nn 10.24 PProviding and fixing 14 nmm mm bright finished brass spring catch to steel centre hung sanjith T S ventilators with necessary welding and machine screws etc. complete. Code
0428 9999 9999
Discription Details for then MaterialsBrass casement spring catch Fixing charges including welding and materials etc. Carriage of materials TOTAL Add for water charges @ 1% TOTAL Add for contractor’s profit and overheads @15% Cost of 10 window spring catch Cost of 1 window catch Say
Unit
10 Nos. L.S L.S
Quantity
Rate
Amount
10.00 125.58
109.00 1.00
109.00 125.58
3.64
1.00
3.64 238.22 2.38 240.60 36.09 276.69 27.67 27.65
10.25
Steel work welded in built up section/framed work including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using steel etc. as required. 10.25.1 In stringers, treads, landing etc. of stair cses including use of chequered plate wherever required, all complete. Code
1007
1010
1549
1003 2205 2271
Discription Consider a flight of staircase of 2.8m height with tread and riser of 200mm & 0.60m wide. Materials(i) Unequal angles as stringers-75x50x6mm 4x12.69x5.6 = 284.25 Kg. Add wastage @ 5% =14.21 Kg. = 298.46kg. Say 2.985q (ii) unequal angles at sides 50x30x5mm 2xl4x0.2x3.00=I6.8kg. Add wastage @ 5% = 0.84kg. = 17.64 kg. Say 0.176q = 3.161q Unequal angles (iii) plate for tread 8mm thick 14x7.5= 105.00kg+ Add wastage @ 5% = 5.25kg. = 110.25kg. Say 1.103q Plate for tread (iv) G. pipe for railing 40mm 2xl2.69m = 25.38m+ Add wastage @ 5% = 1.27m = 26.65m G.I. Pipe for railing (v) M.S. round bars 16mm dia. 15x0.75x2xl.58 = 35.55kg.+ Add wastage @ 5% = 1.78kg. = 37.33 Kg. Say O.373q M.S. round bars Carriage of steel (3.I61 + 1.103+0.373)=4.637q = 0.4637 tonne Carriage of g.I. Pipe approx. wt.
Unit
Quantity
Rate
Amount
quintal
3.161
3100.00
9799.10
quintal
1.103
3400.00
3750.20
160.00
4264.00
3050.00
1137.65
47.29 47.29
21.93 4.69
metre
26.65
quintal
0.373
tonne tonne
0.4637 0.0991
459 Code 1215 0102 0114 0100
9999
Discription 3.72x26.65=99.14kg. Welding charge (electric) 23.20m Labour: Blacksmith 1st class Beldar Bandhani Applying priming coat (i) steps 2.4x 14 = 33.60sqm.+ (ii) angles 4x 12.69x0.25 = 12.69sqm.+ (iii) Bars and other components = 2.00 sqm. (L.S.) (A) (Rate as per item no. 13.50.3) Sundries TOTAL Add for water charges @ 1% on all except ‘A’ TOTAL Add for contractor’s profit and overheads @ 15% on all except ‘A’ Cost of 5.331 qunital Cost per kg say
10.25 Steel work welded in built up section / framed work including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer usin’g structural steel etc. as required. 10.25.2 In grating, frames, guard bar, ladder, railings, brackets, gates and similar works. 10.25.2 In grating, frames, guard bar, railing, brackets, gates and similar works. Code
1008
1002 2205 1215 0102 0114 0100 ‘A’ 9999
Description Details of Imxlm framed guard bar grating. (i) M.S. flat 50x6 mm 2.4kg/per metre 5.75x2.40 = 13.8kg. + Add wastage@ 5% = 0.69kg., Total = 14.49kg. say 14.5 kg. M.S. Flat (ii) 12mm dia. Bars @ 0.89 kg/m 9x1 = 9 metre @ 0.89kg/m = 8.01 kg+Add wastage @ 5% = 0.40kg. Total=8.41 kg. say 0.084q M.S. bar Carriage of steel Welding charges (electric) 60cm Labour Blacksmith 1st class Beldar Bandhani Applying priming coat 0.65 sqm (Rate as per item no. 13.50.3 Sundries Total Add for water charges @ 1% on all except ‘A’ Total Add for contractor’s profit and overheads @ 15% on all except ‘A’ Costof0.218qunital Cost per kg say