Last Planner System ®

Last Planner System ® / Ing. Walter Meléndez Bernardo.

El último planificador Last Planner System ® / Ing. Walter Meléndez Bernardo.

Last Planner System ® / Ing. Walter Meléndez Bernardo.

PLANEAMIENTO Y PROGRAMACION

Last Planner System ® / Ing. Walter Meléndez Bernardo.

DOS TEORIAS PARA GESTIONAR PROYECTOS

Last Planner System ® / Ing. Walter Meléndez Bernardo.

PLANEAMIENTO / PROGRAMACION •  PLANEAMIENTO (ANÁLISIS MACRO) –  Desarrollar las Estrategias de Ejecución del Proyecto

•  PROGRAMACION (ANÁLISIS DE MEDIANO Y CORTO PLAZO) –  Análisis en mayor grado de detalle en el mediano y corto plazo –  Se inicia con el planeamiento

Last Planner System ® / Ing. Walter Meléndez Bernardo.

PLANEAMIENTO •  Estrategias (métodos construcHvos, Hpos de recursos, duraciones) •  Aplicar principios de Física de Producción (balancear capacidad y demanda, cuello de botella, etc) •  IdenHficar fuentes de variabilidad. Desarrollar estrategias para manejo de la variabilidad ORIENTAMOS AL FLUJO Last Planner System ® / Ing. Walter Meléndez Bernardo.

PLANEAMIENTO •  Algunos Resultados del Planeamiento –  Cronograma General –  Cronograma de Recursos –  Flujo de Caja –  Definición de estrategias

Last Planner System ® / Ing. Walter Meléndez Bernardo.

PROGRAMACIÓN •  Es el desarrollo del plan de trabajo en mayor detalle, considerando el PLANEAMIENTO como punto de parHda, y tomando acciones que permitan que éste pueda ser ejecutado. •  Nos permite idenHficar claramente las tareas que se ejecutarán en el horizonte de Hempo correspondiente. •  Nos permite determinar si la canHdad de trabajo disponible es suficiente para los recursos existentes.

Last Planner System ® / Ing. Walter Meléndez Bernardo.

PLANEAMIENTO / PROGRAMACION TALENTO: EXPERIENCIA CONOCIMIENTO CRITERIO

INFORMACION

PROGRAMACION RECURSOS

PLANEAMIENTO

LO QUE SE HIZO = PENSO HACER

PROTECCION AL PLAN EJECUCION

Last Planner System ® / Ing. Walter Meléndez Bernardo.

LO QUE SE HIZO

ENFOQUE TRADICIONAL Objetivos Del Proyecto

Información

PLANEAMIENTO

Recursos

Lo que se Debe Hacer

EJECUCION DEL PLAN

Last Planner System ® / Ing. Walter Meléndez Bernardo.

Lo que se Hizo

PROCESO DE PROGRAMACIÓN GyM

L O O K A H E A D MANTENIMIENTO DE TANQUES Y VESSELS

SEMANA 23 Fecha: 11/06/2005 Preparado por: R. Ruidías

Item

AMPLIAR DETALLE RESULTADO: LOOKAHEAD

INICIO: PLANEAMIENTO REHABILITACIÓN Y/O MEJORAMIENTO DE LA CARRETERA IMPERIAL IZCUCHACA OBRA 1439 PORCENTAJE DE PLAN COMPLETADO - ANALISIS DE CAUSAS DE INCUMPLIMIENTO

Contrato: REHABILITACIÓN Y MEJORAMIENTO DE LA CARRETERA IMPERIAL - IZCUCHACA Del Km. 0+000 al Km. 33+440 Fecha 14/06/04

LOOKAHEAD

DESCRIPCION DE LA ACTIVIDAD

1) TRAMO 01 KM 0+000 - KM 1+350 (1.35 KM) 1.2 Colocación de Carpeta asfáltica (CAPA 2) 2) TRAMO 02 - KM 1+350 - KM 1+700 (0.35 KM) 2.1 Colocación de Carpeta asfáltica (CAPA 2) 3) TRAMO 03 - KM 1+700 - KM 2+620 (0.92 KM) 3.1 Colocación de Carpeta asfáltica (CAPA 2) 4) TRAMO 04 - KM 2+620 - KM 3+300 (0.68 KM) 4.1 Colocación de Carpeta asfáltica (CAPA 2) 5) TRAMO 05 - KM 3+300 - KM 3+800 (0.50 KM) 5.1 Colocación de Carpeta asfáltica (CAPA 2) 6) TRAMO 06 - KM 3+800 - KM 3+980 (0.18 KM) 6.1 Colocación de Carpeta asfáltica (CAPA 2) 7) TRAMO 07 - KM 3+980 - KM 5+120 (1.14 KM) 7.1 Colocación de Carpeta asfáltica (CAPA 1) 7.2 Via Peatonal y Sardineles de Concreto Bordillos 8) TRAMO 8 - KM 6+170 - KM 7+120 (0.95 KM) 8.2 Imprimacion Asfáltica 9) TRAMO 9 - KM 7+120 - KM 8+140 (01.20 KM) 9.1 Bases y Sub Bases Sub Base Granular Base Granular Imprimacion Asfáltica 10) TRAMO 10 - KM 8+140 - KM 8+700 (0.56 KM) 10.1 Bases y Sub Bases Sub Base Granular Base Granular 11) TRAMO 11 - KM 8+980 - KM 10+000 (1.20 KM) 11.1 Conformacion de Terraplenes 11.2 Bases y Sub Bases Sub Base Granular Base Granular

FECHA DE INICIO PLANEADA

JUNIO 2004 SEMANA 25 L M M J V S D 21 22 23 24 25 26 27

26-Jun

X

X

30-Jun 04-Jul 08-Jul 12-Jul

21-Jun 21-Jun

X X

X X

X X

X X

24-Jun

X

24-Jun 28-Jun 01-Jul

X

X X

X

X

X

X

X

X

PPC Semanal PPC Acumulado TAREAS TAREAS PORCENTAJE DE PROGRAMADAS REALIZADAS PLAN COMPLETADO Semanal Acumulado Semanal Acumulado Semanal Acumulado

FECHA

Semana

13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46

Inicio

Fin

22-Mar-04

28-Mar-04

29-Mar-04

4-Abr-04

5-Abr-04

11-Abr-04

12-Abr-04

18-Abr-04

19-Abr-04

25-Abr-04

26-Abr-04

2-May-04

3-May-04

9-May-04

10-May-04

16-May-04

17-May-04

23-May-04

24-May-04

30-May-04

31-May-04

6-Jun-04

7-Jun-04

13-Jun-04

14-Jun-04

20-Jun-04

21-Jun-04

27-Jun-04

28-Jun-04

11-Jul-04 18-Jul-04

19-Jul-04 26-Jul-04 2-Ago-04

25-Jul-04 1-Ago-04 8-Ago-04

9-Ago-04

15-Ago-04

16-Ago-04

22-Ago-04 29-Ago-04

30-Ago-04

5-Sep-04

6-Sep-04

12-Sep-04

13-Sep-04

19-Sep-04

20-Sep-04

26-Sep-04

27-Sep-04

3-Oct-04

4-Oct-04

10-Oct-04

11-Oct-04

17-Oct-04

18-Oct-04 25-Oct-04

34.5% 52.5% 60.6% 65.4% 66.8% 68.7% 67.7% 66.8% 69.1% 69.0% 67.7% 68.6% 68.2% 68.2% 68.2% 68.2% 68.2% 68.2% 68.2% 68.2% 68.2% 68.2% 68.2% 68.2% 68.2% 68.2% 68.2% 68.2% 68.2% 68.2% 68.2% 68.2% 68.2% 68.2%

4-Jul-04

5-Jul-04 12-Jul-04

23-Ago-04

34.5% 62.7% 74.5% 76.9% 71.2% 81.1% 60.5% 62.8% 83.9% 68.4% 60.4% 74.5% 64.6%

24-Oct-04 31-Oct-04

1-Nov-04

7-Nov-04

8-Nov-04

14-Nov-04

29 51 47 52 59 37 38 78 62 114 96 94 65 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

29 80 127 179 238 275 313 391 453 567 663 757 822 822 822 822 822 822 822 822 822 822 822 822 822 822 822 822 822 822 822 822 822 822

10 32 35 40 42 30 23 49 52 78 58 70 42 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

10 42 77 117 159 189 212 261 313 391 449 519 561 561 561 561 561 561 561 561 561 561 561 561 561 561 561 561 561 561 561 561 561 561

CAUSAS DE INCUMPLIMIENTO ACUMULADO

LOG 3%

REND 27%

EQU 6%

CLI 6% INGS 4%

PROG 38%

INGO 12% QAQC 4%

PORCENTAJE DE PLAN COMPLETADO

CAUSAS DE INCUMPLIMIENTO SEMANAL

100% 83.87%

90%

81.07%

76.92%

74.47%

80%

68.42% 67.7%

67.7%

62.75%

60%

60.6%

65.4%

REND 48%

74.47%

71.19%

70%

PPC

SE DETERMINA EL CUMPLIMIENTO, Y LAS RAZONES QUE NO PERMITIERON EL 100% RESULTADO: PPC Y CAUSAS DE INCUMPLIMIENTO

69.1%

66.8% 60.53%

62.82%

68.2%

60.42%

64,62%

50%

68.7%

52.5%

40%

PROG 17%

34.48%

30%

34.5%

20%

PPC Semanal

PPC Acumulado

17

18

21

ingeniería

del

CLI 0%

10% 0%

13

14

15

16

19 20 Semanas

22

23

24

25

CAUSAS DE INCUMPLIMIENTO INGO

Cambios de proyecto GyM

Logística, llegada tardía incumplimiento LOG pedidos, proveedores.

de de

INGS

Cambios o indefiniciones de ingeniería por Supervisión

REND Malos rendimientos en producción - campo

CLI Eventos clímaticos REPRO

Actividades no programadas y necesidad de ejecutarlas

EQU

Falta de equipos requeridos o averías

QAQC Control de calidad

Actividad

10-Jul 15-Jul

05-Jul 10-Jul

X

X

X

X

X

X

X

D

L

M

M

J

V

S

D

L

M

M

JULIO SEMANA 26

SEMANA 25

J

V

S

D

L

M

M

J

12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

2.00 2.01 2.02 2.03 2.04 2.05 2.06 2.07 2.08 2.09 2.10 2.11 2.12 2.13 2.14

DORISSA MANTENIMIENTO DE TANQUE T-1201 5MB DORISSA Traslado de Equipos y materiales Colocacion de platos ciegos Secado del tanque y limpieza interior Desmontaje del Tanque Reemplazo de arena de la base y enterrado de 04 ánodos Corte y trazado de planchas de techo Montaje de fondo soldado Montaje de primer anillo soldado Montaje del Tanque Prueba hidrostatica Granallado y pintado Cerrado y retiro de platos ciegos Limpieza de area Desmovilizacion

Glb Und Glb kg m3 kg kg kg kg Glb m2 Glb Glb Glb

1.00 5.00 1.00 20,567.00 33.00 3,066.00 6,118.00 3,168.00 22,129.00 1.00 1,188.42 1.00 1.00 1.00

22-May 22-May 24-May 28-May 07-Jun 08-Jun 17-Jun 26-Jun 19-Jun 30-Jun 01-Jul 25-Jul 26-Jul 27-Jul

3.00 3.01 3.02 3.03 3.04 3.05 3.06 3.07 3.08 3.09 3.10 3.11 3.13 3.12 3.14

SHIVIYACU REPARACION DE TRATADOR V-451 Movilización de personal y equipos Colocacion de platos ciegos y apertura de manholes Retiro de quemador y chimenea Retiro de tubo de fuego Limpieza interior e inspección Retiro de válvulas Granallado interior para inspección Reparación metal mecánica Arenado y pintado interior del tratador Retiro/Montaje de Anodos y Sand Pands Colocacion de valvulas Colocacion manholes, retiro de platos ciegos Montaje deTapas Limpieza de area y desmovilizacion de equipos

Glb Und Und Glb Glb Und m2 Kg m2 Und Und Und Und Glb

1.00 17.00 1.00 1.00 1.00 5.00 190.00 3,917.00 380.00 23.00 26.00 17.00 2.00 1.00

01-May 01-May 04-May 06-May 08-May 18-May 19-May 16-May 05-Jun 18-Jun 18-Jun 23-Jun 25-Jun 27-Jun

Last Planner System ® / Ing. Walter Meléndez Bernardo. 21-Jun

CANT

JUNIO SEMANA 25

SEMANA 24

V

S

D

L

M

M

J

V

S

1

2

3

4

5

6

7

1

2

X

X

X

X

X

X

X

X

X

X

X

X

MANTENIMIENTO DE TANQUES Y VESSELS

SE TOMAN ACCIONES CORRECTIVAS SOBRE LAS CAUSAS DE INC. RESULTADO: ROL DE ACCIONES

SE DETERMINA CUALES SON LAS TAREAS EJECUTABLES, SE NEGOCIA UTILIZACION DE RECURSOS COMPARTIDOS, SE ESTABLECEN COMPROMISOS DE EJECUCION RESULTADO: PROGRAMA SEMANAL

Unidad

Fecha Inicio Planeada

X

X

X

X

X X X

X

X

X

X

X

X X

X X

X X

X X

X X

X X

X X

X X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X X X

X X

X

X

X X

X X

X X

X

ANALIZAR CADA TAREA DEL LOOKAHEAD, IDENTIFICAR RESTRICCIONES Y ASIGNAR RESPONSABLES RESULTADO: ANALISIS DE RESTRICCIONES GyM

ANALISIS DE RESTRICCIONES

SEMANA 23

Mantenimiento de Tanques y Vessels

Fecha: 11/Jun/2005 Preparado por: R. Ruidías

Fecha Inicio Planeada

Rest. Tipo

Responsable

1.05 Reparación metal mecánica (Cambio de techo)

07-Abr

M

ES / Pluspetrol

Suministro de planchas por Pluspetrol

1.06 Montaje del Tanque

22-May

M

ES / Pluspetrol

Suministro de planchas por Pluspetrol

2.06 Corte y trazado de planchas de techo

08-Jun

T

JP / RR / Pluspetrol

Transporte de planchas al pie de obra

2.07 Montaje de fondo soldado

17-Jun

T

JP / RR / Pluspetrol

Transporte de planchas al pie de obra

2.08 Montaje de primer anillo soldado

26-Jun

T

JP / RR / Pluspetrol

Transporte de planchas al pie de obra

25-Jun

E

JP / RR / Pluspetrol

Disponibilidad de grua para montaje de tapa

29-Jun

T

JP / RR / Pluspetrol

Transporte de granalla a pie de obra

Item

Actividad

Comentarios

MANTENIMIENTO DE TANQUES Y VESSELS GATHERIG 1.00 MANTENIMIENTO DEL TANQUE 102 DE 15000 BBL

DORISSA 2.00 MANTENIMIENTO DE TANQUE T-1201 5MB DORISSA

SHIVIYACU 3.00 REPARACION DE TRATADOR V-451 3.12 Montaje deTapas 4.00 MANTENIMIENTO DE TANQUE T-404 1000BBL DIESEL 2 4.06 Granallado y pintado

Tipo de Restricciones:

Contrato Diseño

Materiales M. Obra

Equipo Trabajos previos

Otros (X)

LOOKAHEAD

Last Planner System ® / Ing. Walter Meléndez Bernardo.

LOOKAHEAD

MENOR CANTIDAD DE DETALLE

Last Planner System ® / Ing. Walter Meléndez Bernardo.

Fecha: 24/05/2004

LOOKAHEAD

LOOKAHEAD DE 4 SEMANAS

DESCRIPCION DE LA ACTIVIDAD

FECHA DE INICIO

L

SEMANA 22 M M J V S

MAYO 2004 SEMANA 23 D L M M J V S

TRAMO KM 14+000 - KM 25+000 2 PAVIMENTOS

1 2 3 4

Sub Base km 15+800-KM 16+000 km 16+640-KM 16+880 Km 19+000 - Km 19+160 Km 19+700 - Km 20+120

26-May 28-May 24-May 26-May

1 1 2 3 4 5

Base Granular Km 15+800 - Km 16+000 Km 16+640 - Km 16+880 Km 19+000 - Km 19+160 Km 19+160 - Km 19+440 Km 19+440 - Km 19+700 Km 19+700 - Km 20+120

28-May 28-May 26-May 24-May 25-May 30-May

X X

X

X

X

X

X

X X

X

X X X

X

X X

X

X

X X

X X X

X X

X

X

X

X

X

X X

X

3.1 OBRAS DE ARTE ALCANTARILLAS TIPO LOSA 1 14+080 Relleno Estribo I / D 2 16+883 Relleno Estribo I

24-May 25-May

X

ALCANTARILLAS MARCO 1 23+192.50 Relleno Estribo I / D 2 23+498 Relleno Estribo I / D

24-May 24-May

X X

RELLENO DE MUROS 3 Muro N° 36 4 Muro N° 39

X X

X X

X

X

X X

X X

Rellenar espaldon y frente 27-May Rellenar espaldon 30-May

MENOR CANTIDAD DE DETALLE

X

X

X

X

X X

X

X X

X

X

X X

X

ALC. T. LOSA - PONTON 14+079 Encofrado Concreto Losa Superior Relleno

17-May 17-May 22-May 23-May

X

X X X

Last Planner System ® / Ing. Walter Meléndez Bernardo. ALC TMC 48" 20+380

X X

X

X

X

X

X

X

X

X

X X

JUNIO 2004 SEMANA 24 D

Fecha: 24/05/2004

LOOKAHEAD

LOOKAHEAD DE 4 SEMANAS

DESCRIPCION DE LA ACTIVIDAD

FECHA DE INICIO

L

SEMANA 22 M M J V S

MAYO 2004 SEMANA 23 D L M M J V S

JUNIO 2004 SEMANA 24 D

TRAMO KM 14+000 - KM 25+000 2 PAVIMENTOS

2

Sub Base 1 km 15+800-KM 16+000 PAVIMENTOS GSG 2 km 16+640-KM 16+880 3 Km 19+000 - Km 19+160 Sub Base 4 Km 16+000 19+700 - Km 20+120 km 15+800-KM

Granular

1 2 km 16+640-KM 16+880 Base Granular 3 Km 19+0001-Km Km15+800 19+160 - Km 16+000 - Km 16+880 4 Km 19+7001-Km Km16+640 20+120

1 1 2 3 4 5

2 Km 19+000 - Km 19+160 3 Km 19+160 - Km 19+440 Base 4 Km 19+440 - Km 19+700 5 Km 19+700 Km 20+120 15+800 - Km 16+000

Granular

Relleno Estribo I

ALCANTARILLAS MARCO 1 23+192.50 Relleno Estribo I / D 2 23+498 Relleno Estribo I / D

RELLENO DE MUROS 3 Muro N° 36 4 Muro N° 39

X

X X

X

X

X X

X

XX X X

X

X X X XX X X X

28-May

Km Km 16+640 - Km 16+880 Km 19+000 - Km 19+160 Km 19+160 Km 19+440 3.1- OBRAS DE ARTE Km 19+440 - Km 19+700 Km 19+7001-ALCANTARILLAS Km 20+120 TIPO LOSA 14+080 Relleno Estribo I / D 2 16+883

26-May 28-May 24-May X 26-May 26-May

24-May 28-May 28-May 26-May 26-May 24-May X 25-May 30-May 28-May 28-May 26-May 24-May 25-May 30-MayX 24-May 25-May

24-May 24-May

X X

X X X X

X X X

X X

X X X

X X

X X

X X X

X

X

XX XX

X

XX XX X X X

XX X

X X

X

X

X

X

X

X

X

X

X X

X

X

X

X X

Rellenar espaldon y frente 27-May Rellenar espaldon 30-May

MENOR CANTIDAD DE DETALLE

X

X

X

X X

X

X X

X

X

X X

X

ALC. T. LOSA - PONTON 14+079 Encofrado Concreto Losa Superior Relleno

17-May 17-May 22-May 23-May

X

X X X

Last Planner System ® / Ing. Walter Meléndez Bernardo. ALC TMC 48" 20+380

X X

X

X

X

X

X

X

X

X

X X

X

Fecha: 24/05/2004

LOOKAHEAD

LOOKAHEAD DE 4 SEMANAS

DESCRIPCION DE LA ACTIVIDAD

FECHA DE INICIO

L

SEMANA 22 M M J V S

MAYO 2004 SEMANA 23 D L M M J V S

JUNIO 2004 SEMANA 24 D

TRAMO KM 14+000 - KM 25+000 2 PAVIMENTOS

2

Sub Base 1 km 15+800-KM 16+000 PAVIMENTOS GSG 2 km 16+640-KM 16+880 3 Km 19+000 - Km 19+160 Sub Base 4 Km 16+000 19+700 - Km 20+120 km 15+800-KM

Granular

1 2 km 16+640-KM 16+880 Base Granular 3 Km 19+0001-Km Km15+800 19+160 - Km 16+000 - Km 16+880 4 Km 19+7001-Km Km16+640 20+120

2 Km 19+000 - Km 19+160 3 Km 19+160 - Km 19+440 Base 4 Km 19+440 - Km 19+700 5 Km 19+700 Km 20+120 15+800 - Km 16+000

16+883 20+727 20+946 21+440 21+769 22+310 22+590

X

X X

X

X

X X

X

XX X X

X

X X X XX X X X

28-May

Granular

1 Km 1 Km 16+640 - Km 16+880 2 Km 19+000 - Km 19+160 3 Km 19+160 Km 19+440 3.1- OBRAS DE ARTE ALCANTARILLAS TIPO LOSA 4 Km 19+440 - Km 19+700 TIPO LOSA 1 14+080 Estribo I / D 5 Km 19+7001-ALCANTARILLAS Km 20+120 Relleno 14+080 Relleno Estribo I / D

2 3 4 5 6 7 8

26-May 28-May 24-May X 26-May 26-May

24-May 28-May 28-May 26-May 26-May 24-May X 25-May 30-May 28-May

X X X X

X X

X

28-May 26-May X X 24-May X X X 25-May X X X 24-May X X X 30-May 24-May X X X

Relleno Relleno Estribo I I 25-MayX 2 16+883 Estribo 25-May Falta definicion ALCANTARILLAS MARCO Relleno Relleno Estribo I/D 31-May 1 23+192.50 Estribo I/D 24-May X X 2 23+498 Relleno Estribo I / D 24-May X X Relleno Estribo I / D 28-May Relleno Estribo I / D 04-Jun RELLENO DE MUROS Falta ensanche 3 Muro N° 36 Rellenar espaldon y frente 27-May Relleno Rellenar Estriboespaldon I/D 29-May 4 Muro N° 39 30-May

MENOR CANTIDAD DE DETALLE

X X X

X

X

X

X

XX XX

X

XX XX X X X

XX X

X XX X

X

X

X

X

X

X

X

X

X

X

X

X X XXX

X X X

17-May 17-May 22-May 23-May

X

X

X

X

X X

X

X X

X

X

X

X

X

X X X

Last Planner System ® / Ing. Walter Meléndez Bernardo. ALC TMC 48" 20+380

X X

X

X

X X

ALC. T. LOSA - PONTON 14+079 Encofrado Concreto Losa Superior Relleno

X

X

X

X

X

X

X

X

X

X

X

X

ANALISIS DE RESTRICCIONES VERIFICACIÓN DE TODO LO NECESARIO PARA INICIAR LA ACTIVIDAD MANO DE OBRA

EQUIPO

MATERIALES y HERRAMIENTAS

SUBCONTRATOS

OTRAS RESTRICCIONES

CLAVE Last Planner System ® / Ing. Walter Meléndez Bernardo.

