SCFT-Training v 10.0
Short Description
SCFT...
Description
SCFT Procedure Prepared by: Samsung
Course Name: SCFT Procedure Course Objective This module will enable participants to understand how to conduct SCFT with hands on practice using S4 Mini This module will also help to understand the Work Flow Management for SCFT(WAS-SCFT)using online portal SITFORGE.
Session -2 •SCFT -S4 Mini/ troubleshooting Guide
•SCFT Physical Checks & Preparation
• Important Notes
• SCFT Tool & Process (XCAL mobile - software version Operational Process •SCFT Demo- Using s4 Mini handset
Lunch break
Session -1 • SCFT Introduction •SCFT Tests Day 1
Who should attend Field engineers -Solpar Drive test Engineers-Solpar RF Leads / Area ManagersSamsung Quality Manager-Solpar & Samsung
• Hands on exercises
• SCFT WAS Workflow •SCFT Site forge module demo •Accelerating SCFT process
Document History
Edition
Date of Issue
Author
Ver 1.0
15th Feb 2014
Samsung Training Team Preyas Hathi
Ver 2.0
1st
Ver 3.0
18th
May l2014
Samsung Training team
Ver 4.0
20th June 2014
Samsung Training team
Ver 5.0
March 2014
13 July 2015
Samsung Training Team
Samsung Training team
Remarks
Initial Version for conducting Pilot batch
Added Roles and responsibility of DT engineer, Solpar PM and Area manger
SCFT Drive test process updated Added site forge WAS module
Added S4 Mini Troubleshooting process
Document History
Edition
Date of Issue
Author
Remarks
14Aug2014
Samsung Training Team
SCFT Drive test is to be done only within Best server plot of the site and only a single road towards neighbor site is to be driven
15 Oct 2014
Samsung Training Team (HD)
Merged SCFT process and WAS into one slide Updates : Merged SCFT process and added siteforge WAS
Ver 7.0
28 Oct 2014
Samsung Training team (HD)
Ver 8.0
01 Nov 2014
Samsung Training team (HD)
Updated the SCFT issues as per guidelines for Solpars Updates : As per solpar field issues listed added and or modified slides #11, 37, 38, 39 Updated the SCFT issues as per guidelines for Solpars Updates : As per solpar field issues listed added and or modified slides #40, 52, 53
Ver 5.0
Ver 6.0
Ver 9.0
13 Jan 2015
Ver 10.0
13th March 2015
Samsung Training team Ashish Shukla Samsung WJ Lee
Accelerating SCFT Process change recommendation From Slides 84 to 107 Added Additional Trouble shooting Slide :90-101 Accelerating drive test Process Slides 135,138-145
Good to know Keep your mobile phone in the silent mode during the session Need to sign attendance sheet at the start and end of each day At the end of each training post test will be conducted
Stick to break timings Your valuable feedback will be taken at the end to enhance training experience For logistics support contact the co-ordinator
Agenda Health & Safety Requirements Introduction to SCFT
What is SCFT Overview of SCFT Process SCFT Workflow Roles & Responsibilities
SCFT Requirements Lead time Tools
Preparations for SCFT
TSSR Review eNB Parameter Review Drive Route Checklists
Agenda Physical Site Check Measurements of height, azimuth, tilt
Drive Test SCFT Stationary test SCFT Moving test Checklist during drive Post SCFT Drive
SCFT Tool(XCAL mobile - software version v4.09.139 ) Operational Process Stationary test Moving test
SCFT S4 Mini Trouble shooting guide Important Notes Accelerating SCFT process
Introduction to SCFT
Single Cell Functional Test (SCFT) Verification of
(((
(((
Availability and performance of desired services Physical configuration of the eNodeB for each sector Correct installation and configuration of the eNodeB
Testing specific services at the site and while driving around the site
SCFT Process Preparation for SCFT
Instruction from SOLPAR Project Manager
Physical checks of eNB site
SOLPAR Scope
No
Pass Yes
Drive Test
Submit SCFT report to RJIL
Adjust Antenna Parameter and etc.
SCFT Team Composition SOLPAR PM
DT Engineer DT Engineer
Roles & Responsibilities – SOLPAR Project Manager Daily tracking of progress status
Extend support to circle SCFT Team for their minor & critical issues. Interact with Samsung on Progress Management: Daily, Weekly, Monthly basis. SCFT Team Management and site allocation to DT Engineers, Riggers & Car drivers. Validation of drive routes, discussion of issues, site performance analysis Support field team for troubleshooting and any other support during SCFT activity Prepare the RF Database and data backup of all drive related tests ( including any snaps) and provide to Samsung
Roles & Responsibilities – SOLPAR DT Engineer Perform Field Test: DT testing and data collection during SCFT/Cluster Optimization Check site information & change Ant. Parameters
Carry all the necessary tools in field
Rigger will check site as per the checklist
Rigger will make corrections on site and inform Drive Test Engineer Drive Test Engineer will create the drive routes & configure the Smart S4 mini as per defined test scenarios
Drive Test Engineer will save the log file. In case of handoff fail, bad RSRP, call drop etc., inform respective teams immediately
Summary Strictly follow all the health & safety guidelines SCFT verifies the availability and desired performance of a site SCFT involves physical & parameter check of eNodeB, corrections if needed, followed by a drive test around the site SCFT team consists of an DT engineer, Rigger and Car driver with well-defined roles and responsibilities for all
Quiz You find that the antenna azimuth is incorrect. You will _________ • Correct it, log and report the error and then proceed with drive test • Proceed with the drive test and report it later • Cancel the drive test
During the drive test, handover fails. You will _______ • Continue with the drive test as it is • Report it to the respective team before continuing • Cancel the drive test EMF survey is conducted by rigger_______ • Before the SCFT drive • After completion of the SCFT drive • In parallel with the SCFT drive
SCFT Requirements
Tools Required S.No
Tool Name
Description
Specification
1
Vehicle with AC
Driving test & power supply
Must have cigarette lighter point for connecting the power inverter
2
Power inverter
DC to AC
Over 500W
Need 2 test mobile phones DL, UL and VoLTE test SIM card to support from RJIL 2 EA Charger 2 EA Extra battery (Optional) 2 EA Smart phone holder
3
Smart phone (with D M application)
UE with XCAL
4
Compass
Measurement of antenna azimuth
5
Tilt Measure
Measure the antenna tilt
Laser meter or measu ring tape Multi tab (Power extension)
Require to check the antenna height
If using measuring tape, above 50 m eters
Extension cable for connections of lap top etc.
