TRF/EPM/3.0

!!"

#$!!

End User Training Manual for SAP PM – Plant Maintenance

Process Name: Break down Maintenance

Process No: TRF/EPM/3.0

Control Copy No: TRF/EPM/3.0/

%& Doc Version

00

' %

Description

Prepared by

Date

Original

Palani Dorai

18.12.2009

Reviewed by

Approved by

Project: MISSION SURE

Introduction Enterprise Plant Maintenance process in TRF has the following business processes. $

$

(

$ Preventive Maintenance process Equipment Calibration processes

!

!

Unplanned / Breakdown Maintenance processes

"

"

External services processes

#

#

Reconditioning / Shutdown processes.

For each of the above processes, there are separate End User Training Manuals are available This document covers sl. No. 3. Of the above list, that is Unplanned / Breakdown Maintenance Process.

This End User Training manual on Unplanned / Breakdown Maintenance Process consists of the following sequence of sub-processes

1. 2. 3. 4. 5. 6. 7.

Creation of Notifications – transaction Code IW21 Changing the PM Notifications – Transaction Code IW22 Create Breakdown maintenance Order for Notification – Transaction code IW34 Changing the maintenance Order – Transaction Code IW32 PM Order Confirmation – Transaction code IW44 Change PM Notification – Transaction Code IW22 Change Order – Transaction Code IW32

TRF/EPM3.0 Page 2 of 48

!!"

#$!!

Project: MISSION SURE

1. Create Notification - Transaction code IW21 Procedural Steps

Purpose •

Creating Notifications

Transaction Code IW21

Navigation: SAP Easy Access > Logistics > Plant maintenance > Maintenance Processing > Notification > IW21 – Create (General)

Procedure Enter the Transaction code IW21 in the command field as shown in the screen below

Or go as per the navigation shown below and click IW21 – Create (General)

TRF/EPM3.0 Page 3 of 48

!!"

#$!!

Project: MISSION SURE

Press or click on the check mark

icon in the top left side corner of the

Screen, the following screen will appear

TRF/EPM3.0 Page 4 of 48

!!"

#$!!

Project: MISSION SURE

In the above screen, click on the Notification Type field, a drop down icon appears at the end of the field, and click on this field to get the drop down list (see below screen)

And select and double click on the Notification Type “M2”, to get it populated on the screen. TRF/EPM3.0 Page 5 of 48

!!"

#$!!

Project: MISSION SURE The notification is used, for external number assignment. Since system is configured for Internal Notification Number assignment, Do not enter any data in this field. The Reference – Notification field is used, when we like to create a Notification, by copying the details of an already created Notification. Do not enter any data in this field.

Click on the check mark

icon, the following screen appears.

Key-in the descriptio n

a) Key-in the description of Notification button will appear at the end

b) Click on the Functional Loc field, a drop down icon of the field, and click this

icon to get the following drop down menu (as shown below)

TRF/EPM3.0 Page 6 of 48

!!"

#$!!

Project: MISSION SURE

Click on the check mark appears.

button of the above pop up window, the following screen

Select (click once) the required location and click on the check mark populate the value in to the field.

button, to

c) Similarly, get the drop down list for the equipment (as shown below) for the Equipment field Note: while searching for the Equipment No, select the “ Equipment by technical ID tab in the followings earch

number” window.

TRF/EPM3.0 Page 7 of 48

!!"

#$!!

Project: MISSION SURE

Click on the check mark appears.

button of the above pop up window, the following screen

Select (click once) the required equipment Number and click on the check mark button, to populate the value in to the field. d) get the drop down list for the Planner group field, as shown below

TRF/EPM3.0 Page 8 of 48

!!"

#$!!

Project: MISSION SURE In the above screen, select (click once on the line) the required group, and click on the check mark

button to populate the value on the field.

e) Similarly get the drop down list and populate the value on to the Main WorkCtr. field. f) Similarly get the drop down list and populate the value of the Person respons. Field g) Similarly get the drop down list and populate the value of the Reported by field h) Also if required, enter textual matter in the Subject Long Text field After populating all the above values, the screen will look as shown below.

