Project Inspection Division / IAG Typical Inspection Plan (TIP) Index

Form Type

Index

Number

Sub

General Notes: 1-Contractor is required to submit its own ITP(s) for Saudi Aramco review and approval prior proceeding for subjects not covered by the following SATIPs, 2- For activities (checklists) missing in any of the SATIPs provided by Saudi Aramco, Contractor may add that particular activity and submit the revised SATIP(s) for Saudi Aramco review and approval prior proceeding with the task.

SATIP SATIP SATIP SATIP SATIP SATIP SATIP SATIP SATIP SATIP SATIP SATIP SATIP SATIP SATIP

A B H L M M M M M M M M M M M

114 006 003 450 006 100 100 100 100 100 100 100 100 100 100

01 01 01 01 01 01 02 03 04 05 06 07 08 09 10

SATIP

O

101

01 Security Fence and Gates Type SSD1 Standard Security Fence

Civil

1

SATIP SATIP SATIP SATIP SATIP

Q Q Q Q Q

001 001 001 001 006

01 02 03 04 01

Civil Civil Civil Civil Civil

1 1 1 1 1

SATIP

Q

006

02 Asphalt Paving

Civil

1

SATIP

Q

006

03 Foamed Asphalt Stabilization

SATIP SATIP SATIP SATIP SATIP SATIP SATIP SATIP SATIP SATIP SATIP SATIP SATIP SATIP SATIP SATIP SATIP SATIP SATIP

Q Q S P P P P P P P P P P P P P P P P

010 011 070 103 103 104 104 104 104 104 104 104 104 104 104 107 111 111 113

01 01 01 01 02 01 02 03 04 05 07 08 10 11 12 01 01 02 01

SATIP

P

113

02 M.V. Induction Motors (Nameplate Voltage: 4 kV, 6.6 kV, and 13.2 kV)

Electrical

1

SATIP SATIP

P P

113 114

03 Diesel-Generator Set 01 Annunciator Metering and Protection Relaying Cabinets

Electrical Electrical

1 1

Typical Inspection Plan (TIP) Title Earthwork - Site Preparation, Excavation and Backfill Fireproofing Concrete Coating Application on Concrete Surfaces On-Land and Near-Shore Pipelines Security Fencing and Gates Concrete Masonry Units & Building Bricks Water Proofing of Roof Slabs Structural Steel for Buildings Pre-engineered Metal Buildings Gypsum Wall Board System Ceramic Wall and Floor Tiles Metal Doors and Windows Acoustical False Ceiling Glass and Glazing Resilient Vinyl Composition Floor Tile and Base Portland Cement Concrete - Batch Plants Management Cast-In-Place Portland Cement Concrete Pre-Cast Concrete Fence Posts at Fabrication Yards Structural Precast/Prestressed Concrete at Fabrication Yard Asphalt Paving - Batch Plants Management

Cement Based Non-Shrink Grouting Epoxy Grout for Machinery Support Earthwork – Excavation and Backfill For Under Ground Utilities AC UPS Systems Direct Current Power Systems Low Voltage (600V to 1kV) Cable Medium Voltage (1.001kV to 35 kV) Cable Cable Tray, Fittings, and Accessories Boxes (Junction, Terminal, and Pull), Wire Troughs and Wireways Above-Grade Conduit, Fittings, and Accessories Below-Grade Conduit, Fittings, and Accessories HVAC Equipment High Voltage (35.001 kV to 69 kV) Cable Very High Voltage (above 69 kV) Cable Receptacles and Cord-Connected Equipment Over-head Transmission and Distribution Systems Grounding / Bonding Lightning Protection Systems LV Induction Motors

page 1 of 5

Discipline

Rev No.

Civil Civil Civil Civil Civil Civil Civil Civil Civil Civil Civil Civil Civil Civil Civil

1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

Civil

1

Civil Civil Civil Electrical Electrical Electrical Electrical Electrical Electrical Electrical Electrical Electrical Electrical Electrical Electrical Electrical Electrical Electrical Electrical

1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

Notes

Project Inspection Division / IAG Typical Inspection Plan (TIP) Index

Form Type

Index

Number

Sub

General Notes: 1-Contractor is required to submit its own ITP(s) for Saudi Aramco review and approval prior proceeding for subjects not covered by the following SATIPs, 2- For activities (checklists) missing in any of the SATIPs provided by Saudi Aramco, Contractor may add that particular activity and submit the revised SATIP(s) for Saudi Aramco review and approval prior proceeding with the task.

