Sample_2 Procedure for Management Review

February 22, 2019 | Author: Kauser Kazmi | Category: Quality Management System, Iso 9000, Tecnología, Government, Política
Share Embed Donate


Short Description

Download Sample_2 Procedure for Management Review...

Description

MANAGEMENT REVIEW Prepared By: Management Management Representative Representative Approved By: Director

AMENDMENT SHEET

Revision Status

Page No.

Description of Revision

Issue 1, dated 1/0 /01 1/2 /20 011

Document ID: WM-QP-08

Copy No.

Revision: , dated

Document Title: Management Review

Page 1 of 6

Revision No.

0

Rev. Date

01/01/2011

Nil

First draft

NOTE: Upon receipt of amendments, please

a) Remove and destroy the amended sheet(s) / page(s)  b) Replace it with superseded sheet(s) / page(s) c) Check the controlled status d) Inform any discrepancy observed to Management Representative immediately.

Issue 1, dated 1/01/2011

Document ID: WM-QP-08

Copy No.

Revision: , dated

Document Title: Management Review

Page 2 of 6

CONTENTS 1

PURPOSE

2

SCOPE OF APPLICATION

3

DEFINITIONS AND ABBREVIATIONS

4

INTERFACES WITH OTHER DOCUMENTS

5

RESPONSIBILITY FOR APPLICATION

6

PROCESS

7

AFFILIATED RECORDS

8

FILING

9

PROCESS MEASURES

Issue 1, dated 1/01/2011

Document ID: WM-QP-08

Copy No.

Revision: , dated

Document Title: Management Review

Page 3 of 6

1.

PURPOSE

To ensure that the company quality management system is relevant, to both existing and anticipated customer and marketplace trends, achieving what it ought to achieve and being implemented in the manner intended.

2.

SCOPE OF APPLICATION

Keyzed consultants quality management system and business activitie s.

3.

DEFINITIONS AND ABBREVIATIONS Review: Activity undertaken to determine the suitability, adequacy and effectiveness of the subject matter to achieve established objectives

3.1 3.2 3.3

MR – Management Representative QMS –Quality Management System WM – Keyzed consultantsFZE

4.

INTERFACES WITH OTHER DOCUMENTS

ISO 9001:2000, Cl. 5.6

5.

RESPONSIBILITY FOR APPLICATION

Management Representative and Director/ Assigned Staff 

6.

PROCESS

6.1

Management Review Frequency

WM management shall review the quality management system once every year to ensure its continuing suitability, adequacy and effectiveness. The review shall include assessing opportunities and need to change QMS including quality policy and objectives.

6.2

Management Review Meeting

Issue 1, dated 1/01/2011

Document ID: WM-QP-08

Copy No.

Revision: , dated

Document Title: Management Review

Page 4 of 6

The Management Review meeting is chaired by Managing Director and as minimum attended by: - Management Representative - Marketing Consultant The Managing Director/ General Manager may request other members of staff to  participate in the management review meeting. An agenda for Management review meeting is prepared by Management Representative based on feedback, received in relation to the company’s Quality system. Minutes of such reviews are recorded and approved prior to final distribution.

The agenda for Management Review Meeting shall cover the following as minimum: • • • • • • • • • • • • • •

6.3

Review of quality system effectiveness The suitability & status of policy, objectives and procedures Results of internal / external quality audit Non conformities, corrective and preventive action Customers complaints and feedback  Training needs Suppliers performance Adequacy of existing resources. Reports from managerial and supervisory personnel Assessments from external bodies Changes in the volume and type of work  Changes in the local rules and regulations Effectiveness of QMS Process performance and Product conformity

Management Review Output

Minutes of the Management Review meeting shall be taken by the management representative. The minutes shall contain the decisions and actions related to: • • • •

6.4

Improvement of the effectiveness of the QMS and its processes Improvement of product related customer requirements Resource needs  Needed changes for policy and objectives.

Implementation of Decisions

Issue 1, dated 1/01/2011

Document ID: WM-QP-08

Copy No.

Revision: , dated

Document Title: Management Review

Page 5 of 6

Management Representative shall draw up an action plan and monitor the implementation of the decisions taken.

7.

RECORDS

Management Representative shall keep following records: • •

8.

Minutes of the Meeting Decisions and action monitoring log

FILING

The master copy of this procedure is filed by the Management Representative, together with other procedures under the number  WM-QP-08

9.

PROCESS MEASURES

The decisions taken in the management review shall be monitored for its effectiveness using following targets:



100% times the actions taken for the improvement shall be implemented within the agreed time span.

Any discrepancies against the set targets shall be reported to the General Manager   by the MR. Corrective action shall be taken as appropriate following the procedure WM-QP- 05.

Issue 1, dated 1/01/2011

Document ID: WM-QP-08

Copy No.

Revision: , dated

Document Title: Management Review

Page 6 of 6

View more...

Comments

Copyright ©2017 KUPDF Inc.
SUPPORT KUPDF