Total

7

1

0

5

0

0

13

Synchronous Generator

Power Grid

Synchronous Motor

Induction Machines

Lumped Load

Total

1

1

2

7

4

15

System Frequency:

60 Hz

Unit System:

English

Project Filename:

EXAMPLE-ANSI

Output Filename:

C:\ETAP 700\Example-ANSI\Untitled.SA1

Project:

ETAP

Example

7.0.0T

Page:

2

Location:

Irvine, California

Date:

08-28-2009

Contract:

OTI-12345678

SN:

ETAPTRAING

Engineer:

Operation Technology, Inc.

Revision:

Base

Filename:

EXAMPLE-ANSI

Config.:

Normal

Study Case: ANSI - LG

This info is printed on every output report, 1st remark line. (120 characters) Second line of remarks for "ANSI - LG" study case.

Adjustments Apply Tolerance

Individual

Adjustments

/Global

Transformer Impedance:

Yes

Individual

Reactor Impedance:

Yes

Individual

Overload Heater Resistance:

No

Transmission Line Length:

No

Cable Length:

No

Apply

Individual

Adjustments

/Global

Transmission Line Resistance:

Yes

Individual

Cable Resistance:

Yes

Individual

Temperature Correction

Percent

Degree C

Project:

ETAP

Example

7.0.0T

Page:

3

Location:

Irvine, California

Date:

08-28-2009

Contract:

OTI-12345678

SN:

ETAPTRAING

Engineer:

Operation Technology, Inc.

Revision:

Base

Filename:

EXAMPLE-ANSI

Config.:

Normal

Study Case: ANSI - LG

This info is printed on every output report, 1st remark line. (120 characters) Second line of remarks for "ANSI - LG" study case.

Bus Input Data

Bus ID

Type

Initial Voltage Nom. kV

Base kV

0.480

0.480

Sub-sys

%Mag.

Ang.

1

100.00

0.00

Bus1

Load

Bus2

Load

0.480

0.480

1

100.00

0.00

Bus6

Load

13.800

13.800

1

100.00

0.00

Bus7

Load

13.800

13.800

1

100.00

0.00

Bus9

Load

4.160

4.160

1

100.00

0.00

Bus23A

Load

0.480

0.492

1

101.45

-1.23

LVBus

Load

-3.49

Main Bus

SWNG

MCC1

0.480

0.480

1

97.09

34.500

34.500

1

100.00

0.00

Load

0.480

0.492

1

97.94

-3.10

Sub2A

Load

13.800

13.800

1

101.52

-1.20

Sub2B

Gen.

13.800

13.800

1

100.00

1.40

Sub 3

Load

4.160

4.160

1

99.81

-0.50

Sub3 Swgr

Load

4.160

4.160

1

99.59

-0.50

Sub22

Load

3.450

3.450

1

100.00

0.00

Sub23

Load

3.450

3.450

1

100.00

0.00

T1~

Load

34.500

34.500

0

100.00

0.00

16 Buses Total All voltages reported by ETAP are in % of bus Nominal kV. Base kV values of buses are calculated and used internally by ETAP.

Project:

ETAP

Example

7.0.0T

Page:

4

Location:

Irvine, California

Date:

08-28-2009

Contract:

OTI-12345678

SN:

ETAPTRAING

Engineer:

Operation Technology, Inc.

Revision:

Base

Filename:

EXAMPLE-ANSI

Config.:

Normal

Study Case: ANSI - LG

This info is printed on every output report, 1st remark line. (120 characters) Second line of remarks for "ANSI - LG" study case.

Line/Cable Input Data Ohms or Siemens/1000 ft per Conductor (Cable) or per Phase (Line) Length

Line/Cable ID

Library

Size

Adj. (ft)

% Tol.

#/Phase

T (°C)

R

X

Y

Cable2

5.0MCUS3

750

222.0

0

1

75

0.02230

0.03640

0.0000000

Cable14

1.0MCUN3

250

430.0

0

2

75

0.05520

0.03790

0.0000000

Cable22

15MCUS3

350

410.1

0

1

75

0.03815

0.04500

0.0000000

Cable23

15MCUS3

350

410.1

0

1

75

0.03815

0.03600

0.0000000

210

5280.0

0

1

75

0.05125

0.12758

0.0000012

Line4

Line / Cable resistances are listed at the specified temperatures.