Over 5 Ports
8
Spanner
Adjustable spanner
1 set
9
Handset
S4 Mini
2 nos
10
Tool kit
Rigger tool kit, for physical changes
1 set
6 7
UE (Smart phone) Testing Check performance of the smart tool DM at least twice a month, e.g. in the 2nd and 4th week of the month Check at a location where following coverage criteria are met • RSRP : better than -70dBm • SINR : better than 23 dB
Check based on RF parameters RSRP, SINR, Throughput, MCS, CQI etc
Maintain a detailed sheet to identify the best performing Smart DM tools
Maintain performance check records with history as per the attached sheet Appendex-Smart DM performance management.xls
Preparations for SCFT
Preparations for SCFT Get Site Access Confirmation from SOLAPR PM
Check the alarm status from LSMR engineer and ensure not to have any service affected alarm on site
SOLPAR Engineer will collect the TSSR Report & Cell ref file from SOLPAR PM who in-turn shall collect the TSSR report & Cell ref file from Samsung circle RF Lead
Check other tools readiness like magnetic compass, tilt meter and laser meter
S4 mini mobiles should be ready with fully charged condition along with mobile charger, Mobile holder, Inverter, 4 points spike guard
Rigger readiness along with tool kit and safety Kit (Safety belt, Safety Shoes & Helmet) 7) If wall mount antenna or Highway/Flyover mount site, then accordingly arrange extra wall mount rigger with rope etc and hydraulic vehicle (by informing SOLPAR PM and Samsung area manager) in advance respectively Important: no Test can be carried out if the handset. Is less than 10% charged
Preparations for SCFT…
TSSR/Cellref Review
eNB Parameter Verification from LSM-R
Drive Route
Checklist
Preparations for SCFT… Technical Site Survey Report (TSSR)/ Cell ref info
Ensure that the site is verified as per TSSR/Cell ref file, any deviation need to report Samsung immediately Attached annexure-1 for the same to be filled up and handed over to SOLPAR PM, who later sends it over to Samsung RF manager. In case of any deviation in the same it needs to be corrected in cell ref file/field before proceeding for the drive. If it’s a RP1 site and On field data does not match with cell ref file then no need to rectify physical parameter at field but need to correct only cell ref file.
Preparations for SCFT… Technical Site Survey Report (TSSR/Cell ref) • Site Name, and Site Address • Site location in terms of LAT/LON • PCI Site information
• Antenna Azimuth, Antenna Height, Antenna Tilt(electrical tilt) • Antenna physical blockage in main/side lobe (if any) • Tower type (RTT, Wall mount, Pole mount, GBT) in case of wall mount arrange extra wall mount rigger with rope
Antenna parameters
Simulation (Coverage Statistics – RSRP)
• Outdoor Analysis of signal strength for outdoor coverage • Indoor Analysis of signal strength for indoor including penetration loss • Worst Area Analysis by Simulation Plot
Important: Check alarms before moving to site for SCFT
Preparations for SCFT… Technical Site Survey Report (TSSR/Cellref)…
Satellite & Vector maps
Site drawing map
• Satellite map: Pre analysis for service area. Google earth snapshots of actual locations and populated areas • Vector Map: Refer during drive test.
• eNB installation information such as Antenna Pole Location • Antenna direction in terms of Azimuth • Location of ODU (outdoor unit) or shelter room of eNB • Location of other operator Antenna Pole & Shelter room
Preparations for SCFT…
TSSR /Cell refReview
eNB Parameter Verification from LSM-R
Drive Route
Checklist
Preparations for SCFT… eNB Parameter Verification from LSM-R
SOLPAR PM
OPT Engr
SOLPAR DT Engineer
SOLPAR Project Manger instructs solpar Field engi neer to collect eNB parameters from LSM-R engin eer(Samsung) SOLPAR DT engineer will act accordingly and reque st status of eNB parameters from LSM-R engineer (for alarms and site readiness verification) LSM-R engineer will instruct DT Engineer (SOLPAR) If site has service impacting alarm that need site visit by deployment team, then the DT Engineer sh all move over to the next site as assigned by SOLPAR Project manager.