Typical Inspection Plan (TIP) Title

SATIP SATIP SATIP SATIP SATIP SATIP SATIP SATIP SATIP SATIP SATIP SATIP SATIP SATIP SATIP SATIP SATIP

P P P P P P P P P P P P P P P P P

116 116 116 116 116 116 116 116 116 116 116 119 121 121 121 121 123

01 02 03 04 05 06 07 08 10 11 13 01 01 02 03 04 01

SATIP

P

515

01

SATIP SATIP SATIP SATIP SATIP SATIP SATIP SATIP SATIP SATIP

X K K K K K K K K K

600 001 001 001 001 001 001 001 001 001

02 01 02 03 04 05 06 07 08 09

SATIP

K

001

10

SATIP SATIP SATIP SATIP SATIP SATIP SATIP SATIP SATIP SATIP SATIP SATIP

K K J J J J J J J J J J

001 001 100 200 300 400 700 900 902 902 902 902

11 12 01 01 01 01 01 01 01 03 04 05

SATIP

J

902

06

SATIP SATIP

J J

903 904

01 01

MV Switchgear MV Controlgear LV Switchgear and Switchboards LV Controlgear TIP Switchracks and Distribution Racks Fire Water Pump / Motor / Controller LV Panelboards MV (max 35 kV) Non-seg Busduct MV (max. 15kV) Cablebus LV Non-seg Busduct Variable Speed Drive (VSD) HV Switchyard Dry Type Transformers Power Transformers Overhead Transformers Pad Mounted Transformers Light Fixtures and Lighting Systems Factory Assembled (packaged) and Auxiliary Electrical Equipment Impressed Current Cathodic Protection Centrifugal & Axial Fan Air Handing Units HVAC Metal Duct System Chilled Water Piping Chilled Water System Packaged Air Conditioning Units (PACU) Refrigerant piping Air Filteration Devices Through-The-Wall and Window-Mounted Air Conditioners Air Ventilation / C ooling Systems (Exhaust Hoods and Passively Cooled Shelters) A / C Split System Testing, Adjustind and Balancing of HVAC Systems Flow Instrumentation Pressure Instrumentation Liquid Level Instrumentation Temperature Instrumentation Motor Operated Valves (MOV) and Control Valves (CV) Instrumentation Control Loop Checking Metallic Instrumentation and Control Cable Factory Assembled (Packaged) Auxiliary Instrumentation Systems Fiber Optic Cable Electronic Control Systems - DCS ESD PLC SCADA Instrumentation Racks and Panels (open); Terminal Boxes and Instrument Cabinets (enclosed) Intrinsically Safe (IS) Systems Foundation Fieldbus System-Cables and accessorires

page 2 of 5

Discipline

Rev No.

Electrical Electrical Electrical Electrical Electrical Electrical Electrical Electrical Electrical Electrical Electrical Electrical Electrical Electrical Electrical Electrical Electrical

1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

Electrical

1

Electrical HVAC HVAC HVAC HVAC HVAC HVAC HVAC HVAC HVAC

1 1 1 1 1 1 1 1 1 1

HVAC

1

HVAC HVAC

Instrumentation

1 1 1 1 1 1 1 1 1 1 1 1

Instrumentation

1

Instrumentation

1 1

Instrumentation Instrumentation Instrumentation Instrumentation Instrumentation Instrumentation Instrumentation Instrumentation Instrumentation

Instrumentation

Notes

Project Inspection Division / IAG Typical Inspection Plan (TIP) Index

Form Type

Index

Number

Sub

General Notes: 1-Contractor is required to submit its own ITP(s) for Saudi Aramco review and approval prior proceeding for subjects not covered by the following SATIPs, 2- For activities (checklists) missing in any of the SATIPs provided by Saudi Aramco, Contractor may add that particular activity and submit the revised SATIP(s) for Saudi Aramco review and approval prior proceeding with the task.