Project:

ETAP

Example

7.0.0T

Page:

5

Location:

Irvine, California

Date:

08-28-2009

Contract:

OTI-12345678

SN:

ETAPTRAING

Engineer:

Operation Technology, Inc.

Revision:

Base

Filename:

EXAMPLE-ANSI

Config.:

Normal

Study Case: ANSI - LG

This info is printed on every output report, 1st remark line. (120 characters) Second line of remarks for "ANSI - LG" study case.

2-Winding Transformer Input Data

Transformer ID

Rating MVA

Prim. kV

Sec. kV

Z Variation %Z

X/R

+ 5%

- 5%

% Tap Setting % Tol.

Prim.

Sec.

Adjusted %Z

T2

10.000

34.500

13.800

6.90

23.00

-1.50

2.10

0

0

0

6.9000

T3

0.750

4.160

0.480

5.75

18.00

0

0

0

0

0

5.7500

T4

1.500

4.160

0.480

5.75

7.10

0

0

0

0

0

5.7500

T5

0.750

3.450

0.480

5.75

5.79

0

0

0

-2.500

0

5.7500

T22

5.000

13.800

3.450

6.50

12.14

0

0

0

0

0

6.5000

T23

5.000

13.800

3.450

6.50

12.14

0

0

0

0

0

6.5000

XFMR 3

1.000

4.160

0.480

7.20

28.00

0

0

0

-2.500

0

7.2000

3-Winding Transformer Input Data Transformer ID T1

Rating Winding

MVA

Tap kV

Impedance

%

%Z

MVAb

% Tol.

+ 5%

- 5%

39.00

15.000

0

0

0

Primary:

15.000

34.500

0

Zps =

Secondary:

10.000

13.800

0

Zpt =

7.20

40.00

15.000

0

5.000

4.160

0

Zst =

14.10

38.00

15.000

0

Tertiary:

7.10

Z Variation

X/R

Project:

ETAP

Example

7.0.0T

Page:

6

Location:

Irvine, California

Date:

08-28-2009

Contract:

OTI-12345678

SN:

ETAPTRAING

Engineer:

Operation Technology, Inc.

Revision:

Base

Filename:

EXAMPLE-ANSI

Config.:

Normal

Study Case: ANSI - LG

This info is printed on every output report, 1st remark line. (120 characters) Second line of remarks for "ANSI - LG" study case.

Branch Connections CKT/Branch

Connected Bus ID

ID

Type

From Bus

% Impedance, Pos. Seq., 100 MVAb To Bus

R

X

Z

T2

2W XFMR

Main Bus

Sub2A

3.00

68.93

69.00

T3

2W XFMR

Sub3 Swgr

LVBus

42.53

765.49

766.67

T4

2W XFMR

Sub 3

Bus1

53.46

379.59

383.33

T5

2W XFMR

Sub23

Bus23A

124.04

718.18

728.81

T22

2W XFMR

Bus7

Sub22

10.67

129.56

130.00

T23

2W XFMR

Bus6

Sub23

10.67

129.56

130.00

XFMR 3

2W XFMR

Sub3 Swgr

MCC1

24.43

684.01

684.45

T1

3W Xfmr

Main Bus

T1~

-0.03

0.67

0.67

3W Xfmr

Sub2B

T1~

1.24

46.65

46.67

3W Xfmr

Sub 3

T1~

1.23

47.32

47.33

Cable2

Cable

Sub 3

Sub3 Swgr

2.86

4.67

5.48

Cable14

Cable

Bus1

Bus2

515.10

353.67

624.83

Cable22

Cable

Sub2A

Bus7

0.82

0.97

1.27

Cable23

Cable

Sub2B

Bus6

0.82

0.78

1.13

Line4

Line

Sub3 Swgr

Bus9

156.36

389.25

419.48

Y

Project:

ETAP

Example

7.0.0T

Page:

7

Location:

Irvine, California

Date:

08-28-2009

Contract:

OTI-12345678

SN:

ETAPTRAING

Engineer:

Operation Technology, Inc.

Revision:

Base

Filename:

EXAMPLE-ANSI

Config.:

Normal

Study Case: ANSI - LG

This info is printed on every output report, 1st remark line. (120 characters) Second line of remarks for "ANSI - LG" study case.