PROGRAMA SEMANAL •  Esta compuesto de las acHvidades del Lookahead que NO Henen restricciones y que cumplan las prioridades del proyecto GyM

L O O K A H E A D MANTENIMIENTO DE TANQUES Y VESSELS

SEMANA 23

Fecha: 11/06/2005 Preparado por: R. Ruidías

Item

Actividad

Unidad

CANT

Fecha Inicio Planeada

JUNIO SEMANA 25

SEMANA 24 D

L

M

M

J

V

S

D

L

M

M

J

JULIO SEMANA 26

SEMANA 25 V

S

D

L

M

M

J

12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

V

S

D

L

M

M

J

V

S

1

2

3

4

5

6

7

1

2

X

X

X

X

X

X

X

X

X

X

X

X

MANTENIMIENTO DE TANQUES Y VESSELS

2.00 2.01 2.02 2.03 2.04 2.05 2.06 2.07 2.08 2.09 2.10 2.11 2.12 2.13 2.14

DORISSA MANTENIMIENTO DE TANQUE T-1201 5MB DORISSA Traslado de Equipos y materiales Colocacion de platos ciegos Secado del tanque y limpieza interior Desmontaje del Tanque Reemplazo de arena de la base y enterrado de 04 ánodos Corte y trazado de planchas de techo Montaje de fondo soldado Montaje de primer anillo soldado Montaje del Tanque Prueba hidrostatica Granallado y pintado Cerrado y retiro de platos ciegos Limpieza de area Desmovilizacion

Glb Und Glb kg m3 kg kg kg kg Glb m2 Glb Glb Glb

1.00 5.00 1.00 20,567.00 33.00 3,066.00 6,118.00 3,168.00 22,129.00 1.00 1,188.42 1.00 1.00 1.00

22-May 22-May 24-May 28-May 07-Jun 08-Jun 17-Jun 26-Jun 19-Jun 30-Jun 01-Jul 25-Jul 26-Jul 27-Jul

3.00 3.01 3.02 3.03 3.04 3.05 3.06 3.07 3.08 3.09 3.10 3.11 3.13 3.12 3.14

SHIVIYACU REPARACION DE TRATADOR V-451 Movilización de personal y equipos Colocacion de platos ciegos y apertura de manholes Retiro de quemador y chimenea Retiro de tubo de fuego Limpieza interior e inspección Retiro de válvulas Granallado interior para inspección Reparación metal mecánica Arenado y pintado interior del tratador Retiro/Montaje de Anodos y Sand Pands Colocacion de valvulas Colocacion manholes, retiro de platos ciegos Montaje deTapas Limpieza de area y desmovilizacion de equipos

Glb Und Und Glb Glb Und m2 Kg m2 Und Und Und Und Glb

1.00 17.00 1.00 1.00 1.00 5.00 190.00 3,917.00 380.00 23.00 26.00 17.00 2.00 1.00

01-May 01-May 04-May 06-May 08-May 18-May 19-May 16-May 05-Jun 18-Jun 18-Jun 23-Jun 25-Jun 27-Jun

X

X

X

X

X X X

X X

X X

X X

X X

X X

X X

X X

X X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

Contrato: REHABILITACIÓN Y MEJORAMIENTO DE LA CARRETERA IMPERIAL - IZCUCHACA Del Km. 0+000 al Km. 33+440 Fecha 14/06/04

LOOKAHEAD

DESCRIPCION DE LA ACTIVIDAD

X

X

X

X

X

FECHA DE INICIO PLANEADA

JUNIO 2004 SEMANA 25 L M M J V S D 21 22 23 24 25 26 27

X X X

X X

X

X

X X

X X

X X

X

ANALISIS DE RESTRICCIONES

1) TRAMO 01 KM 0+000 - KM 1+350 (1.35 KM) 1.2 Colocación de Carpeta asfáltica (CAPA 2) 2) TRAMO 02 - KM 1+350 - KM 1+700 (0.35 KM) 2.1 Colocación de Carpeta asfáltica (CAPA 2) 3) TRAMO 03 - KM 1+700 - KM 2+620 (0.92 KM) 3.1 Colocación de Carpeta asfáltica (CAPA 2) 4) TRAMO 04 - KM 2+620 - KM 3+300 (0.68 KM) 4.1 Colocación de Carpeta asfáltica (CAPA 2) 5) TRAMO 05 - KM 3+300 - KM 3+800 (0.50 KM) 5.1 Colocación de Carpeta asfáltica (CAPA 2) 6) TRAMO 06 - KM 3+800 - KM 3+980 (0.18 KM) 6.1 Colocación de Carpeta asfáltica (CAPA 2) 7) TRAMO 07 - KM 3+980 - KM 5+120 (1.14 KM) 7.1 Colocación de Carpeta asfáltica (CAPA 1) 7.2 Via Peatonal y Sardineles de Concreto Bordillos 8) TRAMO 8 - KM 6+170 - KM 7+120 (0.95 KM) 8.2 Imprimacion Asfáltica 9) TRAMO 9 - KM 7+120 - KM 8+140 (01.20 KM) 9.1 Bases y Sub Bases Sub Base Granular Base Granular Imprimacion Asfáltica 10) TRAMO 10 - KM 8+140 - KM 8+700 (0.56 KM) 10.1 Bases y Sub Bases Sub Base Granular Base Granular 11) TRAMO 11 - KM 8+980 - KM 10+000 (1.20 KM) 11.1 Conformacion de Terraplenes 11.2 Bases y Sub Bases Sub Base Granular Base Granular

Last Planner System ® / Ing. Walter Meléndez Bernardo.

26-Jun

X

X

X

X

30-Jun 04-Jul 08-Jul 12-Jul

21-Jun 21-Jun

X X

X X

X X

X X

X X

24-Jun

X

X

24-Jun 28-Jun 01-Jul

X

X

X

X

X

X

X

X

10-Jul 15-Jul 21-Jun 05-Jul 10-Jul

X

X

X

ANALISIS DE CUMPLIMIENTO (PPC Y CAUSAS)

DISTRIBUCION DE GAS PARA LIMA Y CALLAO

FRENTE NORTE Plan Semanal del

Descripción

3 al M 3

9 de

J 4

V 5

Diciembre

S 6

D 7

L 8

M 9

Troncal de 20"

Metrado

EVALUACION

PROGRAMADO

EJECUTADO

49+600 @ 52+000

CUMPLIMIENTO

CUMPLIMIENTO

CAUSAS DE

CIVIL

MECANICO SI NO

INCUMPLIMIENTO

SI

Excavación Transporte y Disposición del Material de Excavaciòn Desfile de Tuberías Alineamiento Soldadura (1 junta cada 12 mts) Mantas Termocontraibles (1 junta cada 12 mts) Bajada de Varillon 1er Relleno con arena fina 40 cm (hasta Triducto) Colocar Triducto (2 filas de triducto por metro) Proteccion Catodica (cada 1,000 mts) 2do Relleno con material reciclado (30 cm) 3er Relleno con material reciclado (30 cm) Reposición (Terreno natural/Afirmado/Pavimento/Veredas)

60 60 60

36 3 2 60 60 60

36 3 3 60 60 60

12 1 1 30 30 30

3 3 60 60 60

60 60 60

60 60 60

60 60 60

30 30 30

60 60 60

EN ML EQUIVALENTES

149

52+000 @ 55+930 Excavación Transporte y Disposición del Material de Excavaciòn Desfile de Tuberías Alineamiento Soldadura (1 junta cada 12 mts) Mantas Termocontraibles (1 junta cada 12 mts) Bajada de Varillon 1er Relleno con arena fina 40 cm (hasta Triducto) Colocar Triducto (2 filas de triducto por metro) Proteccion Catodica (cada 1,000 mts) 2do Relleno con material reciclado (30 cm) 3er Relleno con material reciclado (30 cm) Reposición (Terreno natural/Afirmado/Pavimento/Veredas)

84 10 9 270 270 270 270 270 270

40 40

40 40

40 40

40 40

48 4 4 60 60 60

48 4 4 60 60 60

48 4 4 60 60 60

12 1 1 30 30 30

24 4 4 47 40 40

60 60 60

60 60 60

60 60 60

30 30 30

40 40 40

x x x x x x x x

235

PROGRAMADO

40 40

84 10 9 207 520 520 580 580 645

NO

200 200 180 17 17 257 250 250 250 250 250

EJECUTADO

213 213 120 182 17 14 257 251 338 338 388 333

x x

x x x x x

Last Planner System ® / Ing. Walter Meléndez Bernardo.

x x x x

x

CAMPO

ANALISIS DE CUMPLIMIENTO (PPC Y CAUSAS) REHABILITACIÓN Y/O MEJORAMIENTO DE LA CARRETERA IMPERIAL IZCUCHACA OBRA 1439

PORCENTAJE DE PLAN COMPLETADO - ANALISIS DE CAUSAS DE INCUMPLIMIENTO

Semana

FECHA

Inicio

Fin

PPC Semanal PPC Acumulado TAREAS TAREAS PORCENTAJE DE PROGRAMADAS REALIZADAS PLAN COMPLETADO Semanal Acumulado Semanal Acumulado Semanal Acumulado

22-Mar-04 28-Mar-04 13 34.5% 34.5% 29-Mar-04 4-Abr-04 14 62.7% 52.5% 5-Abr-04 11-Abr-04 15 74.5% 60.6% 12-Abr-04 18-Abr-04 16 76.9% 65.4% 19-Abr-04 25-Abr-04 17 71.2% 66.8% 26-Abr-04 2-May-04 18 81.1% 68.7% 3-May-04 9-May-04 19 60.5% 67.7% 10-May-04 16-May-04 20 62.8% 66.8% 17-May-04 23-May-04 21 83.9% 69.1% 24-May-04 30-May-04 22 68.4% 69.0% 31-May-04 6-Jun-04 23 60.4% 67.7% 7-Jun-04 13-Jun-04 24 74.5% 68.6% 14-Jun-04 20-Jun-04 25 64.6% 68.2% 21-Jun-04 27-Jun-04 26 68.2% 4-Jul-04 27 68.2% DISTRIBUCION DE GAS PARA LIMA Y28-Jun-04 CALLAO 5-Jul-04 11-Jul-04 28 68.2% FRENTE NORTE 12-Jul-04 18-Jul-04 29 68.2% 19-Jul-04 25-Jul-04 30 68.2% Plan Semanal del 3 al 26-Jul-04 1-Ago-04 31 68.2% 2-Ago-04 8-Ago-04 32 68.2% 9-Ago-04 15-Ago-04 33 M 68.2% J 16-Ago-04 22-Ago-04 34 68.2% 23-Ago-04 29-Ago-04 35 Descripción 3 68.2%4 30-Ago-04 5-Sep-04 36 68.2% 6-Sep-04 12-Sep-04 37 68.2% 13-Sep-04 19-Sep-04 38 68.2% 20-Sep-04 26-Sep-04 39 68.2% 49+600 @ 52+000 27-Sep-04 3-Oct-04 40 68.2% 4-Oct-04 10-Oct-04 Excavación 41 68.2% 11-Oct-04 17-Oct-04 42 68.2% Transporte y Disposición del Material de Excavaciòn 18-Oct-04 24-Oct-04 43 68.2% Desfile de Tuberías 25-Oct-04 31-Oct-04 44 68.2% 1-Nov-04 7-Nov-04 45 68.2% 36 Alineamiento 8-Nov-04 14-Nov-04 46 68.2%

Troncal de 20"

Soldadura (1 junta cada 12 mts) Mantas Termocontraibles (1 junta cada 12 mts) Bajada de Varillon PORCENTAJE 1er Relleno con arena fina 40 cm (hasta Triducto) Colocar Triducto (2 filas de triducto100% por metro) 90% Proteccion Catodica (cada 1,000 mts) 76.92% 74.47% 2do Relleno con material reciclado 80% (30 cm) 71.19% 3er Relleno con material reciclado (30 cm) 70% Reposición (Terreno natural/Afirmado/Pavimento/Veredas) 62.75% PPC

29 80 127 179 238 275 313 391 453 567 663 757 822 822 822 822 822 822 de 822 822 822 S 822 822 6 822 822 822 822 822 822 822 822 822 82212 822

10 10 32 42 35 77 40 117 42 159 30 189 23 212 49 261 52 313 78 391 58 449 70 519 42 561 0 561 0 561 0 561 0 561 0 561 Diciembre 0 561 0 561 0 561 D L 0 561 561 70 8 0 561 0 561 0 561 0 561 0 561 0 561 0 561 0 561 0 561 0 561 0 561

3 3 1 2 3 1 60 PLAN 60 COMPLETADO 60 30 DE 60 60 60 30 60 60 60 30

CAUSAS DE INCUMPLIMIENTO ACUMULADO

LOG 3%

60 60 60

60.6%

60 67.7%60 60

60.53%

60 60 60

69.1%

62.82%

30 30 30

74.47%

68.42% 67.7% 60.42%

68.2%

CLI 6% INGS 4%

M 9

INGO

Metrado12%EVALUACION PROGRAMADO

84 10 9 270 270 270 270 270 270

3 3 60 60 60 60 60 60

149

64,62%

PROGRAMADO

68.7%

40 40

40 40

40 40

40 40

40 40

CUMPLIMIENTO

CAUSAS DE

CIVIL

MECANICO SI NO

INCUMPLIMIENTO

QAQC 4%

EJECUTADO

NO

84 10 9 CAUSAS DE INCUMPLIMIENTO 207 x 520SEMANAL x 520 REND 580 48%x x 580 x 645

REND Malos rendimientos en producción - campo

REPRO

ejecutarlas

x

235

200 213 200 213 120 CLI 48 48 48 12 24 180 182 0% PPC Semanal PPC Acumulado 4 4 4 1 4 17 17 4 4 4 1 4 17 14 60 19 6020 2160 22 3023 24 25 47 257 257 18 60Semanas 60 60 30 40 250 251 60 60 60 30 40 250 338 CAUSAS DE INCUMPLIMIENTO 60Cambios60o indefiniciones 30 40 250 338 del60 de ingeniería por INGS CLI Eventos clímaticos 60 60Supervisión 60 30 40 250 388 de60 60 60 30 40 Actividades250 no programadas y 333 necesidad de de

x x x

EJECUTADO

x x

PROG 17%

x x x x

x x x x x

EQU

Falta de equipos requeridos o averías

Last Planner System ® / Ing. Walter Meléndez Bernardo. incumplimiento LOG pedidos, proveedores.

PROG 38%

CUMPLIMIENTO

SI

50%

52.5% Excavación 40% 34.48% Transporte y Disposición del Material de Excavaciòn 30% 34.5% Desfile de Tuberías 20% Alineamiento Soldadura (1 junta cada 12 mts) 10% Mantas Termocontraibles (1 junta cada 12 mts) 0% Bajada de Varillon 13 14 15 16 17 1er Relleno con arena fina 40 cm (hasta Triducto) Colocar Triducto (2 filas de triducto por metro) Proteccion Catodica (cada 1,000 mts) 2do Relleno con material reciclado (30 cm) Cambios de ingeniería INGO proyecto GyM 3er Relleno con material reciclado (30 cm) Logística, llegada tardía Reposición (Terreno natural/Afirmado/Pavimento/Veredas)

REND 27%

EQU 6%

83.87% 81.07%

66.8% 65.4% EN60% ML EQUIVALENTES

52+000 @ 55+930

29 51 47 52 59 37 38 78 62 114 96 94 65 0 0 0 0 0 9 0 0 0 V 0 05 0 0 0 0 0 0 0 0 0 0 36 0

QAQC Control de calidad

CAMPO

37 38 39 40 41 42 43 44 45 46

6-Sep-04

12-Sep-04

13-Sep-04

19-Sep-04

20-Sep-04

26-Sep-04

27-Sep-04

3-Oct-04

4-Oct-04

10-Oct-04

11-Oct-04

17-Oct-04

18-Oct-04

24-Oct-04

25-Oct-04

31-Oct-04

1-Nov-04

7-Nov-04

8-Nov-04

14-Nov-04

QAQC

68.2% 0 822 0 561 4% 68.2% 0 822 0 561 68.2% 0 822 0 561 68.2% 0 822 0 561 Y/O MEJORAMIENTO DE LA CARRETERA IMPERIAL IZCUCHACA 68.2% REHABILITACIÓN 0 822 0 561 OBRA 1439 68.2% 0 822 0 561 PORCENTAJE DE PLAN COMPLETADO - ANALISIS DE CAUSAS DE INCUMPLIMIENTO 68.2% 0 822 0 561 68.2% 822 0 561 PPC Semanal PPC0 Acumulado TAREAS TAREAS561 PORCENTAJE 0 DE 822 0 FECHA 68.2% PROGRAMADAS REALIZADAS PLAN COMPLETADO 68.2%Semanal Acumulado 0 822 Acumulado 0Semanal Acumulado 561 Inicio Fin Semanal

ANALISIS DE CUMPLIMIENTO (PPC Y CAUSAS)

Semana

22-Mar-04 28-Mar-04 13 34.5% 34.5% 29 29 10 10 29-Mar-04 4-Abr-04 14 62.7% 52.5% 51 80 32 42 5-Abr-04 11-Abr-04 15 74.5% 60.6% 47 127 35 77 12-Abr-04 18-Abr-04 16 76.9% 65.4% 52 179 40 117 19-Abr-04 25-Abr-04 17 71.2% 66.8% 59 238 42 159 26-Abr-04 2-May-04 18 81.1% 68.7% 37 275 30 189 3-May-04 9-May-04 19 60.5% 67.7% 38 313 23 212 100% 10-May-04 16-May-04 20 62.8% 66.8% 78 391 49 261 17-May-04 23-May-04 21 83.9% 69.1% 62 453 52 313 83.87% 24-May-04 30-May-04 22 68.4% 69.0% 114 567 78 391 90% 31-May-04 6-Jun-04 81.07% 23 60.4% 67.7% 96 663 58 449 76.92% 7-Jun-04 13-Jun-04 74.47% 24 74.5% 68.6% 94 757 70 519 74.47% 80% 14-Jun-04 20-Jun-04 25 71.19% 64.6% 68.2% 65 822 42 561 21-Jun-04 27-Jun-04 26 68.2% 0 822 0 68.42% 67.7% 68.2%561 67.7% 28-Jun-04 4-Jul-04 27 68.2% 0 822 0 561 DISTRIBUCION DE GAS PARA LIMA Y CALLAO 70% 5-Jul-04 11-Jul-04 28 68.2% 0 822 0 561 62.75% FRENTE NORTE 12-Jul-04 18-Jul-04 29 68.2% 0 822 0 561 69.1% 66.8% 25-Jul-04 60.42% 30 68.2% 0 822 0 561 60% 64,62% 65.4%19-Jul-04 Plan Semanal del 3 al 9 de Diciembre 62.82%68.2% 26-Jul-04 1-Ago-04 31 0 822 0 561 60.6% 60.53% 2-Ago-04 8-Ago-04 32 68.2% 0 822 0 561 50% 9-Ago-04 15-Ago-04 33 0 822 0 561 M 68.2% J V S D L 16-Ago-04 68.7% 22-Ago-04 34 68.2% 0 822 0 561 52.5% 23-Ago-04 29-Ago-04 35 68.2% 05 822 0 561 Descripción 3 4 6 7 8 40% 30-Ago-04 5-Sep-04 36 68.2% 0 822 0 561 34.48% 6-Sep-04 12-Sep-04 37 68.2% 0 822 0 561 13-Sep-04 19-Sep-04 38 68.2% 0 822 0 561 30% 34.5% 20-Sep-04 26-Sep-04 39 68.2% 0 822 0 561 49+600 @ 52+000 27-Sep-04 3-Oct-04 40 68.2% 0 822 0 561 20% 4-Oct-04 10-Oct-04 Excavación 41 68.2% 0 822 0 561 11-Oct-04 PPC 17-Oct-04 Semanal PPC Acumulado 42 68.2% 0 822 0 561 Transporte y Disposición del Material de Excavaciòn 18-Oct-04 24-Oct-04 43 68.2% 0 822 0 561 10% de Tuberías Desfile 25-Oct-04 31-Oct-04 44 68.2% 0 822 0 561 1-Nov-04 7-Nov-04 45 68.2% 0 822 0 561 Alineamiento 36 36 12 8-Nov-04 14-Nov-04 46 68.2% 0 822 0 561 0%

CAUSAS DE INCUMPLIMIENTO ACUMULADO CAUSAS DE INCUMPLIMIENTO

PPC

PORCENTAJE DE PLAN COMPLETADO

SEMANAL LOG 3%

REND 27%

REND 48%

EQU 6%

CLI 6% INGS 4%

M 9

INGO

Metrado12%EVALUACION

Troncal de 20"

PROGRAMADO

CUMPLIMIENTO

CAUSAS PROG DE

CIVIL

MECANICO SI NO

17% INCUMPLIMIENTO

QAQC 4%

EJECUTADO

SI

Soldadura (1 junta cada 12 mts) 3 3 1 3 14 15(1 junta 16cada 12 17mts) 18 19 20 21 2 22 3 23 1 24 25 Mantas 13 Termocontraibles 3 Semanas Bajada de Varillon 60 PLAN 60 COMPLETADO 60 30 60 PORCENTAJE DE 1er Relleno con arena fina 40 cm (hasta Triducto) 60 60 60 30 60 Colocar Triducto (2 filas de triducto100% por metro) 60 60 60 30 60 83.87% 90% Proteccion Catodica (cada 1,000 mts) 81.07% 76.92% 74.47% 2do Relleno con material reciclado 80% (30 cm) 60 60 60 30 74.47% 60 Cambios de ingeniería del ingeniería por 71.19% Cambios o indefiniciones de INGO INGS 3er Relleno con material reciclado (30 cm) 60 67.7%60 60 68.42% 3067.7% 60 68.2% proyecto GyM Supervisión 70% Reposición (Terreno natural/Afirmado/Pavimento/Veredas) 60 60 60 30 60 62.75%

PROG 38%

CUMPLIMIENTO

NO

- CLI 0% 84 84 10 10 9 9 DE INCUMPLIMIENTO 270 CAUSAS 207 x 270 520SEMANAL x 270 520 REND 270 580 48%x CLI Eventos x 270 clímaticos 580 x 270 645

x x x

x

CAMPO

EQU

Falta de equipos requeridos o averías

CAUSAS DE INCUMPLIMIENTO

PPC

69.1% Logística, llegada tardía de 66.8% 60.42% 64,62% 65.4% EN60% ML EQUIVALENTES 62.82% incumplimiento de 60.6%REND Malos60.53% rendimientos en producción - campo LOG pedidos, 50% 52+000 @ 55+930 proveedores. 68.7% 52.5% Excavación 40 40 40 40 40% 34.48% Transporte y Disposición del Material de Excavaciòn 40 40 40 40 30%

34.5%

Desfile de Tuberías 20% Alineamiento Soldadura (1 junta cada 12 mts) 10% Mantas Termocontraibles (1 junta cada 12 mts) 0% Bajada de Varillon 13 14 15 16 17 1er Relleno con arena fina 40 cm (hasta Triducto) Colocar Triducto (2 filas de triducto por metro) Proteccion Catodica (cada 1,000 mts) 2do Relleno con material reciclado (30 cm) Cambios de ingeniería INGO proyecto GyM 3er Relleno con material reciclado (30 cm) Logística, llegada tardía Reposición (Terreno natural/Afirmado/Pavimento/Veredas)

149Actividades235 no programadas y necesidad de

REPRO

ejecutarlas PROGRAMADO EJECUTADO

40 40

200 213 200 213 120 CLI 48 48 48 12 24 180 182 0% PPC Semanal PPC Acumulado 4 4 4 1 4 17 17 4 4 4 1 4 17 14 60 19 6020 2160 22 3023 24 25 47 257 257 18 60Semanas 60 60 30 40 250 251 60 60 60 30 40 250 338 CAUSAS DE INCUMPLIMIENTO 60Cambios60o indefiniciones 30 40 250 338 del60 de ingeniería por INGS CLI Eventos clímaticos 60 60Supervisión 60 30 40 250 388 de60 60 60 30 40 Actividades250 no programadas y 333 necesidad de

x x

PROG 17%

x x x x

x x x x x

EQU

Falta de equipos requeridos o averías

Last Planner System ® / Ing. Walter Meléndez Bernardo. incumplimiento LOG pedidos, proveedores.

de

REND Malos rendimientos en producción - campo

REPRO

ejecutarlas

QAQC Control de calidad

QAQC Control de calidad

QAQC

OBRA 1439

6-Sep-04 12-Sep-04 37 68.2% 0 822 0 561 4% 13-Sep-04 19-Sep-04 38 68.2% 0 822 0 561 PORCENTAJE DE PLAN COMPLETADO ANALISIS DE CAUSAS DE INCUMPLIMIENTO 20-Sep-04 26-Sep-04 39 68.2% 0 822 0 561 27-Sep-04 3-Oct-04 40 68.2% 0 822 0 561 Y/O MEJORAMIENTO DE LA CARRETERA IMPERIAL IZCUCHACA 4-Oct-04 10-Oct-04 41 68.2% REHABILITACIÓN 0 822 0 561 OBRA 1439 11-Oct-04 17-Oct-04 42 68.2% 0 822 0 561 PORCENTAJE DE PLAN COMPLETADO - ANALISIS DE CAUSAS DE INCUMPLIMIENTO 18-Oct-04 24-Oct-04 43 68.2% 0 822 0 561 TAREAS TAREAS 25-Oct-04 31-Oct-04 68.2% 822 0 561 PPC Semanal PPC0 Acumulado PROGRAMADAS 44 REALIZADAS TAREAS TAREAS561 PORCENTAJE 1-Nov-04 7-Nov-04 45 0 DE 822 0 FECHA 68.2% Semana PROGRAMADAS REALIZADAS PLAN COMPLETADO emanal Acumulado46 Semanal 8-Nov-04 Acumulado 14-Nov-04 68.2%Semanal Acumulado 0 822 Acumulado 0Semanal Acumulado 561 Inicio Fin Semanal 13