SOLPAR Project Manager has to keep Samsung circle RF lead in loop for all communication
Preparations for SCFT… Line items to be checked by LSMR engineer before the SCFT are as follows:
Site operational status (Site should be ON) Site should be free from service affecting alarms (like VSWR etc.) Identify and inform the latest PCI for both the test site and the neighbor sites (if the cluster is already launched) with LSMR engineer before moving to the site. Neighbor site PCI can be taken from LSMR engineer. SCFT site vital parameter needs to be checked like ANR enabled, Handover defined etc. PCI,Cell,TAC ID Smart scheduler OFF
MIMO Type (2x2, 4x2) from LSM-R
TX power from LSMR
Configuration Parameters
MIMO Mode (TM3/TM4) from LSM-R
Access class barred for other UEs
SON, ANR features
Preparations for SCFT… eNB Parameter Verification from LSM-R
Service Affecting Alarms
• • • •
Site down High drop Rate Low Tx Power GPS Alarm
• VSWR should be 5 min & GPS number of satellites > 4 Low Battery voltages and rare Geomagnetic storms may result in erroneous GPS readings GPS should not be used for Ground Elevation readings as the inaccuracy can be well over 30m Stand in the center of the site location (GBM, RTT,RTP) Once the satellites are acquired, note co-ordinates for N & W in degree - de cimal format. Update this information into check list for pre-post comparison and for data base tracking
Checking Antenna Azimuth Stand in front of the Antenna When taking compass readings, keep at least 8m distance from any magnetic, metal, or current carrying structures such as towers, vehicles, or cables for correct readings Open compass and wait a moment till the compass needle is stationary Check the antenna azimuth with reference to North & measure the value in degrees Compare the observed value with the one in the TSSR In case a mismatch is detected, make corrections on site Mention the values in the check list for pre-post comparison and for database tracking
Check Azimuth – marking on map Check the service direction of the antenna Mark the main serving direction of the antenna on the map
Tower Height Measurement – Laser Meter Stand on the edge of tower Press start button and then press “measure” button
Wait for 2-3 minutes or check the ground or building from the built-in binoculars in the laser meter Press the “measure” button again Take pictures of the value in meters
Tower Height Measurement - Tape Drop the measuring tape from the edge of the tower platform Team member at the ground end will record the value
Antenna Height – RTP / RTT
Antenna Height – GBT / GBM Compare the value on TSSR with actual result Correct the Antenna Height if mismatch with TSSR Report
Antenna Mechanical Tilt Measurement Bring tilt measure in contact with antenna on the back side & center(①) Adjust the tilt measure (②) to level off (③) Check tilt of antenna (④), as per the picture red line is on 3rd mark from zero, w hich means that the tilt is 6 degrees {one mark = 2 degree and consider the bott om scale} Compare the value on TSSR with actual result Correct the Mechanical Tilt in case of mismatch with the TSSR Report Mention the values into check list for pre-post comparison and for database trac king To change tilt, loosen all nuts, adjust tilt as desired and then tighten them
Drive Test
SCFT Drive Test After completing physical verification, SOLPAR engineer will start performing drive test. Drive test to be performed on all motorable roads. The mobiles need to be attached on car dashboard while doing drive test. Check FMS server connectivity to site by downloading test scenarios on “XCAL Auto Mobile” over mobile. SCFT drive test activity has two type of tests. 1. Stationary Test a. Attach b. VOLTE Short call 2. Moving Test a. FTP -DL b. FTP -UL
Stationary Test ( Alpha Sector) Stationary Test Procedure:
Drive test engineer will start the drive test activity with stationary test. Move over to Alpha sector and perform following activities Latch on alpha sector PCI and RSRP, it should have a stable dominant RSRP level from serving cell, and neighbor cells should not be dominant. Check GPS status and select destination value of co-ordinates from map window. Assign “Stationary-1” call setting with Cycle information & site details, (CYCLE should remain the same until the complete SCFT test (STATIONARY & MOVING) ends), if you have to restart the test cause of any issue then issue new and different cycle number, but it should be same for stationary and moving test (ideally it should be incremented by 1, every time you repeat the test on same site), cycle is a reference for naming the log files.
Stationary Test( Alpha Sector)… Perform under mentioned test by pressing “AUTO CALL” over the s4 mini phone. . Stationary Test a. Attach b. VOLTE Short call At the end of “Auto call” press status as “In Progress”. Press “Auto DRM/DRX Upload” button which is popped up & wait for upload to finish.
Stationary Test(Beta Sector) Drive test engineer now moves over towards Beta sector and performs the following activities during stationary test: Check PCI Assign “Stationary-2” call setting with cycle information & site details Perform under mentioned test by pressing “AUTO CALL” over s4 mini handset. a. Attach b. VOLTE Short call At the end of Auto call press status as “In Progress”.
Press “Auto DRM/DRX Upload” button which is popped up & wait for upload to finish.
Stationary Test( Gamma Sector) Drive test engineer shall move over towards Gamma sector and perform the following activities during the stationary test Check PCI and latch to it. Assign “Stationary-3” call setting with cycle information & site details Perform under mentioned test by pressing “AUTO CALL” over s4 mini handset. a. Attach b. VOLTE Short call At the end of “Auto call” presses status as “Completed”. Press “Auto DRM/DRX Upload “button which is popped up & wait for upload to finish
Moving Test After completion of “Stationary” test now the DT has to go for the “Moving test”, drive test engineer will use two S4 mini handsets. There will be two different tests that shall be performed on these handsets.
One handset for DTDL One handset for DTUL
“Moving test” call logging should start by performing a walk test around the site in clockwise and anticlockwise direction for checking the inter-sector handover within the SCFT site and checking the correct PCI as seen in cell reference file. Drive test engineer will carry out the remaining part of moving test while in car in a continuous log. Keep checking the PCI of serving cell so as to confirm handover between neighbors of same site.
Move from Alpha sector to Beta sector to check handover between them. Move from Beta sector to Gamma sector to check handover between them. Move from Gamma sector to Alpha sector to check handover between them. Move from Alpha sector to Gamma sector to check handover between them. Move from Gamma sector to Beta sector to check handover between them. Move from Beta sector to Alpha sector to check handover between them. Make “Coverage footprint” of each sector in all possible drive routes based on Morphology based RSRP Levels. After finishing the clockwise / anti-clockwise routes, You must run through DTR (Drive test route) provided to you by Samsung RF lead NOTE : Samsung RF lead has to provide DTR based on best server plot , as per example attached below. Or Alternately Samsung RF lead must follow procedures provided by National RF Optimization team to prepare DTR , This is Mandatory
Moving Test… Important: If handovers are not happening between neighbor cells then stop the drive and call up LSMR engineer for handover definition or any alarms related to the same, and resume the drive, post the resolution of the same.
Press “Stop” after completion of drive on both handset( based on steps as above) and press status as "Complete” . Press “Auto DRM/DRX Upload” button which gets popped up in both handset & wait for upload to finish. Ask the LSMR engineer to lock the site. Inform the SOLPAR PM and Samsung area manager about the completion of the drive and move for the next drive if time permits for the day.