Power Grid Input Data

Power Grid

Connected Bus

ID

ID

Utility

Main Bus

% Impedance 100 MVA Base

Rating MVASC

kV

1200.000

X/R

34.500

R

45.00

X

0.18514

8.33128

Total Connected Power Grids (= 1 ): 1200.000 MVA

Synchronous Generator Input Data % Impedance in Machine Base Synchronous Generator ID Gen1

Connected Bus Type

Turbo

ID Sub2B

Total Connected Synchronous Generators ( = 1 ): 8.824 MVA

Rating MVA 8.824

Xd"

X/R Ratio

kV

RPM

X"/R

X'/R

13.800

1800

48.00

48.00

R 0.250

Adj. 12.00

Tol. 0.0

Xd' 23.00

Project:

ETAP

Example

7.0.0T

Page:

8

Location:

Irvine, California

Date:

08-28-2009

Contract:

OTI-12345678

SN:

ETAPTRAING

Engineer:

Operation Technology, Inc.

Revision:

Base

Filename:

EXAMPLE-ANSI

Config.:

Normal

Study Case: ANSI - LG

This info is printed on every output report, 1st remark line. (120 characters) Second line of remarks for "ANSI - LG" study case.

Synchronous Motor Input Data % Impedance in Machine Base Synchronous Motor ID

Connected Bus

Type

Qty

Rating

ID

kVA

Xd"

X/R Ratio

kV

RPM

X"/R

X'/R

Syn1

Motor

1

Sub2A

1170.4

13.200

1800

27.00

27.00

0.570

R

Adj. 15.38

Tol. 0.0

23.08

Syn2

Motor

1

LVBus

134.2

0.460

1800

11.00

11.00

1.818

20.00

0.0

30.00

Total Connected Synchronous Machines ( = 2 ): 1304.6 kVA

Induction Machine Input Data

Induction Machine ID

Connected Bus Qty

ID

Rating

% Impedance Machine Base

X/R Ratio

HP/kW

kVA

kV

RPM

X"/R

X'/R

R

X"

2500.00

2060.05

13.200

1800

24.99

24.99

0.83

20.79

X'

Motors Mtr2

1

Sub2B

31.19

Pump 1

1

Sub3 Swgr

500.00

446.99

4.000

1800

4.82

4.82

3.88

18.68

28.02

Mtr1

1

Bus23A

100.00

118.05

0.380

1800

9.02

9.02

2.22

20.00

50.00

Mtr6

2

MCC1

60.00

53.74

0.460

1800

6.03

6.03

3.32

20.00

50.00

Mtr4

1

MCC1

125.00

110.12

0.460

1800

8.71

8.71

2.30

20.00

50.00

Mtr3

1

MCC1

75.00

66.20

0.460

1800

6.74

6.74

2.97

20.00

50.00

Mtr5

1

MCC1

50.00

45.32

0.460

1800

5.51

5.51

3.63

20.00

50.00

Total Connected Induction Motors ( = 8 ): 2954.2 kVA

Xd'

Project:

ETAP

Example

7.0.0T

Page:

9

Location:

Irvine, California

Date:

08-28-2009

Contract:

OTI-12345678

SN:

ETAPTRAING

Engineer:

Operation Technology, Inc.

Revision:

Base

Filename:

EXAMPLE-ANSI

Config.:

Normal

Study Case: ANSI - LG

This info is printed on every output report, 1st remark line. (120 characters) Second line of remarks for "ANSI - LG" study case.

Lumped Load Input Data Lumped Load Lumped Load

Connected Bus

ID

ID

Motor Loads Rating kVA

% Load kV

MTR

STAT

Loading kW

X/R Ratio

kvar

X"/R

X'/R

Static Loads

% Imp. (Machine Base) R

X"

X'

Loading kW

kvar

LUMP1

LVBus

220.0

0.460

70

30

134.0

75.9

2.38

2.38

8.403

20.00

50.00

62.52

35.43

LUMP2

Sub22

3500.0

3.300

60

40

1785.0

1106.2

10.00

10.00

1.538

15.38

23.08

1300.64

806.06

LUMP4

Bus23A

500.0

0.400

70

30

297.5

184.4

2.38

2.38

10.050

23.92

9999.00

183.60

113.79

LUMP6

Bus9

500.0

4.160

60

40

255.0

158.0

6.67

6.67

2.307

15.38

23.08

170.00

105.36

Total Connected Lumped Loads ( = 4 ): 4720.0 kVA

Project:

ETAP

Example

7.0.0T

Page:

10

Location:

Irvine, California

Date:

08-28-2009

Contract:

OTI-12345678

SN:

ETAPTRAING

Engineer:

Operation Technology, Inc.

