A. RESIDENTIA RESIDENTIAL L BUILDING COSTING ITEM NO. 1

SCOPE OF WORKS

PLAN PLANS S & PRO PROFE FESS SSIO IONA NAL L FEE FEE PERM PERMIT IT & LIC LICEN ENSE SES S MOBI MOBILIZ LIZATI ATION ON/DE /DEMO MOBI BILIZ LIZATI ATION ON TEMPORARY FACILITIES F RE REIGH T C HA HAR G GE E OVER OVERHE HEAD AD SUPE SUPERV RVIS ISIO ION N

2

SITE SITEWO WORK RKS S AND AND EART EARTHW HWOR ORKS KS

3

PHONE,BARRACKS,OFFICE &ETC.

EXCAVATION BACKFILLING &COMPACTION LAYO LAYOUT UT & STAK STAKIN ING G GRAVEL BASE

AT 0.5M DEEP ONLY AT 0.5M DEEP ONLY

CONCRETE WORKS

3000 PSI

G-1

3.1 ISOLATED FOOTING 3.2 EXTERIOR EXTERIOR STRIP FOOTING FOOTING 3.3 INTERIOR STRIP FOOTING FOOTING 3.4 SLAB ON ON FILL(HORIZONTAL) FILL(HORIZONTAL) 3.5 COLUM COLUMN N 3.6 BEAM BEAM 3.7 STAIRS STAIRS 3.8 SUSPENDED FLOOR SLAB 3.9 CONCRETE CONCRETE WALL 3.10 COUNTER COUNTER 3.11 ELECTRICAL POST 3.12 SEPTIC SEPTIC TANK TANK 3.13 CATCH BASIN 4

4.1 4.1 4.2 4.2

QTY

UNIT

UNIT PRICE

233.11 233.11 1.00 1.00 1.00 1.00

SQ.M SQ.M LOT LOT LOT LOT

       

312.50 312.50 90,000.00 40,500.00 90,000.00 93,600.00

34.03 113.45 233.11 11.34

CU.M CU,M SQ.M CU.M

 

250.00 812.50 37.50 2,406.25

6.48 12.69 9.28 11.52 5.13 4.35 2.53 22.51 43.91 0.69 0.41 2.09 0.43

CU.M CU.M CU.M CU.M CU.M CU.M CU.M CU.M CU.M CU.M CU.M CU.M CU.M

                         

5,997.19 5,997.19 5,997.19 5,997.19 5,997.19 5,997.19 5,997.19 5,997.19 5,997.19 5,997.19 5,997.19 5,997.19 5,997.19

72,846.88 72,846.88 90,000.00 40,500.00 90,000.00 93,600.00 8,508.60 92,176.50 8,741.63 27,298.43 38,861.78 76,115.10 55,631.71 69,116.39 30,765.57 26,116.55 15,178.40 134,992.19 263,342.50 4,120.97 2,428.86 12,522.13 2,590.79

454.75 848.12

KG KG

68.30 68.30

31,061.19 57,929.62

AMOUNT

G EN EN ER ER AL AL RE RE QU QU IR IR EM EM EN EN TS TS

1.1 1.1 1.2 1.2 1.3 1.4 1 .5 .5 1.6 1.6

2.1 2.2 2.3 2.3 2.4

MATERIALS SPECIFICATION

REINFORCEMENT

ISOL ISOLAT ATED ED FOO FOOTING TING EXTE EXTERI RIOR OR STR STRIP IP FOO FOOTI TING NG

GRADE 33 OR GRADE 40

Trusted by over 1 million members

Try Scribd FREE for 30 days to access over 125 million titles without ads or interruptions! Start Free Trial Cancel Anytime.

Trusted by over 1 million members

Try Scribd FREE for 30 days to access over 125 million titles without ads or interruptions! Start Free Trial Cancel Anytime.

4.3 4.3 INTE INTERI RIOR OR STRI STRIP P FOO FOOTI TING NG 4.4 4.4 SLAB SLAB ON ON FILL FILL(H (HOR ORIZ IZON ONTA TAL) L) 4.5 COLUMN 4.6 BEAM 4.7 STAIRS 4.8 4.8 SUSP SUSPEN ENDE DED D FLOO FLOOR R SLAB SLAB 4 .9 .9 CO ON NC RE RET E W AL AL L 4.10 4.10 WALL WALL OPENI PENING NG   4.11 COUNTER 4.12 ELECTRICAL POST POST (30CM X30CM) 4 .1 .1 3 SEP TI TIC T AN AN K 4 .1 .1 4 C AT AT CH CH B AS ASIN 4.15 G. G . I. W IRE 5

5.1 5.1 5.2 5.2 5.3 5.4 5.4 5 .5 .5 5.6 5.7 5.8 6

6.1 6.2 6.3 6.4

FORMWORKS

COLU COLUMN MN (30C (30CM M X20 X20CM CM)) BEAM BEAM (30C (30CM M X 30CM 30CM)) STAIRS SUSP SUSPEN ENDE DED D FLOO FLOOR R SLAB SLAB CO ON NC RE RET E W AL AL L COUNTER ELECTR ELECTRICA ICAL L POST POST (30CM (30CM X30CM X30CM)) SEPTIC TANK