Checklist during drive If any Attach fail, /Access fail, Handover fail, Sector swap are observed during drive test then call should be immediately stopped and LSMR engineer should be contacted for any running alarm. Later fresh drive for the same should be done post rectification. During drive test and eNB physical verification if any physical obstruction due to which drive couldn’t be done on that road then SOLPAR DT engineer needs to take the snapshot and pass it over to Solpar PM. If SOLPAR engineer can’t drive around in the clockwise or anticlockwise direction then he has to mention the reason against the same along with a snapshot proof. Also if for the stationary test, SOLPAR engineer is unable to go into the main lobe while still in car, then he must try to walk and go into major lobe of the sector, if even that is not possible then he should take snaps to support the same. The SOLPAR engineer should not wait more than 30 mins (post escalation to LSMR and self troubleshooting) for any issue resolution at the site. If issue resolution is taking time, then he should move to the next site.
Post SCFT Drive All snapshots post SCFT (road and antenna obstructions) should be taken and sent to SOLPAR Project Manager/ Samsung Area Manager/Circle RF Lead. Backup of log files in memory card to be taken by the DT (this will required if any file got corrupted during upload). Same to be handed over to Circle RF Lead. Contact LSMR Engineer to lock the site (all three sectors). Handover the keys back to from where they were taken. Inform the Solpar PM and Samsung RF lead about completion of the drive test. Move over to the next site.
SCFT Tool (XCAL mobile - software version v4.09.139 ) Operational Process
SCFT Tool(XCAL mobile) -Operational Process Stationary Test:
Please follow below step by step process, in order to conduct SCFT automation process on XCAL Auto call Only 1 mobile is used for Stationary test. The screenshots are only applicable to handset software version v4.09.139 Start Samsung S-4 Mini testing handset.
SCFT Tool Operational Process – Stationary Test Start “X-Cal Auto” on handset and wait for IP framing Message.
Press GPS unlock message (If it appears)
SCFT Tool Operational Process – Stationary Test(Alpha Sector) Wait for GPS to latch with satellite
Latch on Alpha PCI and start from Alpha Sector.
SCFT Tool Operational Process – Stationary Test(Alpha Sector)… Go to “Report mode” and select the same. As depicted in below screenshots.
SCFT Tool Operational Process – Stationary Test(Alpha Sector)… “GPS Selection”: Give destination value of Co-ordinates from map window of handset (if location not automatically pointed, then do it manually—by pressing “GPS value” and once map can be seen then locate your position on map, and pressing and holding the probable area where you might be based in. manual process shown below) ,green dot of GPS shall appear then press “Back” button( as shown in third screen shot) and check if GPS coordinates have appeared on screen. GPS is latched now.
SCFT Tool Operational Process – Stationary Test(Alpha Sector)… Download name of the cluster by pressing “Down” on Handset. After pressing “Down”, name of cluster (MUMB-0107 here) in which the Lat/long is lying shall pop up, select it.
SCFT Tool Operational Process – Stationary Test(Alpha Sector)… By pressing “Setting” in main window assign under ‘Select type’, “SCFT” and then under ‘Test type’ “STATION 1” (refers to stationary 1 test) and then under ‘Site’ select “Site name” and select “Cycle number” under ‘Cycle’ and press “Save”. (CYCLE should remain the same until the complete SCFT test (STATIONARY & MOVING) ends), if you have to restart the test cause of any issue then issue new and different cycle number, but it should be same for stationary and moving test (ideally it should be incremented by 1, every time you repeat the test on same site), cycle is a reference for the log files. By pressing “Setting” in main window assign under ‘Select type’, “SCFT”
SCFT Tool Operational Process – Stationary Test(Alpha Sector)… Under ‘Test type’ “STATION 1” (refers to stationary 1 test) and then under ‘Site’ select “Site name”
SCFT Tool Operational Process – Stationary Test(Alpha Sector)… Select “Cycle number” under ‘Cycle’ and press “Save”.
SCFT Tool Operational Process – Stationary Test(Alpha Sector)… In same handset by pressing “Scenario” in main window select “SCFT” and then press “OK” over the prompt “SCFT change scenario”. Now press “Start” under “Autocall”.
SCFT Tool Operational Process – Stationary Test(Alpha Sector)… You can see the following test happening one by one.
SCFT Tool Operational Process – Stationary Test (Alpha Sector)… At the end of ‘Autocall’ press status as “In Progress” (Msg which is popped up) Press “OK” for ‘Auto DRM/DRX upload’ prompt which is popped up & wait for upload to finish.
After the upload is done for Stationary 1 test, it will prompt for “Do you want to perform Stationary 2”. Now go for stationary 2(Beta sector) test.
SCFT Tool Operational Process – Stationary Test (BETA Sector) Now move to Beta Sector and latch to Beta sector PCI. Press “OK” in handset for “Do you want to perform stationary 2” prompt. Next under ‘Autocall’ press “Start” in main window (other setting remains same as in Stationary 1) & repeat the procedure as done in “Stationary 1” test from Auto call “Start” up-till file upload, make sure the Cycle remains the same. Press “In Progress” after end of auto call in beta sector and then press “Ok” for “Do you want to upload right now” prompt.
SCFT Tool Operational Process – Stationary Test( Gamma Sector) Now proceed for Gamma sector, latch to Gamma Sector PCI for “Stationary-3” test and repeat the process as done in Beta sector. The difference here being that when the test ends the file upload status should be selected as “Complete” instead of “In progress ” which was done while in alpha and beta sectors.