Revision:

Base

Filename:

EXAMPLE-ANSI

Config.:

Normal

Study Case: ANSI - LG

This info is printed on every output report, 1st remark line. (120 characters) Second line of remarks for "ANSI - LG" study case.

SHORT-CIRCUIT REPORT

3-phase fault at bus: Prefault voltage

LVBus = 0.490

= =

102.00 % of nominal bus kV ( 0.480 kV) 102.00 % of base ( 0.480 kV)

Contribution From Bus ID

1/2 Cycle To Bus ID

LVBus

Total

Sub3 Swgr

%V From Bus

kA Real

kA Imaginary

Imag. /Real

kA Symm. Magnitude

0.00

1.292

-16.609

12.9

16.659

LVBus

94.78

0.844

-14.845

17.6

14.869

Syn2

LVBus

106.43

0.081

-0.889

11.0

0.893

LUMP1

LVBus

106.43

0.367

-0.874

2.4

0.948

Sub 3

Sub3 Swgr

95.35

0.088

-1.654

18.8

1.656

Bus9

Sub3 Swgr

95.30

0.003

-0.018

6.7

0.018

MCC1

Sub3 Swgr

98.04

0.002

-0.016

8.5

0.017

Pump 1

Sub3 Swgr

106.08

0.005

-0.025

5.3

0.025

Bus1

Sub 3

95.35

0.000

0.000

999.9

0.000

# T1~

Sub 3

101.00

0.088

-1.654

18.8

1.656

LUMP6

Bus9

102.00

0.003

-0.018

6.7

0.018

Mtr6

MCC1

109.16

0.006

-0.045

7.4

0.046

Mtr4

MCC1

109.16

0.004

-0.047

11.8

0.047

Mtr3

MCC1

109.16

0.003

-0.028

8.5

0.028

Mtr5

MCC1

109.16

0.003

-0.019

6.6

0.019

NACD Ratio = 1.00 # Indicates a fault current contribution from a three-winding transformer * Indicates a fault current through a tie circuit breaker If faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these PDs will not be reported.

Project:

ETAP

Example

7.0.0T

Page:

11

Location:

Irvine, California

Date:

08-28-2009

Contract:

OTI-12345678

SN:

ETAPTRAING

Engineer:

Operation Technology, Inc.

Revision:

Base

Filename:

EXAMPLE-ANSI

Config.:

Normal

Study Case: ANSI - LG

This info is printed on every output report, 1st remark line. (120 characters) Second line of remarks for "ANSI - LG" study case.

3-phase fault at bus: Prefault voltage

Main Bus = 35.190

= =

102.00 % of nominal bus kV ( 34.500 kV) 102.00 % of base ( 34.500 kV)

