Description
Job No.
Sheet No.
1
Rev.
Project Tittle: TH HE E PRO PO POS E ED D CON ST ST R RU U CT CT IIO ON AND C OMP OMPL LE ET T IIO ON OF ROADWORKS PACKAGE R11D PUSAT PENTADBIRAN Member/Location: KERAJAAN PERSEKUTUAN PUTRAJAYA PERUNDING ZAR S/B
Drg. Ref.
Job Title :
Made by :
DRAINAGE R11D
Sample calculation for Line 1. P6/U1L-1 - Line 1
CH
880
-
CH
1125
=
Pavement Runoff, W
Additional 15% 15%
=
245.0
x
=
1960.0
m²
=
1.15
x
=
2254
m²
=
0.225
ha
8.1
=
Verge Runoff, W
Additional 15% 15%
m
8.0
8.0
1960.0
m²
m
=
245.0
x
=
1984.5
m²
=
1.15
x
8.1
1984.5
m²
2282.175 m²
=
0.228
=
ha
Check for time overload, to
=
to
107
x
n
x L^(1/3)
S^(1/2) where n
=
0.011
L
=
8
m
S
=
2.5
%
=
107
x
=
1.5
min
:.
8 0.011 x 2.5 ^(1/2)
^(1/3)
Bob
Date :
Remark
Job No.
Sheet No.
2
Rev.
Project Tittle: TH HE E PRO PO POS E ED D CON ST ST R RU U CT CT IIO ON AND C OMP OMPL LE ET T IIO ON OF ROADWORKS PACKAGE R11D PUSAT PENTADBIRAN Member/Location: KERAJAAN PERSEKUTUAN PUTRAJAYA PERUNDING ZAR S/B
Drg. Ref. PERKIRAAN REKABENTUK JALAN
Job Title :
Assume Vd
=
td
=
1.0
Made by :
Bob
Date :
m/s (average slope 2 - 4%)
L/V
=
245
/
=
245
sec
=
245
/
=
4.1
1.0
60
min
Therefor,
Time of concentration, tc c
=
o +
=
1.5
+
=
5.6
min
4.1
Checking for Rainfall Intensity, i. Rainfall intensity was based on frequency curve by Angkasa Consulting Services Sdn. Bhd., dwg no: AGHD/DUD/LCP/P AGHD/DUD/LCP/P5/DR03 5/DR03
However, the curve is only to a minimum time of concentration of 10 min. Therefor, the actual rainfall intensity less then 10 min need to be recalculate. Based on the calculation, in refer to the Urban Stormwater Management for Malaysia by Department of Irrigation and Drainage Malaysia, the rainfall intensity foo 100 years (maximum). i,100
=
mm/hr
1072
(see table A)
Therefor peak flow, Q Q
=
C
x
i
x
A
x
0.225
360 Q pave
=
0.95
x
1072 360
=
0.637
m³/s
Remark
Job No.
Sheet No.
3
Rev.
Project Tittle: TH HE E PRO PO POS E ED D CON ST ST R RU U CT CT IIO ON AND C OMP OMPL LE ET T IIO ON OF ROADWORKS PACKAGE R11D PUSAT PENTADBIRAN Member/Location: KERAJAAN PERSEKUTUAN PUTRAJAYA PERUNDING ZAR S/B Job Title :
Thank you for interesting in our services. We are a non-profit group that run this website to share documents. We need your help to maintenance this website.