SCFT Tool Operational Process – Moving Test Under Moving test, follow the under mentioned steps in both handsets as depicted.( this step is same as done in stationary test)
SCFT Tool Operational Process – Moving Test… Select “GPS” in both handsets as was done in stationary mode. ( this step is same as done in stationary test)
After selecting GPS, download name of the Cluster by pressing “Down” on both handsets. After pressing “Down”, name of cluster (MUMB-0179 here) in which the Lat/long is lying shall pop up, select it. ( this step is same as done in stationary test)
SCFT Tool Operational Process – Moving Test… In both handsets Press “Setting” in main window and press “Select type” as “SCFT” and then “Test type” as “Moving” and then under “Site“ select “name of the site” and “Cycle number” and press “Save”. (CYCLE should remain the same until the complete SCFT test (STATIONARY & MOVING) ends). if you have to restart the test cause of any issue then issue new and different cycle number, but it should be same for stationary and moving test (ideally it should be incremented by 1, every time you repeat the test on same site), cycle is a reference for the log files. Press “Setting” in main window and press “Select type” as “SCFT” and then “Test type” as “Moving”
SCFT Tool Operational Process – Moving Test… Under “Site“ select “name of the site”
Press “Cycle number” and press “Save”
SCFT Tool Operational Process – Moving Test… Press “DTDL” in one and “DTUL” in other handset respectively and then press “OK” for ‘DTDL/DTUL change scenario on both handsets.
Press ”Start” under ‘Autocall ‘ in both handsets. Check the traffic should get started on both handset .
SCFT Tool Operational Process – Moving Test… Now do walk test around the site from to confirm inter sector handover from Gama to Alpha, Alpha to Beta, Beta to Gamma and then reverse from Gamma to Beta, Beta to Alpha, and Alpha to Gamma & then continue the drive in CAR from Gama to Alpha, Alpha to Beta, Beta to Gamma and then reverse from Gamma to Beta, Beta to Alpha, and Alpha to Gamma, once inter sector handover are confirmed then continue the drive for Coverage footprint of each sector by driving all roads within the “Best Server Plot” of the site and additional only 1 road drive in each sector connecting SCFT and Neighbor site beyond Best server plot is to be done until a handover happens. Press Auto call “Stop” after completion of device on both handset and Press "Complete” under ‘select’. Press “Auto DRM/DRX Upload” button which is popped up in both handset & wait for respective uploads to finish only then move from the site.
New features added…..logging file size Logging file size can be configured....
NOTE : The size must be set to 50MB (Mandatory), Latest XCAL ver. will automatically start new files after 50MB. If you don’t set it right, there will be re-test request as logs of improper size will cause preprocessing issues
New features added…..log Upload - Manual After every test scenario whenever this is prompt to upload Logs upload it Press “OK” for ‘Auto DRM/DRX upload’ prompt which is popped up & wait for upload to finish.
This will automatically upload the logs after every test scenario. Instead of pressing Ok if you choose to cancel or mistakenly press cancel then you need to upload logs manually as explain next slide
New features added…..log Upload - Manual Uploading of logs can be two ways : Manual
If you missed or choose to not to upload logs auto when there was a prompt every time then upload manually Press “Log Upload” button and it will show list of logs pending to be uploaded Select the logs to be uploaded based on date ×tamp Upon uploading the logs the file names will disappear from pending list
NOTE : Cycle is very important in order to distinguish logs Unless mentioned by RF Optimizer or RF lead never change cycle number. It should be always “1” for all the log files / test scenarios for one round on any given day. Only when you are requested to do second round another or other day you will be asked to change cycle number to “2” by your RF optimizer otherwise don’t change
New features added…..log Upload - Automatic Uploading of logs can be two ways : Manual or Automatic.
NOTE : The size must be set to 50MB (Mandatory), Latest XCAL ver. will automatically start new files after 50MB. If you don’t set it right, there will be re-test request as logs of improper size will cause preprocessing issues
New features added..FTP server selection Manual selection of FTP server possible..
New features added…..VOLTE dialed call Manual selection of dialed number possible..
SCFT -S4 Mini - troubleshooting Guide
No Network service on Handset 1) No network service on S4-Mini handset Observed Issue: As shown in picture below though we are able to see our network parameters being received by the S4-Mini handset, the handset is not registering to the LTE network.
No Network service on Handset… 1) No network service on S4-Mini handset Root Cause: As shown in picture below the “Mobile data” or “Data roaming” settings was unchecked under “Mobile networks” settings.
No VoLTE service status on S4-Mini handset 2) No VoLTE service status on S4-Mini handset Observed Issue: As shown in picture below, though we are able to see data services are active, no VoLTE service is being observed. The internet & FTP session are running fine as shown. When VoLTE call is made it shows “mobile network not available”.
No VoLTE service status on S4-Mini handset… 2) No VoLTE service status on S4-Mini handset Root Cause: As shown in picture below, problem was caused due to change in “PDN preference settings”. Here “Enable Internet PDN” was unchecked. Please restart the phone after checking the “Enable Internet PDN”. Any change to the VoLTE configuration apart from above element, can cause this type of problem.
XCAL-Mobile Software (Not XCAL-Auto Call) doesn’t start 3) XCAL-Mobile Software (Not XCAL-Auto Call) doesn’t start Observed Issue: XCAL-Mobile (Not XCAL-Auto Call) stops after showing message as “License Error (UE time setting must be automatic)”
XCAL-Mobile Software (Not XCAL-Auto Call) doesn’t start… 3) XCAL-Mobile Software (Not XCAL-Auto Call) doesn’t start Root Cause: This was caused since the “Automatic date & time” was unchecked in “date & time” settings.
FTP DTUL failed on Handset 4) FTP DTUL failed on Handset Observed Issue:
FTP DTUL call failed on a particular handset.
FTP DTUL failed on Handset… 4) FTP DTUL failed on Handset Root Cause: As shown below, the FTP URL in which file is going to be uploaded, does not change as per FMS server settings. This caused FTP traffic failure on the slave handset. This issue could be due to XCAL-Auto Mobile Version mismatch or old version being used on slave handset as shown, since after upgrading the XCAL version, the issue got resolved.
Not able to download scenario 5) Not able to download Stationary or Moving scenario. Observed Issue:
Unable to download Stationary or Moving scenario Root Cause:
check the FTP server connectivity in your phones, check the IP address, user id and password and server path as shown below.