TRF/EPM3.0 Page 9 of 48

!!"

#$!!

Project: MISSION SURE

Click the check mark long Text field)

Click the save screen

button to save the record. (Note the change in the Subject

button to save the record., the system returns back to the following

TRF/EPM3.0 Page 10 of 48

!!"

#$!!

Project: MISSION SURE

With the following message at the status line

Note: Note Down the Notification Number for future reference

End of document on T-code IW21

TRF/EPM3.0 Page 11 of 48

!!"

#$!!

Project: MISSION SURE

2. Changing the Pm Notification - Transaction code IW22 Procedural Steps

Purpose •

Changing the Notifications

Transaction Code IW22

Navigation: SAP Easy Access > Logistics > Plant maintenance > Maintenance Processing > Notification > IW22 – Change

Procedure Enter the Transaction code IW22 in the command field as shown in the screen below

Or go as per the navigation shown below and click IW22 - Change

TRF/EPM3.0 Page 12 of 48

!!"

#$!!

Project: MISSION SURE

Press or click on the check mark

icon in the top left side corner of the

Screen, the following screen will appear Key-in the Notification number in the Notification field (refer screen below)

TRF/EPM3.0 Page 13 of 48

!!"

#$!!

Project: MISSION SURE

Click the check mark

button to get the next screen, as shown below

TRF/EPM3.0 Page 14 of 48

!!"

#$!!

Project: MISSION SURE Scroll down (as shown below) to enter the Cause details in the screen.

Click on the drop down

cause code field to get the drop down

button, and then click on this

button to get the following drop down list

TRF/EPM3.0 Page 15 of 48

!!"

#$!!

Project: MISSION SURE

Expand the right side arrow below

button of the MECH cause; the screen will look as

Select (click once on the line) the required line and press the choose button. The value will get populated in to the cause Code field. Key-in the Cause text as required. The screen will look as below

TRF/EPM3.0 Page 16 of 48

!!"

#$!!

push

Project: MISSION SURE

Click on the put in process

button,

And

Click the save screen

button to save the record. The system returns back to the following

With the following message at the status line

End of documentation on T-code IW22

TRF/EPM3.0 Page 17 of 48

!!"

#$!!

Project: MISSION SURE

3. Create Breakdown maintenance order for notification – Transaction Code IW34 Procedural Steps

Purpose Creating Breakdown maintenance order for notification

Transaction Code IW34

Navigation: SAP Easy Access > Logistics > Plant maintenance > Maintenance Processing > Order > Create (Special) > IW34 – Order the Notification

Procedure Enter the Transaction code IW34 in the command field as shown in the screen below

Or go as per the navigation shown below and click IW34 – Order for Notification

TRF/EPM3.0 Page 18 of 48

!!"

#$!!

Project: MISSION SURE

icon in the top left side corner of the

Press or click on the check mark Screen, the following screen will appear

Key-in the Notification number in the Notification field (refer screen below)

TRF/EPM3.0 Page 19 of 48

!!"

#$!!

Project: MISSION SURE

Click on the drop down

button of the Order type, the following drop down list appears

TRF/EPM3.0 Page 20 of 48

!!"

#$!!

Project: MISSION SURE

Select (click once on the line) “PM02 – Breakdown Maintenance Order” (refer above screen) , and click on the check mark button to get the value populated in the Order Type field. The screen will look as shown below.

Do not key-in any value in any of the other fields.

Click the check mark

button, the following screen appears

TRF/EPM3.0 Page 21 of 48

!!"

#$!!

Project: MISSION SURE

Click on the Operation tab, to key-in the operation details that are to be done for this notification, the following screen appears

TRF/EPM3.0 Page 22 of 48

!!"

#$!!

