SAP PP Self Test Certification Questions
February 11, 2017 | Author: Neelesh | Category: N/A
Short Description
For SAP PP Certification...
Description
SAP PP Self Test Certification Questions 1. Following are valid BOM categories a) Inspection BOM b) Material BOM c) Equipment BOM d) Costing BOM Ans : b, c, d 2. Material BOM that is created without plant is called______________ a) Reference BOM b) Master BOM c) Group BOM d) Master group Ans: c 3. If a Header Material is used as a BOM item in the same BOM the BOM is referred as ___ a) Repetitive BOM b) Alternative BOM c) Multiple BOM d) Flexible BOM e) Recursive BOM Ans: 4. Alternative BOMs are grouped under one internal number and are called__________ a) Multiple BOM b) Variant BOM c) Variable BOM d) Super BOM e) Header BOM Ans: 5. BOM can be used for the following a) MRP b) Costing c) Inspection data
d) Sales & Distribution Ans: a, b, c, d 6. The base quantity in the BOM specifies a) To which amount of the semi finished product the item quantities refer b) To which amount the item quantities required for two or more finished products c) To which amount of the finished product the item quantities refer d) To which amount the item quantities are not calculated. Ans: a, b, c 7. Work Center is used in a) Routing b) BOM c) Material Master d) Inspection Plans Ans: a, d 8. Routing contains information on the following a) Material Components b) Operations c) Capacity for Work Centers d) Inspection Characteristics Ans: a, b, c 9. Alternative sequences in routing are created with reference to a) Parallel Sequence b) Master Sequence c) Standard Sequence d) Reference Sequence Ans: 10. Work Center requires formulas for the following a) Move time b) Scheduling c) Capacity requirements
d) Cost estimate using activities Ans: 11. Routings are identified by ____________________ a) Routing Group b) Routing Status c) Group Counter Values d) Routing Group and Group Counter Values e) Status and use Ans: 12. You can assign work center to only one cost center in a time period. a) True
b) False
Ans: 13. Production Planning Module is integrated with the following modules. a) Material Management b) Controlling c) Quality Management d) Sales & Distribution Ans: a, b, c, d 14. Movement Type for Goods Receipt in to Ware House a) 122 b) 123 c) 101 d) 102 Ans: c 15. Movement Type for Transfer Posting to storage location a) 261 b) 301 c) 311 d) 305 Ans: c
SAP PP Certification Questions and Answers
List below are some simulated sap pp certification questions and answers which you may want to study and remember. 1. Production version is created in a) Material master b) BOM c) Routings
(ANS)
2. Setup, processing, teardown in R/3 will be transferred APO as a) Resources b) Locations c) Supplier d) Activity (ANS) 3. A matl. has 2 BOMS, 3 Routings, 2 prdn.versions. How many PPM’s will be created in APO? a) 6 b) 2 (ANS) c) 3 d) 5 4. The result of demand plan is a) squeezing optimised plan b) demand plan (ANS) c) …. d) …… 5. There is 1 APO system, and 4 R/3 systems with identical Matl. master. How many Business system groups (BSG) will be required? a) 5 b) 4 c) 2 d) 1
(ANS)
6. Field MRP type is maintained in a) Basic view b) Work scheduling c) Plant general view d) MRP view (ANS)
7. When are the confirmation nos generated? a) When production order is generated (CREATED) (ANS) b) When production order is released. c) When operation is released. d) When production order is settled. 8. RFC monotor is used to observe a) Communication errror b) User error c) Data base error d) Application error (ANS) 9. A new employee in a company was asked to make an eng. BOM. He said for that the plant on the screen … .. Ans) when he tries to save, the system will give a message that it is a group BOM. He can assign it to the corresponding plant. 10. Which of the following are correct. Operations a) scheduling always occurs at opn level (T) b) can’t be used for capacity planning c) can't be used for costing. 11. The working time of a machine is 0700 to 1500 hrs, break time is 1 hr. overload 110%. Capacity utilisation 90% no of m/c 1. What is available capacity? a) 7.2 b) 6.3 (ANS) c) 5.5 d) 6.93 12. which of the following statements are correct? a) D.P is used for long term planning (T) b) SNP used for midterm crossplant planning( T) c) PPDS upto minute short term planning(T) d) SNP is used for detailed planning(F) 13. In which prodution setup is specified that the matl will be required for production a) matl.master
b) BOM c) Routings(ANS) 14. Which of the following are accelerators (multiple question)? a) … b) .. c) budget paln(ANS) d) …. 15. Which of the following are afected by matl.master a) views(T) b) ….. c) no assignment(T) d) uom SAP PP Reference Books: SAP Production Planning , Configuration, Interview Questions and Certification, Books Goto: SAP MRP - Materials Requirements Planning Configuration Hints and Tips Back to: SAP PP (Production Planning) Configuration Hints and Tips Return to :SAP ABAP/4 Programming, Basis Administration, Configuration Hints and Tips (c) www.sap-basis-abap.com All material on this site is Copyright. Every effort is made to ensure the content integrity. Information used on this site is at your own risk. All product names are trademarks of their respective companies. The site www.sap-basis-abap.com is in no way affiliated with SAP AG. Any unauthorised copying or mirroring is prohibited.
PP Related
SAP PP Certification Sample Questions and Answers
SAP PP Questions and Answers
SAP PP Test Questions (MCQ)
Get help for your SAP PP Problems SAP PP Forum - Do you have a SAP PP Question? SAP Production Planning Books SAP PP Certification, Interview Questions and Configuration Books SAP PP Tips SAP PP Tips and Production Planning/Control Discussion Forum Best regards, SAP Basis, ABAP Programming and Other IMG Stuff http://www.sap-img.com All the site contents are Copyright © www.sap-img.com and the content authors. All rights reserved. All product names are trademarks of their respective companies. The site www.sap-img.com is in no way affiliated with SAP AG. Every effort is made to ensure the content integrity. Information used on this site is at your own risk. The content on this site may not be reproduced or redistributed without the express written permission of www.sap-img.com or the content authors.