SATIP-P-104-07 Rev 1
Short Description
elec...
Description
SAUDI ARAMCO ID/PID - REV 1 - 5/18/05 (Standards Cutoff - August 2004) SATIP No.
SAUDI ARAMCO TYPICAL INSPECTION PLAN Below Grade Conduit and Duct Bank
APPROVED DATE
SATIP-P-104-07
PROJECT TITLE:
WBS/BI/JO/NO.
ITEM NO.
PROJECT PHASE & ACTIVITY CODE
1.0
DOCUMENT REVIEW
TASK / ACTIVITY
QUALITY PROCEDURE
QUALITY RECORD
DISCIPLINE:
1-Oct-05
Electrical
CONTRACTOR/SUBCONTRACTOR
INSPECTION RESPONSIBILITY ASSIGNMENTS CNTRCTR
REMARKS
SAUDI ARAMCO
SATIP-Q-001-02 Cast-in-Place Concrete Cement SATIP-Q-006-02 Asphalt Paving as applicable
1.1
Concrete Mix Design, Asphalt Mix Design, Road Subbase and Base Course Material Test Reports
See Remarks
See Remarks
1.1
Pre-cast Duct banks, Manholes and Handholes Shop Drawing Review (Offsite Fabrication)
See Remarks
See Remarks
2.1
Pre-Cast Concrete / Rebar Material Receiving Inspection and Testing
See Remarks
See Remarks
SATIP-Q-001-04 Structural Pre-Cast Concrete
2.2
Cast-in-Place Portland Concrete Cement / Rebar Material Receiving Inspection and Testing
See Remarks
See Remarks
SATIP-Q-001-02 Cast-in-Place Concrete Cement
2.3
Bulk Material for Duct bank, Manholes, Handholes Storage, Handling and Preservation Visual Inspection (Offsite & Onsite Fabrication)
See Remarks
See Remarks
2.4
Bulk Material for Duct bank, Manholes, Handholes Material Receiving Visual Inspection (Offsite & Onsite Fabrication)
2.0
R1
S
SAIC-P-3334 Duct bank Fabrication SAIC-P-3335 Manhole / Hand-hole Fabrication
RECEIVING INSPECTION
See Remarks
See Remarks
Page 1 of 4 11/27/2005 3:15 PM
W2
W2
S
SAIC-P-3002 Electrical Equipment SH&P SAIC-P-3310 Conduit and Fittings SH&P QC personnel to inspect storage area weekly
S
SAIC-P-3005 Channel, Strut & Support Materials MR SAIC-P-3311 GRS Conduit and Fittings MR SAIC-P-3328 PVC Plastic Conduit and Fittings MR Also see SATIP-P-111-01 Grounding and Bonding QC personnel to inspect 50% of deliveries on receipt by fabricator / jobsite.
Revision A
SAUDI ARAMCO ID/PID - REV 1 - 5/18/05 (Standards Cutoff - August 2004) SATIP No.
SAUDI ARAMCO TYPICAL INSPECTION PLAN Below Grade Conduit and Duct Bank
SATIP-P-104-07
PROJECT TITLE:
ITEM NO.
PROJECT PHASE & ACTIVITY CODE
WBS/BI/JO/NO.
TASK / ACTIVITY
QUALITY PROCEDURE
QUALITY RECORD
2.5
Pre-cast Duct banks, Manholes and Handholes Storage, Handling and Preservation (Offsite Fabrication)
2.6
Pre-Cast Duct banks, Manhole and Handholes Initial Visual Inspection (Offsite Fabrication)
See Remarks
See Remarks
2.7
Pre-Cast Duct banks, Manhole and Handholes Final Visual Inspection (Offsite Fabrication)
See Remarks
See Remarks
2.8
Pre-Cast Duct Bank, Manhole and Handhole Concrete Strength Testing
See Remarks
See Remarks
3.0
APPROVED DATE
1-Oct-05
Electrical
CONTRACTOR/SUBCONTRACTOR
INSPECTION RESPONSIBILITY ASSIGNMENTS
SAIC-P-3327 SAIC-P-3327
DISCIPLINE:
CNTRCTR
SAUDI ARAMCO
W2
S
H1
H1
REMARKS
Weekly inspection by Contractor QC personnel.
W1
SAIC-P-3334 Duct bank Fabrication SAIC-P-3335 Manhole / Hand-hole Fabrication QC hold point for inspection of formwork, rebar, conduit spacers, and embedded hardware prior to concrete placement.
W1
SAIC-P-3334 Duct bank Receiving SAIC-P-3335 Manhole / Hand-hole Receiving QC hold point for conduit mandrel test and inspection of fabricated product prior to shipping to jobsite. SATIP-Q-001-04 Structural Pre-Cast Concrete
INSTALLATION
3.1
Electrical Duct bank & Conduit Excavation and Trenching Visual Inspection
SAIC-P-3333 SAIC-P-3333
H1
W1
SATIP-S-070-01 Excavation and Backfill For Under Ground Utilities SATIP-Q-006-02 Asphalt Paving (Road Crossings) QC hold point for inspection prior to formwork, rebar, conduit installation or precast placement.