Contribution From Bus ID

To Bus ID

Main Bus

Total

Sub2A

Main Bus

# T1~

1/2 Cycle %V From Bus

kA Real

kA Imaginary

1.5 to 4 Cycle Imag. /Real

kA Symm. Magnitude

%V From Bus

kA Real

kA Imaginary

Imag. /Real

kA Symm. Magnitude

0.00

0.528

-21.953

41.6

21.959

0.00

0.508

-21.771

42.9

21.777

12.76

0.022

-0.309

14.3

0.310

9.16

0.016

-0.222

13.9

0.222

Main Bus

0.47

0.051

-1.166

22.7

1.167

0.43

0.037

-1.071

29.3

1.072

Utility

Main Bus

102.00

0.455

-20.478

45.0

20.483

102.00

0.455

-20.478

45.0

20.483

Bus7

Sub2A

12.88

0.044

-0.462

10.6

0.464

9.24

0.032

-0.339

10.4

0.340

Syn1

Sub2A

106.64

0.010

-0.310

30.0

0.310

106.64

0.007

-0.215

29.2

0.215

# Sub2B

T1~

29.70

0.030

-1.048

34.8

1.048

28.32

0.024

-1.000

42.3

1.000

# Sub 3

T1~

3.85

0.021

-0.118

5.5

0.120

2.48

0.013

-0.071

5.5

0.072

Sub22

Bus7

27.29

0.044

-0.462

10.6

0.464

19.81

0.032

-0.339

10.4

0.340

Bus6

Sub2B

29.72

0.020

-0.070

3.6

0.072

28.32

0.001

-0.012

8.6

0.012

Gen1

Sub2B

102.00

0.043

-2.223

51.5

2.224

102.00

0.049

-2.266

46.5

2.266

Mtr2

Sub2B

106.64

0.013

-0.327

25.9

0.327

106.64

0.009

-0.222

24.6

0.222

Sub3 Swgr

Sub 3

4.19

0.177

-0.976

5.5

0.992

2.69

0.107

-0.592

5.5

0.601

Bus1

Sub 3

3.85

0.000

0.000

999.9

0.000

2.48

0.000

0.000

999.9

0.000

NACD Ratio = 0.96 # Indicates a fault current contribution from a three-winding transformer * Indicates a fault current through a tie circuit breaker If faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these PDs will not be reported.

Project:

ETAP

Example

7.0.0T

Page:

12

Location:

Irvine, California

Date:

08-28-2009

Contract:

OTI-12345678

SN:

ETAPTRAING

Engineer:

Operation Technology, Inc.

Revision:

Base

Filename:

EXAMPLE-ANSI

Config.:

Normal

Study Case: ANSI - LG

This info is printed on every output report, 1st remark line. (120 characters) Second line of remarks for "ANSI - LG" study case.

3-phase fault at bus: Prefault voltage

MCC1 = 0.490

= =

102.00 % of nominal bus kV ( 0.480 kV) 99.45 % of base ( 0.492 kV)

Contribution From Bus ID

1/2 Cycle To Bus ID

MCC1

Total

Sub3 Swgr

%V From Bus

kA Real

kA Imaginary

Imag. /Real

kA Symm. Magnitude

0.00

0.925

-17.836

19.3

17.860

MCC1

91.62

0.608

-15.686

25.8

15.698

Mtr6

MCC1

106.43

0.116

-0.699

6.0

0.708

Mtr4

MCC1

106.43

0.083

-0.726

8.7

0.731

Mtr3

MCC1

106.43

0.064

-0.433

6.7

0.437

Mtr5

MCC1

106.43

0.053

-0.293

5.5

0.298

Sub 3

Sub3 Swgr

92.23

0.062

-1.796

29.0

1.797

Bus9

Sub3 Swgr

92.19

0.003

-0.019

7.6

0.019

LVBus

Sub3 Swgr

92.41

0.003

-0.014

5.1

0.015

Pump 1

Sub3 Swgr

103.43

0.005

-0.027

5.9

0.028

Bus1

Sub 3

92.23

0.000

0.000

999.9

0.000

# T1~

Sub 3

98.36

0.062

-1.796

29.0

1.797

LUMP6

Bus9

99.45

0.003

-0.019

7.6

0.019

Syn2

LVBus

103.77

0.002

-0.062

28.3

0.062

LUMP1

LVBus

103.77

0.022

-0.062

2.8

0.066

NACD Ratio = 1.00 # Indicates a fault current contribution from a three-winding transformer * Indicates a fault current through a tie circuit breaker If faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these PDs will not be reported.

Project:

ETAP

Example

7.0.0T

Page:

13

Location:

Irvine, California

Date:

08-28-2009

Contract:

OTI-12345678

SN:

ETAPTRAING

Engineer:

Operation Technology, Inc.

Revision:

Base

Filename:

EXAMPLE-ANSI

Config.:

Normal

Study Case: ANSI - LG

This info is printed on every output report, 1st remark line. (120 characters) Second line of remarks for "ANSI - LG" study case.