       

#16

619.88 473.29 1,016.74 1,026.39 463.00 3,198.11 2,079.62 803.00 37.63 60.00 85.00 122.00 11.00

KG KG KG KG KG KG KG KG KG KG KG KG KG KG KG KG ROLLS

 

68.30 68.30 68.30 68.30 68.30 68.30 68.30 68.30 68.30 68.30 68.30 68.30 2,250.00

METAL/STEEL METAL/STEEL DECK/WOOD FORMWORKS

STEEL DECK OR EQUAL

68.40 58.06 12.88 180.07 702.58 9.16 5.40 33.12

SQ.M SQ.M SQ.M SQ.M SQ.M SQ.M SQ.M SQ.M

202.90 14.77 189.80 1.65

SQ.M CU.M L.M CU.M

350.00 350.00 350.00 987.50 350.00 350.00 350.00 350.00

MASONRY

MASONRY RETOUCH FLOOR TOPPING W INDOW & DOOR SILL CANOPY

20% OF W ALL AREA 2" THICK 2" X 4" CONCRETE

   

187.50 5,997.19 275.00 5,997.19

42,340.14 32,327.06 69,447.19 70,106.04 31,624.55 218,442.62 142,045.81 54,847.77 2,569.94 4,098.21 5,805.80 8,333.04 24,750.00 23,940.00 20,322.40 4,508.00 177,823.08 245,901.60 3,206.70 1,890.00 11,592.00 38,044.28 88,555.07 52,195.00 9,913.35

Trusted by over 1 million members

Try Scribd FREE for 30 days to access over 125 million titles without ads or interruptions! Start Free Trial Cancel Anytime.

7.10

8.00

1HP PRESSURE PRESSURE PUMP PUMP + 82 GAL GAL STAIN STAINLESS LESS MATERIALS BUDGET (PHP 35,000) PRESSURE TANK

1.00

SET

 

ELECTRICAL WORKS FIT OUT

1.00

LOT

  482,557.10

17.40 7.12 63.06 1.00

SQ.M SQ.M SQ.M SET

3MM THK POLYETHYLENE SHEET

115.25

SQ.M

37.50

12MM THHK GYPSUM BOARD ON METAL FRAMING 4.5MM FICEMBOARD ON METAL FRAMING

160.87 21.00 2.00 49.37

SQ.M SQM PCS SQM SQM

712.50 712.50 687.50 712.50

CONDUITS UTILITY BOX JUNCTION BOX PANEL BOARD OUTLET SWITCHES PINLIGHT CENTER LIGHT WALL LAMP 9

37,500.00 482,557.10

NELTEX ORANGE PIPES OR EQUAL

PANASONIC PANASONIC (MATERIALS BUDGET PHP500) (MATERIALS BUDGET PHP1,200) (MATERIALS BUDGET PHP1,200)

METAL WORKS

9.1 9.2 9.2 9.3

W INDOW GRILLS STAIR RAILINGS BACLONY RAILINGS SPIRAL STAIRS

10

THER THERMA MAL L AND AND MOIS MOISTU TURE RE PROT PROTEC ECTI TION ON

10.1

37,500.00

DAMPROOFING

11

C EI EIL IIN N G FIN IS IS HE HE S

11.1 11.2 11.3 11.3 11.4 11.5

INTERIOR CEILING CEILING EAVES PVC PVC AIR AIR VENT VENT DRYW ALL COVE CEILING

EXTERIOR STEEL STEEL STEEL

4.5MM FICEMBOARD ON METAL FRAMING 12MM THHK GYPSUM BOARD ON METAL FRAMING

       

2,097.89 2,097.89 2,097.89 43,750.00

36,503.25 14,936.96 132,292.82 43,750.00 4,321.80 114,622.73 14,962.50 1,375.00 35,174.70

Trusted by over 1 million members

Try Scribd FREE for 30 days to access over 125 million titles without ads or interruptions! Start Free Trial Cancel Anytime.

14.3 14.3 14.2 15

1 5. 5.1

TILE TILE GROU GROUT T KITCHEN COUNTER TOP

W AL AL L TIL ES ES

ADHES ADHESIVE IVE CEMEN CEMENT T TILE TILE GROU GROUT T

15.2 15.2

DECO DECORA RATI TIVE VE STO STONE NES S

17

18

18.1 18.2 18.3 18 4

SQM SQM

83.33 5,625.00

24,610.17 84,847.50 -

59.40

SQM

683.33

60.30 60.30

SQM SQM

110.42 83.33

40,590.00 6,658.13 5,025.00 -

27.30

SQM

770.83

1.00 9.00 3.00

SET SETS SETS

26.00 12.00 1.00 1.00 14.00

SETS SETS SETS SETS PCS

141.31 141.31 23.00 7 32

LM LM PCS LM

 