22-Mar-04

28-Mar-04

34.5%

34.5%

29

29

10

10

29-Mar-04 4-Abr-04 62.7% 52.5% 51 80 32 42 29 10 10 14 CAUSAS DE INCUMPLIMIENTO 5-Abr-04 11-Abr-04 15 74.5% 60.6% 47 127 35 77 ACUMULADO CAUSAS DE INCUMPLIMIENTO 12-Abr-04 DE18-Abr-04 PLAN 76.9%COMPLETADO 65.4% 52 179 40 117 80 32 PORCENTAJE 42 16 CAUSAS DE 19-Abr-04 25-Abr-04 17 71.2% 66.8% 59 238 42 159 INCUMPLIMIENTO SEMANAL 26-Abr-04 2-May-04 81.1% 68.7% 37 275 30 189 127 35 77 18 3-May-04 9-May-04 19 60.5% 67.7% 38 313 23 212 100% ACUMULADO 78 391 49 261 179 40 117 20 10-May-04 16-May-04 62.8% 66.8% LOG REND 17-May-04 23-May-04 21 83.9% 69.1% 62 453 52 313 3% 27% 83.87% 238 159 22 24-May-04 30-May-04 68.4% 69.0% 114 567 78 391 90% 42 31-May-04 6-Jun-04 81.07% 23 60.4% 67.7% 96 663 58 449 REND 76.92% 275 30 7-Jun-04 13-Jun-04 74.47% 189 24 74.5% 68.6% 94 757 70 519 EQU 48% 74.47% 42 80% 14-Jun-04 20-Jun-04 25 71.19% 64.6% 68.2% 65 822 561 6% 313 23 212 26 21-Jun-04 27-Jun-04 68.2% 0 822 0 561 68.42% 68.2% 67.7% 67.7% 4-Jul-04 27 68.2% 0 822 0 561 Y28-Jun-04 CALLAO 70% 49 DE GAS PARA 391DISTRIBUCION 261 LIMA 5-Jul-04 11-Jul-04 28 68.2% 0 822 0 561 62.75% LOG REND FRENTE NORTE 12-Jul-04 18-Jul-04 29 68.2% 0 822 0 561 CLI 69.1% 453 313 30 66.8% 25-Jul-04 60.42% 6% INGS 68.2% 0 822 0 561 60% 52 3% 27% 64,62% 65.4%19-Jul-04 Plan Semanal del 3 al 9 de Diciembre 62.82%68.2% 4% 26-Jul-04 1-Ago-04 31 0 822 0 561 60.6% 567 78 391 32 60.53% 2-Ago-04 8-Ago-04 68.2% 0 822 0 561 50% 9-Ago-04 15-Ago-04 0 822 0 561 663 58 449 33 M 68.2% J V S D L M PROG 16-Ago-04 68.7% 22-Ago-04 34 68.2% 0 822 0 561 INGO 38% 52.5% 23-Ago-04 29-Ago-04 CUMPLIMIENTO CUMPLIMIENTO 35 68.2% 0 822 0 561 Descripción 3 4 5 6 7 8 9 Metrado12%EVALUACION CAUSAS 757 519 36 40% 70 PROG DE EQU 30-Ago-04 5-Sep-04 68.2% 0 822 0 561 QAQC 17% 34.48% 6-Sep-04 12-Sep-04 37 68.2% 0 822 0 561 822Troncal de 4220" 561 38 4% INCUMPLIMIENTO 6% CIVIL MECANICO PROGRAMADO EJECUTADO 13-Sep-04 19-Sep-04 68.2% 0 822 0 561 30% 34.5% 20-Sep-04 26-Sep-04 68.2% 0 822 0 561 82249+600 @ 52+000 0 561 39 SI NO SI NO 27-Sep-04 3-Oct-04 40 68.2% 0 822 0 561 20% 0 4-Oct-04 10-Oct-04 - CLI 68.2% 0 822 0 561 822 Excavación 561 41 0% 11-Oct-04 PPC 17-Oct-04 Semanal PPC Acumulado 42 de Excavaciòn 68.2% 0 822 0 561 Material 18-Oct-04 24-Oct-04 822 Transporte 0y Disposición del561 43 68.2% 0 822 0 561 10% de Tuberías Desfile 25-Oct-04 31-Oct-04 44 68.2% 0 822 0 561 822 Alineamiento 0 561 45 1-Nov-04 7-Nov-04 68.2% 0 561 CLI36 0 36 82212 x 84 84 8-Nov-04 14-Nov-04 46 68.2% 0 822 0 561 0% 6% 3 x mts) 3 1 3 10 10 INGS 822 Soldadura 0(1 junta cada 12561 13 14 15(1 junta 16 17 18 19 20 21 25 x 2 22 3 23 1 24 3 9 9 4% 822 Mantas Termocontraibles 0 561 cada 12 mts) Semanas DE INCUMPLIMIENTO x CAMPO Bajada de Varillon 60 PLAN 60 COMPLETADO 60 30 60 270 CAUSAS 207 PORCENTAJE DE 822 1er Relleno0con arena fina 561 x 40 cm (hasta Triducto) 60 60 60 30 60 270 520SEMANAL 822 Colocar Triducto 0 (2 filas de 561 x triducto100% por metro) 60 60 60 30 60 270 520 PROG 83.87% 90% Proteccion Catodica (cada 1,000 CAUSAS DE INCUMPLIMIENTO 822 0 561 mts) 81.07% REND INGO 76.92% 74.47% 38% 2do Relleno con material reciclado 80% (30 cm) 60 60 60 30 74.47% 60 270 580 48%x Cambios de561ingeniería del ingeniería por Falta de equipos requeridos 71.19% Cambios o indefiniciones de 822 3erINGO 0 INGS CLI Eventos EQU x Relleno con material reciclado (30 cm) 60 67.7%60 12% 60 68.42% 3067.7% 60 270 clímaticos 580 68.2% Supervisión averías x natural/Afirmado/Pavimento/Veredas) 60 60 60 30 60 270 645 822 Reposiciónproyecto 0(Terreno GyM 561 70% 62.75% QAQC 69.1% Logística, llegada tardía de 66.8% 60.42% 60% 64,62% 65.4% 149Actividades235 no programadas y necesidad de 62.82% 822 0 561EN ML EQUIVALENTES 4% - campo incumplimiento de 60.6%REND Malos60.53% rendimientos en producción LOG pedidos, REPRO QAQC Control de calidad ejecutarlas PROGRAMADO EJECUTADO 82252+000 @ 55+930 0 561 50% 52.5% proveedores. 68.7% x Excavación 40 40 40 40 40 200 213 40% PROG 822 Transporte0y Disposición del561 17% 34.48% x Material de Excavaciòn 40 40 40 40 40 200 213 30% 34.5% 822 Desfile de 0 561 Tuberías 120 CLI x 48 48 48 12 24 180 182 822 Alineamiento 0 561 20% 0% PPC Semanal PPC Acumulado x Soldadura (1 junta cada 12 mts) 10% 4 4 4 1 4 17 17 822 Mantas Termocontraibles 0 561 x (1 junta cada 12 mts) 4 4 4 1 4 17 14 822 Bajada de 0 561 0% 13 14 15 16 17 1860 19 6020 2160 22 3023 24 25 x Varillon 47 257 257 x 40 cm (hasta Triducto) 60Semanas 60 60 30 40 250 251 822 1er Relleno0con arena fina 561 x Triducto (2 filas de triducto por metro) 60 60 60 30 40 250 338 822 Colocar 0 561 Proteccion Catodica (cada 1,000 mts) CAUSAS DE INCUMPLIMIENTO 822 2do Relleno0con material reciclado 561 (30 cm) x 60Cambios60o indefiniciones 30 40 250 338 Cambios de ingeniería del60 de ingeniería por Falta de equipos requeridos o

PPC

PPC

29 51 47 52 59 37 38 78 62 114 96 94 65 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

ANALISIS DE CUMPLIMIENTO (PPC Y CAUSAS)

INGO

INGS

CLI Eventos clímaticos

EQU

Last Planner System ® / Ing. Walter Meléndez Bernardo. proyecto GyM 3er Relleno con material reciclado (30 cm) Logística, llegada tardía Reposición (Terreno natural/Afirmado/Pavimento/Veredas)

COMPLETADO

incumplimiento LOG pedidos, proveedores.

60

60Supervisión 60

30

de60 60 60 30 de REND Malos rendimientos en producción - campo

40 40

REPRO

x 250 388 Actividades250 no programadas y 333 necesidad de x ejecutarlas

CAUSAS DE INCUMPLIMIENTO SEMANAL

averías

QAQC Control de calidad

o

OBJETIVOS DE LA PROGRAMACION 1.  Proteger el Plan 2.  Asegurar el Flujo 3.  Aprendizaje – Mejora ConHnua

Last Planner System ® / Ing. Walter Meléndez Bernardo.

DEFINICIONES EN PROGRAMACIÓN •  LOOKAHEAD –  Es el programa de mediano plazo (horizonte de Hempo de 4 a 6 semanas usualmente) cuyas tareas provienen del Cronograma General con un mayor nivel de detalle.

•  ANÁLISIS DE RESTRICCIONES –  Es el ejercicio de idenHficar y proveer con adecuada anHcipación de todo aquello que falta para poder ejecutar una tarea del lookahead

•  PLAN SEMANAL –  Listado de las tareas sin restricciones que producción se compromete a ejecutar en la semana.

Last Planner System ® / Ing. Walter Meléndez Bernardo.

DEFINICIONES EN PROGRAMACIÓN •  PPC (PORCENTAJE DEL PLAN CUMPLIDO)

–  Índice que mide la efecHvidad y confiabilidad de la programación semanal. –  División de tareas completadas al 100% entre las tareas programadas. Se contabiliza el cumplimiento al 100% de lo programado en la semana

•  ANÁLISIS DE CONFIABILIDAD

–  Ejercicio a través del cual: –  Se mide la calidad del sistema de programación. –  Se idenHfican (y se trata de eliminar) las causas que no permiten alcanzar el 100 % del cumplimiento del plan semanal. –  Se aprende sistemáHcamente de las experiencias que se están obteniendo en la obra, con el fin de no cometer errores repeHHvos.

Last Planner System ® / Ing. Walter Meléndez Bernardo.

PROCESO DE PROGRAMACION

•  Detallar las acHvidades del Cronograma General a nivel de tareas y armar el lookahead •  IdenCficar las restricciones de cada tarea del lookahead •  Hacer que las tareas queden listas para ser ejecutadas removiendo las restricciones •  Negociar uso de recursos y espacios comparHdos •  Ajustar el Cronograma General cuando se necesite •  Aprender al medir la performance. Usar el aprendizaje para mejorar

Last Planner System ® / Ing. Walter Meléndez Bernardo.

PROGRAMACIÓN ¿CÓMO ALCANZA LA PROGRAMACIÓN SUS OBJETIVOS?

♦  Proteger el Plan ♦  Asegurar el Flujo ♦  Aprendizaje – Mejora ConHnua

Last Planner System ® / Ing. Walter Meléndez Bernardo.

PROGRAMACIÓN: PROTECCIÓN DEL PLANEAMIENTO Esta todo listo para iniciar la actividad?

REGISTRO GESTION DE PROYECTOS

Revisión: Fecha:

LOOKAHEAD

Pagina:

AREA / DPTO PRODUCCIÓN CLIENTE MINERA YANACOCHA SRL

NRO. REGISTRO

Horizonte semana anterior

AREA 1 EXCAVACIÓN DE TOP SOIL EXCAVACIÓN DE UNSUITABLE RELLENO CON MATERIAL GRANULAR COLOCACIÓN DE SOIL LINER COLOCACIÓN DE GEOMEMBRANA COLOCACIÓN DE PL

M3 M2 M2 M2

08-07-06 08-07-06 15-07-06 22-07-06 29-07-06

UBICACIÓN PAD - YANACOCHA 5 SEMANA 4

HOY

Last Planner System ® / Ing. Walter Meléndez Bernardo.

04/08/06

S D 03/08/06

V 02/08/06

01/08/06

31/07/06

30/07/06

29/07/06

28/07/06

27/07/06

V S D L M M J 26/07/06

L M M J 25/07/06

D

24/07/06

S

23/07/06

V

22/07/06

15/07/06

SEMANA 3

J

21/07/06

14/07/06

M M

20/07/06

L

19/07/06

D

18/07/06

S

16/07/06

V

13/07/06

SEMANA 2

J

12/07/06

10,000 20,000 15,000 20,000 10,000

M3

10/07/06

M3

DEL 08/07/2006 AL 04/08/06

M M 09/07/06

CANT.

L 08/07/06

UND

FECHA DE INICIO PLANEADA

11/07/06

SEMANA 1

DESCRIPCION DE ACTIVIDAD

17/07/06

CODIGO DE PROYECTO 1535 NOMBRE DE PROYECTO YANACOCHA 05

PROGRAMACIÓN: PROTECCIÓN DEL PLANEAMIENTO Esta todo listo para iniciar la actividad?

REGISTRO GESTION DE PROYECTOS

LOOKAHEAD AREA / DPTO PRODUCCIÓN CLIENTE MINERA YANACOCHA SRL

Horizonte semana anterior

AREA 1 EXCAVACIÓN DE TOP SOIL EXCAVACIÓN DE UNSUITABLE RELLENO CON MATERIAL GRANULAR COLOCACIÓN DE SOIL LINER COLOCACIÓN DE GEOMEMBRANA COLOCACIÓN DE PL

M3 M2 M2 M2

08-07-06 08-07-06 15-07-06 22-07-06 29-07-06

Pagina:

Pagina:

Horizonte semana actual

UBICACIÓN PAD - YANACOCHA 5

J

V

S

D

10/08/06

11/08/06

07/08/06

M M

06/08/06

05/08/06

04/08/06

L

09/08/06

SEMANA 5 S D 03/08/06

02/08/06

01/08/06

31/07/06

30/07/06

29/07/06

28/07/06

27/07/06

V

08/08/06

SEMANA 4

V S D L M M J 26/07/06

L M M J 25/07/06

D

24/07/06

S

23/07/06

V

22/07/06

15/07/06

SEMANA 3

J

21/07/06

14/07/06

M M

20/07/06

L

19/07/06

D

18/07/06

S

16/07/06

V

13/07/06

SEMANA 2

J

12/07/06

10,000 20,000 15,000 20,000 10,000

M3

10/07/06

M3

DEL 08/07/2006 AL 04/08/06

M M 09/07/06

CANT.

L 08/07/06

UND

FECHA DE INICIO PLANEADA

11/07/06

SEMANA 1

DESCRIPCION DE ACTIVIDAD

Revisión: Fecha:

NRO. REGISTRO

17/07/06

CODIGO DE PROYECTO 1535 NOMBRE DE PROYECTO YANACOCHA 05

Revisión: Fecha:

HOY

Inicio actividad nueva

Last Planner System ® / Ing. Walter Meléndez Bernardo.

PROGRAMACIÓN: PROTECCIÓN DEL PLANEAMIENTO Esta todo listo para iniciar la actividad?

REGISTRO REGISTRO GESTION DE PROYECTOS

GESTIÓN DE PROYECTOS LOOKAHEAD

ANALISIS DE RESTRICCIONES

AREA 1 AREA 1 EXCAVACIÓN DE TOP SOIL EXCAVACIÓN DE UNSUITABLE COLOCACIÓN DE PL RELLENO CON MATERIAL GRANULAR COLOCACIÓN DE SOIL LINER COLOCACIÓN DE GEOMEMBRANA COLOCACIÓN DE PL

M3 M3 M3 M2 M2 M2

10,000 20,000 15,000 20,000 10,000

08-07-06 08-07-06 05/08/2006 15-07-06 22-07-06 29-07-06

Fecha: Pagina:

J

V

S

D

09/08/06

10/08/06

11/08/06

07/08/06

06/08/06

M M

05/08/06

02/08/06

01/08/06

L

08/08/06

SEMANA 5 S D 04/08/06

V

FECHA DE LEVANTAMIENTO 31/07/06

23/07/06

22/07/06

21/07/06

20/07/06

19/07/06

18/07/06

17/07/06

16/07/06

DESCRIPCION DE LA RESTRICCION

V S D L M M J 30/07/06

L M M J

29/07/06

D

28/07/06

S

27/07/06

V

26/07/06

J

25/07/06

M M

Horizonte semana actual

24/07/06

L

15/07/06

D

14/07/06

13/07/06

S

12/07/06

11/07/06

DEL 15/07/06 AL 11/08/06

10/07/06

DEL 08/07/2006 AL 04/08/06

FECHA DE L M M J V FECHA INICIO INICIO PLANEADA PLANEADA 09/07/06

DESCRIPCION DE LA ACTIVIDAD UND CANT.

Pagina:

NRO. REGISTRO

08/07/06

DESCRIPCION DE ACTIVIDAD

Pagina:

AREA / DPTO NO. REGISTRO PRODUCCIÓN UBICACIÓN PAD - YANACOCHA 5 CLIENTE UBICACIÓN SEMANA 1 SEMANA 2 SEMANA 3 SEMANA 4 MINERA YANACOCHA SRL YANACOCHA 5

Horizonte semana anterior

YANACOCHA 05

Revisión: Revisión: Fecha:

03/08/06

AREA / DPTO CODIGO DE PROYECTO CODIGO PROYECTO / PROPUESTA PRODUCCIÓN 1535 CLIENTE NOMBRE 1535 DE PROYECTO YANACOCHA 05 NOMBRE PROYECTO / PROPUESTA MINERA YANACOCHA SRL

Revisión: Fecha:

RESP.

Falta de material en cantera, necesidad de incrementar 02 excavadoras mas.

03/08/2006

JEFE DE CANTERAS

Falta de Aprobación de Calidad del Material: Granulometría.

03/08/2006

JEFE DE CALIDAD

HOY

Inicio actividad nueva

Last Planner System ® / Ing. Walter Meléndez Bernardo.

PROGRAMACIÓN: PROTECCIÓN DEL PLANEAMIENTO Esta todo listo para iniciar la actividad?

REGISTRO GESTION DE PROYECTOS

LOOKAHEAD AREA / DPTO PRODUCCIÓN CLIENTE MINERA YANACOCHA SRL

Horizonte semana anterior

AREA 1 EXCAVACIÓN DE TOP SOIL EXCAVACIÓN DE UNSUITABLE RELLENO CON MATERIAL GRANULAR COLOCACIÓN DE SOIL LINER COLOCACIÓN DE GEOMEMBRANA COLOCACIÓN DE PL

Last

M3 M2

08-07-06 08-07-06 15-07-06 22-07-06 29-07-06

Pagina:

Pagina:

Horizonte semana actual

UBICACIÓN PAD - YANACOCHA 5

J

V

S

D

10/08/06

11/08/06

07/08/06

M M

06/08/06

05/08/06

04/08/06

L

09/08/06

SEMANA 5 S D 03/08/06

02/08/06

01/08/06

31/07/06

30/07/06

29/07/06

28/07/06

27/07/06

V

08/08/06

SEMANA 4

V S D L M M J 26/07/06

L M M J 25/07/06

D

24/07/06

S

23/07/06

V

22/07/06

15/07/06

SEMANA 3

J

21/07/06

14/07/06

M M

20/07/06

L

19/07/06

D

18/07/06

S

16/07/06

V

13/07/06

SEMANA 2

J

12/07/06

10,000 20,000 15,000 20,000 10,000

M3

10/07/06

M3

DEL 08/07/2006 AL 04/08/06

M M 09/07/06

CANT.

L 08/07/06

UND

FECHA DE INICIO PLANEADA

11/07/06

SEMANA 1

DESCRIPCION DE ACTIVIDAD

Revisión: Fecha:

NRO. REGISTRO

17/07/06

CODIGO DE PROYECTO 1535 NOMBRE DE PROYECTO YANACOCHA 05

Revisión: Fecha:

3 semanas para M2 HOY M2 eliminar restricciones Inicio actividad Altas probabilidades que la nueva actividad empiece en fecha Planner System ® / Ing. Walter Meléndez Bernardo. = PROTECCION

PROGRAMACIÓN = PROTECCIÓN DEL PLANEAMIENTO CRONOGRAMA GENERAL ACTIVIDAD Excavación Masiva Actividad 2 Actividad 3

UND

m3 m3 m3

CANT.

FECHA INICIO PLANEADA

MES 1

MES 2

MES 3

MES 4

100,000 50,000 3,000

Last Planner System ® / Ing. Walter Meléndez Bernardo.

MES 5

MES 6

PROGRAMACIÓN = PROTECCIÓN DEL PLANEAMIENTO CRONOGRAMA GENERAL ACTIVIDAD Excavación Masiva Actividad 2 Actividad 3

UND

FECHA INICIO PLANEADA

CANT.

m3 m3 m3

MES 1

MES 2

MES 3

MES 4

MES 5

MES 6

100,000 50,000 3,000

LOOKAHEAD

EXCAVACIÓN MASIVA EXCAVACIÓN MASIVA AREA 1 EXCAVACIÓN MASIVA AREA 2 EXCAVACIÓN MASIVA AREA 3 EXCAVACIÓN MASIVA AREA 4 EXCAVACIÓN MASIVA AREA 5

M3 M3 M3

18/07/06

19/07/06

20/07/06

21/07/06

D

L

M M

J

V

S

D

04/08/06

17/07/06

S

03/08/06

16/07/06

Last Planner System ® / Ing. Walter Meléndez Bernardo.

V

02/08/06

15/07/06

08-07-06 08-07-06 15-07-06 22-07-06 29-07-06

SEMANA 4

J

01/08/06

14/07/06

L M M

31/07/06

D

30/07/06

S

29/07/06

V

28/07/06

J

27/07/06

M

26/07/06

M

25/07/06

L

24/07/06

D

23/07/06

S

22/07/06

V

13/07/06

4,000 9,000 7,000 3,000 2,000

M3

J

12/07/06

25,000

M

11/07/06

M3 M3

DEL 08/07/2006 AL 04/08/06

SEMANA 3

M

10/07/06

CANT.

SEMANA 2

L

09/07/06

UND

FECHA DE INICIO PLANEADA

08/07/06

SEMANA 1

DESCRIPCION DE ACTIVIDAD

PROGRAMACIÓN = PROTECCIÓN DEL PLANEAMIENTO CRONOGRAMA GENERAL ACTIVIDAD Excavación Masiva Actividad 2 Actividad 3

UND

FECHA INICIO PLANEADA

CANT.

m3 m3 m3

MES 1

MES 2

MES 3

MES 4

MES 5

MES 6

100,000 50,000 3,000

LOOKAHEAD

EXCAVACIÓN MASIVA EXCAVACIÓN MASIVA AREA 1 EXCAVACIÓN MASIVA AREA 2 EXCAVACIÓN MASIVA AREA 3 EXCAVACIÓN MASIVA AREA 4 EXCAVACIÓN MASIVA AREA 5

M3 M3 M3

18/07/06

19/07/06

20/07/06

21/07/06

D

L

M M

J

V

S

D

04/08/06

17/07/06

S

03/08/06

16/07/06

V

02/08/06

15/07/06

SEMANA 4

J

01/08/06

14/07/06

L M M

31/07/06

D

30/07/06

S

29/07/06

V

28/07/06

J

27/07/06

M

26/07/06

M

25/07/06

L

24/07/06

D

23/07/06

S

22/07/06

V

13/07/06

4,000 9,000 7,000 3,000 2,000

M3

J

12/07/06

25,000

M

11/07/06

M3 M3

DEL 08/07/2006 AL 04/08/06

SEMANA 3

M

10/07/06

CANT.

SEMANA 2

L

09/07/06

UND

FECHA DE INICIO PLANEADA

08/07/06

SEMANA 1

DESCRIPCION DE ACTIVIDAD

08-07-06 08-07-06 15-07-06 22-07-06 29-07-06

EXCAVACIÓN MASIVA EXCAVACIÓN MASIVA AREA 1 EXCAVACIÓN MASIVA AREA 2

M3

2,000

08-07-06

M3

3,000

08-07-06

V

S

D

13/07/06

14/07/06

25,000

SEMANA 30 J

12/07/06

M3

DEL 08/07/2006 AL 04/08/06

FECHA DE INICIO PLANEADA

M'

11/07/06

CANTIDAD

M

10/07/06

UND

L

09/07/06

DESCRIPCION DE LA ACTIVIDAD

08/07/06

PLAN SEMANAL

Last Planner System ® / Ing. Walter Meléndez Bernardo.

ASEGURAR EL FLUJO

Last Planner System ® / Ing. Walter Meléndez Bernardo.

ASEGURAR EL FLUJO

Cronograma

REGISTRO GESTION DE PROYECTOS

Revisión: Fecha:

LOOKAHEAD AREA / DPTO PRODUCCIÓN CLIENTE MINERA YANACOCHA SRL

NRO. REGISTRO UBICACIÓN PAD - YANACOCHA 5

AREA 1 EXCAVACIÓN DE TOP SOIL EXCAVACIÓN DE UNSUITABLE RELLENO CON MATERIAL GRANULAR COLOCACIÓN DE SOIL LINER COLOCACIÓN DE GEOMEMBRANA COLOCACIÓN DE PL

M3 M2 M2

08-07-06 08-07-06 15-07-06 22-07-06 29-07-06

M2

Last Planner System ® / Ing. Walter Meléndez Bernardo.