Important Notes
Sector Swap Verification After Physical site parameter verification, condu ct drive test in clock wise and anti-clock wise dir ection to identify any sector swap If found, take corrective action before going for coverage drive test If service-direction of PCID has changed, Data Throughput degradation and Handover Fail can be observed Sector Swap / Call drop: During Stationary test , Engineer must verify correct PCI for every sector, This can be done by checking the Changed PCI per sector and matching it will DTR or Cell Ref file provided to him by RF Lead. During clockwise and anticlockwise moving test if there is call drop &PCI is changed after call drop then redo the clockwise/anticlockwise loop if call drop occurs again. Don’t proceed with SCFT & report to RF Lead
SCFT Parameter Requirements
Min
Average
Max
DL Throughput
2 Mbps
20 Mbps
40 Mbps
UL Throughput
256 Kbps
1Mbps
4 Mbps
RSRP
-108 dBm
--
--
SINR
20 dB
--
--
Legend Throughputs for Moving in Worst condition shouldn’t go below min. as per following table when RSRP = -108dbm and SINR = 20db
Please note Throughput should be better when RSRP and SINR is better * Above table is just for reference for worst condition only
Summary eNB physical check involves checking azimuth (note free range), tilt, antenna height, tower height
SCFT consists of stationary and moving tests Stationary tests include ping, UL & DL throughput and VoLTE connectivity check Drive around the site clockwise & anti-clockwise for moving tests
Especially check for sector swap using PCI Ensure RSRP, throughput and SINR ranges are met
Quiz Average DL throughput should be at least ____ • 4 Mbps • 20 Mbps • 40 Mbps
Sector swap can be identified based on • PCI • RSRP • VSWR Moving test in SCFT does not include • FTP • VoLTE • Either
Work Flow Management for SCFT
Introduction to Work Order Assignment Management Work Order Assignment Management is also known as WAS. WAS is going to help users in automating the Work Order(WO) flow in a systematic manner using a portal called SITEFORGE. Using this portal each level of Management employees will receive and execute their WO or Task assigned to them. Helps to trace the network status through online mode. Provides Visual steps to guide users on progress and upcoming steps. Improves productivity & complete visibility. Helps users to monitor Parameter Compliance Index(Planned Vs. Actual). Helps users to Search/Filter Sites & WO based on various parameters.
Network Lifecycle Management Flow for SCFT (Work Allocation System)
Work Flow Management for SCFT Start RFI report submit Trigger from GIS & WO Issued to Samsung Circle Head (CH)
Notification:Samsu ng AM, RJIL CTO
Samsung CH assigns the WO to respective Samsung Area Manager (AM)
Notification: Samsung CH, SOLPAR PM
AM Splits WO into tasks & assigns SCFT task to respective Solpar PM as per the area.
Notification: Solpar PM, Samsung RF Lead
SOLPAR PM Assigns of SCFT Task to SOLPAR field eng
Accept/Reject(i f SOLFE is needed to be involved
SOLPAR FE Does the SCFT test in accordance with SCFT Test Procedure and update the siteforge server if any parameter updates are done for the site.
Samsung Optimization engineer.
Reject
Notification : Samsung Area Manager, Sasmsung RF lead, RJIL RF lead, SOLPAR FE
Reject
Responsibility: GIS/SIITE FORGE; Notification: Samsung CH
Accept RJIL CTO Validates SCFT report
Accept
Notification: Samsung AM, Samsung RF Lead, Samsung CH, RJIO CTO.
Notification:Sams ung AM, Samsung RF Lead, Samsung CH, RJIO CTO, RJIL RF lead
Task closure in SITEFORGE
Notification: Samsung -CH
Samsung Optimization team Validates the SCFT report(Accept/Rej ect)
All tasks (ATP11A, ATP11B, SCFT & EMF) completed, WO closure
End
Responsibility: RJIL Circle CTO / GIS / System Notification RJIL Circle CTO, GIS
SCFT procedure on Site Forge (WAS)
CH - Login
Circle Head can login by entering his user name & password here
CH – Dashboard, Sites CH has logged in & he is able to view dashboard which overview of Site details
Filters are available here to extract data Site details are available here
CH – Sites…
Click here to know details of that particular site
Siite summary,RAN,Inv entory,Trasnport,P htos,Regulatory & Documents can be viewed here
CH – Work Orders , Sign out
Option to Sign Out CH has to click here to Assign or Re-assign WO to AM
CH has to click here to Assign or Re-assign WO to AM
Select AM from drop down
AM – Login, Dashboard
AM can login by entering username & Password here
AM can view dashboard here
AM has logged in here
AM – Sites List of sites are displayed here
Filters can be accessed here
Reports can be downloaded here by AM
AM – Work Orders List of Work Orders are displayed here
Filters can be accessed here Click here to assign or reassign Samsung engineer
After assigning engineers from drop down Click here
AM – Work Orders…. Click here to see the list of tasks available Click here to assign the task to SOLPAR PM
Assign task start/Finish dates and select SOLPAR PM from drop down
SOLPAR PM- Sign In, Sites
SOLPAR PM logs in by entering User name & Password
Sites information can be accessed here
SOLPAR PM has logged in Filters for accessing data
SOLPAR PM- Sites
By clicking on particular site SOLPM will be able to see details of that site
SOLPAR PM- Tasks List of tasks are displayed here
Click here to assign the task to SOLPAR FE(DT Engineer)
select responsible SOLPAR FE(DT engineer)from dropdown
SOLPAR FE(DT Engineer) – Sign In , Sites
SOLPAR FE(DT Engineer)logs in with his user name & Password
List of sites to be handled can be viewed here
SOLPAR FE (DT engineer)has logged in here
Filters are available Here
SOLPAR FE(DT Engineer) – Tasks
FE has to click here to complete task “Perform SCFT” Click here to edit any parameters value if DT has changed during SCFT
SOLPAR FE(DT Engineer) – Tasks
After Editing the parameter FE has to save here
SOLPAR FE(DT Engineer) – Tasks…
Parameter Changes can be viewed by clicking here
SOLPAR FE(DT Engineer) – Tasks , Sign out
By clicking here FE will be able to see Reject reason of SCFT report
Option to sign out
Samsung Optimizer – Sign In , Sites
Samsung Optimizer logs in here
Samsung Optimizer views list of sites
Samsung Optimizer – Sites
When he clicks on particular site he will be able to see Site summary & Etc.