 CERAMIC TILES BUDGET PHP120 PER 60CMX60CM TILES (AT 1.8METER HEIGHT)  OR PHP30 PER 30CMX30CM ABC ABC OR EQUAL EQUAL ABC ABC OR EQUAL EQUAL CERAMIC TILES BUDGET PHP120 PER 60CMX60CM TILES

DOORS

16.1 D1 (1.2M X 2.1M) 16.2 D2 (0.8M X 2.1M) 16.3 D3 (0.7M X 2.1M)

1 7. 7.1 17.2 17.2 17.3 17.3 17.4 17.5 17.5

295.32 15.08

WALL FINISHE S

15.2 15.2 15.3 15.3

16

ABC ABC OR EQUAL EQUAL GRANITE CHINA

DOORS FIXT UR URE

METAL DOOR METAL DOOR METAL DOOR

     

8,750.00 8,750.00 8,750.00

 

412.50 812.50 1,562.50 562.50 156.25

HAFELE OR EQUAL

DO OO OR H IN IN G GE ES DOOR DOOR KNOB(L KNOB(LEV EVER ER TYPE) TYPE) MAIN MAIN DOOR DOOR LOCK LOCK SET SET DEAD LO LOCK DOO DOOR STO STOPP PPER ER CARPENTRY

BASEBOARDS CORNICE STAIR THREAD STAIR HAND RAIL

1" X 3" 1" X 3" SOLID W OOD SOLID W OOD

 

203.75 203.75 1,918.80 399 75

21,043.75 8,750.00 78,750.00 26,250.00 10,725.00 9,750.00 1,562.50 562.50 2,187.50 28,791.91 28,791.91 44,132.40 2 926 17

Trusted by over 1 million members

Try Scribd FREE for 30 days to access over 125 million titles without ads or interruptions! Start Free Trial Cancel Anytime.

EXCLUDED ITEM

DEEPW ELL SOIL BO BORING TE TEST(OPTIONAL) BOND AND INSURANCE FURNITURES  APPLIANCES

PERMANENT ELECTRIC CONNECTION TRANSFORMER IF IF RE REQUIRED AIRCON UNITS GENERATOR IF REQUIRED

RESIDENTIAL BUILDING COST:

5,586,861.55

TOTAL SQUARE METER PRINCE RANGE PER SQUARE METER

233.11 23,966.63

B. SITE DEVELOPMEN DEVELOPMENT, T, FENCE & GATE GATE ITEM NO. 1

2.1 2.2 2.3 3

SCOPE OF WORKS

MATERIALS SPECIFICATION

UNIT

UNIT PRICE

AMOUNT

SITE SITEWO WORK RKS S AND AND EART EARTHW HWOR ORKS KS

EXCAVATION BACKFILLING &COMPACTION GRAVEL BASE

AT 0.5M DEEP ONLY AT 0.5M DEEP ONLY G-1

CONCRETE WORKS

3000 PSI

3.1 ISOLATED FOOTING 3.2 EXTERIOR EXTERIOR STRIP FOOTING FOOTING 3.3 SLAB ON ON FILL(HORIZONTAL) FILL(HORIZONTAL) 3.4 COLUM COLUMN N 3.5 CONCRETE CONCRETE WALL 4

QTY

REINFORCEMENT

GRADE 33 OR GRADE 40

70.00 280.50 6.00

CU.M CU,M CU.M

 

250.00 812.50 2,406.25

6.30 12.60 9.00 5.10 13.14

CU.M CU.M CU.M CU.M CU.M

         

5,997.19 5,997.19 5,997.19 5,997.19 5,997.19

17,500.00 227,906.25 14,437.50 37,782.28 75,564.56 53,974.69 30,603.65 78,803.04 -

Trusted by over 1 million members

Try Scribd FREE for 30 days to access over 125 million titles without ads or interruptions! Start Free Trial Cancel Anytime.

OUTLET WALL LAMP 7

7.1 7.2 7.3 8

8.1 8.2

PANASONIC (MATERIALS BUDGET PHP1,200)

METAL WORKS

CAR GATE PEDESTRIAN GATE FENCE RAILINGS

STEEL STEEL STEEL

6.30 1.80 58.95

SQ.M SQ.M SQ.M

323.28 67.05

SQM SQM

     

4,370.60 4,370.60 2,097.89

27,534.78 7,867.08 123,670.50

375.00 375.00

121,230.00 25,143.75

PAIN PAINTI TING NG AND VARN VARNIS ISHI HING NG

MASO MASONRY NRY SURFAC SURFACE E METAL SURFACE

VALIDITY OF OFFER IS : 7 DAYS PAYMENT: 30% DOWN PAYMENT 70% PROGRESS BILLING

BOYS BOYSEN EN OR EQUAL EQUAL BOYSEN OR EQUAL

SITE DEVELOPMENT,FENCE & GATE COST:

1,230,335.69

TOTAL AMOUNT:

6,817,197.25