SEMANA 4

04/08/06

S D 03/08/06

V 02/08/06

01/08/06

31/07/06

30/07/06

29/07/06

28/07/06

27/07/06

V S D L M M J 26/07/06

L M M J 25/07/06

D

24/07/06

S

23/07/06

V

22/07/06

15/07/06

SEMANA 3

J

21/07/06

14/07/06

M M

20/07/06

L

19/07/06

D

18/07/06

S

16/07/06

V

13/07/06

SEMANA 2

J

12/07/06

10,000 20,000 15,000 20,000 10,000

M3

10/07/06

M3

M M 09/07/06

CANT.

08/07/06

UND DEL 08/07/2006 AL 04/08/06

FECHA DE INICIO PLANEADA

L

11/07/06

SEMANA 1

DESCRIPCION DE ACTIVIDAD

17/07/06

CODIGO DE PROYECTO 1535 NOMBRE DE PROYECTO YANACOCHA 05

Pagina:

ASEGURAR EL FLUJO

Cronograma

REGISTRO GESTION DE PROYECTOS

Revisión: Fecha:

LOOKAHEAD AREA / DPTO PRODUCCIÓN CLIENTE MINERA YANACOCHA SRL

NRO. REGISTRO UBICACIÓN PAD - YANACOCHA 5

AREA 1 EXCAVACIÓN DE TOP SOIL EXCAVACIÓN DE UNSUITABLE RELLENO CON MATERIAL GRANULAR COLOCACIÓN DE SOIL LINER COLOCACIÓN DE GEOMEMBRANA COLOCACIÓN DE PL

M3 M3 M2 M2 M2

Last Planner System ® / Ing. Walter Meléndez Bernardo.

SEMANA 4 V 02/08/06

01/08/06

31/07/06

30/07/06

29/07/06

28/07/06

27/07/06

26/07/06

25/07/06

D L M M J V S D L M M J 24/07/06

S

23/07/06

V

22/07/06

15/07/06

08-07-06 08-07-06 15-07-06 22-07-06 29-07-06

J

21/07/06

14/07/06

M M

20/07/06

L

19/07/06

D

SEMANA 3

18/07/06

S

16/07/06

V

13/07/06

10,000 20,000 15,000 20,000 10,000

J

12/07/06

M3

DEL 08/07/2006 AL 04/08/06

M M 10/07/06

CANT.

L

09/07/06

UND

FECHA DE INICIO PLANEADA

08/07/06

DESCRIPCION DE ACTIVIDAD

SEMANA 2

11/07/06

SEMANA 1

17/07/06

CODIGO DE PROYECTO 1535 Ahead NOMBRE DE Look PROYECTO YANACOCHA 05

Pagina:

ASEGURAR EL FLUJO

Cronograma

REGISTRO GESTION DE PROYECTOS

Revisión: Fecha:

LOOKAHEAD AREA / DPTO PRODUCCIÓN CLIENTE MINERA YANACOCHA SRL

NRO. REGISTRO UBICACIÓN PAD - YANACOCHA 5

AREA 1 EXCAVACIÓN DE TOP SOIL EXCAVACIÓN DE UNSUITABLE RELLENO CON MATERIAL GRANULAR COLOCACIÓN DE SOIL LINER COLOCACIÓN DE GEOMEMBRANA COLOCACIÓN DE PL

M3 M3 M3 M2 M2 M2

Last Planner System ® / Ing. Walter Meléndez Bernardo.

SEMANA 4 V 02/08/06

01/08/06

31/07/06

30/07/06

29/07/06

28/07/06

27/07/06

26/07/06

D L M M J V S D L M M J 25/07/06

S

24/07/06

15/07/06

Áreas de Soporte Trabajando

V

23/07/06

14/07/06

!10,000 ! ! 08-07-06 ! ! 08-07-06 20,000 ! !15,000 15-07-06 22-07-06 !20,000 !!! 29-07-06 !10,000 ! ! !

J

22/07/06

13/07/06

M M

21/07/06

L

20/07/06

D

19/07/06

S

SEMANA 3

18/07/06

V

16/07/06

J

12/07/06

M M 10/07/06

L

09/07/06

DEL 08/07/2006 AL 04/08/06

FECHA DE UND CANT. INICIO PLANEADA Restricciones

08/07/06

DESCRIPCION DE ACTIVIDAD

SEMANA 2

11/07/06

SEMANA 1

17/07/06

CODIGO DE PROYECTO 1535 Ahead NOMBRE DE Look PROYECTO YANACOCHA 05

Pagina:

ASEGURAR EL FLUJO

Cronograma

REGISTRO GESTION DE PROYECTOS

Revisión: Fecha:

LOOKAHEAD AREA / DPTO PRODUCCIÓN CLIENTE MINERA YANACOCHA SRL

NRO. REGISTRO UBICACIÓN PAD - YANACOCHA 5

AREA 1 EXCAVACIÓN DE TOP SOIL EXCAVACIÓN DE UNSUITABLE RELLENO CON MATERIAL GRANULAR COLOCACIÓN DE SOIL LINER COLOCACIÓN DE GEOMEMBRANA COLOCACIÓN DE PL

M3 M3 M3 M2 M2 M2

Last Planner System ® / Ing. Walter Meléndez Bernardo.

SEMANA 4 V 02/08/06

01/08/06

31/07/06

30/07/06

29/07/06

28/07/06

27/07/06

26/07/06

D L M M J V S D L M M J 25/07/06

S

24/07/06

15/07/06

Áreas de Soporte Trabajando

V

23/07/06

14/07/06

!10,000 ! ! 08-07-06 ! ! 08-07-06 20,000 ! !15,000 15-07-06 22-07-06 !20,000 !!! 29-07-06 !10,000 ! ! !

J

22/07/06

13/07/06

M M

21/07/06

L

20/07/06

D

19/07/06

S

SEMANA 3

18/07/06

V

16/07/06

J

12/07/06

M M 10/07/06

L

09/07/06

DEL 08/07/2006 AL 04/08/06

FECHA DE UND CANT. INICIO PLANEADA Restricciones

08/07/06

DESCRIPCION DE ACTIVIDAD

SEMANA 2

11/07/06

SEMANA 1

17/07/06

CODIGO DE PROYECTO 1535 Ahead NOMBRE DE Look PROYECTO YANACOCHA 05

Pagina:

ASEGURAR EL FLUJO

REGISTRO GESTION DE PROYECTOS

Revisión: REGISTRO Fecha: REGISTRO REGISTRO REGISTRO GESTION DE PROYECTOS Pagina: GESTION DE PROYECTOS

LOOKAHEAD

M3 M3 M2 M2 M2

AREA 11 EXCAVACIÓN DETOP TOPSOIL SOIL !10,000 ! ! 08-07-06 AREA EXCAVACIÓN DE EXCAVACIÓN DETOP TOPSOIL SOIL EXCAVACIÓN DE EXCAVACIÓN DE UNSUITABLE DE UNSUITABLE ! ! 08-07-06 EXCAVACIÓN 20,000 EXCAVACIÓN DE UNSUITABLE RELLENO CON CON MATERIAL GRANULAR DE UNSUITABLE RELLENO MATERIAL GRANULAR !15,000 ! 15-07-06 EXCAVACIÓN RELLENO CON MATERIAL GRANULAR COLOCACIÓN DESOIL SOILLINER LINER RELLENO CON DE MATERIAL GRANULAR COLOCACIÓN COLOCACIÓNDE SOILLINER LINER 22-07-06 COLOCACIÓN DESOIL GEOMEMBRANA !20,000 !!! COLOCACIÓN DE GEOMEMBRANA DE PL COLOCACIÓN GEOMEMBRANA COLOCACIÓN DE GEOMEMBRANA 29-07-06 COLOCACIÓN DE PL !10,000 ! ! COLOCACIÓNDE DEPLPL COLOCACIÓN !

Áreas de Soporte Trabajando

Recursos

Last Planner System ® / Ing. Walter Meléndez Bernardo.

M2 M2

Recursos

02/08/06

11/07/06 13/07/06 12/07/06 11/07/06

10/07/06 11/07/06 12/07/06 10/07/06 01/08/06

AREA AREA 11 EXCAVACIÓN DETOP TOPSOIL SOIL 08-07-06 10,000 EXCAVACIÓN M3M3 DE 08-07-06 10,000 M3 10,000 08-07-06 10,000 M3 08-07-06 EXCAVACIÓN M3 DE UNSUITABLE 08-07-06 20,000 EXCAVACIÓN M3 DE UNSUITABLE 08-07-06 20,000 M3 08-07-06 20,000 RELLENO CON MATERIAL 15-07-06 GRANULAR M3 08-07-06 15,000 RELLENO M3M3 20,000 CON MATERIAL 15-07-06 GRANULAR 15,000 M3 15-07-06 15,000 COLOCACIÓN DESOIL SOIL LINER 22-07-06 20,000 M3 15-07-06 COLOCACIÓN M2M2 15,000 DE 22-07-06 LINER 20,000 M2 20,000 22-07-06 20,000 COLOCACIÓN M2 DE GEOMEMBRANA 29-07-06 10,000 M2 22-07-06 COLOCACIÓN M2 29-07-06 10,000DE GEOMEMBRANA COLOCACIÓN M2 DE PL M2 29-07-06 10,000 M2 29-07-06 10,000 COLOCACIÓN M2 DE PL

09/07/06 10/07/06 11/07/06 09/07/06 31/07/06

08/07/06 09/07/06 08/07/06 10/07/06 30/07/06

08/07/06 09/07/06 29/07/06

Plan Semanal

27/07/06

26/07/06

25/07/06

23/07/06

22/07/06

21/07/06

20/07/06

19/07/06

DEL 08/07/2006 08/07/2006 AL04/08/06 04/08/06 DEL DEL 08/07/2006AL AL 04/08/06 DEL 08/07/2006 AL 04/08/06

AREA AREA 11

M3

18/07/06

17/07/06

16/07/06

15/07/06

Back log

14/07/06

13/07/06

12/07/06

11/07/06

Restricciones

1 LSEMANA DESCRIPCIONDE DE ACTIVIDAD L M M MJM JVJ V FECHA M DESCRIPCION ACTIVIDAD FECHA DEL M FECHA DEDE L M M J V S D FECHAINICIO DE UND CANT. UND UND UND UND CANT. CANT. INICIO INICIO UND DEL CANT. INICIO PLANEADA 08/07/2006 AL04/08/06 04/08/06 PLANEADA PLANEADA DEL 08/07/2006 AL PLANEADA 08/07/06 28/07/06

AREA 1 EXCAVACIÓN DE TOP SOIL EXCAVACIÓN DE UNSUITABLE RELLENO CON MATERIAL GRANULAR COLOCACIÓN DE SOIL LINER COLOCACIÓN DE GEOMEMBRANA COLOCACIÓN DE PL

CANT.

10/07/06

UND

NRO. REGISTRO LOOKAHEAD LOOKAHEAD LOOKAHEAD LOOKAHEAD AREA / DPTO AREA DPTO CODIGO DE PROYECTO UBICACIÓN AREA // DPTO CODIGO DE PROYECTO AREA / DPTO PRODUCCIÓN PRODUCCIÓN 1535 PRODUCCIÓN 1535 PAD - YANACOCHA 5 PRODUCCIÓN CLIENTE

AREA AREA PRO PRODU CLIENTE CLIE NOMBRE DE PROYECTO PROYECTO CLIENTE CLIEN NOMBRE DE SEMANA 2YANACOCHA SEMANA 3 SRL SEMANA 4 CLIENTE MINERA YANACOCHA 05 MIN MINERA YANACOCHA SRL YANACOCHA MINERA YANACOCHA 05 SRL MINER M M J VMINERA S D YANACOCHA L M M J SRL V S D L M SEMANA M SEMANA J 1V SEMANA

NOMBRE DE PROYECTO PROYECTO NOMBRE DE SEMANA NOMBRE DE PROYECTO 051 YANACOCHA YANACOCHA 05 L M M J 05V S D L FECHA DE YANACOCHA DESCRIPCION DE ACTIVIDAD DESCRIPCIONDE DEACTIVIDAD ACTIVIDAD INICIO DESCRIPCION DESCRIPCION DE ACTIVIDAD PLANEADA 09/07/06

DESCRIPCION DE ACTIVIDAD DEL 08/07/2006 AL 04/08/06

GESTION PROYECTOS GESTION DEDE PROYECTOS

AREA / DPTO PRODUCCIÓN CODIGO DE PROYECTO PROYECTO CODIGO DE CLIENTE CODIGO DE PROYECTO CODIGO DE PROYECTO 1535 1535 MINERA YANACOCHA SRL 1535 1535

08/07/06

CODIGO DE PROYECTO 1535 Ahead NOMBRE DE Look PROYECTO YANACOCHA 05

24/07/06

Cronograma

M3M3 M3M3 M3M3 M2M2 M2M2 M2M2

ASEGURAR EL FLUJO

REGISTRO GESTION DE PROYECTOS

Revisión: REGISTRO Fecha: REGISTRO REGISTRO REGISTRO GESTION DE PROYECTOS Pagina: GESTION DE PROYECTOS

LOOKAHEAD

M3 M3 M2 M2 M2

AREA 11 EXCAVACIÓN DETOP TOPSOIL SOIL !10,000 ! ! 08-07-06 AREA EXCAVACIÓN DE EXCAVACIÓN DETOP TOPSOIL SOIL EXCAVACIÓN DE EXCAVACIÓN DE UNSUITABLE DE UNSUITABLE ! ! 08-07-06 EXCAVACIÓN 20,000 EXCAVACIÓN DE UNSUITABLE RELLENO CON CON MATERIAL GRANULAR DE UNSUITABLE RELLENO MATERIAL GRANULAR !15,000 ! 15-07-06 EXCAVACIÓN RELLENO CON MATERIAL GRANULAR COLOCACIÓN DESOIL SOILLINER LINER RELLENO CON DE MATERIAL GRANULAR COLOCACIÓN COLOCACIÓNDE SOILLINER LINER 22-07-06 COLOCACIÓN DESOIL GEOMEMBRANA !20,000 !!! COLOCACIÓN DE GEOMEMBRANA DE PL COLOCACIÓN GEOMEMBRANA COLOCACIÓN DE GEOMEMBRANA 29-07-06 COLOCACIÓN DE PL !10,000 ! ! COLOCACIÓNDE DEPLPL COLOCACIÓN !

Áreas de Soporte Trabajando

Recursos

Asegurar el Flujo Last Planner System ® / Ing. Walter Meléndez Bernardo.

M2 M2

Recursos

02/08/06

11/07/06 13/07/06 12/07/06 11/07/06

10/07/06 11/07/06 12/07/06 10/07/06 01/08/06

AREA AREA 11 EXCAVACIÓN DETOP TOPSOIL SOIL 08-07-06 10,000 EXCAVACIÓN M3M3 DE 08-07-06 10,000 M3 10,000 08-07-06 10,000 M3 08-07-06 EXCAVACIÓN M3 DE UNSUITABLE 08-07-06 20,000 EXCAVACIÓN M3 DE UNSUITABLE 08-07-06 20,000 M3 08-07-06 20,000 RELLENO CON MATERIAL 15-07-06 GRANULAR M3 08-07-06 15,000 RELLENO M3M3 20,000 CON MATERIAL 15-07-06 GRANULAR 15,000 M3 15-07-06 15,000 COLOCACIÓN DESOIL SOIL LINER 22-07-06 20,000 M3 15-07-06 COLOCACIÓN M2M2 15,000 DE 22-07-06 LINER 20,000 M2 20,000 22-07-06 20,000 COLOCACIÓN M2 DE GEOMEMBRANA 29-07-06 10,000 M2 22-07-06 COLOCACIÓN M2 29-07-06 10,000DE GEOMEMBRANA COLOCACIÓN M2 DE PL M2 29-07-06 10,000 M2 29-07-06 10,000 COLOCACIÓN M2 DE PL

09/07/06 10/07/06 11/07/06 09/07/06 31/07/06

08/07/06 09/07/06 08/07/06 10/07/06 30/07/06

08/07/06 09/07/06 29/07/06

Plan Semanal

27/07/06

26/07/06

25/07/06

23/07/06

22/07/06

21/07/06

20/07/06

19/07/06

DEL 08/07/2006 08/07/2006 AL04/08/06 04/08/06 DEL DEL 08/07/2006AL AL 04/08/06 DEL 08/07/2006 AL 04/08/06

AREA AREA 11

M3

18/07/06

17/07/06

16/07/06

15/07/06

Back log

14/07/06

13/07/06

12/07/06

11/07/06

Restricciones

1 LSEMANA DESCRIPCIONDE DE ACTIVIDAD L M M MJM JVJ V FECHA M DESCRIPCION ACTIVIDAD FECHA DEL M FECHA DEDE L M M J V S D FECHAINICIO DE UND CANT. UND UND UND UND CANT. CANT. INICIO INICIO UND DEL CANT. INICIO PLANEADA 08/07/2006 AL04/08/06 04/08/06 PLANEADA PLANEADA DEL 08/07/2006 AL PLANEADA 08/07/06 28/07/06

AREA 1 EXCAVACIÓN DE TOP SOIL EXCAVACIÓN DE UNSUITABLE RELLENO CON MATERIAL GRANULAR COLOCACIÓN DE SOIL LINER COLOCACIÓN DE GEOMEMBRANA COLOCACIÓN DE PL

CANT.

10/07/06

UND

NRO. REGISTRO LOOKAHEAD LOOKAHEAD LOOKAHEAD LOOKAHEAD AREA / DPTO AREA DPTO CODIGO DE PROYECTO UBICACIÓN AREA // DPTO CODIGO DE PROYECTO AREA / DPTO PRODUCCIÓN PRODUCCIÓN 1535 PRODUCCIÓN 1535 PAD - YANACOCHA 5 PRODUCCIÓN CLIENTE

AREA AREA PRO PRODU CLIENTE CLIE NOMBRE DE PROYECTO PROYECTO CLIENTE CLIEN NOMBRE DE SEMANA 2YANACOCHA SEMANA 3 SRL SEMANA 4 CLIENTE MINERA YANACOCHA 05 MIN MINERA YANACOCHA SRL YANACOCHA MINERA YANACOCHA 05 SRL MINER M M J VMINERA S D YANACOCHA L M M J SRL V S D L M SEMANA M SEMANA J 1V SEMANA

NOMBRE DE PROYECTO PROYECTO NOMBRE DE SEMANA NOMBRE DE PROYECTO 051 YANACOCHA YANACOCHA 05 L M M J 05V S D L FECHA DE YANACOCHA DESCRIPCION DE ACTIVIDAD DESCRIPCIONDE DEACTIVIDAD ACTIVIDAD INICIO DESCRIPCION DESCRIPCION DE ACTIVIDAD PLANEADA 09/07/06

DESCRIPCION DE ACTIVIDAD DEL 08/07/2006 AL 04/08/06

GESTION PROYECTOS GESTION DEDE PROYECTOS

AREA / DPTO PRODUCCIÓN CODIGO DE PROYECTO PROYECTO CODIGO DE CLIENTE CODIGO DE PROYECTO CODIGO DE PROYECTO 1535 1535 MINERA YANACOCHA SRL 1535 1535

08/07/06

CODIGO DE PROYECTO 1535 Ahead NOMBRE DE Look PROYECTO YANACOCHA 05

24/07/06

Cronograma

M3M3 M3M3 M3M3 M2M2 M2M2 M2M2

APRENDIZAJE – MEJORA CONTINUA DISTRIBUCION DE GAS PARA LIMA Y CALLAO

FRENTE NORTE Plan Semanal del

Descripción

3 al M 3

9 de

J 4

V 5

Diciembre

S 6

D 7

L 8

M 9

Troncal de 20"

Metrado

EVALUACION

PROGRAMADO

EJECUTADO

49+600 @ 52+000

CUMPLIMIENTO

CUMPLIMIENTO

CAUSAS DE

CIVIL

MECANICO SI NO

INCUMPLIMIENTO

SI

Excavación Transporte y Disposición del Material de Excavaciòn Desfile de Tuberías Alineamiento Soldadura (1 junta cada 12 mts) Mantas Termocontraibles (1 junta cada 12 mts) Bajada de Varillon 1er Relleno con arena fina 40 cm (hasta Triducto) Colocar Triducto (2 filas de triducto por metro) Proteccion Catodica (cada 1,000 mts) 2do Relleno con material reciclado (30 cm) 3er Relleno con material reciclado (30 cm) Reposición (Terreno natural/Afirmado/Pavimento/Veredas)

60 60 60

36 3 2 60 60 60

36 3 3 60 60 60

12 1 1 30 30 30

3 3 60 60 60

60 60 60

60 60 60

60 60 60

30 30 30

60 60 60

EN ML EQUIVALENTES

149

52+000 @ 55+930 Excavación Transporte y Disposición del Material de Excavaciòn Desfile de Tuberías Alineamiento Soldadura (1 junta cada 12 mts) Mantas Termocontraibles (1 junta cada 12 mts) Bajada de Varillon 1er Relleno con arena fina 40 cm (hasta Triducto) Colocar Triducto (2 filas de triducto por metro) Proteccion Catodica (cada 1,000 mts) 2do Relleno con material reciclado (30 cm) 3er Relleno con material reciclado (30 cm) Reposición (Terreno natural/Afirmado/Pavimento/Veredas)

84 10 9 270 270 270 270 270 270

40 40

40 40

40 40

40 40

48 4 4 60 60 60

48 4 4 60 60 60

48 4 4 60 60 60

12 1 1 30 30 30

24 4 4 47 40 40

60 60 60

60 60 60

60 60 60

30 30 30

40 40 40

x x x x x x x x

235

PROGRAMADO

40 40

84 10 9 207 520 520 580 580 645

NO

200 200 180 17 17 257 250 250 250 250 250

EJECUTADO

213 213 120 182 17 14 257 251 338 338 388 333

x x

x x x x x

Last Planner System ® / Ing. Walter Meléndez Bernardo.

x x x x

x

CAMPO

REHABILITACIÓN Y/O MEJORAMIENTO DE LA CARRETERA IMPERIAL IZCUCHACA

APRENDIZAJE – MEJORA CONTINUA OBRA 1439

PORCENTAJE DE PLAN COMPLETADO - ANALISIS DE CAUSAS DE INCUMPLIMIENTO

Semana

FECHA

Inicio

Fin

PPC Semanal PPC Acumulado TAREAS TAREAS PORCENTAJE DE PROGRAMADAS REALIZADAS PLAN COMPLETADO Semanal Acumulado Semanal Acumulado Semanal Acumulado

22-Mar-04 28-Mar-04 13 34.5% 34.5% 29-Mar-04 4-Abr-04 14 62.7% 52.5% 5-Abr-04 11-Abr-04 15 74.5% 60.6% 12-Abr-04 18-Abr-04 16 76.9% 65.4% 19-Abr-04 25-Abr-04 17 71.2% 66.8% 26-Abr-04 2-May-04 18 81.1% 68.7% 3-May-04 9-May-04 19 60.5% 67.7% 10-May-04 16-May-04 20 62.8% 66.8% 17-May-04 23-May-04 21 83.9% 69.1% 24-May-04 30-May-04 22 68.4% 69.0% 31-May-04 6-Jun-04 23 60.4% 67.7% 7-Jun-04 13-Jun-04 24 74.5% 68.6% 14-Jun-04 20-Jun-04 25 64.6% 68.2% 21-Jun-04 27-Jun-04 26 68.2% DISTRIBUCION DE GAS PARA LIMA Y CALLAO 28-Jun-04 4-Jul-04 27 68.2% 5-Jul-04 11-Jul-04 28 68.2% FRENTE NORTE 12-Jul-04 18-Jul-04 29 68.2% 19-Jul-04 25-Jul-04 Plan Semanal del 3 al 30 68.2% 26-Jul-04 1-Ago-04 31 68.2% 2-Ago-04 8-Ago-04 32 68.2% 9-Ago-04 15-Ago-04 33 M 68.2%J 16-Ago-04 22-Ago-04 34 68.2% Descripción 3 68.2%4 23-Ago-04 29-Ago-04 35 30-Ago-04 5-Sep-04 36 68.2% 6-Sep-04 12-Sep-04 37 68.2% 13-Sep-04 19-Sep-04 38 68.2% 49+600 @ 52+000 20-Sep-04 26-Sep-04 39 68.2% 27-Sep-04 3-Oct-04 40 68.2% Excavación 4-Oct-04 10-Oct-04 41 68.2% Transporte y Disposición del Material 11-Oct-04 17-Oct-04 42 de Excavaciòn 68.2% 18-Oct-04 24-Oct-04 43 68.2% Desfile de Tuberías 25-Oct-04 31-Oct-04 44 68.2% Alineamiento 1-Nov-04 7-Nov-04 45 68.2% 36 8-Nov-04 14-Nov-04 68.2% 3 Soldadura (1 junta cada 12 mts) 46

Troncal de 20"

Mantas Termocontraibles (1 junta cada 12 mts) Bajada de Varillon PORCENTAJE 1er Relleno con arena fina 40 cm (hasta Triducto) Colocar Triducto (2 filas de triducto100% por metro) Proteccion Catodica (cada 1,000 mts) 90% 2do Relleno con material reciclado (30 cm) 76.92% 74.47% 80% 71.19% 3er Relleno con material reciclado (30 cm) 70% Reposición (Terreno natural/Afirmado/Pavimento/Veredas) 62.75%

2 60 60

60 60

60 60 60

60 60 67.7% 60

81.07%

PPC

60.6%

50%

Excavación 52.5% 40% Transporte y Disposición del Material de Excavaciòn 34.48% 30% Desfile de Tuberías 34.5% Alineamiento 20% Soldadura (1 junta cada 12 mts) 10% Mantas Termocontraibles (1 junta cada 12 mts) 0% Bajada de Varillon 13 14 15 16 17 1er Relleno con arena fina 40 cm (hasta Triducto) Colocar Triducto (2 filas de triducto por metro) Proteccion Catodica (cada 1,000 mts) 2do Relleno con material reciclado (30 cm) Cambios de ingeniería 3er Relleno con material reciclado INGO (30 cm) proyecto GyM Reposición (Terreno natural/Afirmado/Pavimento/Veredas) Logística, llegada tardía

29 80 127 179 238 275 313 391 453 567 663 757 822 822 822 822 822 de 822 822 822 822 S 822 6 822 822 822 822 822 822 822 822 822 822 82212 822 1

3

10 10 32 42 35 77 40 117 42 159 30 189 23 212 49 261 52 313 78 391 58 449 70 519 42 561 0 561 0 561 0 561 0 561 Diciembre 0 561 0 561 0 561 0 561 D L 0 561 70 8 561 0 561 0 561 0 561 0 561 0 561 0 561 0 561 0 561 0 561 0 561 0 561

1

60 60 60 30 DE PLAN COMPLETADO

EN60% ML EQUIVALENTES 66.8% 65.4% 52+000 @ 55+930

29 51 47 52 59 37 38 78 62 114 96 94 65 0 0 0 0 0 9 0 0 0V 0 05 0 0 0 0 0 0 0 0 0 0 36 0 3

60 60

83.87%

60 60 60

69.1% 60.53%

68.7% 40

62.82%

30 30 30 30 30

74.47%

68.42% 67.7% 60.42%

68.2%

CAUSAS DE INCUMPLIMIENTO ACUMULADO

LOG 3%

EQU 6%

CLI 6% INGS 4%

M 9

MetradoINGO EVALUACION 12% PROGRAMADO

84 10 9 270 270 270 270 270 270

3 3 60 60 60 60 60 60

149

64,62%

PROGRAMADO

40 40

40 40

40 40

38% CUMPLIMIENTO

CAUSAS DE

CIVIL

MECANICO SI NO

INCUMPLIMIENTO

QAQC 4% EJECUTADO

NO

84 10 9 207 CAUSAS DE INCUMPLIMIENTO x 520SEMANAL x 520 REND x 580 48% x 580 x 645

de

REND Malos rendimientos en producción - campo

x

235

40 40

REPRO

x x x

EJECUTADO

CLI 0%

213 213 120 182 17 14 257 251 338 338 388 333

x x

PROG 17%

x x x x

x x x x x

Falta de equipos requeridos o averías

Last Planner System ® / Ing. Walter Meléndez Bernardo. incumplimiento LOG pedidos, proveedores.