3-phase fault at bus: Prefault voltage

Sub 3 = 4.243

= =

102.00 % of nominal bus kV ( 4.160 kV) 102.00 % of base ( 4.160 kV)

Contribution From Bus ID

1/2 Cycle To Bus ID

%V From Bus

kA Real

kA Imaginary

1.5 to 4 Cycle Imag. /Real

kA Symm. Magnitude

%V From Bus

kA Real

kA Imaginary

Imag. /Real

kA Symm. Magnitude

Sub 3

Total

0.00

0.820

-26.398

32.2

26.411

0.00

0.740

-25.967

35.1

25.978

Sub3 Swgr

Sub 3

0.41

0.190

-1.013

5.3

1.030

0.24

0.112

-0.606

5.4

0.616

Bus1

Sub 3

0.00

0.000

0.000

999.9

0.000

0.00

0.000

0.000

999.9

0.000

Sub 3

86.60

0.631

-25.385

40.3

25.393

86.52

0.628

-25.362

40.4

25.369

# T1~ Bus9

Sub3 Swgr

8.02

0.042

-0.249

5.9

0.252

5.46

0.028

-0.170

6.1

0.173

LVBus

Sub3 Swgr

10.74

0.043

-0.183

4.3

0.188

6.00

0.021

-0.103

4.9

0.105

MCC1

Sub3 Swgr

12.17

0.031

-0.231

7.4

0.233

5.29

0.014

-0.099

7.0

0.100

Pump 1

Sub3 Swgr

106.08

0.073

-0.350

4.8

0.357

106.08

0.049

-0.234

4.8

0.239

Bus2

Bus1

0.00

0.000

0.000

999.9

0.000

0.00

0.000

0.000

999.9

0.000

# Main Bus

T1~

87.76

0.070

-2.902

41.2

2.903

87.68

0.071

-2.906

40.9

2.907

# Sub2B

T1~

91.04

0.006

-0.159

28.1

0.159

90.77

0.005

-0.152

32.5

0.152

LUMP6

Bus9

102.00

0.042

-0.249

5.9

0.252

102.00

0.028

-0.170

6.1

0.173

Syn2

LVBus

106.43

0.058

-0.798

13.8

0.800

106.43

0.046

-0.559

12.1

0.561

LUMP1

LVBus

106.43

0.315

-0.789

2.5

0.850

106.43

0.136

-0.330

2.4

0.357

Mtr6

MCC1

109.16

0.098

-0.635

6.5

0.642

109.16

0.044

-0.272

6.2

0.276

Mtr4

MCC1

109.16

0.068

-0.659

9.6

0.663

109.16

0.031

-0.283

9.1

0.285

Mtr3

MCC1

109.16

0.054

-0.393

7.3

0.397

109.16

0.024

-0.169

7.0

0.170

Mtr5

MCC1

109.16

0.045

-0.266

5.9

0.270

109.16

0.020

-0.114

5.7

0.116

Sub2A

Main Bus

89.54

0.003

-0.043

14.1

0.043

88.97

0.002

-0.031

13.6

0.031

Utility

Main Bus

102.00

0.067

-2.859

42.5

2.860

102.00

0.069

-2.875

41.8

2.876

Bus6

Sub2B

91.04

0.003

-0.011

3.5

0.011

90.77

0.000

-0.002

8.1

0.002

Gen1

Sub2B

102.00

0.009

-0.337

38.1

0.337

102.00

0.010

-0.345

34.9

0.345

Mtr2

Sub2B

106.64

0.002

-0.050

22.0

0.050

106.64

0.002

-0.034

20.9

0.034

NACD Ratio = 1.00 # Indicates a fault current contribution from a three-winding transformer * Indicates a fault current through a tie circuit breaker If faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these PDs will not be reported.

Project:

ETAP

Example

7.0.0T

Page:

14

Location:

Irvine, California

Date:

08-28-2009

Contract:

OTI-12345678

SN:

ETAPTRAING

Engineer:

Operation Technology, Inc.

Revision:

Base

Filename:

EXAMPLE-ANSI

Config.:

Normal

Study Case: ANSI - LG

This info is printed on every output report, 1st remark line. (120 characters) Second line of remarks for "ANSI - LG" study case.

3-phase fault at bus: Prefault voltage

Sub3 Swgr = 4.243

= =

102.00 % of nominal bus kV ( 4.160 kV) 102.00 % of base ( 4.160 kV)