SATIP SATIP SATIP SATIP SATIP SATIP SATIP SATIP SATIP

J A A A A A B B D

003 004 004 004 004 004 006 019 001

01 01 02 03 04 05 02 01 01

SATIP

D

100

SATIP

D

Typical Inspection Plan (TIP) Title Instrumentation Piping and Tubing

Discipline

Rev No.

Mech Mech Mech Mech Mech Mech Mech Mech

1 1 1 1 1 1 1 1 1

01 Construction of Atmospheric Tanks (API 650) *

Mech

*

109

01 Shop Fabricated Storage Tank Installation

Mech

1

Instrumentation

Pneumatic Pressure Testing Pressure Testing-Hydrostatic Test of Plant Piping Pressure Testing- Hydrostatic Test of Pipelines Pressure Testing of Pressure Vessels Leak Testing Per SAES-A-004 Intumiscent Fire Proofing Portable Fire Protection Equipment Installation Pressure Vessel Installation

SATIP

E

004

01 Heat Exchanger Installation - Shell and Tube

Mech

1

SATIP

E

007

01 Air Cooled Heat Exchanger- Fin Fan Cooler

Mech

1

SATIP

F

001

04 Power Boiler - Packaged Type

Mech

1

SATIP

F

001

01 Fired Heaters Field Installation

Mech

1

SATIP

F

007

01 Elevated Flare--Stack, Tip & Igniter

Mech

1

SATIP

G

115

01 Lubrication, Shaft Sealing and Oil System for Rotating Equipment

Mech

1

SATIP

G

005

01 Centrifugal Pump

Mech

1

SATIP

G

006

01 Positive Displacement Pump

Mech

1

SATIP

H

002

01 Cement Lining of Pipes and Fittings

Mech

1

SATIP

H

002

02 External FBE Coating of Field Welded Joints

Mech

1

SATIP

H

100

01 Paint Application of liquid Coating System for Industrial facilities

Mech

1

SATIP SATIP SATIP SATIP SATIP SATIP SATIP SATIP SATIP SATIP SATIP SATIP SATIP SATIP SATIP SATIP SATIP SATIP SATIP

H H H H H Y J J J K K K L L L L L L L

002 002 002 002 002 101 600 901 901 402 403 511 108 052 052 350 350 350 350

06 08 09 10 11 01 01 01 02 01 02 01 01 01 02 01 02 05 06

Mech Mech Mech Mech Mech Mech Mech Mech Mech Mech Mech Mech Mech Mech Mech Mech Mech Mech Mech

1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

Renovation and Repair Coating for Submerged Services-APCS 113 Pipe Internal Coating and Installation Hand-Applied Tape Wrapping of Buried Piping Heat Shrink Sleeves Installation Renovation & Repair Coating for Submerged Services-APCS 113C Installation of Metering Skid for Hydrocarbon Gas Safety Relief Valve Installation Instrument Air Supply System Instrument Air Distribution Piping Installation Centrifugal Gas Compressor Reciprocating Compressor for process air or gas services Diesel Engine Installation Valve Installation Hot Tap Installation Stopple Fitting Installation On-Plot Metallic Piping Installation (excluding Brazed Piping) Piping Tie-In Installation Fire Water Distribution Piping Installation Plant Piping - Steam & Steam Condensate Piping

page 3 of 5

Notes

Project Inspection Division / IAG Typical Inspection Plan (TIP) Index

Form Type

Index

Number

Sub

General Notes: 1-Contractor is required to submit its own ITP(s) for Saudi Aramco review and approval prior proceeding for subjects not covered by the following SATIPs, 2- For activities (checklists) missing in any of the SATIPs provided by Saudi Aramco, Contractor may add that particular activity and submit the revised SATIP(s) for Saudi Aramco review and approval prior proceeding with the task.