Project: MISSION SURE Add the operation “Check power supply (refer screen below)

Selecting Component - Stock items

Click on the Components tab to assign the components that are required for the operations, the following screen appears

Click on the drop down

Click on the drop down down list appears,

button of the components field, the following screen appears

button of the material Type field, the following drop

TRF/EPM3.0 Page 23 of 48

!!"

#$!!

Project: MISSION SURE

Select the material type “ERSA” and click on the check mark populated on the Material type field, as shown in screen below

TRF/EPM3.0 Page 24 of 48

!!"

button to get the value

#$!!

Project: MISSION SURE

Click on the check mark button of the above window, to get the components drop down list, as shown in screen below

Scroll the list up and down and locate the required component, and select this component button of the above window, to get the value populated and click on the check mark on the components field. (the screen will look as shown below)

Similarly locate and get the component required for the next operation. The screen will look as shown below, after populating the value in the field. Also key-in the values for the following fields (refer screen below) a) Quantity b) Unit c) Plant d) Operation No

TRF/EPM3.0 Page 25 of 48

!!"

#$!!

Project: MISSION SURE

button , the following screen appears, showing the Click on the check mark description and procurement type for the components.

Select the above two line items of the components and Click on the material availability (overall) button to check the availability of the material. The following message appears at the status line

Since the material is available, it is reserved for this notification, and no PR need to be raised to get the material.

For procurement of external Services Go to the Operations tab, change the control key to PM03 (Plant maintenance - external services), and key in the operation description as “External services”. (Refer screen below)

TRF/EPM3.0 Page 26 of 48

!!"

#$!!

Project: MISSION SURE

And press the External

push button at the bottom of the screen

The following screen appears

In the above screen, key-in the following details a) Short text b) Quantity c) UOM d) Gross Price and then click on the check mark button, the system will populate the cost element value automatically (refer screen below)

TRF/EPM3.0 Page 27 of 48

!!"

#$!!

Project: MISSION SURE

Click the save screen

button to save the record. The system returns back to the following

With the following message at the status line

Note down this Order number to, which will be used while drawing the materials from the stores.

End of documentation on T-code IW34

TRF/EPM3.0 Page 28 of 48

!!"

#$!!

Project: MISSION SURE

4. Change the Breakdown maintenance Order of a Notification – Transaction Code IW32 Procedural Steps

Purpose Change the Breakdown maintenance Order of a Notification

Transaction Code IW32

Navigation: SAP Easy Access > Logistics > Plant maintenance > Maintenance Processing > Order > IW32 – Change

Procedure Enter the Transaction code IW32 in the command field as shown in the screen below

Or go as per the navigation shown below and click IW32 - Change

TRF/EPM3.0 Page 29 of 48

!!"

#$!!

Project: MISSION SURE

Press or click on the check mark

icon in the top left side corner of the

Screen, the following screen will appear Key-in the Order Number in the Order field (refer screen below)

TRF/EPM3.0 Page 30 of 48

!!"

#$!!

Project: MISSION SURE

click on the check mark

button, the following screen appearsr

TRF/EPM3.0 Page 31 of 48

!!"

#$!!

Project: MISSION SURE

Click on the release

button, to release the order. The following screen appears.

In the above screen, key-in the

Requisition Number and Tracking No.

Once the values are keyed-in, the screen will look as shown below

Click on the check mark

button, the following screen will appear

TRF/EPM3.0 Page 32 of 48

!!"

#$!!

Project: MISSION SURE

With the following message at the status line.

Click the save

button, the system will return back to the following screen

TRF/EPM3.0 Page 33 of 48

!!"

#$!!

Project: MISSION SURE

With the following message at the status line

End of document on T=code IW32

TRF/EPM3.0 Page 34 of 48

!!"

#$!!