Contribution From Bus ID

1/2 Cycle To Bus ID

%V From Bus

kA Real

kA Imaginary

1.5 to 4 Cycle Imag. /Real

kA Symm. Magnitude

%V From Bus

kA Real

kA Imaginary

Imag. /Real

kA Symm. Magnitude

Sub3 Swgr

Total

0.00

1.828

-24.339

13.3

24.407

0.00

1.747

-23.909

13.7

23.973

Sub 3

Sub3 Swgr

9.22

1.639

-23.322

14.2

23.379

9.22

1.635

-23.302

14.2

23.360

Bus9

Sub3 Swgr

7.65

0.042

-0.250

6.0

0.253

5.23

0.028

-0.171

6.2

0.173

LVBus

Sub3 Swgr

10.43

0.043

-0.184

4.3

0.189

5.80

0.021

-0.103

4.9

0.105

MCC1

Sub3 Swgr

11.84

0.031

-0.232

7.4

0.234

5.08

0.014

-0.099

7.1

0.100

Pump 1

Sub3 Swgr

106.08

0.073

-0.351

4.8

0.359

106.08

0.049

-0.234

4.8

0.239

Bus1

Sub 3

9.22

0.000

0.000

999.9

0.000

9.22

0.000

0.000

999.9

0.000

# T1~

Sub 3

87.85

1.639

-23.322

14.2

23.379

87.77

1.635

-23.302

14.2

23.360

LUMP6

Bus9

102.00

0.042

-0.250

6.0

0.253

102.00

0.028

-0.171

6.2

0.173

Syn2

LVBus

106.43

0.057

-0.801

14.1

0.803

106.43

0.046

-0.560

12.2

0.562

LUMP1

LVBus

106.43

0.315

-0.793

2.5

0.853

106.43

0.136

-0.331

2.4

0.358

Mtr6

MCC1

109.16

0.097

-0.637

6.5

0.645

109.16

0.044

-0.273

6.2

0.277

Mtr4

MCC1

109.16

0.068

-0.662

9.8

0.665

109.16

0.031

-0.284

9.1

0.285

Mtr3

MCC1

109.16

0.053

-0.394

7.4

0.398

109.16

0.024

-0.169

7.0

0.171

Mtr5

MCC1

109.16

0.045

-0.267

5.9

0.271

109.16

0.020

-0.115

5.7

0.116

Bus2

Bus1

9.22

0.000

0.000

999.9

0.000

9.22

0.000

0.000

999.9

0.000

# Main Bus

T1~

88.91

0.186

-2.666

14.3

2.673

88.83

0.187

-2.670

14.3

2.676

# Sub2B

T1~

91.92

0.012

-0.146

12.3

0.146

91.68

0.011

-0.140

13.1

0.140

NACD Ratio = 1.00 # Indicates a fault current contribution from a three-winding transformer * Indicates a fault current through a tie circuit breaker If faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these PDs will not be reported.

Project:

ETAP

Example

7.0.0T

Page:

15

Location:

Irvine, California

Date:

08-28-2009

Contract:

OTI-12345678

SN:

ETAPTRAING

Engineer:

Operation Technology, Inc.

Revision:

Base

Filename:

EXAMPLE-ANSI

Config.:

Normal

Study Case: ANSI - LG

This info is printed on every output report, 1st remark line. (120 characters) Second line of remarks for "ANSI - LG" study case.

Momentary Duty Summary Report 3-Phase Fault Currents:

(Prefault Voltage = 102 % of the Bus Nominal Voltage)

Bus ID LVBus Main Bus

Device kV 0.480

ID

Momentary Duty Type

Symm. kA rms

X/R Ratio

M.F.

