SAP PP Product Conversion (CS14)

August 26, 2017 | Author: yzmercan | Category: Unit Testing, Software, Technology, Computing, Computing And Information Technology
Share Embed Donate


Short Description

Get this material from http://sapdocs.info/sap/production-planning/sap-r3-ecc-6-0-pp-end-user-guides/...

Description

Testing: Unit Testing / User Manual

Module: Production & Planning

ENVIRONMENT SYSTEM

: SAP R/3 ECC 6.0

CLIENT

: 200

UNIT TESTING SCENARIO SCENARIO NUMBER

: PP - 07

DESCRIPTION

: Product Conversion

PURPOSE

: To convert from one FG model to another FG Model

PREPARED BY NAME Helped by

: S Narayanaswamy : Avtar Singh/G. Sivakumar

DATE

:

TEAM

: Production Planing

APPROVED & TESTED BY NAME

: Nanhe Babu (PwC)

DATE

:

TEAM

: Production Planing

Page 1 of 19

Testing: Unit Testing / User Manual

Module: Production & Planning

1.0 Transaction Code/ Path Enter the menu path of the transaction code, which is going to be tested by the user. Menu Path

Logistics  Production  Master  Bill Of Material Report BOM Comparison – CS14

T.Code

CS14

Input Data 1. Enter the Input FG Code, Plant & Usage No in Primary BOM 2. Enter the to be converted FG Code, Plant & Usage No in Secondary BOM Click on

button

Page 2 of 19

Testing: Unit Testing / User Manual

Module: Production & Planning

You will get this comparison screen :

Export this data to Excel sheet and arrive the net requirements and Primary FG which is to be converted in the list as mentioned below. 2.0

Create conversion BOM from the above table

2.1

Then create routing master as standard practice

Page 3 of 19

Testing: Unit Testing / User Manual

Module: Production & Planning

3.0 Create Conversion Production Order – T.CODE ZPC1 Order type : ZC01

Press enter and select Routing by double clicking on the routing No. Create Production conversion order Delete auto generated Sl. No. Release the Prdn. Order & Save (note down the prdn. order No.) 4.0 Create Manual reservation to FG Only for Matl stagging : T.Code MB21 Mvmt Type : 311

Page 4 of 19

Testing: Unit Testing / User Manual

Module: Production & Planning

Click Ok

Save the reservation Go to MB1B MOVEMENT TYPE:311

Page 5 of 19

Testing: Unit Testing / User Manual

Module: Production & Planning

Enter Ok button

Select ‘M’ – Movement allowed and save the reservation

Go to MB1A – Mvmt: type : 261

Page 6 of 19

Testing: Unit Testing / User Manual

Module: Production & Planning

Click To Reservation and enter the Reservation No. and press enter

Go to MB1A – Mvmt Type 261

Page 7 of 19

Testing: Unit Testing / User Manual

Module: Production & Planning

Click To reservation and provide reservation no. and attach Eng. Sl. No and save. The Serial Number of Engine gets consumed.

Material Staging – MF60

Page 8 of 19

Testing: Unit Testing / User Manual

Module: Production & Planning

Enter Order in Production/process orders tab, remove date from 'Selection period for rqmts'. Click global setting Missing parts calculation: if there are multiple orders open for same header item, in order to capture total requirements of all open order & depending upon stock lying at WiP, once needs to Select 'Include all requirements'. Replenishment options: Since reservation no. needs to be generated for Stock Transfer, Tick 'Stock transfer res.' field. Display: Click all four fields. Units of measure: if 'Unit of issue' is different then Unit of stock keeping, select '1 Priority 1(highest)', accordingly quantity will be calculated & displayed in MF60 screen.

Page 9 of 19

Testing: Unit Testing / User Manual

Module: Production & Planning

Select

all or deselect

depending upon all components, to be staged. Click 'Replenishment Elements'. Then Click 'Replenishment proposal', following screen will be seen. Select the lines & Click Stage. Click

for saving the

posting reservation.

Using the reservation no. generated, MF65 T Code will stage the material by reservation as standard process

Page 10 of 19

Testing: Unit Testing / User Manual

Module: Production & Planning

5. Sl. No control for the Conversion Assign Eng. Sl.no of Old FG to New FG Menu Path

Logistics  Production  Master  Bill Of Material Engine Sl. No Change – IQ02

T.Code

IQ02

Page 11 of 19

Testing: Unit Testing / User Manual

Module: Production & Planning

Enter old FG Model No. and press Sl.No. List

Select the Engine Sl. No & Click Ok Button

To remove the Old Engine Sl. No from the old model go to IQ02 :

Page 12 of 19

Testing: Unit Testing / User Manual

Module: Production & Planning

Page 13 of 19

Testing: Unit Testing / User Manual

Module: Production & Planning

Input the New Material No. and save. Now the Sl. No. will be allotted to the New Matl. No.

Select the Structure Tab and change the Old FG No to New FG No.

Page 14 of 19

Testing: Unit Testing / User Manual

Module: Production & Planning

Click Save button to save the entry

Page 15 of 19

Testing: Unit Testing / User Manual

Module: Production & Planning

6 Material Staging Posting for Reservation No. generated from MF60. 6.1 Go to MB25, enter Production order

After entering the order and executing MB25 T Code, one needs to Set filter on MvT Type, keeping it 311.

6.2 Go to MF65, enter the Reservation No.

Page 16 of 19

Testing: Unit Testing / User Manual

Select all lines using

Module: Production & Planning

button, depending upon Stock Availability in the Storage Location, & one

defined in EP Location (Set in Stock Determining Group), remaining Stock will remain open. Upon availability of Stock, same reservation no. will be used for transfer posting of items. 7.Goto Co11n and do the production order confirmations

Page 17 of 19

Testing: Unit Testing / User Manual

Description of the Field Order

Module: Production & Planning

Nature of the Field Mandatory

Operation

Mandatory

Yield

Optional

Value of the Field Enter your Order No. Enter your Operation No. 0010,0020,... Enter the no. item that one want to confirm

'Posting date' will be date on which Confirmation will be posted 'Reason for Var.',the reason for deviation of Confirmed Quantity to Planned Quantity. Plant wise reason codes are provided as F4 values. Shift, Down time, Actual time taken & Actual Work Centre can be set. Once the confirmation of all operations are done, next step of Goods Receipt needs to be done. 8.Goto MB31 and do the Goods Receipt movement type : 101 attach Eng.Sl.No & save

Enter Order, Plant & Storage Location, Click Adopt / Adopt + Details, following screen will be displayed.

Page 18 of 19

Testing: Unit Testing / User Manual

Module: Production & Planning

Click 'Enter', depending upon Quality Setup, Click Enter twice, following screen is displayed.

Select the Serial number, by clicking in the box next to the Serial number After selecting the Serial numbers,

needs to be clicked.

Above screen will be displayed. Once the screen is displayed, click

, in order to post records.

In production order header screen, quantity confirmed will appear as 'DLV' 9.Now the Engine will convert from old Model to New MODEL with Same Sl. No. 10.Engine route card to be printed again with the converted Model

NARAYANASWAMY-PP *Note – BOM comparison, copying & creating conversion BOM is manual, setting up control will be checked & then in corporated in the manual.

Page 19 of 19

View more...

Comments

Copyright ©2017 KUPDF Inc.
SUPPORT KUPDF