PROG

CUMPLIMIENTO

SI

200 200 48 48 48 12 24 180 PPC Semanal PPC Acumulado 4 4 4 1 4 17 4 4 4 1 4 17 60 60 60 30 47 257 18 19 20 21 22 23 24 25 60Semanas 60 60 30 40 250 60 60 60 30 40 250 CAUSAS DE INCUMPLIMIENTO 60 60 60 30 40 250 del Cambios o indefiniciones de ingeniería por 60 INGS60Supervisión 60 30 40CLI Eventos clímaticos 250 60 60 60 30 40 250 de 40

REND 27%

Actividades no programadas y necesidad de ejecutarlas

EQU

QAQC Control de calidad

CAMPO

37 38 39 40 41 42 43 44 45 46

6-Sep-04

12-Sep-04

13-Sep-04

19-Sep-04

20-Sep-04

26-Sep-04

27-Sep-04

3-Oct-04

4-Oct-04

10-Oct-04

QAQC

68.2% 0 822 0 561 4% 68.2% 0 822 0 561 68.2% 0 822 0 561 68.2% 0 822 0 561 68.2% REHABILITACIÓN 0 822 0 561 Y/O MEJORAMIENTO DE LA CARRETERA IMPERIAL IZCUCHACA 68.2% 0 822 0 561 1439 OBRA PORCENTAJE DE PLAN COMPLETADO - ANALISIS DE CAUSAS DE INCUMPLIMIENTO 68.2% 0 822 0 561 68.2% 0 822 0 561 PPC Semanal PPC Acumulado 68.2%PORCENTAJE 0 DE 822 0 TAREAS TAREAS561 PROGRAMADAS PLAN COMPLETADO 68.2% 0 822 0 REALIZADAS 561

APRENDIZAJE – MEJORA CONTINUA 11-Oct-04

17-Oct-04

18-Oct-04

24-Oct-04

25-Oct-04

31-Oct-04

1-Nov-04 8-Nov-04

7-Nov-04

Semana 14-Nov-04

FECHA

Inicio

Fin

Semanal Acumulado Semanal Acumulado Semanal Acumulado

22-Mar-04 28-Mar-04 13 34.5% 34.5% 29 29 10 10 29-Mar-04 4-Abr-04 14 62.7% 52.5% 51 80 32 42 5-Abr-04 11-Abr-04 15 74.5% 60.6% 47 127 35 77 12-Abr-04 18-Abr-04 16 76.9% 65.4% 52 179 40 117 19-Abr-04 25-Abr-04 17 71.2% 66.8% 59 238 42 159 26-Abr-04 2-May-04 18 81.1% 68.7% 37 275 30 189 100% 3-May-04 9-May-04 19 60.5% 67.7% 38 313 23 212 10-May-04 16-May-04 20 62.8% 66.8% 78 391 49 261 17-May-04 23-May-04 21 83.9% 83.87% 69.1% 62 453 52 313 90% 24-May-04 30-May-04 22 68.4% 69.0% 114 567 78 391 81.07% 31-May-04 6-Jun-04 23 60.4% 67.7% 96 663 58 449 76.92% 74.47% 7-Jun-04 13-Jun-04 24 74.5% 68.6% 94 757 519 74.47% 70 80% 14-Jun-04 20-Jun-04 25 71.19% 64.6% 68.2% 65 822 42 561 68.42% 21-Jun-04 27-Jun-04 26 68.2% 0 822 0 68.2%561 67.7% 67.7% DISTRIBUCION DE GAS PARA LIMA Y CALLAO 70% 28-Jun-04 4-Jul-04 27 68.2% 0 822 0 561 62.75% 5-Jul-04 11-Jul-04 28 68.2% 0 822 0 561 FRENTE NORTE 69.1% 12-Jul-04 18-Jul-04 29 68.2% 0 822 0 561 66.8% 60.42% 60% 64,62% 65.4% 19-Jul-04 25-Jul-04 Plan Semanal del 3 al 9 de Diciembre 30 0 822 0 561 62.82%68.2% 60.6% 31 26-Jul-04 1-Ago-04 68.2% 0 822 0 561 60.53% 2-Ago-04 8-Ago-04 32 68.2% 0 822 0 561 50% 9-Ago-04 15-Ago-04 33 0V 822 0 561 M 68.2%J S D L 16-Ago-04 68.7% 22-Ago-04 34 68.2% 0 822 0 561 52.5% Descripción 3 4 5 6 7 8 23-Ago-04 29-Ago-04 40% 35 68.2% 0 822 0 561 30-Ago-04 5-Sep-04 36 68.2% 0 822 0 561 34.48% 6-Sep-04 12-Sep-04 37 68.2% 0 822 0 561 30% 13-Sep-04 19-Sep-04 38 68.2% 0 822 0 561 34.5% 49+600 @ 52+000 20-Sep-04 26-Sep-04 39 68.2% 0 822 0 561 27-Sep-04 3-Oct-04 40 68.2% 0 822 0 561 20% Excavación 4-Oct-04 10-Oct-04 41 68.2% 0 822 0 561 PPC Semanal PPC Acumulado Transporte y Disposición del Material 11-Oct-04 17-Oct-04 42 de Excavaciòn 68.2% 0 822 0 561 18-Oct-04 24-Oct-04 43 68.2% 0 822 0 561 10% de Tuberías Desfile 25-Oct-04 31-Oct-04 44 68.2% 0 822 0 561 Alineamiento 1-Nov-04 7-Nov-04 45 68.2% 36 0 36 82212 0 561 0% 8-Nov-04 14-Nov-04 68.2% 3 0 3 822 1 0 561 Soldadura (1 junta cada 12 mts) 46

CAUSAS DE INCUMPLIMIENTO CAUSAS DE INCUMPLIMIENTO ACUMULADO

PPC

PORCENTAJE DE PLAN COMPLETADO

SEMANAL

LOG 3%

REND 27%

REND 48%

EQU 6%

CLI 6% INGS 4%

M 9

MetradoINGO EVALUACION 12%

Troncal de 20"

PROGRAMADO

38% CUMPLIMIENTO

CAUSAS PROG DE

CIVIL

MECANICO SI NO

17% INCUMPLIMIENTO

QAQC 4% EJECUTADO

SI

3 3 60 60 60

14 15(1 junta 16cada 12 17mts) 18 19 20 21 2 22 3 23 1 24 25 Mantas 13 Termocontraibles Semanas Bajada de Varillon 60 60 60 30 PORCENTAJE DE PLAN COMPLETADO 1er Relleno con arena fina 40 cm (hasta Triducto) 60 60 60 30 Colocar Triducto (2 filas de triducto100% por metro) 60 60 60 30 Proteccion Catodica (cada 1,000 mts) 83.87% 90% 81.07% 2do Relleno con material reciclado (30 cm) 60 60 60 30 60 76.92% 74.47% Cambios de ingeniería del Cambios o indefiniciones de ingeniería por 74.47% 80% 71.19% INGO INGS 3er Relleno con material reciclado (30 cm) 60 60 60 68.42% 30 60 proyecto GyM Supervisión 68.2% 67.7% 67.7% 70% Reposición (Terreno natural/Afirmado/Pavimento/Veredas) 60 60 60 30 60

PROG

CUMPLIMIENTO

NO

- CLI 0% 84 84 10 10 9 9 270 CAUSAS 207 DE INCUMPLIMIENTO x 270 520SEMANAL x 270 520 REND x 270 580 48% CLI Eventos x 270 clímaticos 580 x 270 645

x x x

x

CAMPO

EQU

Falta de equipos requeridos o averías

CAUSAS DE INCUMPLIMIENTO

PPC

62.75% Logística, llegada tardía de 69.1% EN60% ML EQUIVALENTES 66.8% 60.42% 65.4% 62.82% incumplimiento de 60.6%REND Malos60.53% rendimientos en producción64,62% - campo LOG pedidos, 52+000 @ 55+930 50% proveedores. 68.7% Excavación 40 40 40 40 52.5% 40% Transporte y Disposición del Material de Excavaciòn 40 40 40 40 34.48%

30%

Desfile de Tuberías 34.5% Alineamiento 20% Soldadura (1 junta cada 12 mts) 10% Mantas Termocontraibles (1 junta cada 12 mts) 0% Bajada de Varillon 13 14 15 16 17 1er Relleno con arena fina 40 cm (hasta Triducto) Colocar Triducto (2 filas de triducto por metro) Proteccion Catodica (cada 1,000 mts) 2do Relleno con material reciclado (30 cm) Cambios de ingeniería 3er Relleno con material reciclado INGO (30 cm) proyecto GyM Reposición (Terreno natural/Afirmado/Pavimento/Veredas) Logística, llegada tardía

149Actividades235 no programadas y necesidad de

REPRO

ejecutarlas PROGRAMADO EJECUTADO

40 40

200 200 48 48 48 12 24 180 PPC Semanal PPC Acumulado 4 4 4 1 4 17 4 4 4 1 4 17 60 60 60 30 47 257 18 19 20 21 22 23 24 25 60Semanas 60 60 30 40 250 60 60 60 30 40 250 CAUSAS DE INCUMPLIMIENTO 60 60 60 30 40 250 del Cambios o indefiniciones de ingeniería por 60 INGS60Supervisión 60 30 40CLI Eventos clímaticos 250 60 60 60 30 40 250 de

CLI 0%

213 213 120 182 17 14 257 251 338 338 388 333

x x

PROG 17%

x x x x

x x x x x

Falta de equipos requeridos o averías

Last Planner System ® / Ing. Walter Meléndez Bernardo. incumplimiento LOG pedidos, proveedores.

de

REND Malos rendimientos en producción - campo

REPRO

Actividades no programadas y necesidad de ejecutarlas

QAQC Control de calidad

EQU

QAQC Control de calidad

PORCENTAJE DE PLAN COMPLETADO - ANALISIS DE CAUSAS DE INCUMPLIMIENTO

6-Sep-04 12-Sep-04 37 13-Sep-04 19-Sep-04 38 20-Sep-04 26-Sep-04 39 27-Sep-04 3-Oct-04 40 TAREAS TAREAS 4-Oct-04 10-Oct-04 41 11-Oct-04 17-Oct-04 PROGRAMADAS 42 REALIZADAS 18-Oct-04 24-Oct-04 43 emanal Acumulado44 Semanal 25-Oct-04Acumulado 31-Oct-04 1-Nov-04 7-Nov-04 45 Semana 8-Nov-04 14-Nov-04 46

APRENDIZAJE – MEJORA CONTINUA FECHA

29 10 10 Inicio Fin Semanal Acumulado Semanal Acumulado Semanal Acumulado 80 32 42 13 22-Mar-04 28-Mar-04 34.5% 34.5% 29 29 10 10 CAUSAS DE INCUMPLIMIENTO 29-Mar-04 4-Abr-04 62.7% 52.5% 51 80 32 42 CAUSAS DE INCUMPLIMIENTO 127 35 77 14 5-Abr-04 11-Abr-04 15 74.5% 60.6% 47 127 35 77 CAUSAS DE INCUMPLIMIENTO PORCENTAJE DE18-Abr-04 PLAN COMPLETADO ACUMULADO ACUMULADO 12-Abr-04 16 76.9% 65.4% 52 179 40 117 179 40 117 17 19-Abr-04 25-Abr-04 71.2% 66.8% 59 238 42 159 SEMANAL 26-Abr-04 2-May-04 81.1% 68.7% 37 275 30 189 238 159 18 100% 42 3-May-04 9-May-04 19 60.5% 67.7% 38 313 23 212 10-May-04 16-May-04 62.8% 66.8% 78 391 49 261 275 30 189 20 LOG REND 17-May-04 23-May-04 21 83.9% 83.87% 69.1% 62 453 52 313 3% 27% 90% 24-May-04 30-May-04 22 68.4% 69.0% 114 567 78 391 313 23 212 2376.92%31-May-0481.07% REND 6-Jun-04 60.4% 67.7% 96 663 58 449 74.47% 7-Jun-04 13-Jun-04 74.5% 68.6% 94 757 519 48% EQU 391 261 24 71.19% 74.47% 70 80% 49 LOG 14-Jun-04 20-Jun-04 REND 25 64.6% 68.2% 65 822 42 561 6% 68.42% 21-Jun-04 27-Jun-04 68.2% 0 822 0 68.2%561 67.7% 453 52 313 26 67.7% 3% 27% DISTRIBUCION DE GAS PARA LIMA Y28-Jun-04 CALLAO 70% 4-Jul-04 27 68.2% 0 822 0 561 62.75% 5-Jul-04 11-Jul-04 68.2% 0 822 0 561 567FRENTE 78 391 28 NORTE 69.1% 12-Jul-04 29 68.2% 0 822 0 561 CLI 66.8% 18-Jul-04 60.42% 60% 58 64,62% 663 449 30Plan 65.4%19-Jul-04 25-Jul-04del Semanal 368.2% al Diciembre 6% INGS 0 9 de 822 0 561 62.82% 4% 60.6% 31 26-Jul-04 1-Ago-04 68.2% 0 822 0 561 60.53% 757 519 32 2-Ago-04 8-Ago-04 68.2% 822 0 561 EQU 0 50% 70 9-Ago-04 15-Ago-04 33 0V 822 0 561 M 68.2%J S D L M PROG 822 4252.5% 561 34 16-Ago-04 68.7% 22-Ago-04 68.2%6% 0 822 0 561 38% CUMPLIMIENTO CUMPLIMIENTO Descripción 3 68.2%4 6 70 8 9 MetradoINGO EVALUACION CAUSAS 23-Ago-04 29-Ago-04 40% 35 05 822 561 PROG DE 12% 822 034.48% 561 36 30-Ago-04 5-Sep-04 68.2% 0 822 0 561 17% QAQC INCUMPLIMIENTO CIVIL MECANICO 6-Sep-04 12-Sep-04 68.2% 0 822 0 561 4% 20" PROGRAMADO EJECUTADO 822Troncal 034.5% 561 37 30% de 13-Sep-04 19-Sep-04 38 68.2% 0 822 0 561 20-Sep-04 26-Sep-04 68.2% 0 822 0 561 SI NO SI NO 82249+600 @ 52+000 0 561 39 27-Sep-04 3-Oct-04 40 68.2% 0 822 0 561 CLI 20% Excavación 4-Oct-04 10-Oct-04 41 68.2% 0 822 0 561 0% 822 Transporte0y Disposición del561 CLI Acumulado PPC Semanal PPC Material 11-Oct-04 17-Oct-04 42 de Excavaciòn 68.2% 0 822 0 561 18-Oct-04 24-Oct-04 68.2% 0 822 0 561 10% de 0 6% INGS 822 Desfile 561 43 Tuberías 25-Oct-04 31-Oct-04 44 68.2% 0 822 0 561 x 36 0 36 82212 84 84 1-Nov-04 7-Nov-04 4% 68.2% 0 561 822 Alineamiento 0 561 45 0% 8-Nov-04 14-Nov-04 68.2% 3 0 3 822 1 0 561 x Soldadura (1 junta cada 12 mts) 46 3 10 10 822 Mantas 13 0 14 15(1561 16cada 12 17mts) 18 19 20 21 2 22 3 23 1 24 25 x Termocontraibles junta 3 9 9 Semanas 822 Bajada de 0 561 x CAMPO Varillon 60 60 60 30 60 270 CAUSAS 207 DE INCUMPLIMIENTO PORCENTAJE DE PLAN COMPLETADO PROG x 40 cm (hasta Triducto) 60 60 60 30 60 270 520SEMANAL 822 1er Relleno0con arena fina 561 INGO 38% x Triducto (2 filas de triducto100% 60 60 60 30 60 270 520 822 Colocar 0 561 por metro) 12% Proteccion Catodica (cada 1,000 mts) 83.87%CAUSAS DE INCUMPLIMIENTO 90% 81.07% 822 2do Relleno0con material reciclado 561 (30 cm) 74.47% REND x 60 60 60 30 60 270 580 76.92% Cambios de ingeniería del Cambios o indefiniciones QAQC de ingeniería por Falta de equipos requeridos 48% 74.47% 80% 71.19% INGS CLI Eventos EQU x Relleno0con material reciclado (30 cm) 60 60 60 68.42% 30 60 270 clímaticos 580 822 3erINGO 561 proyecto GyM Supervisión averías 67.7% 67.7% 4% 68.2% 70% x Reposición (Terreno natural/Afirmado/Pavimento/Veredas) 60 60 60 30 60 270 645 822 0 561 62.75% Logística, llegada tardía de 69.1% EN60% ML EQUIVALENTES 149Actividades235 66.8% 60.42% no programadas y necesidad de 65.4% 62.82% incumplimiento de 60.6%REND Malos60.53% rendimientos en producción64,62% - campo LOG pedidos, REPRO QAQC Control de calidad 82252+000 0 561 ejecutarlas @ 55+930 PROGRAMADO EJECUTADO 50% proveedores. 822 Excavación0 561 68.7% x 40 40 40 40 40 200 213 52.5% 40% PROG x Material de Excavaciòn 40 40 40 40 40 200 213 822 Transporte0y Disposición del561 17% 34.48% 30% de Tuberías 120 34.5% 822 Desfile 0 561 CLI x Alineamiento 48 48 48 12 24 180 182 20% 0% PPC Semanal PPC Acumulado 822 Soldadura 0(1 junta cada 12561 x mts) 4 4 4 1 4 17 17 10% x (1561 junta cada 12 mts) 4 4 4 1 4 17 14 822 Mantas Termocontraibles 0 0% x Varillon 60 60 60 30 47 257 257 822 Bajada de 0 561 13 14 15 16 17 18 19 20 21 22 23 24 25 x 1er Relleno con arena fina 40 cm (hasta Triducto) 60Semanas 60 60 30 40 250 251 822 Colocar Triducto 0 (2 filas de 561 x triducto por metro) 60 60 60 30 40 250 338 PPC

PPC

29 51 47 52 59 37 38 78 62 114 96 94 65 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

QAQC

68.2% 0 822 0 561 4% 68.2% 0 822 0 561 68.2% 0 822 0 561 68.2% 0 822 0 561 68.2% REHABILITACIÓN 0 822 0 561 Y/O MEJORAMIENTO DE LA CARRETERA IMPERIAL IZCUCHACA 68.2% 0 822 0 561 1439 OBRA PORCENTAJE DE PLAN COMPLETADO - ANALISIS DE CAUSAS DE INCUMPLIMIENTO 68.2% 0 822 0 561 68.2% 0 822 0 561 PPC Semanal PPC Acumulado 68.2%PORCENTAJE 0 DE 822 0 TAREAS TAREAS561 PROGRAMADAS PLAN COMPLETADO 68.2% 0 822 0 REALIZADAS 561

Proteccion Catodica (cada 1,000 mts) 2do Relleno con material reciclado (30 cm) Cambios de ingeniería 3er Relleno con material reciclado INGO (30 cm) proyecto GyM Reposición (Terreno natural/Afirmado/Pavimento/Veredas) Logística, llegada tardía

Last COMPLETADO

-

60 del 60 de60

60 60 Cambios o INGS 60Supervisión 60 60 60

CAUSAS DE INCUMPLIMIENTO 30 40 250

indefiniciones de ingeniería por

338 388 333

x x x

Falta de equipos requeridos o averías

CAUSAS DE INCUMPLIMIENTO Planner System ® / Ing. Walter Meléndez Bernardo. incumplimiento LOG pedidos, proveedores.

de

30 30

REND Malos rendimientos en producción - campo

40CLI 40

REPRO

Eventos clímaticos 250

250

Actividades no programadas y necesidad de ejecutarlas

SEMANAL

EQU

QAQC Control de calidad

o

PROBLEMA: FALTA DE VOLQUETES Obra:

LOTE 10 - OBRAS SECUNDARIAS DE AGUA POTABLE Y ALCANTARILLADO PARA EL DISTRITO DE PUENTE PIEDRA - LA ENSENADA SEDAPAL Entidad : Contratista: G Y M S.A. Supervisor: Consorcio Nippon Koei - OIST

RELACION DE PEDIDOS (AGREGADOS) FECHA

22/03/07 22/03/07 22/03/07 22/03/07 23/03/07 23/03/07 23/03/07 23/03/07 23/03/07 23/03/07 24/03/07 26/03/07 26/03/07 27/03/07 27/03/07 27/03/07 27/03/07 28/03/07 28/03/07 28/03/07 28/03/07 28/03/07 28/03/07 28/03/07 28/03/07

DESCRIPCION

Confitillo Arena Fina Material Selecto (Hormigon) Material Selecto (Hormigon) Arena Fina Eliminacion de material desmonte Arena para cama Eliminacion de material desmonte Confitillo Eliminacion de material desmonte Confitillo Suministro de Agua Suministro de Agua Suministro de Agua Confitillo Material Selecto (Hormigon) Suministro de Agua Suministro de Agua Suministro de Agua Suministro de Agua Material Selecto (Hormigon) Confitillo Eliminacion de material desmonte Suministro de Agua Suministro de Agua

Placa

# guia remisión

M2

M3

XO-2443 XO-7354 XO-7354 WGA-497 XO-2443 XO-2443 XO-7354 YP-7710 WGA-497 WGA-497 WGA-497 WI-9412 WI-9412 XU-3169 XO-2443 WGA-497 WG-1219 XU-3169 WP-6139 WP-6139 YP-7710 YP-7710 WGA-497 WI-9412 WI-9412

001-005904 001-005928 001-005929 001-005963 001-005919 001-005920 001-005932 001-005952 001-005960 001-005961 001-005964 003-000226 003-000227 000001 001-005922 001-005965 003-000228 000002 000003 000005 001-005953 001-005954 001-005962 003-000229 003-000230

-

16.00 15.00 15.00 17.00 16.00 16.00 15.00 16.50 17.00 17.00 17.00 11.00 11.00 15.00 16.00 17.00 12.00 15.00 15.00 15.00 16.50 16.50 17.00 11.00 11.00

Last Planner System ® / Ing. Walter Meléndez Bernardo.