SATIP SATIP SATIP SATIP SATIP SATIP SATIP SATIP SATIP SATIP SATIP SATIP SATIP SATIP SATIP SATIP SATIP SATIP SATIP SATIP SATIP SATIP SATIP SATIP SATIP SATIP SATIP SATIP SATIP SATIP SATIP SATIP SATIP SATIP SATIP SATIP SATIP SATIP SATIP SATIP SATIP SATIP

L L L L L L L L L M N N N N N N NDE NDE NDE NDT S W W W W W W B S S S S S S S S S S S S S S

350 350 350 410 420 450 450 450 450 001 001 110 120 130 140 001 LPT MPI UT RT 020 010 011 012 014 016 017 069 010 010 030 040 050 060 060 060 060 060 060 060 060 070

07 08 09 01 01 03 04 05 06 01 01 01 01 01 01 02 01 01 01 01 01 01 01 01 01 01 01 01 01 02 01 01 01 01 02 03 04 05 06 07 08 02

Typical Inspection Plan (TIP) Title Cement Lined Pipe Installation Shop Fabrication -Piping and Miscellaneous Steel Structures Utility Piping Installation-Plant Air and Nitrogen Gas Pipelines- Well Head Piping Scraper Trap Station Cross Country Above Ground Pipeline Cross Country Buried Pipeline Reconditioned Buried Line Pipeline-Tie-in Installation Structural Steel-Piperacks, Miscellaneous Steel Supports,Aluminum Structures Cold Insulation Castable Refractory Installation Extreme Erosion Resistant Refractory Installation Refractory System -Fireclay Bricks Installation Refractory Ceramic Fiber Installation Hot Insulation Liquid Penetrant Testing Magnetic Particle Testing Ultrasonic Testing Radiographic Testing Process Plant Oily Water Sewer System Welding of Pressure Vessel Welding of On-Plot Piping Welding of Pipelines Welding of Overlays and Cladding Restoration Welding of Special Corrosion Rresistant Materials-including Duplex SS Welding of API Tanks

Emergency Eyewash/Shower System Gravity Sewer Piping and Sewer Manhole Lift Station and Piping / Force Main Storm Drain Water Distribution Piping Bldg. Sprinklers and Standpipe System Electric Water Heaters Drinking Fountain Skid Mounted Reverse Osmosis System Plumbing Fixtures and Fixture Fittings Roof Drainage Piping System Building Sanitary Drainage, Waste and Vent (DWV) Piping Neutralization Tank, Indirect Waste & Special Waste Copper Piping Irrigation Piping

page 4 of 5

Discipline

Rev No.

Mech Mech Mech Mech Mech Mech Mech Mech Mech Mech Mech Mech Mech Mech Mech Mech Mech Mech Mech Mech Mech Mech Mech Mech Mech Mech Mech Plumbing Plumbing Plumbing Plumbing Plumbing Plumbing Plumbing Plumbing Plumbing Plumbing Plumbing Plumbing Plumbing Plumbing Plumbing

1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

Notes

Project Inspection Division / IAG Typical Inspection Plan (TIP) Index

Form Type

Index

Number

Sub

General Notes: 1-Contractor is required to submit its own ITP(s) for Saudi Aramco review and approval prior proceeding for subjects not covered by the following SATIPs, 2- For activities (checklists) missing in any of the SATIPs provided by Saudi Aramco, Contractor may add that particular activity and submit the revised SATIP(s) for Saudi Aramco review and approval prior proceeding with the task.

SATIP SATIP SATIP SATIP SATIP SATIP SATIP SATIP SATIP SATIP

S T T T T T T T T T

070 151 481 492 624 628 744 911 938 916

03 01 01 01 01 01 01 01 01 01

Typical Inspection Plan (TIP) Title Thermoplastic & RTR Piping Direct Current Power Systems (-48 and -24 VDC) Powered In-Plant Communication Systems Communication Systems Fiber Optic Communications Cable Copper Communication Cable (OSP/ISP/CO) Communication Towers and Facilities (ISP/CO) Outside Plant (OSP) Ductbanks Outside Plant (OSP) System Building Premises Distribution System (PDS)

Discipline

Rev No.

Plumbing Telecomms Telecomms Telecomms Telecomms Telecomms Telecomms Telecomms Telecomms Telecomms

1 1 1 1 1 1 1 1 1 1

Notes

*SATIP was generated by Saudi Aramco for this subject with input from the subcontractor in the field and is now availabl in the field. Please contact the field personnel regarding this issue (Apllicable to Hawiyah project only)

page 5 of 5

View more...

Comments

Copyright ©2017 KUPDF Inc.
SUPPORT KUPDF