DRILLING SYSTEMS

Land Test Stump with Saver Sub Insert 1/4 Turn Lock System 11” to 26-3/4” 2000/15,000 psi Operation and Maintenance Manual

SD010404-01

DRILLING SYSTEMS

All the information contained in this manual is the exclusive property of Cameron. Any reproduction or use of the calculations, drawings, photographs, procedures or instructions, either expressed or implied, is forbidden without the written permission of Cameron or its authorized agent.

Revision 02 April 2013

Produced by Technical Publications, Houston, TX, USA

© 2013 Cameron SD010404-01

2

DRILLING SYSTEMS

PREFACE The procedures included in this book are to be performed in conjunction with the requirements and recommendations outlined in API Specifications. Any repairs to the equipment covered by this book should be done by an authorized Cameron service representative. Cameron will not be responsible for loss or expense resulting from any failure of equipment or any damage to any property or death or injury to any person resulting in whole or in part from repairs performed by other than authorized Cameron personnel. Such unauthorized repairs shall also serve to terminate any contractual or other warranty, if any, on the equipment and may also result in equipment no longer meeting applicable requirements. File copies of this manual are maintained. Revisions and/or additions will be made as deemed necessary by Cameron. The drawings in this book are not drawn to scale, but the dimensions shown are accurate. This book covers Cameron products.

Cameron P.O. Box 1212 Houston, Texas 77251-1212 713-939-2211 http://www.c-a-m.com

SD010404-01

3

DRILLING SYSTEMS

SAFETY WARNING PERSONNEL AND PRODUCT SAFETY ARE PRIMARY OBJECTIVES AND THEREFORE THE FOLLOWING PRECAUTIONS MUST BE TAKEN PRIOR TO CARRYING OUT THIS PROCEDURE: All personnel must acquaint themselves fully and strictly adhere to all company sites’ HEALTH AND SAFETY AT WORK REGULATIONS, together with other specific requirements detailed in this procedure. All work is to be carried out within either a dedicated test bay area with authorised personnel entry points, or an area adequately protected from unauthorized access with a visible cordoned zone and adequately displayed warning signs detailing the test type and associated hazards. The lifting and handling of the equipment must be carried out with extreme caution and with regard to the safety regulations. All personnel in contact with the hydraulic fluid must wear suitable protective clothing and gloves if required; regarding all the necessary precautions detailed on the fluid data sheets. All peripheral equipment shall be assembled in a safe manner. Parts and related drawings shall be reviewed to identify any trapped pressure area. For work, which includes the use of pressurised fluid, compressed gas and/or electrical voltage, all necessary suitable and adequate precautions must be taken prior beginning of work. All personal working on the equipment must have the required experience, training and qualifications. ENSURE THAT NO HYDRAULIC PRESSURE IS APPLIED TO ANY OF THE CONNECTIONS BEFORE COUPLINGS ARE MADE – UP OR DISCONNECTED. ENSURE THAT NO ELECTRICAL POWER IS APPLIED TO ANY OF THE CONNECTIONS BEFORE CONNECTIONS ARE MADE – UP OR DISCONNECTED

SD010404-01

4

DRILLING SYSTEMS

TABLE OF CONTENTS I. Assembly and Parts List....................................................................................................6 II. Benefit..............................................................................................................................8 A. Test Stump Body.................................................................................................8 B. Saver Sub..............................................................................................................8 C. Support Plate.......................................................................................................9 III. Functional Description...................................................................................................9 IV. Assembly Procedure.......................................................................................................12 A. Equipment Preparation Prior to Assembly........................................................12 B. Assembly Body Test Stump (1)............................................................................13 C. Assembly Saver Sub (2)........................................................................................13 D. Install Saver Sub (2) on the Test Stump (1)........................................................13 V. Disassembly Procedure...................................................................................................13 VI. Storage...........................................................................................................................13 VI. Body Test Stump Under 11” Bore Size..........................................................................14

SD010404-01

5

DRILLING SYSTEMS

I. ASSEMBLY AND PARTS LIST

SD010404-01

6

DRILLING SYSTEMS

Parts List: Test Stump Assembly

SD010404-01

Item

Qty

Description

1

1

Test Stump Body

2

1

Saver Sub

3

1

Stud

4

2

Nut

5

2

O-Ring (in assembly saver sub)

6

1

O-Ring (in assembly saver sub)

7

1

Support Plate

7

DRILLING SYSTEMS

II. BENEFIT A. Test Stump Body The test stump body has the same internal preparation regardless of the size and the thread type. It has a centralizing cone to receive the saver sub and one free vent port .The test port is 1/2”-14 NPT up to 5000 psi working pressure, or 1” SF-1000-CX AUTOCLAVE above 5000 psi working pressure. A fitting adapter can be used to adapt this port with customer requirements. Warning: The vent port is closed only when the saver sub is installed to avoid trapping pressure below saver sub. DO NOT use the thread on vent port. B. Saver Sub