CUADRILLA PARTIDA

11 11 11 11 31 11 31 11 11 31 31 31 11 11 B3 B3 31 21 31 31 B3 B3 B3 31 31

0640 0640 0640 0640 0640 0640 0640 0640 0640 0640 0640 0120 0120 0120 0645 0645 0120 0120 0120 0120 0645 0645 0645 0120 0120

PROVEEDOR

Yawar Yawar Yawar Yawar Yawar Yawar Yawar Yawar Yawar Yawar Yawar Guadalupe Guadalupe Salazar Yawar Yawar Guadalupe Salazar Salazar Salazar Yawar Yawar Yawar Guadalupe Guadalupe

APRENDIZAJE TENDENCIA DEL CONSUMO DIARIO DE AGREGADOS 35 30 25

Arena para cama

20

Eliminacion de material desmonte

15

Material Selecto (Hormigon)

10

FECHA

Last Planner System ® / Ing. Walter Meléndez Bernardo.

06/05/07

04/05/07

02/05/07

30/04/07

28/04/07

26/04/07

24/04/07

22/04/07

20/04/07

18/04/07

16/04/07

14/04/07

12/04/07

10/04/07

08/04/07

06/04/07

04/04/07

02/04/07

31/03/07

Total general 29/03/07

0

27/03/07

Transporte Interno(Eliminación desmonte) 25/03/07

5 23/03/07

NÚMERO DE VIAJES

40

APRENDIZAJE SEMANA

1 1 1 1 1 1 2 2 2 2 2 3

3

Actividades Incumplidas en la Semana

Nivel 1

Nivel 2

1

CLI PRI

CLI PRI

1

CLI PRI

CLI PRI

1

ACT PRE

CLI PRI

Remediación

2

CLI PRI

CLI PRI

Remediación Tanques de 10 MB y 15MB Huayuri Mantenimiento de Tanques y Vessels Mantenimiento de Tanques y Vessels Mantenimiento de Tanques y Vessels Mantenimiento de Tanques y Vessels Tanque de 15MB Capahuari Sur

2

EXT

EXT

1

CLI MAT

CLI MAT

EXT

EXT

ACT PRE

EXT

CLI MAT

CLI MAT

CLI PRI

CLI PRI

CLI PRI

CLI PRI

Manteminiento de Carreteras

1

EXT

EXT

Mantenimiento de Tanques y Vessels

1

ACT PRE

EXT

FRENTE DE TRABAJO

Manteminiento de Carreteras Mantenimiento de Tanques y Vessels Mantenimiento de Tanques y Vessels

1 2 1 1 1

Nivel 3

Principales Causas de Incumplimiento Semanal

Cambio de frente por parte de PP Cambio de frente por parte de PP Cambio de frente por parte de PP Cambio de frente por parte de PP Lluvias PP no entregó recurso para Lluvias extraordinarias Lluvias extraordinarias PP no entregó recurso para Cambio de frente por parte de PP Cambio de frente por parte de PP Lluvias extraordinarias Lluvias extraordinarias

PP solicitó el cambio de frente de Huayuri-T Dorissa (Bacheo) a Jibarito No se retiró el crudo del tanque 603 debido a que el Vacuum truck de PP no estuvo disponible

No se cumplió con el monitoreo y muestreo programado en El Carmen, se desvió recursos a la auditoria de Walsh Peru Lluvias extraordinarias en San Jacinto PP no proporcionó punto de agua para la Prueba hidrostática Tanque 603 Terreno saturado impidió ingreso de vacuum truck No se extrajo el crudo / no se ejecutó cierre de manhole Tanque 2704 PP no dispone de los ánodos necesarios para cerrar el tanque Vessel 2733 Se priorizó el arenado y pintado de tuberías No se cumplió con los trabajos en la línea de 8 Sist CI. Cambio de frente a la Línea de Dorissa Por terreno saturado no se ejecutaron los trabajos en San Jacinto 1A No se terminó el arreglo del acceso del tanque para ingreso del vacuum truck, por lo que no se pudo retirar de crudo de interior de tanque

Last Planner System ® / Ing. Walter Meléndez Bernardo.

APRENDIZAJE

TABLA 00: Incidencia de Tipos de Causas de Incumplimiento Nivel 2 y Nivel 3 Incidencia por tipo de CI Nivel 3 en CI Nivel 2 Horizonte: Últimas 14 semanas Frentes: 15

Nivel 2 CLI ING

Total CLI ING CLI MAT Total CLI MAT CLI PER Total CLI PER CLI PRI Total CLI PRI EQ Total EQ EXT Total EXT LOG Total LOG PROG

Total PROG Total General

Nivel 3 Cambios en ingeniería por parte de PP Planos de ingeniería incompletos por parte de PP Indefiniciones técnicas por parte de PP PP no entregó recurso para construcción Falta de cupo - Restricción PP Cambio de frente por parte de PP Falla en equipos de GyM Falta de equipo en el frente de trabajo - GyM Lluvias extraordinarias Demora en entrega de recursos por parte de Logística GyM Error de Programación Priorización de otros trabajos por parte de GyM Falta de equipo/material/personal por programación GyM Falta de aprobación de documentacion

Actividades % Incumplidas Incidencia 80% 12 13% 2 7% 1 8.2% 15 100% 27 14.8% 27 100% 10 5% 10 100% 36 19.8% 36 60% 3 40% 2 2.7% 5 100% 25 13.7% 25 100% 1 0.5% 1 48% 30 27% 17 17% 11 8% 5 34.6% 63 182

Last Planner System ® / Ing. Walter Meléndez Bernardo.

RECOMENDACIONES AL PROCESO •  LOOKAHEAD –  Debe parHr del Cronograma –  Debe ser hecho por (o al menos con) los ejecutores –  Detallar a un nivel ágil pero que permita luego idenHficar restricciones

•  ANALISIS DE RESTRICCIONES –  SE DEBE HACER FORMALMENTE –  Se deben asignar siempre responsables para el levantamiento de cada restricción –  Hacer seguimiento –  Debe tomarse acción concreta sobre las restricciones idenHficadas Last Planner System ® / Ing. Walter Meléndez Bernardo.

RECOMENDACIONES AL PROCESO •  PLAN SEMANAL –  Debe contener tareas que sean ejecutables –  Debe hacerse siempre. No basta duplicar la 1a semana del Lookahead –  Deben incluirse acHvidades colchón –  Debe describir tareas mesurables

•  ANALISIS DE CONFIABILIDAD –  Siempre analizar las causas de incumplimiento –  Interpretar el resultado del PPC (¿qué nos dice?) –  Tomar acciones sobre las causas idenHficadas –  Hacer seguimiento al resultado de dichas acciones Last Planner System ® / Ing. Walter Meléndez Bernardo.

PROBLEMAS EN LA PRACTICA ACTUAL •  No se actualiza el Cronograma General •  El lookahead no parte de lo que se debería hacer. •  El ejecutor no parHcipa en la elaboración de la programación y no la siente suya (Divorcio Campo OT) •  No se hace el Análisis de Restricciones y por lo mismo no se protege el Plan •  El compromiso del Plan Semanal es impuesto •  No se hace seguimiento a las causas de incumplimiento (no hay acciones correcHvas) •  En algunas obras, los pedidos de materiales quedan en Herra de nadie •  EN GENERAL, HEMOS DETECTADO PROBLEMAS PARA LLEVAR A LA PRACTICA EL SISTEMA Last Planner System ® / Ing. Walter Meléndez Bernardo.

RETOS PARA IMPLEMENTACIÓN

Last Planner System ® / Ing. Walter Meléndez Bernardo.

RETOS PARA IMPLEMENTACIÓN FRENTE/DISCIPLINA 01

ANALISIS DE RESTRICCIONES DEL 27 AGO AL 16 SET ACTIVIDAD ITEM

DISCIPLINA

AREA

1,01 1.01.01 1.01.02 1,01 1.01.01 1.01.02 1.01.03 1.01.04 1,02 1.02.05 1.02.06 1.02.07 1.02.07.08 1.02.07.09 1.02.07.10 1,03 1.03.03 1,04 1.04.01 1.04.03 1,05

CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL

300 300 300 300 300 300 300 300 310 310 310 310 310 310 310 340 340 360 360 360 370

CIVIL

370

1.05.01

LINEA AREA 200 - PLATAFORMA FLARE PLATAFORMA - VOLUMENES PLATAFORMA - SECCIONES AREA 300 CANALETAS ARREGLO GENERAL CAMARAS DE DRENAJE ARREGLO GENERAL CAMARAS DRENAJE Y DETALLES DE TAPAS Y GRATINGS FUNDACIONES PARA EQUIPOS DE ILUMINACION AREA 310 - SLUG CATCHER & INLET FACILITIES SOPORTE DE TUBERIAS - DETALLES (37 Bases) SOPORTE DE TUBERIAS - DETALLES (7 Bases) SOPORTE DE TUBERIAS - DETALLES (27 Bases) Colocación de Insertos Metálicos Vaciado de Concreto en Pedestales Rellenos en General AREA 340 - ESTABILIZADORES PAVIMENTOS DE ESTABILIZACION RECINTOS AREA 360 - CRYOGENICA PAVIMENTO CRIOGENICA ARREGLO GENERAL PAVIMENTO CRIOGENICA RECINTOS AREA 370 - TURBOCOMPRESORES PAVIMENTO COMPRESORES ARREGLO GENERAL

EQUIPO ISOMET SPOOLS FECHA DE INCIO S RICO

DESCRIPCION DE LA RESTRICCIÓN

FECHA REQUERIDA EN OBRA

Area con Resticciones para Acceso Area con Resticciones para Acceso

01.09.07 01.09.07

Falta plano: PPAG-300-PL-B-220, 221, 222, 223 Falta plano: PPAG-300-PL-B-224, 225 Falta plano: PPAG-300-PL-B-226, 227 Falta Detalle de Fijación de Poste

01.09.07 01.09.07 01.09.07 01.09.07

Area con Interferencia con Obras de Serpetbol Area con Interferencia con Obras de Serpetbol

01.09.07 01.09.07

Falta que lleguen Insertos Metálicos Falta que lleguen Insertos Metálicos Falta que lleguen Insertos Metálicos

27.08.07 27.08.07 27.08.07

Falta plano: PPAG-340-PL-B-202

01.09.07

Falta plano: PPAG-360-PL-B-210, 211, 212, 213 Falta plano: PPAG-360-PL-B-214

01.09.07 01.09.07

Falta plano: PPAG-370-PL-B-200, 201, 202

01.09.07

Last Planner System ® / Ing. Walter Meléndez Bernardo.

RETOS PARA IMPLEMENTACIÓN ANALISIS DE RESTRICCIONES DEL 27 AGO AL 16 SET ACTIVIDAD

FRENTE/DISCIPLINA 01

ITEM

DISCIPLINA

AREA

1,01 1.01.01 1.01.02 1,01 1.01.01 1.01.02 1.01.03 1.01.04 1,02 1.02.05 1.02.06 1.02.07 1.02.07.08 1.02.07.09 1.02.07.10 1,03 1.03.03 1,04 1.04.01 1.04.03 1,05

CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL

300 300 300 300 300 300 300 300 310 310 310 310 310 310 310 340 340 360 360 360 370

1.05.01

CIVIL

370

LINEA

EQUIPO ISOMET SPOOLS FECHA DE INCIO S RICO

AREA 200 - PLATAFORMA FLARE PLATAFORMA - VOLUMENES PLATAFORMA - SECCIONES AREA 300 CANALETAS ARREGLO GENERAL CAMARAS DE DRENAJE ARREGLO GENERAL CAMARAS DRENAJE Y DETALLES DE TAPAS Y GRATINGS FUNDACIONES PARA EQUIPOS DE ILUMINACION AREA 310 - SLUG CATCHER & INLET FACILITIES SOPORTE DE TUBERIAS - DETALLES (37 Bases) SOPORTE DE TUBERIAS - DETALLES (7 Bases) SOPORTE DE TUBERIAS - DETALLES (27 Bases) Colocación de Insertos Metálicos Vaciado de Concreto en Pedestales Rellenos en General AREA 340 - ESTABILIZADORES PAVIMENTOS DE ESTABILIZACION RECINTOS AREA 360 - CRYOGENICA PAVIMENTO CRIOGENICA ARREGLO GENERAL PAVIMENTO CRIOGENICA RECINTOS AREA 370 - TURBOCOMPRESORES PAVIMENTO COMPRESORES ARREGLO GENERAL

DESCRIPCION DE LA RESTRICCIÓN

FECHA REQUERIDA EN OBRA

Area con Resticciones para Acceso Area con Resticciones para Acceso

01.09.07 01.09.07

Falta plano: PPAG-300-PL-B-220, 221, 222, 223 Falta plano: PPAG-300-PL-B-224, 225 Falta plano: PPAG-300-PL-B-226, 227 Falta Detalle de Fijación de Poste

01.09.07 01.09.07 01.09.07 01.09.07

Area con Interferencia con Obras de Serpetbol Area con Interferencia con Obras de Serpetbol

01.09.07 01.09.07

Falta que lleguen Insertos Metálicos Falta que lleguen Insertos Metálicos Falta que lleguen Insertos Metálicos

27.08.07 27.08.07 27.08.07

Falta plano: PPAG-340-PL-B-202

01.09.07

Falta plano: PPAG-360-PL-B-210, 211, 212, 213 Falta plano: PPAG-360-PL-B-214

01.09.07 01.09.07

Falta plano: PPAG-370-PL-B-200, 201, 202

01.09.07

PLAN SEMANAL Y PPC DEL 20-AGO AL 26-AGO ACTIVIDAD ITEM

DISCIPLINA

AREA

1,01 1.01.06 1.01.06.01 1.01.06.02 1.01.06.03 1,02 1.02.01 1.02.01.01 1.02.01.02 1.02.01.03 1.02.01.04 1.02.01.05 1.02.07 1.02.07.01 1.02.07.02 1.02.07.03 1.02.07.08 1.02.07.09 1.02.07.10 1,03 1.03.04 1.03.05 1.03.05.01 1.03.05.02 1.03.05.03 1.03.05.04 1.03.05.05 1.03.05.06

CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL

300 300 300 300 300 310 310 310 310 310 310 310 310 310 310 310 310 310 310 340 340 340 340 340 340 340 340 340

LINEA AREA 300 CIMENTACION DE TORRE No. 11 DE DESCARGA ELECTRICA Colocación de Pernos de Anclaje Vaciado de Concreto en Pedestales Rellenos en General AREA 310 - SLUG CATCHER & INLET FACILITIES RECINTOS STAQ 12020/30, 22O30 - DETALLES Trazo y Replanteo Excavaciones hasta el Fondo de Excavación Colocación de Solados Colocación de Acero de Refuerzo Vaciado de Concreto en Piso de Caja SOPORTE DE TUBERIAS - DETALLES (27 Bases) Trazo y Replanteo Excavaciones hasta el Fondo de Excavación Colocación de Solados Colocación de Insertos Metálicos Vaciado de Concreto en Pedestales Rellenos en General AREA 340 - ESTABILIZADORES SOPORTE DE TUBERIAS OVERHEADCOMPRESSORS Cimentaciones para Tinglados (12 Bases) Colocación de Encofrado en Zapatas Vaciado de Concreto en Zapatas Colocación de Encofrado en Pedestales Colocación de Pernos de Anclaje Vaciado de Concreto en Pedestales Rellenos en General

EQUIPO ISOMETRI S CO

SPOOLS

L 20

M 21

X

X X

X

X

X

X X

X X

Last Planner System ® / Ing. Walter Meléndez Bernardo.

SEMANA 34 ago-07 M J 22 23

V 24

X X X

X

X X

X X

X X X

X X

X

X X

X

X X

X X X

X

S 25

X X

X X

X X X X X X X X

X X

X X

D 26

RETOS PARA IMPLEMENTACIÓN PLAN SEMANAL Y PPC DEL 20-AGO AL 26-AGO

ANALISIS DE RESTRICCIONES DEL 27 AGO AL 16 SET

ACTIVIDAD

ACTIVIDAD

FRENTE/DISCIPLINA 01

ITEM

DISCIPLINA

AREA

1,01 1.01.01 1.01.02 1,01 1.01.01 1.01.02 1.01.03 1.01.04 1,02 1.02.05 1.02.06 1.02.07 1.02.07.08 1.02.07.09 1.02.07.10 1,03 1.03.03 1,04 1.04.01 1.04.03 1,05

CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL

300 300 300 300 300 300 300 300 310 310 310 310 310 310 310 340 340 360 360 360 370

CIVIL

370

1.05.01

EQUIPO ISOMET SPOOLS FECHA DE INCIO S RICO

LINEA AREA 200 - PLATAFORMA FLARE PLATAFORMA - VOLUMENES PLATAFORMA - SECCIONES AREA 300 CANALETAS ARREGLO GENERAL CAMARAS DE DRENAJE ARREGLO GENERAL CAMARAS DRENAJE Y DETALLES DE TAPAS Y GRATINGS FUNDACIONES PARA EQUIPOS DE ILUMINACION AREA 310 - SLUG CATCHER & INLET FACILITIES SOPORTE DE TUBERIAS - DETALLES (37 Bases) SOPORTE DE TUBERIAS - DETALLES (7 Bases) SOPORTE DE TUBERIAS - DETALLES (27 Bases) Colocación de Insertos Metálicos Vaciado de Concreto en Pedestales Rellenos en General AREA 340 - ESTABILIZADORES PAVIMENTOS DE ESTABILIZACION RECINTOS AREA 360 - CRYOGENICA PAVIMENTO CRIOGENICA ARREGLO GENERAL PAVIMENTO CRIOGENICA RECINTOS AREA 370 - TURBOCOMPRESORES PAVIMENTO COMPRESORES ARREGLO GENERAL

DESCRIPCION DE LA RESTRICCIÓN

FECHA REQUERIDA EN OBRA

Area con Resticciones para Acceso Area con Resticciones para Acceso

01.09.07 01.09.07

Falta plano: PPAG-300-PL-B-220, 221, 222, 223 Falta plano: PPAG-300-PL-B-224, 225 Falta plano: PPAG-300-PL-B-226, 227 Falta Detalle de Fijación de Poste

01.09.07 01.09.07 01.09.07 01.09.07

Area con Interferencia con Obras de Serpetbol Area con Interferencia con Obras de Serpetbol

01.09.07 01.09.07

Falta que lleguen Insertos Metálicos Falta que lleguen Insertos Metálicos Falta que lleguen Insertos Metálicos

27.08.07 27.08.07 27.08.07

Falta plano: PPAG-340-PL-B-202

01.09.07

Falta plano: PPAG-360-PL-B-210, 211, 212, 213 Falta plano: PPAG-360-PL-B-214

01.09.07 01.09.07

Falta plano: PPAG-370-PL-B-200, 201, 202

01.09.07

ITEM

DISCIPLINA

AREA

1,01 1.01.06 1.01.06.01 1.01.06.02 1.01.06.03 1,02 1.02.01 1.02.01.01 1.02.01.02 1.02.01.03 1.02.01.04 1.02.01.05 1.02.07 1.02.07.01 1.02.07.02 1.02.07.03 1.02.07.08 1.02.07.09 1.02.07.10 1,03 1.03.04 1.03.05 1.03.05.01 1.03.05.02 1.03.05.03 1.03.05.04 1.03.05.05 1.03.05.06

CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL

300 300 300 300 300 310 310 310 310 310 310 310 310 310 310 310 310 310 310 340 340 340 340 340 340 340 340 340

LINEA AREA 300 CIMENTACION DE TORRE No. 11 DE DESCARGA ELECTRICA Colocación de Pernos de Anclaje Vaciado de Concreto en Pedestales Rellenos en General AREA 310 - SLUG CATCHER & INLET FACILITIES RECINTOS STAQ 12020/30, 22O30 - DETALLES Trazo y Replanteo Excavaciones hasta el Fondo de Excavación Colocación de Solados Colocación de Acero de Refuerzo Vaciado de Concreto en Piso de Caja SOPORTE DE TUBERIAS - DETALLES (27 Bases) Trazo y Replanteo Excavaciones hasta el Fondo de Excavación Colocación de Solados Colocación de Insertos Metálicos Vaciado de Concreto en Pedestales Rellenos en General AREA 340 - ESTABILIZADORES SOPORTE DE TUBERIAS OVERHEADCOMPRESSORS Cimentaciones para Tinglados (12 Bases) Colocación de Encofrado en Zapatas Vaciado de Concreto en Zapatas Colocación de Encofrado en Pedestales Colocación de Pernos de Anclaje Vaciado de Concreto en Pedestales Rellenos en General

EQUIPO ISOMETRI S CO

SPOOLS

L 20

M 21

M 22

SEMANA 34 ago-07 J 23

V 24

X

X X

X X X

X X

X

X

X X

X

X X

X

X X

X X X

X X

X

X X

X X

X

Estadísticas de Causas de Incum plim iento

EXT 7%

ING 45%

LOG CLI-PRI EJEC 3% 1%1%

ACT-PRE 27%

PROG 16%

C L I-P R I P R OG LOG

EJ EC A C T -P R E

X X

X

X X X

S 25

IN G EXT

Last Planner System ® / Ing. Walter Meléndez Bernardo.

X X

X X X X X X X X

X X

X X

D 26

RETOS PARA IMPLEMENTACIÓN PLAN SEMANAL Y PPC DEL 20-AGO AL 26-AGO

ANALISIS DE RESTRICCIONES DEL 27 AGO AL 16 SET

ACTIVIDAD

ACTIVIDAD

FRENTE/DISCIPLINA 01

ITEM

DISCIPLINA

AREA

1,01 1.01.01 1.01.02 1,01 1.01.01 1.01.02 1.01.03 1.01.04 1,02 1.02.05 1.02.06 1.02.07 1.02.07.08 1.02.07.09 1.02.07.10 1,03 1.03.03 1,04 1.04.01 1.04.03 1,05

CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL

300 300 300 300 300 300 300 300 310 310 310 310 310 310 310 340 340 360 360 360 370

CIVIL

370

1.05.01

LINEA AREA 200 - PLATAFORMA FLARE PLATAFORMA - VOLUMENES PLATAFORMA - SECCIONES AREA 300 CANALETAS ARREGLO GENERAL CAMARAS DE DRENAJE ARREGLO GENERAL CAMARAS DRENAJE Y DETALLES DE TAPAS Y GRATINGS FUNDACIONES PARA EQUIPOS DE ILUMINACION AREA 310 - SLUG CATCHER & INLET FACILITIES SOPORTE DE TUBERIAS - DETALLES (37 Bases) SOPORTE DE TUBERIAS - DETALLES (7 Bases) SOPORTE DE TUBERIAS - DETALLES (27 Bases) Colocación de Insertos Metálicos Vaciado de Concreto en Pedestales Rellenos en General AREA 340 - ESTABILIZADORES PAVIMENTOS DE ESTABILIZACION RECINTOS AREA 360 - CRYOGENICA PAVIMENTO CRIOGENICA ARREGLO GENERAL PAVIMENTO CRIOGENICA RECINTOS AREA 370 - TURBOCOMPRESORES PAVIMENTO COMPRESORES ARREGLO GENERAL

EQUIPO ISOMET SPOOLS FECHA DE INCIO S RICO

DESCRIPCION DE LA RESTRICCIÓN

FECHA REQUERIDA EN OBRA

Area con Resticciones para Acceso Area con Resticciones para Acceso

01.09.07 01.09.07

Falta plano: PPAG-300-PL-B-220, 221, 222, 223 Falta plano: PPAG-300-PL-B-224, 225 Falta plano: PPAG-300-PL-B-226, 227 Falta Detalle de Fijación de Poste

01.09.07 01.09.07 01.09.07 01.09.07

Area con Interferencia con Obras de Serpetbol Area con Interferencia con Obras de Serpetbol

01.09.07 01.09.07

Falta que lleguen Insertos Metálicos Falta que lleguen Insertos Metálicos Falta que lleguen Insertos Metálicos

27.08.07 27.08.07 27.08.07

Falta plano: PPAG-340-PL-B-202

01.09.07

Falta plano: PPAG-360-PL-B-210, 211, 212, 213 Falta plano: PPAG-360-PL-B-214

01.09.07 01.09.07

Falta plano: PPAG-370-PL-B-200, 201, 202

01.09.07

ITEM

DISCIPLINA

AREA

1,01 1.01.06 1.01.06.01 1.01.06.02 1.01.06.03 1,02 1.02.01 1.02.01.01 1.02.01.02 1.02.01.03 1.02.01.04 1.02.01.05 1.02.07 1.02.07.01 1.02.07.02 1.02.07.03 1.02.07.08 1.02.07.09 1.02.07.10 1,03 1.03.04 1.03.05 1.03.05.01 1.03.05.02 1.03.05.03 1.03.05.04 1.03.05.05 1.03.05.06

CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL

300 300 300 300 300 310 310 310 310 310 310 310 310 310 310 310 310 310 310 340 340 340 340 340 340 340 340 340

LINEA AREA 300 CIMENTACION DE TORRE No. 11 DE DESCARGA ELECTRICA Colocación de Pernos de Anclaje Vaciado de Concreto en Pedestales Rellenos en General AREA 310 - SLUG CATCHER & INLET FACILITIES RECINTOS STAQ 12020/30, 22O30 - DETALLES Trazo y Replanteo Excavaciones hasta el Fondo de Excavación Colocación de Solados Colocación de Acero de Refuerzo Vaciado de Concreto en Piso de Caja SOPORTE DE TUBERIAS - DETALLES (27 Bases) Trazo y Replanteo Excavaciones hasta el Fondo de Excavación Colocación de Solados Colocación de Insertos Metálicos Vaciado de Concreto en Pedestales Rellenos en General AREA 340 - ESTABILIZADORES SOPORTE DE TUBERIAS OVERHEADCOMPRESSORS Cimentaciones para Tinglados (12 Bases) Colocación de Encofrado en Zapatas Vaciado de Concreto en Zapatas Colocación de Encofrado en Pedestales Colocación de Pernos de Anclaje Vaciado de Concreto en Pedestales Rellenos en General

EQUIPO ISOMETRI S CO

SPOOLS

Estadísticas de Causas de Incum plim iento

L 20

M 21

M 22

SEMANA 34 ago-07 J 23

V 24

X

X X

X X X

X X

X

X

X X

X

X

X X

X X

D 26

EXT 7%

X X X

X X

X

X X

X

X X

X X X

S 25

X X

X

X X

X X X X X X X X

PROG 16%

X X

X X

C L I-P R I P R OG LOG

Last Planner System ® / Ing. Walter Meléndez Bernardo.

