Acceptance testing shall be carried out by the Contractor. The Contractor shall perform all tests required for commissioning and integration of the Equipment, Software and/or Services, as per the latest approved Schedule 3.
Check that the cabinet doors and locks operate correctly.
Fail
N/A
Remark
Fail
N/A
Remark
Fail
N/A
Remark
Fail
N/A
Remark
Remarks Site Documentation Procedure 3 4
Pass
Check that the equipment is installed according to the as plan site design package. Check that the indoor cable ladder is installed according to the as plan side design package (applicable for Indoor Equipment)
Remarks Civil Works Check Procedure
Pass
5
Check that the cabinets have been securely fastened and are levelled correctly.
6
Check that indoor cable ladder above the cabinet has been installed correctly (applicable for Indoor Equipment).
7
Check that the DDF are grounded to the main grounding bus bar.
Remarks Equipment Specific Checks Procedure 8
Check that all equipment internal cables are correctly installed and labelled.
9
Check that the cabinet blanking panels have been installed.
Check that the antenna layout is according to the site drawing.
37
Check that the feeder cable ladder is installed as per the site drawing.
38
Check that the feeder gland plate is installed as per the site drawing (applicable for Indoor Equipment)
Remarks SITE:
Fail
N/A
SITE CONFIG:
Remark
DATE: Civil Works Inspection
Procedure 39
40
Pass
Fail
N/A
Remark
Fail
N/A
Remark
Check that the feeder cable ladder is correctly installed Check that the feeder grand plate has been correctly installed (applicable for Indoor Equipment).
2.3. BTS VSWR Test & Power transmitting power 2.3.1 Feeder system VSWR test result SITE:
SITE CONFIG:
D AT E :
V S W R a n d R et ur n L os s No.
Cell
Feeder VSWR
1
Cell 1
Feeder Length(m)
Distance To Fault (DTF)
Return Loss (dB)
Audit
RXD12 TRX11
2
Cell 2
RXD22 TRX 21
3
Cell 3
RXD32 TRX 31
Notes: 1. VSWR value shall be refer to the specification manual from the supplier 2. Setting at site master for cable 7/8" (vf and cable loss shall be refer to the specification manual from supplier) 3. Setting at site master for cable 1-5/8" (vf and cable loss shall be refer to the specification manual from supplier) 4. VSWR < 1.3 5. DTF test will be carried out according to the test procedure and test result included in the test documentation.
2.4.3 24 Hours Stability Test Site ID: The purpose of this test is to confirm that the BTS 2G is able to run for 24 hours without any faults.
RESULT:
Date:
Remark : Notes: The 24 hours is to be monitored from the TOC/NOC, and will be passed if BTS is in normal operation with no alarms.
2.4.4 Alarm query test 1. This test will be done from OMC (Region TOC) 2. The purpose of this test is to confirm that the BTS alarms are visible and there are no active alarms
RESULT:
Date:
Remark : Notes: if the site has no active alarms then write “OK, no active alarms”, otherwise record the alarm information in detail