Samsung Optimizer – Sites… RAN details are displayed here
Inventory details are displayed here
Transport details are displayed here
Site photos are displayed here
Samsung Optimizer – Sites… Regulatory details are displayed here
Site documents are displayed here
Site documents can be uploaded here(if any)
Samsung Optimizer – Tasks List of tasks to be handled are displayed here
Task status is displayed here
Click here to know the reason for rejection
Paramet er changes info can be seen here
Samsung Optimizer – Sign Out
Samsung Optimizer can sign out here
Accelerating the SCFT Process change recommendation
KPI Failure rate during SCFT SCFT KPI VoLTE/Attach Success (6)
Fail Reason Stationary Test Fail Handover Fail (No Attempt, HO Fail) Azimuth Mismatching BSP Mismatching Coverage Objective Fail. Missing Route Crossed Feeder or CPRI cable Total
Handover (6)
Coverage Object Met (3) Sector Swap (3)
KPI Fail % 20.9% 19.0% 13.5% 6.6% 16.7% 20.4% 2.9% 100%
VoLTE/Attach Success Stationary Test Fail 2.9% 20.4%
Handover Handover Fail (No Attempt) 20.9% Coverage Object Met Azimuth Mismatching
16.7%
19.0% 13.5%
6.6%
Coverage Object Met BSP Mismatching
Coverage Object Met Coverage Objective Fail. Coverage Object Met Missing Route Sector Swap Crossed Feeder or CPRI cable
SCFT Process [ Automation System ]
[ SAMSUNG ]
Make Cellref File & BSP
[ Circle RF Lead]
[ SOLPAR ]
Provide updated Cellref file & BSP to RF lead every week
Make SCFT DTR No
SiteForge
Report Verify
Provide SCFT DTR (Map & Ant. Info) to SOLPAR team Provide Fail Reason Order Rework (Physical para., Station, Handover, Drive Test)
Yes
ActixOne
SCFT Site Survey
Report Submit Yes
FMS
Change Ant. Para
Ant.Para Mismatch
PA2
No
Stationary Test
PA6,8
Handover Test
PA3
SCFT Drive Test
PA4,7
Log file Upload
PA2 Azimuth Correction at Site NOPT
Samsung (Circle RF Team)
Cellref Eng.
RF Lead
SOLPAR Rigger
Make Cellref file & BSP (Ant. Para matching with ATP11A Provide updated Cellref file & BSP to RF lead every week
Make DTR with Cellref file & BSP
Provide SCFT DTR (Map & Ant. Info) to SOLPAR team
Check Ant. Para with DTR on site If mismatch, Change Ant. Para according to value of Cellref Submit SCFT Site Survey Check List to Samsung RF lead Submit SCFT Site Survey Check List to NOPT engineer
PA2 Azimuth Correction at Site How to make SCFT DTR. 1. Circle RF Lead needs BSP(Best Server Plot) and Cellref . - Cellref file is provided by National Optimization team. - BSP(Best Server Plot) is provided by National RF Validation team. 2. Circle RF Lead can prepare SCFT DTR by using Google Earth, MapInfo or Manually (refer figure-5).
3. Provide the SCFT DTR to Solpar Field Engineer, to start the SCFT test. ※ SCFT DTR do not need to upload to FMS.
[Figure-1. Sample SCFT DTR using Google Earth program]
PA3 Handover Testing Process NOPT Cellref Eng.
Samsung (Circle RF Team)
SOLPAR
RF Lead
LSMR
Field Eng.
Check Inter Sector Neighbor List Check Neighbor List
If missing neighbor, Add neighbor in each sector Confirm Neighbor List
- Do Handover test before SCFT Drive test. - First take a clockwise drive. Start from Alpha to Beta, Beta to Gamma, Gamma back to Alpha. - Then take a anticlockwise drive. Start from Alpha to Gamma, Gamma to Beta, Beta back to Alpha. • Clockwise : Alpha -> Beta -> Gamma-> Alpha • Anti-Clockwise : Alpha -> Gamma -> Beta -> Alpha - Observe the target PCI change without Call Drop. ※ If the PCI is changed after call drop, then try to HO again. - If call drop happened again and again, then DO NOT EXECUTE SCFT and feedback to Samsung RF Lead immediately.
Confirm Neighbor List
Handover Test
PA3 Handover Testing Process How to do HO Test :
[Figure-2. Clockwise / Anti-clockwise Handover Route ]
1. Refer to figure-3, Do Handover test as shown. Start from Alpha sector. Blue route: Clockwise test route. Red route: Anticlockwise test route.
Anti-Clockwise Clockwise
• Clockwise : Alpha -> Beta -> Gamma-> Alpha • Anti-Clockwise : Alpha -> Gamma -> Beta -> Alpha Alpha
2. If HO not happened during test then try it again.
Beta Map with the first tier neighbor
Gamma
PA4 Drive Route Process NOPT
Samsung (Circle RF Team)
Cellref Eng.
RF Lead
SOLPAR Field Eng.
Make Cellref file & BSP (Ant. Para matching with ATP11A Provide updated Cellref file & BSP to RF lead every week
Make DTR with Cellref file & BSP
- Tracking and compare the Driven Route with provided SCFT DTR during SCFT Drive Test. ※ If any DT Route is non motorable, then take photo and provide it to Samsung RF Lead with comment. - Drive all the roads as per SCFT DTR provided. - Drive all the roads in main lobe of serving sector.