ING 45%

LOG CLI-PRI EJEC 3% 1%1%

ACT-PRE 27%

EJ EC A C T -P R E

IN G EXT

RETOS PARA IMPLEMENTACIÓN PLAN SEMANAL Y PPC DEL 20-AGO AL 26-AGO

ANALISIS DE RESTRICCIONES DEL 27 AGO AL 16 SET

ACTIVIDAD

ACTIVIDAD

FRENTE/DISCIPLINA 01

ITEM

DISCIPLINA

AREA

1,01 1.01.01 1.01.02 1,01 1.01.01 1.01.02 1.01.03 1.01.04 1,02 1.02.05 1.02.06 1.02.07 1.02.07.08 1.02.07.09 1.02.07.10 1,03 1.03.03 1,04 1.04.01 1.04.03 1,05

CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL

300 300 300 300 300 300 300 300 310 310 310 310 310 310 310 340 340 360 360 360 370

CIVIL

370

1.05.01

EQUIPO ISOMET SPOOLS FECHA DE INCIO S RICO

LINEA AREA 200 - PLATAFORMA FLARE PLATAFORMA - VOLUMENES PLATAFORMA - SECCIONES AREA 300 CANALETAS ARREGLO GENERAL CAMARAS DE DRENAJE ARREGLO GENERAL CAMARAS DRENAJE Y DETALLES DE TAPAS Y GRATINGS FUNDACIONES PARA EQUIPOS DE ILUMINACION AREA 310 - SLUG CATCHER & INLET FACILITIES SOPORTE DE TUBERIAS - DETALLES (37 Bases) SOPORTE DE TUBERIAS - DETALLES (7 Bases) SOPORTE DE TUBERIAS - DETALLES (27 Bases) Colocación de Insertos Metálicos Vaciado de Concreto en Pedestales Rellenos en General AREA 340 - ESTABILIZADORES PAVIMENTOS DE ESTABILIZACION RECINTOS AREA 360 - CRYOGENICA PAVIMENTO CRIOGENICA ARREGLO GENERAL PAVIMENTO CRIOGENICA RECINTOS AREA 370 - TURBOCOMPRESORES PAVIMENTO COMPRESORES ARREGLO GENERAL

DESCRIPCION DE LA RESTRICCIÓN

FECHA REQUERIDA EN OBRA

Area con Resticciones para Acceso Area con Resticciones para Acceso

01.09.07 01.09.07

Falta plano: PPAG-300-PL-B-220, 221, 222, 223 Falta plano: PPAG-300-PL-B-224, 225 Falta plano: PPAG-300-PL-B-226, 227 Falta Detalle de Fijación de Poste

01.09.07 01.09.07 01.09.07 01.09.07

Area con Interferencia con Obras de Serpetbol Area con Interferencia con Obras de Serpetbol

01.09.07 01.09.07

Falta que lleguen Insertos Metálicos Falta que lleguen Insertos Metálicos Falta que lleguen Insertos Metálicos

27.08.07 27.08.07 27.08.07

Falta plano: PPAG-340-PL-B-202

01.09.07

Falta plano: PPAG-360-PL-B-210, 211, 212, 213 Falta plano: PPAG-360-PL-B-214

01.09.07 01.09.07

Falta plano: PPAG-370-PL-B-200, 201, 202

01.09.07

ITEM

DISCIPLINA

AREA

1,01 1.01.06 1.01.06.01 1.01.06.02 1.01.06.03 1,02 1.02.01 1.02.01.01 1.02.01.02 1.02.01.03 1.02.01.04 1.02.01.05 1.02.07 1.02.07.01 1.02.07.02 1.02.07.03 1.02.07.08 1.02.07.09 1.02.07.10 1,03 1.03.04 1.03.05 1.03.05.01 1.03.05.02 1.03.05.03 1.03.05.04 1.03.05.05 1.03.05.06

CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL

300 300 300 300 300 310 310 310 310 310 310 310 310 310 310 310 310 310 310 340 340 340 340 340 340 340 340 340

EQUIPO ISOMETRI S CO

LINEA

SPOOLS

AREA 300 CIMENTACION DE TORRE No. 11 DE DESCARGA ELECTRICA Colocación de Pernos de Anclaje Vaciado de Concreto en Pedestales Rellenos en General AREA 310 - SLUG CATCHER & INLET FACILITIES RECINTOS STAQ 12020/30, 22O30 - DETALLES Trazo y Replanteo Excavaciones hasta el Fondo de Excavación Colocación de Solados Colocación de Acero de Refuerzo Vaciado de Concreto en Piso de Caja SOPORTE DE TUBERIAS - DETALLES (27 Bases) Trazo y Replanteo Excavaciones hasta el Fondo de Excavación Colocación de Solados Colocación de Insertos Metálicos Vaciado de Concreto en Pedestales Rellenos en General AREA 340 - ESTABILIZADORES SOPORTE DE TUBERIAS OVERHEADCOMPRESSORS Cimentaciones para Tinglados (12 Bases) Colocación de Encofrado en Zapatas Vaciado de Concreto en Zapatas Colocación de Encofrado en Pedestales Colocación de Pernos de Anclaje Vaciado de Concreto en Pedestales Rellenos en General

Estadísticas de Causas de Incum plim iento

L 20

M 21

M 22

SEMANA 34 ago-07 J 23

V 24

X

X X

X X X

X X

X

X

X X

X

X

X X

X X

D 26

EXT 7%

X X X

X X

X

X X

X

X X

X X X

S 25

X X

X X

X

X X

PROG 16%

X X

X X

C L I-P R I P R OG LOG

PLAN SEMANAL Y PPC DEL 20-AGO AL 26-AGO

ANALISIS DE RESTRICCIONES DEL 27 AGO AL 16 SET

ACTIVIDAD

ACTIVIDAD

FRENTE/DISCIPLINA 02

ITEM

DISCIPLINA

AREA

1,01 1.01.01 1.01.02 1,01 1.01.01 1.01.02 1.01.03 1.01.04 1,02 1.02.05 1.02.06 1.02.07 1.02.07.08 1.02.07.09 1.02.07.10 1,03 1.03.03 1,04 1.04.01 1.04.03 1,05

CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL

300 300 300 300 300 300 300 300 310 310 310 310 310 310 310 340 340 360 360 360 370

CIVIL

370

1.05.01

EQUIPO ISOMET SPOOLS FECHA DE INCIO S RICO

LINEA AREA 200 - PLATAFORMA FLARE PLATAFORMA - VOLUMENES PLATAFORMA - SECCIONES AREA 300 CANALETAS ARREGLO GENERAL CAMARAS DE DRENAJE ARREGLO GENERAL CAMARAS DRENAJE Y DETALLES DE TAPAS Y GRATINGS FUNDACIONES PARA EQUIPOS DE ILUMINACION AREA 310 - SLUG CATCHER & INLET FACILITIES SOPORTE DE TUBERIAS - DETALLES (37 Bases) SOPORTE DE TUBERIAS - DETALLES (7 Bases) SOPORTE DE TUBERIAS - DETALLES (27 Bases) Colocación de Insertos Metálicos Vaciado de Concreto en Pedestales Rellenos en General AREA 340 - ESTABILIZADORES PAVIMENTOS DE ESTABILIZACION RECINTOS AREA 360 - CRYOGENICA PAVIMENTO CRIOGENICA ARREGLO GENERAL PAVIMENTO CRIOGENICA RECINTOS AREA 370 - TURBOCOMPRESORES PAVIMENTO COMPRESORES ARREGLO GENERAL

DESCRIPCION DE LA RESTRICCIÓN

FECHA REQUERIDA EN OBRA

Area con Resticciones para Acceso Area con Resticciones para Acceso

01.09.07 01.09.07

Falta plano: PPAG-300-PL-B-220, 221, 222, 223 Falta plano: PPAG-300-PL-B-224, 225 Falta plano: PPAG-300-PL-B-226, 227 Falta Detalle de Fijación de Poste

01.09.07 01.09.07 01.09.07 01.09.07

Area con Interferencia con Obras de Serpetbol Area con Interferencia con Obras de Serpetbol

01.09.07 01.09.07

Falta que lleguen Insertos Metálicos Falta que lleguen Insertos Metálicos Falta que lleguen Insertos Metálicos

27.08.07 27.08.07 27.08.07

Falta plano: PPAG-340-PL-B-202

01.09.07

Falta plano: PPAG-360-PL-B-210, 211, 212, 213 Falta plano: PPAG-360-PL-B-214

01.09.07 01.09.07

Falta plano: PPAG-370-PL-B-200, 201, 202

01.09.07

ITEM

DISCIPLINA

AREA

1,01 1.01.06 1.01.06.01 1.01.06.02 1.01.06.03 1,02 1.02.01 1.02.01.01 1.02.01.02 1.02.01.03 1.02.01.04 1.02.01.05 1.02.07 1.02.07.01 1.02.07.02 1.02.07.03 1.02.07.08 1.02.07.09 1.02.07.10 1,03 1.03.04 1.03.05 1.03.05.01 1.03.05.02 1.03.05.03 1.03.05.04 1.03.05.05 1.03.05.06

CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL

300 300 300 300 300 310 310 310 310 310 310 310 310 310 310 310 310 310 310 340 340 340 340 340 340 340 340 340

EQUIPO ISOMETRI S CO

LINEA

SPOOLS

AREA 300 CIMENTACION DE TORRE No. 11 DE DESCARGA ELECTRICA Colocación de Pernos de Anclaje Vaciado de Concreto en Pedestales Rellenos en General AREA 310 - SLUG CATCHER & INLET FACILITIES RECINTOS STAQ 12020/30, 22O30 - DETALLES Trazo y Replanteo Excavaciones hasta el Fondo de Excavación Colocación de Solados Colocación de Acero de Refuerzo Vaciado de Concreto en Piso de Caja SOPORTE DE TUBERIAS - DETALLES (27 Bases) Trazo y Replanteo Excavaciones hasta el Fondo de Excavación Colocación de Solados Colocación de Insertos Metálicos Vaciado de Concreto en Pedestales Rellenos en General AREA 340 - ESTABILIZADORES SOPORTE DE TUBERIAS OVERHEADCOMPRESSORS Cimentaciones para Tinglados (12 Bases) Colocación de Encofrado en Zapatas Vaciado de Concreto en Zapatas Colocación de Encofrado en Pedestales Colocación de Pernos de Anclaje Vaciado de Concreto en Pedestales Rellenos en General

M 21

M 22

SEMANA 34 ago-07 J 23

V 24

X

X X

X X X

X X

X

X

X X

X

X X

X

X X

S 25

X X

X

X X

X X

EXT 7%

X X

X

X X

PLAN SEMANAL Y PPC DEL 20-AGO AL 26-AGO

ANALISIS DE RESTRICCIONES DEL 27 AGO AL 16 SET

ACTIVIDAD

ACTIVIDAD

FRENTE/DISCIPLINA 03

ITEM

DISCIPLINA

AREA

CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL

300 300 300 300 300 300 300 300 310 310 310 310 310 310 310 340 340 360 360 360 370

CIVIL

370

1.05.01

EQUIPO ISOMET SPOOLS FECHA DE INCIO S RICO

LINEA AREA 200 - PLATAFORMA FLARE PLATAFORMA - VOLUMENES PLATAFORMA - SECCIONES AREA 300 CANALETAS ARREGLO GENERAL CAMARAS DE DRENAJE ARREGLO GENERAL CAMARAS DRENAJE Y DETALLES DE TAPAS Y GRATINGS FUNDACIONES PARA EQUIPOS DE ILUMINACION AREA 310 - SLUG CATCHER & INLET FACILITIES SOPORTE DE TUBERIAS - DETALLES (37 Bases) SOPORTE DE TUBERIAS - DETALLES (7 Bases) SOPORTE DE TUBERIAS - DETALLES (27 Bases) Colocación de Insertos Metálicos Vaciado de Concreto en Pedestales Rellenos en General AREA 340 - ESTABILIZADORES PAVIMENTOS DE ESTABILIZACION RECINTOS AREA 360 - CRYOGENICA PAVIMENTO CRIOGENICA ARREGLO GENERAL PAVIMENTO CRIOGENICA RECINTOS AREA 370 - TURBOCOMPRESORES PAVIMENTO COMPRESORES ARREGLO GENERAL

DESCRIPCION DE LA RESTRICCIÓN

FECHA REQUERIDA EN OBRA

Area con Resticciones para Acceso Area con Resticciones para Acceso

01.09.07 01.09.07

Falta plano: PPAG-300-PL-B-220, 221, 222, 223 Falta plano: PPAG-300-PL-B-224, 225 Falta plano: PPAG-300-PL-B-226, 227 Falta Detalle de Fijación de Poste

01.09.07 01.09.07 01.09.07 01.09.07

Area con Interferencia con Obras de Serpetbol Area con Interferencia con Obras de Serpetbol

01.09.07 01.09.07

Falta que lleguen Insertos Metálicos Falta que lleguen Insertos Metálicos Falta que lleguen Insertos Metálicos

27.08.07 27.08.07 27.08.07

Falta plano: PPAG-340-PL-B-202

01.09.07

Falta plano: PPAG-360-PL-B-210, 211, 212, 213 Falta plano: PPAG-360-PL-B-214

01.09.07 01.09.07

Falta plano: PPAG-370-PL-B-200, 201, 202

01.09.07

ITEM

DISCIPLINA

AREA

1,01 1.01.06 1.01.06.01 1.01.06.02 1.01.06.03 1,02 1.02.01 1.02.01.01 1.02.01.02 1.02.01.03 1.02.01.04 1.02.01.05 1.02.07 1.02.07.01 1.02.07.02 1.02.07.03 1.02.07.08 1.02.07.09 1.02.07.10 1,03 1.03.04 1.03.05 1.03.05.01 1.03.05.02 1.03.05.03 1.03.05.04 1.03.05.05 1.03.05.06

CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL

300 300 300 300 300 310 310 310 310 310 310 310 310 310 310 310 310 310 310 340 340 340 340 340 340 340 340 340

EQUIPO ISOMETRI S CO

LINEA

SPOOLS

AREA 300 CIMENTACION DE TORRE No. 11 DE DESCARGA ELECTRICA Colocación de Pernos de Anclaje Vaciado de Concreto en Pedestales Rellenos en General AREA 310 - SLUG CATCHER & INLET FACILITIES RECINTOS STAQ 12020/30, 22O30 - DETALLES Trazo y Replanteo Excavaciones hasta el Fondo de Excavación Colocación de Solados Colocación de Acero de Refuerzo Vaciado de Concreto en Piso de Caja SOPORTE DE TUBERIAS - DETALLES (27 Bases) Trazo y Replanteo Excavaciones hasta el Fondo de Excavación Colocación de Solados Colocación de Insertos Metálicos Vaciado de Concreto en Pedestales Rellenos en General AREA 340 - ESTABILIZADORES SOPORTE DE TUBERIAS OVERHEADCOMPRESSORS Cimentaciones para Tinglados (12 Bases) Colocación de Encofrado en Zapatas Vaciado de Concreto en Zapatas Colocación de Encofrado en Pedestales Colocación de Pernos de Anclaje Vaciado de Concreto en Pedestales Rellenos en General

PROG 16%

X X

X X

M 21

M 22

SEMANA 34 ago-07 J 23

V 24

X

X X

X X X

X X

X

X

X X

X

X

X X

X X

S 25

X

X X

X

X X

X X

EXT 7%

X X

X

X X

PLAN SEMANAL Y PPC DEL 20-AGO AL 26-AGO

ANALISIS DE RESTRICCIONES DEL 27 AGO AL 16 SET

ACTIVIDAD

ACTIVIDAD

FRENTE/DISCIPLINA 04

ITEM

DISCIPLINA

AREA

CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL

300 300 300 300 300 300 300 300 310 310 310 310 310 310 310 340 340 360 360 360 370

CIVIL

370

1.05.01

LINEA AREA 200 - PLATAFORMA FLARE PLATAFORMA - VOLUMENES PLATAFORMA - SECCIONES AREA 300 CANALETAS ARREGLO GENERAL CAMARAS DE DRENAJE ARREGLO GENERAL CAMARAS DRENAJE Y DETALLES DE TAPAS Y GRATINGS FUNDACIONES PARA EQUIPOS DE ILUMINACION AREA 310 - SLUG CATCHER & INLET FACILITIES SOPORTE DE TUBERIAS - DETALLES (37 Bases) SOPORTE DE TUBERIAS - DETALLES (7 Bases) SOPORTE DE TUBERIAS - DETALLES (27 Bases) Colocación de Insertos Metálicos Vaciado de Concreto en Pedestales Rellenos en General AREA 340 - ESTABILIZADORES PAVIMENTOS DE ESTABILIZACION RECINTOS AREA 360 - CRYOGENICA PAVIMENTO CRIOGENICA ARREGLO GENERAL PAVIMENTO CRIOGENICA RECINTOS AREA 370 - TURBOCOMPRESORES PAVIMENTO COMPRESORES ARREGLO GENERAL

EQUIPO ISOMET SPOOLS FECHA DE INCIO S RICO

DESCRIPCION DE LA RESTRICCIÓN

FECHA REQUERIDA EN OBRA

Area con Resticciones para Acceso Area con Resticciones para Acceso

01.09.07 01.09.07

Falta plano: PPAG-300-PL-B-220, 221, 222, 223 Falta plano: PPAG-300-PL-B-224, 225 Falta plano: PPAG-300-PL-B-226, 227 Falta Detalle de Fijación de Poste

01.09.07 01.09.07 01.09.07 01.09.07

Area con Interferencia con Obras de Serpetbol Area con Interferencia con Obras de Serpetbol

01.09.07 01.09.07

Falta que lleguen Insertos Metálicos Falta que lleguen Insertos Metálicos Falta que lleguen Insertos Metálicos

27.08.07 27.08.07 27.08.07

Falta plano: PPAG-340-PL-B-202

01.09.07

Falta plano: PPAG-360-PL-B-210, 211, 212, 213 Falta plano: PPAG-360-PL-B-214

01.09.07 01.09.07

Falta plano: PPAG-370-PL-B-200, 201, 202

01.09.07

ITEM

DISCIPLINA

AREA

1,01 1.01.06 1.01.06.01 1.01.06.02 1.01.06.03 1,02 1.02.01 1.02.01.01 1.02.01.02 1.02.01.03 1.02.01.04 1.02.01.05 1.02.07 1.02.07.01 1.02.07.02 1.02.07.03 1.02.07.08 1.02.07.09 1.02.07.10 1,03 1.03.04 1.03.05 1.03.05.01 1.03.05.02 1.03.05.03 1.03.05.04 1.03.05.05 1.03.05.06

CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL

300 300 300 300 300 310 310 310 310 310 310 310 310 310 310 310 310 310 310 340 340 340 340 340 340 340 340 340

LINEA AREA 300 CIMENTACION DE TORRE No. 11 DE DESCARGA ELECTRICA Colocación de Pernos de Anclaje Vaciado de Concreto en Pedestales Rellenos en General AREA 310 - SLUG CATCHER & INLET FACILITIES RECINTOS STAQ 12020/30, 22O30 - DETALLES Trazo y Replanteo Excavaciones hasta el Fondo de Excavación Colocación de Solados Colocación de Acero de Refuerzo Vaciado de Concreto en Piso de Caja SOPORTE DE TUBERIAS - DETALLES (27 Bases) Trazo y Replanteo Excavaciones hasta el Fondo de Excavación Colocación de Solados Colocación de Insertos Metálicos Vaciado de Concreto en Pedestales Rellenos en General AREA 340 - ESTABILIZADORES SOPORTE DE TUBERIAS OVERHEADCOMPRESSORS Cimentaciones para Tinglados (12 Bases) Colocación de Encofrado en Zapatas Vaciado de Concreto en Zapatas Colocación de Encofrado en Pedestales Colocación de Pernos de Anclaje Vaciado de Concreto en Pedestales Rellenos en General

EQUIPO ISOMETRI S CO

SPOOLS

X X X X X X

PROG 16%

X X

X X

M 21

M 22

SEMANA 34 ago-07 J 23

V 24

X

X X

X X X

X X

X

X

X X

X

X

X X

X X

S 25

X

X X

X

X X

X X

X

X X

X X

EXT 7%

X X X X X X

ING 45%

LOG CLI-PRI EJEC 3% 1%1%

ACT-PRE 27%

PROG 16%

X X

X X

C L I-P R I P R OG LOG

Last Planner System ® / Ing. Walter Meléndez Bernardo.