Asymm. kA rms

Device Capability Asymm. kA Peak

Symm. kA rms

Asymm. kA rms

Asymm. kA Peak

LVBus

MCC

16.659

16.4

1.537

25.602

43.000

34.500

Main Bus

MCC

21.959

44.3

1.654

36.318

59.982

64.000

108.000

34.500

CB2

5 cy Sym CB

21.959

44.3

1.654

36.318

59.982

64.000

108.000

34.500

CB10

5 cy Sym CB

21.959

44.3

1.654

36.318

59.982

64.000

108.000

34.500

CB1

5 cy Sym CB

21.959

44.3

1.654

36.318

59.982

64.000

108.000

MCC1

0.480

MCC1

MCC

17.860

23.6

1.592

28.425

47.371

Sub 3

4.160

Sub 3

MCC

26.411

39.1

1.644

43.421

71.815

4.160

CB8

5 cy Sym CB

26.411

39.1

1.644

43.421

71.815

78.000

132.300

4.160

CB9

5 cy Sym CB

26.411

39.1

1.644

43.421

71.815

58.000

97.000

4.160

CB18

5 cy Sym CB

26.411

39.1

1.644

43.421

71.815

58.000

97.200

4.160

CB19

5 cy Sym CB

26.411

39.1

1.644

43.421

71.815

78.000

132.300

4.160

Sub3 Swgr

Switchgear

24.407

13.9

1.508

36.794

62.051

39.000

65.810

4.160

CB14

5 cy Sym CB

24.407

13.9

1.508

36.794

62.051

78.400

132.300

4.160

CB13

5 cy Sym CB

24.407

13.9

1.508

36.794

62.051

78.400

132.300

4.160

CB3

5 cy Sym CB

24.407

13.9

1.508

36.794

62.051

66.000

110.700

Sub3 Swgr

Method: IEEE - X/R is calculated from separate R & X networks. Protective device duty is calculated based on total fault current. The multiplication factors for high voltage circuit-breaker and high voltage bus momentary duty (asymmetrical and crest values) are calculated based on system X/R. * Indicates a device with momentary duty exceeding the device capability

Project:

ETAP

Example

7.0.0T

Page:

16

Location:

Irvine, California

Date:

08-28-2009

Contract:

OTI-12345678

SN:

ETAPTRAING

Engineer:

Operation Technology, Inc.

Revision:

Base

Filename:

EXAMPLE-ANSI

Config.:

Normal

Study Case: ANSI - LG

This info is printed on every output report, 1st remark line. (120 characters) Second line of remarks for "ANSI - LG" study case.

Interrupting Duty Summary Report

3-Phase Fault Currents:

(Prefault Voltage = 102 % of the Bus Nominal Voltage)

Bus ID LVBus Main Bus

MCC1

Sub 3

Sub3 Swgr

Device kV

Interrupting Duty

ID

Type

CPT (Cy)

0.480 34.500 CB2

5 cy Sym CB

3.0

Symm. kA rms

X/R Ratio

M.F.

Device Capability Adj. Sym. kA rms

kV

16.659

16.4

21.777

44.5

1.230

26.790

38.000

21.959

44.3

1.087

23.866

38.000

Rated Int.

Adjusted Int.

40.000

40.000

10.000

10.000 *

38.000

40.000

40.000

38.000

40.000

40.000

6.70

50.000

50.000

0.600

20.00

25.000

25.000

0.600

20.00

22.000

22.000 *

22.797

0.480

20.00

30.000

30.000

21.359

0.600

15.00

200.000

200.000

Fuse1

Fuse

CB10

5 cy Sym CB

3.0

21.777

44.5

1.230

26.790

CB1

5 cy Sym CB

3.0

21.777

44.5

1.230

26.790

Fuse

17.860

23.6

1.047

18.696

5.500

CB17

Molded Case

17.860

23.6

1.276

22.797

CB15

Molded Case

17.860

23.6

1.276

22.797

CB7

Molded Case

17.860

23.6

1.276

Fuse2

Fuse

17.860

23.6

1.196

0.480 Fuse3

Test PF

6.65

4.160 CB8

5 cy Sym CB

3.0

25.978

39.6

1.207

31.357

4.800

41.000

47.308

CB9

5 cy Sym CB

3.0

25.978

39.6

1.207

31.357

4.800

29.000

33.462

CB18

5 cy Sym CB

3.0

25.978

39.6

1.207

31.357

4.800

29.000

33.462

CB19

5 cy Sym CB

3.0

25.978

39.6

1.207

31.357

4.800

41.000

47.308

4.160 CB14

5 cy Sym CB

3.0

23.973

14.0

1.000

23.973

4.800

41.000

47.308

CB13

5 cy Sym CB

3.0

23.973

14.0

1.000

23.973

4.800

41.000

47.308

CB3

5 cy Sym CB

3.0

23.973

14.0

1.000

23.973

8.300

33.000

41.000

Method: IEEE - X/R is calculated from separate R & X networks. HV CB interrupting capability is adjusted based on bus nominal voltage Short-circuit multiplying factor for LV Molded Case and Insulated Case Circuit Breakers is calculated based on asymmetrical current. Generator protective device duty is calculated based on maximum through fault current. Other protective device duty is calculated based on total fault current. * Indicates a device with interrupting duty exceeding the device capability ** Indicates that the circuit breaker has been flagged as a generator circuit breaker. However, ETAP could not detect a single path, without a transformer, to the specified generator. Therefore, this circuit breaker is treated as a regular circuit breaker in short-circuit calculations.