Project: MISSION SURE

5. Order Confirmation – Transaction Code IW44 Procedural Steps

Purpose Order Confirmation

Transaction Code IW44

Navigation: SAP Easy Access > Logistics > Plant maintenance > Maintenance Processing > Completion confirmation > Entry > Collective time confirmation. IW44 – Without Selection

Procedure Enter the Transaction code IW44 in the command field as shown in the screen below

Or go as per the navigation shown below and click IW44 – without Selection

TRF/EPM3.0 Page 35 of 48

!!"

#$!!

Project: MISSION SURE

Press or click on the check mark

icon in the top left side corner of the

Screen, the following screen will appear Key-in the Order Number in the Order field (refer screen below)

TRF/EPM3.0 Page 36 of 48

!!"

#$!!

Project: MISSION SURE

Key-in the values for the following fields a) Order No b) Operation No c) Note: F N

Check mark stands for stands for

in the check boxes

of F and N fields

Final confirmation and No remain Work

Once all the values are keyed in fro all the three operations of the order, the screen will look as below

button, the screen automatically populating values in other Click the check mark required fields as shown below

TRF/EPM3.0 Page 37 of 48

!!"

#$!!

Project: MISSION SURE

Click the save

button, the system will return back to the following screen

With the following message at the status line

Return back to the SAP Easy Access Screen or Home Screen. End of document of T-code IW44

TRF/EPM3.0 Page 38 of 48

!!"

#$!!

Project: MISSION SURE

6. Completion of Notification – Transaction Code IW22 Procedural Steps

Purpose Notification Completion

Transaction Code IW22

Navigation: SAP Easy Access > Logistics > Plant maintenance > Maintenance Processing > Notification > IW22 – Change

Procedure Enter the Transaction code IW22 in the command field as shown in the screen below

Or go as per the navigation shown below and click IW22 – without Selection

TRF/EPM3.0 Page 39 of 48

!!"

#$!!

Project: MISSION SURE

icon in the top left side corner of the

Press or click on the check mark Screen, the following screen will appear

Key-in the Notification Number in the Notification field (refer screen below)

TRF/EPM3.0 Page 40 of 48

!!"

#$!!

Project: MISSION SURE

click on the check mark

button, the following screen appears

TRF/EPM3.0 Page 41 of 48

!!"

#$!!

Project: MISSION SURE

Update the Malfunction data. b) Key-in the malfunction end date and time

and click the check mark

Click on the completion flag following screen appears.

button, the screen will look as below

button, and then click on the save

TRF/EPM3.0 Page 42 of 48

!!"

#$!!

button, the

Project: MISSION SURE With the following message at the status line

End of document of T-code IW22

TRF/EPM3.0 Page 43 of 48

!!"

#$!!

Project: MISSION SURE

7. Change Order – Transaction Code IW32 Procedural Steps

Purpose Change Order

Transaction Code IW32

Navigation: SAP Easy Access > Logistics > Plant maintenance > Maintenance Processing > Order > IW32 – Change

Procedure Enter the Transaction code IW32 in the command field as shown in the screen below

Or go as per the navigation shown below and click IW32 – Change

TRF/EPM3.0 Page 44 of 48

!!"

#$!!

Project: MISSION SURE

Press or click on the check mark

icon in the top left side corner of the

Screen, the following screen will appear Key-in the Order Number in the Order field (refer screen below)

TRF/EPM3.0 Page 45 of 48

!!"

#$!!

Project: MISSION SURE

Click on the check mark

button, the following screen appears

TRF/EPM3.0 Page 46 of 48

!!"

#$!!

Project: MISSION SURE

button, the following pop up window

Click on the technical completion flag appears

Click on the check mark following screen

button of the above screen, the system will return back to the

With the following message at the status line

End of document of T-code IW32

End of Training Manual on Breakdown Maintenance process, Document No: TRF/EPM/3.0 !!" #$!!

TRF/EPM3.0 Page 47 of 48

!!"

#$!!

Project: MISSION SURE

TRF/EPM3.0 Page 48 of 48

!!"

#$!!