IN G EXT

D 26

X X X

X X X

EJ EC A C T -P R E

Estadísticas de Causas de Incum plim iento

L 20

X X

ING 45%

LOG CLI-PRI EJEC 3% 1%1%

ACT-PRE 27%

C L I-P R I P R OG LOG

1,01 1.01.01 1.01.02 1,01 1.01.01 1.01.02 1.01.03 1.01.04 1,02 1.02.05 1.02.06 1.02.07 1.02.07.08 1.02.07.09 1.02.07.10 1,03 1.03.03 1,04 1.04.01 1.04.03 1,05

IN G EXT

D 26

X X X

X X X

EJ EC A C T -P R E

Estadísticas de Causas de Incum plim iento

L 20

X X

ING 45%

LOG CLI-PRI EJEC 3% 1%1%

ACT-PRE 27%

X X X X X X

C L I-P R I P R OG LOG

1,01 1.01.01 1.01.02 1,01 1.01.01 1.01.02 1.01.03 1.01.04 1,02 1.02.05 1.02.06 1.02.07 1.02.07.08 1.02.07.09 1.02.07.10 1,03 1.03.03 1,04 1.04.01 1.04.03 1,05

IN G EXT

D 26

X X X

X

X X X

EJ EC A C T -P R E

Estadísticas de Causas de Incum plim iento

L 20

X X

ING 45%

LOG CLI-PRI EJEC 3% 1%1%

ACT-PRE 27%

X X X X X X

EJ EC A C T -P R E

IN G EXT

RETOS PARA IMPLEMENTACIÓN PLAN SEMANAL Y PPC DEL 20-AGO AL 26-AGO

ANALISIS DE RESTRICCIONES DEL 27 AGO AL 16 SET

ACTIVIDAD

ACTIVIDAD

FRENTE/DISCIPLINA 01

ITEM

DISCIPLINA

AREA

1,01 1.01.01 1.01.02 1,01 1.01.01 1.01.02 1.01.03 1.01.04 1,02 1.02.05 1.02.06 1.02.07 1.02.07.08 1.02.07.09 1.02.07.10 1,03 1.03.03 1,04 1.04.01 1.04.03 1,05

CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL

300 300 300 300 300 300 300 300 310 310 310 310 310 310 310 340 340 360 360 360 370

CIVIL

370

1.05.01

EQUIPO ISOMET SPOOLS FECHA DE INCIO S RICO

LINEA AREA 200 - PLATAFORMA FLARE PLATAFORMA - VOLUMENES PLATAFORMA - SECCIONES AREA 300 CANALETAS ARREGLO GENERAL CAMARAS DE DRENAJE ARREGLO GENERAL CAMARAS DRENAJE Y DETALLES DE TAPAS Y GRATINGS FUNDACIONES PARA EQUIPOS DE ILUMINACION AREA 310 - SLUG CATCHER & INLET FACILITIES SOPORTE DE TUBERIAS - DETALLES (37 Bases) SOPORTE DE TUBERIAS - DETALLES (7 Bases) SOPORTE DE TUBERIAS - DETALLES (27 Bases) Colocación de Insertos Metálicos Vaciado de Concreto en Pedestales Rellenos en General AREA 340 - ESTABILIZADORES PAVIMENTOS DE ESTABILIZACION RECINTOS AREA 360 - CRYOGENICA PAVIMENTO CRIOGENICA ARREGLO GENERAL PAVIMENTO CRIOGENICA RECINTOS AREA 370 - TURBOCOMPRESORES PAVIMENTO COMPRESORES ARREGLO GENERAL

DESCRIPCION DE LA RESTRICCIÓN

FECHA REQUERIDA EN OBRA

Area con Resticciones para Acceso Area con Resticciones para Acceso

01.09.07 01.09.07

Falta plano: PPAG-300-PL-B-220, 221, 222, 223 Falta plano: PPAG-300-PL-B-224, 225 Falta plano: PPAG-300-PL-B-226, 227 Falta Detalle de Fijación de Poste

01.09.07 01.09.07 01.09.07 01.09.07

Area con Interferencia con Obras de Serpetbol Area con Interferencia con Obras de Serpetbol

01.09.07 01.09.07

Falta que lleguen Insertos Metálicos Falta que lleguen Insertos Metálicos Falta que lleguen Insertos Metálicos

27.08.07 27.08.07 27.08.07

Falta plano: PPAG-340-PL-B-202

01.09.07

Falta plano: PPAG-360-PL-B-210, 211, 212, 213 Falta plano: PPAG-360-PL-B-214

01.09.07 01.09.07

Falta plano: PPAG-370-PL-B-200, 201, 202

01.09.07

ITEM

DISCIPLINA

AREA

1,01 1.01.06 1.01.06.01 1.01.06.02 1.01.06.03 1,02 1.02.01 1.02.01.01 1.02.01.02 1.02.01.03 1.02.01.04 1.02.01.05 1.02.07 1.02.07.01 1.02.07.02 1.02.07.03 1.02.07.08 1.02.07.09 1.02.07.10 1,03 1.03.04 1.03.05 1.03.05.01 1.03.05.02 1.03.05.03 1.03.05.04 1.03.05.05 1.03.05.06

CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL

300 300 300 300 300 310 310 310 310 310 310 310 310 310 310 310 310 310 310 340 340 340 340 340 340 340 340 340

EQUIPO ISOMETRI S CO

LINEA

SPOOLS

AREA 300 CIMENTACION DE TORRE No. 11 DE DESCARGA ELECTRICA Colocación de Pernos de Anclaje Vaciado de Concreto en Pedestales Rellenos en General AREA 310 - SLUG CATCHER & INLET FACILITIES RECINTOS STAQ 12020/30, 22O30 - DETALLES Trazo y Replanteo Excavaciones hasta el Fondo de Excavación Colocación de Solados Colocación de Acero de Refuerzo Vaciado de Concreto en Piso de Caja SOPORTE DE TUBERIAS - DETALLES (27 Bases) Trazo y Replanteo Excavaciones hasta el Fondo de Excavación Colocación de Solados Colocación de Insertos Metálicos Vaciado de Concreto en Pedestales Rellenos en General AREA 340 - ESTABILIZADORES SOPORTE DE TUBERIAS OVERHEADCOMPRESSORS Cimentaciones para Tinglados (12 Bases) Colocación de Encofrado en Zapatas Vaciado de Concreto en Zapatas Colocación de Encofrado en Pedestales Colocación de Pernos de Anclaje Vaciado de Concreto en Pedestales Rellenos en General

Estadísticas de Causas de Incum plim iento

L 20

M 21

M 22

SEMANA 34 ago-07 J 23

V 24

X

X X

X X X

X X

X

X

X X

X

X

X X

X X

D 26

EXT 7%

X X X

X X

X

X X

X

X X

X X X

S 25

X X

X X

X

X X

PROG 16%

X X

X X

C L I-P R I P R OG LOG

PLAN SEMANAL Y PPC DEL 20-AGO AL 26-AGO

ANALISIS DE RESTRICCIONES DEL 27 AGO AL 16 SET

ACTIVIDAD

ACTIVIDAD

FRENTE/DISCIPLINA 02

ITEM

DISCIPLINA

AREA

1,01 1.01.01 1.01.02 1,01 1.01.01 1.01.02 1.01.03 1.01.04 1,02 1.02.05 1.02.06 1.02.07 1.02.07.08 1.02.07.09 1.02.07.10 1,03 1.03.03 1,04 1.04.01 1.04.03 1,05

CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL

300 300 300 300 300 300 300 300 310 310 310 310 310 310 310 340 340 360 360 360 370

CIVIL

370

1.05.01

EQUIPO ISOMET SPOOLS FECHA DE INCIO S RICO

LINEA AREA 200 - PLATAFORMA FLARE PLATAFORMA - VOLUMENES PLATAFORMA - SECCIONES AREA 300 CANALETAS ARREGLO GENERAL CAMARAS DE DRENAJE ARREGLO GENERAL CAMARAS DRENAJE Y DETALLES DE TAPAS Y GRATINGS FUNDACIONES PARA EQUIPOS DE ILUMINACION AREA 310 - SLUG CATCHER & INLET FACILITIES SOPORTE DE TUBERIAS - DETALLES (37 Bases) SOPORTE DE TUBERIAS - DETALLES (7 Bases) SOPORTE DE TUBERIAS - DETALLES (27 Bases) Colocación de Insertos Metálicos Vaciado de Concreto en Pedestales Rellenos en General AREA 340 - ESTABILIZADORES PAVIMENTOS DE ESTABILIZACION RECINTOS AREA 360 - CRYOGENICA PAVIMENTO CRIOGENICA ARREGLO GENERAL PAVIMENTO CRIOGENICA RECINTOS AREA 370 - TURBOCOMPRESORES PAVIMENTO COMPRESORES ARREGLO GENERAL

DESCRIPCION DE LA RESTRICCIÓN

FECHA REQUERIDA EN OBRA

Area con Resticciones para Acceso Area con Resticciones para Acceso

01.09.07 01.09.07

Falta plano: PPAG-300-PL-B-220, 221, 222, 223 Falta plano: PPAG-300-PL-B-224, 225 Falta plano: PPAG-300-PL-B-226, 227 Falta Detalle de Fijación de Poste

01.09.07 01.09.07 01.09.07 01.09.07

Area con Interferencia con Obras de Serpetbol Area con Interferencia con Obras de Serpetbol

01.09.07 01.09.07

Falta que lleguen Insertos Metálicos Falta que lleguen Insertos Metálicos Falta que lleguen Insertos Metálicos

27.08.07 27.08.07 27.08.07

Falta plano: PPAG-340-PL-B-202

01.09.07

Falta plano: PPAG-360-PL-B-210, 211, 212, 213 Falta plano: PPAG-360-PL-B-214

01.09.07 01.09.07

Falta plano: PPAG-370-PL-B-200, 201, 202

01.09.07

ITEM

DISCIPLINA

AREA

1,01 1.01.06 1.01.06.01 1.01.06.02 1.01.06.03 1,02 1.02.01 1.02.01.01 1.02.01.02 1.02.01.03 1.02.01.04 1.02.01.05 1.02.07 1.02.07.01 1.02.07.02 1.02.07.03 1.02.07.08 1.02.07.09 1.02.07.10 1,03 1.03.04 1.03.05 1.03.05.01 1.03.05.02 1.03.05.03 1.03.05.04 1.03.05.05 1.03.05.06

CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL

300 300 300 300 300 310 310 310 310 310 310 310 310 310 310 310 310 310 310 340 340 340 340 340 340 340 340 340

ACTIVIDAD

ACTIVIDAD

FRENTE/DISCIPLINA 03

DISCIPLINA

AREA

CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL

300 300 300 300 300 300 300 300 310 310 310 310 310 310 310 340 340 360 360 360 370

CIVIL

370

1.05.01

EQUIPO ISOMET SPOOLS FECHA DE INCIO S RICO

LINEA

SPOOLS

M 21

M 22

SEMANA 34 ago-07 J 23

V 24

X

X X

X X X

X X

X

X

X X

AREA 200 - PLATAFORMA FLARE PLATAFORMA - VOLUMENES PLATAFORMA - SECCIONES AREA 300 CANALETAS ARREGLO GENERAL CAMARAS DE DRENAJE ARREGLO GENERAL CAMARAS DRENAJE Y DETALLES DE TAPAS Y GRATINGS FUNDACIONES PARA EQUIPOS DE ILUMINACION AREA 310 - SLUG CATCHER & INLET FACILITIES SOPORTE DE TUBERIAS - DETALLES (37 Bases) SOPORTE DE TUBERIAS - DETALLES (7 Bases) SOPORTE DE TUBERIAS - DETALLES (27 Bases) Colocación de Insertos Metálicos Vaciado de Concreto en Pedestales Rellenos en General AREA 340 - ESTABILIZADORES PAVIMENTOS DE ESTABILIZACION RECINTOS AREA 360 - CRYOGENICA PAVIMENTO CRIOGENICA ARREGLO GENERAL PAVIMENTO CRIOGENICA RECINTOS AREA 370 - TURBOCOMPRESORES PAVIMENTO COMPRESORES ARREGLO GENERAL

FECHA REQUERIDA EN OBRA

DESCRIPCION DE LA RESTRICCIÓN Area con Resticciones para Acceso Area con Resticciones para Acceso

01.09.07 01.09.07

Falta plano: PPAG-300-PL-B-220, 221, 222, 223 Falta plano: PPAG-300-PL-B-224, 225 Falta plano: PPAG-300-PL-B-226, 227 Falta Detalle de Fijación de Poste

01.09.07 01.09.07 01.09.07 01.09.07

Area con Interferencia con Obras de Serpetbol Area con Interferencia con Obras de Serpetbol

01.09.07 01.09.07

Falta que lleguen Insertos Metálicos Falta que lleguen Insertos Metálicos Falta que lleguen Insertos Metálicos

27.08.07 27.08.07 27.08.07

Falta plano: PPAG-340-PL-B-202

01.09.07

Falta plano: PPAG-360-PL-B-210, 211, 212, 213 Falta plano: PPAG-360-PL-B-214

01.09.07 01.09.07

Falta plano: PPAG-370-PL-B-200, 201, 202

01.09.07

ITEM

DISCIPLINA

AREA

1,01 1.01.06 1.01.06.01 1.01.06.02 1.01.06.03 1,02 1.02.01 1.02.01.01 1.02.01.02 1.02.01.03 1.02.01.04 1.02.01.05 1.02.07 1.02.07.01 1.02.07.02 1.02.07.03 1.02.07.08 1.02.07.09 1.02.07.10 1,03 1.03.04 1.03.05 1.03.05.01 1.03.05.02 1.03.05.03 1.03.05.04 1.03.05.05 1.03.05.06

CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL

300 300 300 300 300 310 310 310 310 310 310 310 310 310 310 310 310 310 310 340 340 340 340 340 340 340 340 340

LINEA

S 25

X

X X

X

X X

EQUIPO ISOMETRI S CO

SPOOLS

AREA 300 CIMENTACION DE TORRE No. 11 DE DESCARGA ELECTRICA Colocación de Pernos de Anclaje Vaciado de Concreto en Pedestales Rellenos en General AREA 310 - SLUG CATCHER & INLET FACILITIES RECINTOS STAQ 12020/30, 22O30 - DETALLES Trazo y Replanteo Excavaciones hasta el Fondo de Excavación Colocación de Solados Colocación de Acero de Refuerzo Vaciado de Concreto en Piso de Caja SOPORTE DE TUBERIAS - DETALLES (27 Bases) Trazo y Replanteo Excavaciones hasta el Fondo de Excavación Colocación de Solados Colocación de Insertos Metálicos Vaciado de Concreto en Pedestales Rellenos en General AREA 340 - ESTABILIZADORES SOPORTE DE TUBERIAS OVERHEADCOMPRESSORS Cimentaciones para Tinglados (12 Bases) Colocación de Encofrado en Zapatas Vaciado de Concreto en Zapatas Colocación de Encofrado en Pedestales Colocación de Pernos de Anclaje Vaciado de Concreto en Pedestales Rellenos en General

X X

X

X X

X

X X

X

X X

X X

X X

X

L 20

M 21

M 22

SEMANA 34 ago-07 J 23

V 24

X

X X

X X X

X X

X

X

X X

X

X

X X

X X

X X

X

X X

X

X X

X X X

X X

EXT 7%

X X

X X

X

PROG 16%

X X

X X

S 25

C L I-P R I P R OG LOG

EJ EC A C T -P R E

PLAN SEMANAL Y PPC DEL 20-AGO AL 26-AGO

ANALISIS DE RESTRICCIONES DEL 27 AGO AL 16 SET

ACTIVIDAD

ACTIVIDAD

FRENTE/DISCIPLINA 04

ITEM

DISCIPLINA

AREA

CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL

300 300 300 300 300 300 300 300 310 310 310 310 310 310 310 340 340 360 360 360 370

CIVIL

370

1.05.01

LINEA AREA 200 - PLATAFORMA FLARE PLATAFORMA - VOLUMENES PLATAFORMA - SECCIONES AREA 300 CANALETAS ARREGLO GENERAL CAMARAS DE DRENAJE ARREGLO GENERAL CAMARAS DRENAJE Y DETALLES DE TAPAS Y GRATINGS FUNDACIONES PARA EQUIPOS DE ILUMINACION AREA 310 - SLUG CATCHER & INLET FACILITIES SOPORTE DE TUBERIAS - DETALLES (37 Bases) SOPORTE DE TUBERIAS - DETALLES (7 Bases) SOPORTE DE TUBERIAS - DETALLES (27 Bases) Colocación de Insertos Metálicos Vaciado de Concreto en Pedestales Rellenos en General AREA 340 - ESTABILIZADORES PAVIMENTOS DE ESTABILIZACION RECINTOS AREA 360 - CRYOGENICA PAVIMENTO CRIOGENICA ARREGLO GENERAL PAVIMENTO CRIOGENICA RECINTOS AREA 370 - TURBOCOMPRESORES PAVIMENTO COMPRESORES ARREGLO GENERAL

EQUIPO ISOMET SPOOLS FECHA DE INCIO S RICO

FECHA REQUERIDA EN OBRA

DESCRIPCION DE LA RESTRICCIÓN Area con Resticciones para Acceso Area con Resticciones para Acceso

01.09.07 01.09.07

Falta plano: PPAG-300-PL-B-220, 221, 222, 223 Falta plano: PPAG-300-PL-B-224, 225 Falta plano: PPAG-300-PL-B-226, 227 Falta Detalle de Fijación de Poste

01.09.07 01.09.07 01.09.07 01.09.07

X X

Estadísticas de Causas de Incum plim iento

EXT 7%

DISCIPLINA

AREA

CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL

300 300 300 300 300 310 310 310 310 310 310 310 310 310 310 310 310 310 310 340 340 340 340 340 340 340 340 340

LINEA AREA 300 CIMENTACION DE TORRE No. 11 DE DESCARGA ELECTRICA Colocación de Pernos de Anclaje Vaciado de Concreto en Pedestales Rellenos en General AREA 310 - SLUG CATCHER & INLET FACILITIES RECINTOS STAQ 12020/30, 22O30 - DETALLES Trazo y Replanteo Excavaciones hasta el Fondo de Excavación Colocación de Solados Colocación de Acero de Refuerzo Vaciado de Concreto en Piso de Caja SOPORTE DE TUBERIAS - DETALLES (27 Bases) Trazo y Replanteo Excavaciones hasta el Fondo de Excavación Colocación de Solados Colocación de Insertos Metálicos Vaciado de Concreto en Pedestales Rellenos en General AREA 340 - ESTABILIZADORES SOPORTE DE TUBERIAS OVERHEADCOMPRESSORS Cimentaciones para Tinglados (12 Bases) Colocación de Encofrado en Zapatas Vaciado de Concreto en Zapatas Colocación de Encofrado en Pedestales Colocación de Pernos de Anclaje Vaciado de Concreto en Pedestales Rellenos en General

EQUIPO ISOMETRI S CO

SPOOLS

PROG 16%

X X

X X

01.09.07 01.09.07

Falta que lleguen Insertos Metálicos Falta que lleguen Insertos Metálicos Falta que lleguen Insertos Metálicos

27.08.07 27.08.07 27.08.07 01.09.07

Falta plano: PPAG-360-PL-B-210, 211, 212, 213 Falta plano: PPAG-360-PL-B-214

01.09.07 01.09.07

M 21

M 22

SEMANA 34 ago-07 J 23

V 24

X

X X

X X X

X X

X

X

X X

Falta plano: PPAG-370-PL-B-200, 201, 202

01.09.07

X

X

X X

X X

S 25

X

X X

X

X X

X X

X

Last Planner System ® / Ing. Walter Meléndez Bernardo.

IN G EXT

D 26

EXT 7%

X X X

X

X X

EJ EC A C T -P R E

Estadísticas de Causas de Incum plim iento

L 20

X X

ING 45%

LOG CLI-PRI EJEC 3% 1%1%

ACT-PRE 27%

X X X X X X

X X

La puesta en marcha no es fácil, ES UN RETO

Area con Interferencia con Obras de Serpetbol Area con Interferencia con Obras de Serpetbol

Falta plano: PPAG-340-PL-B-202

ITEM 1,01 1.01.06 1.01.06.01 1.01.06.02 1.01.06.03 1,02 1.02.01 1.02.01.01 1.02.01.02 1.02.01.03 1.02.01.04 1.02.01.05 1.02.07 1.02.07.01 1.02.07.02 1.02.07.03 1.02.07.08 1.02.07.09 1.02.07.10 1,03 1.03.04 1.03.05 1.03.05.01 1.03.05.02 1.03.05.03 1.03.05.04 1.03.05.05 1.03.05.06

IN G EXT

D 26

C L I-P R I P R OG LOG

1,01 1.01.01 1.01.02 1,01 1.01.01 1.01.02 1.01.03 1.01.04 1,02 1.02.05 1.02.06 1.02.07 1.02.07.08 1.02.07.09 1.02.07.10 1,03 1.03.03 1,04 1.04.01 1.04.03 1,05

ING 45%

LOG CLI-PRI EJEC 3% 1%1%

ACT-PRE 27%

X X X X X X

X

X X

IN G EXT

D 26

X

X X

EJ EC A C T -P R E

Estadísticas de Causas de Incum plim iento

L 20

AREAS DE SOPORTE: • Toma de Personal • Compras • Equipos • QA/QC • PdR y GA EQUIPO ISOMETRI S CO

PLAN SEMANAL Y PPC DEL 20-AGO AL 26-AGO

ANALISIS DE RESTRICCIONES DEL 27 AGO AL 16 SET

ITEM 1,01 1.01.01 1.01.02 1,01 1.01.01 1.01.02 1.01.03 1.01.04 1,02 1.02.05 1.02.06 1.02.07 1.02.07.08 1.02.07.09 1.02.07.10 1,03 1.03.03 1,04 1.04.01 1.04.03 1,05

LINEA

AREA 300 CIMENTACION DE TORRE No. 11 DE DESCARGA ELECTRICA Colocación de Pernos de Anclaje Vaciado de Concreto en Pedestales Rellenos en General AREA 310 - SLUG CATCHER & INLET FACILITIES RECINTOS STAQ 12020/30, 22O30 - DETALLES Trazo y Replanteo Excavaciones hasta el Fondo de Excavación Colocación de Solados Colocación de Acero de Refuerzo Vaciado de Concreto en Piso de Caja SOPORTE DE TUBERIAS - DETALLES (27 Bases) Trazo y Replanteo Excavaciones hasta el Fondo de Excavación Colocación de Solados Colocación de Insertos Metálicos Vaciado de Concreto en Pedestales Rellenos en General AREA 340 - ESTABILIZADORES SOPORTE DE TUBERIAS OVERHEADCOMPRESSORS Cimentaciones para Tinglados (12 Bases) Colocación de Encofrado en Zapatas Vaciado de Concreto en Zapatas Colocación de Encofrado en Pedestales Colocación de Pernos de Anclaje Vaciado de Concreto en Pedestales Rellenos en General

ING 45%

LOG CLI-PRI EJEC 3% 1%1%

ACT-PRE 27%

X X X X X X

X X

X X X X X X

ING 45%

LOG CLI-PRI EJEC 3% 1%1%

ACT-PRE 27%

PROG 16%

X X

X X

C L I-P R I P R OG LOG

EJ EC A C T -P R E

IN G EXT

RETOS PARA LA IMPLEMENTACIÓN •  Para llevar a cabo esto: –  El Gerente de Proyecto es el que debe exigir que todo esto ocurra, y facilitar para que pase –  El personal de Producción debe ser el que programe –  El personal de OT debe facilitar con herramientas y análisis –  El personal de soporte como LogísHca, Reclutamiento, Equipos, etc debe trabajar sistemáHcamente en el levantamiento de restricciones siguiendo las prioridades de la Producción. Para ello deben ser muy organizados ES NECESARIO UN GRAN CAMBIO DE

Last Planner System ®ENFOQUE DE TODOS LOS INVOLUCRADOS / Ing. Walter Meléndez Bernardo.

RUTINA DE REUNIONES Hora

Lunes

8:30 - 9:00

Martes

Miércoles

10:00 - 11:00 OT prepara el material para la Reunión Semanal de Proyecto Resp: Oficina Técnica 11:00 - 12:00

12:00 - 1:00

1:00 - 2:00

Envío de Reporte Semanal del SISPO a OT Resp: Administración

2:00 - 3:00

3:00 - 4:00

4:00 - 5:00

5:00 - 6:00

REUNIÓN SEMANAL DE PROYECTO (4:30 pm)

Envío de Status de Levantamiento de Restricciones de Producción Resp: Áreas Soporte

Viernes

OT revisa la información relacionada a las Envío del acta de la Reunión herramientas de Semanal de Producción y programación, avance e IP y del consolidado de prepara el material para la restricciones a las áreas Reunión Semanal de soporte Producción Resp: Oficina Técnica Resp: Oficina Técnica

Envío del acta de la Reunión Semanal de Proyecto Resp: Oficina Técnica

9:00 - 10:00

Jueves

Elaboración, revisión y envío de las herramientas de Programación a OT. Resp: Áreas de Producción

REUNIÓN SEMANAL DE PRODUCCIÓN (4:30 pm)

Last Planner System ® / Ing. Walter Meléndez Bernardo.

IP MMOO Vs PPC FRENTE NORTE

IMPORTANCIA DE LA CONFIABILIDAD 25.00

HH / ML Real Acumulado HH / ML Real Semanal HH / ML Teorico

21.48 22.50

20.00

PRODUCTIVIDAD Y CONFIABILIDAD

17.50

14.11

13.94

14.13

14.11

13.98

13.93

15.59

13.77

13.68

13.58

11.32

11.22

13.47

13.39

13.27

13.92

12.50

12.38 11.61 10.00

10.60 97%

80% 69%

5.00 40%

68% 67%

80%

85%

69%

70%

17%

10.23

84%

86%

71%

71%

83%

73% 72%

72%

SEM 36

SEM 37

SEM 38

SEM 39

SEM 41

SEM 42

SEM 43

SEM 44

SEM 45

SEM 46

Last Planner System ® / Ing. Walter Meléndez Bernardo.

SEM 47

2

11 25 /

11 18 /

11 11 /

1 4/ 1

10 28 /

10

10

SEM 40

21 /

0.00

14 /

0

9

PPC Semanal PPC Semanal Acumulado

30 /

9 23 /

16 /

9

2.50 0%

9

10.80

52%

20%

7/

69%

68%

68%

67%

11.92 10.39

85%

77%

69%

7.50

60%

10.43

92%

7/ 1

100%

13.24

2/ 1

15.00

SEM 48

CONSISTENCIA DE INDICADORES INDICADOR

PPC ALTO = BUENA CONFIABILIDAD QUE DEBERIA PASAR BUEN FLUJO = BUENA PRODUCTIVIDAD

x

!"

!"

BUEN AVANCE = CUMPLIMIENTO DEL PLAZO

x

x

x

Last Planner System ®

METAS MUY POBRES EN PLAN /SEMANAL Ing. Walter

LOOKAHEAD NO PARTE DEL CRONOGRAMA GENERAL Meléndez Bernardo.

EL SISTEMA DE PROTECCION NO FUNCIONA

Muchas gracias Walter Gilberto Meléndez Bernardo Ingeniero Civil Correo electrónico: [email protected] [email protected] Celular: +56 956531566