Provide SCFT DTR (Map & Ant. Info) to SOLPAR team
Drive Test according to DTR
Submit missing road with photo or comment to RF lead Submit missing road with photo or comment to NOPT engineer
PA4 Drive Route Process How to make SCFT DTR. 1. Circle RF Lead needs BSP(Best Server Plot) and Cellref . - Cellref file is provided by National Optimization team. - BSP(Best Server Plot) is provided by National RF Validation team. 2. Circle RF Lead can prepare SCFT DTR by using Google Earth, MapInfo or Manually (refer figure-5).
3. Provide the SCFT DTR to Solpar Field Engineer, to start the SCFT test. ※ SCFT DTR do not need to upload to FMS.
[Figure-3. Sample SCFT DTR using Google Earth program]
PA6 Sector Swap Confirmation Process NOPT
Samsung (Circle RF Team)
Cellref Eng.
RF Lead
SOLPAR Field Eng.
Make Cellref file & BSP (Ant. Para matching with ATP11A Provide updated Cellref file & BSP to RF lead every week
Make DTR with Cellref file & BSP
- Go to stationary point in main lobe of antenna and check PCI. - Compare the detected PCI with provided PCI (SCFT DTR) - For swap between sectors, change the CPRI cable of swapped sectors. - Check PCIs before start the SCFT for all three sectors again and if OK then proceed for SCFT Drive Test.
Provide SCFT DTR (Map & Ant. Info) to SOLPAR team
Stationary Test If sector swapped, Change CPRI cable of swapped secoters Report CPRI cable changing status on Site Survey Check List Submit SCFT Site Survey Check List to NOPT engineer
PA6 Sector Swap Confirmation Process How can check Sector Swap [Figure-4. Stationary Test Point]
1. Choose Stationary Point in the main lobe of antenna.
2. Check that you get only one PCI assigned to test sector. - eg. For figure shown, you must get PCI 9 for alpha sector. If you get 10 PCI then that is sector swap. Alpha
- In this case you have to change CPRI cable to correct the swap. (Alpha PCI 9 CPRI Beta PCI 10 CPRI). 3. Repeat the above procedure for remaining sectors as well.
Map with the first tier neighbor Gamma
Beta
PA6 Sector Swap Confirmation Process How to change CPRI Cable 1. The Engineer must carry with him site keys for easy access. 2. Change the CPRI cables at DU to correct the swap. 3. Correct the labeling of CPRI cable after the change. 4. The color code is as shown in picture. • Alpha-Blue. • Beta - Red. • Gamma-Green.
[Figure-5. DU CPRI Cable Position]
Beta Alpha
Gamma
PA7 Throughput Confirmation NOPT Cellref Eng.
Samsung (Circle RF Team) LSMR
SOLPAR
RF Lead
Field Eng.
Check Backhaul & Alarm Status
Check eNB Health Status
Check Backhaul & Alarm Status. If any issue, Report related team Confirm eNB Health Status
- DL/UL Throughput by Speedtest.net (App.) before test - During drive test if low throughput value is observed, then stop DT and restart the test. - During DT observe the DL/UL throughput changes all the time. - If the low DL or UL T-put is observed during SCFT even though signal condition is good and PCI value is correct then stop the SCFT and make the call again. If issue still persist, contact LMSR engineer.
DL THR : Min. 20 Mbps / UL THR Mim 1 Mbps Provide eNB Health Status
Drive Test
Check eNB Health Status
Confirm eNB Health Status
PA8 Stationary Test NOPT
Samsung (Circle RF Team)
Cellref Eng.
SOLPAR
RF Lead
Field Eng.
Make Cellref file & BSP (Ant. Para matching with ATP11A Provide updated Cellref file & BSP to RF lead every week
Make DTR with Cellref file & BSP Every morning, before field team start test, get confirmation from RJIL circle team that VoLTE is working or not.
- Go to stationary point in main lobe of antenna and check PCI. (Have to check only one PCI assigned to test sector.) ※ Many field team move from sector to sector for stationary test, but the PCI change don’t happen and they do not notice it. - Compare the detected PCI with provided PCI (SCFT DTR). - Perform the VoLTE call test. - If VoLTE call fail, report to Samsung RF lead with symptom
Provide SCFT DTR (Map & Ant. Info) to SOLPAR team & VoLTE Call Health Stauts
Stationary Test (UE Attach/VoLTE call setup) If VoLTE call fail, report to RF Lead with symptom
Raise the issue to Samsung EPC team(DP) in that circle --> RJIL manager in that circle --> IMS team
PA8 Stationary Test Stationary Test 1. Choose Stationary Point in the main lobe of antenna. 2. Check that you get only one PCI assigned to test sector. - Many field team move from sector to sector for stationary test, but the PCI change don’t happen and they do not notice it. 3. Repeat the above procedure for remaining sectors as well
[Figure-5. Stationary Test Point]
Alpha
Map with the first tier neighbor Beta Gamma
Summary Work Order Assignment Management is also called as WAS. AM receives SCFT trigger once ATP11B process is completed. AM assigns SCFT Task to Samsung Optimizer & Samsung RF Head. AM distributes(assigns) “Perform SCFT” Task to SOLPAR PM. SOLPAR PM will further assign “Perform SCFT” task to SOLPAR FE(DT Engineer). SOLPAR FE has to accept this task from SOLPAR PM and follow below steps. a)SOLPAR FE will conduct SCFT task using Mobile device(eg:S4 Mini) to complete and upload test data to FMS server(separate process) b)SOLPAR FE will input parameter changes(if any) to siteforge server and submits it for Samsung Optimizer approval. Samsung Optimizer will accept or reject according SCFT test data available in FMS server and flow continues. Overall WAS Improves productivity & complete visibility.
QUIZ Question 1: Who will assign SCFT Task to Samsung RF head ? Ans: Samsung Area Manager Question 2: Who will assign “perform SCFT” task to DT Engineer? Answer: PM(SOLPAR) Question 3: Whether Samsung RF head can reject approved SCFT data by Samsung Optimizer? Answer: A) Yes B) No
Thank You
View more...
Comments