3.2
Direct Buried Conduit Visual Inspection
SAIC-P-3331 SAIC-P-3331
H1
W1
QC hold point for conduit mandrel test and inspection of installed conduit prior to backfilling.
3.3
Jobsite Fabricated Electrical Duct banks, Manholes, and Handholes Initial Visual Inspection
W1
SAIC-P-3334 Duct bank Fabrication SAIC-P-3335 Manhole / Handhole Fabrication SAIC-P-3337 Duct bank Grounding and Bonding QC hold point for inspection of formwork, rebar, conduit spacers, and embedded hardware prior to concrete placement.
See Remarks
See Remarks
Page 2 of 4 11/27/2005 3:15 PM
H1
Revision A
SAUDI ARAMCO ID/PID - REV 1 - 5/18/05 (Standards Cutoff - August 2004) SATIP No.
SAUDI ARAMCO TYPICAL INSPECTION PLAN Below Grade Conduit and Duct Bank
SATIP-P-104-07
PROJECT TITLE:
ITEM NO.
APPROVED DATE
WBS/BI/JO/NO.
PROJECT PHASE & ACTIVITY CODE
TASK / ACTIVITY
QUALITY PROCEDURE
QUALITY RECORD
3.4
Jobsite Fabricated and Pre-cast Electrical Duct banks, Manholes, and Handholes Final Visual Inspection
See Remarks
See Remarks
3.5
Jobsite Fabricated Duct banks, Manholes, and Handholes Concrete Strength Testing
See Remarks
See Remarks
DISCIPLINE:
1-Oct-05
Electrical
CONTRACTOR/SUBCONTRACTOR
INSPECTION RESPONSIBILITY ASSIGNMENTS CNTRCTR
H1
REMARKS
SAUDI ARAMCO
W1
SAIC-P-3334 Duct bank Fabrication SAIC-P-3335 Manhole / Handhole Fabrication SAIC-P-3337 Duct bank Grounding and Bonding QC hold point for conduit mandrel test, ground resistance test, and inspection of completed product prior to backfilling. SATIP-Q-001-02 Cast-in-Place Concrete Cement QC hold point for review and approval of concrete test results prior to cable pulling at jobsite.
3.6
Backfilling Visual Inspection
SAIC-P-3333 SAIC-P-3333
H1
W1
SATIP-S-070-01 Excavation and Backfill For Under Ground Utilities SATIP-Q-006-02 Asphalt Paving QC hold point for QC inspection prior to backfilling of identification tape.
3.7
Conduit Identification and Termination Visual Inspection
SAIC-P-3336 SAIC-P-3336
H1
W2
SA PID shall be notified on start of this activity for each duct bank.
4.0
PRE-COMMISSIONING
Ground Resistance Testing
4.1
See Remarks
See Remarks
SATIP-P-111-01 Grounding and Bonding
GENERAL NOTES 1
The first three incidents of each Inspection or testing activity listed require 100 % participation by Saudi Aramco Site Inspection Personnel. After this period, Saudi Aramco Inspection may adjust the levels of Saudi Aramco participation based upon the Contractor’s performance.
2
Surveillance: QA/QC organization to monitor work in progress without notice from Construction Organization
3 4
Witness:
QA/QC organization shall be notified of the timing of Inspection or test in advance. However, the inspection or test shall be performed as scheduled if the QA/QC organization representative is not present.
Hold:
QA/QC organization shall be notified of the timing of inspection or test in advance. Inspection or test shall not be carried out without the QA/QC organization representative in attendance.
Page 3 of 4 11/27/2005 3:15 PM
Revision A
SAUDI ARAMCO ID/PID - REV 1 - 5/18/05 (Standards Cutoff - August 2004) SATIP No.
SAUDI ARAMCO TYPICAL INSPECTION PLAN Below Grade Conduit and Duct Bank
SATIP-P-104-07
PROJECT TITLE:
ITEM NO. 5
PROJECT PHASE & ACTIVITY CODE
APPROVED DATE
WBS/BI/JO/NO.
QUALITY PROCEDURE
TASK / ACTIVITY
QUALITY RECORD
DISCIPLINE:
1-Oct-05
Electrical
CONTRACTOR/SUBCONTRACTOR
INSPECTION RESPONSIBILITY ASSIGNMENTS CNTRCTR
REMARKS
SAUDI ARAMCO
If the Main Contractor delegates the assigned responsibility to the Subcontractor, then the Main Contractor will have the same degree of responsibility as assigned to Saudi Aramco.
LEGEND W1
100% Witness Inspection/Test
H2
Sample Hold Point for QC Inspection or Test
RH1 100% Review and Approval of Documents
W2
Sample Witness Inspection/Test
R1
100% Review of Documents
RH2 Sample Review and Approval of Documents
H1
100% Hold Point for QC Inspection or Test
R2
Sample Review of Documents
Page 4 of 4 11/27/2005 3:15 PM
S
Surveillance
Revision A