The saver sub can be used in all test stump bodies which include the typical internal preparation. The saver sub has the same external profile for all threads. It has a ring groove on the top face to limit the torque (5000 N•m) when the saver sub is installed in the test stump. On the external profile, two O-rings ensure a good sealing. It can be used as a sacrificial part when the thread is worn. C. Support Plate The support plate can be round, square, rectangular or any other shape with or without fixation holes (customer to specify at time of order). SD010404-01

8

DRILLING SYSTEMS

III. FUNCTIONAL DESCRIPTION Make sure the test stump is fully equipped with the stud /nuts fitted. Screw the saver sub with its mandrel (5000 N•m max. torque), and run down the assembly through the entire BOP stack.

Typical Arrangement

The funnel on the test stump helps centralizing during final installation of the saver sub. Rotate ¼ turn counterclockwise to lock the saver sub on to the test stump assembly.

SD010404-01

9

DRILLING SYSTEMS

The operator can proceed with the testing of the pipe ram packer and bottom connections. Close the pipe ram around the test mandrel, then apply test pressure through the test port on the test stump and/or choke and kill lines.

After the testing of the pipe ram packer is complete, bleed the pressure to zero. Then open the pipe ram and unscrew the mandrel. The saver sub will remain in the test stump housing.

SD010404-01

10

DRILLING SYSTEMS

The operator can proceed with the testing of the shear ram packer. Close the shear ram, then apply test pressure through the test port on the test stump and/or choke and kill lines.

After testing the shear rams packer, bleed the pressure. Open the shear rams and screw the mandrel on the saver sub; the saver sub is unlocked in the test stump housing. Once the mandrel contacts the saver sub, the last 1/4 turn unlocks the sub from test stump.

SD010404-01

11

DRILLING SYSTEMS

Remove the saver sub through the stack. The water is released through the vent hole.

IV. ASSEMBLY PROCEDURE A. Equipment Preparation Prior to Assembly The work area should be clean and well-lit. 1. Remove all dirt, grit and oil from ring grooves and inner surfaces of the body. Clean detergent and fresh water should be used for cleaning. High pressure air may also be used if it is dry air. 2. The back face and the mating face of the hub or flange must be free of galling, dents, upset, or raised edges as damage in these areas may prevent proper makeup of the joint. Use magnetic particle examination if necessary. In case of a defect, call your nearest Cameron representative. 3. Sealed elastomer containers should not be opened until they are required for assembly. This is to prevent contamination and damage to the seals.

SD010404-01

12

DRILLING SYSTEMS

B. Assembly Body Test Stump (1) 1. Screw a nut (4) on stud (3), then install stud through the body test stump 2. Tighten torque on another nut (4) on stud (3) (Refer to 1.D for torque value). Use Molycote grease. 3. Install ring gasket in groove. C. Assembly Saver Sub (2) 1. Install two O-rings (5) on the saver sub. 2. Install O-rings (6) on the saver sub. D. Install Saver Sub (2) on the Test Stump (1) 1. Install saver sub (2) on test stump (1) prep. 2. Rotate the saver sub (2) ¼ turn counterclockwise to lock it. The saver sub is locked when the position indicator is in front of lock marking.

V. DISASSEMBLY PROCEDURE 1. Inspect the ring groove. 2. Clean the test port. 3. Rotate the saver sub (2) ¼ turn clockwise 4. Remove the saver sub (2) and clean the sealing area (counter bore) in the body (1). Check and remove the O-rings (5) and (6) on the saver sub if damaged.

VI. STORAGE 1. Flush the test stump saver sub box connection, and inspect the gasket groove, back face and the mating face of the hub or flange. 2. Disassemble the test stump. Clean and inspect all parts. Studs, nuts and hubs which have visible cracks, or any visibly worn or deformed threads must be replaced. If in doubt, contact your nearest Cameron representative. 3. Flush and inspect the gasket and hub or flange connection using magnetic particle examination if necessary. In case of defect, call your nearest Cameron representative. 4. Reassemble the test stump. Spray internal surfaces, hub or flange, ring gasket, and components of connector with oil. 5. Install metallic protector on the hub or flange connection, and protect the test port.

SD010404-01

13

DRILLING SYSTEMS

VII. BODY TEST STUMP UNDER 11” BORE SIZE The thread is integrated in body test stump, there is no saver subs for 7-1/16 bore size.

SD010404-01

14

DRILLING SYSTEMS

NOTES:

SD010404-01

15

CAMERON P.O. Box 1212 Houston, TX 77251-1212 USA Tel 1-713-939-2211 www.c-a-m.com

ENVIRONME N

XCELLEN LE CE TA

TH SAFETY AL A HE

ND

CA

HSE Policy Statement At Cameron, we are committed ethically, financially and personally to a working environment where no one gets hurt, nothing gets harmed.